EXECUTIVE SUMMARY
Master Site Plan & Urban Design Guidelines
May, 2007
Table of Contents
Section 1: Introduction 1
1.1 Project Introduction 1
1.2 Document Structure 1
1.3 Developing a New Mixed-Use Community 2
bmi pace
Brook Mcllroy Planning & Urban Design / Pace Architects
with,
MSAi Architects
Noel Harding
Urban Marketing Collaborative
Section 1: Introduction
1.1 Project Introduction
In January 2006, City Council endorsed the findings of
Olympia and York’s Highest and Best Use Study for Marina
Park. The study recommended a new mixed-use village at the
base of Red River Road that included recreational, office, retail
and residential uses. The study also strongly recommended
that the existing park and recreational program be retained,
expanded and blended with the new village area. This
relationship between park spaces and urban areas was
developed to expand the viability of the area as a year-round
recreational destination.
Further to endorsing the study, the City of Thunder Bay
retained the consultant team of Brook McIlroy Planning and
Urban Design/Pace Architects (Project Lead), MSAi Architects,
Urban Marketing Collaborative and Noel Harding Studio to
develop a more detailed vision for Marina Park. Under the
direction of the Waterfront Development Committee, and
with input from City Staff and local stakeholders, the team has View looking east between Pier 2 and Pier 1.
developed a Master Site Plan and Urban Design Guidelines to
guide the transition of Prince Arthur’s Landing at Marina into
a vibrant mixed-use urban park.
6 Established Parkland
Prince Arthur’s Landing at Marina Park
• Making a year-round destination on the waterfront • 30 metre set-back from the rail corridor;
for visitors and residents that can contribute to the
revitalization of Water Street and the Port Arthur • 300 metre set-back from residential from the Rail
neighbourhood. Shunting Yards;
• Designing an urban waterfront area that will become an • 300 metre restrictive covenant from the industrial lands
anchor component to improve connections along the to the south;
entire 52 kilometres of Lake Superior waterfront. • The existing established green and public spaces; and,
• Developing a mixed-use waterfront park that is unrivaled • The existing heritage structures including the CN Rail
in the Great Lakes. and Baggage Building
3.1 Design Constraints
The principle design constraints that informed the Master
Site Plan are outlined on the map below. These constraints
include:
Illustration of the Skating / Model Boat Pond during winter - the Water Garden Pavilion is shown on the left and the Artisan Market is shown on the
right.
Illustration of the Market Square - the Artisan Market Building is shown in the centre and the CN Building is shown on the left. The square is designed
8 to be flexible so it can accommodate a mix of potential uses like festivals, markets and parking. The Market Square is shown here as a parking area in
the winter months, supporting the year-round feasibility of businesses. In the summer it can be transformed to a public square and market area.
Illustration looking towards Prince Arthur’s Landing along Pier 2. The Pier is recommended for updated landscaping and walkways. A new visitors
marina is proposed on the right and temporary vending kiosks are proposed along the length of the Pier. 9
2-way Bike Path Spirit Garden Accessible Waterfront New and Updated Parking Areas
10
The Beacons
11
Wind Temperature Water Movement
Executive Summary - Master Site Plan and Urban Design Guidelines
4.3 Summary of Expanded Park Area
An expanded park area was an important requirement of
the Master Site Plan for Marina Park. The resulting park
area is shown below.
A new Artisan Market Building and Market Square Area introduces Expanded walking and cycling trails begins the process of connecting Thunder
12 new retail opportunities. Bay’s 52 km of Waterfront.
A variety of trail types are Some signage in Prince Arthur’s Landing can become Flexible multi-use parking lots are a
recommended. visible landmarks for the development. central theme of the Master Site Plan.
13
14
16
Flexible outdoor space along the waterfront support new festivals and 4. Material choices for buildings, walkways and other park
events in the park. elements should reflect the local character of Thunder
Bay, be of high quality and easily maintained.
5. Park and Village programming and tenancies should be
geared to support all-season use.
6. Environmentally sustainable design should be
employed wherever feasible including orienting
buildings to access natural light and ventilation,
integrating infrastructure systems, installing low water
and energy-use appliances, selecting native plant
species, using permeable paving materials, creating
green roofs, and taking advantage of opportunities for
alternative energy generation.
12. New buildings shall not have blank facades facing the LAKE SUPERIOR 4.5 m 3.0 m 4.5 m 0.6 m PLANTING
20
LIGHT STANDARD
LAKE EDGE
LAKE EDGE LAKE EDGE TREATMENT
TREATMENT TREATMENT
FLUSH CURB
- UNIT PAVERS OR
FEATURE PAVING
LIGHT STANDARD
LIGHT STANDARD
INFO BOARD
LIGHT STANDARD
3. Skate Boarding
Park
3. Skate Boarding
Park
PAINTED METAL
This pavilion is a The skate board The skate board
central building to the park program is park program is
activities areas guaranteed to be a guaranteed to be
located at the base of positive generator
for Marina Park. The
location of the park
RAILING
RAILING
PAINTED METAL
RAILING
21
4.5 m
La
Pier 1
S ec t i o n Lo o k i n g Wes t s h ow i n g Ur b a n D e s i g n R e co m m e n d at i o n s
A minimum continuous Marina Park Drive is to be
20 metre wide public treated as an extension of
linear park must be the park area with high
ne
60
Pla
De
incorporated along the quality planting and
gle
gre
water’s edge. Only paving. All roads from
An
eA
interruptions for access Pearl St. to Camelot St. will
ree
ng
to the water or water use unit pavers as the
le P
eg
facilities are permitted. primary material. Road
D
lan
design should
60
e
accommodate both
vehicular and pedestrian
travel. No portion of new
development shall exceed
All setbacks that occur
7 storeys or 25 metres plus
above third floor should be
mechanical, roof access or
a minimum of 2 metres.
penthouse.
A 60 degree angle
plane starting 4.5
metres from the face of
the building provides a
build to line for new
development within
the park
Maximum
Redevelopment
Envelope
the CN Building
Redevelopment
ree
An
3 metres
Envelope
gle
Min 1m setback
Pla
setback
ne
sidewalk boulevard traffic lane traffic lane traffic land boulevard sidewalk
and off peak
where parking lane
possible
Water Street Streetscape Improvements
10 metres from
face of building
to angle plane
23
Potential elevations for the Artisan Market Building shown from the front (facing the water) and from the side (facing the Market Square)
24
Long elevation of the potential mixed-use buildings, the CN Building and the Artisan Market Building
Prince Arthur’s Landing at Marina Park
Potential upper floor plan for the residential and hotel components of the mixed-use buildings.
Potential ground floor plan for the mixed-use buildings, with public uses along the active facades and parking against the tracks.
25