Sie sind auf Seite 1von 10

Diesel Technology Seminar

(2710/TRR)
Saturday 28th June 2003
08:00 Coffee
08:15 Vendors HSK
Controlled components
Sub suppliers
Subcontractors
Controlled components
09:15 Main engine alignment TRR
Shop
On board
10:30 Coffee
10:45 Cleanliness TBO
11:30 Safety SNN
12:00 Lunch
13:30 Shop test TBO
PMI
Performance evaluation
Sea trial
14:30 Alpha Lubricator System TBO
15:30 Coffee
15:45 Service experience TRR
17:00 Communication TRR
MBD - Licensee (LL, DUN)
MBD - Ship owner (SL)
MBD - Class
17:30 Summary and conclusion HSK/TRR
Evaluation of the seminar
HSK: Mr. H. S. Kofoed, General Manager Production Support
TRR: Mr. T. R. Rasmusssen, Engineer Production Support
SNN: Mr. Steen Normind, Engineer Production Support
TBO: Mr. T. Oxving, Superintendent engineer Operation
Flushing of Engine
3330277/20030619 (2160/KID)
Location of check bag and
blank flanges
Protection apron
Lube oil inlet
R
Manometer
Check bag
housing
Flexible hose
Man hole
Check bag
housing
Manometer
Flexible hose
Oil sample
10
1
6
5
7 9
2
4
3
3
8
Blanking off pipes:
1. Main bearing by-pass blanks
2. Crosshead bearings by-pass blanks
3. Blank-off bearings and spray
nozzles at main chain
4. Blank-off thrust bearing
5. Blank-off or by-pass axial vibration damper
6. Blank-off torsional vibration damper
7. Blank-off forward moment compensator
chain drive
8. Blank-off or by-pass turbocharger
9. Blank-off hydraulic chain tightener
10. Blank-off PTO-PTI power gear
Flushing of engine pipe system
Flushing of external piping system, until visible dirt has been removed
The standard full flow 50 micron filter basket should either be exhanged with a
10-25 microne filter basket, or additional 10-25 micron filter material should be
inserted inside the filter basket
Flushing of both external and internal piping system, but not the bearings.
The standard full flow 50 micron filter basket should either be exhanged with a
10-25 microne filter basket, or additional 10-25 micron filter material should be
inserted inside the filter basket .
Checkbag filter in the blind-end of the lubrication oil system
Portable vibrator or hammer should be used on the outside of lube oil pipes
during flushing (however be aware of natural frequency of the pipe systemand
the size of vibrators used may cause excessive stresses in the pipes and
welds.
Visual check of system pipe blind-ends by removing blank flanges.
Flushing duration normally 24-48 hours.
Flushing of Engine
3330278/20030619 (2160/KID)
Blank flanges
Main bearings Crosshead bearings
D
D
4
H
d2
D
D
9
d1
Diameter > d2
Diameter > D
I
Diameter < d1
H =
H =
Flushing of Engine
3330276/20030619 (2160/KID)
Checkbag
Sketch of check bag
housing:
Approximate
dimensions
7
0
3
9
0
160
75
3
6
0
Alternative
checkbag
(inside engine):
Flexible hose
4
0
0
180
80
Checkbag frame
Plate, welde
to housing
Checkbag monofil
filter cloth
50um
MAN B&W Diesel A/S







Checkbag: Is used for checking the system for content of visible, unwanted particles.

Particle counting: MAN B&W Diesel A/S recommend that in parallel to using the
checkbag, that cleanliness of the lube oil is checked by particle counting, in order to find
particle concentration, size and type of impurities.

When using particle counting, flushing should not be accepted as being complete until the
cleanliness is found to be within the range of the specified.

MAN B&W Diesel A/S specify ISO 4406 level ? 19/15

If test equipment for verification by particle counting is not directly available, we
recommend that the nearest test institute or a company working with hydraulic systems to
be contacted for assistance.
MAN B&W Diesel A/S







V x D
Re > ---------------- x 1000 > 3000
v (cSt )

Re = Reynold Number > 3000
V = Average flow velocity (m/s)
D = Pipe inner diameter
v = Kinematic viscosity (cSt)

It is highly recommended that the flushing oil flow should reach a minimum of Reynold Number equal to 3000 in order to have
sufficient turbulence in the pipes.

Normally an flushing oil temperature equal to 60-65 C would be sufficient also in terms to ensure that all inside rust protection
of pipes and engine parts is removed.