designated by REC 1 WAPCOS, Gurgaon Chhattisgarh 45 Inspections not due, as yet. 2 INTERTEK Karnataka 30 2 -do- Out of 30 material inspections conducted, 2 lot of material has been rejected (Insulator in respect of Belgum & Transformer in Case of gulbarga ) 3 Instrumentation Ltd, Kota Punjab 21 3 -do- 21 Material Inspections have been conducted & 3 have been rejected ( Guy Insulator & Shackle Insulator & Pole) 4 VOYANTS,Gurgaon Andhra Pradesh 45 3 -do- Out of 45 Material Inspections conducted, 3 lot of material 2 lots in respect of insulator and one lot of Distribution Transformer has been Rejected 5 -do- Gujarat 135 10 -do- Out of 135 Material Inspections conducted, 10 lot of material has been rejected (Poles in respect of sabarkanta scheme, schakel Insulater in respect of Ahemdabad, Transformer in respect of Mehsana, Bansakantha,Rajkot, Porbandar, J unagarh,& Amerli, Energy 6 -do- Haryana 35 -do- -do- Kerala 3 1 -do- 7 -do- Madhya Pradesh 119 -do- 8 -do- Maharashtra 150 2 -do- Out of 150 material inspections conducted, 2 lot of material has been rejected (Energy Meter in respect of Ahmadnagar & Distribution transformer in respect of Raigad) 9 -do- Rajasthan 110 3 -do- Out of 110 material inspections conducted, 3 lot of material has been rejected (Insulator in respect of J aipur and Tonk & Cable in respect of J aipur) 10 -do- Tamil nadu 139 3 -do- Out of 139 Material Inspections conducted, 3 lot of material has been rejected (Poles in respect of Thanjavur scheme & Distribution Transformer in respect of Thiruvarur) Works Rejection Instances RGGVY:DetailsofQualityInspectionsconductedbyRECQualityMonitorsandRejectiontherein Material Inspection Works Inspection Results of Inspection Sl. No. State No. of Inspections Conducted Material Rejection Instances No. of Inspections Conducted 4-Jul-11 REC Quality Monitor (RQM) designated by REC Works Rejection Instances RGGVY:DetailsofQualityInspectionsconductedbyRECQualityMonitorsandRejectiontherein Material Inspection Works Inspection Results of Inspection Sl. No. State No. of Inspections Conducted Material Rejection Instances No. of Inspections Conducted 11 -do- West Bengal 117 8 -do- Out of 117 Material Inspections conducted, 8 lot of material have been rejected (Poles in respect of Kharakpur Block and puruliya schemes & Distribution Transformer in respect of Murshidabad & Howrah, Insulator in respect of 24-Parganas and Conductor in c 12 CES, Kolkata Arunachal Pradesh 61 1 -do- Out of 61 Material Inspection Conducted, 1 lot of material has been rejected (Poles in respect of Tirap scheme) 13 -do- Assam 135 5 -do- Out of 135 Material Inspection Conducted, 5 lot of material has been rejected (Poles in respect of Morigaon scheme, Cable & Conductor in respect of Kamrup Scheme) 14 -do- Orissa 216 1 -do- Out of 216 Material Inspections Conducted, 1 lot of material has been rejected( Distribution Transformer in respect of Bolangir) 15 -do- J harkhand 53 1 -do- Out of 53 Material Inspection Conducted, 1 lot of material has been rejected ( Poles in respect of Ranchi scheme) 16 -do- Sikkim 7 -do- 17 -do- Bihar 111 -do- 18 -do- Himachal Pradesh 124 3 -do- Out of 124 Material Inspection Conducted, 3 lot of material has been rejected (Insulater in respect of Hamirpur,Bilaspur & mandi scheme) 19 NPTI, Faridabad J ammu & Kashmir 45 2 -do- Out of 45 Material Inspection Conducted, 2 lot of material has been rejected (Insulater in respect of anantnag scheme and poles in case of Budgam) 20 -do- Manipur 34 -do- 21 -do- Meghalaya 28 2 -do- Out of 28 Material Inspection Conducted, 1 lot of material has been rejected (Energy Meter in respect of West Khasi Hills scheme) 22 -do- Mizoram 26 -do- 23 -do- Nagaland 36 -do- 24 -do- Tripura 18 -do- 4-Jul-11 REC Quality Monitor (RQM) designated by REC Works Rejection Instances RGGVY:DetailsofQualityInspectionsconductedbyRECQualityMonitorsandRejectiontherein Material Inspection Works Inspection Results of Inspection Sl. No. State No. of Inspections Conducted Material Rejection Instances No. of Inspections Conducted 1843 50 Total