Sie sind auf Seite 1von 3

DOCUMENT SUBMISSION STATUS: AP

C 21.12.10 Revised as per comment sheet no. CS-M7-M-00148 PS GAK GAK


B 14.08.10 Revised as per latest Layout PS GAK GAK
A 31.03.10 Submitted for Approval PS GAK GAK
REV DATE DESCRIPTION DRWN CHKD APPD
OWNER








OWNERS CONSULTANT



EPC CONTRACTOR








EPC CONTRACTORS CONSULTANT

FI CHTNER

Fichtner GMBH & Co. Kg
PROJECT TITLE
VUNG ANG 1 THERMAL POWER PLANT 2 x 600MW
M-LOT7 ASH HANDLING PLANT

CONTRACT No. 100210/LILAMA-TECPRO Dated 10.02.2010



DRAWING TITLE : WET BOTTOM ASH HOPPER JET PUMP SIZING CALCULATION
SUB-CONTRACTOR :

TECPRO SYSTEMS LI MI TED


FUNCTION NAME SIGN DATE
DRWN Poonam Singh 21.12.10
CHKD G.Ashok Kumar 21.12.10
APPD G.Ashok Kumar 21.12.10

DOCUMENT No. VA1-TATL-00100-M-M7-CAL-0001
SCALE REV C
VIETNAM OIL AND GAS GROUP (PVN)
POYRY ENERGY LTD
VIETNAM MACHINERY INSTALLATION
CORPORATION (LILAMA)
Sl No Parameters Terms Units Formula Value Remarks
1 Bottom Ash T
BA T/hr 20.00
As per Revised input Design
Parameters, Attachment no.2
2 Deletd
3 Deleted
4 Total Coarse ash generation T
CA T/hr 20.00
5 Ash Generation for 8 Hrs T/shift [8 x T
CA
] 160.00
6 Density of Bottom Ash T/Cum 1.20
As per Revised input Design
Parameters, Attachment no.2
7 Wet Bottom Ash Hopper Capacity required Q
BAR m
3
133.33
8 Wet Bottom Ash Hopper Capacity Provided Q
BAp m
3
200.00
Refer calculation no.
VA1-TATL-00100-M-M7-CAL-0002
9 Evacuation Time t
c Hrs 1.10
As per Revised input Design
Parameters, Attachment no.2
10 Evacuation Rate Q
c m
3
/hr [Q
BAP
/ t
c
] 181.82
11 No of J et Pumps working n Nos 2.00
12 Input to each J et Pump Q m
3
/hr [Q / n] 90 91
CALCULATION SHEET
M-Lot7 Ash Handling Plant
100210/LILAMA-TECPRO dated 10.02.2010
Vietnam Oil and Gas Group (PVN)
Poyry Energy Ltd
Vietnam Machinery Installation Corporation (LILAMA) EPC Contractor
Contract No.
Owner
Owner's Consultant
Wet Bottom Ash Hopper Jet Pump Sizing Calculations
Poonam Singh
G. Ashok Kumar
EPC Contractor Consultant
Sub Contractor Tecpro Systems Limited
DOC. NO. : VA1-TATL-00100-M-M7-CAL-0001
Project Title
Pacakge Title
REVISION : C DATE : 21.12.10
Vung Ang 1 Thermal Power Plant 2 x 600MW
Fichtner GMBH & Co. Kg
Subject
Calculated By
Reviewed and Approved By
B
C
C
12 Input to each J et Pump Q
J P m/hr [Q
c
/ n] 90.91
13 Additional J etting water for flushing Q
j m
3
/hr 15.00
14 Clinker Grinder Sealing water Q
CG m
3
/hr 4.00
15 Total J et Pump inlet Q
TJ P m
3
/hr [Q
J P
+Q
j
+Q
CG
] 109.91
16 J et Pump discharge pipe NB 250.00
17 Pipe OD OD mm 273.10
18 Pipe thickness t mm 36.55
6mm pipe thk +20mm Basalt Lining thk
+10.55 mm mortar Thk
19 Pipe ID ID mm 200.00
20 Pipe Area A m
2
0.03
21 Permissible velocity through the pipe V m/s 2.30
22 Permissible flow through the pipe Q m
3
/hr 260.23
23 Motive water (HP water) Q
mot m
3
/hr [Q - Q
TJ P
] 150.32
Q
mot m
3
/hr 150.00
24 Specific gravity of conveying slurry S1
(Q+ash equivalent
(54.54))/Q
1.210 Particle Density of Ash 2 T/ m3
25 Specific gravity of J et pump input slurry S
(Q
TJ P
+ash equivalent
(54.54))/Q
TJ P
1.496 Particle Density of Ash 2 T/ m
3
26 Removal rate of J et Pump Q
TJ P
/S 73.457
Which includes other water from wet
bottom ash hopper
27 Length of conveying pipe (Maximum distance considered) L M 330.00
28 No. of bends in pipe N
b 9.00
B
B
B
B
1 of 2
29 Equivalent pipe length L
eq M 3.70
30 Friction loss in pipe per 1000m Hf M 26.95
31 Hf in slurry pipe (C =140) 8.99
32 Margin on Head [10%] H M 1.1 x Hf 9.89
33 Static head H
st M 5.00
34 Total Drop T
drop M [Hst +Hf] 14.89
By momentum eqn
35 Head required at J et Pump inlet MWC HxQ
mot
x0.30 =QxT
drop 86.12 J et Pump efficiency =30%
MWC = 87
36 Motive water required at Jet Pump inlet 150 m
3
/hr at 87 MWC
B
B
2 of 2

Das könnte Ihnen auch gefallen