Sie sind auf Seite 1von 3

Nu suntem atat de bogati incat sa ne permitem lucruri ieftine

Written part:
First page
Table of contents
Technical statement
1st. CHAPTER: Load evaluation and predimensionig of the elements

1. Snow load evaluation***********************
2. Wind load evaluation**************************
3. Live load evaluation****************************
4. Dead load evaluation***************************
5. Predimensionig of the columns**************************
6. Seismic load evaluation*****************************************
7. Deflections calculation????????????????????????????*************

2nd. CHAPTER: Structural modeling and analysis in Autodesck Robot Structural Analysis

1. Exterior and Interior walls on structural model
2. Live load on the structural model
3. Wind load on the structural model
4. Snow load on the structural model
5. Seismic load on the structural model
6. Permanent loads on the structural model
7. Load combination
8. Structural analysis result
9. Structural model for slab analysis
10. Analysis result for the slab

3rd.CHAPTER: Structural elements design

1.Slab design
2.Transversal Beam
3.Longitudinal Beam
4.Central Columns
5.Stairs

4th.CHAPTER: Foundation design

1.Dimensionig of the foundation
2.Reinforcement design in the R.C. block
3.Settelment analysis

5th.CHAPTER: Thermal design

1. Thermal resistence of buiding envelope elements
2. Total building thermal resistence

6th.CHAPTER: Technological processes and site organization

1.Assesment
2.Technological flow
3.Equipment and machinery
4.Execution schedule
5. Terms computation
6. Graphical representation
7.Site organization

Nu suntem atat de bogati incat sa ne permitem lucruri ieftine


Drawing list:
Plan parter***********
Plan subsol********************
Etaj curent******************
-Terrace roof plan*************
-Basement parking lot layout***********
-Foundation plan
-Section A-A****************************
-Section B-B
-Views
Elements:
-Slab-Foarmwork plan
-Slab-Superior reinforcement plans
-Slab-Inferior reinforcement plan
-Longitudinal beam
-Transversal beam
-Central column
-Central Column foundation
-Site organization plan
-Technological waves scheme













Intrebari
Incarcare utila birouri ----? 2.5.
Lift greutatea pe placa sau fundatie separate?
Nu suntem atat de bogati incat sa ne permitem lucruri ieftine

Factor de comportare.q

Das könnte Ihnen auch gefallen