0 Bewertungen0% fanden dieses Dokument nützlich (0 Abstimmungen)
55 Ansichten3 Seiten
This document summarizes the review comments from Pöyry Energy for the outline drawing of the low pressure final heat withdrawal (LP FWH) system for the Two x 500MW Mong Duong 1 Thermal Power Plant project. It includes 9 comments from Pöyry with the contractor's responses. All comments from the previous revision were closed as addressed by the contractor in the updated revision. The status of the document is listed as "Received for Information – Returned with Comments".
This document summarizes the review comments from Pöyry Energy for the outline drawing of the low pressure final heat withdrawal (LP FWH) system for the Two x 500MW Mong Duong 1 Thermal Power Plant project. It includes 9 comments from Pöyry with the contractor's responses. All comments from the previous revision were closed as addressed by the contractor in the updated revision. The status of the document is listed as "Received for Information – Returned with Comments".
This document summarizes the review comments from Pöyry Energy for the outline drawing of the low pressure final heat withdrawal (LP FWH) system for the Two x 500MW Mong Duong 1 Thermal Power Plant project. It includes 9 comments from Pöyry with the contractor's responses. All comments from the previous revision were closed as addressed by the contractor in the updated revision. The status of the document is listed as "Received for Information – Returned with Comments".
APPROVED WITH COMMENTS AC Approved Subject to Incorporation of comments RETURNED FOR CORRECTION RT Insufficient Information/ Detail Resubmit for Approval REJECTED RJ Complete redesign required RECEIVED FOR INFORMATION I Returned without comments RECEIVED FOR INFORMATION IC Returned with comments any obligations covered under contract Engineer: Discipline: Date: Note: Approval or comments does not relieve the Contractor of Pyry Energy TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT David Langhorne Senior Mec Engineer 5-Mar-13 Pyry Comment Two(2) x 500MW Mong Duong 1 Thermal Power Plant Project
Dwg. / Doc. Title Outline Drawing for HP-6 Low Pressure FWH Dwg. / Doc. No. MD1-0-V-114-01-00003 HDEC DT No. MD1-HDH-EVN-X-1036 Submitted Date 2012.11.02 Rev. B Pyry TR No. 9A000323-002559 Received Date 2012.11.28 New HDEC DT No. MD1-HDH-EVN-X-2233 Re-Submitted Date 2013.02.05 Rev. C Status Received for Information Returned with Comments
Page1 / 2 No. Pyrys Comments Contractors Reply / Action 1 <Pyrys Comments on Rev.A> Please refer to general comments on MD1-0-V- 114-01-00001.
<Contractors Reply / Action on Rev.A> Noted.
<Contractors Reply / Action on Rev.B> Closed.
2 <Pyrys Comments on Rev.A> Steam inlet line having pipe size of DN300mm (refer to P&ID No. MD1-0-M-110-21-00032 Rev. 0). Therefore, nozzle size should be DN300 instead of nozzle DN550 as shown in the nozzle data table. Please check and correct.
<Pyrys Comments on Rev.B> Closed.
<Contractors Reply / Action on Rev.A> Reflected. 3 <Pyrys Comments on Rev.A> The steam inlet nozzle material should be revised as the HMB for VWO condition indicates a steam temperature of 422 deg C.
<Pyrys Comments on Rev.B> Closed.
<Contractors Reply / Action on Rev.A> Reflected. Steam inlet material has been revised from A106-B to A335-P11. 4 <Pyrys Comments on Rev.A> Drain inlet from HP-7 FWH having pipe size DN350 while the heater nozzle size is DN300. Please clarify.
<Pyrys Comments on Rev.B> Closed.
<Contractors Reply / Action on Rev.A> Nozzle sizes are calculated as per HEC code and standard. HDEC will use 350 x 300 reducer at HP #6 drain inlet 5 <Pyrys Comments on Rev.A> At the key plan, please correct location of HP-6 FWH from Mezzanine floor to Operating floor.
<Pyrys Comments on Rev.B> Closed.
<Contractors Reply / Action on Rev.A> HP-6 FWH is on the HP heater floor. Please check the modified key plan. 6 <Pyrys Comments on Rev.A> According to the Contract requirement, HP heater tube side shall be designed to withstand the boiler feed water pump shut off head. Design pressure of 42 barg does not meet the requirement. Please correct <Contractors Reply / Action on Rev.A> Boiler Feedwater Pump shut-off pressure is 300 barg. BFP shut-off pressure has been reflected as tube side design pressure of 300 barg Page2 / 2
No. Pyrys Comments Contractors Reply / Action
<Pyrys Comments on Rev.B> Closed.
7 <Pyrys Comments on Rev.A> Design pressure and temperature of heater shell side are lower than pressure and temperature of steam inlet. Please correct. <Pyrys Comments on Rev.B> Closed.
<Contractors Reply / Action on Rev.A> Reflected. 8 <Pyrys Comments on Rev.A> Correct the nozzle bevel data table. It appears to be a cut and paste from MD1-0-V-114-01- 00001.
<Pyrys Comments on Rev.B> Closed.
Reflected. 9 <Pyrys Comments on Rev.B> Any change from the previous version shall be cloud marked.