Objectives
Scope of Application
UV-Setter 57-Z
Descriptions
Step 1
Perform work instruction AA-09-037 (Changing the Lamp) of Steps 1 to
6.
Step 2
Perform work instructions AA-09-063 (Replacing the Ball Screw) of the
Steps 1 to 11.
Step 3
The exposure head now can be swung to the right to gain more access
to the
4x Z-Bearings and 4x Z-Rails.
Step 4
Remove 4x Z-bearing by sliding them out from the Z-rail “up or down”.
Step 5
Use “Angle Measuring Tool” as swoon below. (See Fig. 1)
Ball Screw
Lay Out
Bottom Z-
Rail
2x 2.5mm
Bolts
Fig. 1
Harte Hanks HH-003 3 of 3
Inc. Replacing the Z-Linier Bearing/Z-Rail
11-12-09 Rev. A
Step 6
Unscrew 2x 2.5mm bolts and remove “Bottom” Z-rail left side only.
6.2 Use angle-measuring tool to “Align” the top to bottom “new” rail
then fasten the 2x 2.5mm bolts.
Step 7
Unscrew 2x 2.5mm and remove “Top” Z-rail left side only.
7.2 Use angle-measuring tool to “Align” the bottom to top “new” rail
then fasten the 2x 2.5mm bolts.
Step 8
Use steps 5 to 7.2 for right side “Z-Rails”.
Step 9
Install and align the Z-Linier Bearing and guide centrally on the rail
(4x).
Step 10
Place the exposure head on the gauge blocks (between 14 and 19mm).
Step 11
Perform work instruction AA-09-063 (Replacing the Ball Screw) and
steps 1 to 12 “In the reverse order”.