Foreword
WCDMA optimization is a very important part in the
lifecycle of the network.
Mainly, the optimization includes the preparation, single
site verification, RF optimization and parameters
optimization.
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page3
Contents
1. Introduction of Optimization Flow
2. The Preparation for the Optimization Project
3. Single Site Verification
4. RF Optimization
5. Parameters Optimization
6. Optimization Report
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page4
Contents
1. Introduction of Optimization Flow
2. The Preparation for the Optimization Project
3. Single Site Verification
4. RF Optimization
5. Parameters Optimization
6. Optimization Report
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page5
WCDMA Optimization Flow
Project Start
Single Site
Verificaiton
Preparation and
Startup
RF
Optimization
Parameter
Optimization
Acceptance and
Report
Network Information
Collection
Cluster Division and
Team Establishment
Optimization Tools
Preparation
Drive Test and RNC
Configuration Collection
Trouble shooting
Engineering Parameter
Adjustment
Preparation
Data Collection
DT and Statistic
Analysis
Parameter Adjustment
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page6
Introduction of Optimization Flow
Final Documents:
SSV Reports
Optimization Report
Engineering Parameter Table
Cell Parameter Table
Process Documents:
Engineer Parameter Table
Cell Parameter Table
Parameter Changing Record
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page7
Contents
1. Introduction of Optimization Flow
2. The preparation for the Optimization Project
3. Single Site Verification
4. RF Optimization
5. Parameters Optimization
6. Optimization Report
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page8
WCDMA Optimization Flow -
Preparation
Project Start
Single Site
Verificaiton
Preparation and
Startup
RF
Optimization
Parameter
Optimization
Acceptance and
Report
Network Information
Collection
Cluster Division and
Team Establishment
Optimization Tools
Preparation
Drive Test and RNC
Configuration Collection
Trouble shooting
Engineering Parameter
Adjustment
Preparation
Data Collection
DT and Statistic
Analysis
Parameter Adjustment
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page9
The Preparation for Projection
The following work is required:
Understanding of the Existing Network
Cluster Division and Optimization Team Establishment
Optimization Tools and Software
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page10
The Preparation for Projection
Understanding of the Existing Network :
Radio Network Planning report
Latest engineering parameter table and cell parameter table
OMC statistic data
Subscriber complaints
Historical Optimization Reports
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page11
The Preparation for the
Optimization Projection
Cluster Division
One cluster should cover one continuous area, which is
convenient for one time drive test;
Cluster division should consider the terrain,
administration and main roads.
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page12
The Preparation for the Optimization
Projection
Optimization Team Establishment
RNO leader-1
Data Analyzer
Drive Test Operator
Driver
RNO leader-n
Data Analyzer
Drive Test Operator
Driver
..................
RNO manager
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page13
The Preparation for the Optimization
Projection
Optimization Tools
Hardware
UMTS Scanner
UMTS Test UE
Laptop
Digital camera
Spectrum analyzer
Software:
DT tools
MapInfo
Google earth
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page14
Contents
1. Introduction of Optimization Flow
2. The preparation for the Optimization Project
3. Single Site Verification
4. RF Optimization
5. Parameters Optimization
6. Optimization Report
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page15
WCDMA Optimization Flow Single Site
Verification
Project Start
Single Site
Verificaiton
Preparation and
Startup
RF
Optimization
Parameter
Optimization
Acceptance and
Report
Network Information
Collection
Cluster Division and
Team Establishment
Optimization Tools
Preparation
Drive Test and RNC
Configuration Collection
Trouble shooting
Engineering Parameter
Adjustment
Preparation
Data Collection
DT and Statistic
Analysis
Parameter Adjustment
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page16
Single Site Verification
Purpose:
The single site verification test is a part of the WCDMA network
optimization to ensure that the basic functions of the cell are
normal, such as call access, call quality, handover and so on.
Single site verification involves the following aspects:
Parameter setting check in idle mode
Services call (AMR/VP/PS) function check in connected mode
HSDPA function check
CPICH RSCP & Ec/Io
Installation problems check
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page17
Single Site Verification
Single site verification includes :
preparations before test
single site test
solving problems
The single site verification is completed by:
On-site engineers
RNO engineers
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page18
Single Site Verification - Tasks of the
on-site engineers
Application key
Preparations
Test UE Setup
Other Preparations
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page20
Single Site Verification - Tasks of the
on-site engineers
Verification in Idle Mode
Frequency Check
Check whether the frequency is consistent with the planned data
Scramble Check
Check whether the scramble is consistent with the planned data
LAC/RAC Check
Check whether the LAC/RAC is consistent with the planed data.
CPICH_RSCP / CPICH_Ec/Io (Near Site) Test
Check whether the CPICH RSCP and CPICH Ec/Io received by
UE are greater than the threshold
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page21
Single Site Verification - Tasks of the
on-site engineers
Verification in connected Mode
Originating and Terminating Call of Voice Service
Check whether the originating and terminating function of
voice service function normally by call quality test
Originating and Terminating Connection Test of VP Service
Check whether the originating and terminating function of
VP service function normally by call quality test
Access Test of PS Services
Check whether the PS services access are normal
Solving Problems
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page22
Single Site Verification Task of the
RNO engineers
Preparations
Cell Status Confirmation
Before checking site, you need to inquiry product support
engineers whether the cell is in normal status
Testing Route Selection
Before test, you must select a proper testing route according to
site distribution and local environment
Testing Tools
Hardware
Software
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page23
Single Site Verification Task of the
RNO engineers
Coverage Check
Check whether CPICH RSCP and CPICH Ec/Io received by
scanner is normal
Inconsistency of antenna tile/direction angle from planned
one
Check whether the RX ports of different cell are reversely
connected
Fixed Maximum Transmit Power of UE, measure the RTWP of the
cells in OMC room
Checking Antennas by Exchanging Feeders, measure the RSCP
before and after.
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page24
Single Site Verification Task of the
RNO engineers
Service Function Test
MOC and MTC of Voice call
MOC and MTC of VP
UL and DL R99 PS service
HSDPA access function and throughput test
HSUPA access function and throughput test
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page25
Single Site Verification Task of the
RNO engineers
Solving Problems
If RNO engineers find out some installation problem, ask
the installation team fix it and do retest to verify
If RNO engineers find problems about product function,
RNO engineers must ask RAN engineers help to solve
problems
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page26
Single Site Verification
Summarization:
In single site verification stage, engineers check whether
equipment functions are normal
Single site verification is a basis for the following RF
optimization and Parameter optimization
If all verifications about function are accepted, the single
site verification is completed
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page27
Contents
1. Introduction of Optimization Flow
2. The preparation for the Optimization Project
3. Single Site Verification
4. RF Optimization
5. Parameters Optimization
6. Optimization Report
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page28
WCDMA Optimization Flow RF
Optimization
Project Start
Single Site
Verificaiton
Preparation and
Startup
RF
Optimization
Parameter
Optimization
Acceptance and
Report
Network Information
Collection
Cluster Division and
Team Establishment
Optimization Tools
Preparation
Drive Test and RNC
Configuration Collection
Trouble shooting
Engineering Parameter
Adjustment
Preparation
Data Collection
DT and Statistic
Analysis
Parameter Adjustment
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page29
RF Optimization - Overview
Once all the sites on-air and verification is completed, RF
optimization starts
During the RF optimization stage, you willoptimize radio
frequency (RF) signals , so that the distribution of radio signal
is normal in next stage -- parameters optimization
RF optimization includes the following aspects:
Coverage optimization
Pilot pollution optimization
Handover optimization
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page30
RF Optimization flow
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page31
RF Optimization - Preparation (1)
Define Optimization targets
Weak coverage
Pilot pollution
SHO Factor based on DT
Define Test Route
Cluster Division
Preparing Tools and Data
Preparing Software
Preparing Hardware
Engineering and cell Parameter table
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page32
RF Optimization - Preparation (2)
Index Reference Remarks
CPICH Ec/Io 9dB
97% in urban area
According to test result from the scanner, in
unloaded and outdoor conditions, in planning
coverage areas, test in a grid-like route to cover all
cells.
97% in suburban
area
CPICH RSCP
95dBm
98% in urban area
According to test result from the scanner, in
unloaded and outdoor conditions, in planning
coverage areas, test in a grid-like route to cover all
cells. The coverage level request is basic. If
operators have penetration loss request, add the
penetration loss to the coverage level.
95% in suburban
area
SHO Factor based on
DT
30%40%
The SHO Factor based on DT should be 5% to
10% lower than the goal, because the following
optimizations cause the soft handover factor to
increase
Pilot pollution ratio 5%
RF Optimization - Targets
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page33
RF Optimization - Preparation (3)
Dividing Clusters
RF optimization must be performed on a group of or a
cluster of NodeBs , and to ensure that interference from
intra-frequency neighbor cells are considered during
optimization.
Define Test Route
The test route should cover all sites, all main roads and VIP
area.
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page34
RF Optimization - Preparing Tools and
Data:
Software
Genex Probe
Genex Assistant
Mapinfo
Google earth
Device
Scanner
Test terminal and
data line
GPS and data line
Laptop
Vehicle mounted
inverter
Needed data
List of engineering
parameters
Map
KPI requirements
Network configuration
parameters
Survey report
Single site verification
checklist
Floor plan of the target
buildings
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page35
RF Optimization - Data Collection
DT is a major test. Collect scanner and UE data of radio
signals by DT test
Usually the DT and indoor test during RF optimization
stage is based on VP service.
During RF optimization stage, collect neighbor cell data
of network optimization and other data configured in
RNC database
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page37
RF Optimization - RF problem
solutions
Antenna tilt
Antenna azimuth
Antenna location
Split sector
Remove sector
Combine sector
Antenna height
Antenna type
TMA
RRU
Site location
New site
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page38
RF Optimization
Some advices:
Before the RF adjusting, wed better survey the relative sites,
and give some applicable advice
If possible, do the RF adjustment and test the effect at the
same time
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page39
RF Coverage Problem Analysis
The coverage problems to be analyzed include:
Weak coverage
Overshoot coverage
Unbalance between uplink and downlink
No dominating cell
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page40
RF Coverage Problem Analysis
Coverage Analysis Processes:
Downlink Coverage Analysis
Analyzing Pilot Strength
Analyzing Pilot quality
Analyzing Dominate Cell
Analyzing comparison of UE and Scanner Coverage
Uplink Coverage Analysis
Analyzing Uplink Interference
Analyzing distribution of UE Transmit Power
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page41
RF Coverage Problem Analysis
Downlink coverage analysis Pilot Strength Analysis
Check areas of weak coverage, suggestion value as below:
Good: RSCP -85 dBm
Fair: -95 dBm RSCP < -85 dBm
Poor: RSCP < -95 dBm
Mark the areas with weak coverage for further analysis
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page42
RF Coverage Problem Analysis
Downlink coverage analysis - Pilot Strength Analysis
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page43
RF Coverage Problem Analysis
Downlink coverage analysis - Pilot quality Analysis
Ec/Io plot should also be analysed based on the thresholds :
Good: Ec/Io -8 dB
Fair: -14 dB Ec/Io < -8 dB
Poor: Ec/Io < - 14 dB
Areas of poor Ec/Io should be highlighted for further
investigation
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page44
RF Coverage Problem Analysis
-15.5
-63
-20
-19
-18
-17
-16
-15
-14
Ec/Io RSCP
-90
-85
-80
-75
-70
-65
-60
Whats the
problem?
Downlink coverage analysis Pilot quality Analysis:
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page45
RF Coverage Problem Analysis
-15.5
-104
-20
-19
-18
-17
-16
-15
-14
Ec/Io RSCP
-120
-115
-110
-105
-100
-95
-90
Whats the
problem?
Downlink coverage analysis - Pilot quality Analysis:
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page46
RF Coverage Problem Analysis
Downlink coverage analysis - Analyzing Dominating Cell:
Dominating cells analysis is analyzing cell scramble
information obtained in DT
The contents to be checked include :
Weak coverage cell
Cross-cell coverage cell
No dominating cell
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page47
RF Coverage Problem Analysis
Downlink coverage analysis - Analyzing Dominating Cell:
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page48
RF Coverage Problem Analysis
Downlink coverage analysis - Analyzing Dominating Cell:
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page49
RF Coverage Problem Analysis
Downlink coverage analysis - Analyzing comparison of UE and Scanner Coverage :
Inconsistent Best Service Cell between scanner and UE
Copyright 2008 Huawei Technologies Co., Ltd. All rights reserved. Page50
RF Coverage Problem Analysis
Uplink coverage analysis:
Uplink coverage analysis is analyzing UE transmit power
obtained in DT
UE_Tx_Power 10 dBm >= 95%
The test result of voice service by
test handset. Assume the maximum
transmit power of UE is 21 dBm