Sie sind auf Seite 1von 187

TRANSPORTE

COD DESCRIPCION UND


COSTO TOTAL
ENERO 2012
(US$/UM)
COSTO TOTAL
DICIEMBRE
2011 (US$/UM)
VARIACION %
07144 TRANSPORTE EXTRACCION CON LOCOMOTORA LT-02(5.5 Tons) U.S.$/TON 0.97 0.90 6.74%
0 TRANSPORTE EXTRACCION CON LOCOMOTORA A BATERIA LM 15(5.5 Tons) U.S.$/TON 1.57 1.45 7.91%
07128 TRANSPORTE EXTRACCION CON LOCOMOTORA A BATERIA LM 10(3.5 Tons) U.S.$/TON 1.39 1.28 8.99%
07132 TRANSPORTE EXTRACCION CON LOCOMOTORA A BATERIA LM 11(5.5 Tons) U.S.$/TON 1.04 0.96 8.02%
0 TRANSPORTE EXTRACCION CON LOCOMOTORA LT-01 TROLLEY (5.5 Tons) U.S.$/TON 0.97 0.90 6.74%
07136 TRANSPORTE EXTRACCION CON LOCOMOTORA LT-05 TROLLEY (10 Tons) U.S.$/TON 0.88 0.85 4.05%
TRANSPORTE EXTRACCION CON LOCOMOTORA LT-09 TROLLEY (10 Tons) 0.66 0.63 4.05%
AVANCES
COD DESCRIPCION UND
COSTO TOTAL
ENERO 2012
(US$/UM)
COSTO TOTAL
DICIEMBRE
2011 (US$/UM)
VARIACION %
03265 RAMPA 92442 SUR 4.5M X 4.2 M CON (JUMBO ATLAS BOOMER CMHSA) U.S.$/MTS 359.77 346.94 3.70%
RAMPA 4.5M X 4.2 M con Jack Leg-Scoop de 2.0 Yd3. Acarreo hasta 150 mts. U.S.$/MTS 413.73 393.75
03254 RAMPA 3.5M X 3.5 M CON (JUMBO ATLAS BOOMER CMHSA) U.S.$/MTS 332.51 320.64 3.70%
03255 RAMPA 3.0 M X 3.0 M CON (JUMBO ATLAS BOOMER CMHSA ) U.S.$/MTS 287.29 276.12 4.05%
03247 RAMPA 3.0 X 3.0 mts. Jack Leg - Scoop de 2.2 Yd3. Acarreo hasta 150 mts. U.S.$/MTS 307.63 294.02 4.63%
03248 RAMPA 2.4 X 2.4 mts. Jack Leg - Scoop de 2.2 Yd3 acarreo hasta 150 mts U.S.$/MTS 268.49 256.89 4.52%
03249 RAMPA 2.7 X 2.7 mts. Jack Leg - Scoop de 2.2 Yd3 Acarreo hasta 150 mts U.S.$/MTS 287.79 276.04 4.26%
03252 RAMPA 3.5 X 3.5 mts. Jack Leg - Scoop de 2.2 Yd3 Acarreo hasta 150 mts. U.S.$/MTS 322.78 309.24 4.38%
03258 PRECORTE RAMPA 3.0 x 3.0 mts con Jack Leg-Scoop de 2.0 Yd3. Acarreo hasta 150 mts. U.S.$/MTS 327.42 312.48 4.78%
CRUCERO 3.5 X 3.5 mts. Jack Leg - Scoop de 2.2 Yd3 Acarreo hasta 150 mts. Roca D U.S.$/MTS 354.80 341.88 3.78%
CRUCERO 3.00 X 3.00 MTs. Jack Leg-Scoop de 2.2 Yd3. Acarreo hasta 150 mts. Roca D U.S.$/MTS 318.53 306.54 3.91%
02364 CRUCERO 3.5M X 3.5 M CON (JUMBO QUASAR ) U.S.$/MTS 345.54 333.06 3.75%
CRUCERO 3.5 X 3.5 mts. Jack Leg - Scoop de 2.2 Yd3 Acarreo hasta 150 mts. U.S.$/MTS 315.03 302.11 4.28%
02363 CRUCERO 3.0 M X 3.0 M CON (JUMBO ATLAS BOOMER CMHSA) U.S.$/MTS 279.36 268.68 3.97%
02355 CRUCERO 3.0 X 3.0 mts. Jacl Leg-Scoop de 2.0 Yd3. Acarreo hasta 150 mts. U.S.$/MTS 288.37 276.47 4.30%
PRECORTE CRUCERO 3.0 X 3.0 mts. Jack Leg-Scoop de 2.0 Yd3. Acarreo hasta 150 mts. U.S.$/MTS 294.45 282.55 4.21%
02350 CRUCERO 2.40 X 2.40 MTs. Jack Leg-Scoop de 2.2 Yd3. Acarreo hasta 150 mts. U.S.$/MTS 269.82 258.16 4.52%
02354 CRUCERO 2.70 X 2.70 MTs. Jack Leg-Scoop de 2.2 Yds3 Acarreo hasta 150 mts U.S.$/MTS 284.13 272.46 4.28%
02351 CRUCERO 2.40 X 2.40 MTS, EXPLORACION CON PALA NEUMTICA U.S.$/MTS 191.83 181.64 5.61%
01327 GALERIA DE 2.4 X 2.4 CON PALA NEUMTICA U.S.$/MTS 194.92 184.73 5.52%
02369 REFUGIO 2.00 X 2.00 MTs. Jack Leg-Scoop de 2.2 Yd3. Acarreo hasta 150 mts. U.S.$/MTS 221.51 209.87 5.55%
04248 CH. 3.20 x 1.50 Mts.Limpieza Sin Scoop directo a la Tolva, hasta 30 mts altura U.S.$/MTS 348.52 323.27 7.81%
04246 CH. 2.40 x 1.20 Mts.Limpieza Sin Scooptram directo a la Tolva hasta 30 mts altura U.S.$/MTS 152.12 141.47 7.53%
04247 CH. 1.50 x 1.50 Mts. Limpieza sin Scoop, defrente a Chute U.S.$/MTS 135.19 124.53 8.56%
05509 SUB NIVEL 4' x 6' CON WINCHE U.S.$/MTS 185.69 174.37 6.49%
05511 SUB NIVEL 4' x 6' CON WINCHE U.S.$/MTS 128.38 120.41 6.62%
05510 SUB NIVEL 1.20 X 2.10 mts. Con Winche y Scoop 1.50 Yd3. U.S.$/MTS 186.54 175.22 6.46%
05512 SUB NIVEL 1.20 X 2.10 mts. Con Winche U.S.$/MTS 126.27 118.30 6.73%
ROTURA
COD DESCRIPCION UND
COSTO TOTAL
ENERO 2012
(US$/UM)
COSTO TOTAL
DICIEMBRE
2011 (US$/UM)
VARIACION %
06521 EXPLOTACION DE TAJEOS CORTE Y RELLENO EN BREASTING U.S.$/TMS 12.20 11.21 8.79%
06515 EXPLOTACION DE TAJEOS VETAS ANGOSTAS < 1.20 MTS U.S.$/TMS 14.29 13.12 8.96%
06524 EXPLOTACION DE TAJEOS CORTE Y RELLENO EN BREASTING U.S.$/TMS 13.65 12.38 10.29%
06520 EXPLOTACION DE TAJEOS CORTE Y RELLENO EN BREASTING U.S.$/TMS 17.75 16.21 9.48%
06516 EXPLOTACION DE TAJEOS CORTE Y RELLENO EN BREASTING U.S.$/TMS 12.42 11.63 6.79%
06528 ACARREO CON WINCHE U.S.$/TMS 2.30 2.12 8.07%
EXPLOTACION_TAJEO_MECANIZADO ANCHO VENTA 3.5MX4.5M (SIN EQUIPOS) U.S.$/TMS 4.31 3.99 7.90%
EXPLOTACION_TAJEO_MECANIZADO ANCHO VENTA 3.5MX4.5M (CON EQUIPOS) U.S.$/TMS 9.09 8.75 3.87%
EXPLOTACION_TAJEO_MECANIZADO ANCHO VENTA 6MX4.5M (SIN EQUIPOS) U.S.$/TMS 3.31 3.09 6.87%
EXPLOTACION_TAJEO_MECANIZADO ANCHO VENTA 6MX4.5M (CON EQUIPOS) U.S.$/TMS 7.48 7.24 3.19%
EXPLOTACION_TAJEO_MECANIZADO ANCHO VENTA 9MX4.5M (SIN EQUIPOS) U.S.$/TMS 2.38 2.24 6.30%
EXPLOTACION_TAJEO_MECANIZADO ANCHO VENTA 9MX4.5M (CON EQUIPOS) U.S.$/TMS 5.98 5.82 2.70%
LISTADO DE LOS PRECIOS UNITARIOS DE OPERACIONES A ENERO 2012
PDF created with pdfFactory Pro trial version www.pdffactory.com
SOSTENIMIENTO MECANIZADO
COD DESCRIPCION UND
COSTO TOTAL
ENERO 2012
(US$/UM)
COSTO TOTAL
DICIEMBRE
2011 (US$/UM)
VARIACION %
SHOTCRETE VIA SECA (1 DISPARO)
12630 SHOTCRETE TODO COSTO 1" (DRAMIX: 0 Kgs/M3) U.S.$/M2 14.52 14.02 3.52%
12631 SHOTCRETE TODO COSTO 1" (DRAMIX: 10 Kgs/M3) U.S.$/M2 17.81 16.69 6.70%
12632 SHOTCRETE TODO COSTO 1" (DRAMIX: 20 Kgs/M3) U.S.$/M2 21.10 19.36 9.00%
12633 SHOTCRETE TODO COSTO 1" (DRAMIX: 30 Kgs/M3) U.S.$/M2 24.40 22.03 10.75%
12634 SHOTCRETE TODO COSTO 1" (DRAMIX: 40 Kgs/M3) U.S.$/M2 27.69 24.70 12.12%
12635 SHOTCRETE TODO COSTO 2" (DRAMIX: 0 Kgs/M3) U.S.$/M2 28.87 27.93 3.37%
12636 SHOTCRETE TODO COSTO 2" (DRAMIX: 10 Kgs/M3) U.S.$/M2 35.45 33.26 6.59%
12637 SHOTCRETE TODO COSTO 2" (DRAMIX: 20 Kgs/M3) U.S.$/M2 42.04 38.60 8.92%
12638 SHOTCRETE TODO COSTO 2" (DRAMIX: 30 Kgs/M3) U.S.$/M2 48.62 43.93 10.68%
12639 SHOTCRETE TODO COSTO 2" (DRAMIX: 40 Kgs/M3) U.S.$/M2 55.21 49.27 12.06%
12640 SHOTCRETE TODO COSTO 3" (DRAMIX: 0 Kgs/M3) U.S.$/M2 43.20 41.81 3.32%
12641 SHOTCRETE TODO COSTO 3" (DRAMIX: 10 Kgs/M3) U.S.$/M2 53.08 49.82 6.54%
12642 SHOTCRETE TODO COSTO 3" (DRAMIX: 20 Kgs/M3) U.S.$/M2 62.95 57.82 8.88%
12643 SHOTCRETE TODO COSTO 3" (DRAMIX: 30 Kgs/M3) U.S.$/M2 72.83 65.82 10.65%
12644 SHOTCRETE TODO COSTO 3" (DRAMIX: 40 Kgs/M3) U.S.$/M2 82.71 73.83 12.03%
12628 SHOTCRETE 1" TK-40 U.S.$/M2 1.24 1.09 13.88%
12629 SHOTCRETE 2" TK-40 U.S.$/M2 2.49 2.19 13.88%
12123 INSTALACION PERNO HELICOIDAL DE 8' CEMBOL U.S.$/PZA 25.56 24.50 4.31%
12124 INSTALACION PERNO HELICOIDAL DE 6' CEMBOL U.S.$/PZA 20.25 19.37 4.54%
12579 INSTALACION PERNO HYDRABOLT DE 6' (BOMBA MANUAL) U.S.$/PZA 18.32 18.03 1.57%
12580 INSTALACION PERNO HYDRABOLT DE 7' (BOMBA MANUAL) U.S.$/PZA 20.55 19.68 4.40%
12612 INSTALACION PERNO HYDRABOLT DE 7' (BOLTER77) U.S.$/PZA 18.21 17.74 2.65%
INSTALACION DE PERNO CEMENTADO DE 8 PIES 23.79 22.73 4.65%
12611 COLOCADO PERNOS 7 FTS CON LECHADA CEMENTO (BOLTER 77) U.S.$/PZA 15.66 15.62 0.28%
12202 INSTALACION DE CIMBRAS DE 4.5mX4.2m (Incluye Plancha Acanalada+Bolsacrete) U.S.$/PZA 218.95 191.62 14.27%
12192 INSTALACION DE CIMBRAS DE 3.5mX3.5m ( Que incluye las tablas) U.S.$/PZA 298.46 282.55 5.63%
12141 INSTALACION DE CIMBRAS DE 10'X10' ( Que incluye las tablas) U.S.$/PZA 277.06 261.18 6.08%
12205 INSTALACION DE CIMBRAS DE 10'X10' ( No incluye las tablas) U.S.$/PZA 86.48 75.99 13.80%
12160 INSTALACION DE CIMBRAS DE 8'X8' ( Incluye las Tablas) U.S.$/PZA 214.92 204.21 5.25%
12142 INSTALACION DE CIMBRAS DE 10'X10' Y 8'X8' (Rehabilitacion+25 Marchavante) U.S.$/PZA 250.86 235.03 6.73%
12169 TABLAS EN CIMBRAS DE 10'X10' Y 8'X8' U.S.$/PZA 10.35 10.16 1.87%
12143 INSTALACION DE MALLA ELECTROSOLDADA U.S.$/M2 9.37 8.96 4.56%
PARRILLERO 42.09 36.74 14.58%
BOMBERO 42.09 36.74 14.58%
12566 Anillo con revestimiento Concreto Fc=140 Kgs/Cm2(Pie y Boca Chimenea) U.S.$/M3 131.06 121.01 8.30%
12567 Anillo con revestimiento Concreto Fc=30 Kgs/Cm2(Columna Chimenea) U.S.$/M3 66.17 59.57 11.08%
PDF created with pdfFactory Pro trial version www.pdffactory.com
SOSTENIMIENTO CONVENCIONAL
COD DESCRIPCION UND
COSTO TOTAL
ENERO 2012
(US$/UM)
COSTO TOTAL
DICIEMBRE
2011 (US$/UM)
VARIACION %
12161 CUADRO COMPLETO DE MADERA 10' x 10' U.S.$/PZA 175.50 166.50 5.41%
12162 CUADRO COMPLETO DE MADERA 8' x 9' U.S.$/PZA 128.82 124.25 3.68%
12125 CUADRO COMPLETO DE MADERA 8' x 8' U.S.$/PZA 113.89 109.34 4.16%
12149 CUADRO COMPLETO SUB NIVEL 4' x 6'(Sub Nivel) U.S.$/PZA 86.89 82.39 5.46%
12128 CUADRO COMPLETO DE MADERA 6' x 6' (subnivel) U.S.$/PZA 86.89 82.39 5.46%
12129 CUADRO COMPLETO MADERA 7' x 7'(Sub Nivel) U.S.$/PZA 99.47 94.94 4.76%
12130 CUADRO COMPLETO TAJEO DE MADERA 6' x 6' U.S.$/PZA 72.75 69.72 4.34%
12131 CUADRO COMPLETO TAJEO DE MADERA 7' x 7' U.S.$/PZA 85.33 82.28 3.70%
12150 CUADRO COMPLETO TAJEO DE MADERA 8' x 8' U.S.$/PZA 113.38 108.84 4.18%
12163 CUADRO INTERMEDIO DE MADERA 8' x10' U.S.$/PZA 175.50 166.50 5.41%
12164 CUADRO INTERMEDIO DE MADERA 8' x9' U.S.$/PZA 171.24 162.25 5.54%
12126 CUADRO INTERMEDIO DE MADERA 7' x7' U.S.$/PZA 141.89 132.94 6.73%
12127 CUADRO INTERMEDIO DE MADERA 8'x8' U.S.$/PZA 156.38 147.41 6.08%
12152 CUADRO EN CHIMENEA 5'X5' - CON ENCOSTILLADO U.S.$/PZA 118.21 113.65 4.01%
12165 CUADRO EN CHIMENEA 5'X5' - SIN ENCOSTILLADO U.S.$/PZA 104.07 100.99 3.05%
12132 ENMADERADO DOBLE COMPARTIMIENTO EN CHIMENEA 8'X4' CON ENTABLADO U.S.$/PZA 321.14 311.89 2.97%
12151 ENMADERADO DOBLE COMPARTIMIENTO EN CHIMENEA 3.20mX1.50m CON ENTABLADO U.S.$/PZA 435.61 424.47 2.62%
12167 CUADRO COJO 8"X9' (En avances y Tajeos) U.S.$/PZA 86.91 83.86 3.64%
12194 CUADRO COJO 8"X10' (En avances y Tajeos) U.S.$/PZA 86.22 83.17 3.67%
12135 CUADRO COJO 6'X6' (En avances y Tajeos) U.S.$/PZA 58.98 55.98 5.36%
12136 CUADRO COJO 7'X7' (En avances y Tajeos) U.S.$/PZA 67.28 64.27 4.69%
12153 CUADRO COJO TAJEO DE MADERA 8' x 8' U.S.$/PZA 76.56 73.53 4.12%
12134 CUADRO DE CAMBIO 10'X10' U.S.$/PZA 220.18 206.04 6.86%
12166 CUADRO DE CAMBIO 8'X9' U.S.$/PZA 210.17 196.05 7.20%
12133 SOBRECUADRO DE MADERA 7' x 7' U.S.$/PZA 101.34 96.40 5.13%
12137 GUARDACABEZA 5"X 3Mts U.S.$/PZA 15.73 15.08 4.30%
12181 GUARDACABEZA 4"X 2.40Mts U.S.$/PZA 11.01 10.37 6.18%
12186 ENCRIBADO DE CUADRO 5"X6 PIES U.S.$/PZA 31.69 30.76 3.01%
12185 ENCRIBADO DE CUADRO 6"X8 PIES U.S.$/PZA 40.42 39.48 2.38%
12184 ENCRIBADO DE CUADRO 5"X8 PIES U.S.$/PZA 33.61 32.69 2.84%
12154 SOLERA 5"X8' U.S.$/PZA 21.87 20.38 7.30%
12155 SOLERA 6"X8' U.S.$/PZA 28.11 26.32 6.80%
12156 SOLERA 7"X8' U.S.$/PZA 32.13 30.33 5.92%
12139 SOLERA 8"X8' U.S.$/PZA 36.77 34.96 5.16%
12193 SOLERA 8"X10' U.S.$/PZA 41.72 39.91 4.54%
12157 PUNTAL DE SEGURIDAD 5"X8' U.S.$/PZA 18.00 17.10 5.27%
12140 PUNTAL DE SEGURIDAD 6"X8' U.S.$/PZA 23.52 22.40 5.04%
12158 PUNTAL DE SEGURIDAD 7"X8' U.S.$/PZA 31.08 29.58 5.08%
12159 PUNTAL DE SEGURIDAD 8"X8' U.S.$/PZA 42.79 40.54 5.55%
12555 CACHO DE TORO (En avances y Tajeos) U.S.$/PZA 8.69 8.57 1.44%
12170 ENTABLADO DE MADERA CON MALLA PARA RELLENO U.S.$/M2 25.13 24.17 3.98%
12176 ENTABLADO DE MADERA SIN MALLA PARA RELLENO U.S.$/M2 21.54 20.71 3.99%
12182 COLOCADO ENTABLADO (FORRADO CUADROS EN VEZ CANTONERA) U.S.$/PZA 3.63 3.48 4.34%
12183 COLOCADO CANTONERAS U.S.$/PZA 6.00 5.85 2.66%
12191 COLOCADO DE RAJADO U.S.$/PZA 3.89 3.74 4.06%
12169 TABLAS EN CIMBRAS DE 10'X10' Y 8'X8' U.S.$/PZA 10.35 10.16 1.87%
PDF created with pdfFactory Pro trial version www.pdffactory.com
SERVICIOS
COD DESCRIPCION UND
COSTO TOTAL
ENERO 2012
(US$/UM)
COSTO TOTAL
DICIEMBRE
2011 (US$/UM)
VARIACION %
08369 PLATAFORMA DESCANSO CON ESCALERA U.S.$/PZA 37.15 34.99 6.19%
08370 INSTALACION DE ESCALERA U.S.$/PZA 18.53 17.69 4.74%
08352 ENTABLADO U.S.$/M2 22.60 21.83 3.49%
08140 PALLAQUEO U.S.$/TMS 10.12 9.05 11.82%
08144 PIRCADO DE MEJORA DE LEY U.S.$/TMS 8.09 7.20 12.50%
08141 RECUPERACIN DE FINOS U.S.$/TMS 27.83 25.07 11.01%
12199 ELABORACION + INSTALACION BOLSACRETE (Arena+Cemento) U.S.$/M3 61.81 59.24 4.35%
08128 INSTALACION DE TOLVA SIMPLE U.S.$/PZA 929.22 876.32 6.04%
08384 INSTALACION DE VENTILADORES PRINCIPALES HERMETIZADO U.S.$/PZA 356.38 328.05 8.64%
08379 RELLENO DETRITICO CON WINCHE U.S.$/M3 4.66 4.21 10.66%
08380 LIMPIEZA CON PALA DE LINEA U.S.$/M3 3.53 3.24 9.12%
08139 LIMPIEZA A PULSO U.S.$/M3 8.45 7.56 11.70%
08381 RECUPERACION DE CUADRO DE MADERA 7X7, 8'x8', 10X10 U.S.$/PZA 28.28 25.33 11.64%
08371 INSTALACION ALCAYATAS U.S.$/PZA 7.76 5.98 29.75%
08376 INSTALACION ALCAYATAS PARA MANGA DE VENTILACION U.S.$/PZA 5.53 3.93 40.80%
08367 PRECIOS UNITARIOS DESQUINCHE EN REBATIDO DE RAMPA U.S.$/M3 26.38 25.17 4.81%
08368 PRECIOS UNITARIOS DESQUINCHE LIMPIEZA CON SCOOPTRAM U.S.$/M3 21.24 20.04 6.02%
08373 PRECIOS UNITARIOS DESQUINCHE LIMPIEZA CON WINCHE U.S.$/M3 19.96 18.82 6.09%
08366 PRECIOS UNITARIOS DESQUINCHE LIMPIEZA CON PALA U.S.$/M3 20.87 19.72 5.81%
INSTALACION TUBERIA POLIETILENO 2" EN LINEA RECTA (Incluye Traslado) U.S.$/MTS 0.34 0.30 11.70%
INSTALACION TUBERIA POLIETILENO 2" (CURVAS-CODOS) Incluye Traslado U.S.$/MTS 0.56 0.50 11.70%
INSTALACION TUBERIA POLIETILENO 4" EN LINEA RECTA (Incluye Traslado) U.S.$/MTS 0.63 0.56 12.56%
INSTALACION TUBERIA POLIETILENO 4" (EN CURVAS-CODOS) Incluye Traslado U.S.$/MTS 0.83 0.74 12.56%
INSTALACION DE CAMBIO DE VIA U.S.$/CAMBIO 84.46 75.61 11.70%
INSTALACION DE LINEA DE CAUVILLE PRINCIPALES (45 Lbrs/Yd) Incluye Traslado U.S.$/COLLER 36.45 35.39 2.99%
INSTALACION DE LINEA DE CAUVILLE PRINCIPALES (60 Lbrs/Yd) Incluye Traslado 38.52 37.26 3.38%
REPARACION DE LINEA DE CAUVILLE PRINCIPALES (30-45-60 Lbrs/Yd) (Cambio de durmientes) U.S.$/COLLER 12.33 11.54 6.81%
LIMPIEZA DE CUNETA CON MINICARGADOR U.S.$/MTS 0.22 0.20 9.21%
LIMPIEZA DE VIA CON MINICARGADOR U.S.$/MTS 0.22 0.20 9.21%
TRASLADO DE WINCHE DE INTERIOR MINA A MANTENIMIENTO(VICEVERSA) U.S.$/UNI 125.57 111.59 12.52%
COLOCADO PERNOS 7 FTS CON LECHADA CEMENTO (BOLTER 77) U.S.$/UNI 15.66 15.62 0.28%
INSTALACION DE VENTILADOR (5HP - 20 HP) U.S.$/UNI 28.15 25.20 11.70%
INSTALACION DE VENTILADOR + CONSTRUCCION DE PLATAFORMA DE MADERA Y TAPON DE MADERA (25Hp a 50Hp) U.S.$/UNI 169.68 151.99 11.64%
INSTALACION VENTILADOR (80Hp a 250Hp) U.S.$/UNI 62.78 55.80 12.52%
INSTALACION DE VENTILADOR + CONSTRUCCION DE PLATAFORMA DE MADERA (25Hp a 50Hp) U.S.$/UNI 84.84 75.99 11.64%
PROLONGACION DE MANGA DE VENTILACION 10" - 18" (Incluye Linea Gua con material CMHSA) U.S.$/MTS 0.56 0.50 11.70%
PROLONGACION DE MANGAS DE VENTILACION 24" - 30" (Incluye Linea Gua con material CMHSA) U.S.$/MTS 0.76 0.67 12.56%
CAMBIO DE MANGAS DE VENTILACION 10" - 18" U.S.$/MTS 0.56 0.50 11.70%
CAMBIO DE MANGAS DE VENTILACION 24" - 30" U.S.$/MTS 0.76 0.67 12.56%
REPARACION DE MANGAS DE VENTILACION 10" - 18" U.S.$/MTS 0.84 0.76 11.70%
REPARACION DE MANGAS DE VENTILACION - 24" - 30" U.S.$/MTS 1.25 1.11 12.56%
RECUPERAR Y TRASLADAR VENTILADOR (5Hp a 20Hp) DE INTERIOR MINA A SUPERFICIE O VICEVERSA E INTERIOR MINA A INTERIOR MINA U.S.$/UNI 33.94 30.40 11.64%
RECUPERAR Y TRASLADAR VENTILADOR (25Hp a 50Hp) DE INTERIOR MINA A SUPERFICIE O VICEVERSA E INTERIOR MINA A INTERIOR MINA U.S.$/UNI 56.56 50.66 11.64%
RECUPERAR Y TRASLADAR VENTILADOR (80Hp a 250Hp) DE INTERIOR MINA A SUPERFICIE O VICEVERSA E INTERIOR MINA A INTERIOR MINA U.S.$/UNI 125.57 111.59 12.52%
CONSTRUCCION DE TAPON DE MADERA (SECCION 2.4m x 2.4m A 3.5m x 3.5m) CON PUERTA (SECCION 1.5 m x 0.6 m) U.S.$/UNI 84.84 75.99 11.64%
REPARACION DE TAPON DE MADERA O LADRILLO U.S.$/UNI 33.94 30.40 11.64%
CONSTRUCCION DE PUERTA DE MADERA (SECCION 2m x 2m a 3.5m x 3.5m) U.S.$/UNI 113.12 101.32 11.64%
RECUPERAR MANGA 10" - 30" U.S.$/MTS 0.17 0.15 11.64%
INSTALACION DE LINEA TROLLEY U.S.$/MTS 11.86 10.56 12.27%
INSTALACION DE TUBERIA 6",8",10" ALVENIOUS U.S.$/MTS 13.74 12.28 11.84%
PDF created with pdfFactory Pro trial version www.pdffactory.com

T Anual : 365.00
D.NORMALES 273.00 22.75
DOMINGOS 52.00
Basico 31.33 1,500.00 DESC.MEDICO 4.00
Asig. Fam. 1.367 50.00 FERIADOS 10.00
32.70 1,541.00 VACAC. 26.00
INGRESO: MENSUAL ANUAL
Obreros Empleados Obreros Empleados Obreros Conceptos
% Obreros
Mensual: 743.86 1,541.00 8,926.28 18,492.00
CTS 96.69 0.00 1,160.28 0.00 13.00% 14/12/12*365/273
1 VACACIONES 81.74 0.00 980.88 0.00 10.99% (30/273)
2 GRATIFICACIONES 163.49 0.00 1,961.88 0.00 21.98% (60/273)
3 DOMINGOS & FERIADOS-DESC.MEDICO 168.93 0.00 2,027.16 0.00 22.71% (62/273)
DESCANSO MEDICO 10.90 0.00 130.80 0.00 1.47% (4/273)
ESSALUD 66.95 0.00 803.37 0.00 9.00% A
JUBILACION ANTICIPADA 14.88 0.00 178.53 0.00 2.00% B
SCTR-SALUD 7.22 0.00 86.58 0.00 0.97% C
SCTR-PENSIONES(interior Mina) 30.13 0.00 361.51 0.00 4.05% D
VIDA LEY 2.68 0.00 32.13 0.00 0.36% E
APORTES REM. PRINCIPAL 16.38%
ESSALUD 7.36 0.00 88.28 0.00 0.99% 1*A
IES 1.63 0.00 19.62 0.00 0.22% 1*B
SCTR-SALUD 0.79 0.00 9.51 0.00 0.11% 1*C
SCTR-PENSIONES 3.31 0.00 39.73 0.00 0.45% 1*D
VIDA LEY 0.29 0.00 3.53 0.00 0.04% 1*E
IMPUESTOS VACACIONES 1.80%
ESSALUD 14.71 0.00 176.56 0.00 1.98% 2*A
IES 3.27 0.00 39.24 0.00 0.44% 2*B
SCTR-SALUD 1.59 0.00 19.03 0.00 0.21% 2*C
SCTR-PENSIONES 6.62 0.00 79.45 0.00 0.89% 2*D
VIDA LEY 0.59 0.00 7.06 0.00 0.08% 2*E
IMPUESTO GRATIFICACIONES 3.60%
ESSALUD 15.20 0.00 182.45 0.00 2.04% 3*A
IES 3.38 0.00 40.54 0.00 0.45% 3*B
SCTR-SALUD 1.64 0.00 19.66 0.00 0.22% 3*C
SCTR-PENSIONES 6.84 0.00 82.10 0.00 0.92% 3*D
VIDA LEY 0.61 0.00 7.30 0.00 0.08% 3*E
IMPUESTO DOM Y FER.DES.MED. 3.72%
TOTAL: 1,455.30 1,541.00 17,463.46 18,492.00 95.641%
DIAS UTILES DOMINGOS FERIADOS DES.MEDICOVACACIONES
ENERO 0 5 0 26
FEBRERO 24 4 0
MARZO 27 4 0
ABRIL 23 5 2
MAYO 26 4 1
JUNIO 25 4 1
JULIO 24 5 2
AGOSTO 26 4 1
SEPTIEMBRE 26 4 0
OCTUBRE 25 5 1
NOVIEMBRE 25 4 1
DICIEMBRE 22 4 1 4
273 52 10 4 26
ACUMULADO 273 325 335 339 365
Clculo de Leyes Sociales
LEYES SOCIALES DE CTTA A TODO COSTO
PDF created with pdfFactory Pro trial version www.pdffactory.com
ESTRUCTURA DE COSTOS MANO DE OBRA TODO COSTO
TIPO DE CAMBIO (Venta): 2.693
CATEG CATEGORIA UNIDAD JORNAL S/. JORNAL U.S.$ L.SOCIALES TOTAL
CAPATAZ CAPATAZ S/.XJORNAL 77.00 28.59 17.14 45.73
MAESTRO 2 MAESTRO PERFORIS./WINCHER/PALERO S/.XJORNAL 51.00 18.94 18.11 37.05
MAESTRO 3 SOSTENIMIENTO Y SERVICIOS S/.XJORNAL 49 18.20 17.40 35.60
AYUDANTE1 AYUDANTE1 S/.XJORNAL 47.00 17.45 16.69 34.14
OPERADOR 1-A OPERADOR JUMBO S/.XJORNAL 70.50 26.18 25.04 51.22
OPERADOR 2-A Escupero/Robot /Lanzador Concreto S/.XJORNAL 65.50 24.32 23.26 47.58
UNIDAD BASE % CORRESP. COSTO TOTAL
ALIMENTACION OPERADOR DUMPER S/.X DIA 11.5 65% 7.475
PASAJE OPERADOR DUMPER 80 100% 80
FACTOR TRABAJO 42 14
EQUIPOS UNIDAD COSTO PROPIEDAD COSTO OPERACIN COSTO TOTAL
U.S.$/HR U.S.$/HR U.S.$/HR
JUMBO ELECTROHIDR DE 1 BRAZO (*) $/HR 86.87 16.13 103
SCOOP DIESEL 4 YD3 $/HR 45.79 14.21 60
CONTINGENCIAS % 3%
GASTOS GENERALES % 0%
UTILIDAD % 10%
FACTOR DE EFICIENCIA EN COLOCADO CUADROS MADERA 100%
PRODUCCION TAJEOS
COSTO HORARIO DE EQUIPOS U.S.$/HR MESES UNIDAD CANTIDAD
WINCHES ELECTRICOS DE ARRASTRE JOY DE 20 3.67 ENERO TMS 27417.00
PALA NEUMATICA 12B 6.35 FEBRERO TMS 33724.00
BOMBA SUMERGIBLE GRINDEX MODELO MAJOR H, 1.16 MARZO TMS 32548.00
VENTILADORES ELECT 6000CFM 15H 0.92 ABRIL TMS 31181.00
SHOTCRETERA ALIVA 3.70 MAYO TMS 28884.00
LOCOMOTORA 3.5 TN A BATERIA U.S.$/Mes 1,400.00 JUNIO TMS 26491.00
LOCOMOTORA 5.5 TN A BATERIA U.S.$/Mes 2,200.00 JULIO TMS 30759.00
LOCOMOTORA TROLLEY DE 5.5 TN U.S.$/Mes 3,400.00 AGOSTO TMS 27152.00
LOCOMOTORA TROLLEY DE 10 TN U.S.$/Mes 8,000.00 SEPTIEMBRE TMS 27055.00
CARROS MINEROS GRAMBY 180 CFM U.S.$/Mes 151.04 14500 151.041667 OCTUBRE TMS 27835.00
CARROS MINEROS GRAMBY 110 CFM U.S.$/Mes 97.55 9365 97.5520833 NOVIEMBRETMS 32217.00
CARROS MINEROS GRAMBY 80 CFM U.S.$/Mes 91.20 8500 91.1979167 PROMEDIOTMS 29569.36
CARROS MINEROS U35 U.S.$/Mes 47.03 1400 46.6666667
MEZCLADORA U.S.$/Hr 4.44 Consumo Unidad
SCOOP 2.2 Yd3 $/Hr 50.00 3.00 Glns/Hr
SCOOP 1.5 Yd3 $/Hr 40.00 2.00 Glns/Hr
SCOOP 3.5 Yd3 $/Hr 60.00 3.00 Glns/Hr
JUMBO ROCKET BOOMER $/Hr 90.00 1.50 Glns/Hr
VOLQUETE BAJO PERFIL $/Hr 50.00 3.00 Glns/Hr
PERFORADORA JACK LEG (U.S.$/Ft) $/Hr 0.10
COSTO DE TRANSPORTE DE MADERA
RUBRO Und CONSUMO P.UNIT COSTO TOTAL COSTO UNIT OBSERVACION
$/pie
MADERA Pie2-Mina-mes 530,984.18 0.00 0.00 0.00
PERSONAL Glb 1.00 19,175.25 19,175.25 0.04
GASTOS ADMINISTRATIVOS % 0.07 0.00
MANTENIMIENTO CALESAS Und 39.00 23.00 897.00 0.00 Entregada x CMHSA
COSTO LOCOMOTORA SERVICIOS Glb 1.00 1,196.00 1,196.00 0.00
CAMION DYNA Und 1.00 0.00 0.00 0.00
T O T A L 0.04
NOTA: 2,236.62
Factor de correccion longitud madera (pies a mts) 0.98
Transporte Madera Boca a Interior Mina x
Rampa RNG
PDF created with pdfFactory Pro trial version www.pdffactory.com
TIPO DESCRIPCION UNIDAD
PRECIO ENERO 2012
S/.
PRECIO ENERO 2012
U.S.$
VIDA UTIL
UNIDAD VIDA
UTIL
Aceite de Perforacin Almo U.S.$/Gln 9.16
Oxigeno U.S.$/Botella 44.56
Floculante U.S.$/Kg 6.82
Acetileno U.S.$/Botella 110.93
Poliyute U.S.$/M2 1.45
Alambre # 16 U.S.$/Kg 1.22
Alcayata 1/2" U.S.$/Pza 3.36
Cadena 3/16" U.S.$/Mts 2.41
Calibradores U.S.$/Pza 0.15
Grampa de Fe corrugado 3/8" U.S.$/Pza 1.21
Cacho de toro (3/4" x 1.80m) U.S.$/Pza 5.88
Malla Electrosoldada de 4"x4" U.S.$/Mts2 3.18
Adaptador de perno U.S.$/Pza 88.00 350.00 Pernos
Perno helicoidal de 6'+TUERCA+PLACA U.S.$/Pza 8.12
Perno helicoidal de 7'+TUERCA+PLACA U.S.$/Pza 8.82
Perno helicoidal de 8'+TUERCA+PLACA U.S.$/Pza 9.54
Perno Hydrabolt 5', tuerca, placa U.S.$/Pza 12.43
Perno Hydrabolt 6', tuerca, placa U.S.$/Pza 12.82
Perno Hydrabolt 7', tuerca, placa U.S.$/Pza 13.92
Dramix U.S.$/Kg 1.95
62090005 Fibra Sintectica BRCHIP 54 U.S.$/Kg 9.35
Acelerante U.S.$/Kg 0.82
Cartucho de cemento cembol ( 32mm x 305mm) U.S.$/Unid 0.22
Resina U.S.$/Unid 0.75
Cemento S./Bls 30.32 11.26
Clavo 3" U.S.$/Kg 1.28
Clavo 4" U.S.$/Kg 1.28
Clavo 5" U.S.$/Kg 1.44
Clavo 6" U.S.$/Kg 1.44
Tuberia de polietileno de 2" AGUA U.S.$/Pza 2.34
Tubo PVC (Recorte Voladura) U.S.$/Pza 0.41
Tubo PVC 4"x3m U.S.$/Mts 4.10
Codo PVC 4x90 U.S.$/Pza 0.79
Manguera de Aire 1" U.S.$/Mts 2.70 150.00 Pies
Manguera de Agua 1/2" U.S.$/Mts 1.33 150.00 Pies
Soldadura Cellocord 5/32 U.S.$/Kg 3.90
Soldadura Supercito 5/32 U.S.$/Kg 3.84
Soldadura Supercito 1/8 U.S.$/Kg 3.91
Tecle 2 tn. U.S.$/Unid 245.67 360.00 Disp
Descanso (listones 2"x2"x5m.) U.S.$/Pza 0.45
Sacos de polipropileno (50 Kgs/saco) U.S.$/Unid 0.38
Pintura Spry U.S.$/Pza 2.86
Cancamo (Fierro corrugado 3/4" x 8") U.S.$/Pza 5.67
Perno Exagonal U.S.$/Pza 1.16
Pintura Esmalte U.S.$/Pza 9.31
Escalera 3 m. U.S.$/Unid 12.64
COMBUSTIBLE Petroleo S./Gln 12.24 4.55 VIDA UTIL
Barra de extension porta broca conica 4', 7876-6112-11 U.S.$/Pza 68.20 1,820 Pies
Barra de extension porta broca conica 6', 7876-6118-11 U.S.$/Pza 94.60 1,820 Pies
Barra de extension porta broca conica 8', 7876-1124-11 U.S.$/Pza 103.40 1,820 Pies
Broca de 40 mm U.S.$/Pza 25.30 350 Pies
Broca de 38 mm U.S.$/Pza 24.75 350 Pies
Broca de 36 mm U.S.$/Pza 25.85 350 Pies
Barra MF T38 X H35 X R32 X 14", 7324-6543-20 U.S.$/Pza 581.90 2,500 mts
Broca boton R32 X 1-3/4", 7733-5245-S45 U.S.$/Pza 93.50 200 mts
Shank adapter HLX5 X T38, 7304-7585-01 U.S.$/Pza 366.30 3,500 mts
Aco Top Cen R38 55,7994-3655 (COPLAS) U.S.$/Pza 71.50 3,000 mts
Broca escar. 4" GRADOS 12,7721-4802-S45 (RIMADORA) U.S.$/Pza 233.20 200 mts
Adaptador PIL R32 40 12 GRADOS,7821-3440 (ADAPTADOR RIM. U.S.$/Pza 271.70 200 mts
Shank adapter hembra (BOLTER) U.S.$/Pza 341.00 3,500 mts
Barra de extension R32 H25 (BOLTER) U.S.$/Pza 174.90 5,000 Pies
Broca boton R25 x 37 mm (BOLTER) U.S.$/Pza 80.30 500 Pies
Afiladora de Brocas U.S.$/Pza 1,600.00 100,000 mts
Cordon detonante 5p (pentacord) U.S.$/Mts 0.23
Igneter cord U.S.$/Mts 0.41
Guia ensamblada 2.4 mts - carmex (300) U.S.$/Pza 0.76
Exsanel 2.10 mts N 02 (300) U.S.$/Pza 1.15
Exsanel 3.0 mts N 288 (200) U.S.$/Pza 1.32
Exsanel 4.80 mts N 180 (200) U.S.$/Pza 1.58
Emulex 45% 1" x 7" (276) Cart U.S.$/Cart 0.23
Emulex 45% 1 1/8" x 12" (128) Cart U.S.$/Cart 0.52
Emulex 45% 1 1/8" x 12" (128) Kgs U.S.$/Kgs 2.66
Exadit 45% 7/8" x 7" (328) Cart U.S.$/Cart 0.17
Exadit 45% 7/8" x 7" (328) Kgs U.S.$/Kgs 2.23
Exsablock 7/8" x 7" (276) Cart U.S.$/Cart 0.16
Exsablock 7/8" x 7" (276) Kgs U.S.$/Kgs 2.21
Mininel (2.10 mt) U.S.$/Pza 1.05
Mininel (3.00 mt) U.S.$/Pza 1.32
Fulminante electrico 4 mts U.S.$/Pza 4.54
Emulnor 500 1" x 7" (318) Cart U.S.$/Cart 0.14
Emulnor 500 1" x 7" (318) Kgs U.S.$/Kgs 1.78
Emulnor 1000 1" x 7" (264) Cart U.S.$/Cart 0.17
Emulnor 1000 1" x 7" (264) Kgs U.S.$/Kgs 1.79
Emulnor 3000 1 1/8" x 12" (114) Kgs U.S.$/Kgs 1.96
Emulnor 3000 1 1/8" x 12" (114) Cart U.S.$/Cart 0.43
Emulnor 3000 1" x 7" (260) Cart U.S.$/Cart 0.20
Emulnor 3000 1" x 7" (260) Kgs U.S.$/Kgs 2.08
ACEROS DE
PERFORACION
MATERIALES
LISTADO DE PRECIOS DE MATERIALES
ACCESORIOS Y
EXPLOSIVOS
PDF created with pdfFactory Pro trial version www.pdffactory.com
Mad.Aserrada 2"x8"x2.5m S./Pies2 1.52 0.56
Mad.Redondo 6"X3m S./Pies2 1.33 0.49
Madera Cantonera S./Pza 10.43 3.87
Redondo 8" x 8' S./Pza 43.84 16.28
Redondo 5" x 10' S./Pza 21.40 7.95
Redondo 8" x 10' S./Pza 54.81 20.35
Redondo 6" x 10' S./Pza 30.83 11.45
Redondo 7" x 8' S./Pza 33.57 12.47
Redondo 6" x 8' S./Pza 24.66 9.16
Redondo 7" x 10' S./Pza 41.95 15.58
Redondo 4" x 8' S./Pza 10.95 4.07
Redondo 5" x 8' S./Pza 17.12 6.36
Redondo 8" x 4mts S./Pza 73.07 27.13
Redondo 5" x 7' S./Pza 14.99 5.57
Tabla 8" x 2" x 10' S./Pza 19.90 7.39
Tabla 8" x 4" x 10' S./Pza 39.82 14.79
Tabla 1" x 5" x 8' S./Pza 4.96 1.84
Tabla 8" x 2" x 4' S./Pza 7.97 2.96
Tabla 8" x 2" x 2' S./Pza 3.98 1.48
Durmiente 8"x4"x4' S./Pza 15.92 5.91
Durmiente 8"x8"x5' S./Pza 83.60 31.04
Botas U.S.$/Pza 19.57 183.00 Disp
Chaleco de malla con cinta reflectiva U.S.$/Pza 7.34 90.00 Disp
Casco Tipo Sombrero con orejera U.S.$/Pza 51.47 1,095.00 Disp
Faja ergonomica de proteccion lumbar U.S.$/Pza 7.11 183.00 Disp
Protector U.S.$/Pza 11.32 1,095.00 Disp
Barbiquejo U.S.$/Pza 0.68 90.00 Disp
Respirador U.S.$/Pza 23.13 365.00 Disp
Filtro U.S.$/Pza 3.18 60.00 Disp
Cartucho U.S.$/Pza 4.52 365.00 Disp
Retenedor U.S.$/Pza 2.63 365.00 Disp
Guantes de Cuero U.S.$/Pza 3.30 7.00 Disp
Guantes de Neoprene U.S.$/Pza 7.94 7.00 Disp
Correa Portalampara U.S.$/Pza 3.63 365.00 Disp
Tapon de oido U.S.$/Pza 0.63 45.00 Disp
Mameluco U.S.$/Pza 18.67 183.00 Disp
Pantalon de Jebe U.S.$/Pza 12.56 90.00 Disp
Casaca de jebe U.S.$/Pza 12.56 90.00 Disp
Lampara U.S.$/Pza 17.00
Anteojo U.S.$/Pza 5.20 120.00 Disp
Cordon sujetador de anteojo U.S.$/Pza 2.28 183.00 Disp
Tafilete U.S.$/Pza 4.21 365.00 Disp
Corvina U.S.$/Pza 51.70 150.00 Disp
Palana (Lampa tipo cuchara) U.S.$/Pza 9.39 50.00 Disp
Pico U.S.$/Pza 10.90 50.00 Disp
Comba de 6 Lbs U.S.$/Pza 7.83 75.00 Disp
Llave Stilson de 8" U.S.$/Pza 4.79 150.00 Disp
Llave Francesa de 8" U.S.$/Pza 5.90 150.00 Disp
Azuela de 3 Lbs U.S.$/Pza 9.24 150.00 Disp
Chotana U.S.$/Pza 11.18 100.00 Disp
Cable de Acero de 3/8" U.S.$/Mts 1.16 100.00 Disp
Llave stillson de 14" U.S.$/Pza 13.10
MADERA
IMPLEMENTO DE
SEGURIDAD
HERRAMIENTAS
PDF created with pdfFactory Pro trial version www.pdffactory.com
TRANSPORTE CON LOCOMOTORA TROLLEY 5.5 Tons
07144 07145 CONSORCIO MINER0 HORIZONTE S.A.
Produccin Tons/Mes 10,100.00 Tons
No CARROS MINEROS Cant 8.00 Das Mes 30.00 Turnos 2.00
ITEM DESCRIPCION UNI. CANTID. PRECIO MES SUBTOT. TOTAL
UNITARIO U.S.$ $ US$/ UNID
1.- MANO DE OBRA
Maestro Locomotorista Tareas 1.00 37.05 $/Mes 2,223.03
Ayudante Locomotorista Tareas 1.00 34.14 $/Mes 2,048.68
4,271.71 0.42
2.- IMPLEMENTOS
Implementos Seguridad Tareas 2.00 1.90 227.48
227.48 0.023
3.- CARROS MINEROS GRAMBY
Carros Mineros Gramby 80 CFM Cant 8.000 91.20 $/Mes 729.60
729.60 0.07
5.- EQUIPOS
Locomotora LT-02 Cant 1.00 3,400.00 $/Mes 3,400.00
3,400.00 0.34
0.85
6.- GASTOS INDIRECTOS
Contingencia 3% $ 0.03
Gastos Generales 0% $ 0.00
Utilidad 10% $ 0.09
TOTAL COSTO TONELADA EN DOLARES (US$/ TON) 0.97
TRANSPORTE EXTRACCION CON LOCOMOTORA LT-02(5.5 Tons)
PDF created with pdfFactory Pro trial version www.pdffactory.com
TRANSPORTE CON LOCOMOTORA A BATERIA 5.5 Tons
CONSORCIO MINER0 HORIZONTE S.A.
Produccin Tons/Mes 5,350.00 Tons
No CARROS MINEROS Cant 8.00 Das Mes 30.00 Turnos 2.00
ITEM DESCRIPCION UNI. CANTID. PRECIO MES SUBTOT. TOTAL
UNITARIO U.S.$ $ US$/ UNID
1.- MANO DE OBRA
Maestro Locomotorista Tareas 1.00 37.05 $/Mes 2,223.03
Ayudante Locomotorista Tareas 1.00 34.14 $/Mes 2,048.68
4,271.71 0.80
2.- IMPLEMENTOS
Implementos Seguridad Tareas 2.00 1.90 227.48
227.48 0.043
3.- CARROS MINEROS GRAMBY
Carros Mineros Gramby 80 CFM Cant 8.000 91.20 $/Mes 729.60
729.60 0.14
5.- EQUIPOS
Locomotora LM-15 Cant 1.00 2,200.00 $/Mes 2,200.00
2,200.00 0.41
1.39
6.- GASTOS INDIRECTOS
Contingencia 3% $ 0.04
Gastos Generales 0% $ 0.00
Utilidad 10% $ 0.14
TOTAL COSTO METRO LINEAL EN DOLARES (US$/ TON) 1.57
TRANSPORTE EXTRACCION CON LOCOMOTORA A BATERIA LM 15(5.5
Tons)
PDF created with pdfFactory Pro trial version www.pdffactory.com
TRANSPORTE CON LOCOMOTORA A BATERIA 3.5 Tons
07128 07129 CONSORCIO MINER0 HORIZONTE S.A.
TRANSPORTE EXTRACCION CON LOCOMOTORA A BATERIA LM 10(3.5 Tons) Produccin Tons/Mes 5,350.00 Tons
No CARROS MINEROS Cant 15.00 Das Mes 30.00 Turnos 2.00
ITEM DESCRIPCION UNI. CANTID. PRECIO MES SUBTOT. TOTAL
UNITARIO U.S.$ $ US$/ UNID
1.- MANO DE OBRA
Maestro Locomotorista Tareas 1.00 37.05 $/Mes 2,223.03
Ayudante Locomotorista Tareas 1.00 34.14 $/Mes 2,048.68
4,271.71 0.80
2.- IMPLEMENTOS
Implementos Seguridad Tareas 2.00 1.90 227.48
227.48 0.043
3.- CARROS MINEROS GRAMBY
Carros Mineros U35 Cant 15.000 47.03 $/Mes 705.45
705.45 0.13
5.- EQUIPOS
Locomotora LM-10 Cant 1.00 1,400.00 $/Mes 1,400.00
1,400.00 0.26
1.23
6.- GASTOS INDIRECTOS
Contingencia 3% $ 0.04
Gastos Generales 0% $ 0.00
Utilidad 10% $ 0.12
TOTAL COSTO METRO LINEAL EN DOLARES (US$/ TON) 1.39
PDF created with pdfFactory Pro trial version www.pdffactory.com
TRANSPORTE CON LOCOMOTORA A BATERIA 5.5 Tons
07132 07133 CONSORCIO MINER0 HORIZONTE S.A.
Produccin Tons/Mes 8,000.00 Tons
No CARROS MINEROS Cant 7.00 Das Mes 30.00 Ddias 2.00
ITEM DESCRIPCION UNI. CANTID. PRECIO MES SUBTOT. TOTAL
UNITARIO U.S.$ $ US$/ UNID
1.- MANO DE OBRA
Maestro Locomotorista Tareas 1.00 37.05 $/Mes 2,223.03
Ayudante Locomotorista Tareas 1.00 34.14 $/Mes 2,048.68
4,271.71 0.53
2.- IMPLEMENTOS
Implementos Seguridad Tareas 2.00 1.90 227.48
227.48 0.028
3.- CARROS MINEROS GRAMBY
Carros Mineros Gramby 80 CFM Cant 7.000 91.20 $/Mes 638.40
638.40 0.08
5.- EQUIPOS
Locomotora LM-11 Clyton Cant 1.00 2,200.00 $/Mes 2,200.00
2,200.00 0.28
0.92
6.- GASTOS INDIRECTOS
Contingencia 3% $ 0.03
Gastos Generales 0% $ 0.00
Utilidad 10% $ 0.09
TOTAL COSTO METRO LINEAL EN DOLARES (US$/ TON) 1.04
TRANSPORTE EXTRACCION CON LOCOMOTORA A BATERIA LM 11(5.5
Tons)
PDF created with pdfFactory Pro trial version www.pdffactory.com
TRANSPORTE CON LOCOMOTORA TROLLEY 5.5 Tons
CONSORCIO MINER0 HORIZONTE S.A.
Produccin Tons/Mes 10,100.00 Tons
No CARROS MINEROS Cant 8.00 Das Mes 30.00 Turnos 2.00
ITEM DESCRIPCION UNI. CANTID. PRECIO MES SUBTOT. TOTAL
UNITARIO U.S.$ $ US$/ UNID
1.- MANO DE OBRA
Maestro Locomotorista Tareas 1.00 37.05 $/Mes 2,223.03
Ayudante Locomotorista Tareas 1.00 34.14 $/Mes 2,048.68
4,271.71 0.42
2.- IMPLEMENTOS
Implementos Seguridad Tareas 2.00 1.90 227.48
227.48 0.023
3.- CARROS MINEROS GRAMBY
Carros Mineros Gramby 80 CFM Cant 8.000 91.20 $/Mes 729.60
729.60 0.07
5.- EQUIPOS
Locomotora LT-01 Cant 1.00 3,400.00 $/Mes 3,400.00
3,400.00 0.34
0.85
6.- GASTOS INDIRECTOS
Contingencia 3% $ 0.03
Gastos Generales 0% $ 0.00
Utilidad 10% $ 0.09
TOTAL COSTO METRO LINEAL EN DOLARES (US$/ TON) 0.97
TRANSPORTE EXTRACCION CON LOCOMOTORA LT-01 TROLLEY (5.5
Tons)
PDF created with pdfFactory Pro trial version www.pdffactory.com
TRANSPORTE CON LOCOMOTORA TROLLEY 10 Tons
07136 07137 CONSORCIO MINER0 HORIZONTE S.A.
Produccin Tons/Mes 18,000.00 Tons
No CARROS MINEROS Cant 10.00 Das Mes 30.00 Ddias 2.00
ITEM DESCRIPCION UNI. CANTID. PRECIO MES SUBTOT. TOTAL
UNITARIO U.S.$ $ US$/ UNID
1.- MANO DE OBRA
Maestro Locomotorista Tareas 1.00 37.05 $/Mes 2,223.03
Ayudante Locomotorista Tareas 1.00 34.14 $/Mes 2,048.68
4,271.71 0.24
2.- IMPLEMENTOS
Implementos Seguridad Tareas 2.00 1.90 227.48
227.48 0.013
3.- CARROS MINEROS GRAMBY
Carros Mineros Gramby 180 Cant 10.000 151.04 $/Mes 1,510.40
1,510.40 0.08
5.- EQUIPOS
Locomotora LT-05 Cant 1.00 8,000.00 $/Mes 8,000.00
8,000.00 0.44
0.78
6.- GASTOS INDIRECTOS
Contingencia 3% 0.02
Gastos Generales 0% 0.00
Utilidad 10% $ 0.08
TOTAL COSTO METRO LINEAL EN DOLARES (US$/ TON) 0.88
TRANSPORTE EXTRACCION CON LOCOMOTORA LT-05 TROLLEY (10
Tons)
PDF created with pdfFactory Pro trial version www.pdffactory.com
TRANSPORTE CON LOCOMOTORA TROLLEY 10 Tons (TUNEL BALCON)
07136 07137 CONSORCIO MINER0 HORIZONTE S.A.
Produccin Tons/Mes 24,000.00 Tons
No CARROS MINEROS Cant 10.00 Das Mes 30.00 Ddias 2.00
ITEM DESCRIPCION UNI. CANTID. PRECIO MES SUBTOT. TOTAL
UNITARIO U.S.$ $ US$/ UNID
1.- MANO DE OBRA
Maestro Locomotorista Tareas 1.00 37.05 $/Mes 2,223.03
Ayudante Locomotorista Tareas 1.00 34.14 $/Mes 2,048.68
4,271.71 0.18
2.- IMPLEMENTOS
Implementos Seguridad Tareas 2.00 1.90 227.48
227.48 0.009
3.- CARROS MINEROS GRAMBY
Carros Mineros Gramby 180 CFM Cant 10.000 151.04 $/Mes 1,510.40
1,510.40 0.06
5.- EQUIPOS
Locomotora LT-05 Cant 1.00 8,000.00 $/Mes 8,000.00
8,000.00 0.33
0.58
6.- GASTOS INDIRECTOS
Contingencia 3% 0.02
Gastos Generales 0% 0.00
Utilidad 10% $ 0.06
TOTAL COSTO METRO LINEAL EN DOLARES (US$/ TON) 0.66
TRANSPORTE EXTRACCION CON LOCOMOTORA LT-09 TROLLEY (10
Tons)
PDF created with pdfFactory Pro trial version www.pdffactory.com
N de Taladros: 51.00 Avance/Disp 3.00 Metros
UNIDAD CANTIDAD FACTOR PU SUB TOTAL U.S.$/MT
OPERADOR DE JUMBO Hom/Disp 1.00 1.00 51.22 51.22
AYUDANTE OP. JUMBO Hom/Disp 1.00 1.00 37.05 37.05
OPERADOR SCOOPTRAM Hom/Disp 1.00 0.50 47.58 23.79
CARGADOR/DISPARADOR Hom/Disp 1.00 1.00 37.05 37.05
SUB-TOTAL 149.11 49.70
MATERIALES
UNIDAD MTS/DISP
VIDA
ECONOMICA
MTS
ESTANDAR
PZAS/DISP
PRECIO
U.S.$/PZA
U.S.$/MT
BARRAS DE PERFORACION MT/DISP 162.0227189 2500 0.064809088 581.90 12.57
BROCAS DE 45 MM MT/DISP 153.0214567 200 0.765107284 93.50 23.84
SHANK ADAPTER MT/DISP 162.0227189 3500 0.046292205 366.30 5.65
AFILADOR BROCAS MT/DISP 153.0214567 100000 0.001530215 1600.00 0.82
COPLAS MT/DISP 0 3000 0 71.50 0.00
RIMADORA DE 89 MM MT/DISP 9.00126216 200 0.045006311 233.20 3.50
ADAPTADOR DE RIMADORA MT/DISP 9.00126216 200 0.045006311 271.70 4.08
TUBO PVC (Voladura recorte) PZAS/DISP 5 0.41 0.68
TUBERIA DE POLIETILENO DE 2" AGUA PZAS/DISP 0 2.34 0.00
PETROLEO (JUMBO) GLN/HR 3 4.55 4.54
HERRAMIENTAS 1.21 0.40
ALCAYATAS DE 3/4" PZAS/DISP 4 3.36 4.48
0
SUB-TOTAL 60.56
IMPLEMENTOS SEGURIDAD
UNIDAD MTS/DISP
COSTO UNIT
U.S.$/Pers
COSTO
U.S.$
U.S.$/MT
Implementos Seguridad Unidad 3.00 1.90 5.69 1.90
Implementos Operador Scoop Unidad 0.50 3.58 1.79 0.60
2.49
VOLADURA
UNIDAD TALADROS
CANTIDAD/TA
LADRO
CANTIDAD
PZA
UNIDAD
KGS
COSTO
U.S.$/Kgs
U.S.$/MT
EMULEX 45% 1 1/8" X 12" (128) TALADROS 35.00 9.97 349.00 68.16 2.66 60.43
EXADIT 45% 7/8" X 7" (328) TALADROS 13.00 6.00 78.00 5.95 2.23 4.42
CORDON DETONANTE 5P MTS 40.00 0.23 3.07
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) PZAS 2.00 0.76 0.51
EXSANEL 4.80 MTL PZAS 48.00 1.58 25.28
SUB-TOTAL 93.70
EQUIPOS
UNIDAD HRS/DISP
COSTO
PROPIEDAD
U.S.$/HR
COSTO
OPERACIN
U.S.$/HR
COSTO
TOTAL
U.S.$/HR
COSTO
TOTAL
U.S.$
U.S.$/MT
JUMBO ELECTROHIDR DE 1 BRAZO (*) HORAS 2.00 90.00 180.00
SCOOP DIESEL 3.5 YD3 HORAS 2.50 45.79 14.21 60.00 150.00
CAMION DE BAJO PERFIL (2 CAMIONES X 1.8HrsxDisparo) HORAS 0.00 0.00
BOMBA DE 10 HP HORAS 4.00 1.16 4.65
PERFORADORA PIES 12.00 0.10 1.20
SUB-TOTAL 335.85 111.93
TOTAL COSTOS DIRECTOS 318.38
CONTINGENCIAS 3% 9.55
GASTOS GENERALES 0% 0.00
UTILIDAD 10% 31.84
TOTAL COSTOS 359.77
LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
DATOS
CICLO UNID ESTANDAR DESCRIPCION # CART # TAL
EMULEX
11/8"X12"
EXADIT 45
7/8"X7"
TOTAL
PZAS
TOTAL
KGMS
TIEMPO DE CICLO H/DISP 2 Taladro Alivio 3.00
LONG BARRA DE EXTEN PIES 11 Arranque 13.00 3.00 39.00 39.00 7.62
EFIC DE PERF % 95% AXERA 1ra Ayuda Arranque 11.00 4.00 44.00 44.00 8.59
LONG PERFORACION MT 3.19 2da Ayuda Arranque 11.00 4.00 44.00 44.00 8.59
EFIC.AVANCE % 94% 3ra Ayuda Arranque 10.00 4.00 40.00 40.00 7.81
LONG DE PERF EFECTIVA MT 3.00 4ta Ayuda Arranque 10.00 4.00 40.00 40.00 7.81
DURACION GUARDIA H 7 Ayudas de Cuadrador 5.00 2.00 10.00 10.00 1.95
GUARDIAS/DIA GDA/D 2 Ayudas de Corona 5.00 3.00 15.00 15.00 2.93
PRODUCCION/DIA M/D 12.00 Ayudas de Arrastre 10.00 4.00 40.00 40.00 7.81
Cuadradores 6.00 9.00 54.00 54.00 4.12
Coronas 6.00 4.00 24.00 24.00 1.83
Arrastres 11.00 7.00 77.00 77.00 15.04
ANCHO LABOR MT 3.5 TOTAL 51.00 349.00 78.00 427.00 74.11
ALTO LABOR MT 3.5 TOTAL CARGADOS 48.00 TOTAL KG
LONGITUD MT 3 TOTAL KG 68.16 5.95 74.11
SOBREROTURA % 13% PESO Kgs/Cartucho 0.195 0.076
VOLUMEN TOTAL M3 41.608
DENSIDAD MATERIAL TMS/M3 2.65
EFICIENCIAS
EMULEX
11/8"X12"
EXADIT 45
7/8"X7"
TONELAJE TMS/DISP 110.26 DESCRIPCION UNIDAD VALOR Kgs/Cart 0.195 0.076
Densidad de Carga Kgs/mt 24.70 Cart/Caja 128.00 328.00
Factor de Carga Kgs/Ton 0.67 KGS/CAJA 25.00 25.00
RAMPA 92442 SUR 4.5M X 4.2 M CON (JUMBO ATLAS BOOMER CMHSA)
MANO DE OBRA
DESCRIPCION
DESCRIPCION
VOLUMEN POR DISPARO LABOR
DESCRIPCION
DESCRIPCION
EFICIENCIA DE AVANCES DISTRIBUCION DE CARGA DE EXPLOSIVOS
PDF created with pdfFactory Pro trial version www.pdffactory.com
03254 N de Taladros: 42 Avance/Disp 2.90 Metros
UNIDAD CANTIDAD FACTOR PU SUB TOTAL U.S.$/MT
OPERADOR DE JUMBO Hom/Disp 1.00 1.00 51.22 51.22
AYUDANTE OP. JUMBO Hom/Disp 1.00 1.00 37.05 37.05
OPERADOR SCOOPTRAM Hom/Disp 1.00 0.50 47.58 23.79
OPERADOR CAMION DE BAJO PERFIL Hom/Disp 0.00 0.50 47.58 0.00
CARGADOR/DISPARADOR Hom/Disp 1.00 1.00 37.05 37.05
BOMBERO Hom/Disp 0.00 0.38 0.00
SERVICIOS AUXILIARES Hom/Disp 0.00 0.50 0.00
SUB-TOTAL 149.11 51.50
MATERIALES
UNIDAD MTS/DISP
VIDA
ECONOMICA
MTS
ESTANDAR
PZAS/DISP
PRECIO
U.S.$/PZA
U.S.$/MT
BARRAS DE PERFORACION MT/DISP 130.30 2,500 0.05 581.90 10.47
BROCAS DE 45 MM MT/DISP 121.62 200 0.61 93.50 19.64
SHANK ADAPTER MT/DISP 130.30 3,500 0.04 366.30 4.71
AFILADOR BROCAS MT/DISP 121.62 100,000 0.00 1600.00 0.67
COPLAS MT/DISP 0.00 3,000 0.00 71.50 0.00
RIMADORA DE 89 MM MT/DISP 8.69 200 0.04 233.20 3.50
ADAPTADOR DE RIMADORA MT/DISP 8.69 200 0.04 271.70 4.08
TUBO PVC (Voladura recorte) PZAS/DISP 5.00 0.41 0.71
TUBERIA DE POLIETILENO DE 2" AGUA PZAS/DISP 0.00 2.34 0.00
PETROLEO (JUMBO) GLN/HR 3.00 4.55 4.71
HERRAMIENTAS 1.21 0.42
ALCAYATAS DE 3/4" PZAS/DISP 4.00 3.36 4.64
0
SUB-TOTAL 53.54
IMPLEMENTOS SEGURIDAD
UNIDAD MTS/DISP
COSTO UNIT
U.S.$/Pers
COSTO
U.S.$
U.S.$/MT
Implementos Seguridad Unidad 3.00 1.90 5.69 1.96
Implementos Operador Scoop Unidad 0.50 3.58 1.79 0.62
2.58
VOLADURA
UNIDAD TALADROS
CANTIDAD/TA
LADRO
CANTIDAD
PZA
UNIDAD
KGS
COSTO
U.S.$/Kgs
U.S.$/MT
EMULEX 45% 1 1/8" X 12" (128) TALADROS 26.00 8.81 229.00 44.73 2.66 41.09
EXADIT 45% 7/8" X 7" (328) TALADROS 13.00 6.00 78.00 5.95 2.23 4.58
CORDON DETONANTE 5P MTS 40.00 0.23 3.18
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) PZAS 2.00 0.76 0.52
EXSANEL 4.80 MTL PZAS 39.00 1.58 21.28
SUB-TOTAL 70.65
EQUIPOS
UNIDAD HRS/DISP
COSTO
PROPIEDAD
U.S.$/HR
COSTO
OPERACIN
U.S.$/HR
COSTO
TOTAL
U.S.$/HR
COSTO
TOTAL
U.S.$
U.S.$/MT
JUMBO ELECTROHIDR DE 1 BRAZO (*) HORAS 2.00 90.00 180.00
SCOOP DIESEL 3.5 YD3 HORAS 2.50 45.79 14.21 60.00 150.00
CAMION DE BAJO PERFIL (2 CAMIONES X 1.8HrsxDisparo) HORAS 0.00 0.00
BOMBA DE 10 HP HORAS 4.00 1.16 4.65
PERFORADORA PIES 12.00 0.10 1.20
SUB-TOTAL 335.85 115.99
TOTAL COSTOS DIRECTOS 294.25
CONTINGENCIAS 3% 8.83
GASTOS GENERALES 0% 0.00
UTILIDAD 10% 29.43
TOTAL COSTOS 332.51
LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
DATOS
CICLO UNID ESTANDAR DESCRIPCION # CART # TAL
EMULEX
11/8"X12"
EXADIT 45
7/8"X7"
TOTAL
PZAS
TOTAL
KGMS
TIEMPO DE CICLO H/DISP 2 Taladro Alivio 3.00
LONG BARRA DE EXTEN PIES 10 Arranque 13.00 4.00 52.00 52.00 10.16
EFIC DE PERF % 95% AXERA 1ra Ayuda Arranque 9.00 2.00 18.00 18.00 3.52
LONG PERFORACION MT 2.90 2da Ayuda Arranque 9.00 2.00 18.00 18.00 3.52
EFIC.AVANCE % 95% 3ra Ayuda Arranque 8.00 2.00 16.00 16.00 3.13
LONG DE PERF EFECTIVA MT 2.75 4ta Ayuda Arranque 7.00 2.00 14.00 14.00 2.73
DURACION GUARDIA H 7 Ayudas de Cuadrador 5.00 2.00 10.00 10.00 1.95
GUARDIAS/DIA GDA/D 2 Ayudas de Corona 5.00 3.00 15.00 15.00 2.93
PRODUCCION/DIA M/D 11.00 Ayudas de Arrastre 9.00 4.00 36.00 36.00 7.03
Cuadradores 6.00 6.00 36.00 36.00 2.74
Coronas 6.00 7.00 42.00 42.00 3.20
Arrastres 10.00 5.00 50.00 50.00 9.77
ANCHO LABOR MT 3.5 TOTAL 42.00 229.00 78.00 307.00 50.67
ALTO LABOR MT 3.5 TOTAL CARGADOS 39.00 TOTAL KG
LONGITUD MT 3 TOTAL KG 44.73 5.95 50.67
SOBREROTURA % 13% PESO Kgs/Cartucho 0.195 0.076
VOLUMEN TOTAL M3 41.61
DENSIDAD MATERIAL TMS/M3 2.65
EFICIENCIAS
EMULEX
11/8"X12"
EXADIT 45
7/8"X7"
TONELAJE TMS/DISP 110.3 DESCRIPCION UNIDAD VALOR Kgs/Cart 0.195 0.076
Densidad de Carga Kgs/mt 16.89 Cart/Caja 128.00 328.00
Factor de Carga Kgs/Ton 0.46 KGS/CAJA 25.00 25.00
VOLUMEN POR DISPARO LABOR
RAMPA 3.5M X 3.5 M CON (JUMBO ATLAS BOOMER CMHSA)
EFICIENCIA DE AVANCES DISTRIBUCION DE CARGA DE EXPLOSIVOS
DESCRIPCION
DESCRIPCION
DESCRIPCION
DESCRIPCION
MANO DE OBRA
PDF created with pdfFactory Pro trial version www.pdffactory.com
02364 N de Taladros: 42 Avance/Disp. 2.75 Metro
UNIDAD CANTIDAD FACTOR PU SUB TOTAL U.S.$/MT
OPERADOR DE JUMBO Hom/Disp 1.00 1.00 51.22 51.22 0.00
AYUDANTE OP. JUMBO Hom/Disp 1.00 1.00 37.05 37.05 0.00
OPERADOR SCOOPTRAM Hom/Disp 1.00 0.50 47.58 23.79 0.00
OPERADOR CAMION DE BAJO PERFIL Hom/Disp 0.00 0.50 47.58 0.00 0.00
CARGADOR/DISPARADOR Hom/Disp 1.00 1.00 37.05 37.05 0.00
BOMBERO Hom/Disp 0.00 0.38 0.00 0.00
SERVICIOS AUXILIARES Hom/Disp 0.00 0.50 0.00 0.00
SUB-TOTAL 149.11 54.21
MATERIALES
UNIDAD MTS/DISP
VIDA
ECONOMIC
A MTS
ESTANDAR
PZAS/DISP
PRECIO
U.S.$/PZA
U.S.$/MT
BARRAS DE PERFORACION MT/DISP 123.79 2,500 0.05 581.90 10.47
BROCAS DE 45 MM MT/DISP 115.53 200 0.58 93.50 19.64
SHANK ADAPTER MT/DISP 123.79 3,500 0.04 366.30 4.71
AFILADOR BROCAS MT/DISP 115.53 100,000 0.00 1600.00 0.67
COPLAS MT/DISP 0.00 3,000 0.00 71.50 0.00
RIMADORA DE 89 MM MT/DISP 8.25 200 0.04 233.20 3.50
ADAPTADOR DE RIMADORA MT/DISP 8.25 200 0.04 271.70 4.08
TUBO PVC (Voladura recorte) PZAS/DISP 5.00 0.41 0.75
TUBERIA DE POLIETILENO DE 2" AGUA PZAS/DISP 0.00 2.34 0.00
PETROLEO (JUMBO) GLN/HR 3.00 4.55 4.96
HERRAMIENTAS 1.21 0.44
ALCAYATAS DE 3/4" PZAS/DISP 4.00 3.36 4.89
0
SUB-TOTAL 54.09
IMPLEMENTOS SEGURIDAD
UNIDAD MTS/DISP
COSTO UNIT
U.S.$/Pers
COSTO
U.S.$
U.S.$/MT
Implementos Seguridad Unidad 3.00 1.90 5.69 2.07
Implementos Operador Scoop Unidad 0.50 3.58 1.79 0.65
2.72
VOLADURA
UNIDAD TALADROS
CANTIDAD/T
ALADRO
CANTIDAD
PZA
UNIDAD
KGS
COSTO
U.S.$/Kgs
U.S.$/MT
EMULEX 45% 1 1/8" X 12" (128) TALADROS 26.00 8.81 229.00 44.73 2.66 43.25
EXADIT 45% 7/8" X 7" (328) TALADROS 13.00 6.00 78.00 5.95 2.23 4.82
CORDON DETONANTE 5P MTS 40.00 0.23 3.34
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) PZAS 2.00 0.76 0.55
EXSANEL 4.80 MTL PZAS 39.00 1.58 22.40
SUB-TOTAL 74.37
EQUIPOS
UNIDAD HRS/DISP
COSTO
PROPIEDAD
U.S.$/HR
COSTO
OPERACIN
U.S.$/HR
COSTO
TOTAL
U.S.$/HR
COSTO
TOTAL
U.S.$
U.S.$/MT
JUMBO ELECTROHIDR DE 1 BRAZO (*) HORAS 2.00 90.00 180.00
SCOOP DIESEL 3.5 YD3 HORAS 2.50 45.79 14.21 60.00 150.00
CAMION DE BAJO PERFIL (2 CAMIONES X 1.8HrsxDisparo) HORAS 0.00 0.00
B OMBA DE 10 HP HORAS 0.00 1.16 0.00
PERFORADORA PIES 12.00 0.10 1.20
SUB-TOTAL 331.20 120.40
TOTAL COSTOS DIRECTOS 305.78
CONTINGENCIAS 3% 9.17
GASTOS GENERALES 0% 0.00
UTILIDAD 10% 30.58
TOTAL COSTOS 345.54
LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
DATOS
CICLO UNIDAD ESTANDAR DESCRIPCION# CART # TAL
EMULEX
11/8"X12"
EXADIT 45
7/8"X7"
TOTAL
PZAS
TOTAL
KGMS
TIEMPO DE CICLO H/DISP 2.00 Taladro Alivio 3.00
LONG BARRA DE EXTEN PIES 10.00 Arranque 13.00 4.00 52.00 52.00 10.16
EFIC DE PERF % 95% AXERA 1ra Ayuda Arranque 9.00 2.00 18.00 18.00 3.52
LONG PERFORACION MT 2.90 2da Ayuda Arranque 9.00 2.00 18.00 18.00 3.52
EFIC.AVANCE % 95% 3ra Ayuda Arranque 8.00 2.00 16.00 16.00 3.13
LONG DE PERF EFECTIVAMT 2.75 4ta Ayuda Arranque 7.00 2.00 14.00 14.00 2.73
DURACION GUARDIA H 7.00 Ayudas de Cuadrador 5.00 2.00 10.00 10.00 1.95
GUARDIAS/DIA GDA/D 2.00 Ayudas de Corona 5.00 3.00 15.00 15.00 2.93
PRODUCCION/DIA M/D 11.00 Ayudas de Arrastre 9.00 4.00 36.00 36.00 7.03
Cuadradores 6.00 6.00 36.00 36.00 2.74
Coronas 6.00 7.00 42.00 42.00 3.20
ANCHO LABOR MT 3.50 Arrastres 10.00 5.00 50.00 50.00 9.77
ALTO LABOR MT 3.50 TOTAL 42.00 229.00 78.00 307.00 50.67
LONGITUD MT 3.00 TOTAL CARGADOS 39.00 TOTAL KG
SOBREROTURA % 13% TOTAL KG 44.73 5.95 50.67
VOLUMEN TOTAL M3 41.61 PESO Kgs/Cartucho 0.195 0.076
DENSIDAD MATERIAL TMS/M3 2.65
TONELAJE TMS/DISP 110.26
EFICIENCIAS
EMULEX
11/8"X12"
EXADIT 45
7/8"X7"
DESCRIPCION UNIDAD VALOR Kgs/Cart 0.195 0.076
Densidad de Carga Kgs/mt 16.89 Cart/Caja 128.00 328.00
Factor de CargaKgs/Ton 0.46 KGS/CAJA 25.00 25.00
DESCRIPCION
VOLUMEN POR DISPARO LABOR
CRUCERO 3.5M X 3.5 M CON (JUMBO QUASAR )
EFICIENCIA DE AVANCES DISTRIBUCION DE CARGA DE EXPLOSIVOS
DESCRIPCION
MANO DE OBRA
DESCRIPCION
DESCRIPCION
PDF created with pdfFactory Pro trial version www.pdffactory.com
03255 N de Taladros: 38 Avance/Disp. 2.90 MT
33
UNIDAD CANTIDAD FACTOR PU SUB TOTAL U.S.$/MT
OPERADOR DE JUMBO Hom/Disp 1.00 1.00 51.22 51.22 0.00
AYUDANTE OP. JUMBO Hom/Disp 1.00 1.00 37.05 37.05 0.00
OPERADOR SCOOPTRAM Hom/Disp 1.00 0.50 47.58 23.79 0.00
OPERADOR CAMION DE BAJO PERFIL Hom/Disp 0.00 0.50 47.58 0.00 0.00
CARGADOR/DISPARADOR Hom/Disp 1.00 1.00 37.05 37.05 0.00
BOMBERO Hom/Disp 0.00 0.38 0.00 0.00
SERVICIOS AUXILIARES Hom/Disp 0.00 0.50 0.00 0.00
SUB-TOTAL 149.11 51.50
MATERIALES
UNIDAD MTS/DISP
VIDA
ECONOMIC
A MTS
ESTANDAR
PZAS/DISP
PRECIO
U.S.$/PZA
U.S.$/MT
BARRAS DE PERFORACION MT/DISP 118.72 2,500 0.05 581.90 9.54
BROCAS DE 45 MM MT/DISP 110.03 200 0.55 93.50 17.77
SHANK ADAPTER MT/DISP 118.72 3,500 0.03 366.30 4.29
AFILADOR BROCAS MT/DISP 110.03 100,000 0.00 1600.00 0.61
COPLAS MT/DISP 0.00 3,000 0.00 71.50 0.00
RIMADORA DE 89 MM MT/DISP 8.69 200 0.04 233.20 3.50
ADAPTADOR DE RIMADORA MT/DISP 8.69 200 0.04 271.70 4.08
TUBO PVC (Voladura recorte) PZAS/DISP 5.00 0.41 0.71
TUBERIA DE POLIETILENO DE 2" AGUA PZAS/DISP 0.00 2.34 0.00
PETROLEO (JUMBO) GLN/HR 2.25 4.55 3.53
HERRAMIENTAS 1.21 0.42
ALCAYATAS DE 3/4" PZAS/DISP 4.00 3.36 4.64
SUB-TOTAL 49.08
IMPLEMENTOS SEGURIDAD
UNIDAD MTS/DISP
COSTO UNIT
U.S.$/Pers
COSTO
U.S.$
U.S.$/MT
Implementos Seguridad Unidad 3.00 1.90 5.69 1.96
Implementos Operador Scoop Unidad 0.50 3.58 1.79 0.62
2.58
VOLADURA
UNIDAD TALADROS
CANTIDAD/
TALADRO
CANTIDAD
PZA
UNIDAD KGS
COSTO
U.S.$/Kgs
U.S.$/MT
EMULEX 45% 1 1/8" X 12" (128) TALADROS 24.00 7.25 174.00 33.98 2.66 31.22
EXADIT 45% 7/8" X 7" (328) TALADROS 11.00 5.00 55.00 4.19 2.23 3.23
CORDON DETONANTE 5P MTS 35.00 0.23 2.78
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) PZAS 2.00 0.76 0.52
EXSANEL 4.80 MTL PZAS 35.00 1.58 19.10
SUB-TOTAL 56.85
EQUIPOS
UNIDAD HRS/DISP
COSTO
PROPIEDA
D U.S.$/HR
COSTO
OPERACIN
U.S.$/HR
COSTO
TOTAL
U.S.$/HR
COSTO
TOTAL
U.S.$
U.S.$/MT
JUMBO ELECTROHIDR DE 1 BRAZO (*) HORAS 1.50 90.00 135.00
SCOOP DIESEL 3.5 YD3 HORAS 2.20 45.79 14.21 60.00 132.00
CAMION DE BAJO PERFIL (2 CAMIONES X 1.8HrsxDisparo) HORAS 0.00 0.00
B OMBA DE 10 HP HORAS 4.00 1.16 4.65
PERFORADORA PIES 12.00 0.10 1.20
SUB-TOTAL 272.85 94.23
TOTAL COSTOS DIRECTOS 254.24
CONTINGENCIAS 3% 7.63
GASTOS GENERALES 0% 0.00
UTILIDAD 10.00% 25.42
TOTAL COSTOS 287.29
LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO #DIV/0!
DATOS
CICLO UNIDAD ESTANDAR DESCRIPCION# CART # TAL
EMULEX
11/8"X12"
EXADIT 45
7/8"X7"
TOTAL
PZAS
TOTAL
KGMS
TIEMPO DE CICLO H/DISP 2.00 Alivio de arranque 3.00
LONG BARRA DE EXTEN PIES 10.00 Arranque 10.00 4.00 40.00 40.00 7.81
EFIC DE PERF % 95% AXERA 1ra Ayuda Arranque 9.00 2.00 18.00 18.00 3.52
LONG PERFORACION MT 2.90 2da Ayuda Arranque 9.00 2.00 18.00 18.00 3.52
EFIC.AVANCE % 95% 3ra Ayuda Arranque 6.00 2.00 12.00 12.00 2.34
LONG DE PERF EFECTIVA MT 2.75 4ta Ayuda Arranque 6.00 2.00 12.00 12.00 2.34
DURACION GUARDIA H 7.00 Ayudas de Cuadrador 4.00 2.00 8.00 8.00 1.56
GUARDIAS/DIA GDA/D 2.00 Ayudas de Corona 4.00 3.00 12.00 12.00 2.34
PRODUCCION/DIA M/D 11.00 Ayudas de Arrastre 6.00 3.00 18.00 18.00 3.52
Cuadradores 5.00 6.00 30.00 30.00 2.29
Coronas 5.00 5.00 25.00 25.00 1.91
ANCHO LABOR MT 3.00 Arrastres 9.00 4.00 36.00 36.00 7.03
ALTO LABOR MT 3.00 TOTAL PERFORADOS 38.00 174.00 55.00 229.00 38.18
LONGITUD MT 3.00 TOTAL CARGADOS 35.00 TOTAL KG
SOBREROTURA % 13% TOTAL KG 33.98 4.19 38.18
VOLUMEN TOTAL M3 30.57 PESO Kgs/Cartucho 0.195 0.076
DENSIDAD MATERIAL TMS/M3 2.65
TONELAJE TMS/DISP 81.01
EFICIENCIAS
EMULEX
11/8"X12"
EXADIT 45
7/8"X7"
DESCRIPCION UNIDAD VALOR Kgs/Cart 0.195 0.076
Densidad de Carga Kgs/mt 12.73 Cart/Caja 128.00 328.00
Factor de CargaKgs/Ton 0.47 KGS/CAJA 25.00 25.00
DESCRIPCION
VOLUMEN POR DISPARO LABOR
RAMPA 3.0 M X 3.0 M CON (JUMBO ATLAS BOOMER CMHSA )
EFICIENCIA DE AVANCES DISTRIBUCION DE CARGA DE EXPLOSIVOS
MANO DE OBRA
DESCRIPCION
DESCRIPCION
DESCRIPCION
PDF created with pdfFactory Pro trial version www.pdffactory.com
02363 N de Taladros: 38 Avance/Disp. 2.90 MT
31
UNIDAD CANTIDAD FACTOR PU SUB TOTAL U.S.$/MT
OPERADOR DE JUMBO Hom/Disp 1.00 1.00 51.22 51.22
AYUDANTE OP. JUMBO Hom/Disp 1.00 1.00 37.05 37.05
OPERADOR SCOOPTRAM Hom/Disp 1.00 0.50 47.58 23.79
OPERADOR CAMION DE BAJO PERFIL Hom/Disp 0.00 1.00 0.00 0.00
CARGADOR/DISPARADOR Hom/Disp 1.00 1.00 37.05 37.05
BOMBERO Hom/Disp 0.00 1.00 0.00
SERVICIOS AUXILIARES Hom/Disp 1.00 0.00
SUB-TOTAL 149.11 51.50
MATERIALES
UNIDAD MTS/DISP
VIDA
ECONOMICA
MTS
ESTANDAR
PZAS/DISP
PRECIO
U.S.$/PZA
U.S.$/MT
BARRAS DE PERFORACION MT/DISP 118.72 2,500 0.05 581.90 9.54
BROCAS DE 45 MM MT/DISP 110.03 200 0.55 93.50 17.77
SHANK ADAPTER MT/DISP 118.72 3,500 0.03 366.30 4.29
AFILADOR BROCAS MT/DISP 110.03 100,000 0.00 1600.00 0.61
COPLAS MT/DISP 0.00 3,000 0.00 71.50 0.00
RIMADORA DE 89 MM MT/DISP 8.69 200 0.04 233.20 3.50
ADAPTADOR DE RIMADORA MT/DISP 8.69 200 0.04 271.70 4.08
TUBO PVC (Voaldura recorte) PZAS/DISP 5.00 0.41 0.71
TUBERIA DE POLIETILENO DE 2" AGUA PZAS/DISP 0.00 2.34 0.00
PETROLEO (JUMBO) GLN/HR 2.25 4.55 3.53
HERRAMIENTAS 1.21 0.42
ALCAYATAS DE 3/4" PZAS/DISP 3.00 3.36 3.48
SUB-TOTAL 47.92
IMPLEMENTOS SEGURIDAD
UNIDAD MTS/DISP
COSTO UNIT
U.S.$/Pers
COSTO
U.S.$
U.S.$/MT
Implementos Seguridad Unidad 3.00 1.90 5.69 1.96
Implementos Operador Scoop Unidad 0.50 3.58 1.79 0.62
2.58
VOLADURA
UNIDAD TALADROS
CANTIDAD/TA
LADRO
CANTIDAD
PZA
UNIDAD KGS
COSTO
U.S.$/Kgs
U.S.$/MT
EMULEX 45% 1 1/8" X 12" (128) TALADROS 24.00 7.25 174.00 33.98 2.66 31.22
EXADIT 45% 7/8" X 7" (328) TALADROS 11.00 5.00 55.00 4.19 2.23 3.23
CORDON DETONANTE 5P MTS 35.00 0.23 2.78
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) PZAS 2.00 0.76 0.52
EXSANEL 4.80 MTL PZAS 35.00 1.58 19.10
SUB-TOTAL 56.85
EQUIPOS
UNIDAD HRS/DISP
COSTO
PROPIEDAD
U.S.$/HR
COSTO
OPERACIN
U.S.$/HR
COSTO
TOTAL
U.S.$/HR
COSTO
TOTAL
U.S.$
U.S.$/MT
JUMBO ELECTROHIDR DE 1 BRAZO (*) HORAS 1.50 90.00 135.00
SCOOP DIESEL 3.5 YD3 HORAS 2.00 45.79 14.21 60.00 120.00
PERFORADORA PIES 9.00 0.10 0.90
SUB-TOTAL 255.90 88.38
TOTAL COSTOS DIRECTOS 247.22
CONTINGENCIAS 3% 7.42
GASTOS GENERALES 0% 0.00
UTILIDAD 10.00% 24.72
TOTAL COSTOS 279.36
LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO #DIV/0!
DATOS
CICLO UNIDAD ESTANDAR DESCRIPCION # CART # TAL
EMULEX
11/8"X12"
EXADIT 45
7/8"X7"
TOTAL PZAS
TOTAL
KGMS
TIEMPO DE CICLO H/DISP 2.00 Alivio de arranque 3.00
LONG BARRA DE EXTEN PIES 10.00 Arranque 10.00 4.00 40.00 40.00 7.81
EFIC DE PERF % 95% AXERA 1ra Ayuda Arranque 9.00 2.00 18.00 18.00 3.52
LONG PERFORACION MT 2.90 2da Ayuda Arranque 9.00 2.00 18.00 18.00 3.52
EFIC.AVANCE % 95% 3ra Ayuda Arranque 6.00 2.00 12.00 12.00 2.34
LONG DE PERF EFECTIVA MT 2.75 4ta Ayuda Arranque 6.00 2.00 12.00 12.00 2.34
DURACION GUARDIA H 7.00 Ayudas de Cuadrador 4.00 2.00 8.00 8.00 1.56
GUARDIAS/DIA GDA/D 2.00 Ayudas de Corona 4.00 3.00 12.00 12.00 2.34
PRODUCCION/DIA M/D 11.00 Ayudas de Arrastre 6.00 3.00 18.00 18.00 3.52
Cuadradores 5.00 6.00 30.00 30.00 2.29
Coronas 5.00 5.00 25.00 25.00 1.91
ANCHO LABOR MT 3.00 Arrastres 9.00 4.00 36.00 36.00 7.03
ALTO LABOR MT 3.00 TOTAL PERFORADOS 38.00 174.00 55.00 229.00 38.18
LONGITUD MT 3.00 TOTAL CARGADOS 35.00 TOTAL KG
SOBREROTURA % 13% TOTAL KG 33.98 4.19 38.18
VOLUMEN TOTAL M3 30.57 PESO Kgs/Cartucho 0.195 0.076
DENSIDAD MATERIAL TMS/M3 2.65
TONELAJE TMS/DISP 81.01
EFICIENCIAS
EMULEX
11/8"X12"
EXADIT 45
7/8"X7"
DESCRIPCION UNIDAD VALOR Kgs/Cart 0.195 0.076
Densidad de Carga Kgs/mt 12.73 Cart/Caja 128.00 328.00
Factor de Carga Kgs/Ton 0.47 KGS/CAJA 25.00 25.00
DESCRIPCION
VOLUMEN POR DISPARO LABOR
CRUCERO 3.0 M X 3.0 M CON (JUMBO ATLAS BOOMER CMHSA)
EFICIENCIA DE AVANCES DISTRIBUCION DE CARGA DE EXPLOSIVOS
MANO DE OBRA
DESCRIPCION
DESCRIPCION
DESCRIPCION
PDF created with pdfFactory Pro trial version www.pdffactory.com
N de Taladros: 44.00 Avance/Disp. 1.50 MT
UNIDAD CANTIDAD FACTOR PU SUB TOTAL U.S.$/MT
MAESTRO PERFORISTA Hom/Disp 2.20 1.00 37.05 81.51 0.00
AYUDANTE PERFORISTA Hom/Disp 0.50 1.00 34.14 17.07 0.00
OPERADOR SCOOPTRAM Hom/Disp 0.50 1.00 47.58 23.79 0.00
SUB-TOTAL 122.38 81.43
MATERIALES
UNIDAD MTS/DISP
VIDA
ECONOMICA
ESTANDAR
PZAS/DISP
PRECIO
U.S.$/PZA
U.S.$/MT
BARRAS DE PERFORACION 6' Pies/DISP 264.00 1,820 0.15 94.60 9.13
BROCAS DE 40 MM Pies/DISP 264.00 350 0.75 25.30 12.70
ACEITE DE PERFORACION Gkns 0.40 9.16 2.44
PETROLEO Gkns/Hr 6.00 4.55 18.15
HERRAMIENTAS 1.21 0.81
ALCAYATAS DE 3/4" PZAS/DISP 1.00 3.36 2.24
0
SUB-TOTAL 45.46
IMPLEMENTOS SEGURIDAD
UNIDAD MTS/DISP
COSTO UNIT
U.S.$/Pers
COSTO
U.S.$
U.S.$/MT
Implementos Seguridad Unidad 2.70 1.90 5.12
Implementos Seguridad Operador Unidad 0.50 3.58 1.79 4.60
VOLADURA
UNIDAD TALADROS
CANTIDAD/TA
LADRO
CANTIDAD
PZA
UNIDAD KGS
COSTO
U.S.$/Uni
U.S.$/MT
EMULEX 45% 1" X 7" (276) TALADROS 23.00 6.74 155.00 14.04 0.23 23.72
EXSABLOCK 7/8" X 7" (276) TALADROS 12.00 4.00 48.00 3.48 0.16 5.11
CORDON DETONANTE 5P MTS 65.00 0.23 9.95
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) PZAS 2.00 0.76 1.01
EXSANEL 3.0 MTL PZAS 35.00 1.32 30.74
SUB-TOTAL 70.53
EQUIPOS
UNIDAD HRS/DISP
COSTO
PROPIEDAD
U.S.$/HR
COSTO
OPERACIN
U.S.$/HR
COSTO
TOTAL
U.S.$/HR
COSTO
TOTAL U.S.$
U.S.$/MT
SCOOP DIESEL 2.2 YD3 HORAS 2.00 50.00 100.00
MANGUERA AIRE 1 MTS 30.00 150.00 0.2 2.70 0.54
MANGUERA AGUA 1/2 MTS 30.00 150.00 0.2 1.33 0.27
BOMBA DE 10 HP HORAS 4.00 1.16 4.65
PERFORADORA HORAS 264.00 0.10 26.40
SUB-TOTAL 131.85 87.74
TOTAL COSTOS DIRECTOS 289.76
CONTINGENCIAS 3% 8.69
GASTOS GENERALES 0% 0.00
UTILIDAD 10% 28.98
TOTAL COSTOS 327.42 293.64
LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
DATOS
CICLO UNIDAD ESTANDAR DESCRIPCION # CART # TAL
EMULEX
45% 1" X 7"
EXSABLOC
K 7/8" X 7"
TOTAL
PZAS
TOTAL KGMS
TIEMPO DE CICLO H/DISP 2.00 Alivio de arranque 3.00
LONG BARRA DE EXTEN PIES 6.00 Alivio de contorno 6.00
EFIC DE PERF % 95% Arranque 8.00 3.00 24.00 24.00 2.17
LONG PERFORACION MT 1.74 1ra Ayuda Arranque 6.00 2.00 12.00 12.00 1.09
EFIC.AVANCE % 87% 2da Ayuda Arranque 6.00 2.00 12.00 12.00 1.09
LONG DE PERF EFECTIVA MT 1.50 3ra Ayuda Arranque 6.00 2.00 12.00 12.00 1.09
DURACION GUARDIA H 7.00 4ta Ayuda Arranque 6.00 2.00 12.00 12.00 1.09
GUARDIAS/DIA GDA/D 2.00 Ayudas de Cuadrador 6.00 2.00 12.00 12.00 1.09
PRODUCCION/DIA M/D 6.01 Ayudas de Corona 5.00 3.00 15.00 15.00 1.36
Ayudas de Arrastre 8.00 3.00 24.00 24.00 2.17
VOLUMEN POR DISPARO LABOR Cuadradores 0.00 0.00 0.00
ANCHO LABOR MT 3.00 Coronas 0.00 0.00 0.00
ALTO LABOR MT 3.00 Arrastres 8.00 4.00 32.00 32.00 2.90
LONGITUD MT 1.83 Contorno 4.00 12.00 48.00 48.00 3.48
SOBREROTURA % 13% TOTAL PERFORADOS 44.00 155.00 48.00 203.00 17.52
VOLUMEN TOTAL M3 18.64 TOTAL CARGADOS 35.00 TOTAL KG
DENSIDAD MATERIAL TMS/M3 2.65 TOTAL KG 14.04 3.48 17.52
TONELAJE TMS/DISP 49.38 PESO Kgs/Cartucho 0.091 0.072
EFICIENCIAS
EMULEX
45% 1" X 7"
EXSABLOCK
7/8" X 7"
DESCRIPCION UNIDAD VALOR Kgs/Cart 0.091 0.072
Densidad de Carga Kgs/mt 9.58 Cart/Caja 276.00 276.00
Factor de Carga Kgs/Ton 0.35 KGS/CAJA 25.00 20.00
PRECORTE RAMPA 3.0 x 3.0 mts con Jack Leg-Scoop de 2.0 Yd3. Acarreo hasta 150 mts.
EFICIENCIA DE AVANCES DISTRIBUCION DE CARGA DE EXPLOSIVOS
MANO DE OBRA
DESCRIPCION
DESCRIPCION
DESCRIPCION
DESCRIPCION
PDF created with pdfFactory Pro trial version www.pdffactory.com
FORMATO DE PRECIOS UNITARIOS DE AVANCES - MECANIZADO
PRECORTE CRUCERO3.0 X3.0 mts. J ack Leg-Scoopde 2.0 Yd3. Acarreo hasta 150 mts. N Taladros: 44 u
N Tal.carg.: 35 u
AVANCE: 1.50 ml
ITEM DESCRIPCION UNI. CANTID. PRECIO SUBTOT. TOTAL
UNITARIO $ US$/ UNID
CICLO UNIDADESTANDARDESCRIPCION # CART # TAL
EMULEX
45% 1" X 7"
EXSABLOC
K 7/8" X 7"
TOTAL
PZAS
1.- MANODE OBRA TIEMPO DE CICLO H/DISP 2.00 Alivio de arranque 3.00
Perforista Tareas 1.00 37.05 $/Tarea 37.05 LONG BARRA DE EXTEN PIES 6.00 Alivio de contorno 6.00
Ayudante Perforista Tareas 1.00 34.14 $/Tarea 34.14 EFIC DE PERF % 95% Arranque 8.00 3.00 24.00 24.00
Operador Scoop Tareas 0.50 47.58 $/Tarea 23.79 LONG PERFORACION MT 1.74 1ra Ayuda Arranque 6.00 2.00 12.00 12.00
EFIC.AVANCE % 86% 2da Ayuda Arranque 6.00 2.00 12.00 12.00
94.99 63.32 LONG DE PERF EFECTIVA MT 1.50 3ra Ayuda Arranque 6.00 2.00 12.00 12.00
2.- IMPLEMENTOS DURACION GUARDIA H 7.00 4ta Ayuda Arranque 6.00 2.00 12.00 12.00
Tareas con ropa de Agua Tareas 2.00 1.90 3.79 GUARDIAS/DIA GDA/D 2.00 Ayudas de Cuadrador 6.00 2.00 12.00 12.00
Tareas con Operaadores Tareas 0.500 3.58 1.79 PRODUCCION/DIA M/D 6.00 Ayudas de Corona 5.00 3.00 15.00 15.00
5.58 3.72 Ayudas de Arrastre 8.00 3.00 24.00 24.00
3.- MATERIALESY HERRAMIENTAS VOLUMEN POR DISPARO LABOR Cuadradores 0.00
Barra de 6 P.P. 264.000 94.60 $/uni 13.72 ANCHO LABOR MT 3.00 Coronas 0.00
Broca de 40 mm PP 264.000 25.30 $/uni 19.08 ALTO LABOR MT 3.00 Arrastres 7.00 4.00 28.00 28.00
Aceite de Perforacin Gln 0.400 9.16 $/uni 3.66 LONGITUD MT 1.83 Contorno 4.00 12.00 48.00 48.00
Petroleo D2 Gln/Hr 6.000 4.55 $/uni 27.27 SOBREROTURA % 13% TOTAL PERFORADOS 44.00 151.00 48.00 199.00
Herramientas de Mina-Barretillas Global $/uni 1.21 VOLUMEN TOTAL M3 18.64 TOTAL CARGADOS 35.00 TOTAL KG
Alcayatas de 3/4" uni 1.000 3.36 $/uni 3.36 DENSIDAD MATERIAL TMS/M3 2.50 TOTAL KG 13.68 3.48 17.16
68.31 45.54 TONELAJE TMS/DISP46.59 PESO Kgs/Cartucho 0.091 0.072
4.- EXPLOSIVOS
EMULEX 45% x 1" x 7" (276) Pza. 151.00 0.230 $/uni 34.73
EFICIENCIAS
EMULEX
45% 1" X 7"
EXSABLOC
K 7/8" X 7"
EXSABLOCK 7/8" X 7" (276) Pza. 48.00 0.160 $/uni 7.68 DESCRIPCION UNIDAD VALOR Kgs/Cart 0.091 0.072
EXSANEL 3.0 m Pza. 35.00 1.320 $/uni 46.20 Densidad de Carga Kgs/mt 9.38 Cart/Caja 276.00 276.00
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza. 2.00 0.760 $/uni 1.52 Factor de Carga Kgs/Ton 0.37 KGS/CAJA 25.00 20.00
CORDON DETONANTE 5P Pza. 20.00 0.230 $/uni 4.60
IGNICION RAPIDA Mts. 0.10 0.410 $/uni 0.04
94.77 63.18
5.- EQUIPOS
Scooptrams 2.2 Yd3 Hrs. 2.00 50.00 $/hr 100.00
Perforadora P.P. 264.00 0.10 $/pp 26.40
Manguera Aire 1 Mts. 30.00 2.70 $/hr 0.54
Manguera Agua 1/2 Mts. 30.00 1.33 $/hr 0.27
127.21 84.80
260.57
6.- GASTOSINDIRECTOS
Contingencias 3% $ 7.82
Gastos Generales 0% $ 0.00
Utilidad 10% $ 26.06
TOTAL COSTOMETROLINEAL EN DOLARES(US$/ M-L) 294.45
Energa Elctrica, Tuberias, accesorios proporciona Ca.
EFICIENCIA DE AVANCES DISTRIBUCION DE CARGA DE EXPLOSIVOS
PDF created with pdfFactory Pro trial version www.pdffactory.com
03247 CONSORCIO MINER0 HORIZONTE S.A.
RAMPA3.0 X3.0 mts. J ack Leg- Scoopde 2.2 Yd3. Acarreo hasta 150 mts. N Taladros: 38 u
N Tal.carg.: 35 u
AVANCE: 1.50 ml
ITEM DESCRIPCION UNI. CANTID. PRECIO SUBTOT. TOTAL EFICIENCIA DE AVANCES DISTRIBUCION DE CARGA DE EXPLOSIVOS
UNITARIO $ US$/ UNID
CICLO UNIDADESTANDARDESCRIPCION # CART # TAL
EMULEX
45% 1" X 7"
EXSABLOC
K 7/8" X 7"
TOTAL
PZAS
TOTAL
KGMS
1.- MANODE OBRA TIEMPO DE CICLO H/DISP 2.00 Alivio de arranque 3.00
Perforista Tareas 2.00 37.05 $/Tarea 74.10 LONG BARRA DE EXTEN PIES 6.00 Alivio de contorno
Ayudante Perforista Tareas 0.50 34.14 $/Tarea 17.07 EFIC DE PERF % 95% Arranque 8.00 3.00 24.00 24.00 2.17
Operador Scoop Tareas 0.50 47.58 $/Tarea 23.79 LONG PERFORACION MT 1.74 1ra Ayuda Arranque 6.00 2.00 12.00 12.00 1.09
Personal de servicios auxiliares Tareas 0.00 34.14 $/Tarea 0.00 EFIC.AVANCE % 86% 2da Ayuda Arranque 6.00 2.00 12.00 12.00 1.09
Bombero Tareas 0.00 34.14 $/Tarea 0.00 LONG DE PERF EFECTIVA MT 1.50 3ra Ayuda Arranque 6.00 2.00 12.00 12.00 1.09
114.97 76.64 DURACION GUARDIA H 7.00 4ta Ayuda Arranque 6.00 2.00 12.00 12.00 1.09
2.- IMPLEMENTOS GUARDIAS/DIA GDA/D 2.00 Ayudas de Cuadrador 6.00 2.00 12.00 12.00 1.09
Tareas con ropa de Agua Tareas 2.50 1.90 4.74 PRODUCCION/DIA M/D 6.00 Ayudas de Corona 5.00 3.00 15.00 15.00 1.36
Implementos Operador Scoop Tareas 0.50 3.58 1.79
6.53 4.35 Ayudas de Arrastre 8.00 3.00 24.00 24.00 2.17
3.- MATERIALESY HERRAMIENTAS VOLUMEN POR DISPARO LABOR Cuadradores 4.00 6.00 24.00 24.00 1.74
Barra de 6 P.P. 228.000 94.60 $/uni 11.85 ANCHO LABOR MT 3.00 Coronas 4.00 6.00 24.00 24.00 1.74
Broca de 40 mm P.P. 228.000 25.30 $/uni 16.48 ALTO LABOR MT 3.00 Arrastres 7.00 4.00 28.00 28.00 2.54
Aceite de Perforacin Gln 0.400 9.16 $/uni 3.66 LONGITUD MT 1.83 Contorno 0.00
Petroleo Gln/Hr 6.000 4.55 $/uni 27.27 SOBREROTURA % 13% TOTAL PERFORADOS 38.00 151.00 48.00 199.00 17.16
Herramientas de Mina-Barretillas Global $/uni 1.21 VOLUMEN TOTAL M3 18.64 TOTAL CARGADOS 35.00 TOTAL KG
Alcayatas de 3/4" uni 1.000 3.36 $/uni 3.36 DENSIDAD MATERIAL TMS/M3 2.50 TOTAL KG 13.68 3.48 17.16
63.84 42.56 TONELAJE TMS/DISP46.59 PESO Kgs/Cartucho 0.091 0.072
4.- EXPLOSIVOS
EMULEX 45% x 1" x 7" (276) Pza. 151.00 0.230 $/uni 34.73
EFICIENCIAS
EMULEX
45% 1" X 7"
EXSABLOC
K 7/8" X 7"
EXSABLOCK 7/8" X 7" (276) Pza. 48.00 0.160 $/uni 7.68 DESCRIPCION UNIDAD VALOR Kgs/Cart 0.091 0.072
EXSANEL 3.0 m Pza. 35.00 1.320 $/uni 46.20 Densidad de Carga Kgs/mt 9.38 Cart/Caja 276.00 276.00
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza. 2.00 0.760 $/uni 1.52 Factor de Carga Kgs/Ton 0.37 KGS/CAJA 25.00 20.00
CORDON DETONANTE 5P Pza. 20.00 0.230 $/uni 4.60
IGNICION RAPIDA Mts. 0.10 0.410 $/uni 0.04
94.77 63.18
5.- EQUIPOS
Scooptrams 2.2 Yd3 Hrs. 2.00 50.00 $/hr 100.00
Perforadora P.P. 228.00 0.100 $/pp 22.80
Manguera Aire 1 Mts. 30.00 2.70 $/hr 0.54
Manguera Agua 1/2 Mts. 30.00 1.33 $/hr 0.27
Bomba de 10 HP Hrs. 4.00 1.16 $/hr 4.65
128.25 85.50
272.24
6.- GASTOSINDIRECTOS
Contingencias 3% $ 8.17
Gastos Generales 0% $ 0.00
Utilidad 10% $ 27.22
TOTAL COSTOMETROLINEAL EN DOLARES(US$/ M-L) 307.63
Energa Elctrica, Tuberias, accesorios proporciona Ca.
FORMATO DE PRECIOS UNITARIOS DE AVANCES - MECANIZADO
PDF created with pdfFactory Pro trial version www.pdffactory.com
02355 CONSORCIO MINER0 HORIZONTE S.A.
CRUCERO3.0 X3.0 mts. J acl Leg-Scoopde 2.0 Yd3. Acarreo hasta 150 mts. N Taladros: 38 u
N Tal.carg.: 35 u
AVANCE: 1.50 ml
ITEM DESCRIPCION UNI. CANTID. PRECIO SUBTOT. TOTAL EFICIENCIA DE AVANCES DISTRIBUCION DE CARGA DE EXPLOSIVOS
UNITARIO $ US$/ UNID
CICLO UNIDADESTANDARDESCRIPCION # CART # TAL
EMULEX
45% 1" X 7"
EXSABLOC
K 7/8" X 7"
TOTAL
PZAS
TOTAL
KGMS
1.- MANODE OBRA TIEMPO DE CICLO H/DISP 2.00 Alivio de arranque 3.00
Perforista Tareas 1.00 37.05 $/Tarea 37.05 LONG BARRA DE EXTEN PIES 6.00 Alivio de contorno
Ayudante Perforista Tareas 1.00 34.14 $/Tarea 34.14 EFIC DE PERF % 95% Arranque 8.00 3.00 24.00 24.00 2.17
Operador Scoop Tareas 0.50 47.58 $/Tarea 23.79 LONG PERFORACION MT 1.74 1ra Ayuda Arranque 6.00 2.00 12.00 12.00 1.09
EFIC.AVANCE % 86% 2da Ayuda Arranque 6.00 2.00 12.00 12.00 1.09
94.99 63.32 LONG DE PERF EFECTIVA MT 1.50 3ra Ayuda Arranque 6.00 2.00 12.00 12.00 1.09
2.- IMPLEMENTOS DURACION GUARDIA H 7.00 4ta Ayuda Arranque 6.00 2.00 12.00 12.00 1.09
Tareas con ropa de Agua Tareas 2.00 1.90 3.79 GUARDIAS/DIA GDA/D 2.00 Ayudas de Cuadrador 6.00 2.00 12.00 12.00 1.09
Implementos Operador Scoop Tareas 0.50 3.58 1.79 PRODUCCION/DIA M/D 6.00 Ayudas de Corona 5.00 3.00 15.00 15.00 1.36
5.58 3.72 Ayudas de Arrastre 8.00 3.00 24.00 24.00 2.17
3.- MATERIALESY HERRAMIENTAS VOLUMEN POR DISPARO LABOR Cuadradores 4.00 6.00 24.00 24.00 1.74
Barra de 6 P.P. 228.000 94.60 $/uni 11.85 ANCHO LABOR MT 3.00 Coronas 4.00 6.00 24.00 24.00 1.74
Broca de 40 mm PP 228.000 25.30 $/uni 16.48 ALTO LABOR MT 3.00 Arrastres 7.00 4.00 28.00 28.00 2.54
Aceite de Perforacin Gln 0.400 9.16 $/uni 3.66 LONGITUD MT 1.83 Contorno 0.00
Petroleo D2 Gln/Hr 6.000 4.55 $/uni 27.27 SOBREROTURA % 13% TOTAL PERFORADOS 38.00 151.00 48.00 199.00 17.16
Herramientas de Mina-Barretillas Global $/uni 1.21 VOLUMEN TOTAL M3 18.64 TOTAL CARGADOS 35.00 TOTAL KG
Alcayatas de 3/4" uni 1.000 3.36 $/uni 3.36 DENSIDAD MATERIAL TMS/M3 2.50 TOTAL KG 13.68 3.48 17.16
63.84 42.56 TONELAJE TMS/DISP46.59 PESO Kgs/Cartucho 0.091 0.072
4.- EXPLOSIVOS
EMULEX 45% x 1" x 7" (276) Pza. 151.00 0.230 $/uni 34.73
EFICIENCIAS
EMULEX
45% 1" X 7"
EXSABLOC
K 7/8" X 7"
EXSABLOCK 7/8" X 7" (276) Pza. 48.00 0.160 $/uni 7.68 DESCRIPCION UNIDAD VALOR Kgs/Cart 0.091 0.072
EXSANEL 3.0 m Pza. 35.00 1.320 $/uni 46.20 Densidad de Carga Kgs/mt 9.38 Cart/Caja 276.00 276.00
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza. 2.00 0.760 $/uni 1.52 Factor de Carga Kgs/Ton 0.37 KGS/CAJA 25.00 20.00
CORDON DETONANTE 5P Pza. 20.00 0.230 $/uni 4.60
IGNICION RAPIDA Mts. 0.10 0.410 $/uni 0.04
94.77 63.18
5.- EQUIPOS
Scooptrams 2.2 Yd3 Hrs. 2.00 50.00 $/hr 100.00
Perforadora P.P. 228.00 0.10 $/pp 22.80
Manguera Aire 1 Mts. 30.00 2.70 $/hr 0.54
Manguera Agua 1/2 Mts. 30.00 1.33 $/hr 0.27
123.61 82.40
255.19
6.- GASTOSINDIRECTOS
Contingencias 3% $ 7.66
Gastos Generales 0% $ 0.00
Utilidad 10% $ 25.52
TOTAL COSTOMETROLINEAL EN DOLARES(US$/ M-L) 288.37
Energa Elctrica, Tuberias, accesorios proporciona Ca.
FORMATO DE PRECIOS UNITARIOS DE AVANCES - MECANIZADO
PDF created with pdfFactory Pro trial version www.pdffactory.com
03248 CONSORCIO MINER0 HORIZONTE S.A.
RAMPA2.4 X2.4 mts. J ack Leg- Scoopde 2.2 Yd3 acarreo hasta 150 mts N Taladros: 32 u 32
N Tal.carg.: 28 u 28
AVANCE: 1.50 ml
ITEM DESCRIPCION UNI. CANTID. PRECIO SUBTOT. TOTAL
UNITARIO $ US$/ UNID
1.- MANODE OBRA
Perforista Tareas 1.00 37.05 $/Tarea 37.05
Ayudante Perforista Tareas 1.00 34.14 $/Tarea 34.14
Operador Scoop Tareas 0.50 47.58 $/Tarea 23.79
94.99 63.32
2.- IMPLEMENTOS
Tareas con ropa de Agua Tareas 2.00 1.90 3.79
Implementos Operador Scoop Tareas 0.50 3.40 1.70
5.49 3.66
3.- MATERIALESY HERRAMIENTAS
Barra de 6 P.P. 192.000 94.60 $/uni 9.98
Broca de 40 mm PP 192.000 25.30 $/uni 13.88
Aceite de Perforacin Gln 0.250 9.16 $/uni 2.29
Petroleo D2 Gln/Hr 6.000 4.55 $/uni 27.27
Herramientas de Mina-Barretillas Global $/uni 1.21
Alcayatas de 3/4" uni 1.000 3.36 $/uni 3.36
57.99 38.66
4.- EXPLOSIVOS
EMULEX 45% x 1" x 7" (276) Pza. 115.00 0.230 $/uni 26.45
EXADIT 45% 7/8" X 7" (328) Pza. 49.00 0.170 $/uni 8.33
EXSANEL 3.0 m Pza. 28.00 1.320 $/uni 36.96
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza. 2.00 0.760 $/uni 1.52
CORDON DETONANTE 5P Mts. 10.00 0.230 $/uni 2.30
IGNICION RAPIDA Mts. 0.10 0.410 $/pie 0.04
75.60 50.40
5.- EQUIPOS
Ventiladora 10 CFM Hrs. 0.00 0.92 $/hr 0.00
Scooptrams 2.2 Yd3 Hrs. 2.00 50.00 $/hr 100.00
Perforadora P.P. 192.00 0.100 $/pp 19.20
Manguera Aire 1 Mts. 30.00 2.70 $/hr 0.54
Manguera Agua 1/2 Mts. 30.00 1.33 $/hr 0.27
Bomba de 10 HP Hrs. 2.00 1.16 $/hr 2.32
122.33 81.55
237.60
6.- GASTOSINDIRECTOS
Contingencias 3% $ 7.13
Gastos Generales 0% $ 0.00
Utilidad 10% $ 23.76
TOTAL COSTOMETROLINEAL EN DOLARES(US$/ M-L) 268.49
Energa Elctrica, Tuberias, accesorios proporciona Ca.
FORMATO DE PRECIOS UNITARIOS DE AVANCES - MECANIZADO
PDF created with pdfFactory Pro trial version www.pdffactory.com
N de Taladros: 51.00 Avance/Disp 1.50 Metros
N de Tal. Cargados 47.00
UNIDAD CANTIDAD FACTOR PU SUB TOTAL U.S.$/MT
OPERADOR Hom/Disp 2.00 1.00 51.22 102.43
AYUDANTE Hom/Disp 1.00 1.00 37.05 37.05
OPERADOR SCOOPTRAM Hom/Disp 1.00 0.50 47.58 23.79
CARGADOR/DISPARADOR Hom/Disp 1.00 1.00 37.05 37.05
SUB-TOTAL 200.33 133.75
MATERIALES
UNIDAD MTS/DISP
VIDA
ECONOMICA
MTS
ESTANDAR
PZAS/DISP
PRECIO
U.S.$/PZA
U.S.$/MT
Barra de 6 P.P. 80.39 1820 0.04 68.20 2.01
Broca de 38 mm PP 76.39 350 0.22 24.75 3.61
Aceite de Perforacin Gln 0.40 1.00 9.16 2.45
Petroleo Gln/Hr 7.5 4.54511697 22.76
Herramientas de Mina-Barretillas Global 0.00 1.21 0.81
ALCAYATAS DE 3/4" PZAS/DISP 4.00 3.36 8.97
0
SUB-TOTAL 40.60
IMPLEMENTOS SEGURIDAD
UNIDAD MTS/DISP
COSTO UNIT
U.S.$/Pers
COSTO
U.S.$
U.S.$/MT
Implementos Seguridad Unidad 4.00 1.90 7.58 5.06
Implementos Operador Scoop Unidad 0.50 3.58 1.79 1.20
6.26
VOLADURA
UNIDAD TALADROS PRECIO
COSTO
U.S.$/Disp
U.S.$/MT
EMULEX 45% x 1" x 7" (276) Pza 235.2 0.23 54.096
EXSABLOCK 7/8" X 7" (276) Pza 33.6 0.16 5.376
EXADIT 45% 7/8" X 7" (328) Pza 75.6 0.17 12.852
EXSANEL 3.0m Pza. 47 1.32 62.04
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza. 2 0.76 1.52
CORDON DETONANTE 5P Mts. 15 0.23 3.45
IGNICION RAPIDA Mts. 0.1 0.41 0.041
SUB-TOTAL 139.375 93.05393984
EQUIPOS
UNIDAD HRS/DISP
VIDA
ECONOMICA
COSTO
TOTAL
U.S.$/HR
COSTO
TOTAL
U.S.$
U.S.$/MT
SCOOP DIESEL 2.5 YD3 HORAS 2.5 50 125
BOMBA DE 10 HP HORAS 4 1.16164279 4.64657115
PERFORADORA PIES 80.3871472 0.1 8.03871472
Manguera Aire 1 Mts. 30 150 2.7 0.54
Manguera Agua 1/2 Mts. 30 150 1.33 0.266
SUB-TOTAL 138.49 92.46
TOTAL COSTOS DIRECTOS 366.13
CONTINGENCIAS 3% 10.98
GASTOS GENERALES 0% 0.00
UTILIDAD 10% 36.61
TOTAL COSTOS 413.73
LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
DATOS
CICLO UNID ESTANDAR
TIEMPO DE CICLO H/DISP 2
LONG BARRA DE EXTEN PIES 6
EFIC DE PERF % 90% AXERA
LONG PERFORACION MT 1.65
EFIC.AVANCE % 91%
LONG DE PERF EFECTIVA MT 1.50
DURACION GUARDIA H 7
GUARDIAS/DIA GDA/D 2
PRODUCCION/DIA M/D 5.99
ANCHO LABOR MT 4.5
ALTO LABOR MT 4.2
LONGITUD MT 1.5
SOBREROTURA % 13%
VOLUMEN TOTAL M3 32.1
DENSIDAD MATERIAL TMS/M3 2.65
TONELAJE TMS/DISP 85.06
EFICIENCIA DE AVANCES
VOLUMEN POR DISPARO LABOR
RAMPA 4.5M X 4.2 M con Jack Leg-Scoop de 2.0 Yd3. Acarreo hasta 150 mts.
MANO DE OBRA
DESCRIPCION
DESCRIPCION
DESCRIPCION
DESCRIPCION
PDF created with pdfFactory Pro trial version www.pdffactory.com
03252 CONSORCIO MINER0 HORIZONTE S.A.
RAMPA 3.5 X 3.5 mts. J ack Leg - Scoop de 2.2 Yd3 Acarreo hasta 150 mts. N Taladros: 43 u
N Tal.carg.: 39 u
AVANCE: 1.50 ml
ITEM DESCRIPCION UNI. CANTID. PRECIO SUBTOT. TOTAL
UNITARIO $ US$/ UNID
1.- MANO DE OBRA
Perforista Tareas 2.00 37.05 $/Tarea 74.10
Ayudante Perforista Tareas 0.50 34.14 $/Tarea 17.07
Operador Scoop Tareas 0.50 47.58 $/Tarea 23.79
114.97 76.64
2.- IMPLEMENTOS
Tareas con ropa de Agua Tareas 2.50 1.90 4.74
Implementos Operador Scoop Tareas 0.50 3.58 1.79
6.53 4.35
3.- MATERIALES Y HERRAMIENTAS
Barra de 6 P.P. 258.000 94.60 $/uni 13.41
Broca de 40 mm PP 258.000 25.30 $/uni 18.65
Aceite de Perforacin Gln 0.400 9.16 $/uni 3.66
Petroleo Gln/Hr 6.000 4.55 $/uni 27.27
Herramientas de Mina-Barretillas Global $/uni 1.21
Alcayatas de 3/4" uni 1.000 3.36 $/uni 3.36
67.57 45.04
4.- EXPLOSIVOS
EMULEX 45% x 1" x 7" (276) Pza 168.00 0.230 $/uni 38.64
EXSABLOCK 7/8" X 7" (276) Pza 24.00 0.160 $/uni 3.84
EXADIT 45% 7/8" X 7" (328) Pza 54.00 0.170 $/uni 9.18
EXSANEL 3.0m Pza. 39.00 1.320 $/uni 51.48
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza. 2.00 0.760 $/uni 1.52
CORDON DETONANTE 5P Mts. 15.00 0.230 $/uni 3.45
IGNICION RAPIDA Mts. 0.10 0.410 $/pie 0.04
108.15 72.10
5.- EQUIPOS
Ventiladora 10 CFM Hrs. 0.00 0.92 $/hr 0.00
Scooptrams 2.2 Yd3 Hrs. 2.00 50.00 $/hr 100.00
Perforadora P.P. 258.00 0.100 $/pp 25.80
Manguera Aire 1 Mts. 30.00 2.70 $/hr 0.54
Manguera Agua 1/2 Mts. 30.00 1.33 $/hr 0.27
Bomba de 10 HP Hrs. 4.00 1.16 $/hr 4.65
131.25 87.50
285.64
6.- GASTOS INDIRECTOS
Contingencias 3% $ 8.57
Gastos Generales 0% $ 0.00
Utilidad 10% $ 28.56
TOTAL COSTO METRO LINEAL EN DOLARES (US$/ M-L) 322.78
Energa Elctrica, Tuberias, accesorios proporciona Ca.
FORMATO DE PRECIOS UNITARIOS DE AVANCES - MECANIZADO
PDF created with pdfFactory Pro trial version www.pdffactory.com
03249 CONSORCIO MINER0 HORIZONTE S.A.
RAMPA 2.7 X 2.7 mts. J ack Leg - Scoop de 2.2 Yd3 Acarreo hasta 150 mts N Taladros: 41 u
10004 N Tal.carg.: 31 u
Log. Perfor.: 6 Pies
AVANCE: 1.50 ml
ITEM DESCRIPCION UNI. CANTID. PRECIO SUBTOT. TOTAL
UNITARIO $ US$/ UNID
1.- MANO DE OBRA
Perforista Tareas 1.00 37.05 $/Tarea 37.05
Ayudante Perforista Tareas 1.00 34.14 $/Tarea 34.14
Operador Scoop Tareas 0.50 47.58 $/Tarea 23.79
Bombero Tareas 34.14 $/Tarea 0.00
94.99 63.32
2.- IMPLEMENTOS
Implementos Tareas 2.00 1.90 3.79
Implementos Operador Scoop Tareas 0.50 3.58 1.79
5.58 3.72
3.- MATERIALES Y HERRAMIENTAS
Barra de 6 P.P. 246.000 94.60 $/uni 12.79
Broca de 40 mm PP 246.000 25.30 $/uni 17.78
Aceite de Perforacin Gln 0.400 9.16 $/uni 3.66
Petroleo Gln/Hr 6.000 4.55 $/uni 27.27
Herramientas de Mina-Barretillas Global $/uni 1.21
Alcayatas de 3/4" uni 1.000 3.36 $/uni 3.36
66.07 44.05
4.- EXPLOSIVOS
EMULEX 45% x 1" x 7" (276) Pza. 126.00 0.230 $/uni 28.98
EXSABLOCK 7/8" X 7" (276) Pza. 20.00 0.160 $/uni 3.20
EXADIT 45% 7/8" X 7" (328) Pza. 56.00 0.170 $/uni 9.52
EXSANEL 3.0m Pza. 31.00 1.320 $/uni 40.92
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza. 2.00 0.760 $/uni 1.52
CORDON DETONANTE 5P Mts. 10.00 0.230 $/uni 2.30
IGNICION RAPIDA Mts. 0.10 0.410 $/pie 0.04
86.48 57.65
5.- EQUIPOS
Ventiladora 10 CFM Hrs. 0.00 0.92 $/hr 0.00
Scooptrams 2.2 Yd3 Hrs. 2.00 50.00 $/hr 100.00
Perforadora P.P. 246.00 0.100 $/pp 24.60
Manguera Aire 1 Mts. 30.00 2.70 $/hr 0.54
Manguera Agua 1/2 Mts. 30.00 1.33 $/hr 0.27
Bomba de 10 HP Hrs. 3.00 1.16 $/hr 3.48
128.89 85.93
254.68
6.- GASTOS INDIRECTOS
Contingencias 3% $ 7.64
Gastos Generales 0% $ 0.00
Utilidad 10% $ 25.47
TOTAL COSTO METRO LINEAL EN DOLARES (US$/ M-L) 287.79
Energa Elctrica, Tuberias, accesorios proporciona Ca.
FORMATO DE PRECIOS UNITARIOS DE AVANCES - MECANIZADO
PDF created with pdfFactory Pro trial version www.pdffactory.com
CONSORCIO MINER0 HORIZONTE S.A.
CICLO UNIDAD ESTANDAR DESCRIPCION # CART # TAL
EMULEX
45% 1" X 7"
EXSABLOCK
7/8" X 7"
TOTAL PZAS TOTAL KGMS
CRUCERO3.5 X3.5 mts. J ack Leg- Scoopde 2.2 Yd3 Acarreo hasta 150 mts.N Taladros: 43 u TIEMPO DE CICLO H/DISP 2.00 Alivio de arranque 3.00
N Tal.carg.: 40 u LONG BARRA DE EXTEN PIES 6.00 Alivio de contorno
AVANCE: 1.50 ml EFIC DE PERF % 95% Arranque 8.00 3.00 24.00 24.00 2.17
LONG PERFORACION MT 1.74 1ra Ayuda Arranque 6.00 2.00 12.00 12.00 1.09
ITEM DESCRIPCION UNI. CANTID. PRECIO SUBTOT. TOTAL EFIC.AVANCE % 86% 2da Ayuda Arranque 6.00 2.00 12.00 12.00 1.09
UNITARIO $ US$/ UNID LONG DE PERF EFECTIVA MT 1.50 3ra Ayuda Arranque 6.00 2.00 12.00 12.00 1.09
1.- MANODE OBRA DURACION GUARDIA H 7.00 4ta Ayuda Arranque 6.00 2.00 12.00 12.00 1.09
Perforista Tareas 2.00 37.05 $/Tarea 74.10 GUARDIAS/DIA GDA/D 2.00 Ayudas de Cuadrador 6.00 2.00 12.00 12.00 1.09
Ayudante Perforista Tareas 0.50 34.14 $/Tarea 17.07 PRODUCCION/DIA M/D 6.00 Ayudas de Corona 5.00 7.00 35.00 35.00 3.17
Operador Scoop Tareas 0.40 47.58 $/Tarea 19.03 Ayudas de Arrastre 8.00 4.00 32.00 32.00 2.90
Cuadradores 4.00 6.00 24.00 24.00 1.74
110.21 73.47 ANCHO LABOR MT 3.50 Coronas 4.00 5.00 20.00 20.00 1.45
2.- IMPLEMENTOS ALTO LABOR MT 3.50 Arrastres 7.00 5.00 35.00 35.00 3.17
Tareas con ropa de Agua Tareas 2.50 1.90 4.74 LONGITUD MT 1.83 Contorno 0.00 0.00
Implementos Operador Scoop Tareas 0.40 3.58 1.43
6.17 4.12 SOBREROTURA % 13% TOTAL PERFORADOS 43.00 186.00 44.00 230.00 20.04
3.- MATERIALESY HERRAMIENTAS VOLUMEN TOTAL M3 25.36 TOTAL CARGADOS 40.00 TOTAL KG
Barra de 6 P.P. 258.000 94.60 $/uni 13.41 DENSIDAD MATERIAL TMS/M3 2.50 TOTAL KG 16.85 3.19 20.04
Broca de 40 mm PP 258.000 25.30 $/uni 18.65 TONELAJE TMS/DISP 63.41 PESO Kgs/Cartucho 0.091 0.072
Aceite de Perforacin Gln 0.400 9.16 $/uni 3.66
Petroleo Gln/Hr 6.000 4.55 $/uni 27.27
EFICIENCIAS
EMULEX
45% 1" X 7"
EXSABLOCK
7/8" X 7"
Herramientas de Mina-Barretillas Global $/uni 1.21 DESCRIPCION UNIDAD VALOR Kgs/Cart 0.091 0.072
Alcayatas de 3/4" uni 1.000 3.36 $/uni 3.36 Densidad de Carga Kgs/mt 10.96 Cart/Caja 276.00 276.00
67.57 45.04 Factor de Carga Kgs/Ton 0.32 KGS/CAJA 25.00 20.00
4.- EXPLOSIVOS
EMULEX 45% x 1" x 7" (276) Pza 186.00 0.230 $/uni 42.78
EXSABLOCK 7/8" X 7" (276) Pza 44.00 0.160 $/uni 7.04
EXSANEL 3.0m Pza. 40.00 1.320 $/uni 52.80
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza. 2.00 0.760 $/uni 1.52
CORDON DETONANTE 5P Mts. 15.00 0.230 $/uni 3.45
IGNICION RAPIDA Mts. 0.10 0.410 $/pie 0.04
107.63 71.75
5.- EQUIPOS
Scooptrams 2.2 Yd3 Hrs. 2.00 50.00 $/hr 100.00
Perforadora P.P. 258.00 0.100 $/pp 25.80
Manguera Aire 1 Mts. 30.00 2.70 $/hr 0.54
Manguera Agua 1/2 Mts. 30.00 1.33 $/hr 0.27
126.61 84.40
278.79
6.- GASTOSINDIRECTOS
Contingencias 3% $ 8.36
Gastos Generales 0% $ 0.00
Utilidad 10% $ 27.88
TOTAL COSTOMETROLINEAL ENDOLARES(US$/ M-L) 315.03
Energa Elctrica, Tuberias, accesorios proporciona Ca.
EFICIENCIA DE AVANCES DISTRIBUCION DE CARGA DE EXPLOSIVOS
VOLUMEN POR DISPARO LABOR
FORMATO DE PRECIOS UNITARIOS DE AVANCES - MECANIZADO
PDF created with pdfFactory Pro trial version www.pdffactory.com
CONSORCIO MINER0 HORIZONTE S.A.
CRUCERO 3.5 X 3.5 mts. Jack Leg - Scoop de 2.2 Yd3 Acarreo hasta 150 mts. N Taladros: 53 u
PARA ROCA DURA N Tal.carg.: 50 u
AVANCE: 1.50 ml
ITEM DESCRIPCION INCID. UNI. CANTID. PRECIO SUBTOT. TOTAL
UNITARIO $ US$/ UNID
1.- MANO DE OBRA
Perforista Tareas 2.00 37.05 $/Tarea 74.10
Ayudante Perforista Tareas 0.50 34.14 $/Tarea 17.07
Operador Scoop Tareas 0.40 47.58 $/Tarea 19.03
110.21 73.47
2.- IMPLEMENTOS
Tareas con ropa de Agua Tareas 2.50 1.90 4.74
Implementos Operador Scoop Unidad Tareas 0.40 3.58 1.43
6.17 4.12
3.- MATERIALES Y HERRAMIENTAS
Barra de 6 P.P. 318.000 94.60 $/uni 16.53
Broca de 40 mm PP 318.000 25.30 $/uni 22.99
Aceite de Perforacin Gln 0.400 9.16 $/uni 3.66
Petroleo Gln/Hr 6.000 4.55 $/uni 27.27
Herramientas de Mina-Barretillas Global $/uni 1.21
Alcayatas de 3/4" uni 1.000 3.36 $/uni 3.36
75.02 50.01
4.- EXPLOSIVOS
EMULEX 45% x 1" x 7" (276) Pza 285.00 0.230 $/uni 65.55
EXSABLOCK 7/8" X 7" (276) Pza 65.00 0.160 $/uni 10.40
EXSANEL 3.0m Pza. 50.00 1.320 $/uni 66.00
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza. 2.00 0.760 $/uni 1.52
CORDON DETONANTE 5P Mts. 15.00 0.230 $/uni 3.45
IGNICION RAPIDA Mts. 0.10 0.410 $/pie 0.04
146.96 97.97
5.- EQUIPOS
Scooptrams 2.2 Yd3 Hrs. 2.00 50.00 $/hr 100.00
Perforadora P.P. 318.00 0.100 $/pp 31.80
Manguera Aire 1 Mts. 30.00 2.70 $/hr 0.54
Manguera Agua 1/2 Mts. 30.00 1.33 $/hr 0.27
132.61 88.40
313.98
6.- GASTOS INDIRECTOS
Contingencias 3% $ 9.42
Gastos Generales 0% $ 0.00
Utilidad 10% $ 31.40
TOTAL COSTO METRO LINEAL EN DOLARES (US$/ M-L) 354.80
Energa Elctrica, Tuberias, accesorios proporciona Ca.
FORMATO DE PRECIOS UNITARIOS DE AVANCES - MECANIZADO
PDF created with pdfFactory Pro trial version www.pdffactory.com
CONSORCIO MINER0 HORIZONTE S.A.
CRUCERO 3.00 X 3.00 MTs. Jack Leg-Scoop de 2.2 Yd3. Acarreo hasta 150 mts. N Taladros: 47
PARA ROCA DURA N Tal.carg.: 43 u
AVANCE: 1.50 ml
ITEM DESCRIPCION INCID. UNI. CANTID. PRECIO SUBTOT. TOTAL
UNITARIO $ US$/ UNID
1.- MANO DE OBRA
Perforistas Tareas 1.00 37.05 $/Tarea 37.05
Ayudante Perforista Tareas 1.00 34.14 $/Tarea 34.14
Operador Scoop Tareas 0.50 47.58 $/Tarea 23.79
94.99 63.32
2.- IMPLEMENTOS
Tareas con ropa de Agua Tareas 2.00 1.90 3.79
Tareas sin ropa de agua Tareas 0.50 3.58 1.79
5.58 3.72
3.- MATERIALES Y HERRAMIENTAS
Barra de 6 P.P. 282.000 94.60 $/uni 14.66
Broca de 40 mm PP 282.000 25.30 $/uni 20.38
Aceite de Perforacin Gln. 0.250 9.16 $/uni 2.29
Petroleo D2 Gln/Hr 6.000 4.55 $/uni 27.27
Herramientas de Mina Global $/uni 1.21
Alcayatas de 3/4" uni 1.000 3.36 $/uni 3.36
69.17 46.12
4.- EXPLOSIVOS 8.81 m3
EMULEX 45% x 1" x 7" (276) uni 250.00 0.230 $/uni 57.50
EXSABLOCK 7/8" X 7" (276) Pza. 0.00 $/uni 0.00
EXADIT 45% 7/8" X 7" (328) Pza. 78.00 0.170 $/uni 13.26
EXSANEL 3.0 m Pza. 43.00 1.150 $/uni 49.45
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza. 2.00 0.760 $/uni 1.52
CORDON DETONANTE 5P Mts. 10.00 0.230 $/uni 2.30
IGNICION RAPIDA Mts. 0.10 0.410 $/pie 0.04
124.07 82.71
5.- EQUIPOS
Ventiladora 10000 CFM Hrs. 0.00 0.00 $/hr 0.00
Scooptrams de 2.2 Yd3 Hrs. 2.00 50.00 $/hr 100.00
Perforadora P.P. 282.00 0.100 $/pp 28.20
Manguera de Aire 1 Mts. 30.00 2.70 $/hr 0.54
Manguera de Agua 1/2 Mts. 30.00 1.33 $/hr 0.27
129.01 86.00
281.88
6.- GASTOS INDIRECTOS
Contingencias 3% $ 8.46
Gastos Generales 0% $ 0.00
Utilidad 10% $ 28.19
TOTAL COSTO METRO LINEAL EN DOLARES (US$/ M-L) 318.53
ACUMULACION PARCOY
PRECIOS UNITARIOS DE AVANCES PARA ROCA DURA
PDF created with pdfFactory Pro trial version www.pdffactory.com
FORMATO DE PRECIOS UNITARIOS DE AVANCES
02350 CONSORCIO MINER0 HORIZONTE S.A.
CRUCERO 2.40 X 2.40 MTs. J ack Leg-Scoop de 2.2 Yd3. Acarreo hasta 150 mts. N Taladros: 32
N Tal.carg.: 28 u
AVANCE: 1.50 ml
ITEM DESCRIPCION INCID. UNI. CANTID. PRECIO SUBTOT. TOTAL
UNITARIO $ US$/ UNID
1.- MANO DE OBRA
Perforistas Tareas 1.00 37.05 $/Tarea 37.05
Ayudante Perforista Tareas 1.00 34.14 $/Tarea 34.14
Operador Scoop Tareas 0.50 47.58 $/Tarea 23.79
Bombero Tareas 34.14 $/Tarea 0.00
94.99 63.32
2.- IMPLEMENTOS
Tareas con ropa de Agua Tareas 2.00 1.90 3.79
Tareas sin ropa de agua Tareas 0.50 3.58 1.79
5.58 3.72
3.- MATERIALES Y HERRAMIENTAS
Barra de 6 P.P. 192.000 94.60 $/uni 9.98
Broca de 40 mm PP 192.000 25.30 $/uni 13.88
Aceite de Perforacin Gln. 0.250 9.16 $/uni 2.29
Petroleo D2 Gln/Hr 6.000 4.55 $/uni 27.27
Herramientas de Mina Global $/uni 1.21
Alcayatas de 3/4" uni 1.000 3.36 $/uni 3.36
57.99 38.66
4.- EXPLOSIVOS 8.81 m3
EMULEX 45% x 1" x 7" (276) uni 115.00 0.230 $/uni 26.45
EXSABLOCK 7/8" X 7" (276) Pza. 25.00 0.160 $/uni 4.00
EXADIT 45% 7/8" X 7" (328) Pza. 49.00 0.170 $/uni 8.33
EXSANEL 3.0 m Pza. 28.00 1.320 $/uni 36.96
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza. 2.00 0.760 $/uni 1.52
CORDON DETONANTE 5P Mts. 10.00 0.230 $/uni 2.30
IGNICION RAPIDA Mts. 0.10 0.410 $/pie 0.04
79.60 53.07
5.- EQUIPOS
Ventiladora 10000 CFM Hrs. 0.00 0.92 $/hr 0.00
Scooptrams de 2.2 Yd3 Hrs. 2.00 50.00 $/hr 100.00
Perforadora P.P. 192.00 0.100 $/pp 19.20
Manguera de Aire 1 Mts. 30.00 2.70 $/hr 0.54
Manguera de Agua 1/2 Mts. 30.00 1.33 $/hr 0.27
120.01 80.00
238.78
6.- GASTOS INDIRECTOS
Contingencias 3% $ 7.16
Gastos Generales 0% $ 0.00
Utilidad 10% $ 23.88
TOTAL COSTO METRO LINEAL EN DOLARES (US$/ M-L) 269.82
ACUMULACION PARCOY
PDF created with pdfFactory Pro trial version www.pdffactory.com
FORMATO DE PRECIOS UNITARIOS DE AVANCES
CONSORCIO MINER0 HORIZONTE S.A.
REFUGIO 2.00 X 2.00 MTs. J ack Leg-Scoop de 2.2 Yd3. Acarreo hasta 150 mts. N Taladros: 24
N Tal.carg.: 20 u
AVANCE: 1.50 ml
ITEM DESCRIPCION INCID. UNI. CANTID. PRECIO SUBTOT. TOTAL
UNITARIO $ US$/ UNID
1.- MANO DE OBRA
Perforistas Tareas 1.00 37.05 $/Tarea 37.05
Ayudante Perforista Tareas 1.00 34.14 $/Tarea 34.14
Operador Scoop Tareas 0.50 47.58 $/Tarea 23.79
Bombero Tareas 34.14 $/Tarea 0.00
94.99 63.32
2.- IMPLEMENTOS
Tareas con ropa de Agua Tareas 2.00 1.90 3.79
Tareas sin ropa de agua Tareas 0.50 3.58 1.79
5.58 3.72
3.- MATERIALES Y HERRAMIENTAS
Barra de 6 P.P. 144.000 94.60 $/uni 7.48
Broca de 40 mm PP 144.000 25.30 $/uni 10.41
Aceite de Perforacin Gln. 0.250 9.16 $/uni 2.29
Petroleo D2 Gln/Hr 4.500 4.55 $/uni 20.45
Herramientas de Mina Global $/uni 1.21
Alcayatas de 3/4" uni 1.000 3.36 $/uni 3.36
45.21 30.14
4.- EXPLOSIVOS 8.81 m3
EMULEX 45% x 1" x 7" (276) uni 81.00 0.230 $/uni 18.63
EXSABLOCK 7/8" X 7" (276) Pza. 18.00 0.160 $/uni 2.88
EXADIT 45% 7/8" X 7" (328) Pza. 37.00 0.170 $/uni 6.29
EXSANEL 3.0m Pza. 20.00 1.320 $/uni 26.40
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza. 2.00 0.760 $/uni 1.52
CORDON DETONANTE 5P Mts. 10.00 0.230 $/uni 2.30
IGNICION RAPIDA Mts. 0.10 0.410 $/pie 0.04
58.06 38.71
5.- EQUIPOS
Ventiladora 10000 CFM Hrs. 0.00 0.00 $/hr 0.00
Scooptrams de 2.2 Yd3 Hrs. 1.50 50.00 $/hr 75.00
Perforadora P.P. 144.00 0.100 $/pp 14.40
Manguera de Aire 1 Mts. 30.00 2.70 $/hr 0.54
Manguera de Agua 1/2 Mts. 30.00 1.33 $/hr 0.27
90.21 60.14
196.03
6.- GASTOS INDIRECTOS
Contingencias 3% $ 5.88
Gastos Generales 0% $ 0.00
Utilidad 10% $ 19.60
TOTAL COSTO METRO LINEAL EN DOLARES (US$/ M-L) 221.51
ACUMULACION PARCOY
PDF created with pdfFactory Pro trial version www.pdffactory.com
02354 CONSORCIO MINER0 HORIZONTE S.A.
CRUCERO 2.70 X 2.70 MTs. J ack Leg-Scoop de 2.2 Yds3 Acarreo hasta 150 mts N Taladros: 41
N Tal.carg.: 31 u
AVANCE: 1.50 ml
ITEM DESCRIPCION INCID. UNI. CANTID. PRECIO SUBTOT. TOTAL
UNITARIO $ US$/ UNID
1.- MANO DE OBRA
Perforistas Tareas 1.00 37.05 $/Tarea 37.05
Ayudante Perforista Tareas 1.00 34.14 $/Tarea 34.14
Operador Scoop Tareas 0.50 47.58 $/Tarea 23.79
94.99 63.32
2.- IMPLEMENTOS
Tareas con ropa de Agua Tareas 2.00 1.90 3.79
Tareas sin ropa de agua Tareas 0.50 3.58 1.79
5.58 3.72
3.- MATERIALES Y HERRAMIENTAS
Barra de 6 P.P. 246.000 94.60 $/uni 12.79
Broca de 40 mm PP 246.000 25.30 $/uni 17.78
Aceite de Perforacin Gln. 0.250 9.16 $/uni 2.29
Petroleo D2 Gln/Hr 6.000 4.55 $/uni 27.27
Herramientas de Mina Global $/uni 1.21
Alcayatas de 3/4" uni 1.000 3.36 $/uni 3.36
64.70 43.13
4.- EXPLOSIVOS 8.81 m3
EMULEX 45% x 1" x 7" (276) Pza. 126.00 0.230 $/uni 28.98
EXSABLOCK 7/8" X 7" (276) Pza. 20.00 0.160 $/uni 3.20
EXADIT 45% 7/8" X 7" (328) Pza. 56.00 0.170 $/uni 9.52
EXSANEL 3.0m Pza. 31.00 1.320 $/uni 40.92
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza. 2.00 0.760 $/uni 1.52
CORDON DETONANTE 5P Mts. 10.00 0.230 $/uni 2.30
IGNICION RAPIDA Mts. 0.10 0.410 $/pie 0.04
86.48 57.65
5.- EQUIPOS
Ventiladora 10000 CFM Hrs. 0.00 0.92 $/hr 0.00
Scooptrams de 2.2 Yd3 Hrs. 2.00 50.00 $/hr 100.00
Perforadora P.P. 246.00 0.100 $/pp 24.60
Manguera de Aire 1 Mts. 30.00 2.70 $/hr 0.54
Manguera de Agua 1/2 Mts. 30.00 1.33 $/hr 0.27
125.41 83.60
251.44
6.- GASTOS INDIRECTOS
Contingencias 3% $ 7.54
Gastos Generales 0% $ 0.00
Utilidad 10% $ 25.14
TOTAL COSTO METRO LINEAL EN DOLARES (US$/ M-L) 284.13
PDF created with pdfFactory Pro trial version www.pdffactory.com
FORMATO DE PRECIOS UNITARIOS DE AVANCES
04248 CONSORCIO MINER0 HORIZONTE S.A.
CH. 3.20 x 1.50 Mts.Limpieza Sin Scoop directo a la Tolva, hasta 30 mts altura N Taladros: 26 u
N Tal.carg.: 22 u
AVANCE: 0.65 ml
ITEM DESCRIPCION INCID. UNI. CANTID. PRECIO SUBTOT. TOTAL
UNITARIO $ US$/ UNID
1.- MANO DE OBRA
Perforistas Tareas 1.25 37.05 $/Tarea 46.31
Ayudante Perforista Tareas 1.25 34.14 $/Tarea 42.68
Ayudante Tareas 0.50 34.14 $/Tarea 17.07
106.07 163.18
2.- IMPLEMENTOS
Tareas con ropa de Agua Tareas 3.00 1.90 5.69
5.69 8.75
3.- MATERIALES Y HERRAMIENTAS
Barra de 6 P.P. 130.000 94.60 $/pp 6.76
Broca de 40 mm PP 130.000 25.30 $/uni 9.40
Aceite de Perforacin Gln. 0.250 9.16 $/gln. 2.29
Herramientas de Mina Global Global 1.21
19.66 30.24
4.- EXPLOSIVOS 3.58 m3
EMULEX 45% x 1" x 7" (276) Pza. 60.00 0.230 $/uni 13.80
EXSABLOCK 7/8" X 7" (276) Pza. 0.00 0.160 $/uni 0.00
EXADIT 45% 7/8" X 7" (328) Pza. 50.00 0.170 $/uni 8.50
EXSANEL 3.0 m Pza. 22.00 1.320 $/uni 29.04
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza. 2.00 0.760 $/uni 1.52
CORDON DETONANTE 5P Mts. 10.00 0.230 $/mts. 2.30
IGNICION RAPIDA Mts. 0.25 0.410 $/mts. 0.10
55.26 85.02
5.- EQUIPOS
Scooptrams de 1.50 Yd3 Hrs. 0.00 40.00 $/hr 0.00
Ventilador Hrs. 0.00 0.92 $/hr 0.00
Perforadora P.P. 130.00 0.10 $/pp 13.00
Manguera de Aire 1 Mts. 30.00 2.70 $/mts. 0.54
Manguera de Agua 1/2 Mts. 30.00 1.33 $/mts. 0.27
13.81 21.24
308.43
6.- GASTOS INDIRECTOS
Contingencias 3% $ 9.25
Gastos Generales 0% $ 0.00
Utilidad 10% $ 30.84
TOTAL COSTO METRO LINEAL EN DOLARES (US$/ M-L) 348.52
Energa Elctrica, Tuberias y Accesorios proporciona Ca, hasta 50 Mts del top del frente
ACUMULACION PARCOY
PDF created with pdfFactory Pro trial version www.pdffactory.com
FORMATO DE PRECIOS UNITARIOS DE AVANCES
04246 CONSORCIO MINER0 HORIZONTE S.A.
CH. 2.40 x 1.20 Mts.Limpieza Sin Scooptram directo a la Tolva hasta 30 mts altura N Taladros: 23 u
Distancia de recorrido 150 mts N Tal.carg.: 19 u
AVANCE: 1.30 ml
ITEM DESCRIPCION INCID. UNI. CANTID. PRECIO SUBTOT. TOTAL
UNITARIO $ US$/ UNID
1.- MANO DE OBRA
Perforistas Tareas 1.00 37.05 $/Tarea 37.05
Ayudante Perforista Tareas 1.00 34.14 $/Tarea 34.14
Ayudante Tareas 0.50 34.14 $/Tarea 17.07
Operador Scooptram Tareas 0.00 47.58 $/Tarea 0.00
Bodeguero Tareas $/Tarea
88.27 67.90
2.- IMPLEMENTOS
Tareas con ropa de Agua Tareas 2.50 1.90 4.74
Tareas sin ropa de agua Tareas
4.74 3.65
3.- MATERIALES Y HERRAMIENTAS
Barra de 6 P.P. 115.000 94.60 $/pp 5.98
Broca de 40 mm PP 115.000 25.30 $/uni 8.31
Aceite de Perforacin Gln. 0.250 9.16 $/gln. 2.29
Herramientas de Mina Global Global 1.21
17.79 13.69
4.- EXPLOSIVOS 3.58 m3
EMULEX 45% x 1" x 7" (276) Unid. 70.00 0.230 $/uni 16.10
EXSABLOCK 7/8" X 7" (276) Unid. 0.00 0.160 $/uni 0.00
EXADIT 45% 7/8" X 7" (328) Unid. 40.00 0.170 $/uni 6.80
EXSANEL 3.0m Unid. 19.00 1.320 $/uni 25.08
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza. 2.00 0.760 $/uni 1.52
CORDON DETONANTE 5P Mts. 10.00 0.230 $/mts. 2.30
IGNICION RAPIDA Mts. 0.25 0.410 $/mts. 0.10
51.90 39.93
5.- EQUIPOS
Perforadora P.P. 115.00 0.100 $/pp 11.50
Manguera de Aire 1 Mts. 30.00 2.700 $/mts. 0.54
Manguera de Agua 1/2 Mts. 30.00 1.330 $/mts. 0.27
Bomba de 10 HP Hrs. 0.00 1.162 $/hr 0.00
12.31 9.47
134.62
6.- GASTOS INDIRECTOS
Contingencias 3% $ 4.04
Gastos Generales 0% $ 0.00
Utilidad 10% $ 13.46
TOTAL COSTO METRO LINEAL EN DOLARES (US$/ M-L) 152.12
Energa Elctrica, Tuberias y Accesorios proporciona Ca, hasta 50 Mts del top del frente
ACUMULACION PARCOY
PDF created with pdfFactory Pro trial version www.pdffactory.com
FORMATO DE PRECIOS UNITARIOS DE AVANCES
04247 CONSORCIO MINER0 HORIZONTE S.A.
CH. 1.50 x 1.50 Mts. Limpieza sin Scoop, defrente a Chute N Taladros: 18 u
Distancia de recorrido 150 Mts. N Tal.carg.: 14 u
AVANCE: 1.30 ml
ITEM DESCRIPCION INCID. UNI. CANTID. PRECIO SUBTOT. TOTAL
UNITARIO $ US$/ UNID
1.- MANO DE OBRA
Perforistas Tareas 1.25 37.05 $/Tarea 46.31
Ayudante Perforista Tareas 1.25 34.14 $/Tarea 42.68
Operador Scooptram Tareas 0.00 47.58 $/Tarea 0.00
Bodeguero Tareas $/Tarea
88.99 68.46
2.- IMPLEMENTOS
Tareas con ropa de Agua Tareas 2.50 1.90 4.74
Tareas sin ropa de agua Tareas 0.00 0.00
4.74 3.65
3.- MATERIALES Y HERRAMIENTAS
Barra de 6 P.P. 90.000 94.60 $/pp 4.68
Broca de 40 mm PP 90.000 25.30 $/uni 6.51
Aceite de Perforacin Gln. 0.250 9.16 $/gln. 2.29
Herramientas de Mina Global Global 1.21
14.68 11.30
4.- EXPLOSIVOS
EMULEX 45% x 1" x 7" (276) Unid. 50.00 0.230 $/uni 11.50
EXSABLOCK 7/8" X 7" (276) Unid. 0.00 0.160 $/uni 0.00
EXADIT 45% 7/8" X 7" (328) Unid. 20.00 0.170 $/uni 3.40
EXSANEL 3.0m Unid. 14.00 1.320 $/uni 18.48
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza. 2.00 0.760 $/uni 1.52
CORDON DETONANTE 5P Mts. 10.00 0.230 $/mts. 2.30
IGNICION RAPIDA Mts. 0.25 0.410 $/mts. 0.10
37.30 28.69
5.- EQUIPOS
Scooptrams de 1.50 Yd3 Hrs. 0.00 40.00 $/hr 0.00
Perforadora P.P. 90.00 0.100 $/pp 9.00
Manguera de Aire 1 Mts. 30.00 2.700 $/mts. 0.54
Manguera de Agua 1/2 Mts. 30.00 1.330 $/mts. 0.27
Bomba de 10 HP Hrs. 0.00 1.162 $/hr 0.00
9.81 7.54
119.64
6.- GASTOS INDIRECTOS
Contingencias 3% $ 3.59
Gastos Generales 0% $ 0.00
Utilidad 10% $ 11.96
TOTAL COSTO METRO LINEAL EN DOLARES (US$/ M-L) 135.19
Energa Elctrica, Tuberias y Accesorios proporciona Ca, hasta 50 Mts del tope del frente
PDF created with pdfFactory Pro trial version www.pdffactory.com
FORMATO DE PRECIOS UNITARIOS CRUCERO DE EXPLORACION CON PALA
02351 CONSORCIO MINERO HORIZONTE
CRUCERO 2.40 X 2.40 MTS, EXPLORACION CON PALA NEUMTICA N Taladros Perf 32 Unid
N Taladros Disp 28
Long.taladro 6 Pis
Rendimiento 1.50 ml
ITEM DESCRIPCION Unid. Cant.
Precio
Unitario $
Sub
Total $
Total
(US$)/Und
1.00 MANO DE OBRA
Maestro perforista Tareas 1.00 37.05 37.05
Ayudante de perforista Tareas 1.00 34.14 34.14
Palero Tareas 0.00 37.05 0.00
Ayud. (cuneta, tuberias,alcayatas,Rieles) Tareas 0.50 34.14 17.07
88.27 58.84
2.00 IMPLEMENTOS
Tareas con ropa de Agua Tareas 2.50 1.90 4.74
4.74 3.16
3.00 MATERIALES Y HERRAMIENTAS
Barras de 6' p.p 192.00 94.60 9.98
Broca de 40 mm PP 192.00 25.30 13.88
Aceite de perforacion Gln 0.25 9.16 2.29
Herramientas de mina Global 1.21
Durmientes 8"x4"x4' Pza. 1.00 5.91 5.91
Alcayatas de 3/4" Un 1.00 3.36 3.36
36.63 24.42
4.00 EXPLOSIVOS
EMULEX 45% x 1" x 7" (276) Pza. 115 0.230 26.45
EXSABLOCK 7/8" X 7" (276) Pza. 25 0.160 4.00
EXADIT 45% 7/8" X 7" (328) Pza. 49 0.170 8.33
EXSANEL 3.0 m Unid. 28 1.320 36.96
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza. 2.00 0.760 1.52
CORDON DETONANTE 5P Mts 10.00 0.230 2.30
IGNICION RAPIDA Mts 0.10 0.410 0.04
79.60 53.07
5.00 EQUIPOS
Ventilador 10 CFM Hrs. 0.00 0.92 0.00
Pala Neumatica 12B Hrs 4.00 6.35 25.40
Perforadora P.P. 192.0 0.100 19.20
Manguera Aire 1" Mts 30.0 2.70 0.54
Manguera agua 1/2" Mts 30.0 1.33 0.27
45.41 30.27
6.00 GASTOS DIRECTOS 169.76
Contingencias 3% 5.09
Gastos Generales 0% 0.00
Utilidad 10% 16.98
TOTAL COSTO LINEAL EN DOLARES (US$/M-L) 191.83
PDF created with pdfFactory Pro trial version www.pdffactory.com
PRECIOS UNITARIOS SUB_NIVEL 4' x 6' CON WINCHE Y LIMPIEZA SCOOP EN EL NIVEL
05509 CONSORCIO MINERO HORIZONTE FECHA 31/04/2005
SUB NIVEL 4' x 6' CON WINCHE N Taladros Perf 21.00 u
LIMPIEZA EN EL NIVEL CON SCOOP N Taladros Disp 17.00
Long.taladro 5.00 Pis
Rendimiento 1.40 ml
ITEM DESCRIPCION Unid. Cant.
Precio
Unitario $
Sub
Total $
Total
(US$)/Und
1.00 MANO DE OBRA
Maestro perforista Tareas 1.00 37.05 37.05
Ayudante de perforista Tareas 1.00 34.14 34.14
Operador Scooptram Tareas 0.50 47.58 23.79
94.99 67.85
2.00 IMPLEMENTOS
Tareas con ropa de Agua Tareas 2.00 1.90 3.79
Tareas sin ropa de agua Tareas 0.50 3.58 1.79
5.58 3.99
3.00 MATERIALES Y HERRAMIENTAS
Barras de 6' p.p 105.000 94.60 5.46
Broca de 40 mm PP 105.000 25.30 7.59
Petroleo Gln 2.000 4.55 9.09
Aceite de perforacion Gln 0.250 9.16 2.29
Herramientas de mina Global 1.21
25.64 18.31
4.00 EXPLOSIVOS
EMULEX 45% x 1" x 7" (276) Pza. 66 0.230 15.18
EXADIT 45% 7/8" X 7" (328) Pza. 30 0.170 5.10
EXSANEL 3.0 m Pza. 17.00 1.320 22.44
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza. 2.00 0.760 1.52
CORDON DETONANTE 5P Mts 4.00 0.230 0.92
IGNICION RAPIDA Mts 0.10 0.410 0.04
45.20 32.29
5.00 EQUIPOS
Ventilador 10 CFM Hrs. 0.00 0.92 0.00
Winche Hrs 2.00 3.67 7.34
Scooptram 1.50 Yds Hrs 1.00 40.00 40.00
Perforadora P.P. 105.0 0.100 10.50
Manguera Aire 1" Mts 30.0 2.70 0.54
Manguera agua 1/2" Mts 30.0 1.33 0.27
58.64 41.89
6.00 GASTOS DIRECTOS 164.33
Contingencias 3% 4.93
Gastos Generales 0% 0.00
Utilidad 10% 16.43
TOTAL COSTO LINEAL EN DOLARES (US$/M-L) 185.69
PDF created with pdfFactory Pro trial version www.pdffactory.com
PRECIOS UNITARIOS SUB_NIVEL 4' x 6' CON WINCHES EN EL NIVEL
05511 CONSORCIO MINERO HORIZONTE FECHA
SUB NIVEL 4' x 6' CON WINCHE N Taladros Perf 21.00 U
LIMPIEZA EN NIVEL CON WINCHES N Taladros Disp 17.00
Long.taladro 5.00 Pis
Rendimiento 1.40 ml
ITEM DESCRIPCION Unid. Cant.
Precio
Unitario $
Sub
Total $
Total
(US$)/Und
1.00 MANO DE OBRA
Maestro perforista Tareas 1.00 37.05 37.05
Ayudante de perforista Tareas 1.00 34.14 34.14
71.20 50.85
2.00 IMPLEMENTOS
Tareas con ropa de Agua Tareas 2.00 1.90 3.79
3.79 2.71
3.00 MATERIALES Y HERRAMIENTAS
Barras de 6' p.p 105.000 94.60 5.46
Broca de 40 mm PP 105.000 25.30 7.59
Aceite de perforacion Gln 0.250 9.16 2.29
Herramientas de mina Global 1.21
16.55 11.82
4.00 EXPLOSIVOS
EMULEX 45% x 1" x 7" (276) Pza. 66 0.230 15.18
EXADIT 45% 7/8" X 7" (328) Pza. 30 0.170 5.10
EXSANEL 3.0 m Pza. 17.00 1.320 22.44
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza. 2.00 0.760 1.52
CORDON DETONANTE 5P Mts 4.00 0.230 0.92
IGNICION RAPIDA Mts 0.10 0.410 0.04
45.20 32.29
5.00 EQUIPOS
Ventilador 10 CFM Hrs. 0.00 0.92 0.00
Winche Hrs 3.00 3.67 11.01
Scooptram 1.50 Yds3 Hrs 0.00 40.00 0.00
Perforadora P.P. 105.0 0.100 10.50
Manguera Aire 1" Mts 30.0 2.70 0.54
Manguera agua 1/2" Mts 30.0 1.33 0.27
22.31 15.94
6.00 GASTOS DIRECTOS 113.61
Contingencias 3% 3.41
Gastos Generales 0% 0.00
Utilidad 10% 11.36
TOTAL COSTO LINEAL EN DOLARES (US$/M-L) 128.38
PDF created with pdfFactory Pro trial version www.pdffactory.com
FORMATO DE PRECIOS UNITARIOS GALERIA DE EXPLORACION CON PALA
01327 CONSORCIO MINERO HORIZONTE N Taladros Perf 36 u 32
GALERIA DE 2.4 X 2.4 CON PALA NEUMTICA N Taladros Carg 33.00 u 28
Long.taladro 6 Pis
Rendimiento 1.50 ml
ITEM DESCRIPCION Unid. Cant. Precio Unitario $
Sub Total
$
Total
(US$)/Und
CICLO UNIDAD ESTANDAR DESCRIPCION # CART # TAL
EMULEX
45% 1" X 7"
EXSABLOCK
7/8" X 7"
EXADIT 45%
7/8" X 7"
TOTAL
PZAS
TOTAL KGMS
1.00 MANO DE OBRA TIEMPO DE CICLO H/DISP 2.00 Alivio de arranque 3.00
Maestro perforista Tareas 1.00 37.05 37.05 LONG BARRA DE EXTEN PIES 6.00 Alivio de contorno
Ayudante de perforista Tareas 1.00 34.14 34.14 EFIC DE PERF % 95% Arranque 8.00 3.00 24.00 24.00 2.17
Palero Tareas 0.00 37.05 0.00 LONG PERFORACIONMT 1.74 1ra Ayuda Arranque 7.00 2.00 14.00 14.00 1.27
Ayud. (cuneta, tuberias,alcayatas,Rieles) Tareas 0.50 34.14 17.07 EFIC.AVANCE % 86% 2da Ayuda Arranque 6.00 2.00 12.00 12.00 1.09
88.27 58.845 LONG DE PERF EFECTIVA MT 1.50 3ra Ayuda Arranque 5.00 2.00 10.00 10.00 0.91
2.00 IMPLEMENTOS DURACION GUARDIA H 7.00 4ta Ayuda Arranque 5.00 2.00 10.00 10.00 0.91
Tareas con ropa de Agua Tareas 2.50 1.90 4.74 GUARDIAS/DIA GDA/D 2.00 Ayudas de Cuadrador 4.00 2.00 8.00 8.00 0.72
Tareas sin ropa de Agua Tareas 0.00 0.00 0.00 PRODUCCION/DIA M/D 6.00 Ayudas de Corona 4.00 3.00 12.00 12.00 1.09
4.74 3.159 Ayudas de Arrastre 5.00 5.00 25.00 25.00 2.26
3.00 MATERIALES Y HERRAMIENTAS Cuadradores 4.00 4.00 16.00 16.00 1.22
Barras de 6' p.p 216.0 94.60 11.23 ANCHO LABOR MT 2.40 Coronas 4.00 4.00 16.00 16.00 1.16
Broca de 40 mm PP 216.0 25.30 15.61 ALTO LABOR MT 2.40 Arrastres 6.00 4.00 24.00 24.00 2.17
Aceite de perforacion Gln 0.250 9.16 2.29 LONGITUD MT 1.83 Contorno 0.00 0.00
Herramientas de mina Global 1.21 SOBREROTURA % 13% TOTAL PERFORADOS 36.00 139.00 16.00 16.00 171.00 14.97
Durmientes 8"x4"x4' Pza. 1.0 5.91 5.91 VOLUMEN TOTAL M3 11.93 TOTAL CARGADOS 33.00 TOTAL KG
Alcayatas de 3/4" Un 1.000 3.36 3.36 DENSIDAD MATERIALTMS/M3 2.50 TOTAL KG 12.59 1.16 1.22 14.97
39.61 26.409 TONELAJE TMS/DISP 29.82 PESO Kgs/Cartucho 0.091 0.072 0.076
4.00 EXPLOSIVOS
EMULEX 45% x 1" x 7" (276) Pza. 139 0.230 31.97
EFICIENCIAS
EMULEX
45% 1" X 7"
EXSABLOC
K 7/8" X 7"
EXADIT 45%
7/8" X 7"
EXSABLOCK 7/8" X 7" (276) Pza. 16 0.160 2.56 DESCRIPCION UNIDAD VALOR Kgs/Cart 0.091 0.072 0.076
EXADIT 45% 7/8" X 7" (328) Pza. 16 0.170 2.72 Densidad de Carga Kgs/mt 8.19 Cart/Caja 276.00 276.00 328.00
EXSANEL 3.0 m Pza. 33.00 1.320 43.56 Factor de Carga Kgs/Ton 0.50 KGS/CAJA 25.00 20.00 25.00
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza. 2.00 0.760 1.52
CORDON DETONANTE 5P Mts 10.00 0.230 2.30
IGNICION RAPIDA Mts 0.10 0.410 0.04
84.67 56.447
5.00 EQUIPOS
Ventilador 10 CFM Hrs. 0.000 0.920 0.00
Pala Neumatica 12B Hrs 3.000 6.351 19.05
Perforadora P.P. 216.000 0.100 21.60
Manguera Aire 1" Mts 30.000 2.700 0.54
Manguera agua 1/2" Mts 30.000 1.330 0.27
41.46 27.638
6.00 GASTOS DIRECTOS 172.50
Contingencias 3% 5.17
Gastos Generales 0% 0.00
Utilidad 10% 17.25
TOTAL COSTO LINEAL EN DOLARES (US$/M-L) 194.92
DISTRIBUCION DE CARGA DE EXPLOSIVOS
VOLUMEN POR DISPARO LABOR
EFICIENCIA DE AVANCES
PDF created with pdfFactory Pro trial version www.pdffactory.com
05510 CONSORCIO MINER0 HORIZONTE S.A.
SUB NIVEL 1.20 X 2.10 mts. Con Winche y Scoop 1.50 Yd3. N Taladros: 22 u
Acarreo hasta 150 mts. N Tal.carg.: 18 u
Long. Perfor.: 5 pies
AVANCE: 1.40 ml
ITEM DESCRIPCION INCID. UNI. CANTID. PRECIO SUBTOT. TOTAL
UNITARIO $ US$/UNID
1.- MANO DE OBRA
Perforista Tareas 1.00 37.05 $/Tarea 37.05
Ayudante Perforista Tareas 1.00 34.14 $/Tarea 34.14
Operador Scoop Tareas 0.50 47.58 $/Tarea 23.79
94.99 67.85
2.- IMPLEMENTOS
Implementos Tareas 2.00 1.90 3.79
Implementos Operador Scoop Tareas 0.50 3.58 1.79
5.58 3.99
3.- MATERIALES Y HERRAMIENTAS
Barra de 6 P.P. 110.000 94.60 $/uni 5.72
Broca de 40 mm PP 110.000 25.30 $/uni 7.95
Petroleo D2 Gln 2.000 4.55 $/uni 9.09
Aceite de Perforacin Gln 0.250 9.16 $/uni 2.29
Herramientas de Mina-Barretillas Global $/uni 1.21
26.26 18.76
4.- EXPLOSIVOS
EMULEX 45% x 1" x 7" (276) Pza. 60.00 0.230 $/uni 13.80
EXSABLOCK 7/8" X 7" (276) Pza. 0.00 0.160 $/uni 0.00
EXADIT 45% 7/8" X 7" (328) Pza. 30.00 0.170 $/uni 5.10
EXSANEL 3.0 m Pza. 18.00 1.320 $/uni 23.76
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza. 2.00 0.760 $/uni 1.52
CORDON DETONANTE 5P Mts. 4.00 0.230 $/uni 0.92
IGNICION RAPIDA Mts. 0.10 0.410 $/pie 0.04
45.14 32.24
5.- EQUIPOS
Ventiladora 10 CFM Hrs. 0.00 0.92 $/hr 0.00
Scooptrams 1.50 Yd3 Hrs. 1.00 40.00 $/hr 40.00
Winche Hrs. 2.00 3.67 $/hr 7.34
Perforadora P.P. 110.00 0.100 $/pp 11.00
Manguera Aire 1 Mts. 30.00 2.70 $/hr 0.54
Manguera Agua 1/2 Mts. 30.00 1.33 $/hr 0.27
Bomba de 10 HP Hrs. 0.00 1.16 $/hr 0.00
59.14 42.25
165.08
6.- GASTOS INDIRECTOS
Contingencias 3% $ 4.95
Gastos Generales 0% $ 0.00
Utilidad 10% $ 16.51
TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L) 186.54
Energa Elctrica, Tuberias, accesorios proporciona Ca.
FORMATO DE PRECIOS UNITARIOS DE AVANCES - MECANIZADO
PDF created with pdfFactory Pro trial version www.pdffactory.com
05512 CONSORCIO MINER0 HORIZONTE S.A.
SUB NIVEL 1.20 X 2.10 mts. Con Winche N Taladros: 22 u
N Tal.carg.: 18 u
Long. Perfor.: 5 pies
AVANCE: 1.40 ml
ITEM DESCRIPCION INCID. UNI. CANTID. PRECIO SUBTOT. TOTAL
UNITARIO $ US$/UNID
1.- MANO DE OBRA
Perforista Tareas 1.00 37.05 $/Tarea 37.05
Ayudante Perforista Tareas 1.00 34.14 $/Tarea 34.14
71.20 50.85
2.- IMPLEMENTOS
Implementos Tareas 2.00 1.90 3.79
3.79 2.71
3.- MATERIALES Y HERRAMIENTAS
Barra de 6 P.P. 110.000 94.60 $/uni 5.72
Broca de 40 mm PP 110.000 25.30 $/uni 7.95
Aceite de Perforacin Gln 0.250 9.16 $/uni 2.29
Herramientas de Mina-Barretillas Global $/uni 1.21
17.17 12.26
4.- EXPLOSIVOS
EMULEX 45% x 1" x 7" (276) Pza 60.00 0.230 $/uni 13.80
EXADIT 45% 7/8" X 7" (328) Pza. 30.00 0.170 $/uni 5.10
EXSANEL 3.0 m Pza. 18.00 1.320 $/uni 23.76
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza. 2.00 0.760 $/uni 1.52
CORDON DETONANTE 5P Mts. 4.00 0.230 $/uni 0.92
IGNICION RAPIDA Mts. 0.10 0.410 $/uni 0.04
45.14 32.24
5.- EQUIPOS
Ventiladora 10 CFM Hrs. 0.00 0.92 $/hr 0.00
Scooptrams 1.50 Yd3 Hrs. 0.00 40.00 $/hr 0.00
Winche Hrs. 2.00 3.67 $/hr 7.34
Perforadora P.P. 110.00 0.10 $/pp 11.00
Manguera Aire 1 Mts. 30.00 2.70 $/hr 0.54
Manguera Agua 1/2 Mts. 30.00 1.33 $/hr 0.27
Bomba de 10 HP Hrs. 0.00 $/hr 0.00
19.14 13.67
111.74
6.- GASTOS INDIRECTOS
Contingencias 3% $ 3.35
Gastos Generales 0% $ 0.00
Utilidad 10% $ 11.17
TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L) 126.27
Energa Elctrica, Tuberias, accesorios proporciona Ca.
FORMATO DE PRECIOS UNITARIOS DE AVANCES
ACUMULACION PARCOY
PDF created with pdfFactory Pro trial version www.pdffactory.com
CONSORCIO MINER0 HORIZONTE S.A.
NICHO PARA TABLERO ELECTRICO 0.60m x 0.60m N Taladros: 30.00 u
Long. Perfor.: 2.00 pies
AVANCE: 1.00 Unid
ITEM DESCRIPCION INCID UNI. CANTID. PRECIO SUBTOT. TOTAL
UNITARIO $ US$/UNID
1.- MANO DE OBRA
Perforista 0.50 Tareas 1.00 37.05 $/Tarea 18.53
Ayudante Perforista 0.50 Tareas 1.00 34.14 $/Tarea 17.07
35.60 35.60
2.- IMPLEMENTOS
Implementos Tareas 2.00 1.90 3.79
3.79 3.79
3.- MATERIALES Y HERRAMIENTAS
Barra de 6 P.P. 60.000 94.60 $/uni 3.12
Broca de 40 mm PP 60.000 25.30 $/uni 4.34
Aceite de Perforacin Gln 0.250 9.16 $/uni 2.29
Herramientas de Mina-Barretillas Global $/uni 1.21
10.96 10.96
4.- EQUIPOS
Perforadora P.P. 60.00 0.100 $/pp 6.00
Manguera Aire 1 Mts. 30.00 2.70 $/hr 0.54
Manguera Agua 1/2 Mts. 30.00 1.33 $/hr 0.27
6.81 6.81
57.15
6.- GASTOS INDIRECTOS
Contingencias 3% $ 1.71
Gastos Generales 0% $ 0.00
Utilidad 10% $ 5.72
TOTAL COSTO EN DOLARES (US$/UNIDAD) 64.58
Energa Elctrica, Tuberias, accesorios proporciona Ca. 146.94
138.33
FORMATO DE PRECIOS UNITARIOS NICHO TABLERO
PDF created with pdfFactory Pro trial version www.pdffactory.com
Produccin Total Mineral en Tajeos (TMS/MES) 29,569
ITEM DESCRIPCION INCID. UNI. CANTID. PRECIO SUBTOT. TOTAL
UNITARIO Das Mes $ US$/ UNID
2.- MANO DE OBRA S/.
Capataz Tareas 2.00 77.00 30.00 1,715.56
Maestro Relleno M2/M3 Tareas 6.00 51.00 30.00 3,408.84
Preparacion A1 Tareas 12.00 47.00 30.00 6,282.96
SUB TOTAL 20.00 11,407.35
Leyes Sociales 10,910.16
SUB TOTAL 22,317.51 0.75
3.- IMPLEMENTOS
Implementos Ropa Agua Tareas 180.00 1.90 341.22
Implementos sin Ropa agua Tareas 420.00 1.90 796.17
SUB TOTAL 1,137.38 0.04
4.- MATERIALES Y HERRAMIENTAS
Poliyute M2 8,000.00 1.45 11,600.00
Clavos 3" Kgs 250.00 1.28 320.00
Tubo 4"X3m PVC Unid 600.00 4.10 2,460.00
Codos 4" x 90 Un 30.00 0.79 23.70
Herramientas de Mina-Barretillas Global 1.67
Floculante Kgs 0.00 6.82 0.00
Alambre No 8 Kgs 50.00 1.22 61.00
Madera Redondo Fts2 230.00 0.494 113.59
Madera Aserrada Fts2 4,000.00 0.564 2,257.71
16,837.67 0.57
TOTAL COSTOS POR TMS SEGN MEDICION TOPOGRAFICO DE TAJ EOS U.S.$/ TMS 1.36 *
*
FORMATO DE PRECIOS UNITARIOS DE RELLENO HIDRAULICO
Los Pus de RRHH son ponderados con las TMS ROTAS MENSUALES de los TAJEOS y se pagar segn
MEDICION TOPOGRAFICA DE ROTURA DE MINERAL.
El personal de tuberos para la linea TRONCAL y los BOMBEROS sern por Administracin de CMHSA (6
personas), que no contempla este Precio Unitario
SUB - NIVEL
TOLVA
Relleno Hidralico
Relleno Detrtico
Produccin Total Mineral en Tajeos
(TMS/MES)
Espacio Vaco
PDF created with pdfFactory Pro trial version www.pdffactory.com
06521
EXPLOTACION DE TAJEOS CORTE Y RELLENO EN BREASTINGN Taladros: 12.00 Unid
LIMPIEZA CON WINCHE N Tal.carg.: 12.00 Unid
ROTURA MINERAL: 15.00 TMS/DISPARO
ITEM DESCRIPCION INCID. UNI. CANTID. PRECIO SUBTOT. TOTAL
UNITARIO $ US$/UNID
1.- MANO DE OBRA
Maestro Perforista 1.00 Tareas 1.00 37.05 $/Tarea 37.05
Ayudante Perforista 1.00 Tareas 1.00 34.14 $/Tarea 34.14
Ayud.- Movimiento Winche 0.25 Tareas 1.00 34.14 $/Tarea 8.54
79.73 5.32
2.- IMPLEMENTOS
Implementos personal operativo normal Tareas 2.25 1.90 4.27
4.27 0.28
3.- MATERIALES Y HERRAMIENTAS
Barra cnica 6' PP 66.00 94.60 1,820.00 3.43
Broca de 40 mm Pza 66.00 25.30 350.00 4.77
Aceite de Perforacin Gln 0.25 9.16 $/uni 2.29
Herramientas Global $/gdia 1.67
12.17 0.81
4.- EXPLOSIVOS
EXADIT 45% 7/8" X 7" (328) uni 60.00 0.170 $/uni 10.20
EXSANEL 2.1 m Pza 12.00 1.150 $/pie 13.80
IGNICION RAPIDA mts 0.10 0.410 $/m 0.04
CORDON DETONANTE 5P mts 6.00 0.230 $/m 1.38
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza 2.00 0.760 $/uni 1.52
26.94 1.80
5.- EQUIPOS
Winche de 20 HP h-m 3.00 3.67 $/hr 11.01
Perforadora manual pp 66.00 0.10 $/pp 6.60
Mangueras 1" mts 30.00 2.70 $/mt 0.54
Mangueras 1/2" mts 30.00 1.33 $/mt 0.27
18.41 1.23
6.- RRHH
Relleno Hidralico TMS 1 $/Tons 1.36 1.36
10.80
7.- GASTOS INDIRECTOS
Imprevistos 3% $ 0.32
Gastos Generales 0% $ 0.00
Utilidad 10% $ 1.08
TOTAL COSTO ROTURA EN DOLARES (US$/TM) 12.20
PRECIOS UNITARIOS ROTURA - CON 1 WINCHE
PDF created with pdfFactory Pro trial version www.pdffactory.com
06515
EXPLOTACION DE TAJEOS VETAS ANGOSTAS < 1.20 MTS N Taladros: 11.00 Unid
LIMPIEZA SOLO WINCHE N Tal.carg.: 11.00 Unid
ROTURA MINERAL:11.00 TMS/DISPARO
ITEM DESCRIPCION INCID. UNI. CANTID. PRECIO SUBTOT. TOTAL
UNITARIO $ US$/UNID
1.- MANO DE OBRA
Maestro Perforista 1.00 Tareas 1.00 37.05 $/Tarea 37.05
Ayudante Perforista 1.00 Tareas 1.00 34.14 $/Tarea 34.14
71.20 6.47
2.- IMPLEMENTOS
Implementos personal operativo normal Tareas 2.00 1.90 3.79
3.79 0.34
3.- MATERIALES Y HERRAMIENTAS
Barra cnica 6' PP 55.00 94.60 1,820.00 2.86
Broca de 40 mm Pza 55.00 25.30 350.00 3.98
Aceite de Perforacin Gln 0.25 9.16 $/uni 2.29
Herramientas Global $/gdia 1.67
10.80 0.98
4.- EXPLOSIVOS
EXADIT 45% 7/8" X 7" (328) uni 55.00 0.170 $/uni 9.35
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza 2.00 0.760 $/pie 1.52
EXSANEL 2.1 m Pza 11.00 1.150 $/pie 12.65
IGNICION RAPIDA mts 0.10 0.410 $/m 0.04
CORDON DETONANTE 5P mts 5.00 0.230 $/m 1.15
24.71 2.25
5.- EQUIPOS
Winche de 20 HP h-m 2.00 3.67 $/hr 7.34
Perforadora manual pp 55.00 0.10 $/pp 5.50
Mangueras 1" mts 30.00 2.70 $/mt 0.54
Mangueras 1/2" mts 30.00 1.33 $/mt 0.27
13.64 1.24
6.- RRHH
Relleno Hidralico TMS 1 $/Tons 1.36 1.36
12.65
7.- GASTOS INDIRECTOS
Imprevistos 3% $ 0.38
Gastos Generales 0% $ 0.00
Utilidad 10% $ 1.26
TOTAL COSTO ROTURA EN DOLARES (US$/TM) 14.29
ROTURA VETA ANGOSTA CON ALTO GRADO DIFICULTAD CON 1 WINCHE
PDF created with pdfFactory Pro trial version www.pdffactory.com
06524
EXPLOTACION DE TAJEOS CORTE Y RELLENO EN BREASTINGN Taladros: 6.00 Unid
RECUPERACION DE PILAR LIMPIEZA SOLO CON WINCHE N Tal.carg.: 6.00 Unid
ROTURA MINERAL: 10.00 TMS/DISPARO
ITEM DESCRIPCION INCID. UNI. CANTID. PRECIO SUBTOT. TOTAL
UNITARIO $ US$/UNID
1.- MANO DE OBRA
Maestro Perforista 1.00 Tareas 1.00 37.05 $/Tarea 37.05
Ayudante Perforista 1.00 Tareas 1.00 34.14 $/Tarea 34.14
71.20 7.12
2.- IMPLEMENTOS
Implementos personal operativo normal Tareas 2.00 1.90 3.79
3.79 0.38
3.- MATERIALES Y HERRAMIENTAS
Barra cnica 6' PP 24.00 94.60 1,820.00 1.25
Broca de 40 mm Pza 24.00 25.30 350.00 1.73
Aceite de Perforacin Gln 0.25 9.16 $/uni 2.29
Herramientas Global $/gdia 1.67
6.95 0.69
4.- EXPLOSIVOS
EXADIT 45% 7/8" X 7" (328) uni 30.00 0.170 $/uni 5.10
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza 2.00 0.760 $/pie 1.52
EXSANEL 2.1 m Pza 6.00 1.150 $/pie 6.90
IGNICION RAPIDA mts 0.10 0.410 $/m 0.04
CORDON DETONANTE 5P mts 5.00 0.230 $/m 1.15
14.71 1.47
5.- EQUIPOS
Winche de 20 HP h-m 2.00 3.67 $/hr 7.34
Scooptram 1.50 Yds3 Hrs 0.00 40.00 $/hr 0.00
Perforadora manual pp 24.00 0.10 $/pp 2.40
Mangueras 1" mts 30.00 2.70 $/mt 0.54
Mangueras 1/2" mts 30.00 1.33 $/mt 0.27
10.54 1.05
6.- RRHH
Relleno Hidralico TMS 1 $/Tons 1.36 1.36
12.08
7.- GASTOS INDIRECTOS
Imprevistos 3% $ 0.36
Gastos Generales 0% $ 0.00
Utilidad 10% $ 1.21
TOTAL COSTO ROTURA EN DOLARES (US$/TM) 13.65
PRECIOS UNITARIOS ROTURA - RECUPERACION PILARES CON 1 WINCHE
PDF created with pdfFactory Pro trial version www.pdffactory.com
06520
EXPLOTACION DE TAJEOS CORTE Y RELLENO EN BREASTINGN Taladros: 12.00 Unid
CIRCADO LIMPIEZA CON WINCHE N Tal.carg.: 12.00 Unid
ROTURA MINERAL: 10.00 TMS/DISPARO
ITEM DESCRIPCION INCID. UNI. CANTID. PRECIO SUBTOT. TOTAL
UNITARIO $ US$/UNID
1.- MANO DE OBRA
Maestro Perforista 1.00 Tareas 1.00 37.05 $/Tarea 37.05
Ayudante Perforista 1.00 Tareas 1.00 34.14 $/Tarea 34.14
Ayud. - Movimiento Winche, 0.50 Tareas 1.00 34.14 $/Tarea 17.07
88.27 8.83
2.- IMPLEMENTOS
Implementos personal operativo normal Tareas 2.50 1.90 4.74
4.74 0.47
3.- MATERIALES Y HERRAMIENTAS
Barra cnica 6' PP 60.00 94.60 1,820.00 3.12
Broca de 40 mm Pza 60.00 25.30 350.00 4.34
Aceite de Perforacin Gln 0.25 9.16 $/uni 2.29
Herramientas Global $/gdia 1.67
11.42 1.14
4.- EXPLOSIVOS
EXADIT 45% 7/8" X 7" (328) uni 60.00 0.170 $/uni 10.20
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza 2.00 0.760 $/pie 1.52
EXSANEL 2.1 m Pza 12.00 1.150 $/pie 13.80
IGNICION RAPIDA mts 0.10 0.410 $/m 0.04
CORDON DETONANTE 5P mts 5.00 0.230 $/m 1.15
26.71 2.67
5.- EQUIPOS
Winche de 20 HP h-m 1.50 3.67 $/hr 5.50
Perforadora manual pp 60.00 0.10 $/pp 6.00
Mangueras 1" mts 30.00 2.70 $/mt 0.54
Mangueras 1/2" mts 30.00 1.33 $/mt 0.27
12.31 1.23
6.- RRHH
Relleno Hidralico TMS 1 $/Tons 1.36 1.36
15.71
7.- GASTOS INDIRECTOS
Imprevistos 3% $ 0.47
Gastos Generales 0% $ 0.00
Utilidad 10% $ 1.57
TOTAL COSTO ROTURA EN DOLARES (US$/TM) 17.75
PRECIOS UNITARIOS ROTURA - CIRCADO CON 1 WINCHE
PDF created with pdfFactory Pro trial version www.pdffactory.com
06516
EXPLOTACION DE TAJEOS CORTE Y RELLENO EN BREASTING N Taladros: 15 u
LIMPIEZA CON SCOOP DE 1.50 Yds3 N Tal.carg.: 15 u
Acarreo de mineral a la Tolva(Chute) ROTURA MINERAL: 25.00 TMS/DISPARO
ITEM DESCRIPCION INCID. UNI. CANTID. PRECIO SUBTOT. TOTAL
UNITARIO $ US$/UNID
1.- MANO DE OBRA
Maestro Perforista 1.00 Tareas 1.00 37.05 $/Tarea 1.48
Ayudante Perforista 1.00 Tareas 1.00 34.14 $/Tarea 1.37
Operador Scoop 0.50 Tareas 1.00 47.58 $/Tarea 0.95
3.80
2.- IMPLEMENTOS
Implementos personal operativo normal Tareas 2.00 1.90 3.79
Implementos Operador Scoop Tareas 0.50 3.58 1.79
5.58 0.22
3.- MATERIALES Y HERRAMIENTAS
Barra cnica 6' PP 75.000 94.60 1,820.00 3.90
Broca de 40 mm Pza 75.000 25.30 350.00 5.42
Aceite de Perforacin Gln 0.250 9.16 $/uni 2.29
Petroleo D2 Gln/Hr 3.990 4.55 $/uni 18.14
Herramientas Global $/gdia 1.67
31.42 1.26
4.- EXPLOSIVOS
EXADIT 45% 7/8" X 7" (328) uni 75.00 0.170 $/uni 12.75
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza 2.00 0.760 $/pie 1.52
EXSANEL 2.1 m Pza 15.00 1.150 $/pie 17.25
IGNICION RAPIDA mts 0.10 0.410 $/m 0.04
CORDON DETONANTE 5P mts 10.00 0.230 $/m 2.30
33.86 1.35
5.- EQUIPOS
Scooptram 2.20 Yds3 h-m 1.33 50.00 $/hr 66.50
Perforadora manual pp 75.00 0.10 $/pp 7.50
Mangueras 1" mts 30.00 2.70 $/mt 0.54
Mangueras 1/2" mts 30.00 1.33 $/mt 0.27
74.81 2.99
6.- RRHH
Relleno Hidralico TMS 1 $/Tons 1.36 1.36
10.99
6.- GASTOS INDIRECTOS
Imprevistos 3% $ 0.33
Gastos Generales 0% $ 0.00
Utilidad 10% $ 1.10
TOTAL COSTO ROTURA EN DOLARES (US$/TM) 12.42
PRECIOS UNITARIOS ROTURA - MECANIZADO CON 1 SCOOPTRAM
PDF created with pdfFactory Pro trial version www.pdffactory.com
Densidad 3 Tons/M3
EXPLOTACION DE TAJEOS CORTE Y RELLENO EN BREASTINGN Taladros: 15 Unid
LIMPIEZA CON SCOOP DE 1.50 Yds3 N Tal.carg.: 15 Unid
Acarreo de mineral a la Tolva(Chute) Avan.Neto 1.5 ROTURA MINERAL: 23.76 TMS/DISPARO
ITEM DESCRIPCION INCID. UNI. CANTID. PRECIO SUBTOT. TOTAL
UNITARIO $ US$/UNID
1.- MANO DE OBRA
Maestro Perforista 1.00 Tareas 1.00 37.05 $/Tarea 1.56
Ayudante Perforista 1.00 Tareas 1.00 34.14 $/Tarea 1.44
Operador Scoop 0.50 Tareas 1.00 47.58 $/Tarea 1.00
4.00
2.- IMPLEMENTOS
Implementos personal operativo normal Tareas 2.00 1.90 3.79
Implementos Operador Scoop Tareas 0.50 3.58 1.79 0.23
3.- MATERIALES Y HERRAMIENTAS
Barra cnica 6' PP 75.000 94.60 1,820.00 3.90
Broca de 40 mm Pza 75.000 25.30 350.00 5.42
Aceite de Perforacin Gln 0.250 9.16 $/uni 2.29
Petroleo D2 Gln/Hr 3.990 4.55 $/uni 18.14
Herramientas Global $/gdia 1.67
31.42 1.32
4.- EXPLOSIVOS
EXADIT 45% 7/8" X 7" (328) uni 90.00 0.170 $/uni 15.30
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza 2.00 0.760 $/pie 1.52
EXSANEL 2.1 m Pza 15.00 1.150 $/pie 17.25
IGNICION RAPIDA mts 0.10 0.410 $/m 0.04
CORDON DETONANTE 5P mts 10.00 0.230 $/m 2.30
36.41 1.53
5.- EQUIPOS
Scooptram 2.20 Yds3 h-m 1.33 50.00 $/hr 66.50
Perforadora manual pp 75.00 0.10 $/pp 7.50
Mangueras 1" mts 30.00 2.70 $/mt 0.54
Mangueras 1/2" mts 30.00 1.33 $/mt 0.27
74.81 3.15
6.- RRHH
Relleno Hidralico TMS 1 $/Tons 1.36 1.36
11.60
6.- GASTOS INDIRECTOS
Imprevistos 3% $ 0.35
Gastos Generales 0% $ 0.00
Utilidad 10% $ 1.16
TOTAL COSTO ROTURA EN DOLARES (US$/TM) 13.11
PRECIOS UNITARIOS ROTURA - MECANIZADO CON 1 SCOOPTRAM
PDF created with pdfFactory Pro trial version www.pdffactory.com
3.5 m x 3.5 m
N de Taladros: 44.00 Tons/Disp. 132.61
10 12 10 12 10 12
UNIDAD CANTIDAD
GDIAS/DI
SP
FACTOR PU SUB TOTAL U.S.$/Tons PRIMERA FILA 2 7 8
EMUL
11/8"X12"
14 16 0.198 2.772 3.168
OPERADOR DE JUMBO 1.00 Hom/Disp 0.00 0.30 1.00 51.22 0.00 SEGUNDA FILA 3 7 8
EMUL
11/8"X12"
21 24 0.198 4.158 4.752
AYUDANTE OPER.JUMBO 1.00 Hom/Disp 0.00 0.30 1.00 34.14 0.00 TERCERA FILA 4 7 8
EMUL
11/8"X12"
28 32 0.198 5.544 6.336
OPERADOR SCOOPTRAM Hom/Disp 1.00 0.74 1.00 47.58 35.06 CUARTA FILA 1 7 8
EMUL
11/8"X12"
7 8 0.198 1.386 1.584
CARGADOR/DISPARADOR Hom/Disp 3.00 1.00 1.00 37.05 111.15
TALADROS DE
PRECORTE
17 5 6
EXSABLOCK
7/8"X7"
85 102 0.072 6.12 7.344
SERVICIOS PARA RELLENO Hom/Disp 2.00 1.00 1.00 34.14 68.29 TALADROS DE ALIVIO 17
SUB-TOTAL 214.50 1.62
MATERIALES TOTAL CARGADOS 27
TOTAL
EMULEX 45
11/8"x12"
70 80
UNIDAD MTS/DISP
VIDA
UTIL
ESTANDAR
PZAS/DISP
PRECIO
U.S.$/PZA
U.S.$/Ton TOTAL PERFORADOS 44
TOTAL
EXSABLOCK
7/8"x 7"
85 102
BARRAS DE PERFORACION Mts/Disp 163.35 2,500 0.07 581.90 0.29 TOTAL 155 182 19.98 23.184
BROCAS DE 45 MM Mts/Disp 163.35 200 0.82 93.50 0.58
SHANK ADAPTER Mts/Disp 163.35 3,500 0.05 366.30 0.13
EFICIENCIA DE
PENETRACION
100%
AFILADOR BROCAS Mts/Disp 163.35 100,000 0.00 1,600.00 0.02 EFICIENCIA DE AVANCE 97%
POLIYUTE Mts2/Ton 9.30 1.45 0.10 RENDIMIENTOS UNI 10 PIES 12 PIES
KILOS DE EXPLOSIVO Kg 19.98 23.18
TUBO PVC (Voladura recorte) Pzas/Disp 10.00 0.41 0.03 LONGITUD DE TALADRO m 3.00 3.60
VOLUMEN m
3 32.08 38.50
Petroleo para Jumbo 0.50 Glns 4.55 TONELAJE Tn 96.25 115.50
Petroleo para Scoop 4.00 4.55
HERRAMIENTAS GLB 0.00 1.67 0.01 AVANCE PROMEDIO m 2.91 3.49
ALCAYATAS DE 3/4" Pzas/Disp 3.00 3.36 0.08 FACTOR DE CARGA Kg/m
3 0.62 0.60
FACTOR DE POTENCIA Kg/Tn 0.21 0.20
SUB-TOTAL 1.23
FACTOR DE CARGA
LINEAL
Kg/m 7 7
IMPLEMENTOS SEGURIDAD
UNIDAD MTS/DISP
COSTO UNIT
U.S.$/Pers
COSTO
U.S.$
U.S.$/Ton
IMPLEMENTOS SEGURIDAD Unidad 5.00 1.90 9.48 0.07 JUMBO
Implementos Operador Scoop Tareas 0.74 3.58 2.64 0.02 DESCRIPCION UNIDAD VALOR
0.09 Velocidad Penetracion Mts/Hr 90.00 4.92 Fts/Minto
VOLADURA
Mts de Labor Mts 163.35
UNIDAD MTS/DISP
CANTIDA
D/
TALADR
O
CANTIDAD
PZAS
UNIDAD KG
COSTO
U.S.$/Kg
U.S.$/Ton
Hrs Perforacion Hrs 1.81
EMULEX 45% 1 1/8" X 12" FILAS TALADROS 10.00 8.00 80.00 15.63 2.66 0.31 Hrs Perfor./Gdia Hrs 6.00
EXABLOC 7/8" X 7" Corona TALADROS 17.00 6.00 102.00 9.24 2.21 0.15 Gdias Perforacion Gdias 0.30
CORDON DETONANTE 5P MTS 45.00 0.21 0.07
GUIA ENSAMBLADA 2.4 mts (Carmex) PZAS 2.00 0.76 0.01 SCOOPTRAM
EXANEL 4.8 Mts PZAS 27.00 1.58 0.32 Rendimiento Tons/Hr 30.00
SUB-TOTAL 0.87 Tons Produccin Tons 132.61
Hrs Scoop Hrs 4.42
EQUIPOS Hrs Limpieza./Gdia Hrs 6.00
UNIDAD HRS/DISP
COSTO
PROPIE
DAD
U.S.$/HR
COSTO
OPERACIN
U.S.$/HR
COSTO
TOTAL
U.S.$/HR
COSTO
TOTAL
U.S.$
U.S.$/Ton
Tons Limpieza/Gdia Tons 180.00
JUMBO ELECTROHIDR DE 1 BRAZO (*) 1.81 HORAS 0.00 86.87 16.13 103.00 0.00 Gdias Limpieza Gdias 0.74
SCOOP DIESEL 4 YD3 4.42 HORAS 45.79 14.21 60.00 0.00
SUB-TOTAL 0.00 0.00
TOTAL COSTOS DIRECTOS 3.81
IMPREVISTOS 3% 0.11
UTILIDAD 10% 0.38
SUB TOTAL COSTOS INDIRECTOS 0.50
DIFERENCIA
TOTAL COSTOS U.S.$/Ton (Sin equipos) 4.31 6.74 -2.435769866
TOTAL COSTOS U.S.$/Ton (Con equipos) 9.09 8.55 0.531312474
LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
DATOS
Malla N cartuchos
CICLO UNIDAD
ESTAND
AR
DESCRIPCION
UNIDAD
EMULEX 45%
1 1/8"X12
EXABLOC
7/8"X7"
Corona
17.00
TIEMPO DE CICLO H/DISP 3.21 Taladro Alivio 17.00 2.00 8 16 EMUL 11/8"X12"
LONG BARRA DE EXTEN PIES 14.00 Primera Fila 2.00 16.00 3.00 8 24 EMUL 11/8"X12"
EFIC DE PERF % 87% Segunda Fila 3.00 24.00 4.00 8 32 EMUL 11/8"X12"
LONG PERFORACION MT 3.71 Tercera Fila 4.00 32.00 1.00 8 8 EMUL 11/8"X12"
EFIC.AVANCE % 81% Cuarta Fila 1.00 8.00 17.00 6 102 EXSABLOCK 7/8"X7"
LONG DE AVANCE EFECTIVA MT 3.01 Taladro de Precorte 17.00 102.00
DURACION GUARDIA H 8.00
GUARDIAS/DIA GDA/D 2.00 44 182
PRODUCCION/DIA M/D 12.03 TOTAL 44.00 80.00 102.00
TOTAL KGS 44.00 15.63 9.24 24.86
0.19
ANCHO LABOR Mt 3.50 PESO Kgs/Cartucho 0.20 0.09
ALTO LABOR Mt 3.50
LONGITUD Mt 3.01 EFICIENCIAS
SOBREROTURA % 20% DESCRIPCION UNIDAD VALOR
VOLUMEN TOTAL Mt3 44.20 Densidad de Carga Kgs/mt 16.54
DENSIDAD MATERIAL Tons/Mt3 3.00 Factor de Carga Kgs/Ton 0.37
PESO
KILOS
MANO DE OBRA
VOLUMEN POR DISPARO LABOR
CALCULO DE HRS USO EQUIPOS
DESCRIPCION
DESCRIPCION
DESCRIPCION
DESCRIPCION
EFICIENCIA DE AVANCES DISTRIBUCION DE CARGA DE EXPLOSIVOS
EXPLOSIVO Y
DIMENSION
TOTAL CARTUCHOS
EXPLOTACION_TAJEO_MECANIZADO ANCHO VETA MENOR DE 3.50 MX 4.50M
SIN JUMBO(CON JUMBO) DISTRIBUCION POR TALADRO RMR 21 - 30
SECCION N DE TAL
CART. POR TALADRO para
cada longitud (pies)
PDF created with pdfFactory Pro trial version www.pdffactory.com
6 x 4.5
N de Taladros: 69.00 Tons/Disp. 272.80 CART. POR TOTAL KILOS
14 14 14
UNIDAD CANTIDAD
GDIAS/DI
SP
FACTOR PU SUB TOTAL U.S.$/Tons PRIMERA FILA 7 9
EMUL
11/8"X12"
63 0.198 12.474
OPERADOR DE JUMBO 1.00 Hom/Disp 0.00 0.47 1.00 51.22 0.00 SEGUNDA FILA 8 9
EMUL
11/8"X12"
72 0.198 14.256
AYUDANTE OPER.JUMBO 1.00 Hom/Disp 0.00 0.47 1.00 34.14 0.00 TERCERA FILA 10 9
EMUL
11/8"X12"
90 0.198 17.82
OPERADOR SCOOPTRAM Hom/Disp 1.00 1.42 1.00 47.58 67.61 CUARTA FILA 15 9
EMUL
11/8"X12"
135 0.198 26.73
CARGADOR/DISPARADOR Hom/Disp 3.00 1.00 1.00 37.05 111.15
TALADROS DE
PRECORTE
15 5
EXSABLOCK
7/8"X7"
75 0.072 5.4
SERVICIOS PARA RELLENO Hom/Disp 2.00 1.00 1.00 34.14 68.29 TALADROS DE ALIVIO 14
SUB-TOTAL 247.05 0.91
MATERIALES TOTAL CARGADOS 55
TOTAL
EMULEX 45
11/8"x12"
360
UNIDAD MTS/DISP
VIDA
UTIL MTS
ESTANDAR
PZAS/DISP
PRECIO
U.S.$/PZA
U.S.$/Ton TOTAL PERFORADOS 69
TOTAL
EXSABLOCK
7/8"x 7"
75
BARRAS DE PERFORACION Mts/Disp 256.16 2,500 0.10 581.90 0.22 TOTAL 435 76.68
BROCAS DE 45 MM Mts/Disp 256.16 200 1.28 93.50 0.44
SHANK ADAPTER Mts/Disp 256.16 3,500 0.07 366.30 0.10
EFICIENCIA DE
PENETRACION
100%
AFILADOR BROCAS Mts/Disp 256.16 100,000 0.00 1,600.00 0.02 EFICIENCIA DE AVANCE 97%
RENDIMIENTOS UNI 10 PIES
KILOS DE EXPLOSIVO Kg 76.68
TUBO PVC (Voladura recorte) Pzas/Disp 10.00 0.41 0.02 LONGITUD DE TALADRO m 4.20
POLIYUTE Mts2/Ton 9.30 1.45 0.05 VOLUMEN m
3
99.00
Petroleo para Jumbo 0.50 Glns 4.55 TONELAJE Tn 296.99
Petroleo para Scoop 4.00 Glns 4.55
HERRAMIENTAS GLB 0.00 1.67 0.01 AVANCE PROMEDIO m 4.07
ALCAYATAS DE 3/4" Pzas/Disp 3.00 3.36 0.04 FACTOR DE CARGA Kg/m
3
0.77
FACTOR DE POTENCIA Kg/Tn 0.26
SUB-TOTAL 0.88
FACTOR DE CARGA
LINEAL
Kg/m 19
IMPLEMENTOS SEGURIDAD
UNIDAD MTS/DISP
COSTO UNIT
U.S.$/Pers
COSTO
U.S.$
U.S.$/Ton
IMPLEMENTOS SEGURIDAD Unidad 5.00 1.90 9.48 0.03 JUMBO
Implementos Operador Scoop Tareas 1.42 3.58 5.09 0.02 DESCRIPCION UNIDAD VALOR
0.05 Velocidad Penetracion Mts/Hr 90.00 Fts/Minto
Mts de Labor Mts 256.16
VOLADURA Hrs Perforacion Hrs 2.85
UNIDAD MTS/DISP
CANTIDA
D/
TALADR
O
CANTIDAD
PZAS
UNIDAD KG
COSTO
U.S.$/Kg
U.S.$/Ton
Hrs Perfor./Gdia Hrs 6.00
EMULEX 45% 1 1/8" X 12" FILAS TALADROS 40.00 9.00 360.00 70.31 2.66 0.69 Gdias Perforacion Gdias 0.47
EXABLOC 7/8" X 7" Corona TALADROS 15.00 5.00 75.00 5.43 2.21 0.04
CORDON DETONANTE 5P MTS 45.00 0.21 0.03 SCOOPTRAM
GUIA ENSAMBLADA 2.4 mts (Carmex) PZAS 2.00 0.76 0.01 Rendimiento Tons/Hr 32.00
EXANEL 4.8 Mts PZAS 55.00 1.58 0.32 Tons Produccin Tons 272.80
SUB-TOTAL 1.09 Hrs Scoop Hrs 8.53
Hrs Limpieza./Gdia Hrs 6.00
EQUIPOS Tons Limpieza/Gdia Tons 192.00
UNIDAD HRS/DISP
COSTO
PROPIE
DAD
U.S.$/HR
COSTO
OPERACIN
U.S.$/HR
COSTO
TOTAL
U.S.$/HR
COSTO
TOTAL
U.S.$
U.S.$/Ton
Gdias Limpieza Gdias 1.42
JUMBO ELECTROHIDR DE 1 BRAZO (*) 2.85 HORAS 0.00 86.87 16.13 103.00 0.00
SCOOP DIESEL 4 YD3 8.53 HORAS 45.79 14.21 60.00 0.00
SUB-TOTAL 0.00 0.00
TOTAL COSTOS DIRECTOS 2.93
IMPREVISTOS 3% 0.09
UTILIDAD 10% 0.29
SUB TOTAL COSTOS INDIRECTOS 0.38
TOTAL COSTOS U.S.$/Ton (Sin equipos) 3.31 5.86778
TOTAL COSTOS U.S.$/Ton (Con equipos) 7.48 7.24239
LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
DATOS Malla
N
cartuchos
14.00
CICLO UNIDAD
ESTAND
AR
DESCRIPCION
UNIDAD
EMULEX 45%
1 1/8"X12
EXABLOC
7/8"X7"
Corona 7.00 9
63
EMUL 11/8"X12"
TIEMPO DE CICLO H/DISP 3.21 Taladro Alivio 14.00 8.00 9 72 EMUL 11/8"X12"
LONG BARRA DE EXTEN PIES 14.00 Primera Fila 7.00 63.00 10.00 9 90 EMUL 11/8"X12"
EFIC DE PERF % 87% Segunda Fila 8.00 72.00 15.00 9 135 EMUL 11/8"X12"
LONG PERFORACION MT 3.71 Tercera Fila 10.00 90.00 15.00 5 75 EXSABLOCK 7/8"X7"
EFIC.AVANCE % 81% Cuarta Fila 15.00 135.00
LONG DE AVANCE EFECTIVA MT 3.01 Taladro de Precorte 15.00 75.00
DURACION GUARDIA H 8.00 69 435
GUARDIAS/DIA GDA/D 2.00
PRODUCCION/DIA M/D 12.03 TOTAL 69.00 360.00 75.00
TOTAL KGS 69.00 70.31 5.43 75.75
0.28
ANCHO LABOR Mt 6.00 PESO Kgs/Cartucho 0.20 0.07
ALTO LABOR Mt 4.50
LONGITUD Mt 3.01 EFICIENCIAS
SOBREROTURA % 12% DESCRIPCION UNIDAD VALOR
VOLUMEN TOTAL Mt3 90.93 Densidad de Carga Kgs/mt 50.38
DENSIDAD MATERIAL Tons/Mt3 3.00 Factor de Carga Kgs/Ton 0.56
TONELAJE Tons/Disp 272.80
VOLUMEN POR DISPARO LABOR
DESCRIPCION
DESCRIPCION CALCULO DE HRS USO EQUIPOS
DESCRIPCION
DESCRIPCION
EFICIENCIA DE AVANCES DISTRIBUCION DE CARGA DE EXPLOSIVOS
EXPLOSIVO Y
DIMENSION
PESO
MANO DE OBRA
EXPLOTACION_TAJEO_MECANIZADO ANCHO VETA MENOR DE 6.0 M
SIN JUMBO(CON JUMBO) DISTRIBUCION POR TALADRO RMR 21 - 30
SECCION N DE TAL
PDF created with pdfFactory Pro trial version www.pdffactory.com
9 m x 4.5 m
N de Taladros: 100.00 Tons/Disp. 438.43
14 12 14 12 14 12
UNIDAD CANTIDAD GDIAS/DISP FACTOR PU SUB TOTAL U.S.$/Tons PRIMERA FILA 2 7 8
EMUL
11/8"X12"
14 16 0.198 2.772 3.168
OPERADOR DE JUMBO 1.00 Hom/Disp 0.00 0.69 1.00 51.22 0.00 SEGUNDA FILA 4 7 8
EMUL
11/8"X12"
28 32 0.198 5.544 6.336
AYUDANTE OPER.JUMBO 1.00 Hom/Disp 0.00 0.69 1.00 34.14 0.00 TERCERA FILA 6 7 8
EMUL
11/8"X12"
42 48 0.198 8.316 9.504
OPERADOR SCOOPTRAM Hom/Disp 1.00 1.92 1.00 47.58 91.50 CUARTA FILA 8 7 8
EMUL
11/8"X12"
56 64 0.198 11.088 12.672
CARGADOR/DISPARADOR Hom/Disp 3.00 1.00 1.00 37.05 111.15 QUINTA FILA 7 7 8
EMUL
11/8"X12"
49 56 0.198 9.702 11.088
SERVICIOS PARA RELLENO Hom/Disp 2.00 1.00 1.00 34.14 68.29 SEXTA FILA 7 7 8
EMUL
11/8"X12"
49 56 0.198 9.702 11.088
SUB-TOTAL 270.94 0.62
TALADROS DE
PRECORTE 33 5 6
EXSABLOCK
7/8"X7"
165 198 0.072 11.88 14.256
TALADROS DE ALIVIO 33
MATERIALES TOTAL CARGADOS 67
TOTAL
EMULEX 45
11/8"x12"
238 272
UNIDAD MTS/DISP
VIDA UTIL
MTS
ESTANDAR
PZAS/DISP
PRECIO
U.S.$/PZA
U.S.$/Ton TOTAL PERFORADOS 100
TOTAL
EXSABLOCK
7/8"x 7"
165 198
BARRAS DE PERFORACION Mts/Disp 371.25 2,500 0.15 581.90 0.20 TOTAL 403 470 59.004 68.112
BROCAS DE 45 MM Mts/Disp 371.25 200 1.86 93.50 0.40
SHANK ADAPTER Mts/Disp 371.25 3,500 0.11 366.30 0.09 EFICIENCIA DE
PENETRACION
100%
AFILADOR BROCAS Mts/Disp 371.25 100,000 0.00 1,600.00 0.01 EFICIENCIA DE AVANCE 97%
RENDIMIENTOS UNI 10 PIES 12 PIES
KILOS DE EXPLOSIVO Kg 59.00 68.11
TUBO PVC (Voladura recorte) Pzas/Disp 10.00 0.41 0.01 LONGITUD DE m 4.20 3.60
POLIYUTE Mts2/Ton 9.30 1.45 0.03 VOLUMEN m3 148.50 127.28
Petroleo para Jumbo 0.50 Glnz 4.55 TONELAJE Tn 445.49 381.85
Petroleo para Scoop 4.00 Glnz 4.55
HERRAMIENTAS GLB 0.00 1.67 0.00 AVANCE PROMEDIO m 4.07 3.49
ALCAYATAS DE 3/4" Pzas/Disp 4.00 3.36 0.03 FACTOR DE CARGA Kg/m3 0.40 0.54
FACTOR DE POTENCIA Kg/Tn 0.13 0.18
SUB-TOTAL 0.77
FACTOR DE CARGA
LINEAL
Kg/m 14 20
IMPLEMENTOS SEGURIDAD
UNIDAD MTS/DISP
COSTO UNIT
U.S.$/Pers
COSTO
U.S.$
U.S.$/Ton
IMPLEMENTOS SEGURIDAD Unidad 5.00 1.90 9.48 0.02 JUMBO
Implementos Operador Scoop Tareas 1.92 3.58 6.89 0.02 DESCRIPCION UNIDAD VALOR
0.04 Velocidad Penetracion Mts/Hr 90.00 4.92 Fts/Minto
Mts de Labor Mts 371.25
VOLADURA Hrs Perforacion Hrs 4.12
UNIDAD MTS/DISP
CANTIDAD/
TALADRO
CANTIDAD
PZAS
UNIDAD KG
COSTO
U.S.$/Kg
U.S.$/Ton
Hrs Perfor./Gdia Hrs 6.00
EMULEX 45% 1 1/8" X 12" FILAS TALADROS 34.00 8.00 272.00 53.13 2.66 0.32 Gdias Perforacion Gdias 0.69
EXABLOC 7/8" X 7" Corona TALADROS 33.00 6.00 198.00 17.93 2.21 0.09
CORDON DETONANTE 5P MTS 50.00 0.21 0.02 SCOOPTRAM
GUIA ENSAMBLADA 2.4 mts (Carmex) PZAS 2.00 0.76 0.00 Rendimiento Tons/Hr 38.00
EXANEL 4.8 Mts PZAS 67.00 1.58 0.24 Tons Produccin Tons 438.43
SUB-TOTAL 0.68 Hrs Scoop Hrs 11.54
Hrs Limpieza./Gdia Hrs 6.00
EQUIPOS Tons Limpieza/Gdia Tons 228
UNIDAD HRS/DISP
COSTO
PROPIEDAD
U.S.$/HR
COSTO
OPERACIN
U.S.$/HR
COSTO
TOTAL
U.S.$/HR
COSTO
TOTAL
U.S.$
U.S.$/Ton
Gdias Limpieza Gdias 1.92
JUMBO ELECTROHIDR DE 1 BRAZO (*) 4.12 HORAS 0.00 86.87 16.13 103.00 0.00
SCOOP DIESEL 4 YD3 11.54 HORAS 45.79 14.21 60.00 0.00
SUB-TOTAL 0.00 0.00
TOTAL COSTOS DIRECTOS 2.11
IMPREVISTOS 3% 0.06
UTILIDAD 10% 0.21
SUB TOTAL COSTOS INDIRECTOS 0.27
TOTAL COSTOS U.S.$/Ton (Sin equipos) 2.38
TOTAL COSTOS U.S.$/Ton (Con equipos) 5.98
LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
DATOS Malla N cartuchos
33.00
CICLO UNIDAD
ESTANDA
R
DESCRIPCION
UNIDAD
EMULEX 45%
1 1/8"X12
EXABLOC
7/8"X7"
Corona 2.00 8
16
Emulex 11/8"x12"
TIEMPO DE CICLO H/DISP 3.21 Taladro Alivio 33.00 4.00 8 32 Emulex 11/8"x12"
LONG BARRA DE EXTEN PIES 14.00 Primera Fila 2.00 16.00 6.00 8 48 Emulex 11/8"x12"
EFIC DE PERF % 87% Segunda Fila 4.00 32.00 8.00 8 64 Emulex 11/8"x12"
LONG PERFORACION MT 3.71 Tercera Fila 6.00 48.00 7.00 8 56 Emulex 11/8"x12"
EFIC.AVANCE % 81% Cuarta Fila 8.00 64.00 7.00 8 56 Emulex 11/8"x12"
LONG DE AVANCE EFECTIVA MT 3.01 Quinta Fila 7.00 56.00 33.00 6 198 Emulnor 1x7
DURACION GUARDIA H 8.00 Sexta Fila 7.00 56.00 100 470
GUARDIAS/DIA GDA/D 2.00 Contorno de Recorte 33.00 0.00 198.00
PRODUCCION/DIA M/D 12.03 TOTAL 100.00 272.00 198.00
TOTAL KGS 100.00 53.13 17.93 71.06
0.16
ANCHO LABOR Mt 9.00 PESO Kgs/Cartucho 0.20 0.09
ALTO LABOR Mt 4.50
LONGITUD Mt 3.01 EFICIENCIAS
SOBREROTURA % 20% DESCRIPCION UNIDAD VALOR
VOLUMEN TOTAL Mt3 146.14 Densidad de Carga Kgs/mt 47.26
DENSIDAD MATERIAL Tons/Mt3 3.00 Factor de Carga Kgs/Ton 0.32
TONELAJE Tons/Disp 438.43
EXPLOTACION_TAJEO_MECANIZADO ANCHO VETA 9MX4.5M
SIN JUMBO(CON JUMBO)
MANO DE OBRA
DESCRIPCION
DESCRIPCION
DESCRIPCION
DESCRIPCION
EFICIENCIA DE AVANCES DISTRIBUCION DE CARGA DE EXPLOSIVOS
VOLUMEN POR DISPARO LABOR
TOTAL CARTUCHOS
CALCULO DE HRS USO EQUIPOS
PESO
KILOS
DISTRIBUCION POR TALADRO RMR 21 - 30
SECCION N DE TAL
CART. POR TALADRO para EXPLOSIVO
Y DIMENSION
PDF created with pdfFactory Pro trial version www.pdffactory.com
06528 ROTURA: 15.00 TMS/DISPARO
ITEM DESCRIPCION INCID. UNI. CANTID. PRECIO SUBTOT. TOTAL
UNITARIO $ US$/UNID
1.- MANO DE OBRA
Maestro Perforista 0.50 Tareas 1.00 37.05 $/Tarea 18.53
18.53 1.24
2.- IMPLEMENTOS
Implementos personal operativo normal Tareas 0.50 1.90 0.95
0.95 0.06
3.- EQUIPOS
Winche de 20 HP Hrs 3.00 3.67 $/hr 11.01
11.01 0.73
4.- GASTOS INDIRECTOS 2.03
Imprevistos 3% $ 0.06
Gastos Generales 0% $ 0.00
Utilidad 10% $ 0.20
TOTAL COSTO ROTURA EN DOLARES (US$/TM) 2.30
ACARREO CON WINCHE
PDF created with pdfFactory Pro trial version www.pdffactory.com
08367 Long. Barreno 1.80 Mts.
Produccin tajo/mes TM Eff. Perf. 93%
Rend. TM/TAL TM/TAL Eff. Volad. 95%
Produccin tajo/Gdia. 13.50 m3 Av. Efectivo 1.50
N Tal/Guar. 25.00
Rend./ Tal. 0.45 m3
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/m.
Unit.$ Util Disp. $ (US$/m.)
1. MANO DE OBRA
Perforistas Tarea 1.00 37.05 37.05
Ayud. Perforista Tarea 1.00 34.14 34.14
Operador Scoop 0.50 47.58 23.79
2.50 94.99 7.04
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
Implementos Operador Scoop Tareas 0.50 3.58 1.79
5.58 0.41
3. MATERIALES Y HERRAMIENTAS
Barra de 6 pies P.P. 150.00 94.60 1,820 7.80
Broca de 40 mm P.P 150.00 25.30 350.00 10.84
Aceite Perforacin Gln. 0.25 9.16 2.29
Petroleo D2 Gln/Hr 5.00 4.55 22.73
Herramientas de mina Global 1.21
44.87 3.32
4. EXPLOSIVOS 4.50 m3.
Exadit 45% 7/8" x 7" (328) Unid 125.00 0.17 21.25
Exsanel 2.1 m Pza. 25.00 1.15 28.75
Guia ensamblada 2.4 mtl - carmex (300) Pza. 2.00 0.76 1.52
Ignicion rapida mts 0.10 0.410 $/m 0.04
Cordon detonante 5p mts 10.00 0.230 $/m 2.30
53.86 3.99
5. EQUIPO PERFORACIN-LIMPIEZA
Scooptram de 1.50 Yd3. Hrs. 2.50 40.00 100.00
perforadora P.P. 150.00 0.10 15.00
Manguera aire 1" Mts. 30.00 2.70 150 0.54
Manguera agua 1/2" Mts. 30.00 1.33 150 0.27
115.81 8.58
COSTOS DIRECTOS 23.34
COSTOS FIJOS ( van en lista por separado )
23.34
GASTOS GENERALES (por separado)
IMPREVISTOS 3% 0.70
GASTOS GENERALES 0% 0.00
UTILIDAD 10% 2.33
COSTO TOTAL (US$/m3.) 26.38
La energia elctrica, proporciona Cia.
PRECIOS UNITARIOS DESQUINCHE EN REBATIDO DE RAMPA
PDF created with pdfFactory Pro trial version www.pdffactory.com
08368 Long. Barreno 1.80 Mts.
Produccin tajo/mes TM Eff. Perf. 93%
Rend. TM/TAL TM/TAL Eff. Volad. 95%
Produccin tajo/Gdia. 13.50 m3 Av. Efectivo 1.50
33.75 TMS N Tal/Guar. 25.00
Rend./ Tal. 0.45 m3
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/m.
Unit.$ Util Disp. $ (US$/m.)
1. MANO DE OBRA
Perforistas Tarea 1.00 37.05 37.05
Ayud. Perforista Tarea 1.00 34.14 34.14
Operador Scooptram 0.50 47.58 23.79
-
2.50 94.99 7.04
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
Implementos Operador Scoop Tareas 0.50 3.58 1.79
5.58 0.41
3. MATERIALES Y HERRAMIENTAS
Barra de 6 pies P.P. 150.00 94.60 1,820 7.80
Broca de 40 mm PP 150.00 25.30 350 10.84
Aceite Perforacin Gln. 0.25 9.16 2.29
Petroleo D2 Gln/Hr 2.50 4.55 11.36
Herramientas de mina Global 1.21
33.50 2.48
4. EXPLOSIVOS 4.50 m3.
EXADIT 45% 7/8" X 7" (328) Unid 125.00 0.17 21.25
EXSANEL 2.1 m Pza. 25.00 1.15 28.75
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300)Pza. 2.00 0.76 1.52
IGNICION RAPIDA mts 0.25 0.410 $/m 0.10
CORDON DETONANTE 5P mts 10.00 0.230 $/m 2.30
53.92 3.99
5. EQUIPO PERFORACIN-LIMPIEZA
Scooptram 1.50 Yds3 Hrs. 1.25 40.00 50.00
perforadora P.P. 150.00 0.10 15.00
Manguera aire 1" Mts. 30.00 2.70 150 0.54
Manguera agua 1/2" Mts. 30.00 1.33 150 0.27
65.81 4.87
COSTOS DIRECTOS 18.80
COSTOS FIJOS ( van en lista por separado )
18.80
GASTOS GENERALES (por separado)
IMPREVISTOS 3% 0.56
GASTOS GENERALES 0% 0.00
UTILIDAD 10% 1.88
COSTO TOTAL (US$/m3.) CON SCOOPTRAM 21.24
La energia elctrica, proporciona Cia.
Todas las tuberias y accesorios necesarios proporciona Cia, hasta 50 Mts del tope del trabajo
PRECIOS UNITARIOS DESQUINCHE LIMPIEZA CON SCOOPTRAM
PDF created with pdfFactory Pro trial version www.pdffactory.com
08373 Long. Barreno 1.80 Mts.
Produccin tajo/mes TM Eff. Perf. 93%
Rend. TM/TAL TM/TAL Eff. Volad. 95%
Produccin tajo/Gdia. 10.00 m3 Av. Efectivo 1.50
25.00 TMS N Tal/Guar. 25.00
Rend./ Tal. 0.45 m3
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/m.
Unit.$ Util Disp. $ (US$/m.)
1. MANO DE OBRA
Perforistas Tarea 1.00 37.05 37.05
Ayud. Perforista Tarea 1.00 34.14 34.14
2.00 71.20 7.12
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 0.38
3. MATERIALES Y HERRAMIENTAS
Barra de 6 pies P.P. 150.00 94.60 1,820 7.80
Broca de 40 mm PP 150.00 25.30 350 10.84
Aceite Perforacin Gln. 0.25 9.16 2.29
Herramientas de mina Global 1.21
22.14 2.21
4. EXPLOSIVOS 3.33 m3.
EXADIT 45% 7/8" X 7" (328) Unid 125.00 0.17 21.25
EXSANEL 2.1 m Pza. 25.00 1.15 28.75
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza. 2.00 0.76 1.52
CORDON DETONANTE 5P Mts. 5.00 0.23 1.15
IGNICION RAPIDA Mts. 0.10 0.41 0.04
52.71 5.27
5. EQUIPO PERFORACIN-LIMPIEZA
Winche de 20 HP Hrs. 3.00 3.67 11.01
perforadora P.P. 150.00 0.10 15.00
Manguera aire 1" Mts. 30.00 2.70 150 0.54
Manguera agua 1/2" Mts. 30.00 1.33 150 0.27
26.81 2.68
COSTOS DIRECTOS 17.67
COSTOS FIJOS ( van en lista por separado )
17.67
GASTOS GENERALES (por separado)
IMPREVISTOS 3% 0.53
GASTOS GENERALES 0% 0.00
UTILIDAD 10% 1.77
COSTO TOTAL (US$/m3.) CON WINCHE 19.96
La energia elctrica, proporciona Cia.
Todas las tuberias y accesorios necesarios proporciona Cia, hasta 50 Mts del tope del trabajo
PRECIOS UNITARIOS DESQUINCHE LIMPIEZA CON WINCHE
PDF created with pdfFactory Pro trial version www.pdffactory.com
08366 Long. Barreno 1.80 Mts.
Produccin tajo/mes TM Eff. Perf. 93%
Rend. TM/TAL TM/TAL Eff. Volad. 95%
Produccin tajo/Gdia. 10.00 m3 Av. Efectivo 1.50
25.00 TMS N Tal/Guar. 25.00
Rend./ Tal. 0.45 m3
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/m.
Unit.$ Util Disp. $ (US$/m.)
1. MANO DE OBRA
Perforistas Tarea 1.00 37.05 37.05
Ayud. Perforista Tarea 1.00 34.14 34.14
2.00 71.20 7.12
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 0.38
3. MATERIALES Y HERRAMIENTAS
Barra de 6 pies P.P. 150.00 94.60 1,820 7.80
Broca de 40 mm PP 150.00 25.30 350 10.84
Aceite Perforacin Gln. 0.25 9.16 2.29
Herramientas de mina Global 1.21
22.14 2.21
4. EXPLOSIVOS 3.33 m3.
EXADIT 45% 7/8" X 7" (328) Unid 125.00 0.17 21.25
EXSANEL 2.1 m Pza. 25.00 1.15 28.75
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza. 2.00 0.76 1.52
CORDON DETONANTE 5P Mts. 5.00 0.23 1.15
IGNICION RAPIDA Mts. 0.10 0.41 0.04
52.71 5.27
5. EQUIPO PERFORACIN-LIMPIEZA
Pala de Linea Hrs. 3.00 6.35 19.05
perforadora P.P. 150.00 0.10 15.00
Manguera aire 1" Mts. 30.00 2.70 150 0.54
Manguera agua 1/2" Mts. 30.00 1.33 150 0.27
34.86 3.49
COSTOS DIRECTOS 18.47
COSTOS FIJOS ( van en lista por separado )
18.47
GASTOS GENERALES (por separado) -
IMPREVISTOS 3% 0.55
GASTOS GENERALES 0% 0.00
UTILIDAD 10% 1.85
COSTO TOTAL (US$/m3.) CON PALA 20.87
La energia elctrica, proporciona Cia.
Todas las tuberias y accesorios necesarios proporciona Cia, hasta 50 Mts del tope del trabajo
PRECIOS UNITARIOS DESQUINCHE LIMPIEZA CON PALA
PDF created with pdfFactory Pro trial version www.pdffactory.com
SHOTCRETE 1" TK-40
Avance Mts 2/Cuadrilla...........: 6.00 M3 46.06 m2
DESCRIPCION UNIDAD CANTID. COST./UNIT. FACTOR U.S.$ U.S.$/Gdia
MANO DE OBRA
Maestro Prepar. Mezcla Tarea 1.00 35.60 0.38 13.35
Operador TK-40 Tarea 1.00 47.58 0.38 17.84
Ayudantes Shotcrete Tarea 1.00 34.14 0.38 12.80
1.13 44.00 0.96
IMPLEMENTOS SEGURIDAD N Tars.
Tareas sin ropa de agua 1.13 4.61 5.19
5.19 0.11
MATERIAL Y HERRAMIENTAS
Otras Herramientas Global 1.55
Pesaje $/M3 - 10.00 -
Cemento Bolsas - 11.26 -
Acelerante Kg - 0.82 -
Dramix Kg - 1.95 -
Calibradores Pza - 0.15 -
Petroleo D2 Gln/Hr - 4.55 -
1.55 0.03
EQUIPO DE PERFORACION
Scooptram de 2.2 Yd3. Hrs. - 50.00 -
TK40 Hrs. - 3.70 -
- -
SUB-TOTAL COSTOS DIRECTOS 1.10
Contingencias 3% 0.03
Utilidad 10% 0.11
COSTO TOTAL U.S.$/M2. 1.24
Equipo TK - 40 a costo de CMHSA
PRECIOS UNITARIOS SHOTCRETE TK 40 1" -VIA SECA
PDF created with pdfFactory Pro trial version www.pdffactory.com
SHOTCRETE 2" TK-40
Avance Mts 2/Cuadrilla...........: 6.00 M3 23.03 m2
DESCRIPCION UNIDAD CANTID. COST./UNIT. FACTOR U.S.$ U.S.$/Gdia
MANO DE OBRA
Maestro Prepar. Mezcla Tarea 1.00 35.60 0.38 13.35
Operador TK-40 Tarea 1.00 47.58 0.38 17.84
Ayudantes Shotcrete Tarea 1.00 34.14 0.38 12.80
1.13 44.00 1.91
IMPLEMENTOS SEGURIDAD N Tars.
Tareas sin ropa de agua 1.13 4.61 5.19
5.19 0.23
MATERIAL Y HERRAMIENTAS
Otras Herramientas Global 1.55
Pesaje $/M3 - 10.00 0 -
Cemento Bolsas - 11.26 - -
Acelerante Kg - 0.82 - -
Dramix Kg - 1.95 - -
Calibradores Pza - 0.15 - -
Petroleo D2 Gln/Hr - 4.55 - -
1.55 0.07
EQUIPO DE PERFORACION
Scooptram de 2.2 Yd3. Hrs. - 50.00 -
TK40 Hrs. - 3.70 -
- -
SUB-TOTAL COSTOS DIRECTOS 2.20
Contingencias 3% 0.07
Utilidad 10% 0.22
COSTO TOTAL U.S.$/M2. 2.49
Equipo TK-40 a costo de CMHSA
M3 X DISP 3.00
COSTO X PESAJE (US$) $30.00
TIEMPO TRASLADO DE PLANTA - LABOR (HRAS) 0.50
TIEMPO DE MEZCLA (HRAS) 0.50
TIEMPO DE LANZADO (HRAS) 2.00
OTROS TIEMPOS MUERTOS 0.50
TOTAL HRS 3.50
MAESTRO SHOTCRETE 1.00
AYTE DE SHOTCRETE 3.00
SECCION 3 X 3 CON JACK LEG
DESCRIPCION
M3 X DISP 1.5
COSTO DE PESAJE $15.00
TRASLADO DE PLANTA - LABOR 0.50
MEZCLA 0.50
LANZADO 1.50
OTROS TIEMPOS MUERTOS 0.50
TOTAL HRS 3.00
MAESTRO SHOTCRETE 1.00
AYTE DE SHOTCRETE 3.00
PRECIOS UNITARIOS SHOTCRETE 2" TK 40 VIA SECA
SECCION 3 X 3 CON JUMBO
DESCRIPCION
PDF created with pdfFactory Pro trial version www.pdffactory.com
SHOTCRETE TODO COSTO 1" (DRAMIX: 0 Kgs/M3,10 Kgs/M3, 20 kgs/M3, 30 kgs/M3, 40 kgs/M3)
Avance Mts 2/Cuadrilla...........: 1.50 M3 20.08 m2 13.39
DESCRIPCION UNIDAD CANTID. COST./UNIT. FACTOR U.S.$ U.S.$/Gdia
MANO DE OBRA
Maestro Prepar. Mezcla Tarea 1.00 35.60 0.38 13.35
Ayudantes Shotcrete Tarea 3.00 34.14 0.38 38.41
Operador Scoop Tarea 1.00 47.58 - -
1.50 51.76 2.58
IMPLEMENTOS SEGURIDAD N Tars.
Tareas sin ropa de agua 1.50 4.61 6.92
6.92 0.34
MATERIAL Y HERRAMIENTAS
Otras Herramientas Global 1.55
Pesaje $/M3 - - -
Cemento Bolsas 15.00 11.26 168.88
Acelerante Kg 22.50 0.82 18.45
Dramix Kg - 1.95 -
Calibradores Pza 20.00 0.15 3.00
Petroleo D2 Gln/Hr - 4.55 -
191.88 9.56
EQUIPO DE PERFORACION
Scooptram de 2.2 Yd3. Hrs. - 50.00 -
Shotcretera y accesorios Hrs. 2.00 3.70 7.41
7.41 0.37
SUB-TOTAL COSTOS DIRECTOS 12.85
Contingencias 3% 0.39
Utilidad 10% 1.28
COSTO TOTAL U.S.$/M2. 14.52
Nota: La arena lo proporciona la Ca. en zona de trabajo
VARIACION DE PRECIOS SEGN GRADO DE MEZCLA DE DRAMIX
DRAMIX (0 KGS/M3) U.S.$/M2 14.52
DRAMIX (10 KGS/M3) U.S.$/M2 17.81
DRAMIX (20 KGS/M3) U.S.$/M2 21.10
DRAMIX (30 KGS/M3) U.S.$/M2 24.40
DRAMIX (40 KGS/M3) U.S.$/M2 27.69
M3 X DISP 3.00
COSTO X PESAJE (US$) $30.00
TIEMPO TRASLADO DE PLANTA - LABOR (HRAS) 0.50
TIEMPO DE MEZCLA (HRAS) 0.50
TIEMPO DE LANZADO (HRAS) 2.00
OTROS TIEMPOS MUERTOS 0.50
TOTAL HRS 3.50
MAESTRO SHOTCRETE 1.00
AYTE DE SHOTCRETE 3.00
SECCION 3 X 3 CON JACK LEG
DESCRIPCION
M3 X DISP 1.5
COSTO DE PESAJE $15.00
TRASLADO DE PLANTA - LABOR 0.50
MEZCLA 0.50
LANZADO 1.50
OTROS TIEMPOS MUERTOS 0.50
TOTAL HRS 3.00
MAESTRO SHOTCRETE 1.00
AYTE DE SHOTCRETE 3.00
PRECIOS UNITARIOS SHOTCRETE 1" VIA SECA (1disparos)
SECCION 3 X 3 CON JUMBO
DESCRIPCION
PDF created with pdfFactory Pro trial version www.pdffactory.com
SHOTCRETE TODO COSTO 2" (DRAMIX: 0 Kgs/M3,10 Kgs/M3, 20 kgs/M3, 30 kgs/M3, 40 kgs/M3)
Avance Mts 2/Cuadrilla...........: 1.50 M3 10.04 m2 6.69
DESCRIPCION UNIDAD CANTID. COST./UNIT. FACTOR U.S.$ U.S.$/Gdia
MANO DE OBRA
Maestro Prepar. Mezcla Tarea 1.00 35.60 0.38 13.35
Ayudantes Shotcrete Tarea 3.00 34.14 0.38 38.41
Operador Scoop Tarea 1.00 47.58 - -
1.50 51.76 5.16
IMPLEMENTOS SEGURIDAD N Tars.
Tareas sin ropa de agua 1.50 4.61 6.92
6.92 0.69
MATERIAL Y HERRAMIENTAS
Otras Herramientas Global 1.55
Pesaje $/M3 - - -
Cemento Bolsas 15.00 11.26 168.88
Acelerante Kg 22.50 0.82 18.45
Dramix Kg - 1.95 -
Calibradores Pza 10.00 0.15 1.50
Petroleo D2 Gln/Hr - 4.55 -
190.38 18.96
EQUIPO DE PERFORACION
Scooptram de 2.2 Yd3. Hrs. - 50.00 -
Shotcretera y accesorios Hrs. 2.00 3.70 7.41
7.41 0.74
SUB-TOTAL COSTOS DIRECTOS 25.55
Contingencias 3% 0.77
Utilidad 10% 2.55
COSTO TOTAL U.S.$/M2. 28.87
Nota: La arena lo proporciona la Ca. en zona de trabajo
VARIACION DE PRECIOS SEGN GRADO DE MEZCLA DE DRAMIX
DRAMIX (0 KGS/M3) U.S.$/M2 28.87
DRAMIX (10 KGS/M3) U.S.$/M2 35.45
DRAMIX (20 KGS/M3) U.S.$/M2 42.04
DRAMIX (30 KGS/M3) U.S.$/M2 48.62
DRAMIX (40 KGS/M3) U.S.$/M2 55.21
M3 X DISP 3.00
COSTO X PESAJE (US$) $30.00
TIEMPO TRASLADO DE PLANTA - LABOR (HRAS) 0.50
TIEMPO DE MEZCLA (HRAS) 0.50
TIEMPO DE LANZADO (HRAS) 2.00
OTROS TIEMPOS MUERTOS 0.50
TOTAL HRS 3.50
MAESTRO SHOTCRETE 1.00
AYTE DE SHOTCRETE 3.00
SECCION 3 X 3 CON JACK LEG
DESCRIPCION
M3 X DISP 1.5
COSTO DE PESAJE $15.00
TRASLADO DE PLANTA - LABOR 0.50
MEZCLA 0.50
LANZADO 1.50
OTROS TIEMPOS MUERTOS 0.50
TOTAL HRS 3.00
MAESTRO SHOTCRETE 1.00
AYTE DE SHOTCRETE 3.00
PRECIOS UNITARIOS SHOTCRETE 2" VIA SECA (1disparos)
SECCION 3 X 3 CON JUMBO
DESCRIPCION
PDF created with pdfFactory Pro trial version www.pdffactory.com
SHOTCRETE TODO COSTO 3" (DRAMIX: 0 Kgs/M3,10 Kgs/M3, 20 kgs/M3, 30 kgs/M3, 40 kgs/M3)
Avance Mts 2/Cuadrilla...........: 1.50 M3 6.69 m2 4.46
DESCRIPCION UNIDAD CANTID. COST./UNIT. FACTOR U.S.$ U.S.$/Gdia
MANO DE OBRA
Maestro Prepar. Mezcla Tarea 1.00 35.60 0.38 13.35
Ayudantes Shotcrete Tarea 3.00 34.14 0.38 38.41
Operador Scoop Tarea 1.00 47.58 - -
1.50 51.76 7.73
IMPLEMENTOS SEGURIDAD N Tars.
Tareas sin ropa de agua 1.50 4.61 6.92
6.92 1.03
MATERIAL Y HERRAMIENTAS
Otras Herramientas Global 1.55
Pesaje $/M3 - - -
Cemento Bolsas 15.00 11.26 168.88
Acelerante Kg 22.50 0.82 18.45
Dramix Kg 1.95 -
Calibradores Pza 6.00 0.15 0.90
Petroleo D2 Gln/Hr - 4.55 -
189.78 28.36
EQUIPO DE PERFORACION
Scooptram de 2.2 Yd3. Hrs. - 50.00 -
Shotcretera y accesorios Hrs. 2.00 3.70 7.41
7.41 1.11
SUB-TOTAL COSTOS DIRECTOS 38.23
Contingencias 3% 1.15
Utilidad 10% 3.82
COSTO TOTAL U.S.$/M2. 43.20
Nota: La arena lo proporciona la Ca. en zona de trabajo
VARIACION DE PRECIOS SEGN GRADO DE MEZCLA DE DRAMIX
DRAMIX (0 KGS/M3) U.S.$/M2 43.20
DRAMIX (10 KGS/M3) U.S.$/M2 53.08
DRAMIX (20 KGS/M3) U.S.$/M2 62.95
DRAMIX (30 KGS/M3) U.S.$/M2 72.83
DRAMIX (40 KGS/M3) U.S.$/M2 82.71
M3 X DISP 3.00
COSTO X PESAJE (US$) $30.00
TIEMPO TRASLADO DE PLANTA - LABOR (HRAS) 0.50
TIEMPO DE MEZCLA (HRAS) 0.50
TIEMPO DE LANZADO (HRAS) 2.00
OTROS TIEMPOS MUERTOS 0.50
TOTAL HRS 3.50
MAESTRO SHOTCRETE 1.00
AYTE DE SHOTCRETE 3.00
SECCION 3 X 3 CON JACK LEG
DESCRIPCION
M3 X DISP 1.5
COSTO DE PESAJE $15.00
TRASLADO DE PLANTA - LABOR 0.50
MEZCLA 0.50
LANZADO 1.50
OTROS TIEMPOS MUERTOS 0.50
TOTAL HRS 3.00
MAESTRO SHOTCRETE 1.00
AYTE DE SHOTCRETE 3.00
PRECIOS UNITARIOS SHOTCRETE 3" VIA SECA (1disparos)
SECCION 3 X 3 CON JUMBO
DESCRIPCION
PDF created with pdfFactory Pro trial version www.pdffactory.com
SHOTCRETE TODO COSTO 2" (FIBRA: 3,50 Kgs/M3, 5 kgs/M3)
Avance Mts 2/Cuadrilla...........: 1.50 M3 10.04 m2
DESCRIPCION UNIDAD CANTID. COST./UNIT. FACTOR U.S.$ U.S.$/Gdia
MANO DE OBRA
Maestro Prepar. Mezcla Tarea 1.00 35.60 0.38 13.35
Ayudantes Shotcrete Tarea 3.00 34.14 0.38 38.41
Operador Scoop Tarea 1.00 47.58 - -
1.50 51.76 5.16
IMPLEMENTOS SEGURIDAD N Tars.
Tareas sin ropa de agua 1.50 4.61 6.92
6.92 0.69
MATERIAL Y HERRAMIENTAS
Otras Herramientas Global 1.55
Pesaje $/M3 - - -
Cemento Bolsas 15.00 11.26 168.88
Acelerante Kg 22.50 0.82 18.45
Fibra Sintectica BRCHIP 54 Kg - 9.35 -
Calibradores Pza 10.00 0.15 1.50
Petroleo D2 Gln/Hr - 4.55 -
190.38 18.96
EQUIPO DE PERFORACION
Scooptram de 2.2 Yd3. Hrs. - 50.00 -
Shotcretera y accesorios Hrs. 2.00 3.70 7.41
7.41 0.74
SUB-TOTAL COSTOS DIRECTOS 25.55
Contingencias 3% 0.77
Utilidad 10% 2.55
COSTO TOTAL U.S.$/M2. 28.87
Nota: La arena lo proporciona la Ca. en zona de trabajo
VARIACION DE PRECIOS SEGN GRADO DE MEZCLA DE DRAMIX
FIBRA PLASTICA (3.5 KGS/M3) U.S.$/M2 3.5 KG 32.55
FIBRA PLASTICA (5.0 KGS/M3) U.S.$/M2 5 KG 34.13
M3 X DISP 3.00
COSTO X PESAJE (US$) $30.00
TIEMPO TRASLADO DE PLANTA - LABOR (HRAS) 0.50
TIEMPO DE MEZCLA (HRAS) 0.50
TIEMPO DE LANZADO (HRAS) 2.00
OTROS TIEMPOS MUERTOS 0.50
TOTAL HRS 3.50
MAESTRO SHOTCRETE 1.00
AYTE DE SHOTCRETE 3.00
SECCION 3 X 3 CON JACK LEG
DESCRIPCION
M3 X DISP 1.5
COSTO DE PESAJE $15.00
TRASLADO DE PLANTA - LABOR 0.50
MEZCLA 0.50
LANZADO 1.50
OTROS TIEMPOS MUERTOS 0.50
TOTAL HRS 3.00
MAESTRO SHOTCRETE 1.00
AYTE DE SHOTCRETE 3.00
PRECIOS UNITARIOS SHOTCRETE 2" VIA SECA CON FIBRA PLASTICA (1
disparo)
SECCION 3 X 3 CON JUMBO
DESCRIPCION
PDF created with pdfFactory Pro trial version www.pdffactory.com
Solo instalacin del perno
12123
Longitud Taladro : 2.40 Mts.
Rendimiento : 15.00 Unid.
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Perforistas Tarea 1.00 37.05 37.05
Ayud. Perforista Tarea 1.00 34.14 34.14
Ayudante Tarea 1.00 34.14 34.14
3.00 105.34 7.02
2. IMPLEMENTOS SEGURIDAD
Tareas sin ropa de agua Tar. 3.00 1.90 5.69
5.69 0.38
3. MATERIALES Y HERRAMIENTAS
Barra de 8 pies P.P. 112.50 103.40 1,820 6.39
Broca 40 mm Pza 112.50 25.30 350 8.13
Aceite Perforacin Gln. 0.17 9.16 1.56
Perno Helicohidal de 8',tuerca,placa Pza. 15.00 9.54 143.10
Resina Cart 30.00 0.75 22.50
Cembol Cart 150.00 0.22 33.00
Adaptador para inst perno Pza. 1.00 88.00 350 0.25
Herramientas de mina Global 1.21
216.14 14.41
5. EQUIPO PERFORACIN-LIMPIEZA
perforadora P.P. 112.50 0.10 11.25
Manguera aire 1" Mts. 30.00 2.70 150 0.54
Manguera agua 1/2" Mts. 30.00 1.33 150 0.27
12.06 0.80
COSTOS DIRECTOS 22.62
COSTOS FIJOS ( van en lista por separado )
IMPREVISTOS 3% 0.68
GASTOS GENERALES 0% 0.00
UTILIDAD 10% 2.26
COSTO TOTAL (US$/Pza. 25.56
INSTALACION PERNO HELICOIDAL DE 8' CEMBOL
PDF created with pdfFactory Pro trial version www.pdffactory.com
Solo instalacin del perno
12124
Longitud Taladro : 1.80 Mts.
Rendimiento : 18.00 Unid.
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Perforistas Tarea 1.00 37.05 37.05
Ayud. Perforista Tarea 1.00 34.14 34.14
Ayud. Tarea 1.00 34.14 34.14
3.00 105.34 5.85
2. IMPLEMENTOS SEGURIDAD
Tareas sin ropa de agua Tar. 2.00 1.90 3.79
Tareas sin ropa de agua Tar. 1.00 1.90 1.90
5.69 0.32
3. MATERIALES Y HERRAMIENTAS
Barra de 6 pies Pza 108.00 94.60 1,820 5.61
Broca 40 mm Pza 108.00 25.30 350 7.81
Aceite Perforacin Gln. 0.17 9.16 1.56
Perno Helicohidal de 6',tuerca,placa Pza. 18.00 8.12 146.16
Resina Cart 18.00 0.75 13.50
Cembolt Cart 108.00 0.22 23.76
Adaptador para inst perno Pza. 1.00 88.00 350.00 0.25
Herramientas de mina Global 1.21
199.86 11.10
5. EQUIPO PERFORACIN-LIMPIEZA
perforadora P.P. 108.00 0.10 10.80
Manguera aire 1" Mts. 30.00 2.70 150 0.54
Manguera agua 1/2" Mts. 30.00 1.33 150 0.27
11.61 0.64
COSTOS DIRECTOS 17.92
COSTOS FIJOS ( van en lista por separado )
IMPREVISTOS 3% 0.54
GASTOS GENERALES 0% 0.00
UTILIDAD 10% 1.79
COSTO TOTAL (US$/Pza) 20.25
INSTALACION PERNO HELICOIDAL DE 6' CEMBOL
PDF created with pdfFactory Pro trial version www.pdffactory.com
Rendimientos controlados en campo Rampa 1145S y Cx 673S:
Longitud Taladro : 1.80 Mts. R. dura R. semi dura
Rendimiento : 56.00 Unid./gdia (6 horas) (seg) (seg)
Tiempo de perforacin de 6 pies de taladro 250 200
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza. 240 180
Unit.$ Util Disp. $ (US$/pza.) 250 180
1. MANO DE OBRA Prom (seg) 247 187
Perforistas Tarea 1.00 37.05 37.05 Tiempo de perforacin de 7 pies de taladro 450 265
Ayud. Perforista Tarea 1.00 34.14 34.14 380 270
Ayud. Tarea 1.00 34.14 34.14 350 300
3.00 105.34 1.88 Prom (seg) 393 278
2. IMPLEMENTOS SEGURIDAD Tiempo de instalacin de hydrabolt (colocado e inflado 6' y 7')
Tareas sin ropa de agua Tar. 2.00 1.90 3.79
Tareas sin ropa de agua Tar. 1.00 1.90 1.90
5.69 0.10 Prom (seg)
3. MATERIALES Y HERRAMIENTAS Demoras por acomodo, empates, atascos, etc. 60 58
BARRA CONICA 6' Pza 336.00 94.60 1,820 17.46 57 60
Broca 38 mm Pza 336.00 24.75 350 23.76 70 65
Aceite Perforacin Gln. 0.17 9.16 1.56 70 45
Perno Hydrabolt 6',tuerca,placa Pza. 56.00 12.82 717.92 60 70
Herramientas de mina Global 1.55 Prom (seg) 67 60
762.25 13.61
5. EQUIPO PERFORACIN-LIMPIEZA
perforadora P.P. 336.00 0.10 33.60 RESUMEN:
Manguera aire 1" Mts. 30.00 2.70 150 0.54 Pernos Hydrabolt de 6pies 420 353
Manguera agua 1/2" Mts. 30.00 1.33 150 0.27 7 6
34.41 0.61 Prom (min/per)
COSTOS DIRECTOS 16.21 Pernos Hydrabolt de 7pies 567 445
9 7
IMPREVISTOS 3% 0.49 Prom (min/per)
GASTOS GENERALES 0% 0.00
UTILIDAD 10% 1.62
COSTO TOTAL (US$/Pza) 18.32 Instalacin de N de Hydrabolt: 8 hr/gdia 5 hr/gdia 4 hr/gdia
N de Pernos Hydrabolt de 6' 74 47 37
EQUIPO CMHSA N de Pernos Hydrabolt de 7' 57 36 28
8.4
INSTALACION PERNO HYDRABOLT DE 6' (BOMBA MANUAL)
Solo instalacin del perno
CONTROL DE TIEMPOS
110
6.4
110
100
107
PDF created with pdfFactory Pro trial version www.pdffactory.com
Rendimientos controlados en campo Ramp 1145S y Cx 673S:
Longitud Taladro : 2.10 Mts. R. dura R. semi dura
Rendimiento : 43.00 Unid./gdia (6 horas) (seg) (seg)
Tiempo de perforacin de 6 pies de taladro 250 200
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza. 240 180
Unit.$ Util Disp. $ (US$/pza.) 250 180
1. MANO DE OBRA Prom (seg) 247 187
Perforistas Tarea 1.00 37.05 37.05 Tiempo de perforacin de 7 pies de taladro 450 265
Ayud. Perforista Tarea 1.00 34.14 34.14 380 270
Ayud. Tarea 1.00 34.14 34.14 350 300
3.00 105.34 2.45 Prom (seg) 393 278
2. IMPLEMENTOS SEGURIDAD Tiempo de instalacin de hydrabolt (colocado e inflado 6' y 7')
Tareas sin ropa de agua Tar. 2.00 1.90 3.79
Tareas sin ropa de agua Tar. 1.00 1.90 1.90
5.69 0.13 Prom (seg)
3. MATERIALES Y HERRAMIENTAS Demoras por acomodo, empates, atascos, etc. 60 58
BARRA CONICA 8' Pza 301.00 103.40 1,820 17.10 57 60
Broca 38 mm Pza 301.00 24.75 350 21.29 70 65
Aceite Perforacin Gln. 0.17 9.16 1.56 70 45
Perno Hydrabolt 7',tuerca,placa Pza. 43.00 13.92 598.56 60 70
Herramientas de mina Global 1.55 Prom (seg) 67 60
640.05 14.88
5. EQUIPO PERFORACIN-LIMPIEZA
perforadora P.P. 301.00 0.10 30.10 RESUMEN:
Manguera aire 1" Mts. 30.00 2.70 150 0.54 Pernos Hydrabolt de 6pies 420 353
Manguera agua 1/2" Mts. 30.00 1.33 150 0.27 7 6
30.91 0.72 Prom (min/per)
COSTOS DIRECTOS 18.19 Pernos Hydrabolt de 7pies 567 445
9 7
IMPREVISTOS 3% 0.55 Prom (min/per)
GASTOS GENERALES 0% 0.00
UTILIDAD 10% 1.82 Instalacin de N de Hydrabolt: 8 hr/gdia 5 hr/gdia 4 hr/gdia
COSTO TOTAL (US$/Pza) 20.55 N de Pernos Hydrabolt de 6' 74 47 37
EQUIPO CMHSA N de Pernos Hydrabolt de 7' 57 36 28
INSTALACION PERNO HYDRABOLT DE 7' (BOMBA MANUAL)
Solo instalacin del perno
CONTROL DE TIEMPOS
110
8.4
110
100
107
6.4
PDF created with pdfFactory Pro trial version www.pdffactory.com
Longitud Taladro : 2.40 Mts.
Rendimiento : 38.00 Unid./gdia (8 horas)
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Perforistas Tarea 1.00 51.22 51.22
Ayud. Perforista Tarea 1.00 34.14 34.14
2.00 85.36 2.25
2. IMPLEMENTOS SEGURIDAD
Tareas sin ropa de agua Tar. 2.00 1.90 3.79
3.79 0.10
3. MATERIALES Y HERRAMIENTAS
Barra Extension R32 Pza 304.00 174.90 5,000.00 10.63
Broca boton R25 x 37mm Pza 304.00 80.30 500.00 48.82
Shank Adapter hembra Pza 304.00 341.00 11,480.00 9.03
Perno Hydrabolt 7',tuerca,placa Pza. 38.00 13.92 528.96
Herramientas de mina Global 1.55
598.99 15.76
5. EQUIPO PERFORACIN-LIMPIEZA
Manguera aire 1" Mts. 30.00 2.70 150 0.54
Manguera agua 1/2" Mts. 30.00 1.33 150 0.27
0.81 0.02
COSTOS DIRECTOS 18.13
IMPREVISTOS 3% 0.54
GASTOS GENERALES 0% 0.00
UTILIDAD 10% 1.81
COSTO TOTAL (US$/Pza) 20.49
Nota: Bomba manual de inyeccin proporcionada por CMHSA
16.79
INSTALACION PERNO HYDRABOLT DE 8' CON BOMBA
MANUAL(BOLTER77)
PDF created with pdfFactory Pro trial version www.pdffactory.com
INSTALACION DE PERNO CEMENTADO DE 8 PIES
Longitud Taladro : 8 pies
Rendimiento : 15 Und/gdia
DESCRIPCIN Unid. Cant. Vida Cant Incidencia Costo Costo/Pza.
Total Util PU Unit.$ (US$/pza.)
1. MANO DE OBRA
Perforistas Tarea 1.00 1.00 1.00 0.07 37.05 2.47
Ayud. Perforista Tarea 2.00 1.00 2.00 0.13 34.14 4.55
7.02
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 3.00 1.00 3.00 0.20 1.90 0.38
0.38
3. MATERIALES Y HERRAMIENTAS
Barra cnica de 8' pp 112.50 1,820 0.06 0.00 103.40 0.43
Broca cnica descartable de 38 mm und 112.50 350 0.32 0.02 24.75 0.53
Aceite de perforacin Gln. 0.23 500.00 0.00 0.00 9.16 0.00
Perno helicoidal de 8' (inc. tuerca y placa) und 15.00 1.00 15.00 1.00 9.54 9.54
Cemento kg 127.50 1.00 127.50 8.50 0.26 2.25
Adaptador para instalacin de perno helic und 1.00 350.00 0.00 0.00 88.00 0.02
Herramientas de mina Global 1.00 1.00 1.00 0.07 1.21 0.08
12.85
5. EQUIPO PERFORACIN-LIMPIEZA
Perforadora P.P. 112.50 1.00 112.50 7.50 0.10 0.75
Manguera aire 1" Mts. 30.00 150 0.20 0.01 2.70 0.04
Manguera agua 1/2" Mts. 30.00 150 0.20 0.01 1.33 0.02
0.80
COSTOS DIRECTOS 21.05
IMPREVISTOS 3% 0.63
UTILIDAD 10% 2.11
COSTO TOTAL (US$/Pza. 23.79
Nota: Bomba manual de inyeccin proporcionada por CMHSA
PDF created with pdfFactory Pro trial version www.pdffactory.com
Cemento (Bolzas x Perno) 0.2 Hras Efectivas colocado 5.00
Rendimiento / Gdia. 75.00 Unid/Gdia Rendmto Pzas/Hr 15.00
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util $ (US$/UNI.)
1. MANO DE OBRA
Maestro Tarea 1.00 51.22 51.22
Ayudante Tarea 1.00 34.14 34.14
2.00 85.36 1.14
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 2.00 1.90 3.79
3.79 0.05
3. HERRAMIENTAS
Barra Extension R32 Pza 525.00 174.90 5,000 18.36
Broca boton R25 x 37mm Pza 525.00 80.30 500 84.32
Shank Adapter hembra Pza 525.00 341.00 11,480 15.59
Perno 7 Fts Unidad 75.00 8.82 661.50
Cemento Bolsas 15.00 11.26 168.88
Herramientas Global 1.55
950.20 12.67
COSTOS DIRECTOS 13.86
IMPREVISTOS 3% 0.42
GASTOS GENERALES 0% 0.00
UTILIDAD 10% 1.39
COSTO TOTAL (US$/UNI) 15.66
EQUIPO CMHSA
COLOCADO PERNOS 7 FTS CON LECHADA CEMENTO (BOLTER 77)
PDF created with pdfFactory Pro trial version www.pdffactory.com
12125
Rendimiento / Gdia. 2.00 Unidad
DESCRIPCIN Unid. Cant. Costo FACTOR Costo x Costo/Pza.
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 100% 35.60
Ayud. Enmaderador Tarea 1.00 34.14 100% 34.14
2.00 69.74 34.87
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 1.90
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 0.77
4. MADERA Und pies/und pies $ / Pza US$
Redondos(8''X8') 3 32.42 97.26 16.28 48.84
Tirante (5"x10') 1 16.10 16.10 7.95 7.95
Redondo(8"X0.15cm) - Bloqueo 2 2.06 4.12 0.49 2.03
Cuas (8"X4"X2")
117.48 58.82
58.82
COSTOS DIRECTOS 96.36
COSTOS FIJOS ( van en lista por separado )
96.36
SUPERVISIN -
IMPREVISTOS 3% 2.89
GASTOS GENERALES 0% -
UTILIDAD 10% 9.64
COSTO TOTAL (US$/Pza.) 108.89
Costo de Transporte de Madera 117.48 0.043 5.00
COSTO TOTAL (US$/Pza.) sin CUNETA 113.89
COSTO TOTAL (US$/Pza.) con CUNETA (mas 2.0%) #DIV/0!
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
LABOR >20 MTS SE PAGARA 2% + DEL PU
CUADRO COMPLETO DE MADERA 8' x 8'
PDF created with pdfFactory Pro trial version www.pdffactory.com
12162
Rendimiento / Gdia. 2.00 Unidad
DESCRIPCIN Unid. Cant. Costo FACTOR Costo x Costo/Pza.
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 100% 35.60
Ayud. Enmaderador Tarea 1.00 34.14 100% 34.14
2.00 69.74 34.87
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 1.90
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 0.77
4. MADERA Und pies/und pies $ / Pza US$
Redondos(8''X10') 3 41.23 123.69 20.35 61.06
Tirantes (5"x10') 1 16.10 16.10 7.95 7.95
Redondo(8"X0.15cm) - Bloqueo 2 2.06 4.12 0.49 2.03
Cuas (8"X4"X2")
143.91 71.04
71.04
COSTOS DIRECTOS 108.58
COSTOS FIJOS ( van en lista por separado )
108.58
SUPERVISIN -
IMPREVISTOS 3% 3.26
GASTOS GENERALES 0% -
UTILIDAD 10% 10.86
COSTO TOTAL (US$/Pza.) 122.69
Costo de Transporte de Madera 143.91 0.043 6.13
COSTO TOTAL (US$/Pza.) sin Cuneta 128.82
COSTO TOTAL (US$/Pza.) con CUNETA (mas 2%) #DIV/0!
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
CUADRO COMPLETO DE MADERA 8' x 9'
PDF created with pdfFactory Pro trial version www.pdffactory.com
12161
Rendimiento / Gdia. 1.00 Unidad
DESCRIPCIN Unid. Cant. Costo FACTOR Costo x Costo/Pza.
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 1.00 35.60
Ayud. Enmaderador Tarea 1.00 34.14 1.00 34.14
2.00 69.74 69.74
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 3.79
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 1.55
4. MADERA Und pies/und pies $ / Pza US$
Redondos(8''X10') 3 41.23 123.69 20.35 61.06
Tirantes (6"x10') 1 23.19 23.19 11.45 11.45
Redondo(8"X0.15cm) - Bloqueo2 2.06 4.12 0.49 2.03
Cuas (8"X4"X2")
151.00 74.54
74.54
COSTOS DIRECTOS 149.62
COSTOS FIJOS ( van en lista por separado )
149.62
IMPREVISTOS 3% 4.49
GASTOS GENERALES 0% -
UTILIDAD 10% 14.96
COSTO TOTAL (US$/Pza.) 169.07
Costo de Transporte de Madera 151.00 0.043 6.43
COSTO TOTAL (US$/Pza.) 175.50
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
CUADRO COMPLETO DE MADERA 10' x 10'
PDF created with pdfFactory Pro trial version www.pdffactory.com
12163
Rendimiento / Gdia. 1.00 Unidad
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 35.60
Ayud. Enmaderador Tarea 1.00 34.14 34.14
2.00 69.74 69.74
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 3.79
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 1.55
4. MADERA Und pies/und pies $ / Pza US$
Redondos(8''X10') 3 41.23 123.69 20.35 61.06
Tirante (6"x10') 1 23.19 23.19 11.45 11.45
Redondo(8"X0.15cm) - Bloqueo 2 2.06 4.12 0.49 2.03
Cuas (8"X4"X2")
151.00
74.54 74.54
COSTOS DIRECTOS 149.62
COSTOS FIJOS ( van en lista por separado )
149.62
IMPREVISTOS 3% 4.49
GASTOS GENERALES 0% -
UTILIDAD 10% 14.96
COSTO TOTAL (US$/Pza.) 169.07
Costo de Transporte de Madera 151.00 0.043 6.43
COSTO TOTAL (US$/Pza.) 175.50
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
El encribado se pagar por separado
CUADRO INTERMEDIO DE MADERA 8' x10'
PDF created with pdfFactory Pro trial version www.pdffactory.com
12164
Rendimiento / Gdia. 1.00 Unidad
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 35.60
Ayud. Enmaderador Tarea 1.00 34.14 34.14
2.00 69.74 69.74
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 3.79
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 1.55
4. MADERA Und pies/und pies $ / Pza US$
Redondos(8''X10') 3 41.23 123.69 20.35 61.06
Tirante (5"x10') 1 16.10 16.10 7.95 7.95
Redondo(8"X0.15cm) - Bloqueo 2 2.06 4.12 0.49 2.03
Cuas (8"X4"X2")
143.91
71.04 71.04
COSTOS DIRECTOS 146.12
COSTOS FIJOS ( van en lista por separado )
146.12
IMPREVISTOS 3% 4.38
GASTOS GENERALES 0% -
UTILIDAD 10% 14.61
COSTO TOTAL (US$/Pza.) 165.11
Costo de Transporte de Madera 143.91 0.043 6.13
COSTO TOTAL (US$/Pza.) sin CUNETA 171.24
COSTO TOTAL (US$/Pza.) con CUNETA (mas 2%) #DIV/0!
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
El encribado se pagar por separado
CUADRO INTERMEDIO DE MADERA 8' x9'
PDF created with pdfFactory Pro trial version www.pdffactory.com
12126
Rendimiento / Gdia. 1.00 Unidad
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 35.60
Ayud. Enmaderador Tarea 1.00 34.14 34.14
2.00 69.74 69.74
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 3.79
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 1.55
4. MADERA Und pies/und pies $ / Pza US$
Redondos(7''X8') 3 25.25 75.75 12.47 37.40
Tirante (5"x10') 1 16.10 16.10 7.95 7.95
Redondo(7"X0.15cm) - Bloqueo 2 1.58 3.16 0.49 1.56
Cuas (8"X4"X2")
95.01
46.90 46.90
COSTOS DIRECTOS 121.98
COSTOS FIJOS ( van en lista por separado )
121.98
IMPREVISTOS 3% 3.66
GASTOS GENERALES 0% -
UTILIDAD 10% 12.20
COSTO TOTAL (US$/Pza.) 137.84
Costo de Transporte de Madera 95.01 0.043 4.05
COSTO TOTAL (US$/Pza.) sin CUNETA 141.89
'COSTO TOTAL (US$/Pza.) con CUNETA (mas 2%) #DIV/0!
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
El encribado se pagar por separado
LABOR >20 MTS SE PAGARA 2% + DEL PU
CUADRO INTERMEDIO DE MADERA 7' x7'
PDF created with pdfFactory Pro trial version www.pdffactory.com
12127
Rendimiento / Gdia. 1.00 Unidad
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 35.60
Ayud. Enmaderador Tarea 1.00 34.14 34.14
2.00 69.74 69.74
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 3.79
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 1.55
4. MADERA Und pies/und pies $ / Pza US$
Redondos(8''X8') 3 32.98 98.94 16.28 48.84
Tirante (5"x10') 1 16.10 16.10 7.95 7.95
Redondo(8"X0.15cm) - Bloqueo 2 2.06 4.12 0.49 2.03
Cuas (8"X4"X2")
119.16 58.82
58.82
COSTOS DIRECTOS 133.90
COSTOS FIJOS ( van en lista por separado )
133.90
SUPERVISIN -
IMPREVISTOS 3% 4.02
GASTOS GENERALES 0% -
UTILIDAD 10% 13.39
COSTO TOTAL (US$/Pza.) 151.31
Costo de Transporte de Madera 119.16 0.043 5.07
COSTO TOTAL (US$/Pza.) sin CUNETA 156.38
'COSTO TOTAL (US$/Pza.) con CUNETA (mas 2%) #DIV/0!
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
El encribado se pagar por separado
LABOR >20 MTS SE PAGARA 2% + DEL PU
CUADRO INTERMEDIO DE MADERA 8'x8'
PDF created with pdfFactory Pro trial version www.pdffactory.com
12128
Rendimiento / Gdia. 2.00 Unidad
DESCRIPCIN Unid. Cant. Costo FACTOR Costo x Costo/Pza.
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 100% 35.60
Ayud. Enmaderador Tarea 1.00 34.14 100% 34.14
2.00 69.74 34.87
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
Tareas sin ropa de agua Tar. - - -
3.79 1.90
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 0.77
4. MADERA Und pies/und pies $ / Pza US$
Redondos(6''X8') 3 18.55 55.65 9.16 27.47
Tirante (5"x10') 1 16.10 16.10 7.95 7.95
Redondo(6"X0.15cm) - Bloqueo 2 1.16 2.32 0.49 1.15
Cuas (8"X4"X2")
74.07 36.56
36.56
COSTOS DIRECTOS 74.10
COSTOS FIJOS ( van en lista por separado )
74.10
SUPERVISIN
IMPREVISTOS 3% 2.22
GASTOS GENERALES 0% -
UTILIDAD 10% 7.41
COSTO TOTAL (US$/Pza.) 83.74
Costo de Transporte de Madera 74.07 0.043 3.15
COSTO TOTAL (US$/Pza.) 86.89
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
LABOR >20 MTS SE PAGARA 2% + DEL PU
CUADRO COMPLETO DE MADERA 6' x 6' (subnivel)
PDF created with pdfFactory Pro trial version www.pdffactory.com
12129
Rendimiento / Gdia. 2.00 Unidad
DESCRIPCIN Unid. Cant. Costo FACTOR Costo x Costo/Pza.
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 100% 35.60
Ayud. Enmaderador Tarea 1.00 34.14 100% 34.14
2.00 69.74 34.87
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 1.90
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 0.77
4. MADERA Und pies/und pies $ / Pza US$
Redondos(7''X8') 3 25.25 75.75 12.47 37.40
Tirante (5"x10') 1 16.10 16.10 7.95 7.95
Redondo(7"X0.15cm) - Bloqueo 2 1.58 3.16 0.49 1.56
Cuas (8"X4"X2")
95.01 46.90
46.90
COSTOS DIRECTOS 84.44
COSTOS FIJOS ( van en lista por separado )
84.44
IMPREVISTOS 3% 2.53
GASTOS GENERALES 0% -
UTILIDAD 10% 8.44
COSTO TOTAL (US$/Pza.) 95.42
Costo de Transporte de Madera 95.01 0.043 4.05
COSTO TOTAL (US$/Pza.) sin CUNETA 99.47
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
LABOR >20 MTS SE PAGARA 2% + DEL PU
CUADRO COMPLETO MADERA 7' x 7'(Sub Nivel)
PDF created with pdfFactory Pro trial version www.pdffactory.com
12149
Rendimiento / Gdia. 2.00 Unidad
DESCRIPCIN Unid. Cant. Costo FACTOR Costo x Costo/Pza.
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 100% 35.60
Ayud. Enmaderador Tarea 1.00 34.14 100% 34.14
2.00 69.74 34.87
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 1.90
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 0.77
4. MADERA Und pies/und pies $ / Pza US$
Redondos(6''X8') 3.00 18.55 55.65 9.16 27.47
Tirante (5"x10') 1.00 16.10 16.10 7.95 7.95
Redondo(6"X0.15cm) - Bloqueo 2 1.16 2.32 0.49 1.15
74.07 36.56
36.56
COSTOS DIRECTOS 74.10
COSTOS FIJOS ( van en lista por separado )
74.10
IMPREVISTOS 3% 2.22
GASTOS GENERALES 0% -
UTILIDAD 10% 7.41
COSTO TOTAL (US$/Pza.) 83.74
Costo de Transporte de Madera 74.07 0.043 3.15
COSTO TOTAL (US$/Pza.) 86.89
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
LABOR >20 MTS SE PAGARA 2% + DEL PU
CUADRO COMPLETO SUB NIVEL 4' x 6'(Sub Nivel)
PDF created with pdfFactory Pro trial version www.pdffactory.com
12130
Rendimiento / Gdia. 3.00 Unidad
DESCRIPCIN Unid. Cant. Costo FACTOR Costo x Costo/Pza.
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 100% 35.60
Ayud. Enmaderador Tarea 1.00 34.14 100% 34.14
2.00 69.74 23.25
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 1.26
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 0.52
4. MADERA Und pies/und pies $ / Pza US$
Redondos(6''X8') 3 18.55 55.65 9.16 27.47
Tirante (5"x10') 1 16.10 16.10 7.95 7.95
Redondo(6"X0.15cm) - Bloqueo 2 1.16 2.32 0.49 1.15
Cuas (8"X4"X2")
74.07 36.56
36.56
COSTOS DIRECTOS 61.59
COSTOS FIJOS ( van en lista por separado )
61.59
IMPREVISTOS 3% 1.85
GASTOS GENERALES 0% -
UTILIDAD 10% 6.16
COSTO TOTAL (US$/Pza.) 69.60
Costo de Transporte de Madera 74.07 0.043 3.15
COSTO TOTAL (US$/Pza.) 72.75
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
LABOR >20 MTS SE PAGARA 2% + DEL PU
CUADRO COMPLETO TAJEO DE MADERA 6' x 6'
PDF created with pdfFactory Pro trial version www.pdffactory.com
12131
Rendimiento / Gdia. 3.00 Unidad
DESCRIPCIN Unid. Cant. Costo FACTOR Costo x Costo/Pza.
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 100% 35.60
Ayud. Enmaderador Tarea 1.00 34.14 100% 34.14
2.00 69.74 23.25
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 1.26
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 0.52
4. MADERA Und pies/und pies $ / Pza US$
Redondos(7''X8') 3 25.25 75.75 12.47 37.40
Tirante (5"x10') 1 16.10 16.10 7.95 7.95
Redondo(7"X0.15cm) - Bloqueo 2 1.58 3.16 0.49 1.56
Cuas (8"X4"X2")
95.01 46.90
46.90
COSTOS DIRECTOS 71.93
COSTOS FIJOS ( van en lista por separado )
71.93
IMPREVISTOS 3% 2.16
GASTOS GENERALES 0% -
UTILIDAD 10% 7.19
COSTO TOTAL (US$/Pza.) 81.28
Costo de Transporte de Madera 95.01 0.043 4.05
COSTO TOTAL (US$/Pza.) 85.33
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
LABOR >20 MTS SE PAGARA 2% + DEL PU
CUADRO COMPLETO TAJEO DE MADERA 7' x 7'
PDF created with pdfFactory Pro trial version www.pdffactory.com
12150
Rendimiento / Gdia. 2.00 Unidad
DESCRIPCIN Unid. Cant. Costo FACTOR Costo x Costo/Pza.
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 100% 35.60
Ayud. Enmaderador Tarea 1.00 34.14 100% 34.14
2.00 69.74 34.87
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 1.90
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 0.77
4. MADERA Und pies/und pies $ / Pza US$
Redondos(8''X8') 3 32.98 98.94 16.28 48.84
Tirante (5"x10') 1 16.10 16.10 7.95 7.95
Redondo(7"X0.15cm) - Bloqueo 2 1.58 3.16 0.49 1.56
Cuas (8"X4"X2") -
118.20 58.34
58.34
COSTOS DIRECTOS 95.88
COSTOS FIJOS ( van en lista por separado )
95.88
IMPREVISTOS 3% 2.88
GASTOS GENERALES 0% -
UTILIDAD 10% 9.59
COSTO TOTAL (US$/Pza.) 108.35
Costo de Transporte de Madera 118.20 0.043 5.03
COSTO TOTAL (US$/Pza.) 113.38
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
LABOR >20 MTS SE PAGARA 2% + DEL PU
CUADRO COMPLETO TAJEO DE MADERA 8' x 8'
PDF created with pdfFactory Pro trial version www.pdffactory.com
12132
Rendimiento / Gdia. 1.00 Unidad
DESCRIPCIN Unid. Cant. Costo FACTOR Costo x Costo/Pza.
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 100% 35.60
Ayud. Enmaderador Tarea 1.00 34.14 100% 34.14
2.00 69.74 69.74
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 3.79
3. MATERIALES Y HERRAMIENTAS
Clavo 6" Kgr. 1.50 1.44 2.16
Herramientas Global 1.55
3.71 3.71
4. MADERA Und pies/und pies $ / Pza US$
Redondos (7"x8') 1.5 25.25 37.88 12.47 18.70
Redondos (7"x10') 5 31.57 157.85 15.58 77.89
Redondo(7"X0.15cm) - Bloqueo 10 1.58 15.78 0.49 7.79
Tablas (8"X2"X10') - Entablado 12 13.12 157.44 7.39 88.67
368.95 193.05
193.05
COSTOS DIRECTOS 270.29
IMPREVISTOS 3% 8.11
GASTOS GENERALES 0% -
UTILIDAD 10% 27.03
COSTO TOTAL (US$/Pza.) 305.43
Costo de Transporte de Madera 368.95 0.043 15.71
COSTO TOTAL (US$/Pza.) 321.14
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
LABOR >20 MTS SE PAGARA 2% + DEL PU
ENMADERADO DOBLE COMPARTIMIENTO EN CHIMENEA 8'X4' CON ENTABLADO
PDF created with pdfFactory Pro trial version www.pdffactory.com
12151
Rendimiento / Gdia. 1.00 Unidad
DESCRIPCIN Unid. Cant. Costo FACTOR Costo x Costo/Pza.
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 1.20 42.72
Ayud. Enmaderador Tarea 1.00 34.14 1.20 40.97
2.00 83.69 83.69
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.40 1.90 4.55
4.55 4.55
3. MATERIALES Y HERRAMIENTAS
Clavo 6" Kgr. 2.00 1.44 2.88
Herramientas Global 1.55
4.43 4.43
4. MADERA Und pies/und pies $ / Pza US$
Redondos (7"x8') 3 25.25 75.75 12.47 37.40
Redondos (7"x10') 6 31.57 189.42 15.58 93.46
Redondo(7"X0.15cm) - Bloqueo 12 1.58 18.94 0.49 9.35
Tablas (8"X2"X10') - Entablado 18 13.12 236.16 7.39 133.01
520.27 273.23
273.23
COSTOS DIRECTOS 365.89
IMPREVISTOS 3% 10.98
GASTOS GENERALES 0% -
UTILIDAD 10% 36.59
COSTO TOTAL (US$/Pza.) 413.46
Costo de Transporte de Madera 520.27 0.043 22.15
COSTO TOTAL (US$/Pza.) 435.61
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
LABOR >20 MTS SE PAGARA 2% + DEL PU
ENMADERADO DOBLE COMPARTIMIENTO EN CHIMENEA 3.20mX1.50m CON ENTABLADO
PDF created with pdfFactory Pro trial version www.pdffactory.com
12152
Rendimiento / Gdia. 2.00 Unidad
DESCRIPCIN Unid. Cant. Costo FACTOR Costo x Costo/Pza.
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 100% 35.60
Ayud. Enmaderador Tarea 1.00 34.14 100% 34.14
2.00 69.74 34.87
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 1.90
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 0.77
4. MADERA Und pies/und pies $ / Pza US$
Redondos (7"x10') 3.0 31.57 94.71 15.58 46.73
Tirantes (7"x10') 1 31.57 31.57 15.58 15.58
Encostillado (Cantonera $/Pza) 0 - - 3.87 -
126.28 62.31
62.31
COSTOS DIRECTOS 99.85
COSTOS FIJOS ( van en lista por separado )
99.85
IMPREVISTOS 3% 3.00
GASTOS GENERALES 0% -
UTILIDAD 10% 9.98
COSTO TOTAL (US$/Pza.) 112.83
Costo de Transporte de Madera 126.28 0.043 5.38
COSTO TOTAL (US$/Pza.) 118.21
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
LABOR >20 MTS SE PAGARA 2% + DEL PU
CUADRO EN CHIMENEA 5'X5' - CON ENCOSTILLADO
PDF created with pdfFactory Pro trial version www.pdffactory.com
12165
Rendimiento / Gdia. 3.00 Unidad
DESCRIPCIN Unid. Cant. Costo Costo x Costo/Pza.
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 35.60
Ayud. Enmaderador Tarea 1.00 34.14 34.14
2.00 69.74 23.25
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 1.26
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 0.52
4. MADERA Und pies/und pies $ / Pza US$
Redondos (7"x10') 3.0 31.57 94.71 15.58 46.73
Tirantes (7"x10') 1 31.57 31.57 15.58 15.58
126.28 62.31
62.31
COSTOS DIRECTOS 87.34
COSTOS FIJOS ( van en lista por separado )
87.34
IMPREVISTOS 3% 2.62
GASTOS GENERALES 0% -
UTILIDAD 10% 8.73
COSTO TOTAL (US$/Pza.) 98.69
Costo de Transporte de Madera 126.28 0.043 5.38
COSTO TOTAL (US$/Pza.) 104.07
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
LABOR >20 MTS SE PAGARA 2% + DEL PU
CUADRO EN CHIMENEA 5'X5' - SIN ENCOSTILLADO
PDF created with pdfFactory Pro trial version www.pdffactory.com
Cuadro Incluye una vuelta de cribing
12133
Rendimiento / Gdia. 2.00 Unidad
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 0.80 28.48
Ayud. Enmaderador Tarea 1.00 34.14 0.80 27.32
Ayud. Tarea 0.50 34.14 17.07
2.50 72.87 36.43
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.10 1.90 3.98
3.98 1.99
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 0.77
4. MADERA Und pies/und pies $ / Pza US$
Redondos(7''X8') 3 25.25 75.75 12.47 37.40
Tirantes (5"x10') 1 16.10 16.10 7.95 7.95
Redondo(7"X0.15cm) - Bloqueo 2 1.58 3.16 0.49 1.56
95.01 46.90
46.90
COSTOS DIRECTOS 86.10
COSTOS FIJOS ( van en lista por separado )
86.10
IMPREVISTOS 3% 2.58
GASTOS GENERALES 0% -
UTILIDAD 10% 8.61
COSTO TOTAL (US$/Pza.) 97.29
Costo de Transporte de Madera 95.01 0.043 4.05
COSTO TOTAL (US$/Pza.) 101.34
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
LABOR >20 MTS SE PAGARA 2% + DEL PU
SOBRECUADRO DE MADERA 7' x 7'
PDF created with pdfFactory Pro trial version www.pdffactory.com
12134
Rendimiento / Gdia. 1.00 Unidad
DESCRIPCIN Unid. Cant. Costo FACTOR Costo x Costo/Pza.
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 100% 35.60
Ayud. Enmaderador Tarea 1.00 34.14 100% 34.14
Ayud. Tarea 1.00 34.14 34.14
3.00 103.89 103.89
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 3.00 1.90 5.69
5.69 5.69
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 1.55
4. MADERA Und pies/und pies $ / Pza US$
Redondos(8''X10') 2 41.23 82.46 20.35 40.71
Redondos(8''X4m) 1 54.09 54.09 27.13 27.13
Tirante (5"x10') 1 16.10 16.10 7.95 7.95
Redondo(8"X0.15cm) - Bloqueo 2 2.06 4.12 0.49 2.03
Cuas (8"X4"X2") 0
156.77 77.82
77.82
COSTOS DIRECTOS 188.94
COSTOS FIJOS ( van en lista por separado )
188.94
IMPREVISTOS 3% 5.67
GASTOS GENERALES 0% -
UTILIDAD 10% 18.89
COSTO TOTAL (US$/Pza.) 213.50
Costo de Transporte de Madera 156.77 0.043 6.68
COSTO TOTAL (US$/Pza.) 220.18
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
CUADRO DE CAMBIO 10'X10'
PDF created with pdfFactory Pro trial version www.pdffactory.com
12166
Rendimiento / Gdia. 1.00 Unidad
DESCRIPCIN Unid. Cant. Costo FACTOR Costo x Costo/Pza.
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 100% 35.60
Ayud. Enmaderador Tarea 1.00 34.14 100% 34.14
Ayud. Tarea 1.00 34.14 100% 34.14
3.00 103.89 103.89
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 3.00 1.90 5.69
5.69 5.69
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 1.55
4. MADERA Und pies/und pies $ / Pza US$
Redondos(8''X10') 3 41.23 123.69 20.35 61.06
Tirante (5"x8') 1 16.10 16.10 6.36 6.36
Redondo(8"X0.15cm) - Bloqueo 2 2.06 4.12 0.49 2.03
Cuas (8"X4"X2")
143.91 69.45
69.45
COSTOS DIRECTOS 180.57
COSTOS FIJOS ( van en lista por separado )
180.57
IMPREVISTOS 3% 5.42
GASTOS GENERALES 0% -
UTILIDAD 10% 18.06
COSTO TOTAL (US$/Pza.) 204.04
Costo de Transporte de Madera 143.91 0.043 6.13
COSTO TOTAL (US$/Pza.) 210.17
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
CUADRO DE CAMBIO 8'X9'
PDF created with pdfFactory Pro trial version www.pdffactory.com
12167
Rendimiento / Gdia. 3.00 Unidad
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 100% 35.60
Ayud. Enmaderador Tarea 1.00 34.14 100% 34.14
2.00 69.74 23.25
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 1.26
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 0.52
4. MADERA Und pies/und pies $ / Pza US$
Redondos(8''X10') 2 41.23 82.46 20.35 40.71
Tirante (5"x8') 1 12.88 12.88 6.36 6.36
Redondo(6"X0.15cm) - Bloqueo 2 1.16 2.32 0.49 1.15
Cuas (8"X4"X2") 0
97.66 48.21
48.21
COSTOS DIRECTOS 73.23
COSTOS FIJOS ( van en lista por separado )
73.23
IMPREVISTOS 3% 2.20
GASTOS GENERALES 0% -
UTILIDAD 10% 7.32
COSTO TOTAL (US$/Pza.) 82.76
Costo de Transporte de Madera 97.66 0.043 4.16
COSTO TOTAL (US$/Pza.) 86.91
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
LABOR >20 MTS SE PAGARA 2% + DEL PU
CUADRO COJO 8"X9' (En avances y Tajeos)
PDF created with pdfFactory Pro trial version www.pdffactory.com
12194
Rendimiento / Gdia. 3.00 Unidad
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 100% 35.60
Ayud. Enmaderador Tarea 1.00 34.14 100% 34.14
2.00 69.74 23.25
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 1.26
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 0.52
4. MADERA Und pies/und pies $ / Pza US$
Redondos(8''X10') 2 41.23 82.46 20.35 40.71
Tirante (5"x8') 1 12.88 12.88 6.36 6.36
Redondo(6"X0.15cm) - Bloqueo 1 1.16 1.16 0.49 0.57
Cuas (8"X4"X2") 0
96.50 47.64
47.64
COSTOS DIRECTOS 72.66
COSTOS FIJOS ( van en lista por separado )
72.66
IMPREVISTOS 3% 2.18
GASTOS GENERALES 0% -
UTILIDAD 10% 7.27
COSTO TOTAL (US$/Pza.) 82.11
Costo de Transporte de Madera 96.50 0.043 4.11
COSTO TOTAL (US$/Pza.) 86.22
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
LABOR >20 MTS SE PAGARA 2% + DEL PU
CUADRO COJO 8"X10' (En avances y Tajeos)
PDF created with pdfFactory Pro trial version www.pdffactory.com
12135
Rendimiento / Gdia. 3.00 Unidad
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 100% 35.60
Ayud. Enmaderador Tarea 1.00 34.14 100% 34.14
2.00 69.74 23.25
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 1.26
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 0.52
4. MADERA Und pies/und pies $ / Pza US$
Redondos(6''X8') 2 18.55 37.10 9.16 18.31
Tirante (5"x8') 1 12.88 12.88 6.36 6.36
Redondo(6"X0.15cm) - Bloqueo 1 1.16 1.16 0.49 0.57
Cuas (8"X4"X2") 0
51.14 25.24
25.24
COSTOS DIRECTOS 50.27
COSTOS FIJOS ( van en lista por separado )
50.27
IMPREVISTOS 3% 1.51
GASTOS GENERALES 0% -
UTILIDAD 10% 5.03
COSTO TOTAL (US$/Pza.) 56.81
Costo de Transporte de Madera 51.14 0.043 2.18
COSTO TOTAL (US$/Pza.) 58.98
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
LABOR >20 MTS SE PAGARA 2% + DEL PU
CUADRO COJO 6'X6' (En avances y Tajeos)
PDF created with pdfFactory Pro trial version www.pdffactory.com
12136
12168
Rendimiento / Gdia. 3.00 Unidad
DESCRIPCIN Unid. Cant. Costo FACTOR Costo x Costo/Pza.
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 100% 35.60
Ayud. Enmaderador Tarea 1.00 34.14 100% 34.14
2.00 69.74 23.25
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 1.26
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 0.52
4. MADERA Und pies/und pies $ / Pza US$
Redondos(7''X8') 2 25.25 50.50 12.47 24.93
Tirante (5"x8') 1 12.88 12.88 6.36 6.36
Redondo(7"X0.15cm) - Bloqueo 1 1.58 1.58 0.49 0.78
Cuas (8"X4"X2") 0
64.96 32.07
32.07
COSTOS DIRECTOS 57.10
COSTOS FIJOS ( van en lista por separado )
57.10
IMPREVISTOS 3% 1.71
GASTOS GENERALES 0% -
UTILIDAD 10% 5.71
COSTO TOTAL (US$/Pza.) 64.52
Costo de Transporte de Madera 64.96 0.043 2.77
COSTO TOTAL (US$/Pza.) 67.28
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
LABOR >20 MTS SE PAGARA 2% + DEL PU
CUADRO COJO 7'X7' (En avances y Tajeos)
PDF created with pdfFactory Pro trial version www.pdffactory.com
12153
Cuadro Incluye una vuelta de encribado
Rendimiento / Gdia. 3.00 Unidad
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 100% 35.60
Ayud. Enmaderador Tarea 1.00 34.14 100% 34.14
2.00 69.74 23.25
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 1.26
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 0.52
4. MADERA Und pies/und pies $ / Pza US$
Redondos(8''X8') 2 32.98 65.96 16.28 32.56
Tirante (5"x8') 1 12.88 12.88 6.36 6.36
Redondo(7"X0.15cm) - Bloqueo 1 1.58 1.58 0.49 0.78
Cuas (8"X4"X2") 0
80.42 39.70
39.70
COSTOS DIRECTOS 64.72
COSTOS FIJOS ( van en lista por separado )
64.72
IMPREVISTOS 3% 1.94
GASTOS GENERALES 0% -
UTILIDAD 10% 6.47
COSTO TOTAL (US$/Pza.) 73.14
Costo de Transporte de Madera 80.42 0.043 3.42
COSTO TOTAL (US$/Pza.) 76.56
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
LABOR >20 MTS SE PAGARA 2% + DEL PU
CUADRO COJO TAJEO DE MADERA 8' x 8'
PDF created with pdfFactory Pro trial version www.pdffactory.com
08128
Cuadro Incluye una vuelta de encribado
Rendimiento / Gdia. 0.50 Unidad
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 3.00 106.79
Ayud. Enmaderador Tarea 1.00 34.14 3.00 102.43
2.00 209.23 418.45
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 6.00 1.90 11.37
11.37 22.75
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
Clavos 6" Kgr. 1.50 1.44 2.16
3.71 7.41
4. MADERA Und pies/und pies $ / Pza US$
Redondos(8''X10') 7 41.23 288.61 20.35 142.47
Redondos(8''X8') 2 32.98 65.96 16.28 32.56
Redondos(6''X8') - Tirante y topes 2 18.55 37.10 9.16 18.31
Tablas 8"x4"x10' 5 26.25 131.25 14.79 73.93
Tablas 8"x2"x10' 11 13.12 144.32 7.39 81.28
Cuas (8"X4"X2")
667.24 348.56 348.56
COSTOS DIRECTOS 797.17
IMPREVISTOS 3% 23.92
GASTOS GENERALES 0% -
UTILIDAD 10% 79.72
COSTO TOTAL (US$/Pza.) 900.80
Costo de Tranbsporte de Madera 667.24 0.043 28.41
COSTO TOTAL (US$/Pza.) 929.22
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
Asimismo, el costo incluye los cuadros base, puntales, pata de gallo, etc.
Costo incluye EL CUADRO + LA TOLVA
INSTALACION DE TOLVA SIMPLE
PDF created with pdfFactory Pro trial version www.pdffactory.com
12137
Rendimiento / Gdia. 14.00 Unidad
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 35.60
Ayud. Enmaderador Tarea 1.00 34.14 34.14
2.00 69.74 4.98
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 0.27
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 0.11
4. MADERA Und pies/und pies $ / Pza US$
Redondos(5''X10') 1 16.10 16.10 7.95 7.95
7.95
COSTOS DIRECTOS 13.31
COSTOS FIJOS ( van en lista por separado )
13.31
IMPREVISTOS 3% 0.40
GASTOS GENERALES 0% -
UTILIDAD 10% 1.33
COSTO TOTAL (US$/Pza.) 15.04
Costo de Transporte de Madera 16.10 0.043 0.69
COSTO TOTAL (US$/Pza.) 15.73
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
LABOR >20 MTS SE PAGARA 2% + DEL PU
GUARDACABEZA 5"X 3Mts
PDF created with pdfFactory Pro trial version www.pdffactory.com
12181
Rendimiento / Gdia. 14.00 Unidad
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 35.60
Ayud. Enmaderador Tarea 1.00 34.14 34.14
2.00 69.74 4.98
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 0.27
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 0.11
4. MADERA Und pies/und pies $ / Pza US$
Redondos(4''X8') 1 8.25 8.25 4.07 4.07
4.07
COSTOS DIRECTOS 9.43
COSTOS FIJOS ( van en lista por separado )
9.43
IMPREVISTOS 3% 0.28
GASTOS GENERALES 0% -
UTILIDAD 10% 0.94
COSTO TOTAL (US$/Pza.) 10.65
Costo de Transporte de Madera 8.25 0.043 0.35
COSTO TOTAL (US$/Pza.) 11.01
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
LABOR >20 MTS SE PAGARA 2% + DEL PU
GUARDACABEZA 4"X 2.40Mts
PDF created with pdfFactory Pro trial version www.pdffactory.com
12186
Rendimiento / Gdia. 10.00 Vuelta 4 elementos
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 35.60
Ayud. Enmaderador Tarea 1.00 34.14 34.14
2.00 69.74 6.97
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 0.38
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 0.15
4. MADERA Und pies/und pies $ / Pza US$
Encribado (5"x7') 2 11.27 22.54 5.57 11.13
Encribado (5"x10') 1 16.10 16.10 7.95 7.95
SUB TOTAL 38.64 19.08
19.08
COSTOS DIRECTOS 26.59
COSTOS FIJOS ( van en lista por separado )
26.59
IMPREVISTOS 3% 0.80
GASTOS GENERALES 0% -
UTILIDAD 10% 2.66
COSTO TOTAL (US$/Vuelta) 30.04
Costo de Transporte de Madera 38.64 0.043 1.65
COSTO TOTAL (US$/Pza.) 31.69
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
LABOR >20 MTS SE PAGARA 2% + DEL PU
ENCRIBADO DE CUADRO 5"X6 PIES
PDF created with pdfFactory Pro trial version www.pdffactory.com
12185
Rendimiento / Gdia. 10.00 Vuelta 4 elementos
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 35.60
Ayud. Enmaderador Tarea 1.00 34.14 34.14
2.00 69.74 6.97
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 0.38
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 0.15
4. MADERA Und pies/und pies $ / Pza US$
Encribado (6"x8') 2 18.55 37.10 9.16 18.31
Encribado (5"x10') 1 16.10 16.10 7.95 7.95
SUB TOTAL 53.20 26.26
26.26
COSTOS DIRECTOS 33.77
COSTOS FIJOS ( van en lista por separado )
33.77
IMPREVISTOS 3% 1.01
GASTOS GENERALES 0% -
UTILIDAD 10% 3.38
COSTO TOTAL (US$/Vuelta) 38.16
Costo de Transporte de Madera 53.20 0.043 2.27
COSTO TOTAL (US$/Pza.) 40.42
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
LABOR >20 MTS SE PAGARA 2% + DEL PU
ENCRIBADO DE CUADRO 6"X8 PIES
PDF created with pdfFactory Pro trial version www.pdffactory.com
12184
Rendimiento / Gdia. 10.00 Vuelta 4 elementos
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 35.60
Ayud. Enmaderador Tarea 1.00 34.14 34.14
2.00 69.74 6.97
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 0.38
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 0.15
4. MADERA Und pies/und pies $ / Pza US$
Encribado (5"x8') 2 12.88 25.76 6.36 12.71
Encribado (5"x10') 1 16.10 16.10 7.95 7.95
SUB TOTAL 41.86 20.66
20.66
COSTOS DIRECTOS 28.17
COSTOS FIJOS ( van en lista por separado )
28.17
IMPREVISTOS 3% 0.85
GASTOS GENERALES 0% -
UTILIDAD 10% 2.82
COSTO TOTAL (US$/Vuelta) 31.83
Costo de Transporte de Madera 41.86 0.043 1.78
COSTO TOTAL (US$/Pza.) 33.61
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
LABOR >20 MTS SE PAGARA 2% + DEL PU
ENCRIBADO DE CUADRO 5"X8 PIES
PDF created with pdfFactory Pro trial version www.pdffactory.com
12191
Rendimiento / Gdia. 60.00
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 35.60
Ayud. Enmaderador Tarea 1.00 34.14 34.14
2.00 69.74 1.16
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 0.06
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 0.03
4. MADERA Und pies/und pies $ / Pza US$
Redondo (4"x8') rajado 1 8.25 4.13 4.07 2.03
SUB TOTAL 4.13 2.03
2.03
COSTOS DIRECTOS 3.28
COSTOS FIJOS ( van en lista por separado )
3.28
IMPREVISTOS 3% 0.10
GASTOS GENERALES 0% -
UTILIDAD 10% 0.33
COSTO TOTAL (US$/Vuelta) 3.71
Costo de Transporte de Madera 4.13 0.043 0.18
COSTO TOTAL (US$/Pza.) 3.89
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
LABOR >20 MTS SE PAGARA 2% + DEL PU
COLOCADO DE RAJADO
PDF created with pdfFactory Pro trial version www.pdffactory.com
12183
Rendimiento / Gdia. 60.00
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 35.60
Ayud. Enmaderador Tarea 1.00 34.14 34.14
2.00 69.74 1.16
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 0.06
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 0.03
4. MADERA Und pies/und pies $ / Pza US$
Cantoneras 1 5.00 5.00 3.87 3.87
SUB TOTAL 5.00 3.87
3.87
COSTOS DIRECTOS 5.12
COSTOS FIJOS ( van en lista por separado )
5.12
IMPREVISTOS 3% 0.15
GASTOS GENERALES 0% -
UTILIDAD 10% 0.51
COSTO TOTAL (US$/Vuelta) 5.79
Costo de Transporte de Madera 5.00 0.043 0.21
COSTO TOTAL (US$/Pza.) 6.00
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
LABOR >20 MTS SE PAGARA 2% + DEL PU
COLOCADO CANTONERAS
PDF created with pdfFactory Pro trial version www.pdffactory.com
12182
Rendimiento / Gdia. 60.00
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 35.60
Ayud. Enmaderador Tarea 1.00 34.14 34.14
2.00 69.74 1.16
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 0.06
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 0.03
4. MADERA Und pies/und pies $ / Pza US$
Entablado (5"x1"x8') 1 3.28 1.84 1.84
SUB TOTAL 3.28 1.84
1.84
COSTOS DIRECTOS 3.09
COSTOS FIJOS ( van en lista por separado )
3.09
IMPREVISTOS 3% 0.09
GASTOS GENERALES 0% -
UTILIDAD 10% 0.31
COSTO TOTAL (US$/Vuelta) 3.50
Costo de Transporte de Madera 3.28 0.043 0.14
COSTO TOTAL (US$/Pza.) 3.63
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
LABOR >20 MTS SE PAGARA 2% + DEL PU
COLOCADO ENTABLADO (FORRADO CUADROS EN VEZ CANTONERA)
PDF created with pdfFactory Pro trial version www.pdffactory.com
12154
Rendimiento / Gdia. 6.00 Unidad
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 35.60
Ayud. Enmaderador Tarea 1.00 34.14 34.14
2.00 69.74 11.62
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 0.63
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 0.26
4. MADERA Und pies/und pies $ / Pza US$
Redondos (5"x8') 1 12.88 12.88 6.36 6.36
6.36
COSTOS DIRECTOS 18.87
COSTOS FIJOS ( van en lista por separado )
18.87
IMPREVISTOS 3% 0.57
GASTOS GENERALES 0% -
UTILIDAD 10% 1.89
COSTO TOTAL (US$/Pza.) 21.32
Costo de Transporte de Madera 12.88 0.043 0.55
COSTO TOTAL (US$/Pza.) 21.87
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
LABOR >20 MTS SE PAGARA 2% + DEL PU
SOLERA 5"X8'
PDF created with pdfFactory Pro trial version www.pdffactory.com
12155
Rendimiento / Gdia. 5.00 Unidad
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 35.60
Ayud. Enmaderador Tarea 1.00 34.14 34.14
2.00 69.74 13.95
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 0.76
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 0.31
4. MADERA Und pies/und pies $ / Pza US$
Redondos (6"x8') 1 18.55 18.55 9.16 9.16
9.16
COSTOS DIRECTOS 24.17
COSTOS FIJOS ( van en lista por separado )
24.17
IMPREVISTOS 3% 0.73
GASTOS GENERALES 0% -
UTILIDAD 10% 2.42
COSTO TOTAL (US$/Pza.) 27.32
Costo de Transporte de Madera 18.55 0.043 0.79
COSTO TOTAL (US$/Pza.) 28.11
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
LABOR >20 MTS SE PAGARA 2% + DEL PU
SOLERA 6"X8'
PDF created with pdfFactory Pro trial version www.pdffactory.com
12156
Rendimiento / Gdia. 5.00 Unidad
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 35.60
Ayud. Enmaderador Tarea 1.00 34.14 34.14
2.00 69.74 13.95
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 0.76
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 0.31
4. MADERA Und pies/und pies $ / Pza US$
Redondos (7"x8') 1 25.25 25.25 12.47 12.47
12.47
COSTOS DIRECTOS 27.48
COSTOS FIJOS ( van en lista por separado )
27.48
IMPREVISTOS 3% 0.82
GASTOS GENERALES 0% -
UTILIDAD 10% 2.75
COSTO TOTAL (US$/Pza.) 31.05
Costo de Tranbsporte de Madera 25.25 0.043 1.08
COSTO TOTAL (US$/Pza.) 32.13
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
LABOR >20 MTS SE PAGARA 2% + DEL PU
SOLERA 7"X8'
PDF created with pdfFactory Pro trial version www.pdffactory.com
12139
Rendimiento / Gdia. 5.00 Unidad
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 35.60
Ayud. Enmaderador Tarea 1.00 34.14 34.14
2.00 69.74 13.95
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 0.76
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 0.31
4. MADERA Und pies/und pies $ / Pza US$
Redondos (8"x8') 1 32.98 32.98 16.28 16.28
16.28
COSTOS DIRECTOS 31.30
COSTOS FIJOS ( van en lista por separado )
31.30
IMPREVISTOS 3% 0.94
GASTOS GENERALES 0% -
UTILIDAD 10% 3.13
COSTO TOTAL (US$/Pza.) 35.36
Costo de Tranbsporte de Madera 32.98 0.043 1.40
COSTO TOTAL (US$/Pza.) 36.77
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
LABOR >20 MTS SE PAGARA 2% + DEL PU
SOLERA 8"X8'
PDF created with pdfFactory Pro trial version www.pdffactory.com
12193
Rendimiento / Gdia. 5.00 Unidad
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 35.60
Ayud. Enmaderador Tarea 1.00 34.14 34.14
2.00 69.74 13.95
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 0.76
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 0.31
4. MADERA Und pies/und pies $ / Pza US$
Redondos (8"x10') 1 41.23 41.23 20.35 20.35
20.35
COSTOS DIRECTOS 35.37
COSTOS FIJOS ( van en lista por separado )
35.37
IMPREVISTOS 3% 1.06
GASTOS GENERALES 0% -
UTILIDAD 10% 3.54
COSTO TOTAL (US$/Pza.) 39.97
Costo de Tranbsporte de Madera 41.23 0.043 1.76
COSTO TOTAL (US$/Pza.) 41.72
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
LABOR >20 MTS SE PAGARA 2% + DEL PU
SOLERA 8"X10'
PDF created with pdfFactory Pro trial version www.pdffactory.com
Con Plantilla
12157
Rendimiento / Gdia. 10.00 Unidad
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 35.60
Ayud. Enmaderador Tarea 1.00 34.14 34.14
2.00 69.74 6.97
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 0.38
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 0.15
4. MADERA Und pies/und pies $ / Pza US$
Redondos (5"x8) 1 12.88 12.88 6.36 6.36
Tabla (8"x2"x2) 1 2.62 2.62 1.48 1.48
15.50 7.84
COSTOS DIRECTOS 15.34
COSTOS FIJOS ( van en lista por separado )
15.34
IMPREVISTOS 3% 0.46
GASTOS GENERALES 0% -
UTILIDAD 10% 1.53
COSTO TOTAL (US$/Pza.) 17.34
Costo de Tranbsporte de Madera 15.50 0.043 0.66
COSTO TOTAL (US$/Pza.) 18.00
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
LABOR >20 MTS SE PAGARA 2% + DEL PU
PUNTAL DE SEGURIDAD 5"X8'
PDF created with pdfFactory Pro trial version www.pdffactory.com
Con Plantilla
12140
Rendimiento / Gdia. 8.00 Unidad
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 35.60
Ayud. Enmaderador Tarea 1.00 34.14 34.14
2.00 69.74 8.72
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 0.47
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 0.19
4. MADERA Und pies/und pies $ / Pza US$
Redondos (6"x8') 1 18.55 18.55 9.16 9.16
Tabla (8"x2"x2) 1 2.62 2.62 1.48 1.48
21.17 10.63
COSTOS DIRECTOS 20.02
COSTOS FIJOS ( van en lista por separado )
20.02
IMPREVISTOS 3% 0.60
GASTOS GENERALES 0% -
UTILIDAD 10% 2.00
COSTO TOTAL (US$/Pza.) 22.62
Costo de Tranbsporte de Madera 21.17 0.043 0.90
COSTO TOTAL (US$/Pza.) 23.52
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
LABOR >20 MTS SE PAGARA 2% + DEL PU
PUNTAL DE SEGURIDAD 6"X8'
PDF created with pdfFactory Pro trial version www.pdffactory.com
Con Plantilla
12158
Rendimiento / Gdia. 6.00 Unidad
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 35.60
Ayud. Enmaderador Tarea 1.00 34.14 34.14
2.00 69.74 11.62
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 0.63
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 0.26
4. MADERA Und pies/und pies $ / Pza US$
Redondos (7"x8') 1 25.25 25.25 12.47 12.47
Tabla (8"x2"x2) 1 2.62 2.62 1.48 1.48
27.87 13.94 13.94
COSTOS DIRECTOS 26.46
COSTOS FIJOS ( van en lista por separado )
26.46
IMPREVISTOS 3% 0.79
GASTOS GENERALES 0% -
UTILIDAD 10% 2.65
COSTO TOTAL (US$/Pza.) 29.90
Costo de Tranbsporte de Madera 27.87 0.043 1.19
COSTO TOTAL (US$/Pza.) 31.08
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
LABOR >20 MTS SE PAGARA 2% + DEL PU
PUNTAL DE SEGURIDAD 7"X8'
PDF created with pdfFactory Pro trial version www.pdffactory.com
Con Plantilla
12159
Rendimiento / Gdia. 4.00 Unidad
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 35.60
Ayud. Enmaderador Tarea 1.00 34.14 34.14
2.00 69.74 17.44
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 0.95
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 0.39
4. MADERA Und pies/und pies $ / Pza US$
Redondos (8"x8') 1 32.98 32.98 16.28 16.28
Tabla (8"x2"x2) 1 2.62 2.62 1.48 1.48
35.60 17.76
COSTOS DIRECTOS 36.53
COSTOS FIJOS ( van en lista por separado )
36.53
IMPREVISTOS 3% 1.10
GASTOS GENERALES 0% -
UTILIDAD 10% 3.65
COSTO TOTAL (US$/Pza.) 41.28
Costo de Tranbsporte de Madera 35.60 0.043 1.52
COSTO TOTAL (US$/Pza.) 42.79
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
LABOR >20 MTS SE PAGARA 2% + DEL PU
PUNTAL DE SEGURIDAD 8"X8'
PDF created with pdfFactory Pro trial version www.pdffactory.com
08369
Rendimiento / Gdia. 5.00 Unidad 5 ESCALERAS Y 5 DESCANSOS SIN PUNTALES
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 35.60
Ayud. Enmaderador Tarea 1.00 34.14 34.14
2.00 69.74 13.95
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 0.76
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
Clavos
1.55 0.31
4. MADERA Und pies/und pies $ / Pza US$
Escalera (3m.) 1 12.64 12.64
Descanso (listones 2"x2"x5m.) 8 5.38 43.04 0.45 3.60
43.04 16.24
16.24
COSTOS DIRECTOS 31.26
COSTOS FIJOS ( van en lista por separado )
31.26
IMPREVISTOS 3% 0.94
GASTOS GENERALES 0% -
UTILIDAD 10% 3.13
COSTO TOTAL (US$/Pza.) 35.32
Costo de Tranbsporte de Madera 43.04 0.043 1.83
COSTO TOTAL (US$/Pza.) 37.15
LABOR >20 MTS SE PAGARA 2% + DEL PU #DIV/0!
PLATAFORMA DESCANSO CON ESCALERA
PDF created with pdfFactory Pro trial version www.pdffactory.com
08370
Rendimiento / Gdia. 20.00 Unidad
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 35.60
Ayud. Enmaderador Tarea 1.00 34.14 34.14
2.00 69.74 3.49
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 0.19
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
Clavos
1.55 0.08
4. MADERA Und $ / und US$
Escalera (3m.) 1 12.64 12.64
12.64
COSTOS DIRECTOS 16.39
COSTOS FIJOS ( van en lista por separado )
16.39
IMPREVISTOS 3% 0.49
GASTOS GENERALES 0% -
UTILIDAD 10% 1.64
COSTO TOTAL (US$/Pza.) 18.53
INSTALACION DE ESCALERA
PDF created with pdfFactory Pro trial version www.pdffactory.com
08371
Rendimiento : 30.00 Unid. de 2 fts
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Perforistas Tarea 1.00 37.05 37.05
Ayud. Perforista Tarea 1.00 34.14 34.14
2.00 71.20 2.37
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 0.13
3. MATERIALES Y HERRAMIENTAS
BARRA CONICA 6" Fts 60.00 94.60 1,820 3.12
Broca 40 mm Fts 60.00 25.30 350 4.34
Aceite Perforacin Gln. 0.12 9.16 1.10
Alcayata Pza. 30.00 3.36 100.80
Cembolt Pza 60.00 0.22 13.20
Herramientas de mina Global 1.62
124.17 4.14
5. EQUIPO PERFORACIN-LIMPIEZA
perforadora P.P. 60.00 0.10 6.00
Manguera aire 1" Mts. 30.00 2.70 150 0.54
Manguera agua 1/2" Mts. 30.00 1.33 150 0.27
6.81 0.23
COSTOS DIRECTOS 6.87
COSTOS FIJOS ( van en lista por separado )
6.87
IMPREVISTOS 3% 0.21
GASTOS GENERALES 0% -
UTILIDAD 10% 0.69
COSTO TOTAL (US$/Pza. 7.76
INSTALACION ALCAYATAS
PDF created with pdfFactory Pro trial version www.pdffactory.com
08376
Rendimiento : 60.00 Unid./Gud. 0.5 Fts
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Perforistas Tarea 1.00 37.05 37.05
Ayud. Perforista Tarea 1.00 34.14 34.14
2.00 71.20 1.19
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 0.06
3. MATERIALES Y HERRAMIENTAS
Barra cnica 6" P.P 30.00 94.60 1,820 1.56
Broca 40 mm P.P 30.00 25.30 350 2.17
Aceite Perforacin Gln. 0.12 9.16 1.10
Alcayata Pza. 60.00 3.36 201.60
Cembolt Pza 30.00 0.22 6.60
Herramientas de mina Global 1.62
214.64 3.58
5. EQUIPO PERFORACIN-LIMPIEZA
perforadora P.P. 30.00 0.10 3.00
Manguera aire 1" Mts. 30.00 2.70 150 0.54
Manguera agua 1/2" Mts. 30.00 1.33 150 0.27
3.81 0.06
COSTOS DIRECTOS 4.89
COSTOS FIJOS ( van en lista por separado )
4.89
IMPREVISTOS 3% 0.15
GASTOS GENERALES 0% -
UTILIDAD 10% 0.49
COSTO TOTAL (US$/Pza. 5.53
INSTALACION ALCAYATAS PARA MANGA DE VENTILACION
PDF created with pdfFactory Pro trial version www.pdffactory.com
Taladros 4 Fts Perf. 7.00
Rendimiento / Gdia. 1.00 Cimbra + 14 Planchas Acanaladas + 87 Bolsascrete
DESCRIPCIN Cantidad Incidencia Costo Vida Costo x Costo/Pza.
UNIDAD Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Tarea 1.00 1.00 37.05 37.05
Ayudante Tarea 3.00 1.00 34.14 102.43
4.00 139.48 139.48
2. IMPLEMENTOS SEGURIDAD
Implementos SeguridadTarea 4.00 1.90 7.58
7.58 7.58
3. HERRAMIENTAS
Herramientas Global 1.62
1.62 1.62
4. MATERIALES
DESCRIPCION UNIDAD
CANTIDA
D
ESTANDAR PRECIO
PZAS/UNID U.S.$/PZA U.S.$
Barra de 6" FTS/Unidad 28.00 1820.00 0.02 94.60 1.46
Broca de 40 mm FTS/Unidad 28.00 350.00 0.08 25.30 2.02
Aceite de Perforacin GLNS/Unidad 0.50 9.16 4.58
Cemento Bolsas/Unidad 0.50 11.26 5.63
Soldadura Supercito 1/8" Kgs/Unidad 1.00 3.91 3.91
Cancamo Pzas/Unidad 4.00 5.67 22.68
40.28 40.28
5. EQUIPOS
Perforadora Fts /Unidad 28.00 0.10 2.80
Maquina Soldar Hrs/Unidad 2.00 1.00 2.00
4.80 4.80
COSTOS DIRECTOS 193.76
IMPREVISTOS 3% 5.81
GASTOS GENERALES 0% -
UTILIDAD 10% 19.38
COSTO TOTAL (US$/Pza.) 218.95
No incluye Costo de Cimbra, ni Plancha Acanalada ni Bolsa Cret (Arena+Cemento)
INSTALACION DE CIMBRAS DE 4.5mX4.2m (Incluye Plancha Acanalada+Bolsacrete)
VIDA
UTIL
PDF created with pdfFactory Pro trial version www.pdffactory.com
Rendimiento / Gdia. 1.00 Unidad
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Tarea 1.00 37.05 37.05
Ayudante Tarea 1.00 34.14 34.14
Ayud. Tarea 1.00 34.14 34.14
3.00 105.34 105.34
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 3.00 1.90 5.69
5.69 5.69
3. HERRAMIENTAS
Herramientas Global 1.55
1.55 1.55
MATERIALES
Und Pies/Uni pies $ / Pza $
Entablado (8"x2"x4') 48 5.25 252.00 2.96 142.06
SUB-TOTAL 252.00 142.06 142.06
COSTOS DIRECTOS 254.63
254.63
IMPREVISTOS 3% 7.64
GASTOS GENERALES 0% -
UTILIDAD 10% 25.46
COSTO TOTAL (US$/Pza.) 287.73
Costo de Transporte de Madera 252.00 0.043 10.73
COSTO TOTAL (US$/Pza.) 298.46
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
No incluye cimbra
INSTALACION DE CIMBRAS DE 3.5mX3.5m ( Que incluye las tablas)
PDF created with pdfFactory Pro trial version www.pdffactory.com
12141
Rendimiento / Gdia. 1.00 Unidad
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Tarea 1.00 37.05 37.05
Ayudante Tarea 1.00 34.14 34.14
Ayud. Tarea 1.00 34.14 34.14
3.00 105.34 105.34
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 3.00 1.90 5.69
5.69 5.69
3. HERRAMIENTAS
Herramientas Global 1.55
1.55 1.55
MATERIALES
Und Pies/Uni pies $ / Pza $
Entablado (8"x2"x4') 42 5.25 220.50 2.96 124.30
SUB-TOTAL 220.50 124.30 124.30
COSTOS DIRECTOS 236.87
236.87
IMPREVISTOS 3% 7.11
GASTOS GENERALES 0% -
UTILIDAD 10% 23.69
COSTO TOTAL (US$/Pza.) 267.67
Costo de Transporte de Madera 220.50 0.043 9.39
COSTO TOTAL (US$/Pza.) 277.06
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
No incluye cimbra
INSTALACION DE CIMBRAS DE 10'X10' ( Que incluye las tablas)
PDF created with pdfFactory Pro trial version www.pdffactory.com
12205
Rendimiento / Gdia. 1.00 Unidad
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Tarea 1.00 37.05 37.05
Ayudante Tarea 1.00 34.14 34.14
Ayud. Tarea - 34.14 -
2.00 71.20 71.20
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 2.00 1.90 3.79
3.79 3.79
3. HERRAMIENTAS
Herramientas Global 1.55
1.55 1.55
MATERIALES
Und Pies/Uni pies $ / Pza $
Entablado (8"x2"x4') 0 5.25 - 2.96 -
SUB-TOTAL - - -
COSTOS DIRECTOS 76.53
76.53
IMPREVISTOS 3% 2.30
GASTOS GENERALES 0% -
UTILIDAD 10% 7.65
COSTO TOTAL (US$/Pza.) 86.48
Costo de Transporte de Madera - 0.043 0.00
COSTO TOTAL (US$/Pza.) 86.48
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
No incluye cimbra
INSTALACION DE CIMBRAS DE 10'X10' ( No incluye las tablas)
PDF created with pdfFactory Pro trial version www.pdffactory.com
12160
Rendimiento / Gdia. 1.00 Unidad
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Tarea 1.00 37.05 37.05
Ayudante Tarea 1.00 34.14 34.14
2.00 71.20 71.20
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 2.00 1.90 3.79
3.79 3.79
3. HERRAMIENTAS
Herramientas Global 1.55
1.55 1.55
4. -MATERIALES
Und Pies/Uni pies $ / Pza $
Entablado (8"x2"x4') 36 5.25 189.00 2.96 106.54
SUB-TOTAL 189.00 106.54 106.54
COSTOS DIRECTOS 183.08
183.08
IMPREVISTOS 3% 5.49
GASTOS GENERALES 0% -
UTILIDAD 10% 18.31
COSTO TOTAL (US$/Pza.) 206.87
Costo de Tranbsporte de Madera 189.00 0.043 8.05
COSTO TOTAL (US$/Pza.) 214.92
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
No incluye cimbra
INSTALACION DE CIMBRAS DE 8'X8' ( Incluye las Tablas)
PDF created with pdfFactory Pro trial version www.pdffactory.com
12142
Rendimiento / Gdia. 1.00 Unidad
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Tarea 1.00 37.05 37.05
Ayudante Tarea 1.00 34.14 34.14
Ayud. Tarea 1.00 34.14 34.14
3.00 105.34 105.34
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 3.00 1.90 5.69
5.69 5.69
3. HERRAMIENTAS
Herramientas Global 1.55
1.55 1.55
4.- MATERIALES
Und Pies/Uni pies $ / Pza $
Marchavantes (4"x8') 25 8.25 206.25 4.07 101.65
SUB-TOTAL 206.25 101.65 101.65
COSTOS DIRECTOS 214.23
214.23
IMPREVISTOS 3% 6.43
GASTOS GENERALES 0% -
UTILIDAD 10% 21.42
COSTO TOTAL (US$/Pza.) 242.07
Costo de Tranbsporte de Madera 206.25 0.043 8.78
COSTO TOTAL (US$/Pza.) 250.86
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
No incluye cimbra
La recuperacin de cuadros intermedios se paga por tareas
INSTALACION DE CIMBRAS DE 10'X10' Y 8'X8' (Rehabilitacion+25
Marchavante)
PDF created with pdfFactory Pro trial version www.pdffactory.com
12199
Rendimiento / Gdia. 8.00 M3 480 Bolsacrete
DESCRIPCIN Cantidad Incidencia Costo Vida Costo x Costo/Pza.
UNIDAD Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Tarea 1.00 1.00 35.60 35.60
Ayudante Tarea 1.00 1.00 34.14 34.14
2.00 69.74 8.72
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tarea 2.00 1.90 3.79
3.79 0.47
3. HERRAMIENTAS
Herramientas Global 1.55
1.55 0.19
4. MATERIALES
DESCRIPCION UNIDAD CANTIDAD Estandar CANTIDAD PRECIO
Bolsas/M3 U.S.$/PZA U.S.$
Saco Polipropileno Bolsas 480.00 1.00 480 0.38 182.40
Cemento Bolsas 8.00 2.00 16 11.26 180.14
362.54 45.32
COSTOS DIRECTOS 54.70
54.70
IMPREVISTOS
CONTINGENCIA 3% 1.64
GASTOS GENERALES 0% -
UTILIDAD 10% 5.47
COSTO TOTAL (US$/M3.) 61.81
ELABORACION + INSTALACION BOLSACRETE (Arena+Cemento)
PDF created with pdfFactory Pro trial version www.pdffactory.com
12169
Rendimiento / Gdia. 60.00 Unidad
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Tarea 1.00 37.05 37.05
Ayudante Tarea 1.00 34.14 34.14
2.00 71.20 1.19
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 2.00 1.90 3.79
3.79 0.06
3. HERRAMIENTAS
Herramientas Global 1.55
1.55 0.03
4.- MATERIALES
Und Pies/Uni pies $ / Pza $
Tablas (2"x8"x10') 60 13.12 787.20 7.39 443.37
SUB-TOTAL 787.20 443.37 7.39
COSTOS DIRECTOS 8.67
8.67
IMPREVISTOS 3% 0.26
GASTOS GENERALES 0% -
UTILIDAD 10% 0.87
COSTO TOTAL (US$/Tabla) 9.79
Costo de Tranbsporte de Madera 13.12 0.043 0.56
COSTO TOTAL (US$/Pza.) 10.35
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
No incluye cimbra
La recuperacin de cuadros intermedios se paga por tareas
TABLAS EN CIMBRAS DE 10'X10' Y 8'X8'
PDF created with pdfFactory Pro trial version www.pdffactory.com
12170
Rendimiento / Gdia. 11.00 M2
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Tarea 1.00 35.60 35.60
Ayudante Tarea 1.00 34.14 34.14
2.00 69.74 6.34
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 2.00 1.90 3.79
3.79 0.34
3. HERRAMIENTAS
Herramientas Global 1.55 0.14
4. MATERIALES CANTIDAD PIES2 TOT.PIES2 PRECIO MONTO
Redondos (5"x8) Pza 5 12.88 64.40 6.36 31.79
Tabla (8"x2"x10) Pza 12 13.12 157.44 7.39 88.67
Clavos 6 " Kgs 4 1.44 5.76
Malla Electrosoldada M2 11.00 3.18 34.98
221.84 161.20
14.65
COSTOS DIRECTOS 21.48
21.48
SUPERVISIN -
IMPREVISTOS 3% 0.64
GASTOS GENERALES 0% -
UTILIDAD 10% 2.15
COSTO TOTAL (US$/M2.) 24.27
COSTO DE TRANSPORTE DE MADERA 221.84 0.043 0.86
COSTO TOTAL (US$/M2.) 25.13
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
Malla Electrosoldada y todos los materiales es a costo del Contratista
LABOR >20 MTS SE PAGARA 2% + DEL PU
ENTABLADO DE MADERA CON MALLA PARA RELLENO
PDF created with pdfFactory Pro trial version www.pdffactory.com
12176
Rendimiento / Gdia. 11.00 M2
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Tarea 1.00 35.60 35.60
Ayudante Tarea 1.00 34.14 34.14
2.00 69.74 6.34
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 2.00 1.90 3.79
3.79 0.34
3. HERRAMIENTAS
Herramientas Global 1.55 0.14
4. MATERIALES CANTIDAD PIES2 TOT.PIES2 PRECIO MONTO
Redondos (5"x8) Pza 5 12.88 64.40 6.36 31.79
Tabla (8"x2"x10) Pza 12 13.12 157.44 7.39 88.67
Clavos 6 " Kgs 4 1.44 5.76
Malla ElectrosoldadaM2 0.00 221.84 3.18 -
126.22
11.47
COSTOS DIRECTOS 18.30
18.30
IMPREVISTOS 3% 0.55
GASTOS GENERALES 0% -
UTILIDAD 10% 1.83
COSTO TOTAL (US$/M2.) 20.68
COSTO DE TRANSPORTE DE MADERA 221.84 0.0426 0.86
COSTO TOTAL (US$/M2.) 21.54
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
Malla Electrosoldada y todos los materiales es a costo del Contratista
LABOR >20 MTS SE PAGARA 2% + DEL PU
ENTABLADO DE MADERA SIN MALLA PARA RELLENO
1.80 m
1.50 m
PDF created with pdfFactory Pro trial version www.pdffactory.com
08352
Rendimiento / Gdia. 12.00 M2
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Tarea 1.00 35.60 35.60
Ayudante Tarea 1.00 34.14 34.14
2.00 69.74 5.81
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 2.00 1.90 3.79
-
3.79 0.32
3. HERRAMIENTAS
Herramientas Global 1.55 0.13
4. MATERIALES CANTIDAD PIES2 TOT.PIES2 PRECIO MONTO
Tabla (8"x2"x10) Pza 20 13.12 262.40 7.39 147.79
Clavos 6 " Kgs 5 1.44 7.20
262.40 154.99
12.92
COSTOS DIRECTOS 19.17
19.17
IMPREVISTOS 3% 0.58
GASTOS GENERALES 0% -
UTILIDAD 10% 1.92
COSTO TOTAL (US$/M2.) 21.66
COSTO DE TRANSPORTE DE MADERA 262.40 0.04 0.93
COSTO TOTAL (US$/M2.) 22.60
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
Malla Electrosoldada y todos los materiales es a costo del Contratista
LABOR >20 MTS SE PAGARA 2% + DEL PU
ENTABLADO
1.00 m
1.00 m
PDF created with pdfFactory Pro trial version www.pdffactory.com
08140 TMS/GDIA.: 8.40
ITEM DESCRIPCION INCID. UNI. CANTID. PRECIO SUBTOT. TOTAL
UNITARIO $ US$/ UNID
1.- MANO DE OBRA
Maestro - Tareas 1.00 35.60 $/Tarea 35.60
Ayudante 1.00 34.14 $/Tarea 34.14
2.00
69.74 8.30
2.- IMPLEMENTOS
Implementos Seguridad Tareas 2.00 1.90 3.79
3.79 0.45
3.- HERRAMIENTAS
Global $/gdia 1.67
1.67 0.20
6.- GASTOS INDIRECTOS 8.95
Imprevistos 3% $ 0.27
Gastos Generales 0% 0.00
Utilidad 10% $ 0.90
TOTAL COSTO PALLAQUEO EN DOLARES (US$/ TM) 10.12
PALLAQUEO
Herramientas
PDF created with pdfFactory Pro trial version www.pdffactory.com
08144
Rendimiento TMS/Gdia 2.80 M3
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Tarea 0.25 35.60 8.90
Ayud. Perforista Tarea 0.25 34.14 8.54
0.50 17.44 6.23
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 0.50 1.90 0.95
0.95 0.34
3. HERRAMIENTAS
Herramientas de mina Global 1.67
1.67 0.60
COSTOS DIRECTOS 7.16
COSTOS FIJOS ( van en lista por separado )
7.16
IMPREVISTOS 3% 0.21
GASTOS GENERALES 0% -
UTILIDAD 10% 0.72
COSTO TOTAL (US$/TMS) 8.09
OBSERVACION: Solo se paga siempre y cuando se respeten el Ancho de Minado establecido
PIRCADO DE MEJORA DE LEY
PDF created with pdfFactory Pro trial version www.pdffactory.com
08141
Rendimiento / Gdia. 15.00 Tm/Gdia
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Tarea 1.00 35.60 35.60
Ayudante Tarea 6.00 34.14 204.87
7.00 240.47 16.03
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 7.00 1.90 13.27
13.27 0.88
3. HERRAMIENTAS
Herramientas Global 1.67
1.67 0.11
4. -MATERIALES
Sacos de polipropileno unid (50 Kgs/saco) 300.00 0.38 114.00
SUB-TOTAL 114.00 7.60
COSTOS DIRECTOS 24.63
24.63
IMPREVISTOS 3% 0.74
GASTOS GENERALES 0% -
UTILIDAD 10% 2.46
COSTO TOTAL (US$/Pza.) 27.83
Costo de Transporte de Madera - 0.043 0.00
COSTO TOTAL (US$/Tm.) 27.83
RECUPERACIN DE FINOS
PDF created with pdfFactory Pro trial version www.pdffactory.com
08384
Rendimiento / Gdia. 0.50 Pzas/Gdia
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Tarea 1.00 35.60 35.60
Ayudante Tarea 2.00 34.14 68.29
3.00 103.89 207.77
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 3.00 1.90 5.69
5.69 11.37
3. HERRAMIENTAS
Herramientas Global 1.21
1.21 2.42
4. MATERIALES Und Pies/Uni pies $/Uni $
Tablas 2"*8"4' 14 5.25 73.50 2.96 41.43
Grampa fe corrugado de 3/8" uni 4.00 1.21 4.84
Cemento Bolsa 3.50 11.26 39.41
Clavos 5" Kg. 1.00 1.44 1.44
Clavos 4" Kg. 2.00 1.28 2.56
SUB-TOTAL 73.50 89.68 89.68
5. EQUIPOS
Tecle 2 tn. uni 1.00 245.67 360.00 0.68
0.68 1.36
COSTOS DIRECTOS 312.61
312.61
IMPREVISTOS 3% 9.38
GASTOS GENERALES 0% -
UTILIDAD 10% 31.26
COSTO TOTAL (US$/Pza.) 353.25
Costo de Transporte de Madera 73.50 0.043 3.13
COSTO TOTAL (US$/Pza.) 356.38
Costo Incluye transporte de los materiales a sus labores a cuenta Contrata #DIV/0!
INSTALACION DE VENTILADORES PRINCIPALES HERMETIZADO
PDF created with pdfFactory Pro trial version www.pdffactory.com
08379 Avance Neto/Gdia.(m3)........: 20.00
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/M3
Unit.$ Util Disp. $ (US$/M3.)
MANO DE OBRA
Maestro Tarea 1.00 35.60 1.00 35.60
Ayudante Tarea 1.00 34.14 1.00 34.14
69.74 3.49
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 2.00 1.90 3.79
3.79 0.19
3. HERRAMIENTAS
Herramientas Global 1.67 0.08
4. EQUIPOS
Ventilador Hrs 0.00 0.92 $/hr 0.00
Winche de 20 HP h-m 2.00 3.67 $/hr 7.34
7.34 0.37
COSTOS DIRECTOS 4.13
COSTO INDIRECTOS
IMPREVISTOS 3% 0.12
GASTOS GENERALES 0% -
UTILIDAD 10% 0.41
COSTO TOTAL (US$/M3.) 4.66
RELLENO DETRITICO CON WINCHE
PDF created with pdfFactory Pro trial version www.pdffactory.com
08380
Avance Neto/Gdia.(m3)........: 30.00
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/M3
Unit.$ Util Disp. $ (US$/M3.)
MANO DE OBRA
Maestro Tarea 1.00 35.60 1.00 35.60
Ayudante Tarea 1.00 34.14 1.00 34.14
TOTAL 2.00 69.74 2.32
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 2.00 1.90 3.79
SUB TOTAL 3.79 0.13
3. HERRAMIENTAS
Herramientas Global 1.21 0.04
4. EQUIPOS Unidad Hrs PU
Pala de Linea Hrs 3.00 6.35 $/hr 19.05
SUB TOTAL 19.05 0.64
COSTOS DIRECTOS 3.13
COSTO INDIRECTOS
IMPREVISTOS 3% 0.09
GASTOS GENERALES 0% -
UTILIDAD 10% 0.31
SUB TOTAL INDIRECTOS 0.41
COSTO TOTAL (US$/M3.) 3.53
LIMPIEZA CON PALA DE LINEA
PDF created with pdfFactory Pro trial version www.pdffactory.com
08139
Avance Neto/Gdia.(m
3
): 10.00
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/M3
Unit.$ Util Disp. $ (US$/M3.)
1. MANO DE OBRA
Maestro Tarea 1.00 35.60 1.00 35.60
Ayudante Tarea 1.00 34.14 1.00 34.14
TOTAL 2.00 69.74 6.97
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 2.00 1.90 3.79
SUB TOTAL 3.79 0.38
3. HERRAMIENTAS
Herramientas Global 1.21 0.12
COSTOS DIRECTOS 7.47
COSTO INDIRECTOS
IMPREVISTOS 3% 0.22
GASTOS GENERALES 0% -
UTILIDAD 10% 0.75
SUB TOTAL INDIRECTOS 0.97
COSTO TOTAL (US$/M3.) 8.45
LIMPIEZA A PULSO
PDF created with pdfFactory Pro trial version www.pdffactory.com
08381
Rendimiento / Gdia. 3.00 Unidad
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.60 35.60
Ayud. Enmaderador Tarea 1.00 34.14 34.14
2.00 69.74 23.25
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.90 3.79
3.79 1.26
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.55
1.55 0.52
COSTOS DIRECTOS 25.03
COSTOS FIJOS ( van en lista por separado )
25.03
SUPERVISIN -
IMPREVISTOS 3% 0.75
GASTOS GENERALES 0% -
UTILIDAD 10% 2.50
COSTO TOTAL (US$/Pza.) 28.28
COSTO TOTAL (US$/Pza.) 28.28
RECUPERACION DE CUADRO DE MADERA 7X7, 8'x8', 10X10
PDF created with pdfFactory Pro trial version www.pdffactory.com
12143
Rendimiento / Gdia. 42.50 M2 Taladros: 50
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Tarea 1.00 37.05 37.05
Ayudante Tarea 1.00 34.14 34.14
2.00 71.20 1.68
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 2.00 1.90 3.79
3.79 0.09
3. MATERIALES Y HERRAMIENTAS
Malla Electrosoldada 4'x4' M2 50.00 3.18 1.00 159.00
Cemento Bolsa 1.00 11.26 1.00 11.26
Alambre No16 Kgs 3.00 1.22 1.00 3.66
Grampa de Fe Corrugado 3/8" Pzas 75.00 1.21 1.00 90.75
Herramientas Global 1.55
266.21 6.26
5. EQUIPO PERFORACIN-LIMPIEZA
perforadora P.P. 50.00 0.10 5.00
Barra de 4 P.P. 50.00 68.20 $/uni 1.87
Broca de 40 mm PP 50.00 25.30 $/uni 3.61
Manguera aire 1" Mts. 30.00 2.70 150 0.54
Manguera agua 1/2" Mts. 30.00 1.33 150 0.27
11.29 0.27
COSTOS DIRECTOS 8.29
IMPREVISTOS 3% 0.25
GASTOS GENERALES 0% -
UTILIDAD 10% 0.83
COSTO TOTAL (US$/M2.) 9.37
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
Malla Electrosoldada y todos los materiales es a costo del Contratista
INSTALACION DE MALLA ELECTROSOLDADA
PDF created with pdfFactory Pro trial version www.pdffactory.com
Rendimiento 1 TMS/Guardia
ITEM DESCRIPCION INCID. UNI. CANTID. PRECIO SUBTOT. TOTAL
UNITARIO $ US$/UNID
1.- MANO DE OBRA $/Tarea
Parrillero Tareas 1.00 34.14 34.14
34.14 34.14
2.- IMPLEMENTOS
Implementos seguridad Tareas 1.00 1.90 1.90
1.90 1.90
3.- MATERIALES Y HERRAMIENTAS $/Glb
Herramientas Glb 1.21 1.21
1.21 1.21
37.25
5.- GASTOS INDIRECTOS
Contingencias 3% $ 1.12
Gastos Generales 0% $ 0.00
Utilidad 10% $ 3.73
TOTAL COSTO POR TAREA EN DOLARES (US$/DIA/PARRILERO) 42.09
TOTAL COSTO POR TAREA EN DOLARES (US$/Hr/PARRILERO) 5.26
PARRILLERO
PDF created with pdfFactory Pro trial version www.pdffactory.com
Rendimiento 1 M3/Guardia
ITEM DESCRIPCION INCID. UNI. CANTID. PRECIO SUBTOT. TOTAL
UNITARIO $ US$/UNID
1.- MANO DE OBRA $/Tarea
Bombero Tareas 1.00 34.14 34.14
34.14 34.14
2.- IMPLEMENTOS
Implementos seguridad Tareas 1.00 1.90 1.90
1.90 1.90
3.- MATERIALES Y HERRAMIENTAS $/Glb
Herramientas Glb 1.21 1.21
1.21 1.21
37.25
4.- GASTOS INDIRECTOS
Contingencias 3% $ 1.12
Gastos Generales 0% $ 0.00
Utilidad 10% $ 3.73
TOTAL COSTO POR TAREA EN DOLARES (US$/ DIA/ BOMBERO ) 42.09
TOTAL COSTO POR TAREA EN DOLARES (US$/ Hr/ BOMBERO ) 5.26
BOMBERO
PDF created with pdfFactory Pro trial version www.pdffactory.com
Rendimiento / Gdia. 250 Mts/Cuadrilla Mts/Mes 15,000
DESCRIPCIN Unid. Cant. Costo Vida Costo x
Unit.$ Util Disp. $ (US$/MTS.)
1. MANO DE OBRA
Maestro Tarea 1.00 35.60 35.60
Ayudante Tarea 1.00 34.14 34.14
2.00 69.74 0.28
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 2.00 1.90 3.79
3.79 0.02
3. HERRAMIENTAS
Herramientas Global 1.21
1.21 0.00
COSTOS DIRECTOS $ 0.30
IMPREVISTOS 3% $ 0.01
GASTOS GENERALES 0% $ 0.00
UTILIDAD 10% $ 0.03
COSTO TOTAL (US$/MTS) 0.34
NOTA:
1. empalmado e instalacion
INSTALACION TUBERIA POLIETILENO 2" EN LINEA RECTA (Incluye
Traslado)
PDF created with pdfFactory Pro trial version www.pdffactory.com
Rendimiento / Gdia. 150 Mts/Cuadrilla Mts/Mes 15,000
DESCRIPCIN Unid. Cant. Costo Vida Costo x
Unit.$ Util Disp. $ (US$/MTS.)
1. MANO DE OBRA
Maestro Tarea 1.00 35.60 35.60
Ayudante Tarea 1.00 34.14 34.14
2.00 69.74 0.46
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 2.00 1.90 3.79
3.79 0.03
3. HERRAMIENTAS
Herramientas Global 1.21
1.21 0.01
COSTOS DIRECTOS $ 0.50
IMPREVISTOS 3% $ 0.01
GASTOS GENERALES 0% $ 0.00
UTILIDAD 10% $ 0.05
COSTO TOTAL (US$/MTS) 0.56
NOTA:
1. empalmado e instalacion
INSTALACION TUBERIA POLIETILENO 2" (CURVAS-CODOS) Incluye
Traslado
PDF created with pdfFactory Pro trial version www.pdffactory.com
Rendimiento / Gdia. 200 Mts/Cuadrilla
DESCRIPCIN Unid. Cant. Costo Vida Costo x
Unit.$ Util Disp. $ (US$/MTS.)
1. MANO DE OBRA
Maestro Tarea 1.00 35.60 35.60
Ayudante Tarea 2.00 34.14 68.29
3.00 103.89 0.52
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 3.00 1.90 5.69
5.69 0.03
3. HERRAMIENTAS
Herramientas Global 1.21
1.21 0.01
COSTOS DIRECTOS $ 0.55
IMPREVISTOS 3% $ 0.02
GASTOS GENERALES 0% $ 0.00
UTILIDAD 10% $ 0.06
COSTO TOTAL (US$/MTS) 0.63
NOTA:
1. empalmado e instalacion
INSTALACION TUBERIA POLIETILENO 4" EN LINEA RECTA (Incluye
Traslado)
PDF created with pdfFactory Pro trial version www.pdffactory.com
Rendimiento / Gdia. 150 Mts/Cuadrilla
DESCRIPCIN Unid. Cant. Costo Vida Costo x
Unit.$ Util Disp. $ (US$/MTS.)
1. MANO DE OBRA
Maestro Tarea 1.00 35.60 35.60
Ayudante Tarea 2.00 34.14 68.29
3.00 103.89 0.69
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 3.00 1.90 5.69
5.69 0.04
3. HERRAMIENTAS
Herramientas Global 1.21
1.21 0.01
COSTOS DIRECTOS $ 0.74
IMPREVISTOS 3% $ 0.02
GASTOS GENERALES 0% $ 0.00
UTILIDAD 10% $ 0.07
COSTO TOTAL (US$/MTS) 0.83
NOTA:
1. empalmado e instalacion
INSTALACION TUBERIA POLIETILENO 4" (EN CURVAS-CODOS) Incluye
Traslado
PDF created with pdfFactory Pro trial version www.pdffactory.com
Rendimiento 1 Cambio/Cuadrilla
ITEM DESCRIPCION UNI. CANTID. PRECIO SUBTOT. TOTAL
UNITARIO $ US$/UNID
1.- MANO DE OBRA $/Tarea
Carrilano Tareas 1.00 35.60 35.60
Ayudante Tareas 1.00 34.14 34.14
69.74 69.74
2.- IMPLEMENTOS
Implementos seguridad Tareas 2.00 1.90 3.79
3.79 3.79
3.- MATERIALES Y HERRAMIENTAS $/Glb
Herramientas Glb 1.21 1.21
1.21 1.21
$ 74.74
4.- GASTOS INDIRECTOS
Contingencias 3% $ 2.24
Gastos Generales 0% $ 0.00
Utilidad 10% $ 7.47
COSTO TOTAL POR CAMBIO (US$/CAMBIO) 84.46
INSTALACION DE CAMBIO DE VIA
PDF created with pdfFactory Pro trial version www.pdffactory.com
Rendimiento / Gdia. 36 Mts/Gdia
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Tarea 3.00 35.60 106.79
Ayudante Tarea 5.00 34.14 170.72
8.00 277.52 7.71
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 8.00 1.90 15.17
15.17 0.42
3. HERRAMIENTAS
Herramientas Global 1.55
1.55 0.04
4. -MATERIALES (Durmiente)
Und Pies/Uni pies $/Pza $
Durmiente (8"x8"x5') 27.07 26.25 710.53 31.04 840.27
710.53 840.27 23.34
COSTOS DIRECTOS 31.51
IMPREVISTOS 3% 0.95
GASTOS GENERALES 0% -
UTILIDAD 10% 3.15
COSTO TOTAL (US$/Pza.) 35.61
Costo de Tranbsporte de Madera 710.53 0.043 0.84
COSTO TOTAL (US$/Collera.) 36.45
Costo Incluye transporte de los materiales a sus labores a cuenta Contrata
INSTALACION DE LINEA DE CAUVILLE PRINCIPALES (45 Lbrs/Yd) Incluye Traslado
PDF created with pdfFactory Pro trial version www.pdffactory.com
Rendimiento / Gdia. 30 Mts/Gdia
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Tarea 3.00 35.60 106.79
Ayudante Tarea 5.00 34.14 170.72
8.00 277.52 9.25
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 8.00 1.90 15.17
15.17 0.51
3. HERRAMIENTAS
Herramientas Global 1.55
1.55 0.05
4. -MATERIALES (Durmiente)
Und Pies/Uni pies $/Pza $
Durmiente (8"x8"x5') 22.56 26.25 592.11 31.04 700.23
592.11 700.23 23.34
COSTOS DIRECTOS 33.15
IMPREVISTOS 3% 0.99
GASTOS GENERALES 0% -
UTILIDAD 10% 3.31
COSTO TOTAL (US$/Pza.) 37.46
Costo de Tranbsporte de Madera 592.11 0.05 1.06
COSTO TOTAL (US$/Collera.) 38.52
Costo Incluye transporte de los materiales a sus labores a cuenta Contrata
INSTALACION DE LINEA DE CAUVILLE PRINCIPALES (60 Lbrs/Yd) Incluye Traslado
PDF created with pdfFactory Pro trial version www.pdffactory.com
Rendimiento / Gdia. 18 Durmientes/Gdia
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Tarea 1.00 35.60 35.60
Ayudante Tarea 2.00 34.14 68.29
3.00 103.89 5.77
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 3.00 1.90 5.69
5.69 0.32
3. HERRAMIENTAS
Herramientas Global 1.55
1.55 0.09
4. -MATERIALES (Durmiente)
Und Pies/Uni pies $/Pza $
Durmiente (8"x4"x4') 13.53 10.33 139.80 5.91 80.01
139.80 80.01 4.44
COSTOS DIRECTOS 10.62
IMPREVISTOS 3% 0.32
GASTOS GENERALES 0% -
UTILIDAD 10% 1.06
COSTO TOTAL (US$/Pza.) 12.00
Costo de Tranbsporte de Madera 139.80 0.04 0.33
COSTO TOTAL (US$/Collera.) 12.33
Costo Incluye transporte de los materiales a sus labores a cuenta Contrata
REPARACION DE LINEA DE CAUVILLE PRINCIPALES (30-45-60 Lbrs/Yd) (Cambio de
durmientes)
PDF created with pdfFactory Pro trial version www.pdffactory.com
Rendimiento / Gdia. 200 Mts/Gdia
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util $ (US$/UNI.)
1. MANO DE OBRA
Maestro Tarea 1.00 35.60 35.60
1.00 35.60 0.18
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 1.00 1.90 1.90
1.90 0.01
3. HERRAMIENTAS
Herramientas Global 1.55
1.55 0.01
COSTOS DIRECTOS $ 0.20
IMPREVISTOS 3% $ 0.01
GASTOS GENERALES 0% $ 0.00
UTILIDAD 10% $ 0.02
COSTO TOTAL (US$/MT) 0.22
EQUIPO CMHSA
LIMPIEZA DE CUNETA CON MINICARGADOR
PDF created with pdfFactory Pro trial version www.pdffactory.com
Rendimiento / Gdia. 200 Mts/Gdia
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util $ (US$/UNI.)
1. MANO DE OBRA
Maestro Tarea 1.00 35.60 35.60
1.00 35.60 0.18
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 1.00 1.90 1.90
1.90 0.01
3. HERRAMIENTAS
Herramientas Global 1.55
1.55 0.01
COSTOS DIRECTOS $ 0.20
IMPREVISTOS 3% $ 0.01
GASTOS GENERALES 0% $ 0.00
UTILIDAD 10% $ 0.02
COSTO TOTAL (US$/MT) 0.22
EQUIPO CMHSA
LIMPIEZA DE VIA CON MINICARGADOR
PDF created with pdfFactory Pro trial version www.pdffactory.com
Rendimiento / Gdia. 1.00 Unid/Gdia
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util $ (US$/UNI.)
1. MANO DE OBRA
Maestro Tarea 1.00 35.60 35.60
Ayudante Tarea 2.00 34.14 68.29
3.00 103.89 103.89
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 3.00 1.90 5.69
5.69 5.69
3. HERRAMIENTAS
Herramientas Global 1.55
1.55 1.55
COSTOS DIRECTOS $ 111.12
IMPREVISTOS 3% $ 3.33
GASTOS GENERALES 0% $ 0.00
UTILIDAD 10% $ 11.11
COSTO TOTAL (US$/UNI) 125.57
EQUIPO CMHSA
TRASLADO DE WINCHE DE INTERIOR MINA A MANTENIMIENTO(VICEVERSA)
PDF created with pdfFactory Pro trial version www.pdffactory.com
Rendimiento / Gdia. 3 Uni/Gdia
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util $ (US$/UNI)
1. MANO DE OBRA
Maestro Tarea 1.00 35.60 35.60
Ayudante Tarea 1.00 34.14 34.14
2.00 69.74 23.25
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 2.00 1.90 3.79
3.79 1.26
3. HERRAMIENTAS
Herramientas Global 1.21
1.21 0.40
COSTOS DIRECTOS $ 24.91
IMPREVISTOS 3% $ 0.75
GASTOS GENERALES 0% $ 0.00
UTILIDAD 10% $ 2.49
COSTO TOTAL (US$/UNI) 28.15
Cable y Estrobo Cta CMHSA
INSTALACION DE VENTILADOR (5HP - 20 HP)
PDF created with pdfFactory Pro trial version www.pdffactory.com
Rendimiento / Gdia. 0.5 Uni/Gdia
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util $ (US$/UNI.)
1. MANO DE OBRA
Maestro Tarea 1.00 35.60 35.60
Ayudante Tarea 1.00 34.14 34.14
2.00 69.74 139.48
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 2.00 1.90 3.79
3.79 7.58
3. HERRAMIENTAS
Herramientas Global 1.55
1.55 3.09
COSTOS DIRECTOS $ 150.16
IMPREVISTOS 3% $ 4.50
GASTOS GENERALES 0% $ 0.00
UTILIDAD 10% $ 15.02
COSTO TOTAL (US$/UNI) 169.68
Cable y Estrobo Cta CMHSA
INSTALACION DE VENTILADOR + CONSTRUCCION DE PLATAFORMA DE MADERA Y
TAPON DE MADERA (25Hp a 50Hp)
PDF created with pdfFactory Pro trial version www.pdffactory.com
Rendimiento / Gdia. 2 Uni/Gdia
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util $ (US$/UNI.)
1. MANO DE OBRA
Maestro Tarea 1.00 35.60 35.60
Ayudante Tarea 2.00 34.14 68.29
3.00 103.89 51.94
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 3.00 1.90 5.69
5.69 2.84
3. HERRAMIENTAS
Herramientas Global 1.55
1.55 0.77
COSTOS DIRECTOS $ 55.56
IMPREVISTOS 3% $ 1.67
GASTOS GENERALES 0% $ 0.00
UTILIDAD 10% $ 5.56
COSTO TOTAL (US$/UNI) 62.78
Cable y Estrobo Cta CMHSA
INSTALACION VENTILADOR (80Hp a 250Hp)
PDF created with pdfFactory Pro trial version www.pdffactory.com
Rendimiento / Gdia. 1 Uni/Gdia
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util $ (US$/UNI.)
1. MANO DE OBRA
Maestro Tarea 1.00 35.60 35.60
Ayudante Tarea 1.00 34.14 34.14
2.00 69.74 69.74
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 2.00 1.90 3.79
3.79 3.79
3. HERRAMIENTAS
Herramientas Global 1.55
1.55 1.55
COSTOS DIRECTOS $ 75.08
IMPREVISTOS 3% $ 2.25
GASTOS GENERALES 0% $ 0.00
UTILIDAD 10% $ 7.51
COSTO TOTAL (US$/UNI) 84.84
Cable y Estrobo Cta CMHSA
INSTALACION DE VENTILADOR + CONSTRUCCION DE PLATAFORMA DE
MADERA (25Hp a 50Hp)
PDF created with pdfFactory Pro trial version www.pdffactory.com
Rendimiento / Gdia. 150 Mts/Gdia 10 Mangas
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Tarea 1.00 35.60 35.60
Ayudante Tarea 1.00 34.14 34.14
2.00 69.74 0.46
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 2.00 1.90 3.79
3.79 0.03
3. HERRAMIENTAS
Herramientas Global 1.21
1.21 0.01
COSTOS DIRECTOS $ 0.50
IMPREVISTOS 3% $ 0.01
GASTOS GENERALES 0% $ 0.00
UTILIDAD 10% $ 0.05
COSTO TOTAL (US$/MTS) 0.56
Material costo CMHSA(Linea Guia)
PROLONGACION DE MANGA DE VENTILACION 10" - 18" (Incluye Linea Gua con material
CMHSA)
PDF created with pdfFactory Pro trial version www.pdffactory.com
Rendimiento / Gdia. 165 Mts/Gdia 15 Mangas
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Tarea 1.00 35.60 35.60
Ayudante Tarea 2.00 34.14 68.29
3.00 103.89 0.63
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 3.00 1.90 5.69
5.69 0.03
3. HERRAMIENTAS
Herramientas Global 1.21
1.21 0.01
COSTOS DIRECTOS $ 0.67
IMPREVISTOS 3% $ 0.02
GASTOS GENERALES 0% $ 0.00
UTILIDAD 10% $ 0.07
COSTO TOTAL (US$/MTS) 0.76
Material costo CMHSA(Linea Guia)
PROLONGACION DE MANGAS DE VENTILACION 24" - 30" (Incluye Linea Gua con
material CMHSA)
PDF created with pdfFactory Pro trial version www.pdffactory.com
Rendimiento / Gdia. 150 Mts/Gdia 6 Mangas
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Tarea 1.00 35.60 35.60
Ayudante Tarea 1.00 34.14 34.14
2.00 69.74 0.46
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 2.00 1.90 3.79
3.79 0.03
3. HERRAMIENTAS
Herramientas Global 1.21
1.21 0.01
COSTOS DIRECTOS $ 0.50
IMPREVISTOS 3% $ 0.01
GASTOS GENERALES 0% $ 0.00
UTILIDAD 10% $ 0.05
COSTO TOTAL (US$/MTS) 0.56
Material costo CMHSA(Linea Guia)
CAMBIO DE MANGAS DE VENTILACION 10" - 18"
PDF created with pdfFactory Pro trial version www.pdffactory.com
Rendimiento / Gdia. 165 Mts/Gdia 15 Mangas
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Tarea 1.00 35.60 35.60
Ayudante Tarea 2.00 34.14 68.29
3.00 103.89 0.63
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 3.00 1.90 5.69
5.69 0.03
3. HERRAMIENTAS
Herramientas Global 1.21
1.21 0.01
COSTOS DIRECTOS $ 0.67
IMPREVISTOS 3% $ 0.02
GASTOS GENERALES 0% $ 0.00
UTILIDAD 10% $ 0.07
COSTO TOTAL (US$/MTS) 0.76
CAMBIO DE MANGAS DE VENTILACION 24" - 30"
PDF created with pdfFactory Pro trial version www.pdffactory.com
Rendimiento / Gdia. 100 Mts/Gdia 10 Mangas
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Tarea 1.00 35.60 35.60
Ayudante Tarea 1.00 34.14 34.14
2.00 69.74 0.70
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 2.00 1.90 3.79
3.79 0.04
3. HERRAMIENTAS
Herramientas Global 1.21
1.21 0.01
COSTOS DIRECTOS $ 0.75
IMPREVISTOS 3% $ 0.02
GASTOS GENERALES 0% $ 0.00
UTILIDAD 10% $ 0.07
COSTO TOTAL (US$/MTS) 0.84
Material costo CMHSA(Linea Guia)
REPARACION DE MANGAS DE VENTILACION 10" - 18"
PDF created with pdfFactory Pro trial version www.pdffactory.com
Rendimiento / Gdia. 100 Mts/Gdia 10 Mangas
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Tarea 1.00 35.60 35.60
Ayudante Tarea 2.00 34.14 68.29
3.00 103.89 1.04
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 3.00 1.90 5.69
5.69 0.06
3. HERRAMIENTAS
Herramientas Global 1.21
1.21 0.01
COSTOS DIRECTOS $ 1.11
IMPREVISTOS 3% $ 0.03
GASTOS GENERALES 0% $ 0.00
UTILIDAD 10% $ 0.11
COSTO TOTAL (US$/MTS) 1.25
Material costo CMHSA(Linea Guia)
REPARACION DE MANGAS DE VENTILACION - 24" - 30"
PDF created with pdfFactory Pro trial version www.pdffactory.com
Rendimiento / Gdia. 2.5 Uni/Gdia
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util $ (US$/UNI.)
1. MANO DE OBRA
Maestro Tarea 1.00 35.60 35.60
Ayudante Tarea 1.00 34.14 34.14
2.00 69.74 27.90
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 2.00 1.90 3.79
3.79 1.52
3. HERRAMIENTAS
Herramientas Global 1.55
1.55 0.62
COSTOS DIRECTOS $ 30.03
IMPREVISTOS 3% $ 0.90
GASTOS GENERALES 0% $ 0.00
UTILIDAD 10% $ 3.00
COSTO TOTAL (US$/UNI) 33.94
Cables y Estrobo Cta CMHSA
RECUPERAR Y TRASLADAR VENTILADOR (5Hp a 20Hp) DE INTERIOR MINA A
SUPERFICIE O VICEVERSA E INTERIOR MINA A INTERIOR MINA
PDF created with pdfFactory Pro trial version www.pdffactory.com
Rendimiento / Gdia. 1.5 Uni/Gdia
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util $ (US$/UNI.)
1. MANO DE OBRA
Maestro Tarea 1.00 35.60 35.60
Ayudante Tarea 1.00 34.14 34.14
2.00 69.74 46.49
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 2.00 1.90 3.79
3.79 2.53
3. HERRAMIENTAS
Herramientas Global 1.55
1.55 1.03
COSTOS DIRECTOS $ 50.05
IMPREVISTOS 3% $ 1.50
GASTOS GENERALES 0% $ 0.00
UTILIDAD 10% $ 5.01
COSTO TOTAL (US$/UNI) 56.56
Cables y Estrobo Cta CMHSA
RECUPERAR Y TRASLADAR VENTILADOR (25Hp a 50Hp) DE INTERIOR MINA A
SUPERFICIE O VICEVERSA E INTERIOR MINA A INTERIOR MINA
PDF created with pdfFactory Pro trial version www.pdffactory.com
Rendimiento / Gdia. 1 Uni/Gdia
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util $ (US$/UNI.)
1. MANO DE OBRA
Maestro Tarea 1.00 35.60 35.60
Ayudante Tarea 2.00 34.14 68.29
3.00 103.89 103.89
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 3.00 1.90 5.69
5.69 5.69
3. HERRAMIENTAS
Herramientas Global 1.55
1.55 1.55
COSTOS DIRECTOS $ 111.12
IMPREVISTOS 3% $ 3.33
GASTOS GENERALES 0% $ 0.00
UTILIDAD 10% $ 11.11
COSTO TOTAL (US$/UNI) 125.57
Cables y Estrobo Cta CMHSA
RECUPERAR Y TRASLADAR VENTILADOR (80Hp a 250Hp) DE INTERIOR MINA A
SUPERFICIE O VICEVERSA E INTERIOR MINA A INTERIOR MINA
PDF created with pdfFactory Pro trial version www.pdffactory.com
Rendimiento / Gdia. 1 Uni/Gdia
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util $ (US$/UNI.)
1. MANO DE OBRA
Maestro Tarea 1.00 35.60 35.60
Ayudante Tarea 1.00 34.14 34.14
2.00 69.74 69.74
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 2.00 1.90 3.79
3.79 3.79
3. HERRAMIENTAS
Herramientas Global 1.55
1.55 1.55
COSTOS DIRECTOS $ 75.08
IMPREVISTOS 3% $ 2.25
GASTOS GENERALES 0% $ 0.00
UTILIDAD 10% $ 7.51
COSTO TOTAL (US$/UNI) 84.84
CONSTRUCCION DE TAPON DE MADERA (SECCION 2.4m x 2.4m A 3.5m x 3.5m)
CON PUERTA (SECCION 1.5 m x 0.6 m)
PDF created with pdfFactory Pro trial version www.pdffactory.com
Rendimiento / Gdia. 2.5 Uni/Gdia
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util $ (US$/UNI.)
1. MANO DE OBRA
Maestro Tarea 1.00 35.60 35.60
Ayudante Tarea 1.00 34.14 34.14
2.00 69.74 27.90
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 2.00 1.90 3.79
3.79 1.52
3. HERRAMIENTAS
Herramientas Global 1.55
1.55 0.62
COSTOS DIRECTOS $ 30.03
IMPREVISTOS 3% $ 0.90
GASTOS GENERALES 0% $ 0.00
UTILIDAD 10% $ 3.00
COSTO TOTAL (US$/UNI) 33.94
REPARACION DE TAPON DE MADERA O LADRILLO
PDF created with pdfFactory Pro trial version www.pdffactory.com
Rendimiento / Gdia. 0.75 Uni/Gdia
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util $ (US$/UNI.)
1. MANO DE OBRA
Maestro Tarea 1.00 35.60 35.60
Ayudante Tarea 1.00 34.14 34.14
2.00 69.74 92.99
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 2.00 1.90 3.79
3.79 5.06
3. HERRAMIENTAS
Herramientas Global 1.55
1.55 2.06
COSTOS DIRECTOS $ 100.11
IMPREVISTOS 3% $ 3.00
GASTOS GENERALES 0% $ 0.00
UTILIDAD 10% $ 10.01
COSTO TOTAL (US$/UNI) 113.12
CONSTRUCCION DE PUERTA DE MADERA (SECCION 2m x 2m a 3.5m x 3.5m)
PDF created with pdfFactory Pro trial version www.pdffactory.com
Rendimiento / Gdia. 500 Mts/Gdia
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util $ (US$/UNI.)
1. MANO DE OBRA
Maestro Tarea 1.00 35.60 35.60
Ayudante Tarea 1.00 34.14 34.14
2.00 69.74 0.14
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 2.00 1.90 3.79
3.79 0.01
3. HERRAMIENTAS
Herramientas Global 1.55
1.55 0.00
COSTOS DIRECTOS $ 0.15
IMPREVISTOS 3% $ 0.00
GASTOS GENERALES 0% $ 0.00
UTILIDAD 10% $ 0.02
COSTO TOTAL (US$/Mts) 0.17
RECUPERAR MANGA 10" - 30"
PDF created with pdfFactory Pro trial version www.pdffactory.com
CLIENTE: CONSORCIO MINER0 HORIZONTE S.A.
N Taladros: 17
INSTALACION DE LINEA TROLLEY N Tal.carg.: 17 Unid
Rendimiento 40 Mts/Guardia
ITEM DESCRIPCION INCID. UNI. CANTID. PRECIO SUBTOT. TOTAL
UNITARIO $ US$/UNID
1.- MANO DE OBRA
Perforistas Tareas 1 37.05 $/Tarea 37.05
Ayudante Tareas 1 34.14 $/Tarea 34.14
Peon Tareas 2 34.14 $/Tarea 68.29
139.48 3.49
2.- IMPLEMENTOS
Implementos seguridad Tareas 4 1.47 5.90
5.90 0.15
3.- MATERIALES Y HERRAMIENTAS
Barra de 4 P.P. 51.00 68.20 $/uni 1.91
Broca de 38 mm PP 51.00 25.30 $/uni 3.69
Aceite de Perforacin Gln. 0.21 9.16 $/uni 1.92
Pintura spray rojo uni 1.70 2.86 $/uni 4.86
Oxigeno M3 1.70 44.56 $/m3 75.75
Acetileno Kg. 0.34 110.93 $/kg. 37.72
Pintura esmalte Gln. 0.25 9.31 $/uni 2.33
Escalera uni 1.00 12.64 $/uni 12.64
Cancamos uni 18.00 5.67 $/uni 102.06
Soldadura Kg. 3.71 3.84 $/kg. 14.23
Cemento Kg. 1.02 11.26 $/kg. 11.48
268.59 6.71
4.- EQUIPOS
Tecle 2 tn. uni 1.00 245.67 360 0.68
Perforadora P.P. 51.00 0.10 $/pp 5.10
5.78 0.14
10.49
5.-
GASTOS INDIRECTOS
Contingencias 3% $ 0.31
Gastos Generales 0% $ 0.00
Utilidad 10% $ 1.05
TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L) 11.86
FORMATO DE PRECIOS UNITARIOS
U. E. A. PARCOY
PDF created with pdfFactory Pro trial version www.pdffactory.com
N Taladros: 8 Unid.
Rendimiento 20 Mts/Guardia
ITEMDESCRIPCION INCID. UNI. CANTID. PRECIO SUBTOT. TOTAL
UNITARIO $ US$/UNID
1.- MANO DE OBRA
Perforistas Tareas 1.00 37.05 $/Tarea 37.05
Ayudante Tareas 1.00 34.14 $/Tarea 34.14
Peon Tareas 1.00 34.14 $/Tarea 34.14
105.34 5.27
2.- IMPLEMENTOS
Implementos seguridad Tareas 3.00 1.90 5.69
5.69 0.28
3.- MATERIALES Y HERRAMIENTAS
Barra de 4 P.P. 2.00 68.20 $/uni 0.07
Broca de 38 mm PP 2.00 25.30 $/uni 0.14
Oxigeno M3 1.34 44.56 $/uni 59.71
Acetileno Kg. 0.06 110.93 $/uni 6.66
Aceite de Perforacin Gln. 0.21 9.16 $/uni 1.92
Alcayatas 3/4" uni 8.00 3.36 $/uni 26.88
Soldadura Kg. 2.50 3.90 $/kg. 9.75
Cadena 3/16" m. 5.00 2.41 $/m. 12.05
Cemento Kg. 0.48 11.26 $/kg. 5.40
Perno hexagonal Jgo. 8.00 1.16 $/kg. 9.28
131.87 6.59
4.- EQUIPOS
Perforadora P.P. 2.00 0.10 $/pp 0.20
0.20 0.01
12.16
5.- GASTOS INDIRECTOS
Contingencias 3% $ 0.36
Gastos Generales 0% $ 0.00
Utilidad 10% $ 1.22
TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L) 13.74
INSTALACION DE TUBERIA 6",8",10" ALVENIOUS
PDF created with pdfFactory Pro trial version www.pdffactory.com
12555
Rendimiento / Gdia. 60.00 Unidad 4 fts
DESCRIPCIN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Tarea 0.70 37.05 25.94
Ayudante Tarea 0.70 34.14 23.90
1.40 49.84 0.83
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 1.40 1.90 2.65
2.65 0.04
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.67
- -
5. MATERIALES DE PERFORACION
Barra conica 6" Pies 240.00 94.60 1,820 12.47
Broca 40 mm Pza 240.00 25.30 350 17.35
Aceite Perforacin Gln. 0.17 9.16 1.56
Cacho de toro (3/4" x 1.80m) Pza. 60.00 5.88 352.80
384.18 6.40
6. EQUIPO PERFORACIN-LIMPIEZA
perforadora P.P. 240.00 0.10 24.00
Manguera aire 1" Mts. 30.00 2.70 150 0.54
Manguera agua 1/2" Mts. 30.00 1.33 150 0.27
24.81 0.41
COSTOS DIRECTOS 7.69
IMPREVISTOS 3% 0.23
GASTOS GENERALES 0% -
UTILIDAD 10% 0.77
COSTO TOTAL (US$/Pza.) 8.69
COSTO TOTAL (US$/Pza.) 8.69
CACHO DE TORO (En avances y Tajeos)
PDF created with pdfFactory Pro trial version www.pdffactory.com
Rendimiento 2.00 (Anillos+Concreto)/Gdia 1.00 M3
1. MANO DE OBRA
DESCRIPCIN Unid. Cant. C. Unit.$ U.S.$ U.S.$/M3.
Operario tarea 1.00 35.60 35.60
Oficial tarea 2.00 34.14 68.29
Peon tarea 1.00 34.14 34.14
Sub Total 4.00 138.03 69.02
2. IMPLEMENTOS SEGURIDAD
DESCRIPCION Unid. Cant. C. Unit.$ Factor U.S.$
Implementos Seguridad Maestro Unid. 3.00 1.90 1.00 5.69
Implementos Seguridad ayudantes Unid. 1.00 1.90 1.00 1.90
SUB TOTAL 7.58 3.79
3. HERRAMIENTAS
DESCRIPCION Unid. Cant. C. Unit.$ Factor U.S.$
Herramientas Glb 2.00 1.62 1.00 3.23
SUB TOTAL 3.23 1.62
A1= 3.53 M2
4. MATERIALES A2= 2.26 M2
DESCRIPCION Unid. Cant. C. Unit.$ Factor U.S.$ Diferencia= 1.27 M2
Cemento porthand tipo I (8 Bolzas x M3) Bol 6.00 11.26 1.00 67.55 Volumen = 1.27 M3
Soldadura Cellocord 5/32 Kgs 2.00 3.90 1.00 7.80
Soldadura Superciro 5/32 Kgs 1.50 3.84 1.00 5.76
Maquina Soldar Hrs 2.00 1.00 1.00 2.00
SUB TOTAL 83.11 41.56 No Anillos 2.12 Pzas
5. EQUIPOS Und
DESCRIPCION Unid. Cant. C. Unit.$ Factor U.S.$
Mezcladora Unid. - 4.44 1.00 -
SUB TOTAL - -
COSTOS DIRECTOS 115.98
IMPREVISTOS 3% 3.48
GASTOS GENERALES 0% -
UTILIDAD 10% 11.60
COSTOS INDIRECTOS 15.08
COSTO TOTAL (US$/M3) 131.06
Nota: Material puesto en la labor, Mezcla de Concreto y Scooptram+ Anillo Metalico a costo de CMHSA
Anillo con revestimiento Concreto Fc=140 Kgs/Cm2(Pie y Boca Chimenea)
ANILLADO+CONCRETO(Concreto:6 bolsas cemento/M3)
1.50m
1.20m
ANILLADO+CONCRETO(Concreto:6 bolsas cemento/M3)
PDF created with pdfFactory Pro trial version www.pdffactory.com
Rendimiento 3.00 (Anillos+Concreto)/Gdia 1.00 M3
1. MANO DE OBRA
DESCRIPCIN Unid. Cant. C. Unit.$ U.S.$ U.S.$/M3.
Operario tarea 1.00 35.60 35.60
Oficial tarea 2.00 34.14 68.29
Peon tarea 1.00 34.14 34.14
Sub Total 4.00 138.03 46.01
2. IMPLEMENTOS SEGURIDAD A1= 3.53 M2
DESCRIPCION Unid. Cant. C. Unit.$ Factor U.S.$ A2= 2.26 M2
Implementos Seguridad Maestro Unid. 3.00 1.90 1.00 5.69 Diferencia= 1.27 M2
Implementos Seguridad ayudantes Unid. 1.00 1.90 1.00 1.90 Volumen = 1.27 M3
SUB TOTAL 7.58 2.53 No Anillos 2.12 Pzas
3. HERRAMIENTAS
DESCRIPCION Unid. Cant. C. Unit.$ Factor U.S.$
Herramientas Glb 2.00 1.62 1.00 3.23
SUB TOTAL 3.23 1.08
4. MATERIALES
DESCRIPCION Unid. Cant. C. Unit.$ Factor U.S.$
Cemento porthand tipo I (8 Bolzas x M3) Bol 1.00 11.26 1.00 11.26
Soldadura Cellocord 5/32 Kgs 2.00 3.90 1.00 7.80
Soldadura Superciro 5/32 Kgs 1.50 3.84 1.00 5.76
Maquina Soldar Hrs 2.00 1.00 1.00 2.00
SUB TOTAL 26.82 8.94
5. EQUIPOS Und
DESCRIPCION Unid. Cant. C. Unit.$ Factor U.S.$
Mezcladora Unid. - 4.44 1.00 -
SUB TOTAL - -
COSTOS DIRECTOS 58.56
IMPREVISTOS 3% 1.76
GASTOS GENERALES 0% -
UTILIDAD 10% 5.86
COSTOS INDIRECTOS 7.61
COSTO TOTAL (US$/M3) 66.17
Nota: Material puesto en la labor y Scooptram + Anillo Metalico a costo de CMHSA
Anillo con revestimiento Concreto Fc=30 Kgs/Cm2(Columna Chimenea)
ANILLADO+CONCRETO(1 bolsas cemento+Arena)
1.50m
1.20m
PDF created with pdfFactory Pro trial version www.pdffactory.com
Unid. Cant.
Costo
Unit.$
Vida Util
Costo x
Tarea
Costo
(US$/Tarea)
1. MANO DE OBRA
Ayudante Perforista Tarea 1.00 29.04 29.04
SUB TOTAL 29.04
2. IMPLEMENTOS SEGURIDAD MINEROS SUBTERRANEO
Unid. Cant.
Precio
US$/Unid.
Vida Util
(Disparos)
Costo Unitario
por Disparo
Botas de Jebe Punta Acero Par 1.00 19.57 183 0.11
Chaleco de malla con cinta reflectiva Pza 1.00 7.34 90 0.08
Casco Tipo Sombrero Portalmpara Pza 1.00 11.32 1,095 0.01
Casco Tipo Sombrero Portalampara con orejera Pza 0.00 51.47 1,095 0.00
Faja ergonomica de proteccion lumbar Pza 0.00 7.11 183 0.00
Barbiquejo Elstico Gancho Metlico SEKUR Uni 1.00 0.68 90 0.01
Respirador Pza 1.00 23.13 365 0.06
Filtro Par 2.00 3.18 60 0.11
Cartucho para gases Par 0.60 4.52 365 0.01
Retenedor Par 2.00 2.63 365 0.01
Guante de cuero Par 1.00 3.30 7 0.47
Correa Portalmpara Faja Plana 1 1/2" Uni 1.00 3.63 365 0.01
Tapn de Oido Uni 1.00 0.63 45 0.01
Mameluco Jean Uni 1.00 18.67 183 0.10
Pantaln de Jebe Uni 1.00 12.56 90 0.14
Casaca de Jebe Uni 1.00 12.56 90 0.14
Lmpara Uni 1.00 17.00 30 0.57
Anteojos de cristal endurecido Uni 1.00 5.20 120 0.04
Cordn Sujetador de Anteojos Uni 0.00 2.28 183 0.00
Tafilete de 4 Puntas (Suspensin ECO V) Uni 1.00 4.21 365 0.01
SUB-TOTAL 1.90
3. HERRAMIENTAS SUB-TOTAL 1.48
COSTOS DIRECTOS 32.42
Imprevistos (Alimentacion S/4.5, Pasaje S/.1.5= ) 1.80
Utilidad 10% 3.24
COSTOS INDIRECTOS SUB-TOTAL 5.04
COSTO TOTAL (US$/TAREA) 37.46
COSTO DE TAREA ADMINISTRATIVA
DESCRIPCION
DESCRIPCIN
PDF created with pdfFactory Pro trial version www.pdffactory.com
Unid. Cant.
Precio
US$/Unid.
Vida Util
(Disparos)
Costo Unitario
por Disparo
Botas de Jebe Punta Acero Par 1.00 19.57 183 0.11
Chaleco de malla con cinta reflectiva Pza 1.00 7.34 90 0.08
Casco Tipo Sombrero Portalampara con orejera Pza 0.00 51.47 1,095 0.00
Barbiquejo Elstico Gancho Metlico SEKUR Uni 1.00 0.68 90 0.01
Respirador Pza 1.00 23.13 90 0.26
Filtro Par 2.00 3.18 7 0.91
Cartucho para gases Par 0.60 4.52 7 0.39
Retenedor Par 2.00 2.63 365 0.01
Guante de Neoprene Par 1.00 7.94 10 0.79
Correa Portalmpara Faja Plana 1 1/2" Uni 1.00 3.63 365 0.01
Tapn de Oido Uni 1.00 0.63 45 0.01
Mameluco Jean Uni 1.00 18.67 183 0.10
Pantaln de Jebe Uni 1.00 12.56 90 0.14
Casaca de Jebe Uni 1.00 12.56 90 0.14
Lmpara Uni 1.00 17.00 30 0.57
Anteojos de cristal endurecido Uni 1.00 5.20 120 0.04
Cordn Sujetador de Anteojos Uni 0.00 2.28 183 0.00
Tafilete de 4 Puntas (Suspensin ECO V) Uni 1.00 4.21 365 0.01
SUB-TOTAL 3.58
Unid. Cant.
Precio
US$/Unid.
Vida Util
(Disparos)
Costo Unitario
por Disparo
Botas de Jebe Punta Acero Par 1.00 19.57 183 0.11
Chaleco de malla con cinta reflectiva Pza 1.00 7.34 90 0.08
Casco Tipo Sombrero Portalampara con orejera Pza 0.00 51.47 150 -
Barbiquejo Elstico Gancho Metlico SEKUR Uni 1.00 0.68 90 0.01
Respirador Pza 1.00 23.13 90 0.26
Filtro Par 2.00 3.18 5 1.27
Cartucho para gases Par 0.60 4.52 5 0.54
Retenedor Par 2.00 2.63 365 0.01
Careta de proteccion facial Uni 1.00 36.11 90 0.40
Adaptador para Careta de proteccion facial Uni 1.00 9.37 90 0.10
Guante de Neoprene Par 1.00 7.94 10 0.79
Correa Portalmpara Faja Plana 1 1/2" Uni 1.00 3.63 365 0.01
Tapn de Oido Uni 1.00 0.63 30 0.02
Mameluco Jean Uni 1.00 18.67 183 0.10
Pantaln de Jebe Uni 1.00 12.56 90 0.14
Casaca de Jebe Uni 1.00 12.56 90 0.14
Lmpara Uni 1.00 17.00 30 0.57
Anteojos de cristal endurecido Uni 1.00 5.20 120 0.04
Cordn Sujetador de Anteojos Uni 0.00 2.28 183 -
Tafilete de 4 Puntas (Suspensin ECO V) Uni 1.00 4.21 365 0.01
SUB-TOTAL 4.61
DESCRIPCION
IMPLEMENTOS SEGURIDAD MINEROS SUBTERRANEO OPERADORES EQUIPO
IMPLEMENTOS SEGURIDAD MINEROS SUBTERRANEO OPERADORES SHOTCRETEROS
DESCRIPCION
PDF created with pdfFactory Pro trial version www.pdffactory.com
DESCRIPCION UNID. CANTIDAD PRECIO VIDA ECON. COSTO UNITARIO
US$/UNIDAD (Disparos) POR DISPARO
Botas de Jebe Punta Acero Par 1 19.57 183.00 0.11
Casco Tipo Sombrero Portalmpara Uni 1 11.32 1,095.00 0.01
Casco Tipo Sombrero Portalampara con orejera Pza 0 51.47 1,095.00 0.00
Faja ergonomica de proteccion lumbar Pza 0 7.11 183.00 0.00
Barbiquejo Elstico Gancho Metlico SEKUR Uni 1 0.68 90.00 0.01
Respirador Pza 1 23.13 365.00 0.06
Filtro Par 2 3.18 60.00 0.11
Cartucho para gases Par 1 4.52 365.00 0.01
Retenedor Par 2 2.63 365.00 0.01
Guante de cuero Par 1 3.30 15.00 0.22
Correa Portalmpara Faja Plana 1 1/2" Uni 1 3.63 365.00 0.01
Tapn de Oido Uni 1 0.63 45.00 0.01
Mameluco Jean Uni 1 18.67 183.00 0.10
Pantaln de Jebe Uni 0 12.56 90.00 0.00
Casaca de Jebe Uni 0 12.56 90.00 0.00
Lmpara Uni 1 17.00 30.00 0.57
Anteojos Uni 1 5.20 120.00 0.04
Cordn Sujetador de Anteojos Uni 0 2.28 183.00 0.00
Tafilete de 4 Puntas (Suspensin ECO V) Uni 1 4.21 365.00 0.01
Zapato Seguridad Uni 1 30.57 365.00 0.08
SUB-TOTAL 1.37
1.22
IMPLEMENTOS DE SEGURIDAD EMPLEADOS
PDF created with pdfFactory Pro trial version www.pdffactory.com
DESCRIPCION UNID. CANTIDAD PRECIO VIDA ECON. COSTO UNIT
$/UNIDAD (Disparos) POR DISP
Corvina Pzas 1.00 51.70 150.00 0.34
Lampa Pzas 2.00 9.39 50.00 0.38
Pico Pzas 2.00 10.90 50.00 0.44
Combo 6 Lbs Pzas 1.00 7.83 75.00 0.10
Llave Stilson de 8" Pzas 1.00 4.79 150.00 0.03
LLave Francesa 8" Pzas 1.00 5.90 150.00 0.04
Azuela Pzas 1.00 9.24 150.00 0.06
Chotana Pzas 2.00 11.18 100.00 0.22
1.62
Cable de Acero 3/8" Mts 40.00 1.16 100.00 0.46
2.08
DESCRIPCION UNIDAD VALOR
Herramientas Avances U.S.$/Disp 1.21
Herramientas Tajeos U.S.$/Disp 1.67
Herramientas Sostenimiento U.S.$/Disp 1.55
1.48
HERRAMIENTAS
PDF created with pdfFactory Pro trial version www.pdffactory.com
SOBREDISTANCIA SCOOPTRAM
Distancia Precio
Mts U.S.$/M3 U.S.$/TMS
08129 50 2.08 0.77
08118 100 2.97 1.10
08130 150 3.87 1.43
08119 200 4.76 1.76
08131 250 5.65 2.09
08120 300 6.55 2.43
08132 350 7.44 2.76
08121 400 8.34 3.09
08133 450 9.23 3.42
08122 500 10.13 3.75
08134 550 11.02 4.08
08123 600 11.91 4.41
08135 650 12.81 4.74
08124 700 13.70 5.08
08136 750 14.60 5.41
08125 800 15.49 5.74
08137 850 16.39 6.07
08126 900 17.28 6.40
08138 950 18.18 6.73
08127 1000 19.07 7.06
PDF created with pdfFactory Pro trial version www.pdffactory.com
DESCRIPCION UNIDAD
CARGUIO IDA CARGADO DESCARGA VUELTA VACIO CICLO
Muestras:11 Minutos 0.75 1.00 0.40 0.74 2.89 100.00 MTS
TIEMPO=
100 MTS
TIEMPO VARIABLE
Velocidad Cargado (Espacio/Tiempo) 100.00 Mts/Minuto 6.00 Km/Hr
Velocidad Vacio (Espacio/Tiempo) 135.14 Mts/Minuto 8.11 Km/Hr
TIEMPOS FIJOS
CARGUIO Minutos 0.75
DESCARGA Minutos 0.40
SUB TOTAL 1.15
NO
DISTANCIA(Mts) 50.00 100.00 150.00 200.00 250.00 300.00 350.00 400.00 450.00 500.00 550.00 600.00 650.00 700.00 750.00 800.00 850.00 900.00 950.00 1,000.00
Tiempo Ida (Cargado) 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00 8.50 9.00 9.50 10.00
Tiempo Vuelta (Vacio) 0.37 0.74 1.11 1.48 1.85 2.22 2.59 2.96 3.33 3.70 4.07 4.44 4.81 5.18 5.55 5.92 6.29 6.66 7.03 7.40
Total CICLO (FIJO+VARIABLE) Minutos 2.02 2.89 3.76 4.63 5.50 6.37 7.24 8.11 8.98 9.85 10.72 11.59 12.46 13.33 14.20 15.07 15.94 16.81 17.68 18.55
No Viajes Cucharas/Hora 29.70 20.76 15.96 12.96 10.91 9.42 8.29 7.40 6.68 6.09 5.60 5.18 4.82 4.50 4.23 3.98 3.76 3.57 3.39 3.23
M3/HORA (INSITU: Medido Topograficamente) 33.72 23.57 18.12 14.71 12.39 10.69 9.41 8.40 7.59 6.92 6.35 5.88 5.47 5.11 4.80 4.52 4.27 4.05 3.85 3.67
COSTO SCOOP 2.2 Yds3 U.S.$/Hr 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00
Petroleo 13.64 13.64 13.64 13.64 13.64 13.64 13.64 13.64 13.64 13.64 13.64 13.64 13.64 13.64 13.64 13.64 13.64 13.64 13.64 13.64
COSTO SCOOP 2.2 Yds3 U.S.$/Hr 63.64 63.64 63.64 63.64 63.64 63.64 63.64 63.64 63.64 63.64 63.64 63.64 63.64 63.64 63.64 63.64 63.64 63.64 63.64 63.64
Operador 5.95 5.95 5.95 5.95 5.95 5.95 5.95 5.95 5.95 5.95 5.95 5.95 5.95 5.95 5.95 5.95 5.95 5.95 5.95 5.95
Implementos de seguridad 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45
Total propuesto 70.03 70.03 70.03 70.03 70.03 70.03 70.03 70.03 70.03 70.03 70.03 70.03 70.03 70.03 70.03 70.03 70.03 70.03 70.03 70.03
COSTO U.S.$/M3 2.08 2.97 3.87 4.76 5.65 6.55 7.44 8.34 9.23 10.13 11.02 11.91 12.81 13.70 14.60 15.49 16.39 17.28 18.18 19.07
COSTO U.S.$/TMS 0.77 1.10 1.43 1.76 2.09 2.43 2.76 3.09 3.42 3.75 4.08 4.41 4.74 5.08 5.41 5.74 6.07 6.40 6.73 7.06
HR/TM 0.01 0.02 0.02 0.02 0.03 0.03 0.04 0.04 0.05 0.05 0.06 0.06 0.07 0.07
TON MOVIDAS EN 1 HORA A X DISTANCIA 94.43 66.00 50.73 41.20 34.68 29.94 26.35 23.52 21.24 19.36 17.79 16.46 15.31 14.31
MINUTOS PARA MOVER 1 TON 0.64 0.91 1.18 1.46 1.73 2.00 2.28 2.55 2.82 3.10 3.37 3.65 3.92 4.19
MINUTOS PARA 1 CICLO 2.02 2.89 3.76 4.63 5.50 6.37 7.24 8.11 8.98 9.85 10.72 11.59 12.46 13.33
CAPACIDAD CUCHARA SCOOPTRAM Yds 2.20
1 Yda 3 de carguio = 0.764554 M3 0.76
M3 INSITU/CUCHARA 1.14
TMS POR CUCHARA 3.18
NOTA: LA ESTRUCTURA DE COSTOS DE LOS Pus CONTEMPLA LA DISTANCIA DE ACACRREO CON SCOOPTRAM A 150 MTS DEL FRENTE DE TRAQBAJO
EL CALCULO CONSIDERA SOBREDISTANCIAS DEL CONTRATO
CASO 1 SOBREDISTANCIA = 100 MTS , TOTAL RECORRIDO HASTA EL ORE PASS = 250 MTS
CASO 2 SOBREDISTANCIA = 200 MTS , TOTAL RECORRIDO HASTA EL ORE PASS = 350 MTS
CASO 3 SOBREDISTANCIA = 300 MTS , TOTAL RECORRIDO HASTA EL ORE PASS = 450-500 MTS
NOTA 2= NO HAY PAGOS ADICIONALES > 100 MTS HASTA LLEGAR A LOS 200 MTS
NO HAY PAGOS ADICIONALES > 200 MTS HASTA LLEGAR A LOS 300 MTS
NO HAY PAGOS ADICIONALES > 300 MTS HASTA LLEGAR A LOS 500 MTS
TIEMPOS
OBSERVACION
SIMULACION DE TIEMPOS Y COSTOS
CALCULO COSTO TRANSPORTE MATERIAL CON SCOOP EN TODA LABOR SUBTERRANEA
LABOR
ORE PASS "A" ORE PASS "B" ORE PASS "C"
Hasta 250 MTS
COSTO "A"= $ 1.82/M3
Hasta 350 Mts
COSTO "B"= $ 2.92/M3
COSTO "C"= $ 4.02/M3
Hasta 450 - 500 Mts (Pago Maximo)
VELOCIDAD
ESPACIO
VELOCIDAD =
ESPACIO
TIEMPO
LABOR
ORE PASS "A" ORE PASS "B" ORE PASS "C"
Hasta 250 MTS
COSTO "A"= $ 1.82/M3
Hasta 350 Mts
COSTO "B"= $ 2.92/M3
COSTO "C"= $ 4.02/M3
Hasta 450 - 500 Mts (Pago Maximo)
PDF created with pdfFactory Pro trial version www.pdffactory.com
Distancia
Mts MINERAL DESMONTE MINERAL DESMONTE
50 0.84 1.01 0.81 0.97
100 1.01 1.21 0.93 1.12
150 1.17 1.40 1.06 1.27
200 1.33 1.60 1.18 1.41
250 1.50 1.79 1.30 1.56
300 1.66 1.99 1.42 1.71
350 1.82 2.19 1.54 1.85
400 1.98 2.38 1.67 2.00
450 2.15 2.58 1.79 2.15
500 2.31 2.77 1.91 2.29
550 2.47 2.97 2.03 2.44
600 2.64 3.16 2.16 2.59
650 2.80 3.36 2.28 2.73
700 2.96 3.56 2.40 2.88
750 3.13 3.75 2.52 3.03
800 3.29 3.95 2.64 3.17
850 3.45 4.14 2.77 3.32
900 3.62 4.34 2.89 3.47
950 3.78 4.53 3.01 3.61
1000 3.94 4.73 3.13 3.76
1050 4.10 4.93 3.26 3.91
1100 4.27 5.12 3.38 4.05
1150 4.43 5.32 3.50 4.20
1200 4.59 5.51 3.62 4.35
1250 4.76 5.71 3.75 4.49
1300 4.92 5.90 3.87 4.64
1350 5.08 6.10 3.99 4.79
1400 5.25 6.30 4.11 4.93
1450 5.41 6.49 4.23 5.08
1500 5.57 6.69 4.36 5.23
1550 5.74 6.88 4.48 5.38
1600 5.90 7.08 4.60 5.52
1650 6.06 7.27 4.72 5.67
1700 6.22 7.47 4.85 5.82
1750 6.39 7.66 4.97 5.96
1800 6.55 7.86 5.09 6.11
1850 6.71 8.06 5.21 6.26
1900 6.88 8.25 5.34 6.40
1950 7.04 8.45 5.46 6.55
2000 7.20 8.64 5.58 6.70
12 TMS 16 TMS
U.S.$/TMS
TRANSPORTE CON DUMPER 12 Y 16 TON
PDF created with pdfFactory Pro trial version www.pdffactory.com
DUMPER 12 TON
DESCRIPCION UNIDAD CARGUIO IDA CARGADO DESCARGA
VUELTA
VACIO
CICLO
Muestras:11 Minutos 3.5 1.17 1.32 1.14 7.13 100.00 MTS
DUMPER 16 TON
DESCRIPCION UNIDAD CARGUIO IDA CARGADO DESCARGA
VUELTA
VACIO
CICLO
DUMPER
12 TON
DUMPER
16 TON
Muestras:11 Minutos 4.7 1.17 1.80 1.14 8.81 100.00 MTS Capacidad de dumper (m3) 4.50 6.00
Factor de carga 0.90 0.90
Esponjamiento material 25% 25%
TIEMPO VARIABLE DUMPER Mts/Min Km/Hr Mts/Min Km/Hr
Velocidad Cargado (Espacio/Tiempo) 85.47 5.13 85.47 5.13 M3 INSITU/Tolva 3.04 4.05
Velocidad Vacio (Espacio/Tiempo) 87.72 5.26 87.72 5.26 TMS por Tolva (MINERAL) 9.11 12.15
TMS por Tolva (DESMONTE) 7.59 10.13
TIEMPOS FIJOS
DUMPER
12 TON
DUMPER
16 TON
CARGUIO (Minutos) 3.50 4.70 Densidad de mineral TMS/m3 3.00
DESCARGA (Minutos) 1.32 1.80 Densidad de desmonte TMS/m3 2.50
SUB TOTAL 4.82 6.50
SIMULACION DE TIEMPOS Y COSTOS DE MINERAL
DISTANCIA(Mts) 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 800 850 900 950 1,000 1,050 1,100 1,150 1,200 1,250 1,300 1,350 1,400 1,450 1,500 1,550 1,600 1,650 1,700 1,750 1,800 1,850 1,900 1,950 2,000
Tiempo Ida (Cargado) (12 Ton) 0.59 1.17 1.76 2.34 2.93 3.51 4.10 4.68 5.27 5.85 6.44 7.02 7.61 8.19 8.78 9.36 9.95 10.53 11.12 11.70 12.29 12.87 13.46 14.04 14.63 15.21 15.80 16.38 16.97 17.55 18.14 18.72 19.31 19.89 20.48 21.06 21.65 22.23 22.82 23.40
Tiempo Vuelta (Vacio) (12 Ton) 0.57 1.14 1.71 2.28 2.85 3.42 3.99 4.56 5.13 5.70 6.27 6.84 7.41 7.98 8.55 9.12 9.69 10.26 10.83 11.40 11.97 12.54 13.11 13.68 14.25 14.82 15.39 15.96 16.53 17.10 17.67 18.24 18.81 19.38 19.95 20.52 21.09 21.66 22.23 22.80
CICLO (FIJO+VARIABLE) Minutos (12 Ton) 5.98 7.13 8.29 9.44 10.60 11.75 12.91 14.06 15.22 16.37 17.53 18.68 19.84 20.99 22.15 23.30 24.46 25.61 26.77 27.92 29.08 30.23 31.39 32.54 33.70 34.85 36.01 37.16 38.32 39.47 40.63 41.78 42.94 44.09 45.25 46.40 47.56 48.71 49.87 51.02
Tiempo Ida (Cargado) (16 Ton) 0.59 1.17 1.76 2.34 2.93 3.51 4.10 4.68 5.27 5.85 6.44 7.02 7.61 8.19 8.78 9.36 9.95 10.53 11.12 11.70 12.29 12.87 13.46 14.04 14.63 15.21 15.80 16.38 16.97 17.55 18.14 18.72 19.31 19.89 20.48 21.06 21.65 22.23 22.82 23.40
Tiempo Vuelta (Vacio) (16 Ton) 0.57 1.14 1.71 2.28 2.85 3.42 3.99 4.56 5.13 5.70 6.27 6.84 7.41 7.98 8.55 9.12 9.69 10.26 10.83 11.40 11.97 12.54 13.11 13.68 14.25 14.82 15.39 15.96 16.53 17.10 17.67 18.24 18.81 19.38 19.95 20.52 21.09 21.66 22.23 22.80
CICLO (FIJO+VARIABLE) Minutos (16 Ton) 7.66 8.81 9.97 11.12 12.28 13.43 14.59 15.74 16.90 18.05 19.21 20.36 21.52 22.67 23.83 24.98 26.14 27.29 28.45 29.60 30.76 31.91 33.07 34.22 35.38 36.53 37.69 38.84 40.00 41.15 42.31 43.46 44.62 45.77 46.93 48.08 49.24 50.39 51.55 52.70
No Viajes / Hora (12 Ton) 10.04 8.42 7.24 6.36 5.66 5.11 4.65 4.27 3.94 3.67 3.42 3.21 3.02 2.86 2.71 2.58 2.45 2.34 2.24 2.15 2.06 1.98 1.91 1.84 1.78 1.72 1.67 1.61 1.57 1.52 1.48 1.44 1.40 1.36 1.33 1.29 1.26 1.23 1.20 1.18
No Viajes / Hora (16 Ton) 7.84 6.81 6.02 5.40 4.89 4.47 4.11 3.81 3.55 3.32 3.12 2.95 2.79 2.65 2.52 2.40 2.30 2.20 2.11 2.03 1.95 1.88 1.81 1.75 1.70 1.64 1.59 1.54 1.50 1.46 1.42 1.38 1.34 1.31 1.28 1.25 1.22 1.19 1.16 1.14
M3/HORA (DUMPER 12 TON) 30.50 25.56 22.00 19.31 17.20 15.51 14.12 12.96 11.98 11.13 10.40 9.76 9.19 8.68 8.23 7.82 7.45 7.12 6.81 6.53 6.27 6.03 5.81 5.60 5.41 5.23 5.06 4.90 4.76 4.62 4.49 4.36 4.24 4.13 4.03 3.93 3.83 3.74 3.65 3.57
M3/HORA (DUMPER 16 TON) 31.74 27.58 24.39 21.85 19.80 18.09 16.66 15.44 14.38 13.46 12.65 11.94 11.29 10.72 10.20 9.73 9.30 8.90 8.54 8.21 7.90 7.62 7.35 7.10 6.87 6.65 6.45 6.26 6.08 5.91 5.74 5.59 5.45 5.31 5.18 5.05 4.94 4.82 4.71 4.61
COSTO DUMPER U.S.$/Hr 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19
Petroleo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
COSTO DUMPER U.S.$/Hr 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19
Total propuesto U.S.$/Hr 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19 77.19
COSTO U.S.$/M3 (DUMPER 12 TON) 2.53 3.02 3.51 4.00 4.49 4.98 5.47 5.95 6.44 6.93 7.42 7.91 8.40 8.89 9.38 9.87 10.36 10.85 11.34 11.82 12.31 12.80 13.29 13.78 14.27 14.76 15.25 15.74 16.23 16.72 17.21 17.69 18.18 18.67 19.16 19.65 20.14 20.63 21.12 21.61
COSTO U.S.$/M3 (DUMPER 16 TON) 2.43 2.80 3.17 3.53 3.90 4.27 4.63 5.00 5.37 5.73 6.10 6.47 6.83 7.20 7.57 7.93 8.30 8.67 9.04 9.40 9.77 10.14 10.50 10.87 11.24 11.60 11.97 12.34 12.70 13.07 13.44 13.80 14.17 14.54 14.90 15.27 15.64 16.01 16.37 16.74
COSTO DE TRANSPORTE CON DUMPER DE 12 TON 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 800 850 900 950 1,000 1,050 1,100 1,150 1,200 1,250 1,300 1,350 1,400 1,450 1,500 1,550 1,600 1,650 1,700 1,750 1,800 1,850 1,900 1,950 2,000
COSTO U.S.$/TMS (MINERAL) 0.84 1.01 1.17 1.33 1.50 1.66 1.82 1.98 2.15 2.31 2.47 2.64 2.80 2.96 3.13 3.29 3.45 3.62 3.78 3.94 4.10 4.27 4.43 4.59 4.76 4.92 5.08 5.25 5.41 5.57 5.74 5.90 6.06 6.22 6.39 6.55 6.71 6.88 7.04 7.20
COSTO U.S.$/TMS (DESMONTE) 1.01 1.21 1.40 1.60 1.79 1.99 2.19 2.38 2.58 2.77 2.97 3.16 3.36 3.56 3.75 3.95 4.14 4.34 4.53 4.73 4.93 5.12 5.32 5.51 5.71 5.90 6.10 6.30 6.49 6.69 6.88 7.08 7.27 7.47 7.66 7.86 8.06 8.25 8.45 8.64
COSTO DE TRANSPORTE CON DUMPER DE 16 TON 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 800 850 900 950 1,000 1,050 1,100 1,150 1,200 1,250 1,300 1,350 1,400 1,450 1,500 1,550 1,600 1,650 1,700 1,750 1,800 1,850 1,900 1,950 2,000
COSTO U.S.$/TMS (MINERAL) 0.81 0.93 1.06 1.18 1.30 1.42 1.54 1.67 1.79 1.91 2.03 2.16 2.28 2.40 2.52 2.64 2.77 2.89 3.01 3.13 3.26 3.38 3.50 3.62 3.75 3.87 3.99 4.11 4.23 4.36 4.48 4.60 4.72 4.85 4.97 5.09 5.21 5.34 5.46 5.58
COSTO U.S.$/TMS (DESMONTE) 0.97 1.12 1.27 1.41 1.56 1.71 1.85 2.00 2.15 2.29 2.44 2.59 2.73 2.88 3.03 3.17 3.32 3.47 3.61 3.76 3.91 4.05 4.20 4.35 4.49 4.64 4.79 4.93 5.08 5.23 5.38 5.52 5.67 5.82 5.96 6.11 6.26 6.40 6.55 6.70
OBSERVACION
Dumper 12 Ton Dumper 16 Ton
CALCULO COSTO TRANSPORTE MATERIAL CON DUMPER EN TODA LABOR SUBTERRANEA
TIEMPOS
OBSERVACION
TIEMPOS
VELOCIDAD=
ESPACIO
TIEMPO
PDF created with pdfFactory Pro trial version www.pdffactory.com
DESCRIPCION UNIDAD DATOS U.S.$
Alquiler Dumpers U.S.$/Hr $50.00
Petroleo Glns/Hr 3.00
Petroleo U.S.$/Galon 4.55
Petroleo U.S.$/Hr 13.64
Operador U.S.$/Hr 5.94806621 5.94806621
Alimentacion U.S.$/Hr 0.35 0.35
EPPS U.S.$/Hr 0.17153156 0.17153156
Pasaje U.S.$/Hr 0.07 0.07
SUB TOTAL U.S.$/Hr $70.17
UTILIDAD U.S.$/Hr 10% $7.02
COSTO TOTAL U.S.$/Hr $77.19 $76.11
$71.07
COSTO HORARIO VOLQUETE BAJO PERFIL DUMPERS
PDF created with pdfFactory Pro trial version www.pdffactory.com
OBREROS EMPLEADOS
9.00% 9.00%
2.00% 2.00%
0.97% 0.97%
4.05% 4.05%
0.00% 0.00%
0.36% 0.30%
16.38% 16.32%
JORNAL 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00
CONCEPTOS % ENE. FEB. MAR. ABR. MAY. JUN. JUL. AGO. SET. OCT. NOV. DIC TOTAL
dias 31 28 31 30 31 30 31 31 30 31 30 31 365
VAC GRAT GRAT
REMUNERACION 1,085.00 980.00 1,085.00 1,085.00 1,050.00 1,085.00 1,085.00 1,050.00 1,085.00 1,050.00 1,085.00 11,725.00
VACACIONES 1,050.00 1,050.00
GRATIFICACIONES Factor 1,050.00 1,050.00 2,100.00
ASIG.FAMILIAR 55 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Descanso Medico 12 4.00 11.67 11.67 11.67 11.67 11.67 11.67 11.67 11.67 11.67 11.67 11.67 11.67 140.00
Hrs Extras 1.25 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CTS 9.72% 105.49 95.28 105.49 102.08 105.49 102.08 105.49 105.49 102.08 105.49 102.08 105.49 1,242.01
SUB TOTAL 1,202.15 1,086.94 1,202.15 1,163.75 1,202.15 1,163.75 2,252.15 1,202.15 1,163.75 1,202.15 1,163.75 2,252.15 16,257.01
Gravado(Afecto al Impuesto) 1,096.67 991.67 1,096.67 1,061.67 1,096.67 1,061.67 2,146.67 1,096.67 1,061.67 1,096.67 1,061.67 2,146.67 15,015.00
APOR REM.PRINC 16.38% 179.63 162.44 179.63 0.00 179.63 173.90 351.62 179.63 173.90 179.63 173.90 351.62 2,285.56
APOR GRAT. 16.38% 0.00 0.00
APOR VAC. 16.38% 173.90 173.90
TOTAL: 1,381.79 1,249.38 1,381.79 1,337.65 1,381.79 1,337.65 2,603.78 1,381.79 1,337.65 1,381.79 1,337.65 2,603.78 18,716.47
59.63%
JORNAL 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00
CONCEPTOS % ENE. FEB. MAR. ABR. MAY. JUN. JUL. AGO. SET. OCT. NOV. DIC TOTAL
dias 31 28 31 30 31 30 31 31 30 31 30 31 365
VAC GRAT GRAT
REMUNERACION 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 16,500.00
VACACIONES 1,500.00 1,500.00
GRATIFICACIONES Factor 1,500.00 1,500.00 3,000.00
ASIG.FAMILIAR 55 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Descanso Medico 360 4.00 16.67 16.67 16.67 0.00 16.67 16.67 16.67 16.67 16.67 16.67 16.67 16.67 183.33
CTS 9.72% 145.83 145.83 145.83 145.83 145.83 145.83 145.83 145.83 145.83 145.83 145.83 145.83 1,750.00
SUB TOTAL 1,662.50 1,662.50 1,662.50 1,645.83 1,662.50 1,662.50 3,162.50 1,662.50 1,662.50 1,662.50 1,662.50 3,162.50 22,933.33
Gravado(Afecto al Impuesto) 1,516.67 1,516.67 1,516.67 1,500.00 1,516.67 1,516.67 3,016.67 1,516.67 1,516.67 1,516.67 1,516.67 3,016.67 21,183.33
APOR REM.PRINC 16.32% 247.52 247.52 247.52 0.00 247.52 247.52 492.32 247.52 247.52 247.52 247.52 492.32 3,212.32
APOR GRAT. 16.32% 0.00 0.00
APOR VAC. 16.32% 244.80 244.80
TOTAL: 1,910.02 1,910.02 1,910.02 1,890.63 1,910.02 1,910.02 3,654.82 1,910.02 1,910.02 1,910.02 1,910.02 3,654.82 26,390.45
59.94%
LEYES SOCIALES
ESSALUD
JUBILACION ANTICIPADA
SCTR-SALUD
PLANILLA DE OBREROS SUBSUELO Y OOCC INTERIOR MINA
PLANILLA DE EMPLEADOS SUBSUELO A TODO COSTO
SCTR-PENSIONES(interior Mina)
SCTR Pension Prima
VIDA LEY
TOTAL
PDF created with pdfFactory Pro trial version www.pdffactory.com
OBREROS EMPLEADOS
9.00% 9.00%
0.00% 0.00%
0.97% 0.97%
0.99% 0.99%
0.00% 0.00%
0.36% 0.30%
11.32% 11.26%
JORNAL 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00
CONCEPTOS % ENE. FEB. MAR. ABR. MAY. JUN. JUL. AGO. SET. OCT. NOV. DIC TOTAL
dias 31 28 31 30 31 30 31 31 30 31 30 31 365
VAC GRAT GRAT
REMUNERACION 1,085.00 980.00 1,085.00 1,085.00 1,050.00 1,085.00 1,085.00 1,050.00 1,085.00 1,050.00 1,085.00 11,725.00
VACACIONES 1,050.00 1,050.00
GRATIFICACIONES Factor 1,050.00 1,050.00 2,100.00
ASIG.FAMILIAR 55 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Descanso Medico 12 4.00 11.67 11.67 11.67 11.67 11.67 11.67 11.67 11.67 11.67 11.67 11.67 11.67 140.00
Hrs Extras 1.25 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CTS 9.72% 105.49 95.28 105.49 102.08 105.49 102.08 105.49 105.49 102.08 105.49 102.08 105.49 1,242.01
SUB TOTAL 1,202.15 1,086.94 1,202.15 1,163.75 1,202.15 1,163.75 2,252.15 1,202.15 1,163.75 1,202.15 1,163.75 2,252.15 16,257.01
Gravado(Afecto al Impuesto) 1,096.67 991.67 1,096.67 1,061.67 1,096.67 1,061.67 2,146.67 1,096.67 1,061.67 1,096.67 1,061.67 2,146.67 15,015.00
APOR REM.PRINC 11.32% 124.14 112.26 124.14 0.00 124.14 120.18 243.00 124.14 120.18 124.14 120.18 243.00 1,579.52
APOR GRAT. 11.32% 0.00 0.00
APOR VAC. 11.32% 120.18 120.18
TOTAL: 1,326.30 1,199.20 1,326.30 1,283.93 1,326.30 1,283.93 2,495.16 1,326.30 1,283.93 1,326.30 1,283.93 2,495.16 17,956.71
53.15%
JORNAL 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00
CONCEPTOS % ENE. FEB. MAR. ABR. MAY. JUN. JUL. AGO. SET. OCT. NOV. DIC TOTAL
dias 31 28 31 30 31 30 31 31 30 31 30 31 365
VAC GRAT GRAT
REMUNERACION 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 16,500.00
VACACIONES 1,500.00 1,500.00
GRATIFICACIONES Factor 1,500.00 1,500.00 3,000.00
ASIG.FAMILIAR 55 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Descanso Medico 360 4.00 16.67 16.67 16.67 0.00 16.67 16.67 16.67 16.67 16.67 16.67 16.67 16.67 183.33
CTS 9.72% 145.83 145.83 145.83 145.83 145.83 145.83 145.83 145.83 145.83 145.83 145.83 145.83 1,750.00
SUB TOTAL 1,662.50 1,662.50 1,662.50 1,645.83 1,662.50 1,662.50 3,162.50 1,662.50 1,662.50 1,662.50 1,662.50 3,162.50 22,933.33
Gravado(Afecto al Impuesto) 1,516.67 1,516.67 1,516.67 1,500.00 1,516.67 1,516.67 3,016.67 1,516.67 1,516.67 1,516.67 1,516.67 3,016.67 21,183.33
APOR REM.PRINC 11.26% 170.78 170.78 170.78 0.00 170.78 170.78 339.68 170.78 170.78 170.78 170.78 339.68 2,216.34
APOR GRAT. 11.26% 0.00 0.00
APOR VAC. 11.26% 168.90 168.90
TOTAL: 1,833.28 1,833.28 1,833.28 1,814.73 1,833.28 1,833.28 3,502.18 1,833.28 1,833.28 1,833.28 1,833.28 3,502.18 25,318.58
53.45%
LEYES SOCIALES
ESSALUD
JUBILACION ANTICIPADA
SCTR-SALUD
PLANILLA DE OBREROS SUPERFICIE
PLANILLA DE EMPLEADOS SUBSUELO A TODO COSTO
SCTR-PENSIONES(interior Mina)
SCTR Pension Prima
VIDA LEY
TOTAL
PDF created with pdfFactory Pro trial version www.pdffactory.com
OBREROS EMPLEADOS
9.00% 9.00%
1.00% 1.00%
0.97% 0.97%
0.99% 0.99%
0.00% 0.00%
0.36% 0.30%
12.32% 12.26%
JORNAL 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00
CONCEPTOS % ENE. FEB. MAR. ABR. MAY. JUN. JUL. AGO. SET. OCT. NOV. DIC TOTAL
dias 31 28 31 30 31 30 31 31 30 31 30 31 365
VAC GRAT GRAT
REMUNERACION 1,085.00 980.00 1,085.00 1,085.00 1,050.00 1,085.00 1,085.00 1,050.00 1,085.00 1,050.00 1,085.00 11,725.00
VACACIONES 1,050.00 1,050.00
GRATIFICACIONES 1,050.00 1,050.00 2,100.00
CTS 9.72% 105.49 95.28 105.49 102.08 105.49 102.08 105.49 105.49 102.08 105.49 102.08 105.49 1,242.01
SUB TOTAL 1,190.49 1,075.28 1,190.49 1,152.08 1,190.49 1,152.08 2,240.49 1,190.49 1,152.08 1,190.49 1,152.08 2,240.49 16,117.01
Gravado(Afecto al Impuesto) 1,085.00 980.00 1,085.00 1,050.00 1,085.00 1,050.00 2,135.00 1,085.00 1,050.00 1,085.00 1,050.00 2,135.00 14,875.00
APOR REM.PRINC 12.32% 133.67 120.74 133.67 0.00 133.67 129.36 263.03 133.67 129.36 133.67 129.36 263.03 1,703.24
APOR GRAT. 12.32% 0.00 0.00
APOR VAC. 12.32% 129.36 129.36
TOTAL: 1,324.16 1,196.01 1,324.16 1,281.44 1,324.16 1,281.44 2,503.52 1,324.16 1,281.44 1,324.16 1,281.44 2,503.52 17,949.61
53.09%
JORNAL 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00
CONCEPTOS % ENE. FEB. MAR. ABR. MAY. JUN. JUL. AGO. SET. OCT. NOV. DIC TOTAL
dias 31 28 31 30 31 30 31 31 30 31 30 31 365
VAC GRAT GRAT
REMUNERACION 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 16,500.00
VACACIONES 1,500.00 1,500.00
GRATIFICACIONES 1,500.00 1,500.00 3,000.00
CTS 9.72% 145.83 145.83 145.83 145.83 145.83 145.83 145.83 145.83 145.83 145.83 145.83 145.83 1,750.00
SUB TOTAL 1,645.83 1,645.83 1,645.83 1,645.83 1,645.83 1,645.83 3,145.83 1,645.83 1,645.83 1,645.83 1,645.83 3,145.83 22,750.00
Gravado(Afecto al Impuesto) 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 3,000.00 1,500.00 1,500.00 1,500.00 1,500.00 3,000.00 21,000.00
APOR REM.PRINC 12.26% 183.90 183.90 183.90 0.00 183.90 183.90 367.80 183.90 183.90 183.90 183.90 367.80 2,390.70
APOR GRAT. 12.26% 0.00 0.00
APOR VAC. 12.26% 183.90 183.90
TOTAL: 1,829.73 1,829.73 1,829.73 1,829.73 1,829.73 1,829.73 3,513.63 1,829.73 1,829.73 1,829.73 1,829.73 3,513.63 25,324.60
53.48%
LEYES SOCIALES
ESSALUD
JUBILACION ANTICIPADA
SCTR-SALUD
SIMULACION DE PLANILLA DE OOCC SUPERFICIE
SIMULACION DE PLANILLA DE EMPLEADOS SUPERFICIE
SCTR-PENSIONES(Superficie)
SCTR Pension Prima
VIDA LEY
TOTAL
PDF created with pdfFactory Pro trial version www.pdffactory.com
JORNAL 22.92 22.92 22.92
CONCEPTOS % MES1 MES2 MES3 TOTAL
dias 31 30 31
REMUNERACION 710.52 687.60 710.52 2,108.64
GRATIFICACION 118.42 118.42 118.42 355.26
VACACIONES 0.00 0.00 0.00 0.00
CTS (Rem/12+Grati/6) 69.08 69.08 69.08 207.24
SUB TOTAL 898.02 875.10 898.02 2,671.14
Gravado(Afecto al Impuesto) 828.94 806.02 828.94 2,463.90
SEGUROS
ESSALUD 9.00% 74.60 72.54 74.60 221.75
JUBILACION 2.00% 16.58 16.12 16.58 49.28
SCT SALUD 0.97% 8.04 7.82 8.04 23.90
SCT PENSION 4.05% 33.57 32.64 33.57 99.79
SCT PENSION Prima 0.00% 0.00 0.00 0.00 0.00
VIDA LEY 0.36% 2.98 2.90 2.98 8.87
SUB TOTAL 135.78 132.03 135.78 403.59
TOTAL: 1,033.80 1,007.12 1,033.80 3,074.72
45.82%
BASICO 1,500.00
ASIG.FAM. 50.00
1,550.00
51.67 51.67 51.67 51.67
CONCEPTOS % ENE. FEB. MAR. TOTAL
dias 30 30 30 365
9 9
REMUNERACION 1,550.00 1,550.00 1,550.00 14,828.33
DIAS LIBRES 0.00 465.00 465.00 3,771.67
APOR REM. 18.11% 280.71 364.92 364.92 3,368.46
GRAT 3,100.00
APOR GRAT. 17.75% 550.25
VAC 0.00
APOR VAC. 18.11% 0.00
CTS 8.33% 129.12 167.85 167.85 1,549.38
TOTAL: 1,959.82 2,547.77 2,547.77 27,168.09
SIMULACION DE PLANILLA DE APRENDICES FEBRERO2010
PDF created with pdfFactory Pro trial version www.pdffactory.com

Das könnte Ihnen auch gefallen