Sie sind auf Seite 1von 19

PT.

DESAINAS

COMPANY PROFILE







COMPANY PROFILE



1. Introduction

















2014
Dynamic, Versatile And Fast Growing



PT. DESAINAS

COMPANY PROFILE


PT DESAINASisEPC (Engineering Procurement Construction) company
established on February 3, 1979, by Notary ObingChobirAdikusumah, SH. The
company was originally named PT. DESAIN NASIONAL domiciled in Bandung and on
Oktober19, 1979 changed to PT DESAINAS with the same notary and still reside in
the city of Bandung.

The scope of services PT. DESAINAS is in general construction, consultant
and supervision consultancy services field. Each scope of services ranging from
service survey, planning, design, supervision, Feasibilitiy study, technical assistance
and construction.

Desainas prides itself on meeting modern-dayconstruction challenges and
ensuring the successfulcompletion of complex projects. We promise to deliver the
highest quality of workmanship andclient satisfaction both imperatives to the
DesainasConstruction philosophy.The Company strives to conduct its business
fairlyand honestly and with consideration to the long-termneeds of all its
stakeholders, i.e. clients, employees,subcontractors, suppliers and service
providers.

2. Our Client

Our impressive client list includes a number of highprofile Indonesian businesses
and governmentalorganisations, such as:
Engineering Project :
PT. Perusahaan Listrik Negara / PLN
PT. Dewata Mega Energy
PT. Wimbi Karunia Energi (Developing PLTM Sawidago 2 1x1000 kW)
PT. Kilo Berkat Mandiri (Developing PLTM Kilo 4x2500 kW)
PT. Sinar Sakti Matra Nusantara
National Renewable Energy Laboratory (NREL) USA
PT. Medco Multifab




PT. DESAINAS

COMPANY PROFILE
3. Company Data

Corporate Domicile
Head Office:
JL. Terjun Tandom No. 20
PerumahanArcamanik, Telp/Fax : 022 7101524
BANDUNG- WEST JAVA PROVINCE

Branch Office
Taman Pinang Indah Blok H4/11 Sidoarjo
Telp / Fax: 031-8951994

Establishment Certificate
Name of Notary:YusepSugihMunandar, SH
Number :1
Date : 3 February 1979

Last Update Certificate
Name of Notary :Obing Chobir Adikusumah
Number :5
Date :19October 2012

Ratification of the Department of Justice
Number : y.a. 5/133/4, Year-1980
Date :6 March 1980

Taxpayer Identification Number
NPWP : 01.210.977.3-423.000

Organization / Association
Ikatan Nasional Konsultan Indonesia No 0766
Nomor Anggota INKINDO : 857/P/88.JB
Nomor Anggota KADIN : 20101.001522
Bank Account
Bank Mandiri Cabang Ahmad Yani Timur Bandung
No. Rek. 131-00-5550008-8
An/ PT Desainas
Company Sites
Email : Desainas@yahoo.co.id
Sites : www.Desainas.com



PT. DESAINAS

COMPANY PROFILE


4. Company Personel

COMMISSIONER
Ir. H. Keulman, IAI
Ilman Hamzah Marki, ST.
.
BOARD OF DIRECTORS
Director : Irfan HamzahMarki, ST.
Financial Director : WahyuHariyadi, ST.
Engineering Director : Hany Zaim, ST.





PT. DESAINAS

COMPANY PROFILE
5. Current Project and Experience

a. Engineering Procurement Construction (EPC)Project

In addition to carrying out engineering work, we are also developing our own
several potential hydropower sites which includes survey, design and construction
details. Some sites that we are developing include :
1. PLTM Sawidago 2
Location Capacity Head Turbine Watershed Status
Poso Regency, Central
Sulawesi Province
1 x 900 kW to
upgrade
1x1000 kW
46
meter
Francis

75 km
2


On
Progress
2. PLTM Kuala Kilo
Location Capacity Head Turbine Watershed Status
Poso Regency, Central
Sulawesi Province
4 x 2500 kW
400
meter
Francis
/ Pelton
40 km
2
and 60
km
2


On
Progress

b. Engineering Project Experience

No Name Location Owner Capacity Date
1
Detail Engineering
Design (DED) PLTM
Lokomboro Uprating
Sumba Island, NTT
Province
PT. PLN
/Pusharlis
2 x 500
kW
June Oct
2011
2
Detail Engineering
Design PLTM
Lokomboro 3&4
Cascading
Sumba Island, NTT
Province
PT. PLN
/Pusharlis
2x200 kW
June Oct
2011
3
Review Design PLTM
Sawidago 1
PosoRegency,
Central Sulawesi
Province
PT. PLN
/Pusharlis
1x380 kW
June Oct
2011
4
Feasibility Study Detail
Engineering Design
PLTM di Mamberamo
tengah, Jaya Wijaya,
Tolikara, Yahukimo

Papua Province
ESDM Papua
Province
100 kW -
200 kW
Nov 2011
Feb 2012
5
Feasibility Study Detail
Engineering Design
PLTM Sajingan
Sambas Regency,
West Kalimantan
Province
PT. PLN
/Pusharlis
1x200 kW
July Sept
2012
6
Feasibility Study and
Detail Engineering
KulonProgo
Regency, Yogyakarta
PT.
PuritamaEnergi
1x600 kW
July Nov
2012


PT. DESAINAS

COMPANY PROFILE
Design PLTM Semawung Province
7
Feasibility Study &Detail
Engineering Design
PLTM Lokomboro6&7
Cascading
Sumba Island, NTT
Province
PT. PLN
/Pusharlis
2x200 kW On going
8
Feasibility Study (FS)
and Detail Engineering
Design (DED) PLTM
Umbuwangu 2
Sumba Island, NTT
Province
PT. PLN
/Pusharlis
2x100 kW On going
9
Feasibility Study (FS)
and Detail Engineering
Design (DED) PLTM
Beranda 1
NunukanRegency,
North Kalimantan
Province
PT. PLN
/Pusharlis
2x250 kW
2013 -
finished
10
Feasibility Study (FS)
and Detail Engineering
Design (DED) PLTM Liki
Solok Selatan
Regency, West
Sumatera Province
PT. Dewata
Mega Energi
2 x 750
kW
On going
11
Feasibility Study (FS)
and Detail Engineering
Design (DED) PLTM
TelunBerasap
Solok Selatan
Regency, West
Sumatera Province
PT. Dewata
Mega Energi
2 x4000
kW
2013 -
FInished
12
Feasibility Study (FS)
and Detail Engineering
Design (DED) PLTM
Sawidago 3

PosoRegency,
Central Sulawesi
Province
PT. PLN
/Pusharlis
2 x750 kW On going
13
Feasibility Study (FS)
and Detail Engineering
Design (DED) PLTM
Kolori
PosoRegency,
Central Sulawesi
Province
PT. PLN
/Pusharlis
2 x 250
kW
On going
14
Detail Engineering
Design (DED) PLTM
Merasap
BengkayangRegency,
West Kalimantan
Province
PT. PLN
/Pusharlis
Uprating
3x750 kW
On going
15
Feasibility Study (FS)
and Detail Engineering
Design (DED) PLTM
Kananggar
Sumba island, Nusa
Tenggara Timur
Province
PT. PLN
/Pusharlis
2 x 100
kW
On going
16.
Hydro Energy Project
Feasibility Study
Assistance in Indonesia


Rantausuli village,
Merangin regency
Jambi Province
National
Renewable
Energy
Laboratory -
USA
2 x 1 MW
May 2013 Agt
2013
17.
Hydro Energy Project
Feasibility Study
Assistance in Indonesia
Mamasa regency
West Sulawesi
Province
National
Renewable
Energy
Laboratory-USA
2 x 2 MW
May 2013 Agt
2013
18.
Merangin District MHPP
Potential Study
Merangin District,
Jambi Province
PT. Medco
Multifab
2 x 5 MW July 2013
19.
Detail Engineering
Design Kilo Minihydro
Poso District, Central
Sulawesi Province
PT. Medco
Multifab
4x2.5 MW January 2014



PT. DESAINAS

COMPANY PROFILE

c. Research and Development Turbine
To provide a complete service to the customer, we are also able to design
and produce the desired turbine specifications. Almost all turbine components we
planned and produced using domestic components of assured quality.
To support the energy needs of electricity in remote areas not covered by
the state owned utility PT. PLN, we are conducting research and development of
picoturbines with capacity 0.5 kW - 10 kW and minihydroturbine (1-10 MW). Types
of turbines that we have developed are francis turbine, kaplan turbine,
peltonturbine, etc.
Turbine design developed using 3D CAD software and evaluated using CFD
(computational fluid dynamics) to ensure that the customer gets a tailor-made design
for his project parameter.The following is a list of job design, supervise and
manufacture of turbine.

No Name Location Owner Capacity Date
1
Francis Turbine Design
And Manufacturing
Supervision for
SansarinoMinihydro
Power Plant
LuwuRegency,
Central Sulawesi
Province
PT. PLN /Pusharlis 800 kW 2007
2
Francis Turbine Design
Design And
Manufacturing for
Sawidago 2 Minihydro
Power Plant
PosoRegency,
Central Sulawesi
Province
PT. Stabila Strata
Eskava
910 kW 2008
3
Bulb Kaplan Turbine
Design Design And
Manufacturing
Supervision for Angkup I
& II Minihydro Power
Plant
TakengonRegency,
Aceh Province
PT. PLN /Pusharlis 2x200 kW 2008
4
Design Review Turbine
Relocation from Maja to
Walesi Mini Hydro
Power Plant
Wamena regency,
Papua Province
PT. PLN /Pusharlis 500 kW 2008
5
Rehabilitation Cikotok
Mini Hydro Power Plant
CianjurRegency,
West Java
Province
PT
BangunBumiBersatu
2x500 kW 2010
6
Francis Turbine
DesignDesign And
Wamena regency,
Papua Province
PT. PLN /Pusharlis 2x600 kW 2011


PT. DESAINAS

COMPANY PROFILE
Manufacturing
Supervision for Walesi
6&7 Mini Hydro Power
Plant
7
Francis Turbine
DesignDesign And
Manufacturing
Supervision for
Lokomboro Extension
2&3 Mini Hydro Power
Plant
Sumba Island, NTT
Province
PT. PLN /Pusharlis 2x500 kW 2011
8
Openflume Propeller
Turbine DesignDesign
And Manufacturing
Supervision for
Lokomboro Cascading
4&5 Mini Hydro Power
Plant
Sumba Island, NTT
Province
PT. PLN /Pusharlis 2x200 kW 2011
9
S-type Propeller Turbine
Design for Sinakma 4&5
Mini Hydro Power Plant
Wamena regency,
Papua Province
PT. PLN /Pusharlis 2x300 kW 2011
10
Francis Turbine
DesignDesign And
Manufacturing
Supervision for
Sawidago I Mini Hydro
Power Plant
PosoRegency,
Central Sulawesi
Province
PT. PLN /Pusharlis
1 x 380
kW
2011
11
Uprating Openflume
Francis Turbine for
Sinakma 1 Mini Hydro
Power Plant
Wamena regency,
Papua Province
PT. SinarSaktiMatra
Nusantara
From 80
kW to
120 kW
2011
12
S type Turbine Design
Design And
Manufacturing
SupervisionPLTM
Lokomboro6&7
Cascading
Sumba Island, NTT
Province
PT. PLN /Pusharlis 2x200 kW On going
13
Francis Turbine
DesignDesign And
Manufacturing
SupervisionPLTM
Umbuwangu 2
Sumba Island, NTT
Province
PT. PLN /Pusharlis 2x100 kW On going
14
Francis turbine design
PLTM Beranda 1
NunukanRegency,
North Kalimantan
Province
PT. PLN /Pusharlis 2x250 kW On going
15
Francis Turbin
rehabilitation and
uprating PLTM
Sawidago2
PosoRegency,
Central Sulawesi
Province
PT. PLN /Pusharlis
1 x1000
kW
On going
16
S-type Propeller Turbine
Design And
Central Java
Province
PT Energy Puritama 1x600 kW On Going


PT. DESAINAS

COMPANY PROFILE
Manufacturing for PLTM
Semawung
17
S-type Propeller Turbine
Design And
Manufacturing for PLTM
Broges I
Papua Province
CV. Ryan Jaya
Mandiri
1x100 kW On Going
18
S-type Propeller Turbine
Design And
Manufacturing for PLTM
Broges II
Papua Province
CV. Ryan Jaya
Mandiri
1x140 kW On Going

Turbine Design and Product Documentation








Small turbinfrancis Prototype Small Turbine Runner Prototype













PT. DESAINAS

COMPANY PROFILE









S Type Turbine Francis Turbine PLTM Walesi












Detail Engineering Design PLTM Lokomboro6&7 Cascading : Kaplan S-Type turbine with ANSYS Software













Detail Engineering Design PLTM Lokomboro6&7 Cascading : Kaplan S-Type turbine with 3D CAD
Software



PT. DESAINAS

COMPANY PROFILE

To provide a wide diversity of turbine service, we also develop and repair
small steam turbine to generate electric power below 250 KW.


Power Plant Arrangement for steam turbine 250 KW condencing 8 bars ABS Inlet

The 250 KW condencing type




PT. DESAINAS

COMPANY PROFILE



Rotor Blade repair in our affiliated workshop


Rotor 1 stage Rotor 2 stage

Rotor 3 stage Rotor 4 stage


PT. DESAINAS

COMPANY PROFILE























Location of our hydropower project experience in Indonesia


PT. DESAINAS

6. Contact Us

For more information, contact us at :

Head Office
PT. Desainas
Jalan Terjun Tandom no 20 Perumahan Arcamanik
Post code : 40293
Telephone/Fax : (+62) 022 7101524
Site : www.Desainas.com
Email : desainas@yahoo.co.id
Bandung Jawa Barat
Indonesia


Contact Person :
Ir. HanyZaim
(+62) 081332222581
hanyzaim@yahoo.com
hanyzaim@gmail.com







PT. DESAINAS

COMPANY PROFILE

7. Hydrpower Engineering Project Documentation































Review Design PLTM Sawidago 1 (1x400 kW)










Feasibility Study and Uprating PLTM Sajingan, Sambas Regency
West Kalimantan Province






PT. DESAINAS

COMPANY PROFILE























Detail Engineering Design (DED) PLTM Lokomboro 2&3 Uprating, Sumba Island, NTT Province






















Detail Engineering Design PLTM Lokomboro 4&5 Cascading (2x200 kW), Sumba Island, NTT Province




















Feasibility Study and DED PLTM Kolori (2x250 kW)
Feasibility Study and DED PLTM Sawidago 3 (2x750
kW)




PT. DESAINAS

COMPANY PROFILE



















Detail Engineering Design (DED) PLTM Beranda 1, Nunukan regency, North Kalimantan Province



















Detail Engineering Design Uprating PLTM
Merasap, Bengkayang Regency, Weat Kalimantan
Province
Feasibility Study and Detail Engineering Design
PLTM Semawung, KulonProgo Regency
Yogyakarta Province




































Feasibility Study and DED PLTMLiki(2x750 kW)
South Solok Regency, West Sumatra Province
Feasibility Study and DED PLTM TelunBerasap
(2x4000 kW)





PT. DESAINAS

COMPANY PROFILE
8. TURBINE PRODUCT DOCUMENTATION






Openflume propeler turbine PLTM Lokomboro
4&5 Cascading (2x200 KW)
Runner PLTM Lokomboro 5&6 Cascading
(2x200 KW)





Turbin PLTM Broges 1 &2 (100 KW) Turbin PLTM Sawidago II (1 x 400 kW)




Turbine PLTM Lokomboro 2&3 (2x500 KW) Turbine PLTM Sawidago I (1x400 KW)


PT. DESAINAS

COMPANY PROFILE


Turbine PLTM Semawung (1x600 KW) Turbine PLTM Walesi (2x800 KW)


Turbine Propeller PLTM Angkup I (300 KW) Turbine Propeller PLTM SemawungI (600 KW)

Das könnte Ihnen auch gefallen