Beruflich Dokumente
Kultur Dokumente
By
Base on the construction stage 2D space management
result to create 3D model. (1. Total Spend MH is about
2000 MH (all disciplines MH), 2. The Electrical &
Instrument Trays are included)
Model Review
Unit1
CTCI Review
Model Review
Unit 1 ()
By
Model Review