Optimize pit design quickly by evaluating mineral deposits in light of commodity
prices and costs. The MineSight Long Term Planning Open Pit Engineering
Package harnesses the power of 3D CAD tools to produce pit designs, and build
and manage an economic model. A resource model can be built and managed by
using a basic interpolation of 3D block, stratigraphic, and gridded surface models.
MineSight Economic Planner enables planning engineers to design mining
sequences and generate life-of-mine schedules, including rapid evaluation of
alternative plans to maximize net present value.
BASlC |ACKAC| CORE
MineSight Core
embodies integrated
software, working
seamlessly with all
MineSight applications in
every package, at every
step of the mining
process.
3D ADVANCED CAD
Progressive CAD
capabilities for
MineSight 3D.
3D ENGlNEERlNG OP
CAD
Broaden the reach of
your MineSight CAD
tools with MineSight 3D
Engineering Open Pit
CAD.
ECONOMlC PLANNER
Quick evaluation tools
for maximum profit
potential.
MODELlNG
Cet a deeper grasp of
your site geology.
k|C0MM|hD|D
|k0DUCJS
HAULAGE
Detailed control of your
mining equipment.
PLANNER
For grade control or
simple scheduling
requirements.
5CHEDULE OPTlMlZER
The versatility to
maximize profit
potential and achieve
short- and medium-term
efficiency.
5TRATEGlC PLANNER
Harness long-term
profitability for new and
existing mines.
DATA ANALY5T
Your statistical and
geostatistical data-at
your fingertips.
201+ Mirtec lrc +rc |eic+ Cecs]steas. A|| ri|ts reserec. MireSi|t is + reisterec tr+cea+r| cl |eic+ Cecs]steas. 1

C0k|
Jh| |0UhDAJl0h |0k A|| Mlh|SlChJ |ACKAC|S
0\|k\l|w
MineSight Packages begin with MineSight Core. MineSight Core supplies functions
for creating, managing, manipulating, and displaying MineSight data. Now
available with 64-bit support.
K|Y |k0DUCJS MlNE5lGHT 3D CORE
MineSight 3D visualizes
output from MS3D and
other MineSight
products. Core
functionality includes
creating and
manipulating 2D and 3D
data, editing, querying,
and plotting/display of
all types of geology and
mining data.
MlNE5lGHT 3D DART
MSDART processes large
ASC files and formats
them for input into
MineSight. Manipulate
the data by translating,
sorting, reblocking, or
performing calculations
on the values.
MlNE5lGHT BA5l5 CORE
MineSight Basis is a
collection of programs
and procedures for
manipulating MineSight
files. Core functionality
includes compositing
and reserves
calculations.
MlNE5lGHT COMPA55
MineSight Compass
creates and manages
MineSight files and also
serves as a menu
interface to MineSight
Basis programs and
procedures. MSCompass
runs customizable
procedures that display
a series of panels for
entering input to the
programs.
MlNE5lGHT RE5ERVE
MineSight Reserve
unifies the consolidated
power of MineSight's
reserve engines and
features a completely
integrated reserve
calculation and reporting
engine.
201+ Mirtec lrc +rc |eic+ Cecs]steas. A|| ri|ts reserec. MireSi|t is + reisterec tr+cea+r| cl |eic+ Cecs]steas. 1
K|Y ||AJUk|S Vl5UALlZATlON
Full 3D graphics display of
Drillholes
Models
Ceometry and labels
Ceologic interpretations
Mine designs
Survey pickups
Topography
Other vendors (acQuire drillholes)
nstant 2D data display
Fence diagrams
Simultaneous display in multiple viewers
Snapping modes
Query functions
WYSWYC plotting with customizable
legends and title blocks
Photo overlays on surfaces
Fill drillhole intervals, polygons, and
surfaces with customizable geologic
patterns
Walk-through and Av generation
FlLE CREATlON AND MANlPULATlON
Rotated models
Clone MineSight files and add or edit
item descriptors
Choose MSBasis programs via
customizable menus
Filter MSBasis programs by function and
type
Chained workflow via multi-run
processing
Define program parameters by entering
responses in panels
Prefilled responses for existing pro|ects
Manage responses
Detailed help
Load and manipulate pro|ect data
User-customized calculations
GEOMETRY
Basic CAD functions
Ceometry can be attributed with
userdefined attributes
Digitize geometry
Attach shape templates to polylines
Drape points and lines to surfaces
Extrude polygons into solids
Compute volumes of solids or between
surfaces
Slice solids/drillholes into 2D
mport/export
ASC Survey
DXF
Arcview Shape files
Other vendors (acQuire drillhole
data, import only for Cemcom
data, import only for vulcan data)
DRlLLHOLE5
Create drillhole views
Query and manage drillholes
Filter drillhole display
Advanced 2D and 3D display features
Ceotech display: rose diagrams,
histograms, color strips, dip meters
Drillhole design tool for exploration and
production
Compositing
Other vendors (import, export, and 3D
views of acQuire drillhole data)
MODELlNG
3D block, stratigraphic, surface
modeling
Rotated models
Crade shells (3D isocontour)
Display models in 2D or 3D as surfaces,
blocks, polygons, or contours
Label/color/hatch displays
Range on location and items
DATA MANlPULATlON
Scripting
mport, export, edit, and report file data
Format and sort large ASC files
Change pro|ect coordinates
Rotate models in 2D or 3D
Reblocking
Translation
Compute new values
201+ Mirtec lrc +rc |eic+ Cecs]steas. A|| ri|ts reserec. MireSi|t is + reisterec tr+cea+r| cl |eic+ Cecs]steas. 2
RE5ERVE5
Reserves from 3D block or stratigraphic
models
ncremental reserves
Ceological in-situ resource reporting
Reserve reporting by mining shape
Open pit, underground, and coal
reporting
Partials file generation in a solid or
between surfaces
Multiple polygonal boundary limiting
Selectable reserves-computing
application
201+ Mirtec lrc +rc |eic+ Cecs]steas. A|| ri|ts reserec. MireSi|t is + reisterec tr+cea+r| cl |eic+ Cecs]steas.

D |hClh||klhC 0||h |lJ CAD
D |hClh||klhC 0||h |lJ CAD
0\|k\l|w
Design pits using the MineSight 3D Pit Expansion tool.
K|Y ||AJUk|S PlT EXPAN5lON TOOL
Dump, dyke, spoil design
Pit expansion: upward or downward,
inward or outward
variable berm widths
Simple face and pit slopes
Complex face slopes, pit slopes, and
berms defined by wall azimuth or model
code
Road, ramp, slot design and
transitioning
Ramp centerlines
Switchback design tools
DUMPl5POlL TO TARGET
Automatically builds waste
dump/stockpile/spoil to target volume
Optionally ad|usts starting polygon
up/down and/or in/out
volume determined against surface to
meet design target volume
5URFACE RE5LOPlNG TOOL
Cenerates final landform from as-built
surface
Balances cut and fill volumes
variable slope design specifications
honored
Honors unmoveable areas
201+ Mirtec, lrc. A|| ri|ts reserec. | MireSi|t is + reisterec tr+cea+r| cl Mirtec, lrc. 1

|C0h0MlC ||Ahh|k
C0hC||JUA| |0hC J|kM ||AhhlhC AhD SCh|DU|lhC
0\|k\l|w
Now enhanced with multithreading and *64-bit capacity, MineSight Economic
Planner (MSEP) enables planning engineers to design mining sequences and
generate life-of-mine schedules, including rapid evaluation of alternative plans to
maximize net present value (NPv). The multithreaded*64-bit version of MSEP
increases the speed of calculations and the amount of data processed. MSEP is
the initial MineSight tool applied to new open pit pro|ects during the pre-feasibility
and conceptual planning stages. t creates a practical and operational phase
design. Ceometric results from MSEP are used by the MineSight 3D Pit Expansion
tool to design pits with ramps and berms. The destination strategy created by
MSEP is then used by MineSight Strategic Planner for more detailed scheduling.
K|Y |0lhJS Long term planning
Economic pit limits
Maximize net present value (NPv)
Open pit pre-feasibility
Ultimate pit design
Calculate block values
Lerchs-Crossmann optimization
K|Y ||AJUk|S
Maximize NPv using destination
selection and cutoff grade optimization
Lerchs-Crossmann method for ultimate
pit design with optional reblocking
Floating cone technique for ultimate pit
design
Mining sequence design with limit on
pushback width
Options for simple slopes, complex
slopes and slopes by azimuth
Optional mining cost by bench or block
Multithreaded *64-bit for faster
calculation and greater volume of data
processing
vertical discounting option Automatically evaluate pit bottoms
Optimize schedules to follow most
profitable ore extraction
Determine optimal mining direction Multiple plants/processes, waste
destinations, and stockpile reclaiming
options
Cenerate resource reports within the pit
shell Create long term production
schedules from series of pit shells
Analyze varying
capital-versus-productionrate scenarios
Populate block model items for
value/block, value/ ton, pit number,
destination, and period mined
Evaluate production rates Create reports and graphs for cutoff
grade optimization results
visualize pit shells to create bench
contours and solids
201+ Mirtec lrc +rc |eic+ Cecs]steas. A|| ri|ts reserec. MireSi|t is + reisterec tr+cea+r| cl |eic+ Cecs]steas. 1
Rapidly calculate and evaluate
alternative plans
Create detailed scheduling charts and
reports
Use shells as the basis for final designs
with the MineSight 3D Pit Expansion tool
Export cutoff grade and stockpile
strategies to MineSight Strategic Planner
for more detailed analysis and
scheduling
201+ Mirtec lrc +rc |eic+ Cecs]steas. A|| ri|ts reserec. MireSi|t is + reisterec tr+cea+r| cl |eic+ Cecs]steas. 2

M0D||lhC
Mlh|SlChJ BASlS |k0CkAMS |0k M0D||lhC
0\|k\l|w
MineSight Basis programs for building, managing, and basic interpolation of 3D
block, stratigraphic, and gridded surface models
K|Y ||AJUk|S
Create, edit, report model files Compress models for efficiency Statistical and geostatistical analysis
Back estimation User calculations Store and extract values
Cenerate surfaces Code from boundaries DW interpolation
Trend plane search interpolation Cradient interpolation DTM operations
Contouring Partials between surfaces Display models in MineSight 3D
nitialize and manage MineSight 3D
block, stratigraphic, and gridded surface
model files
201+ Mirtec, lrc. A|| ri|ts reserec. | MireSi|t is + reisterec tr+cea+r| cl Mirtec, lrc. 1

D AD\AhC|D CAD
AD\AhC|D CAD |UhCJl0hA|lJY lh MSD
0\|k\l|w
These functions are available to interactively manipulate solid, surface, and
polygon data in the MineSight 3D CAD environment. Ceneration of mining cuts for
open pit mining and drillhole spearing, coding, and point functions are also
included.
201+ Mirtec, lrc. A|| ri|ts reserec. | MireSi|t is + reisterec tr+cea+r| cl Mirtec, lrc. 1
K|Y ||AJUk|S CAD
Surface gridding
Contour generation from points and
polylines
sopachs of surfaces
Solids from polygon contours
Automatic cut design targeting on
tonnes, volume, or distance
ntersect polylines, surfaces, or solids
with powerful Boolean operators
Clip polyline and polygon data
Clip surfaces
Triangulate points and polylines to
create surfaces
Contour grade values
Crid surfaces to models or models to
surfaces
Polyline linking to create surfaces and
solids
Surfaces colored by dip angle
Partials generation for resource and
reserve calculations
Surface verification and conditioning
including self-intersection, duplicates,
and openings
Model coding
Surface/solid expansion
Create solids from survey strings
Create and manage Large Cridded
Ob|ects
Explode surfaces into components
Merge surfaces
Automatically slice polygons and solids
based on targets
Proximity Reporting
CUT GENERATlON
Design cut patterns for strip or open pit
mines
Limit cut shapes by polygonal
boundaries (inside or outside)
Rectangular gridded cuts or echo cuts
from a polyline
Name individual cuts automatically
END OF PERlOD MAP5
Build end of period solids and surfaces
based on input start surface and period
cuts (polygons or solids).
Can use input cuts from MineSight
Planning Database or directly exported
from MineSight Atlas.
201+ Mirtec, lrc. A|| ri|ts reserec. | MireSi|t is + reisterec tr+cea+r| cl Mirtec, lrc. 2
DRlLLHOLE 5PEARlNG, CODlNG, AND
POlNT FUNCTlON5
Directly code drillholes or generate
geometry from drillholes that pierce
solids or surfaces
Export intersection points
Drillhole coding and percents from
solids or polygons
Ore and waste coding
Cenerate marker points for top or
bottom occurrences of drillhole values
or at contact between values
Normalize coded percents
Code by sectional polygons within
specified tolerance
201+ Mirtec, lrc. A|| ri|ts reserec. | MireSi|t is + reisterec tr+cea+r| cl Mirtec, lrc.

||Ahh|k
CA|CU|AJ| k|S|k\|S AhD C|h|kAJ| ||AhS
0\|k\l|w
Speed and functionality define MineSight Planner, Mintec's newest tool for
calculating reserves and generating plans. With a completely new and intuitive
interface, MineSight Planner allows you to import or design geometry that has
reserves dynamically calculated and stored to the MineSight Planning Database.
Calculate or assign user properties during or post-import. Material can be routed
through a series of destinations and reported with MineSight's Advanced
Reporting and Charting.
K|Y ||AJUk|S
mport or design polygons/solids Automatic reserving of geometry Auto clip geometry against existing
mining blocks or pit design
Build solids between surfaces Feed and reclaim to virtual stockpiles visualize directly in MS3D
Direct integration with MSPD Quick assignment of properties,
including complex calculations
201+ Mirtec, lrc. A|| ri|ts reserec. | MireSi|t is + reisterec tr+cea+r| cl Mirtec, lrc. 1

SJkAJ|ClC ||Ahh|k
0|JlMA| |0hC J|kM ||AhhlhC
0\|k\l|w
MineSight Strategic Planner provides the level of detail required by the mining
industry for full feasibility studies of new and existing mines to ensure that the
long term life-of-mine plan can be used effectively by short and medium term
mine planners as guidelines for their work. MineSight Strategic Planner analyzes
bench pushback reserves, material destinations, and haulage parameters to
provide a feasible life-of-mine schedule that maximizes net present value (NPv)
and considers all operating constraints while meeting or exceeding
pro|ect-specific ob|ectives, period production goals, and quality targets.
K|Y |0lhJS Life-of-mine scheduling
Phase and bench scheduling
Equipment requirements
Stockpile handling
Quality/quantity constraints
Maximize net present value (NPv)
K|Y ||AJUk|S
Optimize schedules for mined benches
and phases in single or multiple pits
Production target controls for mill/leach
capacities, grade/metal
production/product (concentrate,
smelter) requirements, and
contaminant control
Manually control phase mining (daily
mining rate, partial benches per period,
vertical advance limits, forced mining),
phase dependencies, destination
controls (capacity, dumping rate, spread
dumping), material movement, and
stockpile handling
Economic parameter controls for mining
costs, loading/hauling costs, processing
costs, recovery, capital investment, and
varying above costs based on period
and material type
Create sub-regions with matching
material types for destinations
Automatically maximize NPv by mining
the highest grade material and
satisfying operating constraints
Optimize truck/shovel fleet to increase
NPv
Balance stripping ratios quickly Model multiple quantity, quality, and
ratio constraints
True blending of ore materials Report mining costs by bench and/or pit Report truck and shovel cycle time, fuel
burn rate, and costs
Compare NPv for varying schedule
scenarios
Optimize partial bench mining and
stockpile reclamation based on linear
programming
Automatically replace trucks and
shovels to optimize haulage fleet
requirements
201+ Mirtec, lrc. A|| ri|ts reserec. | MireSi|t is + reisterec tr+cea+r| cl Mirtec, lrc. 1
Optimize cutoff grade for each period by
mapping reserves to destinations
Create schedules based on mixed
integer linear programming principles
Create period-to-period life-of-mine
schedule reports and material
movement reports (Microsoft Excel)
ntegrated with MineSight3D to create
end-of-period maps that include both
pits and dumps
201+ Mirtec, lrc. A|| ri|ts reserec. | MireSi|t is + reisterec tr+cea+r| cl Mirtec, lrc. 2

hAU|AC|
CA|CU|AJ| |Ul|M|hJ USAC|
0\|k\l|w
Use MineSight Haulage to create material/routing reports, route profiles, and
cycle time files. MineSight Haulage manages detailed equipment and material
routing requirements. Used in con|unction with MineSight nteractive Planner,
planning engineers can obtain immediate short and long term planning
requirements for trucks and shovels.
K|Y |0lhJS Short and long term planning
Cycle times
Material routing
3D road profiles
Equipment requirements
ntegrated with MineSight Schedule
Optimizer
K|Y ||AJUk|S
Provide haulage equipment
requirement estimates for short-term
planning
Define detailed road networks Define equipment availability, efficiency,
speeds, fuel burn rates, rimpull curves,
and capacity
Calculate detailed round-trip schedule
times based on route length, elevation
profiles, spotting, loading, dumping,
waiting, rolling resistance, and load
state
Route materials contained in a cut to a
mapped destination
Calculate most efficient routes through
a network from cut to destination
Estimate equipment requirements
based on tonnage, net operating hours,
mechanical availability, and utilization
Fully integrated with MineSight
nteractive Planner
Trolley assist options
Cenerate cycle time data for use in
other MineSight planning and
scheduling applications
Share data with other applications via
common data links to the MineSight
Planning Database
Create route profiles for drive diagrams
and external processing
Rimpull curves for equipment definition Designated trolley segments Equipment definition repository
Network and results validation Customizable cycle time file creation
utility including simplified road profiling
201+ Mirtec lrc +rc |eic+ Cecs]steas. A|| ri|ts reserec. MireSi|t is + reisterec tr+cea+r| cl |eic+ Cecs]steas. 1

DAJA AhA|YSJ
C0M|k|h|hSl\| SJAJlSJlCA| AhD C|0SJAJlSJlCA| AhA|YSlS
0\|k\l|w
MineSight Data Analyst analyzes, evaluates, and reports on pro|ect drillhole,
blasthole, and model data. MineSight Data Analyst processes drillhole, blasthole,
and model data (3D block, stratigraphic, surface) with complex statistical and
geostatistical programs and tools. t can read MSTorque pro|ects, MSBasis Files
9,11,12, and other common formats including spreadsheets, databases, and text
files to produce sophisticated and customizable reports, charts, and graphs.
K|Y |0lhJS Statistical and geostatistical analysis
Custom report tool
3D variogram modeling
Advanced filtering and selection
Reserves reporting
Data validation
K|Y ||AJUk|S
Statistical analysis tool focused on
geology and mining data
Analyze MineSight drillhole, blasthole,
and model files, as well as tabular data
from most databases, spreadsheets,
and text files
Connect directly to MSTorque pro|ects
to analyze sample data and composites.
Extensive use of charts, which may be
customized for both content and style
64-bit support allows caching of large
data sets
Run all tools repeatedly with varying
filters
Powerful and customizable reserves
reporting based on model data
ntuitive reports support data selection,
sorting, and filtering
Easily exports results to Microsoft
Word and Excel
ntuitive interface and consistent data
filtering
Use statistical and geostatistical analysis
tools to create:
Histograms and grade tonnage
curves Scatterplots
Cumulative probability plots
Ceneral, indicator, and downhole
variograms with automatic and
manual modeling
Box plots
QQ plots
Declustered data
Cutoff grade reports
Swath Plots
Contact Plots
201+ Mirtec, lrc. A|| ri|ts reserec. | MireSi|t is + reisterec tr+cea+r| cl Mirtec, lrc. 1

SCh|DU|| 0|JlMl/|k
0|JlMl/| Sh0kJ AhD M|DlUM J|kM ||AhhlhC
0\|k\l|w
MineSight Schedule Optimizer determines the most productive cut mining
sequence to achieve the highest pro|ect profitability, and then generates practical
short to medium term pro|ect schedules. This versatile tool satisfies all pro|ect
quality, quantity, market, and geotechnical constraints, as well as destination
capacities, equipment resources, and economic parameters. Advanced integer
programming engines are used to solve optimization/blending and scheduling
problems.
K|Y |0lhJS Shovel-level cuts
Semi-automatic material routing
nfeasibility analysis
Advanced engineer controls
Maximize/minimize metal contents
Multiple commercialized optimization
engine options (LNDO & CPLEX)
Quality/quantity constraints
Stockpile handling
3D block and stratigraphic model
scheduling
Truck/Shovel hour constraints
Maximize net present value (NPv)
Canvas for defining flowsheet
Equipment scheduling
volume reports
variable bench heights
ntegrated with MineSight Haulage
Advanced Reporting and
Charting(ARC) tool
volume constraints
K|Y ||AJUk|S
Calculate schedules based on ob|ectives,
constraints, and economic parameters
Determine optimal cut mining sequence
per period
Automatically conduct infeasibility
analysis to find violating constraints
Maximize/minimize net present value
(NPv), stripping ratio, or metal contents
Utilize available truck and shovel
resources efficiently
Calculate schedules with or without
equipment scheduling option
mport cuts from multiple models
stored on reliable and secure databases
Provide flexible and customized reports
and charts for pre- and post-scheduling
analysis
Provide multiple commercialized
optimization engine options (LNDO &
CPLEX) to calculate schedules
Provide 64-bit package to help solve
more complex problems
ntegrated with MineSight Haulage to
define destinations, capacities, opening
balances, and calculate cycle time
Calculate cut precedence between
benches and phases
Allow semi-automatic material routing ntegrated with cuts designed by
MineSight nteractive Planner and
MineSight scripts
Read data directly from the MineSight
Planning Database
Cenerate customized reports and charts
filtered by periods, phases, benches,
materials, cutoff grade, cut attributes,
and/or equipment hours
Export customized reports to Microsoft
Excel and CvS
Export schedules to MineSight 3D for
visualization
201+ Mirtec lrc +rc |eic+ Cecs]steas. A|| ri|ts reserec. MireSi|t is + reisterec tr+cea+r| cl |eic+ Cecs]steas. 1
ntegrated with MineSight 3D
end-of-period maps
Provide advanced notes-taking tool Provide utility tools for archiving and
retrieving pro|ect
Define or nput:
Ob|ective per period
Materials sent to any number of
mills, leaches, pads, stockpiles, and
waste dumps
Mining, processing, marketing, and
geotechnical constraints
Stockpile mining and reclaiming
constraints as well as reclaiming
method
Constraints for materials sent to
destinations or received from
stockpiles
Constraints for grade items, grade
ratio, and stripping ratio
Bench vertical advance rates
(vARs)
Constraints for shovel and truck
hours
Advanced engineer constraints
such as don't mine/must
mine/must completely mine some
phases, benches or diglines
Tonnage constraints by phase,
bench, or diglines
volume constraints by mining
area, phase, bench, or destination
Destination tonnage/volume
capacity constraints
Physical relationships between
phases
Material movements by mining
area and by phase
Equipment usages by mining area
and by phase
201+ Mirtec lrc +rc |eic+ Cecs]steas. A|| ri|ts reserec. MireSi|t is + reisterec tr+cea+r| cl |eic+ Cecs]steas. 2