This document outlines the method statement for underground cable works including: surveying the cable route, excavating trial pits, trench excavation, cable pulling, jointing and termination, backfilling, installing route markers, testing and commissioning. Key steps include obtaining permits, marking the cable route, manually digging exploratory pits to locate existing utilities, using mechanical excavators for trenching where possible, installing cables in trenches with sand bedding and protection tiles, jointing and terminating cables, backfilling trenches, and testing installed cables before commissioning. Safety measures such as warning tapes and cones will be used during excavation and installation.
This document outlines the method statement for underground cable works including: surveying the cable route, excavating trial pits, trench excavation, cable pulling, jointing and termination, backfilling, installing route markers, testing and commissioning. Key steps include obtaining permits, marking the cable route, manually digging exploratory pits to locate existing utilities, using mechanical excavators for trenching where possible, installing cables in trenches with sand bedding and protection tiles, jointing and terminating cables, backfilling trenches, and testing installed cables before commissioning. Safety measures such as warning tapes and cones will be used during excavation and installation.
This document outlines the method statement for underground cable works including: surveying the cable route, excavating trial pits, trench excavation, cable pulling, jointing and termination, backfilling, installing route markers, testing and commissioning. Key steps include obtaining permits, marking the cable route, manually digging exploratory pits to locate existing utilities, using mechanical excavators for trenching where possible, installing cables in trenches with sand bedding and protection tiles, jointing and terminating cables, backfilling trenches, and testing installed cables before commissioning. Safety measures such as warning tapes and cones will be used during excavation and installation.
CONTENTS Page 1 Purpose 2 2 Scope of Works 2 3 Reference documents 2 4 Method of Installations 3 4.1 Site Surve 3 4.2 !rial pit "#cavation and findings 3 4.3 $ori%ontal &irectional &rilling 3 4.4 !rench e#cavation 4 4.' Sand (edding 4 4.) *a(le pulling 4 4.+ *a(le ,ointing and !ermination ' 4.- .ackfilling and Reinstatement ' 4./ Installation of Route 0 ,oint Markers ) 4.11 !esting and *ommissioning ) ' "2uipment and !ools - ) Safet and Risk Management - 1 PURPOSE Purpose of this method statement is to outline the se2uences and methods of 3orks intended to (e used for the e#cavation of trench for laing underground 33 k4 po3er5 67. !he *ontractor has the right to adapt the methods of e#ecution as contained in this document from time to time and modif as necessar according to specific site conditions. 2 SCOPE OF WORKS Method Statements For Under Ground Cabes !a"e # o$ % METHOD STATEMENT FOR UNDER GROUND CABLE WORKS !he scope of 3orks comprises Manual site surve8 !rail pit e#cavation8 !renching8 *a(le pulling8 *a(le 9ointing8 *a(le termination8 .ackfilling8 Installation of Protection tiles8 Installation of Warning tape8 Reinstatement8 Installation of route markers 0 ,oint markers8 *a(le testing8 $ori%ontal &irectional &rilling 0 7pen:cut for Road *rossings8 and Site clearance. 3 REFERENCES !he method statement shall (e read in con9unction 3ith the follo3ing documents; <a= >&W"> Specifications <(= >pproved ca(le route dra3ings <c= "#isting underground installations <d= >n other directions issued ( the local civil authorities at the site 4 METHOD STATEMENT 4.1 SURVEY 4.1.1 7(tain route approval as re2uired8 prior to start of 3ork. 4.1.2 *onduct Site surve8 esta(lish ca(le route8 and demarcate the trench at Site. 4.2 TRIAL PITS (EXPLORATORY EXCAVATION) 4.2.1 7(tain 3ork permit0?7* from various authorities 5 @>s .uilt@ dra3ings sho3ing all e#isting services. 4.2.2 Set up site8 marked areas to (e e#plored at 111 meters interval or as ma (e re2uired and also near the e#isting identified services8 and fi# 3ith 3arning tape 0 safet cones. 4.2.4 Intimate "tisalat0 &efense0 the concerned departments prior to e#posing their related services 4.2.' Start manual digging using pick:a#e 3ithout sharp edges and hand shovel. 4.2.) Aook in for an 3arning signs 0 3arning tape 0 ca(le tiles that might prop up during e#cavation and take necessar precautions 3hile digging.
4.2.+ "#pose e#isting kno3n (uried service. Record details of e#isting services. Method Statements For Under Ground Cabes !a"e & o$ % METHOD STATEMENT FOR UNDER GROUND CABLE WORKS 4.2.- Protect the services as per specified recommendations. 4.3 Road Cro!"# >s per the re2uirement of clause no.2.+ of >&W"> standards S B *I4IA: *>. 8 at crossing points of high3as 5 roads the contractor shall provide separate ducts for each ca(le circuit plus one spare circuit in the re2uired position. !he duct shall consists of P4* pipes 3ith minimum internal diameter of 211 mm 5 a 3all thickness of ' mm. a) CROSSIN$ FOR FUTURE ROADS% !his shall (e done either ( $&& method or open cut duct concrete (ank as per approved procedures. &) DIRECTIONAL DRILLIN$ (HDD 'or()% Road crossing ( &irectional drilling <$&&= shall (e done as per method statement of approved vendor. >nd nos of ducts shall (e as per re2uirements. .entonite filling in the pipes shall (e done as re2uired in the specification. 4.4 TRENCH EXCAVATION 4.4.1 Set out and mark the e#act line of ca(le route as per approved dra3ings and the o(tain ?7*0 Permission to Work. 4.4.2 "#cavation is carried out using a mechanical e#cavator. In areas 3here usage of e#cavator is unsafe 0 not possi(le8 the trench is made through manual digging. >s per re2uirement of clause no.4.2.2 of >&W"> standards S: *>.CI?S!:DE8 3here sand dunes or an other o(struction e#ist in the proposed ca(le routes8 the shall (e cleared to the normal ground level. 4.4.3 > designated *harge hand 3ill (e assigned to each machine. !he operator 3ill take the directions from the *harge hand or his *onstruction Supervisor 0 Pro9ect "ngineer. 4.4.4 Minimum depth 5 3idth of e#cavated trench and placement of po3er ca(le8 111mm dia DP4* pipe and 67 ca(le8 sand filling8 protection tiles8 3arning tape etc. shall (e generall as dra'!"# No. A33)* CF )**+ S ,--+ A <&ra3ings is attached here3ith= 4.4.' Safet cones 3ill (e provided 3ith 3arning tape along the top edge of the Method Statements For Under Ground Cabes !a"e ' o$ % METHOD STATEMENT FOR UNDER GROUND CABLE WORKS trench. >n e#isting services8 3hich are uncovered as a result of e#cavation8 3ill (e protected 3ith temporar measures8 if re2uired. 4.4.) >ll e#cavated loose material at the top level of the trench 3ill (e removed from the edge of e#cavation. 4.4.+ .ottom of e#cavation 0 trench shall (e trimmed off and free from sharp o(9ects i.e. stones etc prior to sand (edding. 4.' SAND .EDDIN$ 4.'.1 > minimum of 1'1 mm sand (edding on trench (e provided for ca(le cushions. 4.) CA.LE PULLIN$ / LAYIN$ 4.).1 "nsure that areas 0 trench to (e pulled 0 laid 3ith ca(les are inspected and approved. 4.).2 &rums shall (e placed on a pair of stand and shaft to provide smooth rolling 3hile pulling. 4.).3 !he direction of rotation of *a(le drum for moving of ca(le drum or laing of ca(le 3ill (e strictl as per the arro3s marked on the ca(le drums. 4.).4 Set Winch properl and securel fi# to the re2uired distance. 4.).' In order to prevent ca(le damage during pulling operation8 ca(le rollers shall (e placed at ma#imum 2 mtrs intervals as per re2uirement of clause no.4.2.4 of >&W"> standards S:*>.:I?S!:DE8 !he distance (et3een the rollers shall (e maintained and 3ell fi#ed. >ppropriate corner rollers 3ill (e provided as re2uired. 4.).) Special o(servance and care 3ill (e taken 3hen pulling in areas 3ith corners8 through road crossings and through e#isting ducts. 4.).+ *heck ca(le ducts for de(ris and sharp edges and clean the ducts if necessar. 4.).- *a(les to (e applied 3ith sealant or pulling compound for smooth and eas pulling 3hen entering ca(le ducts if necessar. 4.)./ .oth ends of ca(le cut to (e capped8 taped and identification are provided. 4.).11 Perform sheath test 5 meggering on laid ca(le prior to 9ointing and (ack filling as per specification re2uirement. Sheath test shall (e conducted ( in9ecting 11 k4 &* using &* $4 !est kit 5 ' k4 Insulation !ester (et3een armour and the e#ternal graphite surface of the sheath for one minute8 Method Statements For Under Ground Cabes !a"e ( o$ % METHOD STATEMENT FOR UNDER GROUND CABLE WORKS 3ith all remaining phases solidl grounded and the leakage current recorded on test 6ormat. 4.+ 0OINTIN$ AND TERMINATION *a(le 9ointing shall (e done as per the ,oint Fit manufacturerGs instructions 0 instruction manual 3ith the approved 9ointer of >&W">0>>&* in accordance 3ith the (est 3orkmanship. 4.- .ACK F1LLIN$ / REINSTATEMENT Soil !hermal resistivit shall (e measured as per re2uirement of clause no.3a of >&W"> standards S:*>.:I?S!:DE along the route of ca(le. Soil !hermal resistivit 5 temperature of (ackfilling material shall (e measured as per re2uirement of clause no.3 f of >&W"> standards S: *>.:I?S!:DE. !he .ackfilling material should have a ma#imum thermal resistivit of 121 cm2 *0W under operational conditions 5 shall (e chemicall neutral as per re2uirement of clause no. 3 e of >&W"> standards S:*>.:I?S!:DE. Special (edding material shall (e used as per re2uirement of clause no.4.2.+ of >&W"> standards S:*>.:I?S!:DE8 3here the thermal resistivit of natural soil e#ceeds 121 cm2 *0W. 4.-.1 !he "ngineer:*onsultant 0 73ner:*lient ma conduct inspections prior to sand covering 0 installation of 3arning tapes 0 final (ack filling 0 installation of ca(le route markers to keep the continuit 5 progress of the 3ork. 4.-.2 Installed ca(les shall (e covered 3ith selected fine sand upto the level of 3arning tape as re2uired in >&W"> dra3ing no. >&W"> 11 11 1+. !he protection tiles for 33 F4 ca(le trench shall (e '11 mm length8 2'1 mm 3idth 5 concrete grade is *3' 3ith cement tpe 4 <SR*=8 min cement content 3+1 kg0m38 all edges to (e chamfered 5 name to (e fi#ed on each protection tile as per the specification. Protection tiles for M4 5 A4 ca(les shall (e '11 mm length8 211 mm 3idth 5 )1 mm thickness. 4.-.3 .alance of the e#cavated de(ris8 if an8 shall (e level:spread to reinstate the area to the pre:e#cavation condition. >nd if necessar e#tra earth shall (e disposed off. 4.-.4 Permanent reinstatement shall (e done in foot paths and tiled areas. Method Statements For Under Ground Cabes !a"e ) o$ % METHOD STATEMENT FOR UNDER GROUND CABLE WORKS 4./ CA.LE ROUTE MARKERS *a(le Route 5 ,oint markers shall (e installed for each po3er ca(le circuits. *a(le route markers shall (e installed on straight route at distances not e#ceeding 31M and at the points 3here the ca(le route makes a turn and (oth side of road crossings. >nd 9oint marker shall (e installed on top of 9ointing to mark the location of the 9oint. >ll ca(le route 5 9oint markers shall (e made of reinforced concrete and of truncated cone tpe as per approved >&W"> specification. 4.11 TESTIN$ / COMMISSIONIN$ a) S23a42 434 a"d !"51a4!o" r3!4a"63 73a5r373"4 o8 6o"d564or 4.11.1 ?otif the concerned parties to 3itness the test as necessar. 4.11.2 "nsure that ca(le rating8 tpe8 si%e and ca(le num(er conforms to specification and dra3ings. 4.11.3 Surroundings of the testing area shall (e cordoned off and access restricted to authori%ed persons onl. 4.11.4 "nsure that valid 5 cali(rated test e2uipments are availa(le at the test area. 4.11.' $4 hand gloves and $4 grounding sticks shall (e provided for safe handling and draining of voltage residue. 4.11.) Make the ca(le ends at (oth ends read for testing ( removing '11 mm long graphite coating from the ca(le. 4.11.+ Short3ave communication sstem shall (e in place prior to commencement of testing. 4.11.- 6or safet precautions8 one designated representative shall guard the ca(le at the non:testing end. 4.11./ *a(les shall (e checked for continuit and for correct phases. 4.11.11 >ll tests re2uired as per >&W"> Standards S>!:*>.:E"? 5 S>!:*>.: !PR8 for $4:HAP" *a(les shall (e done and the value shall (e recorded on test format. 4.11.11 Sheath !est shall (e conducted ( in9ecting 11 k4 using $4 &* test kit (et3een armour and the e#ternal graphite surface of the sheath for one minute8 3ith all remaining phases solidl grounded and the leakage current shall (e recorded. Method Statements For Under Ground Cabes !a"e * o$ % METHOD STATEMENT FOR UNDER GROUND CABLE WORKS 4.11.12 Immediatel after testing of each phase8 voltage residue shall (e drained ( using grounding stick 3hich is directl connected to earth ground. 4.11.13 !he insulation resistance shall (e measured (et3een phase to phase and phase to earth prior to 9ointing. 4.11.14 Results shall (e recorded. &) HV 434!"#% >fter completion of all straight through 9oints and end termination the phasing out0identification shall (e done from one end to other end and $4 test shall (e conducted as per specification and results shall (e recorded. -.+ E9UIPMENT AND TOOLS !he follo3ing tools 5 tackles 3ill (e at use per site conditions; *a(le Pulling Winch !railer *a(le !rolles *a(le &rum Stand and Shaft *a(le Rollers Pulling Wire or Rope Pulling "e *hain .lock Shackle 0 S3ivel F4 Insulation <Megger= Resistance !ester $4 !est Fit Multi Meter <&igital= $4 $and Eloves $4 Erounding Stick $and !ools !rucks *rane "#cavator Water !anker 3.' !on !ruck for material movement. Plate *ompactor Surve Instrument Ao3 .ed !railer &irectional .oring Machine Method Statements For Under Ground Cabes !a"e + o$ % METHOD STATEMENT FOR UNDER GROUND CABLE WORKS ) SAFETY AND RISK MANA$EMENT >ll e#cavation 3ork 3ill (e e#ecuted in accordance 3ith the >&W">0>>&* $ealth and Safet Plan and necessar precautions shall (e made to ensure safet of men and protection of environment and materials. Special attention 3ill (e given to; : *ordoning off the open pit e#cavation area. : Making sta(le slope if re2uired. : Placement of applica(le safet 3arning gadgets and sign (oards. : >llo3 onl authori%ed personnel to have access to the site. : Provision of first aid kit at the site. IIIII Method Statements For Under Ground Cabes !a"e % o$ %