COMPANY SPECIFICATIONS







ELECTRICAL, TELEPHONE AND
SAFETY SYSTEMS IN CABINS







20222.BLD.ELE.SDS

Rev. 1 July2003



ENGINEERING COMPANY STANDARD
This document is property of Eni S.p.A. Eploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.


Eni S.p.A.
Exploration & Production Division
20222 BLD.ELE.SDS
Rev. 1 July 2003
Sheet 2 di 19

FORWARD

Rev. 0 Sheet 15
September 1997
Issue in conformity with EEC directives
This specification replaces and supersedes the following specification:
a) 11583.BLD.ELE.SPC: General Specification - ELECTRICAL, TELEPHONE AND SAFETY
SYSTEMS IN CABINS


Rev. 1 Total number of pages: 17
July 2003
Issue for normative references revision and contents conformity

Eni S.p.A.
Exploration & Production Division
20222 BLD.ELE.SDS
Rev. 1 July 2003
Sheet 3 di 19

CONTENTS

1. GENERAL
1.1. Scope
1.2. Applicability

2. PROJECT GENERAL REQUIREMENTS
2.1. Design premises
2.2. Reference laws and rules
2.3. Measurement units
2.4. Graphic symbols, codes and identification logos

3. DESIGN
3.1. General
3.2. Environmental conditions
3.3. Voltage levels
3.4. Voltage variations
3.5. Lighting levels
3.6. Contemporaneity coefficients
3.7. Safety execution
3.8. Earthing systems

4. DESIGN DEVELOPMENT
4.1. Conductors sizing
4.2. Circuits sectioning
4.3. Circuits protection
4.4. Protection against direct and indirect contacts
4.5. Earthing systems
4.6. Telephone system
4.7. Damp and wet environments systems
4.8. Systems in infirmary rooms
4.9. System in electric storage batteries rooms
4.10 Fire detection and Fire-Fighting System

5. MATERIALS
5.1. Selection criteria
5.2. Cables
5.3. Junction and connection boxes, control, protection and signal boxes
5.4. Terminal strips
5.5. Sockets
5.6. Battery room extractors

6. INSTALLATION CRITERIA
6.1. General
6.2. Electric plant installation
6.3. Instruments plant installation

7. ACCEPTANCE TESTS

8. TECHNICAL DOCUMENTS

Eni S.p.A.
Exploration & Production Division
20222 BLD.ELE.SDS
Rev. 1 July 2003
Sheet 4 di 19

1. GENERAL

1.1. Scope

This specification defines the main design requirements, supply of material, installation and test of
electrical, telephone and safety systems included in the supply of onshore and offshore cabin.
These shall be considered as general requirements, while the technical definition of the plant and
relevant components shall be the Suppliers responsibility.


1.2. Applicability

This specification shall be considered as an integration of those aspects not covered by the Project's
Specification, where the competence limit, project data and particular choices made are set out.

Eni S.p.A.
Exploration & Production Division
20222 BLD.ELE.SDS
Rev. 1 July 2003
Sheet 5 di 19

2. PROJECT GENERAL REQUIREMENTS

2.1. Design premises

The project will be executed in compliance with the document issued by the Company and observing
the Reference Laws and Rules mentioned. General good practices in technical projects shall however
be respected, particularly as regards safety and accident prevention.


2.2. Reference Laws and Rules

Generally, the Laws, Regulations and Technical Rules issued on the subject m the installation Country
will be respected.

2.2.1. Systems in Italy

Main Law Provisions


DPR 547
7/04/1955
"Rules for the prevention of work accident"
Law 186
01/03/1968
Provisions concerning the production of material, equipment,
machines, installations, electric and electronic plants"
Law 791
18/10/1977
"Application of the EEC directive (72/23 EEC)" relating to the safety
guarantee of electric material to be used within certain voltage limit"
DPR 886
24/05/1979
Integration and adjustment of the rules on pits and caves contained
in the Decree by the President of the Republic (9th April 1959, No.
128) to regulate hydrocarbon prospection, research and exploitation
m territorial seas and m the territorial platform (Supplement no. 1 of
the Official Gazette no. 114 dated 26th April 1980)"
Law 46
05/03/1990
"Technical plants safety, protection, installation and maintenance"
DPR 447
06/12/1991
"Regulation of the realisation of Law 46/90 "
DLgs 615/96 "Implementation of the directive 89/336/CEE/89, in the subject
matter of rapprochement of the member States legislative acts
relating to the electromagnetic compatibility, changed and
integrated by the Directive 92/31/CEE/92, by the Directive
93/68/CEE/93 and by the Directive 93/97/CEE/93"
Dlgs 626/96 "Implementation of the directive 93/68/CE in the subject matter of
CE marking of the electric materials to be used within certain
voltage limits".
DPR 459/96 "Decree of acceptance of the Machines Directive (MSD)
89/392/CEE, 91/368/CEE, 93/44/CEE and 93/68/CEE concerning
rapprochement of member states legislations regarding machines"
DPR 126/98 "Decree of acceptance of the Directive Atex 94/9/CE regarding
materials for potentially explosive atmosphere"

Eni S.p.A.
Exploration & Production Division
20222 BLD.ELE.SDS
Rev. 1 July 2003
Sheet 6 di 19

Technical normative regulations:

Standards EN (CEI EN)
Standards CEI / CEI UNEL (in the absence of Harmonisation Normative references)
Standards IEC (for the lack of Harmonisation and National Normative references)
Standards ISO
Standards UNI


The following normative references can be applied depending upon the type of plant:

N.F.P.A.
SOLAS
DIN
DMCO
ASME
ASTM
ANSI
API.

2.2.2. Systems abroad

Law provision
Laws and rules of the country of installation

Technical rules

Standards IEC
Standards EN (CEI EN)
Standards CEI / CEI UNEL (in the absence of Harmonisation Normative references)
Standards ISO
Standards UNI

The following normative references can be applied depending upon the type of plant:

N.F.P.A.
SOLAS
DIN
DMCO
ASME
ASTM
ANSI
API.


2.3 Measurement units

The measurement units adopted will conform to the International System (I.S.) ISO 1000:1992.
For the cable conduits diameters and fittings in general, the measurement in "inch" may be used.


2.4. Graphic symbols. Identification Codes and Logos

Graphic symbols, identification codes and logos will conform to the CEI EN rules, IEC Standards,
standards and procedures indicated in the Project's Specification.
Eni S.p.A.
Exploration & Production Division
20222 BLD.ELE.SDS
Rev. 1 July 2003
Sheet 7 di 19

3. DESIGN

3.1. General

The design is the entire responsibility of the Supplier who will respect the standard good practice, the
Client's requirements expressed in this specification, the Project Specification, the reference rules and
documents, the safety and functional requirements.


3.2. Environmental conditions

The plants and their components shall be suitable to the environmental conditions in the installation
site defined in the Projects Specification and relevant Data Sheet.


3.3. Voltage levels

3.3.1. Power supply at delivery point

If not otherwise specified in the Data Sheet, the voltage levels relating to electric energy supply will be:

400V 10%; 50 Hz 5% : three-phase and directly earthed neutral
110V : direct current

The symmetric short circuit current value will be defined time by time in the Project's specification.


3.3.2. Distribution systems supply

If not otherwise specified in the Data Sheet, the voltage levels provided for the distribution systems
supply and the relevant electric uses will be:

Power : 400V -50Hz - three-phase+neutral
Normal light : 230V - 50Hz - phase+neutral
Safety light : 110V d.c.
Motors higher than 1kW : 400V - 50Hz - three-phase
Motors lower than 1kW : 230V - 50 Hz - phase+neutral
Three-pole+earth plugs : 400V - 50 Hz, three-phase
Two-pole+earth plugs : 230V - 50 Hz - phase+neutral


3.4. Voltage Variations

The electric system's components shall be selected so that maximum voltage variations, at normal
operating conditions, do not exceed the following values:

Light circuits: 3%
Power Circuits: 5%

The maximum voltage drop admitted at the asynchronous motor start shall not exceed 15%.
Eni S.p.A.
Exploration & Production Division
20222 BLD.ELE.SDS
Rev. 1 July 2003
Sheet 8 di 19

3.5. Lighting Levels

If not otherwise specified in the Project's specification the minimum lighting levels indicated below
shall be adopted. For rooms not considered here below, occupied by personnel with special
requirements, the lighting levels will be defined in each case by comparison with the values indicated
below or by reference to the rules of good practice.

Technological rooms-workshops : 500 Lux
Storerooms-warehouse-services : 100 Lux
Laboratories : 600 Lux
Switchboard rooms : 200 Lux
Control rooms : 300 Lux
Computer rooms : 300 Lux
Corridors : 100 Lux
Infirmary : 850 Lux
Offices : 500 Lux
Changing rooms-showers-toilets : 150 Lux


For more details refer to specification 20209.VAR.ELE.SDS.

3.6. Conteporaneity Coefficients

The contemporaneity coefficients for the determination of the conventional loading shall be lower than
the values indicated below:

Light points : 1
Continuous Use Equipment : 0.8
Plugs (n= number of plugs) : 1/n+0.1
Conditioning : 1
Various centralised services (water, thermal, etc.) : 0.8


3.7. Safety Execution

For the following usages the electric plants shall be realised in accordance with the regulation
CEI EN 60079-14 ( or IEC 60079-14) :

Battery rooms: : plant for zone 1 with the presence of hydrogen
Buildings for Measurements : plant for zone 1 with the presence of neutral gas

In other cases the above shall be installed in accordance with the type of zone and substance present.

3.8. Earthing Systems

The earthing systems for the protection against indirect contacts and against lightning shall be
designed and sized in compliance with the CEI rules CEI 11-1, 64-8, CEI EN 60079-14, 81-1.

For data processing equipment for earthing plant installation the following requirements should be
met:

for dispersion currents exceeding 3,5 mA the above shall be be installed in conformity with CEI EN
60950 - 5.2 or with Appendix G.
Eni S.p.A.
Exploration & Production Division
20222 BLD.ELE.SDS
Rev. 1 July 2003
Sheet 9 di 19

for dispersion currents exceeding 10mA, (Rules CEI 64-8, art. 707.471.3.3) and met all the
requirements relating to directive EMC, the devices should be in accordance with one of the
following three instructions 707.471.3.3.1, 707.471.3.3.2, 707.471.3.3.3.

Eni S.p.A.
Exploration & Production Division
20222 BLD.ELE.SDS
Rev. 1 July 2003
Sheet 10 di 19

4. DESIGN DEVELOPMENT

4.1. Conductors sizing

Sizing on the basis of normal operating currents shall be carried out considering the following criteria:

supply conductors of the single equipment will be sized for the standard capacity of the equipment.
supply conductors of more loads will be sized for the maximum capacity required during standard
operations, taking into account a contemporaneity coefficient of loads as indicated in chapter 3.6.

Conductors shall be sized considering also the maximum voltage drops accepted indicated in chapter
3.4 and the co-ordination of protections against overload and short circuit currents as provided in rules
CEI 64.8. If not otherwise indicated, the minimum sections of conductors admitted according to rules
CEI 64-50 will be:

2.5 mm
2
for power circuits
1.5 mm
2
for light circuits


4.2. Circuits Sectioning

Each circuit shall have supply sectioning systems with suitable switch or under load disconnecting
switch.


4.3. Circuit Protection

Each circuit will be provided with protection devices against overcurrents for equipment and cables,
according to rules CEI 64.8.


4.4. Protection against direct and indirect contacts

All necessary measures shall be taken to protect persons against any dangers of contact with the
active parts of the electric plant. All accessible metallic parts of equipment, switchboards and other
parts of the electric plant not belonging to very low voltage safety circuits, shall be protected against
contact voltages. The protection will be executed by earthing all accessible metallic parts and
coordination of automatic switching devices as indicated in the regulation CEI 64-8 for the plants of TT
and/or TN type.


4.5. Earthing systems

Each cabin will be equipped with an earthing system connected to the general system. An earthing
main ring will be provided at the bottom of the cabin with copper plait or bar, protected against
oxidation and of a section not lower than 95 mm
2
.
The main ring will be connected to 4 earthing plates (BTH type), externally welded to the skid of the
cabin.
All shunts shall be made of copper plait, insulated, with a 25 mm
2
section.
The earthing protection will be integrated by differential earth devices. These devices shall be installed
on single circuits both for power distribution and for the light distribution.
Eni S.p.A.
Exploration & Production Division
20222 BLD.ELE.SDS
Rev. 1 July 2003
Sheet 11 di 19

4.6. Telephone system

The system will be designed in accordance with the Client's specifications and will be composed of
conduits, cabletrays, cables, sockets, redial operations, box with terminal strips, telephone apparatus
and all is necessary for a good system's performance.
Each telephone socket, will come from the arrival box with single cable 1x2x0.6+T.
Telephone apparatuses shall be the civil type, wall or table telephones, of the standard digit keypad.


4.7. Damp and Wet Environment Systems

4.7.1. General

Plants shall be designed and built according to the requirements contained in rules CEI 64-8/7 and
64-50.


4.7.2. Bathroom and showers

For bathrooms and showers all the special requirements indicated in CEI 64-8/7 rules will be
respected, regarding the selection of materials and the execution of electric plants in areas 0, 1, 2 and
3 defined in the rules themselves.


4.7.3. Supplementary equipotential connection

A supplementary equipotential connection shall be carried out to connect all external mass of 1, 2 and
3 areas with the protection conductor (Rules CEI 64-8/7).
For pipings it will be sufficient that these are connected to the protection conductor (PE) at the rooms
entry.


4.8. Systems in infirmary rooms

Electric plants in rooms intended for the infirmary shall be generally designed and constructed in
accordance with rules CEI 64-8/7 part 701 relating to rooms of group 0.
Group 0 rooms shall not require particular practice and can be constructed following the regulations of
64-8 for ordinary surroundings.
Eni S.p.A.
Exploration & Production Division
20222 BLD.ELE.SDS
Rev. 1 July 2003
Sheet 12 di 19


4.9. System in Electric storage batteries rooms

In storage batteries rooms on the stage of complete charging, hydrogen production for electrolysis
takes place.
This fact leads to classification of the following zones:((Figure 1 from guides CEI 64-14):

between the room ceiling and the penetration grid superior edge (zone with a low degree of
ventilation) classified as Z1 (however, eliminable);

within the radius of 50 cm around the storage batteries penetration (EN 50272-2) Z1 for
batteries of open type, Z2 for batteries if of closed type, valves regulated, i.e. hermetic.

Therefore, provision is made for cropped ceiling (Figure 2), whence to eliminate in any case the zone
with a low degree of ventilation.

Penetrations with walls air induction, to assure natural ventilation under normal operation
conditions as well as during complete charging stage;

Any eventual system of artificial ventilation and, in case VN of the above mentioned shall
not be in grade of guaranteeing air exchange sufficient to maintain the percentage of gas
(hydrogen) produced by storage batteries during the complete charging stage, under 30%
of the inflammability inferior limit, as per the calculation given below.

Ventilation system should be provided in this case with two extractors, each sized for the full capacity
required and each one being stand-by for the other one.
Their availability (continuous functioning) shall be double, since two identical ventilation systems
should be installed, independent upon common failure causes, thus guaranteeing uniform air dilution
in the room, that shall be then artificially classified as non-AD.



















STORAGE BATTERIES
OF CLOSED TYPE
WITH VALVE
0,5 m
0,5 m
SCARCE VENTILATION
ZONE
VENTILATION
PENETRATION OPENING
Z2
Z1
Figure 1 - Hazardous zones of batteries room with
zone with low degree of ventilation
Eni S.p.A.
Exploration & Production Division
20222 BLD.ELE.SDS
Rev. 1 July 2003
Sheet 13 di 19









1.


2.
3.
4.
5.
6.
7.



STORAGE BATTERIES
OF CLOSED TYPE
WITH VALVE
VENTILATION
PENETRATION OPENING
0,5 m
0,5 m
Z1
Z2
Figure 2 - Hazardous zones of batteries room without
zone with low degree of ventilation

As indicated by Regulation DIN-VDE 0510 part 2, ventilation flow sufficient to dissolve air under 30%
of the inflammability inferior limit results from the following relation :

Q = v q s n I k
where :

Q = air volume m/h
v = dilution factor, ratio of water-air volume on the minimum inflammability
level of hydrogen v= 96%/4% = 24
q = hydrogen volume developed for electrolysis by current in every cell
per 1 ampere and per 1 hour, at the temperature of 0C and pressure
of 1013 bar q = 0,42 10
-3
m
3
/Ah
s = Safety factor In the regulation s = 5 is advised
n = Number of cells
I = Current value in correspondence of which electrolytic dissociation
occurs, per V > 2,4 V/elem (2A for every 100 Ah)
k = Antimony content indicating factor (k = 1 for Sb>3%, k = 0,5 for
Sb<3%), effects directly the value of current

Similar value is obtained by the formula in regulation EN 50272-2 (actually: v q s = 0,052)

Q = 0,05 x l x n x k

For batteries of hermetic type in Pb, the formation of hydrogen during complete charging is
5-10 times less than that with batteries of open type, thus the value of current is reduced by
further factor of 0,5 and in consequence, even the capacity value.
In this case ventilation is easily obtainable with only VN, penetrations with walls air induction
(cropped ceiling) and/or doors air induction being sized in order to guarantee natural air flow
as calculated.
Therefore, the use of artificial ventilation system is not required.
Eni S.p.A.
Exploration & Production Division
20222 BLD.ELE.SDS
Rev. 1 July 2003
Sheet 14 di 19


Penetrations shall have minimum dimensions determined in accordance with the following
calculation (DIN VDE 0510 - part 2):

A (cm
2
) 28 x Q (m
3
/h)

If provision should not be made for two of them, one shall be of entrance and the other one of
exit on the opposite walls, and if possible, one shall be in the upper part and the other in the
lower part.

The ventilation is considered of high degree, when it provides for dissolving, below 30% of
LEL, produced gas and hydrogen vapours, within a significant distance from producing
sources and ceasing the production at concentration being under LEL in all the surroundings.
The availability (or reliability) of ventilation system can be classified as good as it is always
present (under normal operating conditions as well as during complete charging stage).
As far as the typology of electrical plant concerns, its type shall correspond to
non-hazardous area, since installed in the non-AD, i.e. outside the zone compressed in the
radius of 0.5 m from penetrations (ducts) (EN 50272-2 e DIN-VDE 0510).

The choice of hermetic batteries with gas recombination or gel electrolyte, almost barren of
hydrogen production, provides for natural ventilation only (one grid on one side in the bottom
and one grid on the other side in the upper part) and for ordinary lighting system of normal
type (only Watertight type).

However, for preventive purposes, ordinary lighting system and safety lighting system can be
anyway installed in Ex execution manner.
Eni S.p.A.
Exploration & Production Division
20222 BLD.ELE.SDS
Rev. 1 July 2003
Sheet 15 di 19

4.10. Fire detection and Fire-Fighting System

When required the fire-fighting system will be composed of:

4.10.1. Smoke Detection System

Through detectors installed in the rooms to be protected.
The detectors will be installed on the ceiling and, in the presence of a false floor, they will be installed
with cabling passage, under it as well. The quantity and position of detectors will be defined each time
on the basis of the dimensions and characteristics of the cabin.


4.10.2. Flame Detection System

Through W/IR detectors installed in the rooms to monitor.

The detectors will be installed on the wall or ceiling and their quantity and position will be decided
each time on the basis of the dimensions and characteristics of the cabin.


4.10.3. Poison Gas or Explosive Mixture Detection System

Through detectors installed outside the cabin to be protected. Sensors will be installed, when required,
if the cabin is near the classified areas, at a distance that, for processing or atmospheric reasons,
does not guarantee safety.
When these conditions persist, detectors will be mounted before to conditioning intakes. In the
absence of these, they will be installed close to the cabin on a stake placed at 1.5 m height from the
ground.

4.10.4. Extinguishing System with gas saturation

It is composed of one or more cylinders containing the extinguisher connected to a channelling and
distribution system installed on the ceiling and under the false floor, in the presence of this.
Cylinders will be installed outside, in adequate spaces created in the cabin itself and protected by
steel plate panels.
If the cabin consists of more rooms, each of them will have a separate plant and will be sized
according to its volumes.
In rooms protected by extinguishing systems with inert gas saturation, optical/acoustic alert systems
will be installed inside and an optical one outside next to the entrances, with inclusion/exclusion
selectors on the entrance and interceptions doors.
All instruments mounted in the cabin will be connected to electric boxes installed inside and outside
the cabins.

The type to be utilized shall depend upon evaluation that shall consider the use of cabins,
manned/unmanned and technical/economic factors.
Extinguishers to be normally utilized are as follows:

Carbonic anhydride (CO
2
)
Inergen (Azoto-Argon-CO
2
)

Other extinguishers typologies shall be specified in the Data Sheet, extinguishers containing
chlorinefluorocarbides (CFC) shall not be used in any case.

In relation to the types of plant and if required, cabins will also be equipped with portable CO
2

extinguishers as well as the above systems.
Eni S.p.A.
Exploration & Production Division
20222 BLD.ELE.SDS
Rev. 1 July 2003
Sheet 16 di 19

The quantity will be defined each time on the basis of dimensions and will be indicated on the "Data
Sheet".
Eni S.p.A.
Exploration & Production Division
20222 BLD.ELE.SDS
Rev. 1 July 2003
Sheet 17 di 19

5. MATERIALS

5.1. Selection Criteria

Materials and equipment will be selected on the basis of the individual characteristics of each
component, considering the place of installation and the climatic conditions show in the Data Sheet.


5.2. Cables

Cables will be insulated by means of an elastomer mixture, quality "G10", or similar not propagating
fire (CEI 20-22), and flame (CEI 20-37; CEI 20-38), with low smoke and poison or corrosive gas
emission (CEI 20-35, 20-37, 20-38). The colours of cores will be chosen according to CEI-IEC Rules.


5.3. Junction and Connection Boxes. Control. Protection and Signal Boxes

These will be chosen in relation to the number and type of conductors, the equipment they will contain
and their use. They will have a protection level not lower than "IP23" for indoors and IP55 for
outdoors, unless otherwise specified. They will be made of incombustible material.


5.4. Terminal Strips

Terminals will conform to the reference rules and, in particular, they will allow for disconnection and
further re-connection of the conductors without damaging them.


5.5. Sockets

Sockets will conform to the types required and/or approved by the Client. On the walls, fixed sockets
will not be installed at a height from the floor lower than 300 mm (measured from the middle of the
sockets). Sockets intended for supply to equipment that, due to their capacity or special
characteristics, may cause danger during insertion or disinsertion of plugs, and all standard current
sockets higher than 16A will be provided with an interruption element before the sockets, to allow for
these operations in open circuit.


5.6. Battery Room Extractors

For the possible production of hydrogen during the charging operations of storage batteries the battery
rooms should be constructed with an adequate number of air exchange per hour.
If from the calculations described in paragraph 4.9 the natural ventilation through grids results
insufficient, two extractors shall be in stalled, one being in stand-by for the other one, they will be of
EExdIICT3 execution.
Their power will be measured in order to maintain in any case the hydrogen concentration inferior to
30% of LEL.
Eni S.p.A.
Exploration & Production Division
20222 BLD.ELE.SDS
Rev. 1 July 2003
Sheet 18 di 19

6. INSTALLATION CRITERIA

6.1. General

The plant installation will be carried out according to the latest edition of the Reference Rules and in
particular, according to Rules CEI 64-50. In any case, electric plants will be installed according to the
good practice especially with regard to safety and accidents prevention. The Supplier will obtain
recognition of the technical/professional requirements and will issue a conformance certificate
testifying the compliance with the Rules requirements.


6.2. Electric Plant Installation

6.2.1. Conduit Installation

Distribution in the cabin will be the exposed type. Cables will be installed within conduits or cable trays
made of resin, of a self-extinguishing type with low smoke and poison gasses emission. The internal
diameter of conduits will be at least 1.3 times the diameter of the ideal circle containing the group of
cables and not lower than 15 mm. Inside the battery room the plant should be, if necessary, worthy for
zone 1.


6.2.2. Conductors Installation

Electric and telephone conductors will be installed in conduits, cable trays and boxes independent
from one another, so that they do not cause any reciprocal interference.
All penetrations for conductors will be sealed with self-extinguishing compounds and, when required,
should be installed in such a way that pre-existing class REI might be restored.
All exiting cables will pass through a sleeve welded to the bottom plate and fastened with stainless
steel cable glands AISI 316. When required, sealed penetrations type MCT or similar shall be used.


6.2.3. Protection Conductors (PE)

Protection conductors will be installed in a way to avoid mechanic or corrosion damages. Each
mounting element will be provided with its own protection conductor.


Eni S.p.A.
Exploration & Production Division
20222 BLD.ELE.SDS
Rev. 1 July 2003
Sheet 19 di 19

6.3. Instrument Plant installation

The instrument plant relevant to smoke and flame detectors shall be of non safety type, except for the
cases when sensors are installed in the rooms with possible accretion of hazardous atmosphere.

The instrument plant relevant to smoke detectors, The flame detection plant will be of intrinsic safety
type in any case. The plant inside the battery room will be Eex-d type, using conduits, towards the
room exit signal.


6.3.1. Cable installation

Intrinsic safe cables will be installed in segregated routes and adequately marked. AC supply cables
will be installed in separate routes.
Passages through walls will be fire resistant when required.
Cables will be installed in conduits or cable trays, as specified in par. 6.2.1.

Each exiting cable will pass through a sleeve welded to the bottom plate and fastened by a stainless
steel cable gland.


6.3.2. Pneumatic Plant

The pneumatic plant controlling locks will be made of AISI 316 stainless steel 6x4,4 mm pipe, from a
pneumatic distributor provided with pin interception valves. The distributor will be arranged in a way
that the Company can carry out the connection from outside the cabin.
In case the lock pistons work at a pressure lower than the battery limit pressure, a reducing filter will
be mounted in each supply fine.
Compression fitting shall be in AISI 316.


7. ACCEPTANCE TESTS

The acceptance tests required for plants are indicated in the attached "Inspection Data Sheet" (I.D.S.).


8. TECHNICAL DOCUMENTS

The Supplier will send to the Company all the documents indicated in the Project Specification and
relevant Data Sheet according to the set procedures and schedule. The technical documents will be
edited in the official language specified in the Project Specification and using the symbols indicated in
the Reference Rules.

Das könnte Ihnen auch gefallen