Eni S.p.A. Exploration and Production Division COMPANY SPECIFICATIONS ELECTRICAL, TELEPHONE AND SAFETY SYSTEMS IN CABINS 20222.BLD.ELE.SDS Rev. 1 July 2003 Sheet 2 di 19 FORWARD Rev. 0 Sheet 15 September 1997 Issue in conformity with EEC directives.
Eni S.p.A. Exploration and Production Division COMPANY SPECIFICATIONS ELECTRICAL, TELEPHONE AND SAFETY SYSTEMS IN CABINS 20222.BLD.ELE.SDS Rev. 1 July 2003 Sheet 2 di 19 FORWARD Rev. 0 Sheet 15 September 1997 Issue in conformity with EEC directives.
Eni S.p.A. Exploration and Production Division COMPANY SPECIFICATIONS ELECTRICAL, TELEPHONE AND SAFETY SYSTEMS IN CABINS 20222.BLD.ELE.SDS Rev. 1 July 2003 Sheet 2 di 19 FORWARD Rev. 0 Sheet 15 September 1997 Issue in conformity with EEC directives.
ELECTRICAL, TELEPHONE AND SAFETY SYSTEMS IN CABINS
20222.BLD.ELE.SDS
Rev. 1 July2003
ENGINEERING COMPANY STANDARD This document is property of Eni S.p.A. Eploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Eni S.p.A. Exploration & Production Division 20222 BLD.ELE.SDS Rev. 1 July 2003 Sheet 2 di 19
FORWARD
Rev. 0 Sheet 15 September 1997 Issue in conformity with EEC directives This specification replaces and supersedes the following specification: a) 11583.BLD.ELE.SPC: General Specification - ELECTRICAL, TELEPHONE AND SAFETY SYSTEMS IN CABINS
Rev. 1 Total number of pages: 17 July 2003 Issue for normative references revision and contents conformity
Eni S.p.A. Exploration & Production Division 20222 BLD.ELE.SDS Rev. 1 July 2003 Sheet 3 di 19
CONTENTS
1. GENERAL 1.1. Scope 1.2. Applicability
2. PROJECT GENERAL REQUIREMENTS 2.1. Design premises 2.2. Reference laws and rules 2.3. Measurement units 2.4. Graphic symbols, codes and identification logos
3. DESIGN 3.1. General 3.2. Environmental conditions 3.3. Voltage levels 3.4. Voltage variations 3.5. Lighting levels 3.6. Contemporaneity coefficients 3.7. Safety execution 3.8. Earthing systems
4. DESIGN DEVELOPMENT 4.1. Conductors sizing 4.2. Circuits sectioning 4.3. Circuits protection 4.4. Protection against direct and indirect contacts 4.5. Earthing systems 4.6. Telephone system 4.7. Damp and wet environments systems 4.8. Systems in infirmary rooms 4.9. System in electric storage batteries rooms 4.10 Fire detection and Fire-Fighting System
5. MATERIALS 5.1. Selection criteria 5.2. Cables 5.3. Junction and connection boxes, control, protection and signal boxes 5.4. Terminal strips 5.5. Sockets 5.6. Battery room extractors
6. INSTALLATION CRITERIA 6.1. General 6.2. Electric plant installation 6.3. Instruments plant installation
7. ACCEPTANCE TESTS
8. TECHNICAL DOCUMENTS
Eni S.p.A. Exploration & Production Division 20222 BLD.ELE.SDS Rev. 1 July 2003 Sheet 4 di 19
1. GENERAL
1.1. Scope
This specification defines the main design requirements, supply of material, installation and test of electrical, telephone and safety systems included in the supply of onshore and offshore cabin. These shall be considered as general requirements, while the technical definition of the plant and relevant components shall be the Suppliers responsibility.
1.2. Applicability
This specification shall be considered as an integration of those aspects not covered by the Project's Specification, where the competence limit, project data and particular choices made are set out.
Eni S.p.A. Exploration & Production Division 20222 BLD.ELE.SDS Rev. 1 July 2003 Sheet 5 di 19
2. PROJECT GENERAL REQUIREMENTS
2.1. Design premises
The project will be executed in compliance with the document issued by the Company and observing the Reference Laws and Rules mentioned. General good practices in technical projects shall however be respected, particularly as regards safety and accident prevention.
2.2. Reference Laws and Rules
Generally, the Laws, Regulations and Technical Rules issued on the subject m the installation Country will be respected.
2.2.1. Systems in Italy
Main Law Provisions
DPR 547 7/04/1955 "Rules for the prevention of work accident" Law 186 01/03/1968 Provisions concerning the production of material, equipment, machines, installations, electric and electronic plants" Law 791 18/10/1977 "Application of the EEC directive (72/23 EEC)" relating to the safety guarantee of electric material to be used within certain voltage limit" DPR 886 24/05/1979 Integration and adjustment of the rules on pits and caves contained in the Decree by the President of the Republic (9th April 1959, No. 128) to regulate hydrocarbon prospection, research and exploitation m territorial seas and m the territorial platform (Supplement no. 1 of the Official Gazette no. 114 dated 26th April 1980)" Law 46 05/03/1990 "Technical plants safety, protection, installation and maintenance" DPR 447 06/12/1991 "Regulation of the realisation of Law 46/90 " DLgs 615/96 "Implementation of the directive 89/336/CEE/89, in the subject matter of rapprochement of the member States legislative acts relating to the electromagnetic compatibility, changed and integrated by the Directive 92/31/CEE/92, by the Directive 93/68/CEE/93 and by the Directive 93/97/CEE/93" Dlgs 626/96 "Implementation of the directive 93/68/CE in the subject matter of CE marking of the electric materials to be used within certain voltage limits". DPR 459/96 "Decree of acceptance of the Machines Directive (MSD) 89/392/CEE, 91/368/CEE, 93/44/CEE and 93/68/CEE concerning rapprochement of member states legislations regarding machines" DPR 126/98 "Decree of acceptance of the Directive Atex 94/9/CE regarding materials for potentially explosive atmosphere"
Eni S.p.A. Exploration & Production Division 20222 BLD.ELE.SDS Rev. 1 July 2003 Sheet 6 di 19
Technical normative regulations:
Standards EN (CEI EN) Standards CEI / CEI UNEL (in the absence of Harmonisation Normative references) Standards IEC (for the lack of Harmonisation and National Normative references) Standards ISO Standards UNI
The following normative references can be applied depending upon the type of plant:
N.F.P.A. SOLAS DIN DMCO ASME ASTM ANSI API.
2.2.2. Systems abroad
Law provision Laws and rules of the country of installation
Technical rules
Standards IEC Standards EN (CEI EN) Standards CEI / CEI UNEL (in the absence of Harmonisation Normative references) Standards ISO Standards UNI
The following normative references can be applied depending upon the type of plant:
N.F.P.A. SOLAS DIN DMCO ASME ASTM ANSI API.
2.3 Measurement units
The measurement units adopted will conform to the International System (I.S.) ISO 1000:1992. For the cable conduits diameters and fittings in general, the measurement in "inch" may be used.
2.4. Graphic symbols. Identification Codes and Logos
Graphic symbols, identification codes and logos will conform to the CEI EN rules, IEC Standards, standards and procedures indicated in the Project's Specification. Eni S.p.A. Exploration & Production Division 20222 BLD.ELE.SDS Rev. 1 July 2003 Sheet 7 di 19
3. DESIGN
3.1. General
The design is the entire responsibility of the Supplier who will respect the standard good practice, the Client's requirements expressed in this specification, the Project Specification, the reference rules and documents, the safety and functional requirements.
3.2. Environmental conditions
The plants and their components shall be suitable to the environmental conditions in the installation site defined in the Projects Specification and relevant Data Sheet.
3.3. Voltage levels
3.3.1. Power supply at delivery point
If not otherwise specified in the Data Sheet, the voltage levels relating to electric energy supply will be:
400V 10%; 50 Hz 5% : three-phase and directly earthed neutral 110V : direct current
The symmetric short circuit current value will be defined time by time in the Project's specification.
3.3.2. Distribution systems supply
If not otherwise specified in the Data Sheet, the voltage levels provided for the distribution systems supply and the relevant electric uses will be:
The electric system's components shall be selected so that maximum voltage variations, at normal operating conditions, do not exceed the following values:
Light circuits: 3% Power Circuits: 5%
The maximum voltage drop admitted at the asynchronous motor start shall not exceed 15%. Eni S.p.A. Exploration & Production Division 20222 BLD.ELE.SDS Rev. 1 July 2003 Sheet 8 di 19
3.5. Lighting Levels
If not otherwise specified in the Project's specification the minimum lighting levels indicated below shall be adopted. For rooms not considered here below, occupied by personnel with special requirements, the lighting levels will be defined in each case by comparison with the values indicated below or by reference to the rules of good practice.
For more details refer to specification 20209.VAR.ELE.SDS.
3.6. Conteporaneity Coefficients
The contemporaneity coefficients for the determination of the conventional loading shall be lower than the values indicated below:
Light points : 1 Continuous Use Equipment : 0.8 Plugs (n= number of plugs) : 1/n+0.1 Conditioning : 1 Various centralised services (water, thermal, etc.) : 0.8
3.7. Safety Execution
For the following usages the electric plants shall be realised in accordance with the regulation CEI EN 60079-14 ( or IEC 60079-14) :
Battery rooms: : plant for zone 1 with the presence of hydrogen Buildings for Measurements : plant for zone 1 with the presence of neutral gas
In other cases the above shall be installed in accordance with the type of zone and substance present.
3.8. Earthing Systems
The earthing systems for the protection against indirect contacts and against lightning shall be designed and sized in compliance with the CEI rules CEI 11-1, 64-8, CEI EN 60079-14, 81-1.
For data processing equipment for earthing plant installation the following requirements should be met:
for dispersion currents exceeding 3,5 mA the above shall be be installed in conformity with CEI EN 60950 - 5.2 or with Appendix G. Eni S.p.A. Exploration & Production Division 20222 BLD.ELE.SDS Rev. 1 July 2003 Sheet 9 di 19
for dispersion currents exceeding 10mA, (Rules CEI 64-8, art. 707.471.3.3) and met all the requirements relating to directive EMC, the devices should be in accordance with one of the following three instructions 707.471.3.3.1, 707.471.3.3.2, 707.471.3.3.3.
Eni S.p.A. Exploration & Production Division 20222 BLD.ELE.SDS Rev. 1 July 2003 Sheet 10 di 19
4. DESIGN DEVELOPMENT
4.1. Conductors sizing
Sizing on the basis of normal operating currents shall be carried out considering the following criteria:
supply conductors of the single equipment will be sized for the standard capacity of the equipment. supply conductors of more loads will be sized for the maximum capacity required during standard operations, taking into account a contemporaneity coefficient of loads as indicated in chapter 3.6.
Conductors shall be sized considering also the maximum voltage drops accepted indicated in chapter 3.4 and the co-ordination of protections against overload and short circuit currents as provided in rules CEI 64.8. If not otherwise indicated, the minimum sections of conductors admitted according to rules CEI 64-50 will be:
2.5 mm 2 for power circuits 1.5 mm 2 for light circuits
4.2. Circuits Sectioning
Each circuit shall have supply sectioning systems with suitable switch or under load disconnecting switch.
4.3. Circuit Protection
Each circuit will be provided with protection devices against overcurrents for equipment and cables, according to rules CEI 64.8.
4.4. Protection against direct and indirect contacts
All necessary measures shall be taken to protect persons against any dangers of contact with the active parts of the electric plant. All accessible metallic parts of equipment, switchboards and other parts of the electric plant not belonging to very low voltage safety circuits, shall be protected against contact voltages. The protection will be executed by earthing all accessible metallic parts and coordination of automatic switching devices as indicated in the regulation CEI 64-8 for the plants of TT and/or TN type.
4.5. Earthing systems
Each cabin will be equipped with an earthing system connected to the general system. An earthing main ring will be provided at the bottom of the cabin with copper plait or bar, protected against oxidation and of a section not lower than 95 mm 2 . The main ring will be connected to 4 earthing plates (BTH type), externally welded to the skid of the cabin. All shunts shall be made of copper plait, insulated, with a 25 mm 2 section. The earthing protection will be integrated by differential earth devices. These devices shall be installed on single circuits both for power distribution and for the light distribution. Eni S.p.A. Exploration & Production Division 20222 BLD.ELE.SDS Rev. 1 July 2003 Sheet 11 di 19
4.6. Telephone system
The system will be designed in accordance with the Client's specifications and will be composed of conduits, cabletrays, cables, sockets, redial operations, box with terminal strips, telephone apparatus and all is necessary for a good system's performance. Each telephone socket, will come from the arrival box with single cable 1x2x0.6+T. Telephone apparatuses shall be the civil type, wall or table telephones, of the standard digit keypad.
4.7. Damp and Wet Environment Systems
4.7.1. General
Plants shall be designed and built according to the requirements contained in rules CEI 64-8/7 and 64-50.
4.7.2. Bathroom and showers
For bathrooms and showers all the special requirements indicated in CEI 64-8/7 rules will be respected, regarding the selection of materials and the execution of electric plants in areas 0, 1, 2 and 3 defined in the rules themselves.
4.7.3. Supplementary equipotential connection
A supplementary equipotential connection shall be carried out to connect all external mass of 1, 2 and 3 areas with the protection conductor (Rules CEI 64-8/7). For pipings it will be sufficient that these are connected to the protection conductor (PE) at the rooms entry.
4.8. Systems in infirmary rooms
Electric plants in rooms intended for the infirmary shall be generally designed and constructed in accordance with rules CEI 64-8/7 part 701 relating to rooms of group 0. Group 0 rooms shall not require particular practice and can be constructed following the regulations of 64-8 for ordinary surroundings. Eni S.p.A. Exploration & Production Division 20222 BLD.ELE.SDS Rev. 1 July 2003 Sheet 12 di 19
4.9. System in Electric storage batteries rooms
In storage batteries rooms on the stage of complete charging, hydrogen production for electrolysis takes place. This fact leads to classification of the following zones:((Figure 1 from guides CEI 64-14):
between the room ceiling and the penetration grid superior edge (zone with a low degree of ventilation) classified as Z1 (however, eliminable);
within the radius of 50 cm around the storage batteries penetration (EN 50272-2) Z1 for batteries of open type, Z2 for batteries if of closed type, valves regulated, i.e. hermetic.
Therefore, provision is made for cropped ceiling (Figure 2), whence to eliminate in any case the zone with a low degree of ventilation.
Penetrations with walls air induction, to assure natural ventilation under normal operation conditions as well as during complete charging stage;
Any eventual system of artificial ventilation and, in case VN of the above mentioned shall not be in grade of guaranteeing air exchange sufficient to maintain the percentage of gas (hydrogen) produced by storage batteries during the complete charging stage, under 30% of the inflammability inferior limit, as per the calculation given below.
Ventilation system should be provided in this case with two extractors, each sized for the full capacity required and each one being stand-by for the other one. Their availability (continuous functioning) shall be double, since two identical ventilation systems should be installed, independent upon common failure causes, thus guaranteeing uniform air dilution in the room, that shall be then artificially classified as non-AD.
STORAGE BATTERIES OF CLOSED TYPE WITH VALVE 0,5 m 0,5 m SCARCE VENTILATION ZONE VENTILATION PENETRATION OPENING Z2 Z1 Figure 1 - Hazardous zones of batteries room with zone with low degree of ventilation Eni S.p.A. Exploration & Production Division 20222 BLD.ELE.SDS Rev. 1 July 2003 Sheet 13 di 19
1.
2. 3. 4. 5. 6. 7.
STORAGE BATTERIES OF CLOSED TYPE WITH VALVE VENTILATION PENETRATION OPENING 0,5 m 0,5 m Z1 Z2 Figure 2 - Hazardous zones of batteries room without zone with low degree of ventilation
As indicated by Regulation DIN-VDE 0510 part 2, ventilation flow sufficient to dissolve air under 30% of the inflammability inferior limit results from the following relation :
Q = v q s n I k where :
Q = air volume m/h v = dilution factor, ratio of water-air volume on the minimum inflammability level of hydrogen v= 96%/4% = 24 q = hydrogen volume developed for electrolysis by current in every cell per 1 ampere and per 1 hour, at the temperature of 0C and pressure of 1013 bar q = 0,42 10 -3 m 3 /Ah s = Safety factor In the regulation s = 5 is advised n = Number of cells I = Current value in correspondence of which electrolytic dissociation occurs, per V > 2,4 V/elem (2A for every 100 Ah) k = Antimony content indicating factor (k = 1 for Sb>3%, k = 0,5 for Sb<3%), effects directly the value of current
Similar value is obtained by the formula in regulation EN 50272-2 (actually: v q s = 0,052)
Q = 0,05 x l x n x k
For batteries of hermetic type in Pb, the formation of hydrogen during complete charging is 5-10 times less than that with batteries of open type, thus the value of current is reduced by further factor of 0,5 and in consequence, even the capacity value. In this case ventilation is easily obtainable with only VN, penetrations with walls air induction (cropped ceiling) and/or doors air induction being sized in order to guarantee natural air flow as calculated. Therefore, the use of artificial ventilation system is not required. Eni S.p.A. Exploration & Production Division 20222 BLD.ELE.SDS Rev. 1 July 2003 Sheet 14 di 19
Penetrations shall have minimum dimensions determined in accordance with the following calculation (DIN VDE 0510 - part 2):
A (cm 2 ) 28 x Q (m 3 /h)
If provision should not be made for two of them, one shall be of entrance and the other one of exit on the opposite walls, and if possible, one shall be in the upper part and the other in the lower part.
The ventilation is considered of high degree, when it provides for dissolving, below 30% of LEL, produced gas and hydrogen vapours, within a significant distance from producing sources and ceasing the production at concentration being under LEL in all the surroundings. The availability (or reliability) of ventilation system can be classified as good as it is always present (under normal operating conditions as well as during complete charging stage). As far as the typology of electrical plant concerns, its type shall correspond to non-hazardous area, since installed in the non-AD, i.e. outside the zone compressed in the radius of 0.5 m from penetrations (ducts) (EN 50272-2 e DIN-VDE 0510).
The choice of hermetic batteries with gas recombination or gel electrolyte, almost barren of hydrogen production, provides for natural ventilation only (one grid on one side in the bottom and one grid on the other side in the upper part) and for ordinary lighting system of normal type (only Watertight type).
However, for preventive purposes, ordinary lighting system and safety lighting system can be anyway installed in Ex execution manner. Eni S.p.A. Exploration & Production Division 20222 BLD.ELE.SDS Rev. 1 July 2003 Sheet 15 di 19
4.10. Fire detection and Fire-Fighting System
When required the fire-fighting system will be composed of:
4.10.1. Smoke Detection System
Through detectors installed in the rooms to be protected. The detectors will be installed on the ceiling and, in the presence of a false floor, they will be installed with cabling passage, under it as well. The quantity and position of detectors will be defined each time on the basis of the dimensions and characteristics of the cabin.
4.10.2. Flame Detection System
Through W/IR detectors installed in the rooms to monitor.
The detectors will be installed on the wall or ceiling and their quantity and position will be decided each time on the basis of the dimensions and characteristics of the cabin.
4.10.3. Poison Gas or Explosive Mixture Detection System
Through detectors installed outside the cabin to be protected. Sensors will be installed, when required, if the cabin is near the classified areas, at a distance that, for processing or atmospheric reasons, does not guarantee safety. When these conditions persist, detectors will be mounted before to conditioning intakes. In the absence of these, they will be installed close to the cabin on a stake placed at 1.5 m height from the ground.
4.10.4. Extinguishing System with gas saturation
It is composed of one or more cylinders containing the extinguisher connected to a channelling and distribution system installed on the ceiling and under the false floor, in the presence of this. Cylinders will be installed outside, in adequate spaces created in the cabin itself and protected by steel plate panels. If the cabin consists of more rooms, each of them will have a separate plant and will be sized according to its volumes. In rooms protected by extinguishing systems with inert gas saturation, optical/acoustic alert systems will be installed inside and an optical one outside next to the entrances, with inclusion/exclusion selectors on the entrance and interceptions doors. All instruments mounted in the cabin will be connected to electric boxes installed inside and outside the cabins.
The type to be utilized shall depend upon evaluation that shall consider the use of cabins, manned/unmanned and technical/economic factors. Extinguishers to be normally utilized are as follows:
Other extinguishers typologies shall be specified in the Data Sheet, extinguishers containing chlorinefluorocarbides (CFC) shall not be used in any case.
In relation to the types of plant and if required, cabins will also be equipped with portable CO 2
extinguishers as well as the above systems. Eni S.p.A. Exploration & Production Division 20222 BLD.ELE.SDS Rev. 1 July 2003 Sheet 16 di 19
The quantity will be defined each time on the basis of dimensions and will be indicated on the "Data Sheet". Eni S.p.A. Exploration & Production Division 20222 BLD.ELE.SDS Rev. 1 July 2003 Sheet 17 di 19
5. MATERIALS
5.1. Selection Criteria
Materials and equipment will be selected on the basis of the individual characteristics of each component, considering the place of installation and the climatic conditions show in the Data Sheet.
5.2. Cables
Cables will be insulated by means of an elastomer mixture, quality "G10", or similar not propagating fire (CEI 20-22), and flame (CEI 20-37; CEI 20-38), with low smoke and poison or corrosive gas emission (CEI 20-35, 20-37, 20-38). The colours of cores will be chosen according to CEI-IEC Rules.
5.3. Junction and Connection Boxes. Control. Protection and Signal Boxes
These will be chosen in relation to the number and type of conductors, the equipment they will contain and their use. They will have a protection level not lower than "IP23" for indoors and IP55 for outdoors, unless otherwise specified. They will be made of incombustible material.
5.4. Terminal Strips
Terminals will conform to the reference rules and, in particular, they will allow for disconnection and further re-connection of the conductors without damaging them.
5.5. Sockets
Sockets will conform to the types required and/or approved by the Client. On the walls, fixed sockets will not be installed at a height from the floor lower than 300 mm (measured from the middle of the sockets). Sockets intended for supply to equipment that, due to their capacity or special characteristics, may cause danger during insertion or disinsertion of plugs, and all standard current sockets higher than 16A will be provided with an interruption element before the sockets, to allow for these operations in open circuit.
5.6. Battery Room Extractors
For the possible production of hydrogen during the charging operations of storage batteries the battery rooms should be constructed with an adequate number of air exchange per hour. If from the calculations described in paragraph 4.9 the natural ventilation through grids results insufficient, two extractors shall be in stalled, one being in stand-by for the other one, they will be of EExdIICT3 execution. Their power will be measured in order to maintain in any case the hydrogen concentration inferior to 30% of LEL. Eni S.p.A. Exploration & Production Division 20222 BLD.ELE.SDS Rev. 1 July 2003 Sheet 18 di 19
6. INSTALLATION CRITERIA
6.1. General
The plant installation will be carried out according to the latest edition of the Reference Rules and in particular, according to Rules CEI 64-50. In any case, electric plants will be installed according to the good practice especially with regard to safety and accidents prevention. The Supplier will obtain recognition of the technical/professional requirements and will issue a conformance certificate testifying the compliance with the Rules requirements.
6.2. Electric Plant Installation
6.2.1. Conduit Installation
Distribution in the cabin will be the exposed type. Cables will be installed within conduits or cable trays made of resin, of a self-extinguishing type with low smoke and poison gasses emission. The internal diameter of conduits will be at least 1.3 times the diameter of the ideal circle containing the group of cables and not lower than 15 mm. Inside the battery room the plant should be, if necessary, worthy for zone 1.
6.2.2. Conductors Installation
Electric and telephone conductors will be installed in conduits, cable trays and boxes independent from one another, so that they do not cause any reciprocal interference. All penetrations for conductors will be sealed with self-extinguishing compounds and, when required, should be installed in such a way that pre-existing class REI might be restored. All exiting cables will pass through a sleeve welded to the bottom plate and fastened with stainless steel cable glands AISI 316. When required, sealed penetrations type MCT or similar shall be used.
6.2.3. Protection Conductors (PE)
Protection conductors will be installed in a way to avoid mechanic or corrosion damages. Each mounting element will be provided with its own protection conductor.
Eni S.p.A. Exploration & Production Division 20222 BLD.ELE.SDS Rev. 1 July 2003 Sheet 19 di 19
6.3. Instrument Plant installation
The instrument plant relevant to smoke and flame detectors shall be of non safety type, except for the cases when sensors are installed in the rooms with possible accretion of hazardous atmosphere.
The instrument plant relevant to smoke detectors, The flame detection plant will be of intrinsic safety type in any case. The plant inside the battery room will be Eex-d type, using conduits, towards the room exit signal.
6.3.1. Cable installation
Intrinsic safe cables will be installed in segregated routes and adequately marked. AC supply cables will be installed in separate routes. Passages through walls will be fire resistant when required. Cables will be installed in conduits or cable trays, as specified in par. 6.2.1.
Each exiting cable will pass through a sleeve welded to the bottom plate and fastened by a stainless steel cable gland.
6.3.2. Pneumatic Plant
The pneumatic plant controlling locks will be made of AISI 316 stainless steel 6x4,4 mm pipe, from a pneumatic distributor provided with pin interception valves. The distributor will be arranged in a way that the Company can carry out the connection from outside the cabin. In case the lock pistons work at a pressure lower than the battery limit pressure, a reducing filter will be mounted in each supply fine. Compression fitting shall be in AISI 316.
7. ACCEPTANCE TESTS
The acceptance tests required for plants are indicated in the attached "Inspection Data Sheet" (I.D.S.).
8. TECHNICAL DOCUMENTS
The Supplier will send to the Company all the documents indicated in the Project Specification and relevant Data Sheet according to the set procedures and schedule. The technical documents will be edited in the official language specified in the Project Specification and using the symbols indicated in the Reference Rules.