Sie sind auf Seite 1von 173

Project Description

File Name ......................................................... Camperdown analysis.SPF


Description .......................................................
Camperdown stormwater using a 5 year
return period

Project Options
Flow Units ........................................................
Elevation Type .................................................
Hydrology Method ............................................
Time of Concentration (TOC) Method .............
Link Routing Method ........................................
Enable Overflow Ponding at Nodes .................
Skip Steady State Analysis Time Periods ........

CMS
Elevation
SCS TR-20
Kirpich
Kinematic Wave
YES
NO

Analysis Options
Start Analysis On .............................................
End Analysis On ...............................................
Start Reporting On ...........................................
Antecedent Dry Days .......................................
Runoff (Dry Weather) Time Step .....................
Runoff (Wet Weather) Time Step ....................
Reporting Time Step ........................................
Routing Time Step ...........................................

Oct 09, 2013


Oct 10, 2013
Oct 09, 2013
0
0 01:00:00
0 00:05:00
0 00:05:00
30

00:00:00
00:00:00
00:00:00
days
days hh:mm:ss
days hh:mm:ss
days hh:mm:ss
seconds

Number of Elements
Rain Gages ......................................................
Subbasins.........................................................
Nodes................................................................
Junctions .................................................
Outfalls ....................................................
Flow Diversions .......................................
Inlets ........................................................
Storage Nodes .........................................
Links..................................................................
Channels .................................................
Pipes ........................................................
Pumps .....................................................
Orifices ....................................................
Weirs .......................................................
Outlets .....................................................
Pollutants .........................................................
Land Uses ........................................................

Qty
1
78
129
119
10
0
0
0
119
0
119
0
0
0
0
0
0

Rainfall Details
SN Rain Gage
ID
1

Data
Source

Data Source Rainfall


ID
Type

RainGage-02 Time Series TS-01

Intensity

Rain State County Return


Units
Period
(years)
mm None None 5

Rainfall Rainfall
Depth Distribution
(mm)
79.10 South Africa 24-hr, Type 3

Subbasin Summary
SN Subbasin Area Weighted Average
Flow
Total Total
Total Peak
Time of
ID
Curve
Slope Length Rainfall Runoff Runoff Runoff
Concentration
Number
Volume
(ha)
(%)
(m) (mm) (mm) (ha-mm) (cms) (days hh:mm:ss)
1 Sub-01
1.29
75.00 2.0000 135.95 79.10 26.31
33.94 0.20
0 00:03:51
2 Sub-02
0.67
75.00 2.0000 152.91 79.10 26.31
17.72 0.10
0 00:04:13
3 Sub-03
1.22
75.00 2.0000 204.12 79.10 26.31
31.97 0.18
0 00:05:16
4 Sub-04
1.13
75.00 2.0000 214.22 79.10 26.31
29.75 0.17
0 00:05:28
5 Sub-05
0.89
75.00 2.0000 221.11 79.10 26.31
23.29 0.13
0 00:05:36
6 Sub-06
0.47
75.00 2.0000 128.08 79.10 26.31
12.45 0.08
0 00:03:40
7 Sub-07
0.19
75.00 2.0000 88.89 79.10 26.31
5.00 0.03
0 00:02:46
8 Sub-08
0.56
75.00 2.0000 90.19 79.10 26.31
14.64 0.09
0 00:02:48
9 Sub-09
0.95
75.00 2.0000 149.49 79.10 26.31
25.08 0.15
0 00:04:09
10 Sub-10
1.37
75.00 2.0000 142.70 79.10 26.31
35.97 0.21
0 00:04:00
11 Sub-11
0.13
75.00 2.0000 86.53 79.10 26.31
3.52 0.02
0 00:02:43
12 Sub-12
0.78
75.00 2.0000 82.78 79.10 26.31
20.59 0.13
0 00:02:37
13 Sub-13
0.54
75.00 2.0000 143.27 79.10 26.31
14.16 0.08
0 00:04:01
14 Sub-14
0.52
75.00 2.0000 108.87 79.10 26.31
13.80 0.09
0 00:03:15
15 Sub-15
0.32
75.00 2.0000 34.05 79.10 26.31
8.48 0.06
0 00:01:19
16 Sub-16
2.26
75.00 2.0000 359.38 79.10 26.31
59.40 0.29
0 00:08:09
17 Sub-17
2.74
75.00 2.0000 408.96 79.10 26.31
72.13 0.35
0 00:09:00
18 Sub-18
1.63
75.00 2.0000 121.90 79.10 26.31
42.94 0.26
0 00:03:33
19 Sub-19
1.29
75.00 2.0000 51.61 79.10 26.31
33.83 0.22
0 00:01:49
20 Sub-20
0.91
75.00 2.0000 218.23 79.10 26.31
23.99 0.13
0 00:05:33
21 Sub-21
0.39
75.00 2.0000 139.57 79.10 26.31
10.24 0.06
0 00:03:56
22 Sub-22
0.38
75.00 0.5000 88.74 79.10 26.31
10.05 0.06
0 00:04:43
23 Sub-23
1.15
75.00 2.0000 126.64 79.10 26.31
30.25 0.18
0 00:03:39
24 Sub-24
0.48
75.00 2.0000 138.68 79.10 26.31
12.70 0.08
0 00:03:55
25 Sub-25
0.78
75.00 0.5000 171.77 79.10 26.31
20.41 0.10
0 00:07:52
26 Sub-26
1.38
75.00 2.0000 171.77 79.10 26.31
36.36 0.21
0 00:04:37
27 Sub-27
0.34
75.00 2.0000 119.47 79.10 26.31
8.96 0.06
0 00:03:29
28 Sub-28
1.29
75.00 2.0000 155.49 79.10 26.31
33.83 0.20
0 00:04:16
29 Sub-29
0.91
75.00 2.0000 113.40 79.10 26.31
24.06 0.15
0 00:03:21
30 Sub-30
1.14
75.00 2.0000 153.00 79.10 26.31
29.87 0.18
0 00:04:13
31 Sub-31
0.96
75.00 0.5000 160.77 79.10 26.31
25.33 0.13
0 00:07:28
32 Sub-32
2.14
75.00 1.5000 200.86 79.10 26.31
56.31 0.31
0 00:05:49
33 Sub-33
1.24
75.00 1.8000 228.77 79.10 26.31
32.52 0.18
0 00:06:00
34 Sub-34
0.77
75.00 2.0000 143.17 79.10 26.31
20.37 0.12
0 00:04:00
35 Sub-35
1.46
75.00 1.0000 217.97 79.10 26.31
38.41 0.20
0 00:07:14
36 Sub-36
1.69
75.00 1.0000 247.76 79.10 26.31
44.38 0.22
0 00:07:59
37 Sub-37
1.53
75.00 1.0000 234.95 79.10 26.31
40.39 0.20
0 00:07:40
38 Sub-38
0.39
75.00 1.0000 81.48 79.10 26.31
10.28 0.06
0 00:03:24
39 Sub-39
0.90
75.00 5.0000 210.13 79.10 26.31
23.56 0.14
0 00:03:47
40 Sub-40
2.11
75.00 1.0000 264.20 79.10 26.31
55.50 0.27
0 00:08:24
41 Sub-41
1.29
75.00 2.0000 184.19 79.10 26.31
33.98 0.19
0 00:04:52
42 Sub-42
1.51
75.00 2.0000 197.16 79.10 26.31
39.65 0.22
0 00:05:07
43 Sub-43
1.16
75.00 4.0000 152.60 79.10 26.31
30.46 0.19
0 00:03:13
44 Sub-45
1.63
75.00 8.0000 154.56 79.10 26.31
42.76 0.27
0 00:02:30
45 Sub-46
0.48
75.00 0.5000 57.08 79.10 26.31
12.59 0.08
0 00:03:22
46 Sub-47
1.58
75.00 9.0000 159.44 79.10 26.31
41.68 0.27
0 00:02:26
47 Sub-48
1.44
75.00 8.0000 169.94 79.10 26.31
37.86 0.24
0 00:02:41
48 Sub-50
0.84
75.00 10.0000 159.53 79.10 26.31
22.22 0.14
0 00:02:21
49 Sub-51
1.17
75.00 5.0000 283.72 79.10 26.31
30.70 0.18
0 00:04:46
50 Sub-52
1.08
75.00 4.0000 198.09 79.10 26.31
28.50 0.17
0 00:03:57
51 Sub-54
0.37
75.00 8.0000 89.74 79.10 26.31
9.77 0.07
0 00:01:38
52 Sub-55
1.17
75.00 8.0000 179.58 79.10 26.31
30.67 0.19
0 00:02:48
53 Sub-56
0.50
75.00 10.0000 90.83 79.10 26.31
13.06 0.09
0 00:01:31
54 Sub-57
1.47
75.00 4.0000 162.36 79.10 26.31
38.79 0.24
0 00:03:23
55 Sub-58
0.85
75.00 1.5000 129.38 79.10 26.31
22.37 0.13
0 00:04:09
56 Sub-59
0.55
75.00 0.8000 126.24 79.10 26.31
14.40 0.08
0 00:05:10
57 Sub-60
1.34
75.00 5.0000 163.79 79.10 26.31
35.31 0.22
0 00:03:07
58 Sub-61
2.17
75.00 6.0000 202.56 79.10 26.31
56.99 0.35
0 00:03:25
59 Sub-62
0.98
75.00 5.0000 179.62 79.10 26.31
25.77 0.16
0 00:03:21
60 Sub-63
0.34
75.00 8.0000 44.95 79.10 26.31
8.95 0.06
0 00:00:57
61 Sub-64
0.77
75.00 8.0000 123.82 79.10 26.31
20.24 0.13
0 00:02:06
62 Sub-65
0.86
75.00 8.0000 165.86 79.10 26.31
22.66 0.14
0 00:02:38
63 Sub-66
0.39
75.00 8.0000 155.40 79.10 26.31
10.32 0.07
0 00:02:30
64 Sub-67
0.33
75.00 5.0000 82.95 79.10 26.31
8.63 0.06
0 00:01:51
65 Sub-68
0.23
75.00 3.0000 50.38 79.10 26.31
5.97 0.04
0 00:01:32
66 Sub-69
0.23
75.00 5.0000 74.90 79.10 26.31
5.93 0.04
0 00:01:42
67 Sub-70
0.34
75.00 0.5000 84.28 79.10 26.31
9.00 0.05
0 00:04:33
68 Sub-71
0.21
75.00 3.0000 87.14 79.10 26.31
5.53 0.04
0 00:02:20
69 Sub-72
0.61
75.00 5.0000 128.33 79.10 26.31
15.98 0.10
0 00:02:35
70 Sub-73
0.28
75.00 5.0000 134.09 79.10 26.31
7.30 0.05
0 00:02:40
71 Sub-74
2.37
75.00 1.0000 357.02 79.10 26.31
62.32 0.29
0 00:10:35
72 Sub-75
0.83
75.00 3.0000 153.48 79.10 26.31
21.74 0.13
0 00:03:37
73 Sub-76
2.61
75.00 6.0000 224.36 79.10 26.31
68.66 0.41
0 00:03:43
74 Sub-77
2.19
75.00 1.0000 286.74 79.10 26.31
57.61 0.28
0 00:08:57
75 Sub-78
1.82
75.00 1.0000 271.70 79.10 26.31
47.84 0.23
0 00:08:34
76 Sub-79
1.79
75.00 6.0000 268.93 79.10 26.31
47.23 0.28
0 00:04:16
77 Sub-80
1.56
75.00 6.0000 226.00 79.10 26.31
41.04 0.25
0 00:03:44
78 Sub-81
2.35
75.00 7.0000 266.84 79.10 26.31
61.77 0.37
0 00:04:00

Node Summary
SN Element
ID

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87

MH107
MH109
MH110
MH111
MH112
MH116
MH117
MH118
MH119
MH120
MH123
MH125
MH126
MH127
MH128
MH129
MH130
MH131
MH132
MH133
MH134
MH135
MH137
MH139
MH140
MH141
MH142
MH143
MH144
MH145
MH146
MH147
MH148
MH150
MH151
MH153
MH154
MH155
MH158
MH160
MH162
MH163
MH166
MH168
MH170
MH171
MH173
MH174
MH177
MH178
MH179
MH181
MH183
MH189
MH195
MH197
MH199
MH200
MH201
MH202
MH204
MH205
MH207
MH208
MH209
MH210
MH215
MH216
MH220
MH221
MH222
MH227
MH228
MH229
MH232
MH233
MH234
MH235
MH236
MH237
MH238
MH239
MH240
MH242
MH243
MH245
MH246

Element
Invert Ground/Rim
Initial Surcharge Ponded Peak Max HGL
Max
Min
Time of
Total Total Time
Type
Elevation
(Max)
Water Elevation
Area Inflow Elevation Surcharge Freeboard
Peak Flooded
Flooded
Elevation Elevation
Attained
Depth Attained
Flooding Volume
Attained
Occurrence
(m)
(m)
(m)
(m)
(m) (cms)
(m)
(m)
(m) (days hh:mm) (ha-mm)
(min)
Junction
794.36
796.32
794.36
796.32
0.00 0.19
794.49
0.00
1.83
0 00:00
0.00
0.00
Junction
778.82
780.99
778.82
780.99
0.00 0.57
779.11
0.00
1.88
0 00:00
0.00
0.00
Junction
765.95
768.34
765.95
768.34
0.00 0.86
766.30
0.00
2.05
0 00:00
0.00
0.00
Junction
765.04
767.21
765.04
767.21
0.00 1.20
766.19
0.00
1.02
0 00:00
0.00
0.00
Junction
762.38
764.92
762.38
764.92
0.00 2.24
763.17
0.00
1.75
0 00:00
0.00
0.00
Junction
768.95
770.00
768.95
770.00
0.00 0.12
769.14
0.00
0.86
0 00:00
0.00
0.00
Junction
768.44
770.00
768.44
770.00
0.00 0.17
768.77
0.00
1.23
0 00:00
0.00
0.00
Junction
767.63
770.00
767.63
770.00
0.00 0.37
768.02
0.00
1.98
0 00:00
0.00
0.00
Junction
761.19
764.04
761.19
764.04
0.00 0.70
761.62
0.00
2.42
0 00:00
0.00
0.00
Junction
759.98
763.20
759.98
763.20
0.00 1.97
762.12
0.00
1.08
0 00:00
0.00
0.00
Junction
761.83
763.44
761.83
763.44
0.00 1.12
762.31
0.00
1.12
0 00:00
0.00
0.00
Junction
766.52
768.32
766.52
768.32
0.00 0.41
766.94
0.00
1.37
0 00:00
0.00
0.00
Junction
766.32
768.12
766.32
768.12
0.00 0.60
766.75
0.00
1.38
0 00:00
0.00
0.00
Junction
768.64
769.72
768.64
769.72
0.00 0.05
768.73
0.00
0.99
0 00:00
0.00
0.00
Junction
764.90
766.52
764.90
766.52
0.00 0.23
765.07
0.00
1.46
0 00:00
0.00
0.00
Junction
757.72
760.53
757.72
760.53
0.00 0.52
758.08
0.00
2.45
0 00:00
0.00
0.00
Junction
757.47
760.16
757.47
760.16
0.00 2.52
758.03
0.00
2.12
0 00:00
0.00
0.00
Junction
765.92
766.98
765.92
766.98
0.00 0.06
766.00
0.00
0.97
0 00:00
0.00
0.00
Junction
764.38
765.29
764.38
765.29
0.00 0.06
764.51
0.00
0.78
0 00:00
0.00
0.00
Junction
763.00
764.46
763.00
764.46
0.00 0.14
763.14
0.00
1.31
0 00:00
0.00
0.00
Junction
759.14
760.86
759.14
760.86
0.00 0.26
759.32
0.00
1.54
0 00:00
0.00
0.00
Junction
743.64
745.41
743.64
745.41
0.00 0.31
743.79
0.00
1.61
0 00:00
0.00
0.00
Junction
761.92
763.10
761.92
763.10
0.00 0.04
762.00
0.00
1.10
0 00:00
0.00
0.00
Junction
771.65
773.45
771.65
773.45
0.00 0.23
771.87
0.00
1.58
0 00:00
0.00
0.00
Junction
769.68
770.82
769.68
770.82
0.00 0.34
770.00
0.00
0.82
0 00:00
0.00
0.00
Junction
769.47
771.35
769.47
771.35
0.00 0.41
769.81
0.00
1.54
0 00:00
0.00
0.00
Junction
763.83
766.09
763.83
766.09
0.00 0.41
764.04
0.00
2.06
0 00:00
0.00
0.00
Junction
747.66
750.05
747.66
750.05
0.00 1.05
748.08
0.00
1.97
0 00:00
0.00
0.00
Junction
746.27
748.30
746.27
748.30
0.00 1.05
746.57
0.00
1.73
0 00:00
0.00
0.00
Junction
740.15
741.34
740.15
741.34
0.00 1.05
740.48
0.00
0.86
0 00:00
0.00
0.00
Junction
736.52
738.72
736.52
738.72
0.00 1.19
736.85
0.00
1.88
0 00:00
0.00
0.00
Junction
729.26
731.78
729.26
731.78
0.00 1.19
729.58
0.00
2.20
0 00:00
0.00
0.00
Junction
720.40
722.90
720.40
722.90
0.00 1.48
720.99
0.00
1.91
0 00:00
0.00
0.00
Junction
760.58
761.64
760.58
761.64
0.00 0.04
760.66
0.00
0.99
0 00:00
0.00
0.00
Junction
757.44
759.94
757.44
759.94
0.00 0.65
758.23
0.00
1.71
0 00:00
0.00
0.00
Junction
772.24
773.41
772.24
773.41
0.00 0.07
772.36
0.00
1.05
0 00:00
0.00
0.00
Junction
771.53
772.94
771.53
772.94
0.00 0.07
771.65
0.00
1.30
0 00:00
0.00
0.00
Junction
732.03
735.00
732.03
735.00
0.00 0.06
732.08
0.00
2.92
0 00:00
0.00
0.00
Junction
723.94
725.36
723.94
725.36
0.00 0.33
724.23
0.00
1.13
0 00:00
0.00
0.00
Junction
733.66
735.72
733.66
735.72
0.00 0.13
733.79
0.00
1.93
0 00:00
0.00
0.00
Junction
728.77
730.43
728.77
730.43
0.00 0.26
728.95
0.00
1.48
0 00:00
0.00
0.00
Junction
752.86
754.35
752.86
754.35
0.00 0.09
753.00
0.00
1.35
0 00:00
0.00
0.00
Junction
735.20
738.03
735.20
738.03
0.00 1.12
735.50
0.00
2.52
0 00:00
0.00
0.00
Junction
753.36
754.44
753.36
754.44
0.00 0.16
753.49
0.00
0.95
0 00:00
0.00
0.00
Junction
736.27
739.27
736.27
739.27
0.00 0.31
736.42
0.00
2.86
0 00:00
0.00
0.00
Junction
748.63
751.01
748.63
751.01
0.00 0.18
748.83
0.00
2.18
0 00:00
0.00
0.00
Junction
767.77
769.77
767.77
769.77
0.00 0.00
767.77
0.00
2.00
0 00:00
0.00
0.00
Junction
766.38
768.93
766.38
768.93
0.00 0.00
766.38
0.00
2.55
0 00:00
0.00
0.00
Junction
766.89
768.35
766.89
768.35
0.00 0.40
767.12
0.00
1.24
0 00:00
0.00
0.00
Junction
769.51
770.77
769.51
770.77
0.00 0.27
769.69
0.00
1.08
0 00:00
0.00
0.00
Junction
762.04
763.41
762.04
763.41
0.00 0.43
762.35
0.00
1.06
0 00:00
0.00
0.00
Junction
769.91
771.71
769.91
771.71
0.00 0.19
770.12
0.00
1.59
0 00:00
0.00
0.00
Junction
765.60
768.24
765.60
768.24
0.00 0.52
765.86
0.00
2.39
0 00:00
0.00
0.00
Junction
762.64
765.26
762.64
765.26
0.00 1.52
763.34
0.00
1.92
0 00:00
0.00
0.00
Junction
745.87
748.93
745.87
748.93
0.00 0.99
746.14
0.00
2.80
0 00:00
0.00
0.00
Junction
763.17
765.21
763.17
765.21
0.00 0.07
763.28
0.00
1.93
0 00:00
0.00
0.00
Junction
758.73
760.03
758.73
760.03
0.00 0.26
758.91
0.00
1.11
0 00:00
0.00
0.00
Junction
752.50
754.11
752.50
754.11
0.00 0.48
752.85
0.00
1.26
0 00:00
0.00
0.00
Junction
751.36
752.89
751.36
752.89
0.00 0.48
751.71
0.00
1.18
0 00:00
0.00
0.00
Junction
750.26
752.48
750.26
752.48
0.00 0.81
750.68
0.00
1.80
0 00:00
0.00
0.00
Junction
760.70
762.99
760.70
762.99
0.00 0.28
760.91
0.00
2.08
0 00:00
0.00
0.00
Junction
756.65
758.32
756.65
758.32
0.00 0.37
756.88
0.00
1.44
0 00:00
0.00
0.00
Junction
756.41
758.55
756.41
758.55
0.00 0.28
756.63
0.00
1.91
0 00:00
0.00
0.00
Junction
749.04
750.94
749.04
750.94
0.00 1.18
749.47
0.00
1.48
0 00:00
0.00
0.00
Junction
762.07
764.81
762.07
764.81
0.00 2.42
762.86
0.00
1.96
0 00:00
0.00
0.00
Junction
760.33
763.42
760.33
763.42
0.00 2.41
760.94
0.00
2.48
0 00:00
0.00
0.00
Junction
762.99
765.11
762.99
765.11
0.00 0.28
763.24
0.00
1.87
0 00:00
0.00
0.00
Junction
765.47
767.69
765.47
767.69
0.00 0.13
765.62
0.00
2.07
0 00:00
0.00
0.00
Junction
766.93
768.22
766.93
768.22
0.00 0.35
767.23
0.00
0.99
0 00:00
0.00
0.00
Junction
767.07
768.81
767.07
768.81
0.00 0.33
767.37
0.00
1.44
0 00:00
0.00
0.00
Junction
768.64
769.71
768.64
769.71
0.00 0.14
768.81
0.00
0.90
0 00:00
0.00
0.00
Junction
763.25
766.95
763.25
766.95
0.00 0.83
763.66
0.00
3.29
0 00:00
0.00
0.00
Junction
770.04
771.32
770.04
771.32
0.00 0.29
770.24
0.00
1.08
0 00:00
0.00
0.00
Junction
773.19
774.27
773.19
774.27
0.00 0.29
773.37
0.00
0.90
0 00:00
0.00
0.00
Junction
768.02
769.10
768.02
769.10
0.00 0.07
768.12
0.00
0.98
0 00:00
0.00
0.00
Junction
768.23
770.00
768.23
770.00
0.00 0.21
768.56
0.00
1.44
0 00:00
0.00
0.00
Junction
762.41
765.32
762.41
765.32
0.00 0.52
762.76
0.00
2.57
0 00:00
0.00
0.00
Junction
761.06
764.07
761.06
764.07
0.00 0.37
761.34
0.00
2.72
0 00:00
0.00
0.00
Junction
759.31
761.56
759.31
761.56
0.00 0.37
759.60
0.00
1.96
0 00:00
0.00
0.00
Junction
767.95
770.00
767.95
770.00
0.00 0.37
768.33
0.00
1.67
0 00:00
0.00
0.00
Junction
758.48
760.68
758.48
760.68
0.00 0.52
758.84
0.00
1.84
0 00:00
0.00
0.00
Junction
787.77
790.59
787.77
790.59
0.00 0.28
787.97
0.00
2.62
0 00:00
0.00
0.00
Junction
782.98
784.70
782.98
784.70
0.00 0.43
783.24
0.00
1.45
0 00:00
0.00
0.00
Junction
774.38
776.27
774.38
776.27
0.00 0.68
774.73
0.00
1.54
0 00:00
0.00
0.00
Junction
771.04
772.95
771.04
772.95
0.00 0.75
771.43
0.00
1.52
0 00:00
0.00
0.00
Junction
766.23
768.14
766.23
768.14
0.00 0.64
766.55
0.00
1.60
0 00:00
0.00
0.00
Junction
763.71
765.00
763.71
765.00
0.00 0.20
763.96
0.00
1.03
0 00:00
0.00
0.00

Node Summary
SN Element
ID

Element
Invert Ground/Rim
Initial Surcharge Ponded Peak Max HGL
Max
Min
Time of
Total Total Time
Type
Elevation
(Max)
Water Elevation
Area Inflow Elevation Surcharge Freeboard
Peak Flooded
Flooded
Elevation Elevation
Attained
Depth Attained
Flooding Volume
Attained
Occurrence
(m)
(m)
(m)
(m)
(m) (cms)
(m)
(m)
(m) (days hh:mm) (ha-mm)
(min)
88 MH247
Junction
768.69
771.39
768.69
771.39
0.00 0.19
768.90
0.00
2.49
0 00:00
0.00
0.00
89 MH248
Junction
767.68
770.28
767.68
770.28
0.00 0.41
768.02
0.00
2.26
0 00:00
0.00
0.00
90 MH249
Junction
765.84
767.41
765.84
767.41
0.00 0.60
766.25
0.00
1.16
0 00:00
0.00
0.00
91 MH250
Junction
765.44
767.18
765.44
767.18
0.00 0.64
765.86
0.00
1.33
0 00:00
0.00
0.00
92 MH251
Junction
763.30
764.51
763.30
764.51
0.00 0.74
763.66
0.00
0.85
0 00:00
0.00
0.00
93 MH252
Junction
769.51
771.02
769.51
771.02
0.00 0.13
769.66
0.00
1.35
0 00:00
0.00
0.00
94 MH253
Junction
771.16
772.39
771.16
772.39
0.00 0.13
771.32
0.00
1.07
0 00:00
0.00
0.00
95 MH254
Junction
758.42
762.23
758.42
762.23
0.00 0.26
758.56
0.00
3.67
0 00:00
0.00
0.00
96 MH255
Junction
766.67
768.19
766.67
768.19
0.00 0.07
766.77
0.00
1.42
0 00:00
0.00
0.00
97 MH256
Junction
760.82
763.28
760.82
763.28
0.00 0.33
761.02
0.00
2.26
0 00:00
0.00
0.00
98 MH257
Junction
756.18
758.80
756.18
758.80
0.00 0.33
756.37
0.00
2.43
0 00:00
0.00
0.00
99 MH258
Junction
752.67
754.38
752.67
754.38
0.00 0.33
752.87
0.00
1.51
0 00:00
0.00
0.00
100 MH259
Junction
747.29
748.68
747.29
748.68
0.00 0.18
747.49
0.00
1.19
0 00:00
0.00
0.00
101 MH260
Junction
750.52
753.20
750.52
753.20
0.00 0.15
750.65
0.00
2.56
0 00:00
0.00
0.00
102 MH261
Junction
741.76
743.52
741.76
743.52
0.00 0.31
741.91
0.00
1.61
0 00:00
0.00
0.00
103 MH262
Junction
757.79
759.19
757.79
759.19
0.00 0.04
757.88
0.00
1.31
0 00:00
0.00
0.00
104 MH263
Junction
748.16
750.08
748.16
750.08
0.00 0.65
748.58
0.00
1.50
0 00:00
0.00
0.00
105 MH264
Junction
723.50
725.48
723.50
725.48
0.00 1.25
723.88
0.00
1.59
0 00:00
0.00
0.00
106 MH265
Junction
764.05
765.13
764.05
765.13
0.00 0.10
764.19
0.00
0.94
0 00:00
0.00
0.00
107 MH266
Junction
760.11
761.99
760.11
761.99
0.00 0.13
760.29
0.00
1.70
0 00:00
0.00
0.00
108 MH267
Junction
750.91
753.66
750.91
753.66
0.00 0.26
751.06
0.00
2.60
0 00:00
0.00
0.00
109 MH268
Junction
760.36
761.80
760.36
761.80
0.00 0.43
760.67
0.00
1.13
0 00:00
0.00
0.00
110 MH269
Junction
759.48
760.75
759.48
760.75
0.00 0.61
760.75
0.00
0.00
0 12:10
0.00
1.00
111 MH270
Junction
755.00
757.26
755.00
757.26
0.00 0.26
755.20
0.00
2.06
0 00:00
0.00
0.00
112 MH271
Junction
758.31
759.74
758.31
759.74
0.00 0.28
758.55
0.00
1.19
0 00:00
0.00
0.00
113 MH272
Junction
752.64
754.36
752.64
754.36
0.00 0.37
752.87
0.00
1.49
0 00:00
0.00
0.00
114 MH273
Junction
753.77
755.79
753.77
755.79
0.00 0.28
753.99
0.00
1.80
0 00:00
0.00
0.00
115 MH274
Junction
749.64
751.87
749.64
751.87
0.00 0.50
750.06
0.00
1.81
0 00:00
0.00
0.00
116 MH275
Junction
751.76
753.48
751.76
753.48
0.00 0.09
751.91
0.00
1.58
0 00:00
0.00
0.00
117 MH276
Junction
726.42
728.13
726.42
728.13
0.00 0.06
726.48
0.00
1.65
0 00:00
0.00
0.00
118 MH277
Junction
769.18
770.96
769.18
770.96
0.00 0.77
769.57
0.00
1.38
0 00:00
0.00
0.00
119 NullStructure
Junction
765.44
0.00
765.44
0.00
0.00 0.00
765.44
0.00
0.45
0 00:00
0.00
0.00
120 Out-1P101
Outfall
717.39
0.31
717.51
121 Out-1P113
Outfall
720.29
1.48
720.88
122 Out-1P120
Outfall
723.76
0.33
724.05
123 Out-1P123
Outfall
731.03
1.12
731.33
124 Out-1P126
Outfall
730.40
0.31
730.54
125 Out-1P132(1)(1) Outfall
759.17
0.63
759.68
126 Out-1P144
Outfall
750.04
0.81
750.45
127 Out-1P146(1)
Outfall
748.33
1.18
748.75
128 Out-1P149
Outfall
759.90
2.41
760.51
129 Out-1P88(1)
Outfall
756.94
2.52
757.50

Link Summary
SN Element
ID

Element From
Type (Inlet)
Node

1 P100
2 P100(1)
3 P101
4 P102
5 P104
6 P105
7 P106
8 P107
9 P107(1)
10 P107(1)(1)
11 P108
12 P109
13 P110
14 P111
15 P112
16 P112(1)
17 P113
18 P114
19 P114(1)
20 P116
21 P117
22 P118
23 P118(1)
24 P119(1)(1)
25 P119(1)(1)(1)
26 P120
27 P121
28 P121(1)
29 P122
30 P122(1)
31 P122(2)
32 P123
33 P125
34 P126
35 P127
36 P127(2)
37 P128
38 P131
39 P132
40 P132(1)
41 P132(1)(1)
42 P140
43 P140(1)
44 P140(1)(1)
45 P140(1)(1)(1)
46 P141
47 P141(1)
48 P142
49 P143
50 P144
51 P145
52 P145(1)
53 P146
54 P146(1)
55 P146(2)
56 P147

Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe

MH134
MH267
MH135
MH137
MH139
MH140
MH141
MH142
MH151
MH263
MH143
MH144
MH145
MH146
MH147
MH264
MH148
MH150
MH262
MH153
MH154
MH155
MH276
MH160
MH162
MH158
MH163
MH275
MH174
MH195
MH254
MH166
MH261
MH170
MH171
MH259
MH173
MH178
MH179
MH268
MH269
MH197
MH256
MH257
MH258
MH199
MH270
MH200
MH201
MH202
MH204
MH271
MH205
MH208
MH272
MH207

To (Outlet)
Node

Length

Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total Time Reported
Invert Invert Slope Height Roughness Flow Capacity Design Flow Velocity Depth Depth/ Surcharged Condition
Elevation Elevation
Ratio
Total Depth
Ratio
(m)
(m)
(m) (%)
(mm)
(cms)
(cms)
(m/sec)
(m)
(min)
MH267
71.24 759.14 750.91 11.5500 450.000 0.0120 0.26
1.05
0.25
5.49
0.15
0.34
0.00 Calculated
MH135
60.79 750.91 743.64 11.9600 450.000 0.0120 0.26
1.07
0.25
5.56
0.15
0.34
0.00 Calculated
Out-1P101
65.44 743.64 717.39 40.1100 450.000 0.0120 0.31
1.96
0.16
8.96
0.12
0.27
0.00 Calculated
MH134
52.48 761.92 759.14 5.3100 450.000 0.0120 0.04
0.71
0.05
2.41
0.07
0.16
0.00 Calculated
MH140
79.62 771.65 769.68 2.4800 450.000 0.0120 0.22
0.49
0.46
3.01
0.21
0.47
0.00 Calculated
MH141
23.00 769.68 769.48 0.8300 600.000 0.0120 0.34
0.61
0.57
2.21
0.32
0.54
0.00 Calculated
MH142
35.19 769.47 763.83 16.0200 450.000 0.0120 0.41
1.24
0.33
6.99
0.17
0.40
0.00 Calculated
MH151
57.14 763.83 758.00 10.2200 450.000 0.0120 0.41
0.99
0.42
5.93
0.20
0.45
0.00 Calculated
MH263
60.04 758.00 748.16 16.3800 450.000 0.0120 0.65
1.25
0.52
7.95
0.23
0.51
0.00 Calculated
MH143
63.26 748.16 747.66 0.7900 750.000 0.0120 0.65
1.08
0.61
2.55
0.40
0.56
0.00 Calculated
MH144
11.96 747.66 746.28 11.4800 600.000 0.0120 1.05
2.25
0.47
7.83
0.28
0.48
0.00 Calculated
MH145
38.60 746.27 740.15 15.8600 600.000 0.0120 1.05
2.65
0.40
8.82
0.25
0.44
0.00 Calculated
MH146
50.10 740.15 736.52 7.2500 600.000 0.0120 1.05
1.79
0.59
6.58
0.32
0.55
0.00 Calculated
MH147
39.58 736.52 729.26 18.3300 600.000 0.0120 1.19
2.85
0.42
9.62
0.26
0.45
0.00 Calculated
MH264
55.84 729.26 723.50 10.3100 600.000 0.0120 1.19
2.14
0.56
7.75
0.31
0.53
0.00 Calculated
MH148
46.25 723.50 720.40 6.7100 600.000 0.0120 1.25
1.72
0.72
6.64
0.36
0.63
0.00 Calculated
Out-1P113
10.83 720.40 720.29 1.0000 900.000 0.0120 1.48
1.96
0.76
3.39
0.56
0.65
0.00 Calculated
MH262
70.66 760.58 757.79 3.9500 450.000 0.0120 0.04
0.61
0.06
2.17
0.08
0.17
0.00 Calculated
MH151
16.42 757.79 757.44 2.1400 450.000 0.0120 0.04
0.45
0.09
1.74
0.09
0.20
0.00 Calculated
MH154
29.10 772.24 771.53 2.4500 450.000 0.0120 0.07
0.48
0.14
2.17
0.12
0.26
0.00 Calculated
MH141
14.81 771.53 769.47 13.9100 450.000 0.0120 0.07
1.15
0.06
4.00
0.08
0.17
0.00 Calculated
MH276
16.27 732.03 726.42 34.4500 450.000 0.0120 0.06
1.81
0.04
5.35
0.06
0.13
0.00 Calculated
MH148
25.44 726.42 720.38 23.7400 450.000 0.0120 0.06
1.50
0.04
4.70
0.06
0.14
0.00 Calculated
MH162
81.56 733.66 728.77 6.0000 450.000 0.0120 0.13
0.76
0.17
3.57
0.12
0.28
0.00 Calculated
MH158
76.11 728.77 723.94 6.3500 450.000 0.0120 0.27
0.78
0.34
4.43
0.18
0.40
0.00 Calculated
Out-1P120
8.73 723.94 723.76 2.0000 450.000 0.0120 0.33
0.44
0.75
3.01
0.29
0.65
0.00 Calculated
MH275
62.13 752.86 751.77 1.7600 450.000 0.0120 0.09
0.41
0.21
2.05
0.14
0.31
0.00 Calculated
MH143
27.11 751.76 747.66 15.1200 450.000 0.0120 0.09
1.20
0.07
4.37
0.08
0.18
0.00 Calculated
MH254
59.83 766.38 758.42 13.3000 450.000 0.0120 0.00
1.13
0.00
0.00
0.00
0.00
0.00 Calculated
MH166
46.76 745.87 735.20 22.8000 450.000 0.0120 0.99
1.48
0.67
9.93
0.26
0.60
0.00 Calculated
MH195
78.39 758.42 745.87 16.0100 450.000 0.0120 0.26
1.24
0.21
6.19
0.14
0.31
0.00 Calculated
Out-1P123
36.72 735.20 731.03 11.3500 600.000 0.0120 1.12
2.24
0.50
7.93
0.30
0.50
0.00 Calculated
MH170
32.55 741.76 736.27 16.8600 450.000 0.0120 0.31
1.27
0.25
6.60
0.15
0.34
0.00 Calculated
Out-1P126
19.37 736.27 730.40 30.2600 450.000 0.0120 0.31
1.70
0.18
8.13
0.13
0.29
0.00 Calculated
MH259
67.05 748.63 747.29 2.0000 450.000 0.0120 0.18
0.44
0.41
2.63
0.20
0.45
0.00 Calculated
MH195
53.50 747.29 745.90 2.5900 450.000 0.0120 0.18
0.50
0.36
2.88
0.18
0.41
0.00 Calculated
MH174
70.54 767.77 766.38 1.9800 450.000 0.0120 0.00
0.43
0.00
0.00
0.00
0.00
0.00 Calculated
MH179
122.58 769.51 762.04 6.0900 450.000 0.0120 0.27
0.76
0.35
4.39
0.18
0.41
0.00 Calculated
MH268
58.31 762.04 760.36 2.8800 450.000 0.0120 0.43
0.52
0.82
3.68
0.31
0.69
0.00 Calculated
MH269
48.32 760.36 759.48 1.8300 600.000 0.0120 0.43
0.90
0.48
3.14
0.29
0.49
0.00 Calculated
Out-1P132(1)(1) 36.41 759.48 759.17 0.8500 600.000 0.0120 0.63
0.61
1.03
2.52
0.49
0.90
0.00 > CAPACITY
MH256
53.91 763.17 760.82 4.3600 450.000 0.0120 0.07
0.65
0.11
2.69
0.10
0.22
0.00 Calculated
MH257
61.69 760.82 756.18 7.5300 450.000 0.0120 0.33
0.85
0.38
4.99
0.19
0.43
0.00 Calculated
MH258
46.56 756.18 752.67 7.5300 450.000 0.0120 0.33
0.85
0.38
4.97
0.19
0.43
0.00 Calculated
MH195
54.07 752.67 745.87 12.5900 450.000 0.0120 0.32
1.10
0.29
6.01
0.16
0.37
0.00 Calculated
MH270
62.76 758.73 755.00 5.9500 450.000 0.0120 0.26
0.75
0.34
4.30
0.18
0.40
0.00 Calculated
MH200
59.36 755.00 752.50 4.2000 450.000 0.0120 0.26
0.63
0.40
3.77
0.19
0.44
0.00 Calculated
MH201
41.65 752.50 751.36 2.7400 450.000 0.0120 0.48
0.51
0.94
3.66
0.34
0.77
0.00 Calculated
MH202
78.43 751.36 750.26 1.4100 600.000 0.0120 0.48
0.79
0.61
2.93
0.32
0.56
0.00 Calculated
Out-1P144
17.74 750.26 750.04 1.2600 750.000 0.0120 0.81
1.36
0.60
3.20
0.41
0.56
0.00 Calculated
MH271
60.52 760.70 758.33 3.9200 450.000 0.0120 0.28
0.61
0.46
3.76
0.21
0.47
0.00 Calculated
MH205
61.22 758.31 756.65 2.7200 450.000 0.0120 0.28
0.51
0.55
3.28
0.23
0.53
0.00 Calculated
MH272
73.28 756.65 752.64 5.4600 450.000 0.0120 0.37
0.72
0.52
4.58
0.23
0.51
0.00 Calculated
Out-1P146(1) 16.52 749.04 748.33 4.3300 600.000 0.0120 1.18
1.39
0.85
5.50
0.42
0.71
0.00 Calculated
MH208
65.28 752.64 749.04 5.5200 450.000 0.0120 0.37
0.73
0.52
4.59
0.22
0.51
0.00 Calculated
MH273
78.74 756.41 753.77 3.3500 450.000 0.0120 0.28
0.57
0.49
3.55
0.22
0.49
0.00 Calculated

Link Summary
SN Element
ID

Element From
Type (Inlet)
Node

To (Outlet)
Node

57 P147(1)
58 P147(1)(1)
59 P148
60 P149
61 P153
62 P154
63 P154(1)
64 P158
65 P159
66 P160
67 P164
68 P165
69 P165(1)
70 P166
71 P168
72 P170
73 P171
74 P172
75 P173
76 P174
77 P175
78 P76
79 P76(1)
80 P77(1)
81 P78
82 P78(2)
83 P79
84 P80
85 P80(1)
86 P81
87 P84
88 P85
89 P85(1)
90 P85(1)(1)
91 P86
92 P86(1)
93 P86(1)(1)
94 P87
95 P88
96 P88(1)
97 P89
98 P89(1)
99 P90
100 P91(1)
101 P91(1)(1)
102 P91(1)(1)(1)
103 P92
104 P93
105 P93(1)
106 P93(1)(1)
107 P93(1)(1)(1)
108 P93(2)
109 P94
110 P95
111 P95(1)
112 P95(1)(1)

Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe

MH274
MH208
MH210
Out-1P149
MH189
MH215
MH246
MH111
MH220
MH221
MH112
MH227
MH245
MH228
MH183
MH197
MH260
MH261
MH277
MH110
MH177
MH239
MH240
MH109
MH242
MH243
MH111
MH189
MH112
MH209
MH117
MH233
MH237
MH118
MH183
MH234
MH119
MH120
MH130
Out-1P88(1)
MH252
MH123
MH120
MH247
MH248
MH125
MH126
MH249
MH250
MH251
MH123
MH250
MH128
MH235
MH236
MH238

MH273
MH274
MH209
MH210
MH215
MH246
MH216
MH220
MH221
MH222
MH227
MH245
MH228
MH229
MH232
MH255
MH168
MH260
MH243
MH277
MH252
MH107
MH239
MH240
MH109
MH242
MH110
MH111
MH189
MH112
MH116
MH117
MH233
MH237
MH118
MH183
MH234
MH119
MH120
MH130
MH253
MH177
MH123
MH181
MH247
MH248
MH125
MH126
NullStructure
MH250
MH251
MH249
MH127
MH128
MH235
MH236

Length

Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total Time Reported
Invert Invert Slope Height Roughness Flow Capacity Design Flow Velocity Depth Depth/ Surcharged Condition
Elevation Elevation
Ratio
Total Depth
Ratio
(m)
(m)
(m) (%)
(mm)
(cms)
(cms)
(m/sec)
(m)
(min)
81.52 753.77 749.64 5.0700 450.000 0.0120 0.28
0.70
0.40
4.13
0.19
0.44
0.00 Calculated
73.40 749.64 749.04 0.8200 600.000 0.0120 0.50
0.60
0.84
2.39
0.41
0.70
0.00 Calculated
64.84 762.07 760.33 2.6800 1200.000 0.0120 2.41
6.91
0.35
5.57
0.49
0.41
0.00 Calculated
35.49 760.33 759.90 1.2300 1200.000 0.0120 2.41
4.68
0.52
4.17
0.61
0.51
0.00 Calculated
11.92 762.99 762.65 2.8900 450.000 0.0120 0.28
0.52
0.53
3.35
0.23
0.52
0.00 Calculated
60.60 763.71 762.99 1.1900 450.000 0.0120 0.20
0.34
0.59
2.22
0.24
0.56
0.00 Calculated
63.33 765.47 763.71 2.7700 450.000 0.0120 0.13
0.51
0.24
2.68
0.15
0.33
0.00 Calculated
24.73 766.93 765.94 4.0000 450.000 0.0120 0.35
0.62
0.57
4.01
0.24
0.54
0.00 Calculated
14.31 767.07 766.93 1.0000 600.000 0.0120 0.33
0.67
0.50
2.35
0.30
0.50
0.00 Calculated
78.02 768.64 767.07 2.0000 450.000 0.0120 0.14
0.44
0.31
2.43
0.17
0.38
0.00 Calculated
38.41 763.25 762.38 2.2400 600.000 0.0120 0.83
1.00
0.83
3.94
0.42
0.70
0.00 Calculated
49.76 766.23 763.25 6.0000 450.000 0.0120 0.64
0.76
0.84
5.33
0.31
0.70
0.00 Calculated
63.52 770.04 766.23 6.0000 450.000 0.0120 0.29
0.76
0.39
4.45
0.19
0.43
0.00 Calculated
39.41 773.19 770.04 8.0000 450.000 0.0120 0.29
0.87
0.33
4.95
0.18
0.40
0.00 Calculated
51.93 768.02 765.60 4.6500 450.000 0.0120 0.07
0.67
0.11
2.73
0.10
0.22
0.00 Calculated
76.52 766.67 763.17 4.5700 450.000 0.0120 0.07
0.66
0.11
2.73
0.10
0.22
0.00 Calculated
31.93 753.36 750.52 8.9000 450.000 0.0120 0.16
0.92
0.17
4.31
0.12
0.28
0.00 Calculated
36.87 750.52 741.76 23.7800 450.000 0.0120 0.15
1.51
0.10
6.10
0.10
0.22
0.00 Calculated
83.52 771.04 769.18 2.2300 600.000 0.0120 0.75
0.99
0.75
3.86
0.38
0.65
0.00 Calculated
84.97 769.18 765.95 3.8100 600.000 0.0120 0.78
1.30
0.60
4.79
0.33
0.56
0.00 Calculated
77.17 769.51 766.89 3.3900 450.000 0.0120 0.13
0.57
0.22
2.88
0.14
0.32
0.00 Calculated
59.86 794.36 787.77 11.0000 450.000 0.0120 0.19
1.02
0.18
4.92
0.13
0.29
0.00 Calculated
84.37 787.77 782.98 5.6800 450.000 0.0120 0.28
0.74
0.38
4.32
0.19
0.43
0.00 Calculated
82.72 782.98 778.82 5.0300 450.000 0.0120 0.43
0.69
0.63
4.60
0.25
0.57
0.00 Calculated
73.33 778.82 774.38 6.0600 450.000 0.0120 0.57
0.76
0.75
5.25
0.28
0.65
0.00 Calculated
62.68 774.38 771.05 5.3200 450.000 0.0120 0.68
0.71
0.96
5.10
0.34
0.78
0.00 Calculated
23.13 765.95 765.04 3.9300 600.000 0.0120 0.86
1.32
0.65
4.96
0.34
0.59
0.00 Calculated
46.32 765.04 762.64 5.1700 600.000 0.0120 1.20
1.51
0.79
5.93
0.39
0.67
0.00 Calculated
58.97 762.64 762.38 0.4400 1050.000 0.0120 1.52
1.96
0.77
2.51
0.66
0.66
0.00 Calculated
66.31 762.38 762.07 0.4700 1200.000 0.0120 2.24
2.91
0.77
2.84
0.79
0.66
0.00 Calculated
55.40 768.95 768.44 0.9100 450.000 0.0120 0.12
0.29
0.40
1.75
0.20
0.44
0.00 Calculated
57.60 768.44 768.23 0.3700 450.000 0.0120 0.17
0.19
0.89
1.34
0.33
0.73
0.00 Calculated
70.95 768.23 767.95 0.4000 600.000 0.0120 0.22
0.42
0.51
1.50
0.30
0.51
0.00 Calculated
54.56 767.95 767.63 0.5800 600.000 0.0120 0.37
0.51
0.74
1.96
0.37
0.64
0.00 Calculated
88.65 767.63 765.60 2.2900 600.000 0.0120 0.37
1.01
0.37
3.29
0.25
0.42
0.00 Calculated
72.55 765.60 762.41 4.4000 600.000 0.0120 0.52
1.40
0.38
4.58
0.25
0.42
0.00 Calculated
78.89 762.41 761.19 1.5500 600.000 0.0120 0.52
0.83
0.63
3.10
0.35
0.58
0.00 Calculated
83.05 761.19 759.98 1.4500 600.000 0.0120 0.70
0.80
0.87
3.20
0.43
0.72
0.00 Calculated
71.04 759.98 757.47 3.5300 750.000 0.0120 1.97
2.26
0.87
5.77
0.54
0.72
0.00 Calculated
16.29 757.47 756.94 3.3000 900.000 0.0120 2.52
3.56
0.71
6.07
0.56
0.62
0.00 Calculated
59.91 771.16 769.51 2.7600 450.000 0.0120 0.13
0.51
0.24
2.67
0.15
0.34
0.00 Calculated
72.14 766.89 761.93 6.8800 450.000 0.0120 0.40
0.81
0.49
5.08
0.22
0.50
0.00 Calculated
12.57 761.83 761.64 1.5200 750.000 0.0120 1.12
1.49
0.76
3.70
0.48
0.65
0.00 Calculated
60.59 769.91 768.69 2.0100 450.000 0.0120 0.19
0.44
0.44
2.67
0.21
0.46
0.00 Calculated
50.52 768.69 767.68 2.0100 450.000 0.0120 0.19
0.44
0.44
2.66
0.21
0.46
0.00 Calculated
57.80 767.68 766.52 2.0100 450.000 0.0120 0.41
0.44
0.93
3.13
0.34
0.76
0.00 Calculated
64.03 766.52 766.32 0.3000 750.000 0.0120 0.41
0.66
0.61
1.58
0.42
0.57
0.00 Calculated
67.53 766.32 765.84 0.7200 750.000 0.0120 0.60
1.02
0.58
2.41
0.41
0.55
0.00 Calculated
1.26 765.44 765.44 0.0000 450.000 0.0120 0.00
0.14
0.00
0.00
0.00
0.00
0.00 Calculated
67.89 765.44 763.30 3.1600 600.000 0.0120 0.64
1.18
0.54
4.27
0.31
0.52
0.00 Calculated
56.01 763.30 761.83 2.6200 600.000 0.0120 0.74
1.08
0.68
4.10
0.36
0.61
0.00 Calculated
56.06 765.84 765.44 0.7100 750.000 0.0120 0.60
1.01
0.59
2.39
0.40
0.55
0.00 Calculated
75.53 768.64 764.90 4.9600 450.000 0.0120 0.05
0.69
0.07
2.55
0.08
0.18
0.00 Calculated
63.44 764.90 761.06 6.0400 450.000 0.0120 0.23
0.76
0.30
4.19
0.17
0.38
0.00 Calculated
60.54 761.06 759.31 2.8900 450.000 0.0120 0.37
0.53
0.70
3.57
0.27
0.61
0.00 Calculated
61.13 759.31 758.48 1.3600 600.000 0.0120 0.37
0.78
0.47
2.71
0.28
0.48
0.00 Calculated

Link Summary
SN Element
ID

Element From
Type (Inlet)
Node

To (Outlet)
Node

113 P95(1)(1)(1)
114 P96
115 P97
116 P98
117 P98(1)
118 P99
119 P99(1)

Pipe
Pipe
Pipe
Pipe
Pipe
Pipe
Pipe

MH129
MH130
MH132
MH265
MH133
MH266
MH134

MH238
MH129
MH131
MH132
MH265
MH133
MH266

Length

Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total Time Reported
Invert Invert Slope Height Roughness Flow Capacity Design Flow Velocity Depth Depth/ Surcharged Condition
Elevation Elevation
Ratio
Total Depth
Ratio
(m)
(m)
(m) (%)
(mm)
(cms)
(cms)
(m/sec)
(m)
(min)
55.36 758.48 757.72 1.3800 600.000 0.0120 0.52
0.78
0.67
2.96
0.34
0.60
0.00 Calculated
13.02 757.72 757.47 1.8800 600.000 0.0120 0.52
0.91
0.57
3.33
0.31
0.54
0.00 Calculated
27.05 765.92 764.39 5.6600 450.000 0.0120 0.06
0.73
0.08
2.74
0.08
0.19
0.00 Calculated
36.17 764.38 764.05 0.9100 450.000 0.0120 0.06
0.29
0.19
1.42
0.13
0.29
0.00 Calculated
50.85 764.05 763.00 2.0700 450.000 0.0120 0.10
0.44
0.23
2.27
0.14
0.32
0.00 Calculated
63.12 763.00 760.11 4.5700 450.000 0.0120 0.14
0.66
0.20
3.26
0.13
0.31
0.00 Calculated
57.78 760.11 759.14 1.6800 450.000 0.0120 0.13
0.40
0.34
2.28
0.17
0.40
0.00 Calculated

Subbasin Hydrology
Subbasin : Sub-01
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

1.29
75.00
2.0000
135.95
RainGage-02

Composite Curve Number


Area
(ha)
0.95
0.95

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
TOC Method : Kirpich
Sheet Flow Equation :
Tc = (0.01947 * ((Lf^0.77) * (Sf^-0.385)))
Where :
Tc = Time of Concentration (min)
Lf = Flow Length (m)
Sf = Slope(m/m)
Flow Length (m) .......................................... 135.95
Slope (%) ..................................................... 2
Computed TOC (min) .................................. 3.86

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.20
75.00
0 00:03:52

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-01

Subbasin : Sub-02
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.67
75.00
2.0000
152.91
RainGage-02

Composite Curve Number


Area
(ha)
0.95
0.95

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 152.91
Slope (%) ..................................................... 2
Computed TOC (min) .................................. 4.22

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.10
75.00
0 00:04:13

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-02

Subbasin : Sub-03
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

1.22
75.00
2.0000
204.12
RainGage-02

Composite Curve Number


Area
(ha)
0.95
0.95

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 204.12
Slope (%) ..................................................... 2
Computed TOC (min) .................................. 5.27

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.18
75.00
0 00:05:16

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-03

Subbasin : Sub-04
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

1.13
75.00
2.0000
214.22
RainGage-02

Composite Curve Number


Area
(ha)
0.95
0.95

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 214.22
Slope (%) ..................................................... 2
Computed TOC (min) .................................. 5.47

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.17
75.00
0 00:05:28

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-04

Subbasin : Sub-05
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.89
75.00
2.0000
221.11
RainGage-02

Composite Curve Number


Area
(ha)
0.95
0.95

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 221.11
Slope (%) ..................................................... 2
Computed TOC (min) .................................. 5.61

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.13
75.00
0 00:05:37

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-05

Subbasin : Sub-06
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.47
75.00
2.0000
128.08
RainGage-02

Composite Curve Number


Area
(ha)
0.95
0.95

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 128.08
Slope (%) ..................................................... 2
Computed TOC (min) .................................. 3.68

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.08
75.00
0 00:03:41

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-06

Subbasin : Sub-07
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.19
75.00
2.0000
88.89
RainGage-02

Composite Curve Number


Area
(ha)
0.95
0.95

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 88.89
Slope (%) ..................................................... 2
Computed TOC (min) .................................. 2.78

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.03
75.00
0 00:02:47

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-07

Subbasin : Sub-08
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.56
75.00
2.0000
90.19
RainGage-02

Composite Curve Number


Area
(ha)
0.95
0.95

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 90.19
Slope (%) ..................................................... 2
Computed TOC (min) .................................. 2.81

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.09
75.00
0 00:02:49

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-08

Subbasin : Sub-09
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.95
75.00
2.0000
149.49
RainGage-02

Composite Curve Number


Area
(ha)
0.95
0.95

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 149.49
Slope (%) ..................................................... 2
Computed TOC (min) .................................. 4.15

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.15
75.00
0 00:04:09

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-09

Subbasin : Sub-10
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

1.37
75.00
2.0000
142.70
RainGage-02

Composite Curve Number


Area
(ha)
0.19
0.19

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 142.70
Slope (%) ..................................................... 2
Computed TOC (min) .................................. 4.00

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.21
75.00
0 00:04:00

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-10

Subbasin : Sub-11
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.13
75.00
2.0000
86.53
RainGage-02

Composite Curve Number


Area
(ha)
0.95
0.95

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 86.53
Slope (%) ..................................................... 2
Computed TOC (min) .................................. 2.72

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.02
75.00
0 00:02:43

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-11

Subbasin : Sub-12
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.78
75.00
2.0000
82.78
RainGage-02

Composite Curve Number


Area
(ha)
0.95
0.95

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 82.78
Slope (%) ..................................................... 2
Computed TOC (min) .................................. 2.63

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.13
75.00
0 00:02:38

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-12

Subbasin : Sub-13
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.54
75.00
2.0000
143.27
RainGage-02

Composite Curve Number


Area
(ha)
0.95
0.95

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 143.27
Slope (%) ..................................................... 2
Computed TOC (min) .................................. 4.02

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.08
75.00
0 00:04:01

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-13

Subbasin : Sub-14
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.52
75.00
2.0000
108.87
RainGage-02

Composite Curve Number


Area
(ha)
0.95
0.95

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 108.87
Slope (%) ..................................................... 2
Computed TOC (min) .................................. 3.25

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.09
75.00
0 00:03:15

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-14

Subbasin : Sub-15
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.32
75.00
2.0000
34.05
RainGage-02

Composite Curve Number


Area
(ha)
0.95
0.95

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 34.05
Slope (%) ..................................................... 2
Computed TOC (min) .................................. 1.33

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.06
75.00
0 00:01:20

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-15

Subbasin : Sub-16
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

2.26
75.00
2.0000
359.38
RainGage-02

Composite Curve Number


Area
(ha)
0.95
0.95

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 359.38
Slope (%) ..................................................... 2
Computed TOC (min) .................................. 8.15

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.29
75.00
0 00:08:09

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-16

Subbasin : Sub-17
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

2.74
75.00
2.0000
408.96
RainGage-02

Composite Curve Number


Area
(ha)
0.95
0.95

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 408.96
Slope (%) ..................................................... 2
Computed TOC (min) .................................. 9.00

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.35
75.00
0 00:09:00

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-17

Subbasin : Sub-18
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

1.63
75.00
2.0000
121.90
RainGage-02

Composite Curve Number


Area
(ha)
0.95
0.95

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 121.90
Slope (%) ..................................................... 2
Computed TOC (min) .................................. 3.55

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.26
75.00
0 00:03:33

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-18

Subbasin : Sub-19
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

1.29
75.00
2.0000
51.61
RainGage-02

Composite Curve Number


Area
(ha)
0.95
0.95

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 51.61
Slope (%) ..................................................... 2
Computed TOC (min) .................................. 1.83

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.22
75.00
0 00:01:50

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-19

Subbasin : Sub-20
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.91
75.00
2.0000
218.23
RainGage-02

Composite Curve Number


Area
(ha)
0.91
0.91

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 218.23
Slope (%) ..................................................... 2
Computed TOC (min) .................................. 5.55

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.13
75.00
0 00:05:33

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-20

Subbasin : Sub-21
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.39
75.00
2.0000
139.57
RainGage-02

Composite Curve Number


Area
(ha)
0.39
0.39

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 139.57
Slope (%) ..................................................... 2
Computed TOC (min) .................................. 3.94

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.06
75.00
0 00:03:56

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-21

Subbasin : Sub-22
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.38
75.00
0.5000
88.74
RainGage-02

Composite Curve Number


Area
(ha)
0.38
0.38

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 88.74
Slope (%) ..................................................... 0.5
Computed TOC (min) .................................. 4.73

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.06
75.00
0 00:04:44

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-22

Subbasin : Sub-23
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

1.15
75.00
2.0000
126.64
RainGage-02

Composite Curve Number


Area
(ha)
1.15
1.15

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 126.64
Slope (%) ..................................................... 2
Computed TOC (min) .................................. 3.65

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.18
75.00
0 00:03:39

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-23

Subbasin : Sub-24
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.48
75.00
2.0000
138.68
RainGage-02

Composite Curve Number


Area
(ha)
0.48
0.48

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 138.68
Slope (%) ..................................................... 2
Computed TOC (min) .................................. 3.92

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.08
75.00
0 00:03:55

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-24

Subbasin : Sub-25
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.78
75.00
0.5000
171.77
RainGage-02

Composite Curve Number


Area
(ha)
0.78
0.78

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 171.77
Slope (%) ..................................................... 0.5
Computed TOC (min) .................................. 7.87

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.10
75.00
0 00:07:52

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-25

Subbasin : Sub-26
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

1.38
75.00
2.0000
171.77
RainGage-02

Composite Curve Number


Area
(ha)
1.38
1.38

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 171.77
Slope (%) ..................................................... 2
Computed TOC (min) .................................. 4.62

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.21
75.00
0 00:04:37

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-26

Subbasin : Sub-27
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.34
75.00
2.0000
119.47
RainGage-02

Composite Curve Number


Area
(ha)
0.34
0.34

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 119.47
Slope (%) ..................................................... 2
Computed TOC (min) .................................. 3.49

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.06
75.00
0 00:03:29

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-27

Subbasin : Sub-28
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

1.29
75.00
2.0000
155.49
RainGage-02

Composite Curve Number


Area
(ha)
1.29
1.29

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 155.49
Slope (%) ..................................................... 2
Computed TOC (min) .................................. 4.28

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.20
75.00
0 00:04:17

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-28

Subbasin : Sub-29
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.91
75.00
2.0000
113.40
RainGage-02

Composite Curve Number


Area
(ha)
0.91
0.91

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 113.40
Slope (%) ..................................................... 2
Computed TOC (min) .................................. 3.35

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.15
75.00
0 00:03:21

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-29

Subbasin : Sub-30
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

1.14
75.00
2.0000
153.00
RainGage-02

Composite Curve Number


Area
(ha)
1.14
1.14

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 153.00
Slope (%) ..................................................... 2
Computed TOC (min) .................................. 4.22

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.18
75.00
0 00:04:13

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-30

Subbasin : Sub-31
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.96
75.00
0.5000
160.77
RainGage-02

Composite Curve Number


Area
(ha)
0.96
0.96

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 160.77
Slope (%) ..................................................... 0.5
Computed TOC (min) .................................. 7.48

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.13
75.00
0 00:07:29

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-31

Subbasin : Sub-32
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

2.14
75.00
1.5000
200.86
RainGage-02

Composite Curve Number


Area
(ha)
2.14
2.14

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 200.86
Slope (%) ..................................................... 1.5
Computed TOC (min) .................................. 5.82

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.31
75.00
0 00:05:49

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-32

Subbasin : Sub-33
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

1.24
75.00
1.8000
228.77
RainGage-02

Composite Curve Number


Area
(ha)
1.24
1.24

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 228.77
Slope (%) ..................................................... 1.8
Computed TOC (min) .................................. 6.00

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.18
75.00
0 00:06:00

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-33

Subbasin : Sub-34
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.77
75.00
2.0000
143.17
RainGage-02

Composite Curve Number


Area
(ha)
0.77
0.77

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 143.17
Slope (%) ..................................................... 2
Computed TOC (min) .................................. 4.01

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.12
75.00
0 00:04:01

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-34

Subbasin : Sub-35
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

1.46
75.00
1.0000
217.97
RainGage-02

Composite Curve Number


Area
(ha)
1.46
1.46

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 217.97
Slope (%) ..................................................... 1
Computed TOC (min) .................................. 7.24

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.20
75.00
0 00:07:14

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-35

Subbasin : Sub-36
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

1.69
75.00
1.0000
247.76
RainGage-02

Composite Curve Number


Area
(ha)
1.69
1.69

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 247.76
Slope (%) ..................................................... 1
Computed TOC (min) .................................. 7.99

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.22
75.00
0 00:07:59

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-36

Subbasin : Sub-37
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

1.53
75.00
1.0000
234.95
RainGage-02

Composite Curve Number


Area
(ha)
1.53
1.53

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 234.95
Slope (%) ..................................................... 1
Computed TOC (min) .................................. 7.67

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.20
75.00
0 00:07:40

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-37

Subbasin : Sub-38
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.39
75.00
1.0000
81.48
RainGage-02

Composite Curve Number


Area
(ha)
0.39
0.39

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 81.48
Slope (%) ..................................................... 1
Computed TOC (min) .................................. 3.40

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.06
75.00
0 00:03:24

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-38

Subbasin : Sub-39
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.90
75.00
5.0000
210.13
RainGage-02

Composite Curve Number


Area
(ha)
0.90
0.90

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 210.13
Slope (%) ..................................................... 5
Computed TOC (min) .................................. 3.79

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.14
75.00
0 00:03:47

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-39

Subbasin : Sub-40
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

2.11
75.00
1.0000
264.20
RainGage-02

Composite Curve Number


Area
(ha)
2.11
2.11

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 264.20
Slope (%) ..................................................... 1
Computed TOC (min) .................................. 8.40

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.27
75.00
0 00:08:24

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-40

Subbasin : Sub-41
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

1.29
75.00
2.0000
184.19
RainGage-02

Composite Curve Number


Area
(ha)
1.29
1.29

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 184.19
Slope (%) ..................................................... 2
Computed TOC (min) .................................. 4.87

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.19
75.00
0 00:04:52

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-41

Subbasin : Sub-42
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

1.51
75.00
2.0000
197.16
RainGage-02

Composite Curve Number


Area
(ha)
1.51
1.51

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 197.16
Slope (%) ..................................................... 2
Computed TOC (min) .................................. 5.13

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.22
75.00
0 00:05:08

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-42

Subbasin : Sub-43
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

1.16
75.00
4.0000
152.60
RainGage-02

Composite Curve Number


Area
(ha)
1.16
1.16

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 152.60
Slope (%) ..................................................... 4
Computed TOC (min) .................................. 3.23

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.19
75.00
0 00:03:14

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-43

Subbasin : Sub-45
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

1.63
75.00
8.0000
154.56
RainGage-02

Composite Curve Number


Area
(ha)
1.63
1.63

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 154.56
Slope (%) ..................................................... 8
Computed TOC (min) .................................. 2.50

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.27
75.00
0 00:02:30

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-45

Subbasin : Sub-46
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.48
75.00
0.5000
57.08
RainGage-02

Composite Curve Number


Area
(ha)
0.48
0.48

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 57.08
Slope (%) ..................................................... 0.5
Computed TOC (min) .................................. 3.37

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.08
75.00
0 00:03:22

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-46

Subbasin : Sub-47
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

1.58
75.00
9.0000
159.44
RainGage-02

Composite Curve Number


Area
(ha)
1.58
1.58

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 159.44
Slope (%) ..................................................... 9
Computed TOC (min) .................................. 2.44

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.27
75.00
0 00:02:26

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-47

Subbasin : Sub-48
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

1.44
75.00
8.0000
169.94
RainGage-02

Composite Curve Number


Area
(ha)
1.44
1.44

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 169.94
Slope (%) ..................................................... 8
Computed TOC (min) .................................. 2.69

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.24
75.00
0 00:02:41

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-48

Subbasin : Sub-50
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.84
75.00
10.0000
159.53
RainGage-02

Composite Curve Number


Area
(ha)
0.84
0.84

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 159.53
Slope (%) ..................................................... 10
Computed TOC (min) .................................. 2.35

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.14
75.00
0 00:02:21

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-50

Subbasin : Sub-51
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

1.17
75.00
5.0000
283.72
RainGage-02

Composite Curve Number


Area
(ha)
1.17
1.17

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 283.72
Slope (%) ..................................................... 5
Computed TOC (min) .................................. 4.78

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.18
75.00
0 00:04:47

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-51

Subbasin : Sub-52
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

1.08
75.00
4.0000
198.09
RainGage-02

Composite Curve Number


Area
(ha)
1.08
1.08

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 198.09
Slope (%) ..................................................... 4
Computed TOC (min) .................................. 3.95

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.17
75.00
0 00:03:57

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-52

Subbasin : Sub-54
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.37
75.00
8.0000
89.74
RainGage-02

Composite Curve Number


Area
(ha)
0.37
0.37

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 89.74
Slope (%) ..................................................... 8
Computed TOC (min) .................................. 1.64

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.07
75.00
0 00:01:38

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-54

Subbasin : Sub-55
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

1.17
75.00
8.0000
179.58
RainGage-02

Composite Curve Number


Area
(ha)
1.17
1.17

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 179.58
Slope (%) ..................................................... 8
Computed TOC (min) .................................. 2.80

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.19
75.00
0 00:02:48

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-55

Subbasin : Sub-56
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.50
75.00
10.0000
90.83
RainGage-02

Composite Curve Number


Area
(ha)
0.50
0.50

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 90.83
Slope (%) ..................................................... 10
Computed TOC (min) .................................. 1.52

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.09
75.00
0 00:01:31

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-56

Subbasin : Sub-57
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

1.47
75.00
4.0000
162.36
RainGage-02

Composite Curve Number


Area
(ha)
1.47
1.47

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 162.36
Slope (%) ..................................................... 4
Computed TOC (min) .................................. 3.39

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.24
75.00
0 00:03:23

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-57

Subbasin : Sub-58
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.85
75.00
1.5000
129.38
RainGage-02

Composite Curve Number


Area
(ha)
0.85
0.85

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 129.38
Slope (%) ..................................................... 1.5
Computed TOC (min) .................................. 4.15

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.13
75.00
0 00:04:09

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-58

Subbasin : Sub-59
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.55
75.00
0.8000
126.24
RainGage-02

Composite Curve Number


Area
(ha)
0.55
0.55

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 126.24
Slope (%) ..................................................... 0.8
Computed TOC (min) .................................. 5.18

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.08
75.00
0 00:05:11

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-59

Subbasin : Sub-60
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

1.34
75.00
5.0000
163.79
RainGage-02

Composite Curve Number


Area
(ha)
1.34
1.34

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 163.79
Slope (%) ..................................................... 5
Computed TOC (min) .................................. 3.13

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.22
75.00
0 00:03:08

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-60

Subbasin : Sub-61
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

2.17
75.00
6.0000
202.56
RainGage-02

Composite Curve Number


Area
(ha)
2.17
2.17

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 202.56
Slope (%) ..................................................... 6
Computed TOC (min) .................................. 3.43

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.35
75.00
0 00:03:26

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-61

Subbasin : Sub-62
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.98
75.00
5.0000
179.62
RainGage-02

Composite Curve Number


Area
(ha)
0.98
0.98

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 179.62
Slope (%) ..................................................... 5
Computed TOC (min) .................................. 3.36

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.16
75.00
0 00:03:22

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-62

Subbasin : Sub-63
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.34
75.00
8.0000
44.95
RainGage-02

Composite Curve Number


Area
(ha)
0.34
0.34

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 44.95
Slope (%) ..................................................... 8
Computed TOC (min) .................................. 0.96

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.06
75.00
0 00:00:58

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-63

Subbasin : Sub-64
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.77
75.00
8.0000
123.82
RainGage-02

Composite Curve Number


Area
(ha)
0.77
0.77

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 123.82
Slope (%) ..................................................... 8
Computed TOC (min) .................................. 2.10

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.13
75.00
0 00:02:06

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-64

Subbasin : Sub-65
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.86
75.00
8.0000
165.86
RainGage-02

Composite Curve Number


Area
(ha)
0.86
0.86

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 165.86
Slope (%) ..................................................... 8
Computed TOC (min) .................................. 2.64

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.14
75.00
0 00:02:38

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-65

Subbasin : Sub-66
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.39
75.00
8.0000
155.40
RainGage-02

Composite Curve Number


Area
(ha)
0.39
0.39

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 155.40
Slope (%) ..................................................... 8
Computed TOC (min) .................................. 2.51

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.07
75.00
0 00:02:31

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-66

Subbasin : Sub-67
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.33
75.00
5.0000
82.95
RainGage-02

Composite Curve Number


Area
(ha)
0.33
0.33

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 82.95
Slope (%) ..................................................... 5
Computed TOC (min) .................................. 1.85

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.06
75.00
0 00:01:51

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-67

Subbasin : Sub-68
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.23
75.00
3.0000
50.38
RainGage-02

Composite Curve Number


Area
(ha)
0.23
0.23

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 50.38
Slope (%) ..................................................... 3
Computed TOC (min) .................................. 1.54

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.04
75.00
0 00:01:32

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-68

Subbasin : Sub-69
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.23
75.00
5.0000
74.90
RainGage-02

Composite Curve Number


Area
(ha)
0.23
0.23

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 74.90
Slope (%) ..................................................... 5
Computed TOC (min) .................................. 1.71

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.04
75.00
0 00:01:43

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-69

Subbasin : Sub-70
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.34
75.00
0.5000
84.28
RainGage-02

Composite Curve Number


Area
(ha)
0.34
0.34

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 84.28
Slope (%) ..................................................... 0.5
Computed TOC (min) .................................. 4.55

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.05
75.00
0 00:04:33

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-70

Subbasin : Sub-71
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.21
75.00
3.0000
87.14
RainGage-02

Composite Curve Number


Area
(ha)
0.21
0.21

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 87.14
Slope (%) ..................................................... 3
Computed TOC (min) .................................. 2.34

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.04
75.00
0 00:02:20

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-71

Subbasin : Sub-72
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.61
75.00
5.0000
128.33
RainGage-02

Composite Curve Number


Area
(ha)
0.61
0.61

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 128.33
Slope (%) ..................................................... 5
Computed TOC (min) .................................. 2.59

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.10
75.00
0 00:02:35

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-72

Subbasin : Sub-73
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.28
75.00
5.0000
134.09
RainGage-02

Composite Curve Number


Area
(ha)
0.28
0.28

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 134.09
Slope (%) ..................................................... 5
Computed TOC (min) .................................. 2.68

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.05
75.00
0 00:02:41

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-73

Subbasin : Sub-74
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

2.37
75.00
1.0000
357.02
RainGage-02

Composite Curve Number


Area
(ha)
2.37
2.37

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 357.02
Slope (%) ..................................................... 1
Computed TOC (min) .................................. 10.59

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.29
75.00
0 00:10:35

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-74

Subbasin : Sub-75
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

0.83
75.00
3.0000
153.48
RainGage-02

Composite Curve Number


Area
(ha)
0.83
0.83

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 153.48
Slope (%) ..................................................... 3
Computed TOC (min) .................................. 3.62

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.13
75.00
0 00:03:37

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-75

Subbasin : Sub-76
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

2.61
75.00
6.0000
224.36
RainGage-02

Composite Curve Number


Area
(ha)
2.61
2.61

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 224.36
Slope (%) ..................................................... 6
Computed TOC (min) .................................. 3.72

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.41
75.00
0 00:03:43

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-76

Subbasin : Sub-77
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

2.19
75.00
1.0000
286.74
RainGage-02

Composite Curve Number


Area
(ha)
2.19
2.19

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 286.74
Slope (%) ..................................................... 1
Computed TOC (min) .................................. 8.95

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.28
75.00
0 00:08:57

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-77

Subbasin : Sub-78
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

1.82
75.00
1.0000
271.70
RainGage-02

Composite Curve Number


Area
(ha)
1.82
1.82

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 271.70
Slope (%) ..................................................... 1
Computed TOC (min) .................................. 8.58

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.23
75.00
0 00:08:35

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-78

Subbasin : Sub-79
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

1.79
75.00
6.0000
268.93
RainGage-02

Composite Curve Number


Area
(ha)
1.79
1.79

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 268.93
Slope (%) ..................................................... 6
Computed TOC (min) .................................. 4.27

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.28
75.00
0 00:04:16

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-79

Subbasin : Sub-80
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

1.56
75.00
6.0000
226.00
RainGage-02

Composite Curve Number


Area
(ha)
1.56
1.56

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 226.00
Slope (%) ..................................................... 6
Computed TOC (min) .................................. 3.74

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.25
75.00
0 00:03:44

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-80

Subbasin : Sub-81
Input Data
Area (ha) .....................................................
Weighted Curve Number ............................
Average Slope (%) ......................................
Flow Length (m) ..........................................
Rain Gage ID ...............................................

2.35
75.00
7.0000
266.84
RainGage-02

Composite Curve Number


Area
(ha)
2.35
2.35

Soil/Surface Description
1/4 acre lots, 38% impervious
Composite Area & Weighted CN

Time of Concentration
Flow Length (m) .......................................... 266.84
Slope (%) ..................................................... 7
Computed TOC (min) .................................. 4.00

Subbasin Runoff Results


Total Rainfall (mm) ......................................
Total Runoff (mm) .......................................
Peak Runoff (cms) ......................................
Weighted Curve Number ............................
Time of Concentration (days hh:mm:ss) .....

79.10
26.31
0.37
75.00
0 00:04:00

Soil
Group
B

Curve
Number
75.00
75.00

Subbasin : Sub-81

Junction Input
SN Element
ID

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88

MH107
MH109
MH110
MH111
MH112
MH116
MH117
MH118
MH119
MH120
MH123
MH125
MH126
MH127
MH128
MH129
MH130
MH131
MH132
MH133
MH134
MH135
MH137
MH139
MH140
MH141
MH142
MH143
MH144
MH145
MH146
MH147
MH148
MH150
MH151
MH153
MH154
MH155
MH158
MH160
MH162
MH163
MH166
MH168
MH170
MH171
MH173
MH174
MH177
MH178
MH179
MH181
MH183
MH189
MH195
MH197
MH199
MH200
MH201
MH202
MH204
MH205
MH207
MH208
MH209
MH210
MH215
MH216
MH220
MH221
MH222
MH227
MH228
MH229
MH232
MH233
MH234
MH235
MH236
MH237
MH238
MH239
MH240
MH242
MH243
MH245
MH246
MH247

Invert Ground/Rim Ground/Rim


Initial Initial Surcharge Surcharge Ponded Minimum
Elevation
(Max)
(Max)
Water Water Elevation
Depth
Area
Pipe
Elevation
Offset Elevation Depth
Cover
(m)
(m)
(m)
(m)
(m)
(m)
(m)
(m)
(mm)
794.36
796.32
1.96
794.36 0.00
796.32
0.00
0.00 1506.09
778.82
780.99
2.17
778.82 0.00
780.99
0.00
0.00 1719.89
765.95
768.34
2.40
765.95 0.00
768.34
0.00
0.00 1797.58
765.04
767.21
2.17
765.04 0.00
767.21
0.00
0.00
814.65
762.38
764.92
2.54
762.38 0.00
764.92
0.00
0.00 1340.99
768.95
770.00
1.05
768.95 0.00
770.00
0.00
0.00
603.93
768.44
770.00
1.56
768.44 0.00
770.00
0.00
0.00 1105.47
767.63
770.00
2.37
767.63 0.00
770.00
0.00
0.00 1766.36
761.19
764.04
2.86
761.19 0.00
764.04
0.00
0.00 2252.37
759.98
763.20
3.22
759.98 0.00
763.20
0.00
0.00
815.55
761.83
763.44
1.61
761.83 0.00
763.44
0.00
0.00
858.28
766.52
768.32
1.80
766.52 0.00
768.32
0.00
0.00 1050.00
766.32
768.12
1.80
766.32 0.00
768.12
0.00
0.00 1050.00
768.64
769.72
1.08
768.64 0.00
769.72
0.00
0.00
627.00
764.90
766.52
1.63
764.90 0.00
766.52
0.00
0.00 1176.18
757.72
760.53
2.81
757.72 0.00
760.53
0.00
0.00 2211.48
757.47
760.16
2.68
757.47 0.00
760.16
0.00
0.00 1782.40
765.92
766.98
1.06
765.92 0.00
766.98
0.00
0.00
607.30
764.38
765.29
0.91
764.38 0.00
765.29
0.00
0.00
453.37
763.00
764.46
1.46
763.00 0.00
764.46
0.00
0.00 1008.44
759.14
760.86
1.72
759.14 0.00
760.86
0.00
0.00 1266.75
743.64
745.41
1.77
743.64 0.00
745.41
0.00
0.00 1316.10
761.92
763.10
1.17
761.92 0.00
763.10
0.00
0.00
720.71
771.65
773.45
1.80
771.65 0.00
773.45
0.00
0.00 1348.57
769.68
770.82
1.14
769.68 0.00
770.82
0.00
0.00
541.47
769.47
771.35
1.87
769.47 0.00
771.35
0.00
0.00 1261.44
763.83
766.09
2.26
763.83 0.00
766.09
0.00
0.00 1808.59
747.66
750.05
2.39
747.66 0.00
750.05
0.00
0.00 1640.14
746.27
748.30
2.03
746.27 0.00
748.30
0.00
0.00 1414.23
740.15
741.34
1.19
740.15 0.00
741.34
0.00
0.00
591.74
736.52
738.72
2.21
736.52 0.00
738.72
0.00
0.00 1605.99
729.26
731.78
2.52
729.26 0.00
731.78
0.00
0.00 1922.90
720.40
722.90
2.50
720.40 0.00
722.90
0.00
0.00 1597.75
760.58
761.64
1.07
760.58 0.00
761.64
0.00
0.00
616.93
757.44
759.94
2.50
757.44 0.00
759.94
0.00
0.00 1493.36
772.24
773.41
1.16
772.24 0.00
773.41
0.00
0.00
713.91
771.53
772.94
1.41
771.53 0.00
772.94
0.00
0.00
962.72
732.03
735.00
2.97
732.03 0.00
735.00
0.00
0.00 2524.20
723.94
725.36
1.42
723.94 0.00
725.36
0.00
0.00
974.77
733.66
735.72
2.06
733.66 0.00
735.72
0.00
0.00 1611.08
728.77
730.43
1.66
728.77 0.00
730.43
0.00
0.00 1214.52
752.86
754.35
1.49
752.86 0.00
754.35
0.00
0.00 1042.60
735.20
738.03
2.82
735.20 0.00
738.03
0.00
0.00 2222.71
753.36
754.44
1.08
753.36 0.00
754.44
0.00
0.00
627.00
736.27
739.27
3.01
736.27 0.00
739.27
0.00
0.00 2557.12
748.63
751.01
2.38
748.63 0.00
751.01
0.00
0.00 1930.58
767.77
769.77
2.00
767.77 0.00
769.77
0.00
0.00 1549.95
766.38
768.93
2.55
766.38 0.00
768.93
0.00
0.00 2098.16
766.89
768.35
1.46
766.89 0.00
768.35
0.00
0.00 1009.14
769.51
770.77
1.27
769.51 0.00
770.77
0.00
0.00
817.02
762.04
763.41
1.37
762.04 0.00
763.41
0.00
0.00
915.21
769.91
771.71
1.80
769.91 0.00
771.71
0.00
0.00 1350.00
765.60
768.24
2.64
765.60 0.00
768.24
0.00
0.00 2040.90
762.64
765.26
2.62
762.64 0.00
765.26
0.00
0.00 1567.36
745.87
748.93
3.07
745.87 0.00
748.93
0.00
0.00 2583.25
763.17
765.21
2.03
763.17 0.00
765.21
0.00
0.00 1583.74
758.73
760.03
1.29
758.73 0.00
760.03
0.00
0.00
843.45
752.50
754.11
1.61
752.50 0.00
754.11
0.00
0.00 1157.74
751.36
752.89
1.53
751.36 0.00
752.89
0.00
0.00
930.26
750.26
752.48
2.22
750.26 0.00
752.48
0.00
0.00 1469.67
760.70
762.99
2.29
760.70 0.00
762.99
0.00
0.00 1842.06
756.65
758.32
1.67
756.65 0.00
758.32
0.00
0.00 1223.77
756.41
758.55
2.14
756.41 0.00
758.55
0.00
0.00 1686.22
749.04
750.94
1.90
749.04 0.00
750.94
0.00
0.00 1301.00
762.07
764.81
2.74
762.07 0.00
764.81
0.00
0.00 1543.89
760.33
763.42
3.09
760.33 0.00
763.42
0.00
0.00 1889.85
762.99
765.11
2.12
762.99 0.00
765.11
0.00
0.00 1671.48
765.47
767.69
2.23
765.47 0.00
767.69
0.00
0.00 1776.14
766.93
768.22
1.29
766.93 0.00
768.22
0.00
0.00
688.34
767.07
768.81
1.74
767.07 0.00
768.81
0.00
0.00 1139.66
768.64
769.71
1.08
768.64 0.00
769.71
0.00
0.00
627.00
763.25
766.95
3.70
763.25 0.00
766.95
0.00
0.00 3104.73
770.04
771.32
1.28
770.04 0.00
771.32
0.00
0.00
828.48
773.19
774.27
1.08
773.19 0.00
774.27
0.00
0.00
627.00
768.02
769.10
1.08
768.02 0.00
769.10
0.00
0.00
627.00
768.23
770.00
1.77
768.23 0.00
770.00
0.00
0.00 1166.10
762.41
765.32
2.91
762.41 0.00
765.32
0.00
0.00 2313.83
761.06
764.07
3.00
761.06 0.00
764.07
0.00
0.00 2550.82
759.31
761.56
2.25
759.31 0.00
761.56
0.00
0.00 1647.78
767.95
770.00
2.05
767.95 0.00
770.00
0.00
0.00 1451.98
758.48
760.68
2.20
758.48 0.00
760.68
0.00
0.00 1599.25
787.77
790.59
2.82
787.77 0.00
790.59
0.00
0.00 2365.27
782.98
784.70
1.71
782.98 0.00
784.70
0.00
0.00 1262.20
774.38
776.27
1.89
774.38 0.00
776.27
0.00
0.00 1441.73
771.04
772.95
1.90
771.04 0.00
772.95
0.00
0.00 1304.31
766.23
768.14
1.91
766.23 0.00
768.14
0.00
0.00 1463.32
763.71
765.00
1.28
763.71 0.00
765.00
0.00
0.00
832.91
768.69
771.39
2.70
768.69 0.00
771.39
0.00
0.00 2247.26

Junction Input
SN Element
ID

89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119

Invert Ground/Rim Ground/Rim


Initial Initial Surcharge Surcharge Ponded Minimum
Elevation
(Max)
(Max)
Water Water Elevation
Depth
Area
Pipe
Elevation
Offset Elevation Depth
Cover
(m)
(m)
(m)
(m)
(m)
(m)
(m)
(m)
(mm)
MH248
767.68
770.28
2.60
767.68 0.00
770.28
0.00
0.00 2150.27
MH249
765.84
767.41
1.57
765.84 0.00
767.41
0.00
0.00
821.75
MH250
765.44
767.18
1.74
765.44 0.00
767.18
0.00
0.00
989.93
MH251
763.30
764.51
1.22
763.30 0.00
764.51
0.00
0.00
616.30
MH252
769.51
771.02
1.50
769.51 0.00
771.02
0.00
0.00 1053.66
MH253
771.16
772.39
1.22
771.16 0.00
772.39
0.00
0.00
773.00
MH254
758.42
762.23
3.81
758.42 0.00
762.23
0.00
0.00 3359.25
MH255
766.67
768.19
1.52
766.67 0.00
768.19
0.00
0.00 1066.61
MH256
760.82
763.28
2.46
760.82 0.00
763.28
0.00
0.00 2006.19
MH257
756.18
758.80
2.63
756.18 0.00
758.80
0.00
0.00 2175.21
MH258
752.67
754.38
1.71
752.67 0.00
754.38
0.00
0.00 1256.64
MH259
747.29
748.68
1.39
747.29 0.00
748.68
0.00
0.00
939.15
MH260
750.52
753.20
2.68
750.52 0.00
753.20
0.00
0.00 2231.94
MH261
741.76
743.52
1.77
741.76 0.00
743.52
0.00
0.00 1315.76
MH262
757.79
759.19
1.40
757.79 0.00
759.19
0.00
0.00
952.53
MH263
748.16
750.08
1.92
748.16 0.00
750.08
0.00
0.00 1168.84
MH264
723.50
725.48
1.97
723.50 0.00
725.48
0.00
0.00 1371.49
MH265
764.05
765.13
1.08
764.05 0.00
765.13
0.00
0.00
631.78
MH266
760.11
761.99
1.88
760.11 0.00
761.99
0.00
0.00 1429.04
MH267
750.91
753.66
2.75
750.91 0.00
753.66
0.00
0.00 2303.41
MH268
760.36
761.80
1.44
760.36 0.00
761.80
0.00
0.00
835.92
MH269
759.48
760.75
1.27
759.48 0.00
760.75
0.00
0.00
669.94
MH270
755.00
757.26
2.26
755.00 0.00
757.26
0.00
0.00 1813.52
MH271
758.31
759.74
1.43
758.31 0.00
759.74
0.00
0.00
961.45
MH272
752.64
754.36
1.72
752.64 0.00
754.36
0.00
0.00 1271.76
MH273
753.77
755.79
2.02
753.77 0.00
755.79
0.00
0.00 1569.04
MH274
749.64
751.87
2.23
749.64 0.00
751.87
0.00
0.00 1629.99
MH275
751.76
753.48
1.73
751.76 0.00
753.48
0.00
0.00 1265.56
MH276
726.42
728.13
1.71
726.42 0.00
728.13
0.00
0.00 1258.45
MH277
769.18
770.96
1.77
769.18 0.00
770.96
0.00
0.00 1172.90
NullStructure
765.44
0.00
-765.44
765.44 0.00
0.00
0.00
0.00
0.00

Junction Results
SN Element
ID

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87

MH107
MH109
MH110
MH111
MH112
MH116
MH117
MH118
MH119
MH120
MH123
MH125
MH126
MH127
MH128
MH129
MH130
MH131
MH132
MH133
MH134
MH135
MH137
MH139
MH140
MH141
MH142
MH143
MH144
MH145
MH146
MH147
MH148
MH150
MH151
MH153
MH154
MH155
MH158
MH160
MH162
MH163
MH166
MH168
MH170
MH171
MH173
MH174
MH177
MH178
MH179
MH181
MH183
MH189
MH195
MH197
MH199
MH200
MH201
MH202
MH204
MH205
MH207
MH208
MH209
MH210
MH215
MH216
MH220
MH221
MH222
MH227
MH228
MH229
MH232
MH233
MH234
MH235
MH236
MH237
MH238
MH239
MH240
MH242
MH243
MH245
MH246

Peak Peak Max HGL Max HGL


Max
Min Average HGL Average HGL
Time of
Time of
Total Total Time
Inflow Lateral Elevation
Depth Surcharge Freeboard
Elevation
Depth
Max HGL
Peak Flooded
Flooded
Inflow Attained Attained
Depth Attained
Attained
Attained
Occurrence
Flooding Volume
Attained
Occurrence
(cms) (cms)
(m)
(m)
(m)
(m)
(m)
(m) (days hh:mm) (days hh:mm) (ha-mm)
(min)
0.19
0.19
794.49
0.13
0.00
1.83
794.37
0.01
0 12:05
0 00:00
0.00
0.00
0.57
0.15
779.11
0.29
0.00
1.88
778.84
0.02
0 12:06
0 00:00
0.00
0.00
0.86
0.09
766.30
0.35
0.00
2.05
765.97
0.02
0 12:07
0 00:00
0.00
0.00
1.20
0.00
766.19
1.15
0.00
1.02
765.96
0.92
0 12:05
0 00:00
0.00
0.00
2.24
0.00
763.17
0.79
0.00
1.75
762.44
0.06
0 12:08
0 00:00
0.00
0.00
0.12
0.12
769.14
0.19
0.00
0.86
768.96
0.01
0 12:10
0 00:00
0.00
0.00
0.17
0.06
768.77
0.33
0.00
1.23
768.47
0.03
0 12:06
0 00:00
0.00
0.00
0.37
0.00
768.02
0.39
0.00
1.98
767.66
0.03
0 12:07
0 00:00
0.00
0.00
0.70
0.19
761.62
0.43
0.00
2.42
761.22
0.03
0 12:08
0 00:00
0.00
0.00
1.97
0.16
762.12
2.14
0.00
1.08
761.67
1.69
0 12:11
0 00:00
0.00
0.00
1.12
0.00
762.31
0.48
0.00
1.12
761.95
0.12
0 12:11
0 00:00
0.00
0.00
0.41
0.00
766.94
0.42
0.00
1.37
766.55
0.03
0 12:10
0 00:00
0.00
0.00
0.60
0.20
766.75
0.43
0.00
1.38
766.36
0.04
0 12:11
0 00:00
0.00
0.00
0.05
0.05
768.73
0.09
0.00
0.99
768.65
0.01
0 12:05
0 00:00
0.00
0.00
0.23
0.18
765.07
0.17
0.00
1.46
764.91
0.01
0 12:05
0 00:00
0.00
0.00
0.52
0.00
758.08
0.36
0.00
2.45
757.75
0.03
0 12:06
0 00:00
0.00
0.00
2.52
0.11
758.03
0.56
0.00
2.12
757.52
0.05
0 12:10
0 00:00
0.00
0.00
0.06
0.06
766.00
0.08
0.00
0.97
765.92
0.00
0 12:05
0 00:00
0.00
0.00
0.06
0.00
764.51
0.13
0.00
0.78
764.40
0.02
0 12:05
0 00:00
0.00
0.00
0.14
0.04
763.14
0.14
0.00
1.31
763.01
0.01
0 12:06
0 00:00
0.00
0.00
0.26
0.10
759.32
0.18
0.00
1.54
759.15
0.01
0 12:06
0 00:00
0.00
0.00
0.31
0.04
743.79
0.15
0.00
1.61
743.65
0.01
0 12:06
0 00:00
0.00
0.00
0.04
0.04
762.00
0.08
0.00
1.10
761.93
0.01
0 12:05
0 00:00
0.00
0.00
0.23
0.23
771.87
0.22
0.00
1.58
771.67
0.02
0 12:05
0 00:00
0.00
0.00
0.34
0.12
770.00
0.32
0.00
0.82
769.70
0.02
0 12:05
0 00:00
0.00
0.00
0.41
0.00
769.81
0.34
0.00
1.54
769.51
0.04
0 12:05
0 00:00
0.00
0.00
0.41
0.00
764.04
0.21
0.00
2.06
763.85
0.02
0 12:05
0 00:00
0.00
0.00
1.05
0.33
748.08
0.42
0.00
1.97
747.69
0.03
0 12:06
0 00:00
0.00
0.00
1.05
0.00
746.57
0.30
0.00
1.73
746.30
0.03
0 12:06
0 00:00
0.00
0.00
1.05
0.00
740.48
0.33
0.00
0.86
740.17
0.02
0 12:06
0 00:00
0.00
0.00
1.19
0.15
736.85
0.33
0.00
1.88
736.54
0.02
0 12:06
0 00:00
0.00
0.00
1.19
0.00
729.58
0.32
0.00
2.20
729.28
0.02
0 12:06
0 00:00
0.00
0.00
1.48
0.19
720.99
0.59
0.00
1.91
720.44
0.04
0 12:06
0 00:00
0.00
0.00
0.04
0.04
760.66
0.08
0.00
0.99
760.58
0.00
0 12:05
0 00:00
0.00
0.00
0.65
0.21
758.23
0.80
0.00
1.71
758.01
0.58
0 12:05
0 00:00
0.00
0.00
0.07
0.07
772.36
0.12
0.00
1.05
772.25
0.01
0 12:10
0 00:00
0.00
0.00
0.07
0.00
771.65
0.12
0.00
1.30
771.54
0.01
0 12:05
0 00:00
0.00
0.00
0.06
0.06
732.08
0.05
0.00
2.92
732.03
0.00
0 12:05
0 00:00
0.00
0.00
0.33
0.06
724.23
0.29
0.00
1.13
723.96
0.02
0 12:05
0 00:00
0.00
0.00
0.13
0.13
733.79
0.13
0.00
1.93
733.67
0.01
0 12:05
0 00:00
0.00
0.00
0.26
0.14
728.95
0.18
0.00
1.48
728.78
0.01
0 12:05
0 00:00
0.00
0.00
0.09
0.09
753.00
0.14
0.00
1.35
752.87
0.01
0 12:05
0 00:00
0.00
0.00
1.12
0.14
735.50
0.30
0.00
2.52
735.22
0.02
0 12:05
0 00:00
0.00
0.00
0.16
0.16
753.49
0.13
0.00
0.95
753.37
0.01
0 12:05
0 00:00
0.00
0.00
0.31
0.00
736.42
0.15
0.00
2.86
736.28
0.01
0 12:05
0 00:00
0.00
0.00
0.18
0.18
748.83
0.20
0.00
2.18
748.64
0.01
0 12:05
0 00:00
0.00
0.00
0.00
0.00
767.77
0.00
0.00
2.00
767.77
0.00
0 00:00
0 00:00
0.00
0.00
0.00
0.00
766.38
0.00
0.00
2.55
766.38
0.00
0 00:00
0 00:00
0.00
0.00
0.40
0.28
767.12
0.23
0.00
1.24
766.91
0.02
0 12:10
0 00:00
0.00
0.00
0.27
0.27
769.69
0.18
0.00
1.08
769.52
0.01
0 12:10
0 00:00
0.00
0.00
0.43
0.17
762.35
0.31
0.00
1.06
762.06
0.02
0 12:10
0 00:00
0.00
0.00
0.19
0.19
770.12
0.21
0.00
1.59
769.93
0.02
0 12:10
0 00:00
0.00
0.00
0.52
0.10
765.86
0.26
0.00
2.39
765.62
0.02
0 12:08
0 00:00
0.00
0.00
1.52
0.06
763.34
0.70
0.00
1.92
762.70
0.06
0 12:06
0 00:00
0.00
0.00
0.99
0.23
746.14
0.27
0.00
2.80
745.91
0.04
0 12:05
0 00:00
0.00
0.00
0.07
0.00
763.28
0.11
0.00
1.93
763.18
0.01
0 12:05
0 00:00
0.00
0.00
0.26
0.26
758.91
0.18
0.00
1.11
758.75
0.02
0 12:05
0 00:00
0.00
0.00
0.48
0.23
752.85
0.35
0.00
1.26
752.53
0.03
0 12:05
0 00:00
0.00
0.00
0.48
0.00
751.71
0.35
0.00
1.18
751.39
0.03
0 12:05
0 00:00
0.00
0.00
0.81
0.34
750.68
0.42
0.00
1.80
750.29
0.03
0 12:06
0 00:00
0.00
0.00
0.28
0.28
760.91
0.21
0.00
2.08
760.72
0.02
0 12:10
0 00:00
0.00
0.00
0.37
0.12
756.88
0.23
0.00
1.44
756.67
0.02
0 12:11
0 00:00
0.00
0.00
0.28
0.28
756.63
0.22
0.00
1.91
756.43
0.02
0 12:10
0 00:00
0.00
0.00
1.18
0.39
749.47
0.43
0.00
1.48
749.07
0.03
0 12:10
0 00:00
0.00
0.00
2.42
0.22
762.86
0.79
0.00
1.96
762.13
0.06
0 12:08
0 00:00
0.00
0.00
2.41
0.00
760.94
0.61
0.00
2.48
760.38
0.05
0 12:08
0 00:00
0.00
0.00
0.28
0.08
763.24
0.25
0.00
1.87
763.01
0.02
0 12:06
0 00:00
0.00
0.00
0.13
0.13
765.62
0.15
0.00
2.07
765.48
0.01
0 12:05
0 00:00
0.00
0.00
0.35
0.02
767.23
0.30
0.00
0.99
766.95
0.02
0 12:05
0 00:00
0.00
0.00
0.33
0.20
767.37
0.30
0.00
1.44
767.10
0.03
0 12:05
0 00:00
0.00
0.00
0.14
0.14
768.81
0.17
0.00
0.90
768.65
0.01
0 12:05
0 00:00
0.00
0.00
0.83
0.25
763.66
0.41
0.00
3.29
763.28
0.03
0 12:10
0 00:00
0.00
0.00
0.29
0.00
770.24
0.20
0.00
1.08
770.06
0.02
0 12:10
0 00:00
0.00
0.00
0.29
0.29
773.37
0.18
0.00
0.90
773.21
0.02
0 12:10
0 00:00
0.00
0.00
0.07
0.07
768.12
0.10
0.00
0.98
768.03
0.01
0 12:05
0 00:00
0.00
0.00
0.21
0.05
768.56
0.33
0.00
1.44
768.26
0.03
0 12:07
0 00:00
0.00
0.00
0.52
0.00
762.76
0.35
0.00
2.57
762.43
0.02
0 12:08
0 00:00
0.00
0.00
0.37
0.14
761.34
0.28
0.00
2.72
761.08
0.02
0 12:05
0 00:00
0.00
0.00
0.37
0.00
759.60
0.29
0.00
1.96
759.34
0.03
0 12:05
0 00:00
0.00
0.00
0.37
0.17
768.33
0.38
0.00
1.67
767.98
0.03
0 12:06
0 00:00
0.00
0.00
0.52
0.16
758.84
0.36
0.00
1.84
758.51
0.03
0 12:06
0 00:00
0.00
0.00
0.28
0.10
787.97
0.20
0.00
2.62
787.79
0.02
0 12:05
0 00:00
0.00
0.00
0.43
0.16
783.24
0.26
0.00
1.45
783.00
0.02
0 12:05
0 00:00
0.00
0.00
0.68
0.11
774.73
0.35
0.00
1.54
774.40
0.02
0 12:06
0 00:00
0.00
0.00
0.75
0.07
771.43
0.39
0.00
1.52
771.07
0.03
0 12:06
0 00:00
0.00
0.00
0.64
0.35
766.55
0.32
0.00
1.60
766.25
0.02
0 12:10
0 00:00
0.00
0.00
0.20
0.08
763.96
0.25
0.00
1.03
763.73
0.02
0 12:05
0 00:00
0.00
0.00

Junction Results
SN Element
ID

88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119

Peak Peak Max HGL Max HGL


Max
Min Average HGL Average HGL
Time of
Time of
Total Total Time
Inflow Lateral Elevation
Depth Surcharge Freeboard
Elevation
Depth
Max HGL
Peak Flooded
Flooded
Inflow Attained Attained
Depth Attained
Attained
Attained
Occurrence
Flooding Volume
Attained
Occurrence
(cms) (cms)
(m)
(m)
(m)
(m)
(m)
(m) (days hh:mm) (days hh:mm) (ha-mm)
(min)
MH247
0.19
0.00
768.90
0.21
0.00
2.49
768.71
0.02
0 12:10
0 00:00
0.00
0.00
MH248
0.41
0.22
768.02
0.34
0.00
2.26
767.70
0.02
0 12:10
0 00:00
0.00
0.00
MH249
0.60
0.00
766.25
0.41
0.00
1.16
765.87
0.03
0 12:11
0 00:00
0.00
0.00
MH250
0.64
0.06
765.86
0.42
0.00
1.33
765.47
0.03
0 12:11
0 00:00
0.00
0.00
MH251
0.74
0.13
763.66
0.36
0.00
0.85
763.32
0.02
0 12:11
0 00:00
0.00
0.00
MH252
0.13
0.00
769.66
0.15
0.00
1.35
769.52
0.01
0 12:10
0 00:00
0.00
0.00
MH253
0.13
0.13
771.32
0.16
0.00
1.07
771.18
0.02
0 12:10
0 00:00
0.00
0.00
MH254
0.26
0.26
758.56
0.14
0.00
3.67
758.43
0.01
0 12:05
0 00:00
0.00
0.00
MH255
0.07
0.07
766.77
0.10
0.00
1.42
766.68
0.01
0 12:05
0 00:00
0.00
0.00
MH256
0.33
0.26
761.02
0.20
0.00
2.26
760.84
0.02
0 12:05
0 00:00
0.00
0.00
MH257
0.33
0.00
756.37
0.19
0.00
2.43
756.19
0.01
0 12:05
0 00:00
0.00
0.00
MH258
0.33
0.00
752.87
0.20
0.00
1.51
752.69
0.02
0 12:05
0 00:00
0.00
0.00
MH259
0.18
0.00
747.49
0.20
0.00
1.19
747.30
0.01
0 12:05
0 00:00
0.00
0.00
MH260
0.15
0.00
750.65
0.13
0.00
2.56
750.53
0.01
0 12:05
0 00:00
0.00
0.00
MH261
0.31
0.16
741.91
0.15
0.00
1.61
741.77
0.01
0 12:05
0 00:00
0.00
0.00
MH262
0.04
0.00
757.88
0.09
0.00
1.31
757.79
0.00
0 12:05
0 00:00
0.00
0.00
MH263
0.65
0.00
748.58
0.42
0.00
1.50
748.19
0.03
0 12:06
0 00:00
0.00
0.00
MH264
1.25
0.06
723.88
0.38
0.00
1.59
723.53
0.03
0 12:06
0 00:00
0.00
0.00
MH265
0.10
0.05
764.19
0.14
0.00
0.94
764.06
0.01
0 12:05
0 00:00
0.00
0.00
MH266
0.13
0.00
760.29
0.18
0.00
1.70
760.13
0.02
0 12:06
0 00:00
0.00
0.00
MH267
0.26
0.00
751.06
0.15
0.00
2.60
750.92
0.01
0 12:06
0 00:00
0.00
0.00
MH268
0.43
0.00
760.67
0.31
0.00
1.13
760.39
0.03
0 12:10
0 00:00
0.00
0.00
MH269
0.61
0.19
760.75
1.27
0.00
0.00
759.51
0.03
0 12:10
0 12:10
0.00
1.00
MH270
0.26
0.00
755.20
0.20
0.00
2.06
755.01
0.01
0 12:05
0 00:00
0.00
0.00
MH271
0.28
0.00
758.55
0.24
0.00
1.19
758.35
0.04
0 12:10
0 00:00
0.00
0.00
MH272
0.37
0.00
752.87
0.23
0.00
1.49
752.66
0.02
0 12:11
0 00:00
0.00
0.00
MH273
0.28
0.00
753.99
0.22
0.00
1.80
753.79
0.02
0 12:10
0 00:00
0.00
0.00
MH274
0.50
0.23
750.06
0.42
0.00
1.81
749.67
0.03
0 12:10
0 00:00
0.00
0.00
MH275
0.09
0.00
751.91
0.15
0.00
1.58
751.78
0.02
0 12:05
0 00:00
0.00
0.00
MH276
0.06
0.00
726.48
0.06
0.00
1.65
726.43
0.01
0 12:05
0 00:00
0.00
0.00
MH277
0.77
0.03
769.57
0.39
0.00
1.38
769.21
0.03
0 12:06
0 00:00
0.00
0.00
NullStructure
0.00
0.00
765.44
0.00
0.00
0.45
765.44
0.00
0 00:00
0 00:00
0.00
0.00

Pipe Input
SN Element
ID

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88

Length

(m)
P100
71.24
P100(1)
60.79
P101
65.44
P102
52.48
P104
79.62
P105
23.00
P106
35.19
P107
57.14
P107(1)
60.04
P107(1)(1)
63.26
P108
11.96
P109
38.60
P110
50.10
P111
39.58
P112
55.84
P112(1)
46.25
P113
10.83
P114
70.66
P114(1)
16.42
P116
29.10
P117
14.81
P118
16.27
P118(1)
25.44
P119(1)(1)
81.56
P119(1)(1)(1) 76.11
P120
8.73
P121
62.13
P121(1)
27.11
P122
59.83
P122(1)
46.76
P122(2)
78.39
P123
36.72
P125
32.55
P126
19.37
P127
67.05
P127(2)
53.50
P128
70.54
P131
122.58
P132
58.31
P132(1)
48.32
P132(1)(1)
36.41
P140
53.91
P140(1)
61.69
P140(1)(1)
46.56
P140(1)(1)(1) 54.07
P141
62.76
P141(1)
59.36
P142
41.65
P143
78.43
P144
17.74
P145
60.52
P145(1)
61.22
P146
73.28
P146(1)
16.52
P146(2)
65.28
P147
78.74
P147(1)
81.52
P147(1)(1)
73.40
P148
64.84
P149
35.49
P153
11.92
P154
60.60
P154(1)
63.33
P158
24.73
P159
14.31
P160
78.02
P164
38.41
P165
49.76
P165(1)
63.52
P166
39.41
P168
51.93
P170
76.52
P171
31.93
P172
36.87
P173
83.52
P174
84.97
P175
77.17
P76
59.86
P76(1)
84.37
P77(1)
82.72
P78
73.33
P78(2)
62.68
P79
23.13
P80
46.32
P80(1)
58.97
P81
66.31
P84
55.40
P85
57.60

Inlet Inlet
Outlet Outlet Total Average Pipe
Pipe
Invert Invert
Invert Invert Drop
Slope Shape
Diameter or
Elevation Offset Elevation Offset
Height
(m)
(m)
(m)
(m)
(m)
(%)
(mm)
759.14 0.00
750.91 0.00 8.23 11.5500 CIRCULAR
450.000
750.91 0.00
743.64 0.00 7.27 11.9600 CIRCULAR
450.000
743.64 0.00
717.39 0.00 26.25 40.1100 CIRCULAR
450.000
761.92 0.00
759.14 0.00 2.78 5.3100 CIRCULAR
450.000
771.65 0.00
769.68 0.00 1.98 2.4800 CIRCULAR
450.000
769.68 0.00
769.48 0.01 0.19 0.8300 CIRCULAR
600.000
769.47 0.00
763.83 0.00 5.64 16.0200 CIRCULAR
450.000
763.83 0.00
758.00 0.56 5.84 10.2200 CIRCULAR
450.000
758.00 0.56
748.16 0.00 9.84 16.3800 CIRCULAR
450.000
748.16 0.00
747.66 0.00 0.50 0.7900 CIRCULAR
750.000
747.66 0.00
746.28 0.01 1.37 11.4800 CIRCULAR
600.000
746.27 0.00
740.15 0.00 6.12 15.8600 CIRCULAR
600.000
740.15 0.00
736.52 0.00 3.63 7.2500 CIRCULAR
600.000
736.52 0.00
729.26 0.00 7.25 18.3300 CIRCULAR
600.000
729.26 0.00
723.50 0.00 5.76 10.3100 CIRCULAR
600.000
723.50 0.00
720.40 0.00 3.10 6.7100 CIRCULAR
600.000
720.40 0.00
720.29 0.00 0.11 1.0000 CIRCULAR
900.000
760.58 0.00
757.79 0.00 2.79 3.9500 CIRCULAR
450.000
757.79 0.00
757.44 0.00 0.35 2.1400 CIRCULAR
450.000
772.24 0.00
771.53 0.00 0.71 2.4500 CIRCULAR
450.000
771.53 0.00
769.47 0.00 2.06 13.9100 CIRCULAR
450.000
732.03 0.00
726.42 0.00 5.60 34.4500 CIRCULAR
450.000
726.42 0.00
720.38 -0.02 6.04 23.7400 CIRCULAR
450.000
733.66 0.00
728.77 0.00 4.89 6.0000 CIRCULAR
450.000
728.77 0.00
723.94 0.00 4.83 6.3500 CIRCULAR
450.000
723.94 0.00
723.76 0.00 0.17 2.0000 CIRCULAR
450.000
752.86 0.00
751.77 0.01 1.09 1.7600 CIRCULAR
450.000
751.76 0.00
747.66 0.00 4.10 15.1200 CIRCULAR
450.000
766.38 0.00
758.42 0.00 7.96 13.3000 CIRCULAR
450.000
745.87 0.00
735.20 0.00 10.66 22.8000 CIRCULAR
450.000
758.42 0.00
745.87 0.00 12.55 16.0100 CIRCULAR
450.000
735.20 0.00
731.03 0.00 4.17 11.3500 CIRCULAR
600.000
741.76 0.00
736.27 0.00 5.49 16.8600 CIRCULAR
450.000
736.27 0.00
730.40 0.00 5.86 30.2600 CIRCULAR
450.000
748.63 0.00
747.29 0.00 1.34 2.0000 CIRCULAR
450.000
747.29 0.00
745.90 0.03 1.39 2.5900 CIRCULAR
450.000
767.77 0.00
766.38 0.00 1.40 1.9800 CIRCULAR
450.000
769.51 0.00
762.04 0.00 7.47 6.0900 CIRCULAR
450.000
762.04 0.00
760.36 0.00 1.68 2.8800 CIRCULAR
450.000
760.36 0.00
759.48 0.00 0.88 1.8300 CIRCULAR
600.000
759.48 0.00
759.17 0.00 0.31 0.8500 CIRCULAR
600.000
763.17 0.00
760.82 0.00 2.35 4.3600 CIRCULAR
450.000
760.82 0.00
756.18 0.00 4.64 7.5300 CIRCULAR
450.000
756.18 0.00
752.67 0.00 3.51 7.5300 CIRCULAR
450.000
752.67 0.00
745.87 0.00 6.81 12.5900 CIRCULAR
450.000
758.73 0.00
755.00 0.00 3.73 5.9500 CIRCULAR
450.000
755.00 0.00
752.50 0.00 2.49 4.2000 CIRCULAR
450.000
752.50 0.00
751.36 0.00 1.14 2.7400 CIRCULAR
450.000
751.36 0.00
750.26 0.00 1.10 1.4100 CIRCULAR
600.000
750.26 0.00
750.04 0.00 0.22 1.2600 CIRCULAR
750.000
760.70 0.00
758.33 0.02 2.37 3.9200 CIRCULAR
450.000
758.31 0.00
756.65 0.00 1.66 2.7200 CIRCULAR
450.000
756.65 0.00
752.64 0.00 4.00 5.4600 CIRCULAR
450.000
749.04 0.00
748.33 0.00 0.72 4.3300 CIRCULAR
600.000
752.64 0.00
749.04 0.00 3.60 5.5200 CIRCULAR
450.000
756.41 0.00
753.77 0.00 2.64 3.3500 CIRCULAR
450.000
753.77 0.00
749.64 0.00 4.13 5.0700 CIRCULAR
450.000
749.64 0.00
749.04 0.00 0.60 0.8200 CIRCULAR
600.000
762.07 0.00
760.33 0.00 1.74 2.6800 CIRCULAR
1200.000
760.33 0.00
759.90 0.00 0.44 1.2300 CIRCULAR
1200.000
762.99 0.00
762.65 0.01 0.34 2.8900 CIRCULAR
450.000
763.71 0.00
762.99 0.00 0.72 1.1900 CIRCULAR
450.000
765.47 0.00
763.71 0.00 1.75 2.7700 CIRCULAR
450.000
766.93 0.00
765.94 0.91 0.99 4.0000 CIRCULAR
450.000
767.07 0.00
766.93 0.00 0.14 1.0000 CIRCULAR
600.000
768.64 0.00
767.07 0.00 1.56 2.0000 CIRCULAR
450.000
763.25 0.00
762.38 0.00 0.86 2.2400 CIRCULAR
600.000
766.23 0.00
763.25 0.00 2.99 6.0000 CIRCULAR
450.000
770.04 0.00
766.23 0.00 3.81 6.0000 CIRCULAR
450.000
773.19 0.00
770.04 0.00 3.15 8.0000 CIRCULAR
450.000
768.02 0.00
765.60 0.00 2.42 4.6500 CIRCULAR
450.000
766.67 0.00
763.17 0.00 3.50 4.5700 CIRCULAR
450.000
753.36 0.00
750.52 0.00 2.84 8.9000 CIRCULAR
450.000
750.52 0.00
741.76 0.00 8.77 23.7800 CIRCULAR
450.000
771.04 0.00
769.18 0.00 1.86 2.2300 CIRCULAR
600.000
769.18 0.00
765.95 0.00 3.24 3.8100 CIRCULAR
600.000
769.51 0.00
766.89 0.00 2.62 3.3900 CIRCULAR
450.000
794.36 0.00
787.77 0.00 6.58 11.0000 CIRCULAR
450.000
787.77 0.00
782.98 0.00 4.79 5.6800 CIRCULAR
450.000
782.98 0.00
778.82 0.00 4.16 5.0300 CIRCULAR
450.000
778.82 0.00
774.38 0.00 4.44 6.0600 CIRCULAR
450.000
774.38 0.00
771.05 0.01 3.33 5.3200 CIRCULAR
450.000
765.95 0.00
765.04 0.00 0.91 3.9300 CIRCULAR
600.000
765.04 0.00
762.64 0.00 2.39 5.1700 CIRCULAR
600.000
762.64 0.00
762.38 0.00 0.26 0.4400 CIRCULAR
1050.000
762.38 0.00
762.07 0.00 0.31 0.4700 CIRCULAR
1200.000
768.95 0.00
768.44 0.00 0.50 0.9100 CIRCULAR
450.000
768.44 0.00
768.23 0.00 0.21 0.3700 CIRCULAR
450.000

Pipe Manning's Entrance Exit/Bend Additional Initial


Width Roughness Losses
Losses
Losses Flow
(mm)
450.000
450.000
450.000
450.000
450.000
600.000
450.000
450.000
450.000
750.000
600.000
600.000
600.000
600.000
600.000
600.000
900.000
450.000
450.000
450.000
450.000
450.000
450.000
450.000
450.000
450.000
450.000
450.000
450.000
450.000
450.000
600.000
450.000
450.000
450.000
450.000
450.000
450.000
450.000
600.000
600.000
450.000
450.000
450.000
450.000
450.000
450.000
450.000
600.000
750.000
450.000
450.000
450.000
600.000
450.000
450.000
450.000
600.000
1200.000
1200.000
450.000
450.000
450.000
450.000
600.000
450.000
600.000
450.000
450.000
450.000
450.000
450.000
450.000
450.000
600.000
600.000
450.000
450.000
450.000
450.000
450.000
450.000
600.000
600.000
1050.000
1200.000
450.000
450.000

0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120

0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000

0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

(cms)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Flap
No. of
Gate Barrels

No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Pipe Input
SN Element
ID

89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119

P85(1)
P85(1)(1)
P86
P86(1)
P86(1)(1)
P87
P88
P88(1)
P89
P89(1)
P90
P91(1)
P91(1)(1)
P91(1)(1)(1)
P92
P93
P93(1)
P93(1)(1)
P93(1)(1)(1)
P93(2)
P94
P95
P95(1)
P95(1)(1)
P95(1)(1)(1)
P96
P97
P98
P98(1)
P99
P99(1)

Length

(m)
70.95
54.56
88.65
72.55
78.89
83.05
71.04
16.29
59.91
72.14
12.57
60.59
50.52
57.80
64.03
67.53
1.26
67.89
56.01
56.06
75.53
63.44
60.54
61.13
55.36
13.02
27.05
36.17
50.85
63.12
57.78

Inlet Inlet
Outlet Outlet Total Average Pipe
Pipe
Invert Invert
Invert Invert Drop
Slope Shape
Diameter or
Elevation Offset Elevation Offset
Height
(m)
(m)
(m)
(m)
(m)
(%)
(mm)
768.23 0.00
767.95 0.00 0.29 0.4000 CIRCULAR
600.000
767.95 0.00
767.63 0.00 0.31 0.5800 CIRCULAR
600.000
767.63 0.00
765.60 0.00 2.03 2.2900 CIRCULAR
600.000
765.60 0.00
762.41 0.00 3.20 4.4000 CIRCULAR
600.000
762.41 0.00
761.19 0.00 1.22 1.5500 CIRCULAR
600.000
761.19 0.00
759.98 0.00 1.21 1.4500 CIRCULAR
600.000
759.98 0.00
757.47 0.00 2.50 3.5300 CIRCULAR
750.000
757.47 0.00
756.94 0.00 0.54 3.3000 CIRCULAR
900.000
771.16 0.00
769.51 0.00 1.65 2.7600 CIRCULAR
450.000
766.89 0.00
761.93 0.10 4.97 6.8800 CIRCULAR
450.000
761.83 0.00
761.64 1.66 0.19 1.5200 CIRCULAR
750.000
769.91 0.00
768.69 0.00 1.22 2.0100 CIRCULAR
450.000
768.69 0.00
767.68 0.00 1.01 2.0100 CIRCULAR
450.000
767.68 0.00
766.52 0.00 1.16 2.0100 CIRCULAR
450.000
766.52 0.00
766.32 0.00 0.19 0.3000 CIRCULAR
750.000
766.32 0.00
765.84 0.00 0.49 0.7200 CIRCULAR
750.000
765.44 0.00
765.44 0.00 0.00 0.0000 CIRCULAR
450.000
765.44 0.00
763.30 0.00 2.15 3.1600 CIRCULAR
600.000
763.30 0.00
761.83 0.00 1.47 2.6200 CIRCULAR
600.000
765.84 0.00
765.44 0.00 0.40 0.7100 CIRCULAR
750.000
768.64 0.00
764.90 0.00 3.75 4.9600 CIRCULAR
450.000
764.90 0.00
761.06 0.00 3.83 6.0400 CIRCULAR
450.000
761.06 0.00
759.31 0.00 1.75 2.8900 CIRCULAR
450.000
759.31 0.00
758.48 0.00 0.83 1.3600 CIRCULAR
600.000
758.48 0.00
757.72 0.00 0.76 1.3800 CIRCULAR
600.000
757.72 0.00
757.47 0.00 0.25 1.8800 CIRCULAR
600.000
765.92 0.00
764.39 0.01 1.53 5.6600 CIRCULAR
450.000
764.38 0.00
764.05 0.00 0.33 0.9100 CIRCULAR
450.000
764.05 0.00
763.00 0.00 1.05 2.0700 CIRCULAR
450.000
763.00 0.00
760.11 0.00 2.88 4.5700 CIRCULAR
450.000
760.11 0.00
759.14 0.00 0.97 1.6800 CIRCULAR
450.000

Pipe Manning's Entrance Exit/Bend Additional Initial


Width Roughness Losses
Losses
Losses Flow
(mm)
600.000
600.000
600.000
600.000
600.000
600.000
750.000
900.000
450.000
450.000
750.000
450.000
450.000
450.000
750.000
750.000
450.000
600.000
600.000
750.000
450.000
450.000
450.000
600.000
600.000
600.000
450.000
450.000
450.000
450.000
450.000

0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120
0.0120

0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000

0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

(cms)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Flap
No. of
Gate Barrels

No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Pipe Results
SN Element
ID

Peak
Flow

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87

(cms)
0.26
0.26
0.31
0.04
0.22
0.34
0.41
0.41
0.65
0.65
1.05
1.05
1.05
1.19
1.19
1.25
1.48
0.04
0.04
0.07
0.07
0.06
0.06
0.13
0.27
0.33
0.09
0.09
0.00
0.99
0.26
1.12
0.31
0.31
0.18
0.18
0.00
0.27
0.43
0.43
0.63
0.07
0.33
0.33
0.32
0.26
0.26
0.48
0.48
0.81
0.28
0.28
0.37
1.18
0.37
0.28
0.28
0.50
2.41
2.41
0.28
0.20
0.13
0.35
0.33
0.14
0.83
0.64
0.29
0.29
0.07
0.07
0.16
0.15
0.75
0.78
0.13
0.19
0.28
0.43
0.57
0.68
0.86
1.20
1.52
2.24
0.12

P100
P100(1)
P101
P102
P104
P105
P106
P107
P107(1)
P107(1)(1)
P108
P109
P110
P111
P112
P112(1)
P113
P114
P114(1)
P116
P117
P118
P118(1)
P119(1)(1)
P119(1)(1)(1)
P120
P121
P121(1)
P122
P122(1)
P122(2)
P123
P125
P126
P127
P127(2)
P128
P131
P132
P132(1)
P132(1)(1)
P140
P140(1)
P140(1)(1)
P140(1)(1)(1)
P141
P141(1)
P142
P143
P144
P145
P145(1)
P146
P146(1)
P146(2)
P147
P147(1)
P147(1)(1)
P148
P149
P153
P154
P154(1)
P158
P159
P160
P164
P165
P165(1)
P166
P168
P170
P171
P172
P173
P174
P175
P76
P76(1)
P77(1)
P78
P78(2)
P79
P80
P80(1)
P81
P84

Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froude Reported
Peak Flow
Capacity Design Flow
Velocity Time
Depth
Depth/ Surcharged Number Condition
Occurrence
Ratio
Total Depth
Ratio
(days hh:mm)
(cms)
(m/sec) (min)
(m)
(min)
0 12:06
1.05
0.25
5.49 0.22
0.15
0.34
0.00
Calculated
0 12:06
1.07
0.25
5.56 0.18
0.15
0.34
0.00
Calculated
0 12:06
1.96
0.16
8.96 0.12
0.12
0.27
0.00
Calculated
0 12:05
0.71
0.05
2.41 0.36
0.07
0.16
0.00
Calculated
0 12:05
0.49
0.46
3.01 0.44
0.21
0.47
0.00
Calculated
0 12:05
0.61
0.57
2.21 0.17
0.32
0.54
0.00
Calculated
0 12:05
1.24
0.33
6.99 0.08
0.17
0.40
0.00
Calculated
0 12:06
0.99
0.42
5.93 0.16
0.20
0.45
0.00
Calculated
0 12:06
1.25
0.52
7.95 0.13
0.23
0.51
0.00
Calculated
0 12:06
1.08
0.61
2.55 0.41
0.40
0.56
0.00
Calculated
0 12:06
2.25
0.47
7.83 0.03
0.28
0.48
0.00
Calculated
0 12:06
2.65
0.40
8.82 0.07
0.25
0.44
0.00
Calculated
0 12:06
1.79
0.59
6.58 0.13
0.32
0.55
0.00
Calculated
0 12:06
2.85
0.42
9.62 0.07
0.26
0.45
0.00
Calculated
0 12:06
2.14
0.56
7.75 0.12
0.31
0.53
0.00
Calculated
0 12:06
1.72
0.72
6.64 0.12
0.36
0.63
0.00
Calculated
0 12:06
1.96
0.76
3.39 0.05
0.56
0.65
0.00
Calculated
0 12:05
0.61
0.06
2.17 0.54
0.08
0.17
0.00
Calculated
0 12:05
0.45
0.09
1.74 0.16
0.09
0.20
0.00
Calculated
0 12:05
0.48
0.14
2.17 0.22
0.12
0.26
0.00
Calculated
0 12:10
1.15
0.06
4.00 0.06
0.08
0.17
0.00
Calculated
0 12:05
1.81
0.04
5.35 0.05
0.06
0.13
0.00
Calculated
0 12:05
1.50
0.04
4.70 0.09
0.06
0.14
0.00
Calculated
0 12:05
0.76
0.17
3.57 0.38
0.12
0.28
0.00
Calculated
0 12:05
0.78
0.34
4.43 0.29
0.18
0.40
0.00
Calculated
0 12:05
0.44
0.75
3.01 0.05
0.29
0.65
0.00
Calculated
0 12:05
0.41
0.21
2.05 0.51
0.14
0.31
0.00
Calculated
0 12:05
1.20
0.07
4.37 0.10
0.08
0.18
0.00
Calculated
0 00:00
1.13
0.00
0.00
0.00
0.00
0.00
Calculated
0 12:05
1.48
0.67
9.93 0.08
0.26
0.60
0.00
Calculated
0 12:05
1.24
0.21
6.19 0.21
0.14
0.31
0.00
Calculated
0 12:05
2.24
0.50
7.93 0.08
0.30
0.50
0.00
Calculated
0 12:05
1.27
0.25
6.60 0.08
0.15
0.34
0.00
Calculated
0 12:05
1.70
0.18
8.13 0.04
0.13
0.29
0.00
Calculated
0 12:05
0.44
0.41
2.63 0.42
0.20
0.45
0.00
Calculated
0 12:06
0.50
0.36
2.88 0.31
0.18
0.41
0.00
Calculated
0 00:00
0.43
0.00
0.00
0.00
0.00
0.00
Calculated
0 12:10
0.76
0.35
4.39 0.47
0.18
0.41
0.00
Calculated
0 12:10
0.52
0.82
3.68 0.26
0.31
0.69
0.00
Calculated
0 12:10
0.90
0.48
3.14 0.26
0.29
0.49
0.00
Calculated
0 12:11
0.61
1.03
2.52 0.24
0.49
0.90
0.00
> CAPACITY
0 12:06
0.65
0.11
2.69 0.33
0.10
0.22
0.00
Calculated
0 12:05
0.85
0.38
4.99 0.21
0.19
0.43
0.00
Calculated
0 12:05
0.85
0.38
4.97 0.16
0.19
0.43
0.00
Calculated
0 12:06
1.10
0.29
6.01 0.15
0.16
0.37
0.00
Calculated
0 12:05
0.75
0.34
4.30 0.24
0.18
0.40
0.00
Calculated
0 12:05
0.63
0.40
3.77 0.26
0.19
0.44
0.00
Calculated
0 12:05
0.51
0.94
3.66 0.19
0.34
0.77
0.00
Calculated
0 12:06
0.79
0.61
2.93 0.45
0.32
0.56
0.00
Calculated
0 12:06
1.36
0.60
3.20 0.09
0.41
0.56
0.00
Calculated
0 12:10
0.61
0.46
3.76 0.27
0.21
0.47
0.00
Calculated
0 12:11
0.51
0.55
3.28 0.31
0.23
0.53
0.00
Calculated
0 12:11
0.72
0.52
4.58 0.27
0.23
0.51
0.00
Calculated
0 12:11
1.39
0.85
5.50 0.05
0.42
0.71
0.00
Calculated
0 12:11
0.73
0.52
4.59 0.24
0.22
0.51
0.00
Calculated
0 12:10
0.57
0.49
3.55 0.37
0.22
0.49
0.00
Calculated
0 12:11
0.70
0.40
4.13 0.33
0.19
0.44
0.00
Calculated
0 12:11
0.60
0.84
2.39 0.51
0.41
0.70
0.00
Calculated
0 12:08
6.91
0.35
5.57 0.19
0.49
0.41
0.00
Calculated
0 12:08
4.68
0.52
4.17 0.14
0.61
0.51
0.00
Calculated
0 12:05
0.52
0.53
3.35 0.06
0.23
0.52
0.00
Calculated
0 12:06
0.34
0.59
2.22 0.45
0.24
0.56
0.00
Calculated
0 12:05
0.51
0.24
2.68 0.39
0.15
0.33
0.00
Calculated
0 12:05
0.62
0.57
4.01 0.10
0.24
0.54
0.00
Calculated
0 12:05
0.67
0.50
2.35 0.10
0.30
0.50
0.00
Calculated
0 12:05
0.44
0.31
2.43 0.54
0.17
0.38
0.00
Calculated
0 12:10
1.00
0.83
3.94 0.16
0.42
0.70
0.00
Calculated
0 12:10
0.76
0.84
5.33 0.16
0.31
0.70
0.00
Calculated
0 12:10
0.76
0.39
4.45 0.24
0.19
0.43
0.00
Calculated
0 12:10
0.87
0.33
4.95 0.13
0.18
0.40
0.00
Calculated
0 12:05
0.67
0.11
2.73 0.32
0.10
0.22
0.00
Calculated
0 12:05
0.66
0.11
2.73 0.47
0.10
0.22
0.00
Calculated
0 12:05
0.92
0.17
4.31 0.12
0.12
0.28
0.00
Calculated
0 12:05
1.51
0.10
6.10 0.10
0.10
0.22
0.00
Calculated
0 12:06
0.99
0.75
3.86 0.36
0.38
0.65
0.00
Calculated
0 12:07
1.30
0.60
4.79 0.30
0.33
0.56
0.00
Calculated
0 12:10
0.57
0.22
2.88 0.45
0.14
0.32
0.00
Calculated
0 12:05
1.02
0.18
4.92 0.20
0.13
0.29
0.00
Calculated
0 12:05
0.74
0.38
4.32 0.33
0.19
0.43
0.00
Calculated
0 12:06
0.69
0.63
4.60 0.30
0.25
0.57
0.00
Calculated
0 12:06
0.76
0.75
5.25 0.23
0.28
0.65
0.00
Calculated
0 12:06
0.71
0.96
5.10 0.20
0.34
0.78
0.00
Calculated
0 12:07
1.32
0.65
4.96 0.08
0.34
0.59
0.00
Calculated
0 12:07
1.51
0.79
5.93 0.13
0.39
0.67
0.00
Calculated
0 12:07
1.96
0.77
2.51 0.39
0.66
0.66
0.00
Calculated
0 12:08
2.91
0.77
2.84 0.39
0.79
0.66
0.00
Calculated
0 12:10
0.29
0.40
1.75 0.53
0.20
0.44
0.00
Calculated

Pipe Results
SN Element
ID

Peak
Flow

88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119

(cms)
0.17
0.22
0.37
0.37
0.52
0.52
0.70
1.97
2.52
0.13
0.40
1.12
0.19
0.19
0.41
0.41
0.60
0.00
0.64
0.74
0.60
0.05
0.23
0.37
0.37
0.52
0.52
0.06
0.06
0.10
0.14
0.13

P85
P85(1)
P85(1)(1)
P86
P86(1)
P86(1)(1)
P87
P88
P88(1)
P89
P89(1)
P90
P91(1)
P91(1)(1)
P91(1)(1)(1)
P92
P93
P93(1)
P93(1)(1)
P93(1)(1)(1)
P93(2)
P94
P95
P95(1)
P95(1)(1)
P95(1)(1)(1)
P96
P97
P98
P98(1)
P99
P99(1)

Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froude Reported
Peak Flow
Capacity Design Flow
Velocity Time
Depth
Depth/ Surcharged Number Condition
Occurrence
Ratio
Total Depth
Ratio
(days hh:mm)
(cms)
(m/sec) (min)
(m)
(min)
0 12:07
0.19
0.89
1.34 0.72
0.33
0.73
0.00
Calculated
0 12:08
0.42
0.51
1.50 0.79
0.30
0.51
0.00
Calculated
0 12:07
0.51
0.74
1.96 0.46
0.37
0.64
0.00
Calculated
0 12:07
1.01
0.37
3.29 0.45
0.25
0.42
0.00
Calculated
0 12:08
1.40
0.38
4.58 0.26
0.25
0.42
0.00
Calculated
0 12:09
0.83
0.63
3.10 0.42
0.35
0.58
0.00
Calculated
0 12:09
0.80
0.87
3.20 0.43
0.43
0.72
0.00
Calculated
0 12:10
2.26
0.87
5.77 0.21
0.54
0.72
0.00
Calculated
0 12:10
3.56
0.71
6.07 0.04
0.56
0.62
0.00
Calculated
0 12:10
0.51
0.24
2.67 0.37
0.15
0.34
0.00
Calculated
0 12:10
0.81
0.49
5.08 0.24
0.22
0.50
0.00
Calculated
0 12:11
1.49
0.76
3.70 0.06
0.48
0.65
0.00
Calculated
0 12:10
0.44
0.44
2.67 0.38
0.21
0.46
0.00
Calculated
0 12:10
0.44
0.44
2.66 0.32
0.21
0.46
0.00
Calculated
0 12:10
0.44
0.93
3.13 0.31
0.34
0.76
0.00
Calculated
0 12:11
0.66
0.61
1.58 0.68
0.42
0.57
0.00
Calculated
0 12:11
1.02
0.58
2.41 0.47
0.41
0.55
0.00
Calculated
0 00:00
0.14
0.00
0.00
0.00
0.00
0.00
Calculated
0 12:11
1.18
0.54
4.27 0.26
0.31
0.52
0.00
Calculated
0 12:11
1.08
0.68
4.10 0.23
0.36
0.61
0.00
Calculated
0 12:11
1.01
0.59
2.39 0.39
0.40
0.55
0.00
Calculated
0 12:05
0.69
0.07
2.55 0.49
0.08
0.18
0.00
Calculated
0 12:05
0.76
0.30
4.19 0.25
0.17
0.38
0.00
Calculated
0 12:05
0.53
0.70
3.57 0.28
0.27
0.61
0.00
Calculated
0 12:06
0.78
0.47
2.71 0.38
0.28
0.48
0.00
Calculated
0 12:06
0.78
0.67
2.96 0.31
0.34
0.60
0.00
Calculated
0 12:06
0.91
0.57
3.33 0.07
0.31
0.54
0.00
Calculated
0 12:05
0.73
0.08
2.74 0.16
0.08
0.19
0.00
Calculated
0 12:05
0.29
0.19
1.42 0.42
0.13
0.29
0.00
Calculated
0 12:06
0.44
0.23
2.27 0.37
0.14
0.32
0.00
Calculated
0 12:06
0.66
0.20
3.26 0.32
0.13
0.31
0.00
Calculated
0 12:06
0.40
0.34
2.28 0.42
0.17
0.40
0.00
Calculated

Das könnte Ihnen auch gefallen