JOB Install Piping and valves
WORK TEAM Rigging Crew
SEQUENCE OF BASIC JOB STEPS POTENTIAL ACCIDENTS OR HAZARDS RECOMMENDED SAFE JOB PROCEDURES
1. Raise Cold Work Permit for the job. Conflict with others activities.
2. Inspect the site location. Wrong location. Refer to drawings.
3. ransfer material to the site location. !and" finger inj#ries$ %inger pinched rip and fall. Wear rigger&s gloves. Coordinate lifting and
material handling.
'. (ct#al installing work. Pinch point. )nocking against sensitive instr#ment.
Congested area.
Identif* potential of pinch point. +inimised
personnel working on same area. ,arrier off work
area and working sign.
WHAT TO CHECK AND NOT LIMITED TO WITH REFERENCE TO APPENDIX 1 & 2 OF THE JOB SAFETY ANALYSIS SECTION OF MOGP MANUAL
EXPERIENCE YES NO YES NO
!ave *o# done this job before- "
(re *o# knowledgeable with the job to be
performed-
"
!ave *o# referred to technical drawing"vendor
proced#re"..P-
" Is s#pervision"e/perienced assistance re0#ired- "
PPE YES NO YES NO
!ard hat- " Work vest- "
.afet* 1lasses- " (pron- "
.afet* shoes- " 1oggle- "
2ar pl#gs- " %ace shield- "
Right t*pe of gloves- " Respirator* protection- "
.afet* harness- "
POTENTIAL HAZARDS YES NO YES NO
.lipper* floor- " rapped press#re- "
Congested area- " Press#ri3ed e0#ipment"vessel ha3ard- "
ripping- " %ire"e/plosion ha3ards- "
4verhead work- " 2scape ro#te- "
Working at height- " .hock"electricit*"static- "
.caffolding- " ,reaker rack o#t- "
TML MANAGING OPERATIONS WITH GENERAL PROCEDURES Rev. 0
Talisman Malaysia Limited
HS&E Section
Job Safety Analysis
Doc. No: PM3-HSE-GEN-PR-F-00!
Re"ision: 0
Date: J#ne $00%
Pa&e: A''en(i) 3
.ec#re ladder- " 5alve isolation- "
!eav* load- " 1#ard rotating e0#ipment- "
!ammer strikes- " Power tools ha3ards- "
Pinch"trap finger$ hand- " !igh noise area$ do#ble ear protection- "
,ack inj#r* ha3ard- " .park"hot slag- "
.winging object- " ,#rn 6heat"chemical7- "
%alling object- " 8ear radioactive materials"so#rces- "
4thers closeb*- " 2nvironmental spill- "
.harp object- " !ose connection- "
2*e inj#r*- " Wind*- "
1rating"deck opening- " 9#st*- "
,locked drains- "
Prepared b*:;............................... ;; Reviewed b*: ;;;;;;;;;;.. Closed o#t: <<<<<<<<<<<<<<<<<<<<<<<<<