NORSHORE ATLANTIC an efficient and environmental friendly multi purpose drilling vessel. The vessel is primarily designed for riserless operation utilizing known and field proven technology, resulting in significant cost reduction for our clients Norshore Atlantic 1 Norshore Atlantic 2 Norshore Norwegian based, fully integrated Drilling Contractor Company.
Purpose built Riserless Drilling Unit, Norshore Atlantic Built according to the Norwegian Rules and Regulation, Mobil Offshore Unit. (More strict than MODU).
Advantages to Operators Reduced Well Cost Increased Rig Utilization of Rig(s) on Contract More efficient Field Development More efficient Sub Sea field Decommissiong. Reduced Logistic Early Pilot Hole at Low Cost
Well Management Services (Optional)
3 4 Multi purpose vessel, focused on drilling
Riserless Drilling
Drilling with 18 10k BOP Plug & Abandonment Well Intervention Light Well Intervention w/SS Lubricator (Wire Line, Tractor Operations) Coil Tubing Intervention w/ Stiff Top Compensated Work Over riser. Other Module Installation, SS-crane or Wet Tow of Large SS Modules (Templates, Manifolds, Etc..) Dredging, ROV Support Survey Significant cost savings by using the right-sized tool Sub Sea Construction MOBO Installation (SS Pumps w/Caisson) Infield treaded flowline. Through Tubing Rotary Drilling (TTRD) Cost reduction potential; 30-50% Cost reduction potential; 30-50% Additional capabilities Riserless Completion Open Water Completion Running in combination with LWI. Cost reduction potential; 30-45% Norshore Atlantic - specification Capacities Main particulars Length overall : 115,40 m Breadth molded 28 m Depth main deck 9,00 m Deadweight approx 6,500 t Moon Pool 7,20 x 7,20 m Speed (dm-4,5m, open moonpool) 14,0 kts 98 Beds DNV *1A1 Ship-shaped Drilling Unit (Drill(N))-FS E0 DYNPOS AUTRO-DK Heldk SH-LFL* HL(2,8) COMF-V(3) - Clean design
Fresh Water 1,000 m 3 Fuel oil 1,400 m 3 Liquid Mud 1,150 m 3 Dry Bulk (Cement/barite) 2 x 76 m3, 2 x 70 Hydrocarbon Slop tank 85 m 3
Methanol 7 m 3 Work deck 1,200 m 2
Equipment Main engines : MAK (6pcs) 14,600 kW DP-3, Thrusters : RollsRoyce 2x3,000kW and 4 x 1,500 kW Drilling Module Handling tower : NOV (500 sT A&P HC) Top Drive (Continuos Drilling Torque 55200 ft-lb) Drilling Equipment; NOV (including 3x1600 mud pumps) Remote Operated Pipe Handling, NOV. Mud Mixing Package; NOV Offshore Crane : NOV (140t AHC, 2500 m wire) 18 " 10 K BOP (4 x Rams, 1 x Annular) Mud Recovery System 6 x 100 mT Skid Stations ROV - 175 HP Work ROV (For rental through Oceaneering). Cement Unit (For rental through Halliburton)
5 Norshore Atlantic under construction 21 November 2013 6 21 November 2013 7 Norshore Atlantic under construction Norshore Atlantic under construction 8 North Sea Scenario Norshore Concept Semi-submersible drills entire well; tophole drilling, drilling with riser/BOP, well completion.
75 Days 10 + 65 Days Norshore drill top holes & last part of P & A. Drilling rig/ship to perform remaining drill work. An oil company with three drilling rigs can drill ~14 wells in one year With one Norshore unit and three drilling rigs he can drill ~17 wells in one year
Tophole Drilling - A more efficient way of drilling Well cost reduction of 5 -15 %. Annual increased rig utilization of 10 - 20 % World wide market + 9 Brazil, Pre-Salt potential savings, Norshore top hole for field development 6 Rigs in operation 6 Rigs + Norshore Atlantic The traditional method; The improved method; 16% more wells/year; from 21 to 24 Savings > USD120 mill/year Early production from 3-4 wells/year 10 Load Out Plan 11 Riserless P & A Replace Rig Replace Rig
One unit for the entire P&A activity.
Full Pressure and Well Fluid Level Control.
More efficient solution.
Lower dayrate
Toat Well (P&A) Management.
12 Riserless P & A 13 Riserless P&A Tripple Operation 14 Riserless P & A - Step 1 (H XMT) Arrive Location
Run BOP using SS Crane simultaneously retrieveing XMT Cap.
18 "10 K BOP Configuration: H4 Connector 3(2) x PR 1(2) x BSR Annular H4 Connector (WH Profile)
BOP is being run with BOP Control Umbilicals and K/C Lines (Redundancy) and WOCS Umbilical for Control of XMT.
15 Riserless P & A - Step 2 Land and Connect BOP. Perform Connection test.
ROV installing WOCS Jumper Umbilical
Run 7 " Lubricator Section H4 Connector at bottom section of Lubricator.
Land and Connect Lubricator section on top of BOP (H4 Connector).
Perform Connection Test.
16 Riserless P & A - Step 3 Run in with Slick Line / Wire Line and Crown Plug Retrieving Tool.
Retrieve Crown Plugs.
Kill the well pumping down the Kill Line ad against Closed BSR.
Run WL and install and test plug below Producion Packer.
17 Riserless P & A - Step 4 Disconnetc Lubricator and pull out with same.
Simultaneously install Well Fluid Pump System (Mud Recovery System).
Run in with Tubing Hanger rerieving toool on DP and pull out Upper Completion. Pressure Control while pulling Tubing Hanger free i.e. Closed bag. Flow check i.e. The Well Fluid System Controls fluid level in Well.
Install and pressure test shallow retrieval plug in Production Casing. 18 Riserless P & A - Step 5 ROV disconnecting MRS Hose and Control Cable from MRS Funnel.
Lift off BOP with SS Crane
Retrieve XMT from Derrick
Efficient Dual Operation.
19 Riserless P & A - Step 6 Install BOP again and perform test against Plug in Prod Casing.
Hook up MRS system.
Retrieve Shallow Plug Pressure Control i.e. Closed Annaular while releasing plug. Flow Check
Start P&A with Pressure Control and acurate Well Fluid Level Control. Set Cement Plugs Section Milling Cutting and Retrieving Casing
20 21 22 FLOWCHE CK
FLOWCH ECK 0 0,2 0,4 0,6 0,8 1 1,2 0 2 4 6 8 10 12 14 16 0 2 4 6 8 10 M u d
c o l u m n
i n
W H I N
( m )
M e t e r
C a s i n g
p u l l e d
Time Casing Mud column in WHIM Refill INFLU X INFLUX LOSS LOSS Riserless Drilling 27 Water Based Mud System
30" Conductor
20" Surface casing
18 " WH
18 BOP
Mud recovery System
Standard cgs. prg.
Riserless Drilling 28 Enter most of the Offshore bases 7 m draft
Load up one complete well
No need for Standby Vessel
Water Based Mud Sytem required Riserless Drilling 29 More efficient operation compared to Jack Up. Top hole + main well completion, Step 2. Top Hole Drilling 12 days (Drill for and run 36 and 20)
19% of the Well Construction Time
Main Drilling Phase 40 days (Run BOP, drill for and run 13-3/8, 9-5/8 and 7 casings. Do initial completion)
65% of the Well Construction time
Main Completion Phase 10 days
16% of the Well Construction Time 30 SAVING ON DAY RATE 3 mUSD SAVING ON DAY RATE 2,5 mUSD Cost reduction, increased rig utilization and increased numbers of wells drilled per year. Rig Dayrate 450.000,. USD Norshore Atlantic Day Rate 200.000,- USD SAVING PER WELL Direct day rate savings on drilled well; 20% (5.5 mUSD) Rig can be utilized for 22 days on other well; USD10 mill in increased efficiency
Typical average well construction sequence; 52 days drilling and 10 days completion work. General, Run Upper Completion in Open Water Rig install lower completion 1st barrier Rig install 2nd barrier. Seperate run barrier assembly. Two internal WL retrievable barriers and one annulus packer. Verify 2nd barrier by use of Gauges and readback to surface. Rig leaves the Location. Norshore Atlantic arrives Location (Case: Horizontal Tree). Install Horizontal XMT either by SS Crane or from Tower. By SS Crane, Install on top of XMT Stand Alone Cutting/Closing Device. (Offline Activity) H4 Connector / / 2 x Blind Shear Ram / H4 Connector / Removable Protection - Guiding Funnel Alternativ, utilize 18 " BOP. Run Upper Completion Install SS Lubricator Retrieve Internal Plugs, Hold Open Sleeves. Install Crown Plug, Tree Cap Hand over to Production or Clean Up Well to Norshore Atlantic.
31 Optional, Well Intervention Vessel Module Installation Wireline / Tractor Riserless Well Intervention with LRP/Lubricator. Light Well Intervention Intervention with Riser Riser Intervention with LRP/EDP - Stiff Top Compensated Riser. 32 LRP/EDP 6 5/8 DP Riser or Riser ID 7,25 Lubric. Valve Sec. Rotatable Riser Tension Ring Subsea Construction Vessel Sub Sea Module Installation 150 mT compensated Offshore SS Crane. Wet Tow Items moved Offshore, hanging below the vessel in safe distance above the Seabed. 500 sTon Compensated during Transit and Installation. Large size Sub Sea Equipment Installation Templates / Manifolds / Etc.. ROV support - survey