Multipurpose Riserless Drilling Vessel




NORSHORE ATLANTIC an efficient and environmental friendly multi purpose drilling
vessel. The vessel is primarily designed for riserless operation utilizing known and
field proven technology, resulting in significant cost reduction for our clients
Norshore Atlantic
1
Norshore Atlantic
2
Norshore
Norwegian based, fully integrated Drilling Contractor Company.

Purpose built Riserless Drilling Unit, Norshore Atlantic
Built according to the Norwegian Rules and Regulation, Mobil Offshore Unit. (More
strict than MODU).

Advantages to Operators
Reduced Well Cost
Increased Rig Utilization of Rig(s) on Contract
More efficient Field Development
More efficient Sub Sea field Decommissiong.
Reduced Logistic
Early Pilot Hole at Low Cost

Well Management Services (Optional)




3
4
Multi purpose vessel, focused on drilling

Riserless Drilling

Drilling with 18 10k BOP
Plug & Abandonment
Well
Intervention
Light Well Intervention w/SS Lubricator (Wire Line, Tractor Operations)
Coil Tubing Intervention w/ Stiff Top Compensated Work Over riser.
Other
Module Installation, SS-crane or Wet Tow of Large SS Modules (Templates,
Manifolds, Etc..)
Dredging, ROV Support Survey
Significant cost savings by using the right-sized tool
Sub Sea
Construction
MOBO Installation (SS Pumps w/Caisson)
Infield treaded flowline.
Through Tubing Rotary Drilling (TTRD)
Cost reduction
potential; 30-50%
Cost reduction
potential; 30-50%
Additional capabilities
Riserless
Completion
Open Water Completion Running in
combination with LWI.
Cost reduction
potential; 30-45%
Norshore Atlantic - specification
Capacities
Main particulars
Length overall : 115,40 m
Breadth molded 28 m
Depth main deck 9,00 m
Deadweight approx 6,500 t
Moon Pool 7,20 x 7,20 m
Speed (dm-4,5m, open moonpool) 14,0 kts
98 Beds
DNV *1A1 Ship-shaped Drilling Unit (Drill(N))-FS
E0 DYNPOS AUTRO-DK Heldk SH-LFL*
HL(2,8) COMF-V(3) - Clean design

Fresh Water 1,000 m
3
Fuel oil 1,400 m
3
Liquid Mud 1,150 m
3
Dry Bulk (Cement/barite) 2 x 76 m3, 2 x 70
Hydrocarbon Slop tank 85 m
3

Methanol 7 m
3
Work deck 1,200 m
2


Equipment
Main engines : MAK (6pcs) 14,600 kW
DP-3, Thrusters : RollsRoyce 2x3,000kW and 4 x
1,500 kW
Drilling Module Handling tower : NOV (500 sT A&P HC)
Top Drive (Continuos Drilling Torque 55200 ft-lb)
Drilling Equipment; NOV (including 3x1600 mud pumps)
Remote Operated Pipe Handling, NOV.
Mud Mixing Package; NOV
Offshore Crane : NOV (140t AHC, 2500 m wire)
18 " 10 K BOP (4 x Rams, 1 x Annular)
Mud Recovery System
6 x 100 mT Skid Stations
ROV - 175 HP Work ROV (For rental through
Oceaneering).
Cement Unit (For rental through Halliburton)

5
Norshore Atlantic under construction
21 November 2013
6
21 November 2013
7
Norshore Atlantic under construction
Norshore Atlantic under construction
8
North Sea Scenario Norshore Concept
Semi-submersible drills entire well; tophole
drilling, drilling with riser/BOP, well completion.


75 Days 10 + 65 Days
Norshore drill top holes & last part of P & A.
Drilling rig/ship to perform remaining drill work.
An oil company with three drilling rigs can drill ~14 wells in one year
With one Norshore unit and three drilling rigs he can drill ~17 wells in one year

Tophole Drilling - A more efficient way of drilling
Well cost reduction of 5 -15 %.
Annual increased rig utilization of 10 - 20 %
World wide market
+
9
Brazil, Pre-Salt potential savings,
Norshore top hole for field development
6 Rigs in operation
6 Rigs + Norshore Atlantic
The traditional method; The improved method;
16% more wells/year; from 21 to 24
Savings > USD120 mill/year
Early production from 3-4 wells/year
10
Load Out Plan
11
Riserless P & A Replace Rig
Replace Rig

One unit for the entire P&A
activity.

Full Pressure and Well Fluid
Level Control.

More efficient solution.

Lower dayrate

Toat Well (P&A) Management.

12
Riserless
P & A
13
Riserless P&A
Tripple Operation
14
Riserless P & A - Step 1 (H XMT)
Arrive Location

Run BOP using SS Crane
simultaneously retrieveing XMT
Cap.

18 "10 K BOP Configuration:
H4 Connector
3(2) x PR
1(2) x BSR
Annular
H4 Connector (WH Profile)

BOP is being run with BOP
Control Umbilicals and K/C
Lines (Redundancy) and WOCS
Umbilical for Control of XMT.


15
Riserless P & A - Step 2
Land and Connect BOP.
Perform Connection test.

ROV installing WOCS Jumper
Umbilical

Run 7 " Lubricator Section
H4 Connector at bottom section of
Lubricator.

Land and Connect Lubricator
section on top of BOP (H4
Connector).

Perform Connection Test.


16
Riserless P & A - Step 3
Run in with Slick Line / Wire
Line and Crown Plug Retrieving
Tool.

Retrieve Crown Plugs.

Kill the well pumping down the
Kill Line ad against Closed
BSR.

Run WL and install and test
plug below Producion Packer.


17
Riserless P & A - Step 4
Disconnetc Lubricator and pull
out with same.

Simultaneously install Well Fluid
Pump System (Mud Recovery
System).

Run in with Tubing Hanger
rerieving toool on DP and pull
out Upper Completion.
Pressure Control while pulling
Tubing Hanger free i.e. Closed bag.
Flow check i.e. The Well Fluid
System Controls fluid level in Well.

Install and pressure test shallow
retrieval plug in Production
Casing.
18
Riserless P & A - Step 5
ROV disconnecting MRS Hose
and Control Cable from MRS
Funnel.

Lift off BOP with SS Crane

Retrieve XMT from Derrick

Efficient Dual Operation.


19
Riserless P & A - Step 6
Install BOP again and perform
test against Plug in Prod
Casing.

Hook up MRS system.

Retrieve Shallow Plug
Pressure Control i.e. Closed
Annaular while releasing plug.
Flow Check

Start P&A with Pressure Control
and acurate Well Fluid Level
Control.
Set Cement Plugs
Section Milling
Cutting and Retrieving Casing

20
21
22
FLOWCHE
CK

FLOWCH
ECK
0
0,2
0,4
0,6
0,8
1
1,2
0
2
4
6
8
10
12
14
16
0 2 4 6 8 10
M
u
d

c
o
l
u
m
n

i
n

W
H
I
N

(
m
)

M
e
t
e
r

C
a
s
i
n
g

p
u
l
l
e
d

Time
Casing
Mud column in
WHIM
Refill
INFLU
X
INFLUX
LOSS
LOSS
Riserless Drilling
27
Water Based Mud System

30" Conductor

20" Surface casing

18 " WH

18 BOP

Mud recovery System

Standard cgs. prg.




Riserless Drilling
28
Enter most of the Offshore bases
7 m draft

Load up one complete well

No need for Standby Vessel

Water Based Mud Sytem
required
Riserless Drilling
29
More efficient operation compared to
Jack Up.
Top hole + main well completion, Step 2.
Top Hole Drilling 12 days
(Drill for and run 36 and 20)

19% of the Well Construction Time

Main Drilling Phase 40 days
(Run BOP, drill for and run 13-3/8, 9-5/8
and 7 casings. Do initial completion)

65% of the Well Construction time

Main Completion Phase 10 days

16% of the Well Construction Time
30
SAVING ON DAY RATE
3 mUSD
SAVING ON DAY RATE
2,5 mUSD
Cost reduction, increased rig utilization and increased
numbers of wells drilled per year.
Rig Dayrate 450.000,. USD
Norshore Atlantic Day Rate 200.000,- USD
SAVING PER WELL
Direct day rate savings on drilled well; 20% (5.5 mUSD)
Rig can be utilized for 22 days on other well; USD10 mill in increased efficiency


Typical average well construction sequence; 52 days drilling and 10 days completion work.
General, Run Upper Completion in Open Water
Rig install lower completion 1st barrier
Rig install 2nd barrier.
Seperate run barrier assembly. Two internal WL retrievable barriers and one annulus
packer. Verify 2nd barrier by use of Gauges and readback to surface.
Rig leaves the Location.
Norshore Atlantic arrives Location (Case: Horizontal Tree).
Install Horizontal XMT either by SS Crane or from Tower.
By SS Crane, Install on top of XMT Stand Alone Cutting/Closing Device. (Offline
Activity)
H4 Connector / / 2 x Blind Shear Ram / H4 Connector / Removable Protection - Guiding Funnel
Alternativ, utilize 18 " BOP.
Run Upper Completion
Install SS Lubricator
Retrieve Internal Plugs, Hold Open Sleeves.
Install Crown Plug, Tree Cap
Hand over to Production or Clean Up Well to Norshore Atlantic.





31
Optional, Well Intervention Vessel
Module Installation
Wireline / Tractor Riserless Well Intervention
with LRP/Lubricator.
Light Well Intervention Intervention with Riser
Riser Intervention with LRP/EDP - Stiff Top
Compensated Riser.
32
LRP/EDP
6 5/8 DP Riser
or Riser ID 7,25
Lubric. Valve Sec.
Rotatable Riser
Tension Ring
Subsea Construction Vessel
Sub Sea Module Installation 150 mT
compensated Offshore SS Crane.
Wet Tow Items moved Offshore,
hanging below the vessel in safe
distance above the Seabed.
500 sTon Compensated during
Transit and Installation.
Large size Sub Sea Equipment
Installation
Templates / Manifolds / Etc..
ROV support - survey





Alternative to large Crane Vessels
33