D.O.NO.C/26/2008-MPLADS Date: 14.01.

2009

Dear
The Ministry of Statistics & Programme Implementation has been
monitoring the implementation of Member of Parliament Local Area
Development Scheme (MPLADS). Hon’ble Minister for Statistics &PI (IC) has
convened a meeting on 23 January 2009, at 2.00 PM in the Conference
Room No. 223 of the Ministry at Sardar Patel Bhawan, Parliament Street,
New Delhi. A notice regarding the meeting has already been issued vide
letter of even number dated 26.12.2008. The main purpose of the meeting
is to review the implementation status of MPLADS in various States/UTs.

The agenda items to be discussed during the aforementioned meeting


are forwarded herewith and you are requested to participate with complete
information to make the review meeting fruitful.

With regards,
Yours sincerely,

(A.K. Choudhary)

Nodal Secretaries of all State Governments/UT Administrations

Copy to:-
Chief Secretaries of all State Governments/UT Administrations
Annexure-1

POSITION OF STATES WHO HAVE GIVEN COMPLETE REPLY OF AUDIT


PARA FOR THE YEAR 1997 AND 2000

Audit para 1997 Audit para 2000


(a) Arunachal Pradesh (a) Arunachal Pradesh
(b) Assam (b) Assam
(c) Chhattisgarh (c) Chhattisgarh
(d) Goa (d) Gujrat
(e) Gujrat (e) Haryana
(f) Himachal Pradesh (f) Meghalaya
(g) Haryana (g) Sikkim
(h) Punjab (h) Uttrakhand
(j) Sikkim (j) West Bengal
(k) Tamil Nadu (k) Chandigarh
(l) Uttrakhand (l) DNH
(m) Daman Dieu (m) Daman Dieu
(n) Chandigarh
(o) Dadar Nagar Haveli (DNH)
(p) Delhi
(q) Pondicherry
31/12/2008
STATEWISE RELEASE OF FUNDS/EXPENDITURE OF MEMBER OF PARLIAMENT as on
Sl.No STATE Released Amount Amount %Sancti- Expenditure % Unspent
by G.O.I available with Sanctioned oned Incurred Utilisation Balance
Nodal District over
with Interest etc. (Rs. Crore)
over Release
Release (Rs. Crore) (Rs. Crore)
(Rs. Crore)
(Rs. Crore)
(1) (2) (3) (4) (5) (6) (7) (8) (9)
1 Nominated 265.05 267.86 246.97 93.18 215.93 81.47 51.93
2 Andhra Pradesh 1495.45 1524.79 1503.08 100.51 1353.93 90.54 170.86

3 Arunachal Pr. 76.15 77.03 74.20 97.44 73.86 96.99 3.18

4 Assam 530.55 540.38 512.18 96.54 489.61 92.28 50.77


5 Bihar 1376.90 1399.88 1234.14 89.63 1143.09 83.02 256.79

6 Goa 72.15 76.40 75.07 104.05 65.45 90.71 10.95


7 Gujarat 899.35 922.28 898.59 99.92 815.49 90.68 106.79

8 Haryana 374.25 381.73 352.95 94.31 335.73 89.71 45.99

9 Himachal Pr. 174.30 178.61 169.95 97.50 157.78 90.52 20.83


10 Jammu & Kashmir 214.80 219.07 221.20 102.98 193.78 90.22 25.28

11 Karnataka 950.00 973.38 936.50 98.58 885.78 93.24 87.60

12 Kerala 634.95 667.16 719.52 113.32 586.91 92.43 80.25


13 Madhya pradesh 1020.60 1041.95 1013.85 99.34 945.23 92.61 96.73

14 Maharashtra 1574.75 1633.49 1650.14 104.79 1431.36 90.89 202.13

15 Manipur 78.15 78.58 71.37 91.32 70.15 89.76 8.43


16 Meghalaya 76.15 77.26 71.69 94.14 70.48 92.56 6.78

17 Mizoram 51.10 51.46 50.62 99.06 50.19 98.22 1.27

18 Nagaland 50.10 50.17 41.10 82.04 41.10 82.04 9.07


19 Orissa 779.05 792.83 751.83 96.51 705.41 90.55 87.42

20 Punjab 490.55 499.99 482.44 98.35 455.27 92.81 44.72


21 Rajasthan 874.25 887.08 876.23 100.23 822.53 94.08 64.55

22 Sikkim 52.10 52.97 53.06 101.84 49.72 95.44 3.25

23 Tamil Nadu 1458.35 1488.05 1475.33 101.16 1411.66 96.80 76.39


24 Tripura 74.15 74.47 72.30 97.50 69.08 93.16 5.40

25 Uttar Pradesh 2778.20 2812.26 2637.83 94.95 2493.03 89.74 319.23

26 West Bengal 1328.85 1360.53 1291.95 97.22 1195.57 89.97 164.97


27 A & N Islands 23.05 23.59 21.55 93.49 21.55 93.49 2.04

28 Chandigarh 24.05 24.68 27.49 114.32 22.96 95.46 1.72

29 D & N Haveli 25.05 25.69 26.61 106.23 24.31 97.04 1.38


30 Daman & Diu 26.05 26.16 26.39 101.32 24.19 92.85 1.97

31 Delhi 191.00 198.84 207.73 108.76 170.49 89.26 28.35

32 Lakshdweep 19.05 20.90 19.29 101.24 15.91 83.51 4.99


33 Pondicherry 41.10 43.74 48.32 117.56 38.34 93.28 5.40

34 Chhattisgarh 383.65 391.07 373.07 97.24 351.76 91.69 39.30


35 Uttaranchal 181.25 183.77 172.56 95.20 156.35 86.26 27.42

36 Jharkhand 450.75 456.88 411.31 91.25 388.24 86.13 68.64

Total : 19115.25 19524.98 18818.40 98.45 17342.21 90.72 2182.77

NIC - M/O S&PI.


STATEWISE RELEASE OF FUNDS/EXPENDITURE OF MEMBER OF PARLIAMENT (LOK SABHA) as on 31/12/2008
Sl.No STATE Released Amount Amount %Sancti- Expenditure % Unspent
by G.O.I available with Sanctioned oned Incurred Utilisation Balance
Nodal District over
with Interest etc. (Rs. Crore)
over Release
Release (Rs. Crore) (Rs. Crore)
(Rs. Crore)
(Rs. Crore)
(1) (2) (3) (4) (5) (6) (7) (8) (9)
1 Nominated 48.50 48.85 46.50 95.88 36.98 76.26 11.87
2 Andhra Pradesh 1058.05 1080.84 1075.69 101.67 973.10 91.97 107.74

3 Arunachal Pr. 50.10 50.73 49.09 97.99 49.09 97.99 1.64

4 Assam 356.70 363.59 346.02 97.01 333.31 93.44 30.28


5 Bihar 983.95 1000.61 871.81 88.60 820.10 83.35 180.51

6 Goa 49.10 51.99 53.54 109.05 45.49 92.65 6.49


7 Gujarat 643.30 659.40 652.69 101.46 601.60 93.52 57.80

8 Haryana 255.50 261.52 241.85 94.66 234.77 91.89 26.75

9 Himachal Pr. 101.20 104.03 101.15 99.95 95.55 94.41 8.48


10 Jammu & Kashmir 135.30 138.19 137.46 101.59 122.40 90.47 15.79

11 Karnataka 665.40 684.46 664.77 99.91 627.22 94.26 57.24

12 Kerala 447.00 471.51 514.70 115.14 426.81 95.48 44.69


13 Madhya pradesh 727.40 743.64 735.70 101.14 684.04 94.04 59.60

14 Maharashtra 1143.30 1187.43 1212.99 106.10 1066.46 93.28 120.97

15 Manipur 52.10 52.34 46.16 88.60 45.57 87.47 6.77


16 Meghalaya 51.10 52.11 48.08 94.08 47.29 92.54 4.83

17 Mizoram 26.05 26.24 25.12 96.42 25.12 96.43 1.12

18 Nagaland 25.05 25.05 19.05 76.05 19.05 76.05 6.00


19 Orissa 533.05 542.85 519.35 97.43 500.70 93.93 42.15

20 Punjab 324.65 329.91 322.05 99.20 302.66 93.23 27.25


21 Rajasthan 636.25 646.61 645.54 101.46 607.59 95.50 39.01

22 Sikkim 26.05 26.51 26.77 102.78 25.41 97.52 1.11

23 Tamil Nadu 1003.95 1024.70 1020.02 101.60 975.95 97.21 48.75


24 Tripura 50.10 50.34 48.28 96.36 46.40 92.61 3.94

25 Uttar Pradesh 2023.00 2049.87 1931.07 95.46 1849.18 91.41 200.69

26 West Bengal 960.05 983.32 947.33 98.68 882.43 91.92 100.88


27 A & N Islands 23.05 23.59 21.55 93.49 21.55 93.49 2.04

28 Chandigarh 24.05 24.68 27.49 114.32 22.96 95.46 1.72

29 D & N Haveli 25.05 25.69 26.61 106.23 24.31 97.04 1.38


30 Daman & Diu 26.05 26.16 26.39 101.32 24.19 92.85 1.97

31 Delhi 135.35 141.41 151.17 111.69 126.18 93.22 15.23

32 Lakshdweep 19.05 20.90 19.29 101.24 15.91 83.51 4.99


33 Pondicherry 22.05 23.41 26.72 121.19 20.68 93.78 2.73

34 Chhattisgarh 273.55 279.38 266.48 97.42 254.49 93.03 24.89


35 Uttaranchal 126.25 128.09 121.61 96.32 115.93 91.83 12.16

36 Jharkhand 350.70 354.73 315.89 90.07 303.80 86.63 50.94

Total : 13401.35 13704.69 13305.98 99.29 12374.27 92.34 1330.41

NIC - M/O S&PI.


STATEWISE RELEASE OF FUNDS/EXPENDITURE OF MEMBER OF PARLIAMENT(RAJYA SABHA) as on 31/12/2008
Sl.No STATE Released Amount Amount %Sancti- Expenditure % Unspent
by G.O.I available with Sanctioned oned Incurred Utilisation Balance
Nodal District over
with Interest etc. (Rs. Crore)
over Release
Release (Rs. Crore) (Rs. Crore)
(Rs. Crore)
(Rs. Crore)
(1) (2) (3) (4) (5) (6) (7) (8) (9)
1 Nominated 216.55 219.01 200.47 92.57 178.95 82.64 40.06
2 Andhra Pradesh 437.40 443.95 427.40 97.71 380.83 87.07 63.12

3 Arunachal Pr. 26.05 26.30 25.10 96.37 24.76 95.05 1.54

4 Assam 173.85 176.79 166.15 95.57 156.30 89.90 20.49


5 Bihar 392.95 399.27 362.33 92.21 322.99 82.20 76.28

6 Goa 23.05 24.42 21.53 93.39 19.96 86.59 4.46


7 Gujarat 256.05 262.88 245.89 96.03 213.89 83.53 48.99

8 Haryana 118.75 120.21 111.10 93.56 100.96 85.02 19.25

9 Himachal Pr. 73.10 74.58 68.80 94.11 62.23 85.13 12.35


10 Jammu & Kashmir 79.50 80.88 83.74 105.34 71.38 89.79 9.49

11 Karnataka 284.60 288.92 271.73 95.48 258.56 90.85 30.36

12 Kerala 187.95 195.65 204.83 108.98 160.09 85.18 35.56


13 Madhya pradesh 293.20 298.32 278.15 94.87 261.19 89.08 37.13

14 Maharashtra 431.45 446.06 437.15 101.32 364.90 84.58 81.16

15 Manipur 26.05 26.23 25.21 96.77 24.58 94.34 1.66


16 Meghalaya 25.05 25.15 23.61 94.27 23.20 92.61 1.96

17 Mizoram 25.05 25.22 25.50 101.80 25.07 100.08 0.15

18 Nagaland 25.05 25.12 22.05 88.02 22.05 88.02 3.07


19 Orissa 246.00 249.98 232.47 94.50 204.71 83.21 45.27

20 Punjab 165.90 170.08 160.39 96.68 152.61 91.99 17.47


21 Rajasthan 238.00 240.48 230.69 96.93 214.94 90.31 25.54

22 Sikkim 26.05 26.45 26.29 100.90 24.32 93.35 2.14

23 Tamil Nadu 454.40 463.36 455.31 100.20 435.71 95.89 27.64


24 Tripura 24.05 24.13 24.02 99.89 22.68 94.30 1.45

25 Uttar Pradesh 755.20 762.39 706.77 93.59 643.86 85.26 118.54

26 West Bengal 368.80 377.22 344.62 93.44 313.13 84.91 64.08


27 Delhi 55.65 57.43 56.56 101.63 44.31 79.62 13.12

28 Pondicherry 19.05 20.33 21.59 113.35 17.66 92.69 2.67

29 Chhattisgarh 110.10 111.69 106.59 96.81 97.27 88.35 14.42


30 Uttaranchal 55.00 55.68 50.95 92.64 40.42 73.49 15.26

31 Jharkhand 100.05 102.15 95.43 95.38 84.44 84.40 17.70

Total : 5713.90 5820.30 5512.43 96.47 4967.93 86.94 852.36

NIC - M/O S&PI.


SUMMARY STATEMENT FOR RELEASE/EXPENDITURE OF LOK SABHA & RAJYA SABHA MPs as on 31/12/2008

Interest Transfer Works Works Actual %


Release by Sanctioned Unsanctioned
Accured from OLD Recommended Expenditure Utilisation
G.O.I Total Cost No. Cost Balance No. of Works
MP No. Incurred over
Completed
Sl.No. Name of State (Rs. Crore) (Rs.Crore) (Rs.Crore) (Rs. Crore) (Rs.Crore) (Rs. Crore) (Rs. Crore) (Rs. Crore) Release
1 Nominated 265.05 2.81 2.31 267.86 5742 255.55 5201 246.97 20.89 4172 215.93 81.47
2 Andhra Pradesh 1495.45 29.34 4.57 1524.79 111426 1614.01 105986 1503.08 21.71 93133 1353.93 90.54
3 Arunachal Pr. 76.15 0.88 0.00 77.03 2117 86.05 1879 74.20 2.83 1732 73.86 96.99
4 Assam 530.55 9.83 1.51 540.38 44398 517.55 43496 512.18 28.20 39314 489.61 92.28
5 Bihar 1376.90 22.98 7.75 1399.88 64998 1444.47 48258 1234.14 165.75 42442 1143.09 83.02
6 Goa 72.15 4.25 1.76 76.40 1038 88.10 834 75.07 1.33 667 65.45 90.71
7 Gujarat 899.35 22.93 1.17 922.28 103366 1013.61 88632 898.59 23.69 82108 815.49 90.68
8 Haryana 374.25 7.48 1.24 381.73 34837 388.97 28825 352.95 28.77 26017 335.73 89.71
9 Himachal Pr. 174.30 4.31 0.10 178.61 20502 179.16 19852 169.95 8.66 15091 157.78 90.52
10 Jammu & Kashmir 214.80 4.27 0.00 219.07 13972 238.49 12981 221.20 -2.13 10842 193.78 90.22
11 Karnataka 950.00 23.38 0.06 973.38 52090 985.31 49888 936.50 36.87 43656 885.78 93.24
12 Kerala 634.95 32.21 1.66 667.16 25355 819.25 20988 719.52 -52.37 18324 586.91 92.43
13 Madhya pradesh 1020.60 21.35 0.17 1041.95 87286 1193.78 73106 1013.85 28.10 66318 945.23 92.61
14 Maharashtra 1574.75 58.74 4.03 1633.49 87074 1974.92 56687 1650.14 -16.65 50506 1431.36 90.89
15 Manipur 78.15 0.43 0.00 78.58 5378 72.76 4800 71.37 7.21 4320 70.15 89.76
16 Meghalaya 76.15 1.11 0.15 77.26 5048 74.74 4810 71.69 5.58 4260 70.48 92.56
17 Mizoram 51.10 0.36 0.00 51.46 4427 50.62 4427 50.62 0.84 4328 50.19 98.22
18 Nagaland 50.10 0.07 0.00 50.17 1712 42.10 1682 41.10 9.07 1676 41.10 82.04
19 Orissa 779.05 13.78 5.08 792.83 84469 810.36 76510 751.83 41.00 71838 705.41 90.55
20 Punjab 490.55 9.44 5.35 499.99 59821 507.64 56624 482.44 17.55 51147 455.27 92.81
21 Rajasthan 874.25 12.83 3.37 887.08 68365 932.15 64921 876.23 10.85 60470 822.53 94.08
22 Sikkim 52.10 0.87 0.17 52.97 1024 53.34 1024 53.06 -0.09 976 49.72 95.44
23 Tamil Nadu 1458.35 29.70 11.03 1488.05 70785 1518.27 68499 1475.33 12.72 65121 1411.66 96.80
24 Tripura 74.15 0.32 0.29 74.47 1521 73.87 1517 72.30 2.17 1351 69.08 93.16
25 Uttar Pradesh 2778.20 34.06 14.37 2812.26 126841 2708.83 123039 2637.83 174.43 115935 2493.03 89.74
26 West Bengal 1328.85 31.68 2.32 1360.53 62906 1357.52 60600 1291.95 68.58 52735 1195.57 89.97
27 A & N Islands 23.05 0.54 0.00 23.59 680 22.10 650 21.55 2.04 606 21.55 93.49
28 Chandigarh 24.05 0.63 0.00 24.68 1281 33.24 748 27.49 -2.81 658 22.96 95.46
29 D & N Haveli 25.05 0.64 0.00 25.69 1104 28.61 911 26.61 -0.92 895 24.31 97.04
30 Daman & Diu 26.05 0.11 0.00 26.16 1347 61.87 574 26.39 -0.23 525 24.19 92.85
31 Delhi 191.00 7.84 0.00 198.84 6790 212.12 6784 207.73 -8.89 6330 170.49 89.26
32 Lakshdweep 19.05 1.85 0.00 20.90 102 19.29 34 19.29 1.61 17 15.91 83.51
33 Pondicherry 41.10 2.64 2.35 43.74 1713 64.57 1104 48.32 -4.57 1016 38.34 93.28
34 Chhattisgarh 383.65 7.42 1.19 391.07 37020 480.52 27702 373.07 17.99 25371 351.76 91.69
35 Uttaranchal 181.25 2.52 0.00 183.77 15014 178.63 14584 172.56 11.22 12793 156.35 86.26
36 Jharkhand 450.75 6.13 1.19 456.88 24400 471.39 20168 411.31 45.56 18316 388.24 86.13

TOTAL 19115.25 409.73 73.18 19524.98 1235949 20573.76 1098325 18818.40 995006 17342.21
Review Meeting on Implementation of MPLADS
in States/UTs

23rd January, 2009 at 2.00 p.m.

under the Chairmanship of

Shri G. K. Vasan, Hon’ble MOS (IC)

AGENDA NOTE

Ministry of Statistics and Programme Implementation


CONTENTS

Sl. No. Subject


Page No.

1. Follow up action on the minutes of the meeting held on


10.04.2008.

2. Items for discussion

(i) MPLADS implementation status - physical and financial. 1.


(ii) Pending Documents required for release of MPLADS Funds. 3.
(iii) C&AG Audit Paragraphs.
(iv) Tsunami reconstruction/rehabilitation works.
(v) Bihar floods reconstruction/ rehabilitation works.
(vi) State level Monitoring Committees.
(vii) Updation/furnishing of data on MPLADS Software.
(viii) Training of District Officials.
(ix) Best Practices of implementation by the State/UTs Nodal
(x) Departments.
(xi) Revision of Guidelines.
(xii) Any other item with the permission of the Chair.

Annexure-I-A State-wise release of funds/expenditure in MPLADS


including State-wise ranking as on 31.12.2008.
Annexure-I-B State-wise release of funds/expenditure of Member of
Parliament (Lok Sabha) as on 31.12.2008
Annexure-I-C State-wise release of funds/expenditure of Member of
Parliament (Rajya Sabha) as on 31.12.2008
Annexure-I-D Summary Statement for release/expenditure and
works recommended/works sanctioned of both Lok
Sabha and Rajya Sabha Members of Parliament as
on 31.12.2008.
Annexure –II Pending Documents pertaining to release of MPLADS
Funds.
Annexure –III C&AG Audit Paragraphs.
Annexure –IV Tsunami reconstruction/rehabilitation works
Annexure –V Bihar floods reconstruction/ rehabilitation works.
Annexure –VI State level Monitoring Committees.
Annexure –VII Updation/furnishing of data on MPLADS Software.
Annexure –VIII Training of District Officials.
AGENDA NOTES

REVIEW MEETING WITH THE SECRETARIES OF THE


STATE GOVERNMENTS/UNION TERRITORIES ON
MPLADS AT 2.00 P.M on 23.01.2009.

Background
As per para 6.2 of the MPLADS Guidelines, the Ministry of Statistics & Programme
Implementation will hold meetings in the States and also at the Centre at least once in a year
to review the implementation of the MPLAD Scheme. To ensure better monitoring, the
Ministry of Statistics & Programme Implementation holds review meetings at the Centre
twice a year. Seven such meetings have been held on 11.7.05, 16.12.05, 28.7.06,
15.12.2006, 23.07.07, 04.12.2007 and 10.04.2008.

1. FOLLOW UP ACTION ON THE MINUTES OF THE


MEETING HELD ON 10.04.2008.
The deadlines fixed for completion of uploading of pending data on MPLADS website
(30.06.2008) and forwarding of complete replies of CAG paras have not been
complied with by many States. No data has been uploaded in respect of 10 districts.
The data uploaded by other districts is also incomplete and not up-to-date (details
are at Annexure-VII). The status of replies to CAG paras in respect of Audit Para
1997 and 2000 are placed at Annexure-III.

The Hon’ble Minister mentioned that many States/UTS have still not conducted any
training programme on MPLADS Guidelines. The defaulting States/UTs to send their
proposal to the Ministry for financial and other assistance for conducting these
training As on date-12 States/UTs viz. namely Bihar, Goa, Himachal Pradesh,
Jammu & Kashmir, Manipur, Nagaland, A&N Islands, Chandigarh, D&N
Haveli, Daman & Diu, Delhi and Pondicherry have not yet sent their proposals.
The Hon’ble Minister also expressed his concern over the inordinate delay in
completion of the pending Tsunami works. Tsunami works are still pending in the
States of Andhra Pradesh, Tamil Nadu, Andaman & Nicobar Islands and Kerala.

The Hon’ble Minister also directed the State representatives to conduct meetings
of the State Level Monitoring Committee and send the minutes to the Ministry. Six
States/UTs have not yet constituted the said Committees (Annexure –VI).
2. ITEMS FOR DISCUSSION
(i). MPLADS IMPLEMENTATION STATUS
PHYSICAL AND FINANCIAL
Physical Status – As on 31.12.2008, 12.36 lakh works have been
recommended by the Members of Parliament and District Authorities have
sanctioned 10.98 lakh works. The numbers of works completed have been
reported as 9.95 lakh. The percentage of works completed to sanctioned at the
national level is 90.59. The State-wise details are given Annexure-ID

Financial Status - As on 31.12.2008, Rs.19115.25 crore have been released


since inception of the Scheme and as reported from the Districts, an expenditure
of Rs.17342.21 crore has been incurred. The unspent balance lying with the
District Authorities is Rs. 2182.77 crore. The percentage utilization over release is
90.72% The ranking of the States based on percentage utilization of MPLADS
funds is indicated in the enclosed statement (Annexure-IA).
The latest status (upto 31.12.2008) will be discussed in the meeting.

(ii) . Pending Documents pertaining to release of


MPLADS Funds.

The Nodal Secretaries of all State/UT Governments have been requested


to send the pending documents required for release of MPLADS funds.
The details (Annexure-II) of pending documents are indicated in the
State profiles.

(iii). C&AG Audit Paragraphs


The Comptroller and Auditor General of India has so far submitted two Audit
Reports on Member of Parliament Local Area Development Scheme (MPLADS),
one for the period ending March 1997 and the other for the period ending
March, 2000.

C&AG Report 1997

There are 34 audit paras in the first report. It contains the result of the review
of implementation of the MPLAD Scheme from inception in 1993-94 to 1996-97
in 24 States and 6 Union Territories through sample checks in 165 of the 488
districts.

Complete replies have been received only from Arunachal Pradesh, Gujarat,
Uttarakhand, Chandigarh, Dadra and Nagar Haveli, Daman & Diu, Delhi and
Puducherry.
C&AG Report 2000

There are 45 audit paras in the second report, which covered the period from
1997-98 to 1999-2000 and reviewed the implementation of the scheme in 26
States and 4 Union Territories through sample checks in 241 out of 786
constituencies.

Complete replies have been received only from Haryana, Arunachal Pradesh,
Gujarat, Uttarakhand and Daman & Diu.

DG (Audit) has intimated that complete replies are to be


forwarded alongwith remedial measures taken to avoid
recurrence of such lapses. As the reply to DG (Audit) can
be forwarded only on receipt of complete replies from all
States on all audit objections, the remaining paras need
to be replied satisfactorily by the District
authorities/State/UT Govts on priority.
It is therefore requested that complete replies in respect of all pending
paras of 1997 and 2000 Reports be submitted latest by 20.02.2009.

(iv). Tsunami rehabilitation/ reconstruction


works under MPLADS
57 works to the tune of Rs.2189.30 lakh consented by Lok Sabha MPs and
130 works to the tune of Rs.3134.30 lakh consented by Rajya Sabha MPs
was been earmarked in the tsunami affected areas of A&N Islands, Tamil Nadu,
Puducherry, Andhra Pradesh and Kerala.

As per the latest report received, 49 Lok Sabha works and 110 Rajya Sabha
Works have been completed.

7 Lok Sabha works are in progress. One Lok Sabha work to the tune of Rs.10
lakh in Prakasham District (Providing PWS Scheme, Karedu) has been cancelled
and the fund has been returned to the Nodal District of the MP.

19 Rajya Sabha works are in progress. One work, namely, construction of ‘new
pond and drain water augmentation’ at Mulloothurai in Kanyakumari District has
been cancelled due to site problem.

The details of ongoing and cancelled/not yet started works are at Annexure-IV.

The concerned Nodal Secretaries of the States/UTs are requested to ensure that
the ongoing works are completed within the targeted dates.

(v) BIHAR FLOOD REHABILITATION WORKS


In view of the extensive damage caused by the unprecedented and devastating
floods in Bihar, particularly in the districts of Madhepura, Supaul, Saharsa,
Purnia, Katihar and Araria, the Ministry of Home Affairs (Disaster Management-I
Division) declared the natural calamity in the state of Bihar as a “Calamity of
severe nature” vide letter No. 4-4/2008-NDM-I dated 2nd September, 2008.

Para 2.8 of MPLADS Guidelines provides that “In the event of “Calamity of severe
nature” in any part of the country, an MP can recommend works up to a
maximum of Rs.50 lakh for the affected district. Whether a calamity is of severe
nature or not, will be decided by the Government of India. The funds in this
regard will be released by the District Authority of Nodal district of the MP
concerned to the District Authority of the affected district to get permissible
works done. The Works Completion Report, Utilization Certificate and Audit
Certificate for such works and funds will be provided by the District Authority of
the affected districts to the respective District Authority of Nodal district from
whom the funds were received”.

Hon’ble Chairman, Rajya Sabha and Hon’ble Speaker, Lok Sabha on 3.9.2008
appealed to the MPs to contribute Rs.10 lakh each from their MPLADS funds for
reconstruction projects as permissible under MPLADS Guidelines. Hon’ble
MOS(IC), S&PI vide letter dated 11.9.2008 appealed to all MPs to indicate the
amount they would wish to contribute for such works as permissible under the
MPLADS Guidelines latest by 30th September,2008. They were also asked to
indicate the specific district(s) where such works may be undertaken, if they so
desire.

In response to the aforesaid appeals, 155 Lok Sabha MPs have contributed
Rs.21.95 crore and 149 Rajya Sabha MPs have contributed Rs.20.46 crore
towards Bihar Flood Relief so far.

The state Govt. was asked by this Ministry to furnish the list of rehabilitation
works to be undertaken in the flood affected areas with MPs contribution. The
State Government proposed the following works:-

(a) Disaster Shelter (one for every two panchayat)


Total units=206
Land@ 7.5 lacs per acre and 75 lacs per unit
Cost of 206 units =Rs.15450.00 lacs

(b) Multipurpose Community Center


(One for each 1000 population)
Total units=2100
Land@ 7.5 lacs per acre and 45 lacs per unit
Cost of 2100 units = Rs.102375.00 lacs.

(c) Cattle Shed (one for each 1000 population)


Total units=2100
Land@ 7.5 lacs per acre and 20.00 lacs per unit
Cost of 2100 units =Rs. 49875.00 lacs.

Total Cost = Rs.167700.00 lacs

On noticing that cost of land (prohibited under the MPLADS Guidelines) is also
included in the estimated cost, this Ministry asked the State Government to
furnish list of eligible works, vide letter dated 12.11.2008 without including the
cost of land. However, the State Govt. has again submitted the same proposal
even after the visit of the Parliamentary Committee (RS) on MPLADS to Bihar.
This Ministry, vide do. letter dated 15.12.2008, has asked for the list of eligible
works under MPLADS Guidelines, as suggested by the Rajya Sabha Committee
during its visit to the State, alongwith place/location of the works and cost
(excluding the cost of land) for rehabilitation and reconstruction of the flood
affected areas of Bihar, from the Govt. of Bihar. Reminder was sent on
2.01.2009. However, the requisite information is still awaited from the State
Govt.

(vi). Role of the State/UT Government


Monitoring Committees
In the earlier meetings, the participants from the State Govts./UTs were
requested to intimate the status in respect of action taken in compliance of para
6.3 of the Guidelines.

It is noted that 6 States/UT namely, Maharashtra, Jammu & Kashmir,


Chandigarh, Dadra and Nagar Haveli, Daman & Diu and Mizoram, have
not yet constituted the Monitoring Committee for effective supervision of
MPLADS implementation in their States. Many States/UTs namely though have
constituted the Committees but have not held any meeting of the Committees.
The State-wise details are enclosed in Annexure-VI.

(vii). Work Monitoring Software


In November, 2004, the works monitoring software was launched on
the MPLADS website, i.e., www.mplads.nic.in. The requisite software
developed by NIC was supplied to all the District Authorities with the
request to upload the information pertaining to all MPLAD sanctioned
works w.e.f. 1st April, 2005. It has been observed that despite
deadlines given and agreed to by all the Nodal Secretaries/District
Authorities of States and UTs, either the information has not been
uploaded or in cases where the same has been uploaded, the
information is incomplete and not up-to-date. Due to this, the Ministry
is put in a very embarrassing position at various fora as information is
not readily available to the public at large defeating the basic purpose
for which this website was created.

Out of the 430 nodal districts, data has been uploaded from 420 districts. 10
districts viz. Darbhanga, Khagaria, Kishanganj, Banka in Bihar, Baramullah,
Kathua, Leh in Jammu & Kashmir, Imphal (East) in Manipur and Kohima in
Nagaland have not uploaded any data even after four years of the launch of the
Software Manual for Monitoring of works under MPLADS.
As on 31.12.2008, data in respect of 1959 MPs have been uploaded. Of these,
1474 belong to the Lok Sabha (current and previous periods), with 520
belonging to the 14th Lok Sabha and 954 belonging to the previous Lok Sabha.
Data in respect of 485 Rajya Sabha MPs (sitting and previous) have been
entered, of which 168 are of sitting MPs and 317 are of previous MPs. The
details are at Annexure-VII.

Hon’ble Minister had, in the meeting of 4th December, 2007 desired the
States/UTs to complete the uploading in the MPLADS Software by 30.06.2008.
This needs to be completed on priority latest by 31.03.2009.

As this matter cannot be kept pending further because of the need and
requirement of data to be made available on this website, MOSPI
impresses upon all States/UTs to ensure that complete, accurate up-
to-date information may be uploaded in the specified proformae of the
works monitoring software already available with the District
Authorities by 30th June, 2008. The Guidelines do provide for utilization
of 0.5% as contingency expenses with regard to expenditure incurred
on operationalisation of the works monitoring software.

(viii). Training of District Officials


Many States/UTS have still not conducted ant training programme on MPLADS
Guidelines. In the last meeting held on 10.04.2008, the Hon’ble Minister asked
the defaulting States/UTs to send their proposal to the Ministry for financial
and other assistance for conducting these training As on date 12 States/UTs,
namely Bihar, Goa, Himachal Pradesh, Jammu & Kashmir, Manipur,
Nagaland, A&N Islands, Chandigarh, D&N Haveli, Daman & Diu, Delhi
and Pondicherry have not yet sent theirproposals. The details are indicated in
Annexure-VIII.

(ix) Best practices of implementation by the


State/UT Nodal Departments
The MPLADS Division proposed to bring out a booklet depicting some of the
“Best Works/Projects” implemented under MPLADS and “Best Practices” adopted
by the States/UTs Government for execution of these works for emulation by
other States/UTs. In this regard the Nodal Secretaries of all States/UTs
Government were requested vide letter dated 30.07.2008,(i) to furnish
information on innovative practices/features leading to better Implementation
and positive impact/perception about the Scheme among the local community
and (ii) to furnish details on ten best MPLADS works covering both big and small
works in different sector. Despite reminders dated 30.10.2008 (p-168/C.) and
08.12.2008 (P-206/C.) only following eight States/UTs have forwarded the
requisite details
1. A&N Islands
2 .Haryana
3. Uttar Pradesh
4. West Bengal
5. Madhya Pradesh
6. Arunachal Pradesh
7 .Lakshdweep.
8. Orrisa

(x). Revision of MPLADS Guidelines


The Ministry of Statistics and Programme Implementation is administering the
Member of Parliament Local Area Development Scheme (MPLADS). This Scheme
was announced on 23rd December, 1993. This Scheme is governed by a set of
Guidelines issued from time to time. The first set of Guidelines was prepared by
the Ministry of Rural Development, in February 1994, who initially handled the
Scheme. Subsequently, the Scheme was transferred to this Ministry. This
Ministry has revised the Guidelines in December 1994, February 1997,
September 1999, April 2002 and November 2005.
During the course of review meetings taken by Hon’ble MOS (S&PI) and senior
officers of this Ministry various suggestions were made for further amendment of
the Guidelines. Some MPs have also requested for revision of some provisions of
the Guidelines. An exercise has now been undertaken for further revision of
Guidelines as some clarifications have been issued from time to time and a
compendium of clarifications was also brought out. In this regard, the Nodal
Secretaries of State/UT Governments have been requested vide letters dated 27th
May, 2008 and 26th June, 2008 to send their suggestions/views for revision of
Guidelines based upon their experience of implementation of the Scheme and
interactions/dialogues with DMs/DCs. In reply, only following 13 States/UTS
have forwarded their suggestions:-
1. Karnataka
2. Orissa
3. West Bengal
4. Chandigarh
5. Rajasthan
6. Assam
7. Arunachl Pradesh
8. Himanchal Pradesh
9. Madhya Pradesh
10. Maharshtra
11. Uttar Pradesh
12. Uttranchal
13. Meghalaya

(xi). Any other issue with the permission of the


Chair
-STATUS ON C&AG PARA on 12 January 2009

Sr State/UT No of No of Total Status of Audit Paras for the year


No Audit Audit No of
para Para Audit Audit Para 1997 Audit Para 2000
CAG CAG CAG
Repor Repor Paras
t 1997 t 2000
Complete Partial Complete Partial
reply reply Reply reply
received receive received received
d
1. Andhra 14 14 28 10 04 01 13
Pradesh
2. Aruna Chal 03 06 09 03 - 06 -
Pradesh
3. Assam 11 20 31 11 - 20 -
4. Bihar 10 15 25 03 07 - 15
5 Chattisgarh - 16 16 - - 16 -
6 Goa 02 05 07 02 - 03 02
7 Gujarat 06 17 23 06 - 17 -
8 Himachal 07 10 17 07 - 08 02
Pradesh
9. Haryana 12 13 25 12 - 13 -
10 J&K - 07 07 - - 03 04
11 Jharkhand 08 11 19 02 06 10 01
12 Karnataka 10 12 22 05 05 09 03
13 Kerala 08 09 17 03 05 03 06
14 Madhya 08 16 24 07 01 11 05
Pradesh
15 Maharashtra 10 08 18 04 06 05 03
16 Manipur 13 13 26 08 05 09 04
17 Meghalaya 09 09 18 08 01 09 -
18 Mizoram 09 10 19 06 03 04 06
19 Nagaland 09 10 19 03 06 - 10
20 Orrissa 10 19 29 05 05 16 03
21 Punjab 09 09 18 09 - 06 03
22 Rajasthan 09 15 24 06 03 04 11
23 Sikkim 05 06 11 05 - 06 -
24 Tamil Nadu 13 14 27 13 - 12 02
25 Tripura 09 11 20 07 02 09 02

26 Utter Pradesh 13 11 24 12 01 09 02
27 Uttrakhand 08 04 12 08 - 4 -

28 West Bengal 13 14 27 12 01 14 -
29 A&N Islands 03 08 11 02 01 07 01
30 Chandigarh 03 13 16 03 - 13 -
31 D&N Haveli 05 02 07 05 - 02 -
32 Damn & Diu 03 - 03 03 - - -
33 Delhi 05 05 10 05 - 04 01
*34 Lakshdweep - - - - - - -

35 Pondicherry 13 09 22 13 - 08 01
Total 270 361 631 208 62 261 100

• Lakshdweep did not figure in the CAG report.


Tsunami rehabilitation/reconstruction works under MPLADS
(Lok Sabha)
As on 31-12-2008

Rs. in
Lakh
Name District No. of works Expen
of the diture
Auth Cost Compl Ongo Yet
State
o- eted ing to be
rized start
ed/
drop
ped
Andhra Nellore 3 22 3 -- -- 12.15
Pradesh
Prakasam 2 15 1 -- 1* 5.00
Guntur 1 18 1 -- -- 17.98
East Godavari 6 9 6 -- -- 9.00
West Godavari 1 20 1 -- -- 19.42
Krishna 2 20 1 1 -- 9.50
Total 15 104 13 1 1 73.05
Kerala Kollam 1 100 -- 1 -- 30.15
Alappuzha 1 18 -- 1 -- --
Total 2 118 -- 2 -- 30.15
Tamil Kanyakumari 2 270 1 1 -- 232.50
Nadu
Cuddalore 6 308 6 -- -- 306.90
Nagapattinam 21 289.5 20 1 -- 247.67
Ramanathapur 1 20 1 -- -- 20.00
am
Total 30 887.5 28 2 --
807.07
A&N A&N Islands 5 854.80 3 2 -- 394.94
Puduche Puducherry 5 225 5 -- -- 225.00
rry
Grand Total 57 2189.3 49 7 1 1530.2
0 1

*Project cancelled and the amount returned to DC, Karim Nagar.

(Rajya Sabha)
As on 31-12-2008

Rs. in lakh
Name District No. of works Expen
of the diture
Author Cost Compl Ongo Yet to
State
ized eted ing be
starte
d/
droppe
d
Andhra Nellore 6 24.0 4 2 -- 16.30
Pradesh
Prakasam 2 20.0 2 -- -- 16.95
West 7 45.0 5 2 -- 39.93
Godavari
Krishna 6 60.0 1 5 -- 24.95
Total 21 149.0 12 9 -- 98.13
Kerala Kollam 1 45.0 -- 1 -- --
Alappuzha 2 75.0 1 1 -- 30.65
Ernakulam 1 35.0 1 -- -- 20.89
Total 4 155.0 2 2 -- 51.54
Tamil Kanyakumari 11 250.5 10 -- 1 190.80
Nadu
Cuddalore 10 397.5 9 1 -- 237.20
Nagapattina 19 337.5 19 -- -- 337.50
m
Kancheepura 1 45.0 1 -- -- 42.33
m
Villupuram 45 204.0 45 -- -- 203.88
Total 86 1,234. 84 1 1
5 1011.7
1
A&N A&N Islands 13 1,278. 6 7 -- 690.22
3
Puduche Puducherry 6 317.5 6 - -- 295.39
rry
Grand 130 3134.3 110 19 1 2146.9
Total 9
Pending Tsunami works authorized under MPLADS as on 31.12.2008

Andhra Pradesh

Out of 36 (15-LS & 21-RS) authorised Tsunami works under MPLADS,


25 (13-LS & 12-RS) works have been completed. 1 work has been
dropped while 10 works are under process.

Krishna District
Rs. in Lakh
Sl. Work Place Cost Status Expen
No. of the diture
work
1. Construction of Gollapudum 10 Ongoing 0.00
Cyclone shelter *
cum UP School
building
2. -do- Padatadika of 10 Ongoing 2.50
Kruthivennu *
3. -do- Yesupuram of 10 Ongoing 2.50
Nagayalanka *
4. -do- Krishnapuram of 10 Ongoing 2.65
Nagayalanka *
5. -do- Zinkapalemof 10 Ongoing 2.70
Nagayalanka *
6. -do- Brahmarahgarimula of 10 Ongoing 5.00
Nagayalanka *

* The executive agency could not take up the on-going work. Target date was
30-06-2008. Expected date of completion was Nov.-Dec., 2008. No status report
since July, 2008

Nellore District
Rs. in Lakh
Sl Work Place Cost Status of the Expen
. work diture
N
o.
1. 5 Construction of Bogole 4 Ongoing * 1.21
Net Mending (Audinarayanapu 80% completed
centre ram)
2. 8 -do- Vakadu 4 Ongoing * 0.00
80% completed

* Target date was 30-06-2008. Expected date of completion was report as


30.9.2008. No status report since August, 2008.
West Godavari District
Rs. in Lakh
Sl. Work Place Cost Status Expen
No. of the diture
work
1&2 Construction 1. Chinamynavanilank 5 Ongoing 2.50
of Community a 5 * 2.50
Halls (2 ) – 2. Pedamynavanilanka Ongoing
Rs.5 lakh each *

* Target date was 30-06-2008. Works got delayed due to rain. However,
expected date of completion is 31-10-2008. No status report after August, 2008.
Kerala

6 works (2-LS & 4 –RS) were authorized in Kerala under MPLADS. Only
2 works have been completed.

Kollam District (31-07-2008)


Rs. in Lakh
Sl Work Place Cos Status of the work Expen
. t diture
N
o.
1 C/o Disaster Alapp 100 Ongoing * 30.15
Resistance ad
Building of 40% completed.
the CHC at Out of 55 columns, 30 reached up
Alappad to grade beam level. The site is
(Kollam) water logged. Pile cap & grade
beam to be constructed after
dewatering.
2 Old age Alapp 45 Ongoing Not
Home ad reporte
The work was held up due to d
interruption of access to the work
site by the owner of the land due
to non-payment of cost of
approach road. Now the payment
has been effected. Work is in
progress and is expected to be
completed by 31.12.2008.
* Target date was 30-06-2008. Expected date of completion is 31.10.08. No
status report after July, 2008.

Alappuzha District (31-10-2008)


Rs. in Lakh
Sl Work Place Cos Status of the work Expen
. t diture
N
o.
1 Additional block for Arattup 18 Ongoing * Not
Public Health Center uzha reporte
Foundation d
completed. Brick
work started.

Laying 3.2 Kms of 300 Alappuz 40 80% work Not


sq. mm 11 KV XLPE UG ha completed reporte
cable from Alappuzha d
Sub Station to (Due to price hike of
Alappuzha Medical cable and labour
College Hospital situated charges, the
in the Tsunami affected estimated cost has
area of Electrical been raised to Rs.61
Section, Alappuzha lakhs, for which
Town for providing a Rs.21 lakhs have
standby 11 KV feeder to been pooled from
the Medical College normal
Hospital. developmental fund
of KSEB).
* Expected date of completion not reported. Target date was 30-06-
2008.

Tamil Nadu

Out of 116 works (30-LS & 86-RS), 112 works have been completed,
while one work has been cancelled.

Cuddalore District (30-07-2008)


Rs. in Lakh
Sl Work Place Cost Status of the work Expen
. diture
N
o.
1 Putting up High Uppanar 150.0 Ongoing* 0.00
Level Bridge Back water, 0
Nochikadu 7th call of tender fixed
on 14.8.08. It is in
retender stage.
*No status report after July, 2008.

Kanyakumari district (31-07-2008)


Rs. in Lakh
Sl Work Place Cost Status of Expen
. the work diture
N
o.
1 Construction of fish Simon Colony, 150 Ongoing * 112.50
landing centre with RCC Enayam
Jetty at Puthenthurai
Enayamputhenthurai in
Kanniyakumari District
* Expected date of completion is 30.9.2008. Target date was 30-06-2008. No
status report after July,2008.

Nagapattinam District (31-03-2008)


Rs. in Lakh
Sl Work Place Cost Status of Expen
. the work diture
N
o.
1 Construction of service Nagapattinam, 30 Ongoing * 0.00
home exclusively for Sirkali
tsunami victims
*Target date was 30-04-2008. No status report after March, 2008.
A&N Islands

18 works (5-LS & 13-RS) were authorized in A&N Islands. 9 works


have been completed, while 9 works are under execution.

A&N Islands (31-10-2008)


Rs. in Lakh
Sl. Work Place Cost Status Expen
No of the diture
. work
1. Model Sr. Sec. School Kamorta Island 600.0 Ongoing, 243.78
having classes from I to 0 35%
XII with Hostel. work is
complete
d. #
2. Community Hall Joginder Nagar, 68.34 15% 0.00
Campbell Bay complete
d.
Foundati
on in
progress.
Work is
held up
for want
of supply
of stall by
ANIDCO.
3. Transit Hostel for 50 Nancowry Group 125.7 Ongoing, 23.12
persons at Kamorta of Islands 6 35%
complete
d.
4. Transit Hostel at Great Nicobar 82.18 Ongoing, 51.05
Campbell Bay Islands 77%
complete
d.
5. Model Sr. Sec. School Diglipur 554.6 Ongoing, 250.86
having classes from I to 0 33%
XII with hostel facility complete
d.
6. Development of Bambooflat, 10.09 Ongoing, 8.98
Panchayat Fish Market Andaman District 80%
complete
d. *
7. Construction of Work Hut Bay, Little 77.03 Ongoing, 16.03
Shed Andaman. 80%
complete
d.
8. Construction of Work Namunaghar 45.67 Ongoing, 45.67
Shed under 95%
Namunaghar complete
Gram Panchayat. d*
IEI &
flooring
works are
left, Work
held up
due to
stay by
High
Court.
9. Construction of Work Bambooflat Jetty 67.59 Ongoing, 1.52
Shed Area/Bambooflat 45%
Bazar under complete
Bambooflat Gram d. *
Panchayat.

# The probable date of completion is 31-07-2009. Tentative target date of


completion is 31-07-2009.
* Target date and Expected date of completion is 31-09-2009.
(*) Expected date of completion is 31-07-2009. Target date is 31-03-2009.

Puducherry

All works (11) authorized under MPLADS have been completed.


natural calamity in the state of Bihar as a “Calamity of severe nature” vide letter
No. 4-4/2008-NDM-I dated 2nd September, 2008.

Para 2.8 of MPLADS Guidelines provides that “ In the event of “Calamity


of severe nature” in any part of the country, an MP can recommend works up to
a maximum of Rs.50 lakh for the affected district. Whether a calamity is of
severe nature or not, will be decided by the Government of India. The funds in
this regard will be released by the District Authority of Nodal district of the MP
concerned to the District Authority of the affected district to get permissible
works done. The Works Completion Report, Utilization Certificate and Audit
Certificate for such works and funds will be provided by the District Authority of
the affected districts to the respective District Authority of Nodal district from
whom the funds were received”.

Hon’ble Chairman, Rajya Sabha and Hon’ble Speaker, Lok Sabha on


3.9.2008 appealed to the MPs to contribute Rs.10 lakh each from their quota of
MPLADS funds for reconstruction projects as permissible under MPLADS
Guidelines. Hon’ble MOS(IC), S&PI vide letter dated 11.9.2008 appealed to all
MPs to indicate the amount they would wish to contribute for such works as
permissible under the MPLADS Guidelines latest by 30th September,2008. They
were also asked indicate the specific district(s) where such works may be
undertaken, if they so desire.

In response to the aforesaid appeals, 155 Lok Sabha MPs have


contributed Rs.21.95 crore and 149 Rajya Sabha MPs have contributed Rs.20.46
crore towards Bihar Flood Relief so far.

The state Govt. was asked by this Ministry to furnish the list of
rehabilitation works to be undertaken in the flood affected areas with MPs
contribution. The State Govt has proposed the following works for examination
and submitting the recommendation of the Ministry to the Committee for
consideration:-
(a) Disaster Shelter(one for every two panchayat)
Total units=206
Land@ 7.5 lacs per acre and 75 lacs per unit
Cost of 206 units
=Rs.15450.00 lacs
(b) Multipurpose Community Center
( one for each 1000 population )
Total units=2100
Land@ 7.5 lacs per acre and 45 lacs per unit
Cost of 2100 units = Rs.102375.00
lacs.
(c) Cattle Shed (one for each 1000 population)
Total units=2100
Land@ 7.5 lacs per acre and 20.00 lacs per unit
Cost of 2100 units =Rs. 49875.00 lacs.

Total Cost =
Rs.167700.00 lacs
On noticing that cost of land (prohibited under the MPLADS
Guidelines) is also included in the estimated cost, this Ministry has intimated the
position to the State Govt. and asked them to furnish list of eligible works, vide
letter dated 12.11.2008. However, the State Govt. has again submitted the
same proposal subsequent to the visit of the Parliamentary Committee (RS) on
MPLADS to Bihar. This Ministry, vide do. letter dated 15.12.2008, has asked for
the list of eligible works under MPLADS Guidelines, as suggested by the Rajya
Sabha Committee during its visit to the State, alongwith place/location of the
works and cost (excluding the cost of land) for rehabilitation and reconstruction
of the flood affected areas of Bihar, from the Govt. of Bihar. Reminder was sent
on 2.01.2009. However, the requisite information is still awaited from the State
Govt.

Agenda Item No. (ii) & (iii) : On-line Month Progress Reports (MPR) and Work
Monitoring System

II. Online Monthly Progress Reports (MPRs) - The present MPLAD system
envisages release of funds by MOSPI on the basis of MPRs being submitted by
the District Authorities containing financial and physical performance of MPLAD
works and monitoring of works through the data being uploaded by the District
Authrities on the work monitoring software. However, the late and incomplete
receipt of MPRs results in delay in release of funds. Further, the present MPRs
enable availability of only cumulative information on MPLADS both physical and
financial information.

Many a times, the Ministry does require information with regard to releases,
expenditure, work details (recommended, sanctioned, completed, not started,
discontinued) year-wise, constituency/MP-wise, House-wise, State-wise, etc. total
as well as separately for Scheduled Castes and Scheduled Tribes (SCs/STs). The
above information is also required for replying Parliament Questions and various
other queries raised by Ministries/Committees.
As per the existing system, the hard copies of the MPRs are received from
District Authorities. The cumulative data on physical and financial aspects are
punched in this Ministry for the purpose of release of funds and generation of
various reports. However, this does not meet the various requirements of this
Ministry as mentioned above.

Keeping these aspects in view, and the need for availability of on-line information
through MPRs, the Ministry has modified the existing MPR proforma and
proposes to host the same on the MPLADS website with the request to all the
District Authorities to upload the data especially for the release of funds by the
Ministry and also to have information (both physical and financial) pertaining to
SC/ST areas. This would facilitate the faster release of funds and availability of
some information as indicated above. However, the success would depend upon
the uploading of up-to-date complete information both present and past by the
District Authorities. While uploading the information, the District Authorities also
have to ensure that the information is also consistent with the information being
furnished by them till now.

Since the new system of submission of on-line MPR is likely to take some time,
the MOSPI is constrained to continue with the existing system till the new system
becomes fully operationalized throughout the country.

In order to operationalize the new system at the earliest, the Ministry would like
to request all the Nodal Secretaries of States/UTs to ensure that all District
Authorities must submit the accurate and complete information in the new MPR
proforma w.e.f. 1st June, 2008 in hard copy and post this information on-line
w.e.f. 1st September, 2008.

With a view to ensure that the system becomes fully operational on-line, the
Ministry proposes to release funds only on the basis of on-line MPRs containing
all information i.e. the Ministry would not release funds after 1st September, 2008
on the basis of hard copies of MPRs and the entire responsibility of non-release
of funds in such cases will lie with the concerned Secretaries/District Authorities
of States/UTs. (Copy of the modified MPR is enclosed)

III. Work Monitoring Software

In November, 2004, work monitoring software was launched on the


MPLADS website, i.e., www.mplads.nic.in. The requisite software
developed by NIC was supplied to all the District Authorities with the
request to upload the information pertaining to all MPLAD sanctioned
works w.e.f. 1st April, 2005. It has been observed that despite
deadlines given and agreed to by all the Nodal Secretaries/District
Authorities of States and UTs, either the information has not been
uploaded or in cases where the same has been uploaded, the
information is incomplete and not up-to-date. Due to this, the Ministry
is put in a very embarrassing position at various fora as information
are not readily available to the public at large defeating the basic
purpose for which this website was created. This issue was also
discussed in the last meeting of the Demands For Grants of this
Ministry held in February, 2008.

Out of the 430 nodal districts, data has been uploaded from 420 districts. 10
districts viz. Darbhanga, Khagaria, Kishanganj, Banka in Bihar, Baramullah,
Kathua, Leh in Jammu & Kashmir, Imphal (East) in Manipur and Kohima in
Nagaland have not uploaded any data even after lapse of four years of the
launch of Software Manual for Monitoring of works under MPLADS.
As on 31.03.2008, data in respect of 1686 MPs have been uploaded. Of these,
1274 belong to the Lok Sabha (current and previous periods), with 513
belonging to the 14th Lok Sabha and 761 belonging to previous Lok Sabha. Data
in respect of 412 Rajya Sabha MPs (sitting and previous) have been entered,
of which 247 are of sitting MPs and 165 are of previous MPs. The details are at
Annexure-IB

Hon’ble Minister had, in the meeting of 4th December, 2007 desired the
States/UTs to complete the uploading in the MPLADS Software by 31.01.2008.
But only four districts have uploaded the data since the last meeting. This needs
to be completed immediately.

As this matter cannot be kept pending further because of the need and
requirement of data to be made available to this website, MOSPI impresses upon
all States/UTs to ensure that the complete accurate up-to-date information may
be uploaded in the specified proformae of the work monitoring software already
available with the District Authorities by 30th June, 2008. It is also imperative to
mention that the Guidelines do provide utilization of 0.5% as contingency
expenses with regard to expenditure incurred on opertionalization of work
monitoring software.
Annexure - III

List of ongoing works and target dates reported

A. Lok Sabha Works

I. Andhra Pradesh

Nellore District
Rs. in Lakh
Sl.No Work Place Cost Status of the work Target date
. of ongoing
works
1 Completion of incomplete PWS Durgarajapatna 12 Ongoing --
Scheme to Dugarajapatnam Village m Vakadu
of Vakadu Mandal.

Prakasam District

Sl. Work Place Cost Status of the work Target date


No of ongoing
. works
1 Providing PWS Scheme to Karedu 10 Cancelled --
Alagayapalem and Alagayappattapu
palem hamlets of Karedu Village of
Ulavapadu Mandal’.

Krishna District

Sl. Work Place Cost Status of Target date


No the work of ongoing
. works
1 Construction of Cyclone shelter cum Gollapudum 10 Ongoing 31.3.2008
UP School building
2 Construction of Cyclone shelter cum Malakayalanka 10 Ongoing 31.3.2008
Community Hall

II. Kerala
Kollam District

Sl. Work Place Cost Status of the Target


No work date of
. ongoing
works
1 C/o Disaster Resistance Building of Alappad 100 Ongoing June, 2008
the CHC at Alappad (Kollam)

Alappuzha District (29.2.2008)

Sl. Work Place Cost Status of the Target


No work date of
. ongoing
works
1 Additional block for Public Health Arattupuzha 18 Ongoing June, 2008
Center
III. Tamil Nadu
Kanyakumari

Sl. Work Place Cost Status of the Expenditu


No work re
.
1 Drediging of Chinnamuttom Fishing Chinnamuttom 120 Ongoing 31.1.2008
Harbour and restoring of
infrastructure facilities like generator
room, water supply arrangements,
aution hall, etc.
2 Construction of fish landing centre Simon Colony 150 Ongoing 3.4.2008
with RCC Jetty at
Enayamputhenthurai in
Kanniyakumari District

Nagapattinam District

Sl. Work Place Cost Status of the Expenditu


No work re
.
1 Construction of service home Nagapattinam 30 Ongoing 31.3.2008
exclusively for tsunami victims
2 Construction of orphanage building Nagapattinam 50 Ongoing 31.3.2008
and shelter home for old age
persons

IV. A&N Islands


Rs. in Lakh
Sl. Work Place Cost Status of the Target
No work date of
. ongoing
works
1 Model Sr. Sec. School having classes Kamorta Island 592.62 Ongoing 31.07.2009
from I to XII with Hostel.
2 Community Hall Joginder Nagar, Campbell 68.34 Just started 31.12.2008
Bay

V. Puducherry

Sl. Work Place Cost Status of the Target


No work date of
. ongoing
works
1 Cyclone/ Tsunami Shelter Kilinjelmedu 45 Ongoing 28.2.2008

B. Rajya Sabha Works

I. Andhra Pradesh

Nellore District

Sl.No Work Place Cost Status of the Target


. (Rs. in work date of
Lakh) ongoing
works
3. Construction of Net Mending Bogole 4 Ongoing 31.3.2008
centre
4. -do- Indukurpet 4 Ongoing 31.3.2008
5. -do- Mathukur 4 Ongoing 31.3.2008
6. -do- Vakadu 4 Ongoing 31.3.2008
West Godavari District

Sl. Work Place Cost Status of the Target


No. (Rs. in work date of
Lakh) ongoing
works
1 to 5 Construction of 3. Chinamynavanilanka 25 Ongoing 31.3.2008
Community Halls (5 ) 4. Sarudukodapa
– Rs.5 lakh each 5. Biyyaputhippa
6. Pedamynavanilanka
7. Vemuladeevi (Est.)

Krishna District

Sl. Work Place Cost Status of the Target


No. (Rs. in work date of
Lakh) ongoing
works
7. -do- Padatadika of Kruthivennu 10 Ongoing 31.3.2008
8. -do- Yesupuram of Nagayalanka 10 -do- 31.3.2008
9. -do- Krishnapuram of Nagayalanka 10 -do- 31.3.2008
10. -do- Zinkapalemof Nagayalanka 10 -do- 31.3.2008
11. -do- Brahmarahgarimula of 10 -do- 31.3.2008
Nagayalanka

II. Kerala

Kollam District

Sl. Work Place Cost Status of the Target


No (Rs. in work date of
. Lakh) ongoing
works
1 Old age Home Alappad 45 Ongoing 31.7.2008

Alappuzha District

Sl. Work Place Cost Status of the Target


No (Rs. in work date of
. Lakh) ongoing
works
1 Old age Home Arattupuzha 35 Ongoing 31.3.2008
2 Laying 3.2 Kms of 300 sq. mm 11 KV Alappuzha 40 Not yet 30.4.2008
XLPE UG cable from Alappuzha Sub started
Station to Alappuzha Medical College
Hospital situated in the Tsunami
affected area of Electrical Section,
Alappuzha Town for providing a
standby 11 KV feeder to the Medical
College Hospital.

Ernakulam District

Sl. Work Place Cost Status of the Target


No (Rs. in work date of
. Lakh) ongoing
works
1 Old age Home Edavanakad 35 Ongoing 31.3.2008
III. Tamil Nadu
Kanyakumari district

Sl. Work Place Cost Status of the Target


No (Rs. in work date of
. Lakh) ongoing
works
1 Construction of new pond and Mulloorthurai 20 Discontinue --
rain water augmentation d*
2 Widening of Chempatti Odai for From Champakulam to 16 Ongoing January,
recharge of ground water. Rajakkamangalam thurai 2008
Initial Cost = Rs.50 lakh
Revised Estimates = Rs.16
lakh
Saving = Rs.34 lakh
*Alternate works have been recommended by the State Government.

Cuddalore District

Sl. Work Place Cost Status of the Target


No (Rs. in work date of
. Lakh) ongoing
works
1 Putting up High Level Bridge Uppanar Back water, 150.00 Ongoing September,
Nochikadu 2008

Villupuram District

Sl. Work Place Cost Status of the Target


No (Rs. in work date of
. Lakh) ongoing
works
1 Construction of Community Kottakuppam. 11 Ongoing 31.3.2008
Hall

2 Anganwadi Buildings Rahgmath Nagar 10 Ongoing 10.3.2008

IV. A&N Islands


A&N Islands

Sl. Work Place Cost Status of the Target


No (Rs. in work date of
. Lakh) ongoing
works
1 Transit Hostel for 50 persons at Nancowry Group of Islands 125.76 Ongoing 31.03.2009
Kamorta
2 Transit Hostel at Campbell Bay Great Nicobar Islands 82.2 Ongoing 31.06.2008
3 Model Sr. Sec. School having Diglipur 554.60 Ongoing 31.03.2009
classes from I to XII with hostel
facility
4 Development of Panchayat Fish Bambooflat, Andaman District 10.08 Ongoing 31.03.2008
Market
5 Construction of Work Shed Hut Bay, Little Andaman. 77.03 Ongoing 30.08.2008
6 Construction of Work Shed Burmanallah, South 65.58 Ongoing 310.3.2008
Andaman.
7 Construction of Work Shed Collinpur under Tushnahad 56.79 Ongoing 31.04.2008
Gram Panchayat.
8 Construction of Work Shed Namunaghar under 45.67 Ongoing 31.03.2008
Namunaghar Gram
Panchayat.
9 Construction of Work Shed Bambooflat Jetty 67.59 Ongoing 30.06.2008
Area/Bambooflat Bazar under
Bambooflat Gram Panchayat.
10 Construction of Work Shed. Sippighat village under 46.23 Ongoing 31.03.2008
Sippighat Gram Panchayat

V. Puducherry
Sl. Work Place Cost Status of the Target
No (Rs. in work date of
. Lakh) ongoing
works
1 One Fisheries Training Institute Karaikal 92.50 Ongoing 28.2.2008
BIHAR FLOOD REHABILITATION WORKS

In view of the extensive damage caused by the


unprecedented and devastating floods due to breach in the Kosi river’s
embankments in the state of Bihar, particularly in the districts of
Madhepura, Supaul, Saharsa, Purnia, Katihar and Araria, the Ministry
of Home Affairs(Disaster Management-I Division) declared the

Information regarding compliance of the Guidelines regarding


Constitution of the Monitoring Committee
and review of the Scheme as per para 6.4(vi) of the Guidelines on
MPLADS
(As on 12-01-2009)
State/ Whethe No. and Minutes Whether No. of District Whether Action
UT r Dates received MP was District wise No. MP was taken
Monitor of the or not invited following of invited against
ing meetin or not para meeting or not defaultin
Commit g held and No. 6.4(vi) held at and No. g District
tee of MPs District of MPs Authoriti
constitu attended level attended es not
ted or meeting meeting followin
not g para
6.4(vi)
(Pont (Pont (Pont 3) (Pont 4) (Pont 5A) (Pont (Pont (Pont 6)
1) 2) 5B) 5C)
Andhra Yes -- -- - - - - -
Prades
h
Arunac Yes No No - - - - -
hal
Prades
h
Assam Yes 21.03.2007 -- - - - - -
(I) Yes Yes
13.02.2008
(II)
Bihar Yes 21-02- Yes Yes - - - -
2008
Chattis Yes - - - - - - -
garh
Goa Yes 04-09- Yes Yes/2 2 (North (Yes/2) No
2006 Yes Yes/2 2 Goa-12 adverse
14.11.20 South report
07 Goa-15) recd.
Against
Distt.
Authoritie
s
Gujara Yes - - - - - - -
t
Haryan Yes - - - - - - -
a
Himac Yes - No - - - - -
hal
Prades
h
J&K No - - - - - - -
Jharkh Yes - No - - - - -
and
Karnat Yes - - - - - - -
aka
Kerala Yes 23.07.20 Yes No All District Thiruvana Yes/Distt. -
07 Yes - nthapura MPs are
04-07- m-3, attending
2008 Kollam-3, the
Pathanam meetings
thitta-5,
* Partial information received.
Statewise Summary of Receipt of Full or Partial data from Nodal districts against
the total no. of Districts as on 12/12/2008
Data Received
Sl Total No. Data Data Not Total LS Total 14th LS Sitting
No. State of Districts Received Received MP's RS MP's MP's RS MP's
1 Andhra Pradesh 23 23 0 95 53 38 14
2 Arunachal Pr. 3 3 0 10 1 2 0
3 Assam 14 14 0 58 8 14 4
4 Bihar 32 28 4 50 18 35 9
5 Goa 2 2 0 8 3 2 1
6 Gujarat 22 21 1 74 13 25 5
7 Haryana 11 11 0 24 9 10 3
8 Himachal Pr. 4 4 0 9 7 3 2
9 J&K 6 3 3 3 3 3 2
10 Karnataka 25 25 0 52 17 28 7
11 Kerala 13 13 0 60 21 18 4
12 Madhya pradesh 29 29 0 63 18 28 10
13 Maharashtra 34 34 0 159 40 46 14
14 Manipur 2 1 1 1 1 1 1
15 Meghalaya 2 2 0 10 5 2 0
16 Mizoram 1 1 0 1 1 1 1
17 Nagaland 1 0 1 0 0 0 0
18 Orissa 21 21 0 76 23 21 8
19 Punjab 11 11 0 67 25 13 7
20 Rajasthan 24 24 0 69 14 23 4
21 Sikkim 1 1 0 1 1 1 0
22 Tamil Nadu 30 30 0 65 51 39 16
23 Tripura 2 2 0 2 2 2 1
24 Uttar Pradesh 63 63 0 248 87 80 28
25 West Bengal 18 18 0 171 34 42 13
26 A & N Islands 1 1 0 2 0 1 0
27 Chandigarh 1 1 0 5 0 1 0
28 D & N Haveli 1 1 0 1 0 1 0
29 Daman & Diu 1 1 0 1 0 1 0
30 Delhi 1 1 0 9 6 7 3
31 Lakshdweep 1 1 0 2 0 1 0
32 Pondicherry 1 1 0 3 3 1 1
33 Chhattisgarh 10 10 0 28 7 11 4
34 Uttaranchal 5 5 0 8 5 5 3
35 Jharkhand 14 14 0 39 9 14 3

430 420 10 1474 485 520 168


NIC-MPI
Training of District Officials under MPLADS
S.No State from which Cost of the Date of Whether Whether
proposal received Training sanction funds sent training
(Rs. In conducted
lakh)
2005-06
1 Andhra Pradesh 2.00 13.3.06 Yes Yes
2 Chattisgarh 1.60 .3.06 Yes Yes
3 Uttar Pradesh 1.20 24.3.06 Yes Yes
Total (2005- 4.80
06)
2006-07
4 Maharashtra 3.23 28.4.06 Yes Yes
5 Rajasthan 0.77 25.7.06 Yes Yes
6 Haryana 2.00 25.9.06 Yes Yes
7 Mizoram 0.2128 29.3.07 Yes Yes
8 Tamil Nadu 2.00 5.2.07 Yes Yes
9 Gujarat 0.81 28.2.07 Yes Yes
10 Assam 2.00 29.3.07 Yes Yes
11 Punjab 0.3184 29.3.07 Yes Yes
12 Kerala 0.815 29.3.07 Yes Yes
Total (2006- 12.1562
07)
2007-08
13 West Bengal 0.3552 19.7.07 Yes Yes
14 Meghalaya 0.28 5.12.07 Yes Yes
15 Tripura 0.39878 5.12.07 Yes No(Lr. Sent
on 18.9.08
asking to
conduct
training)
16 Jharkhand 1.74500 5.12.07 Yes Yes
17 Sikkim 0.61 21.1.08 Yes Yes
18 Orissa 1.60 26.3.08 Yes(3.4.08) No
19 Madhya 0.65675 17.3.08 Yes No
Pradesh
Total (2007- 5.64573
08)
2008-09
20 Uttarakhand 0.50000 9.5.08 Yes No(Lr. Sent
(17.6.08) on 18.9.08
asking to
conduct
training)
21 Karnataka 0.75000 4.6.08 Yes 17.6.08 Yes
22 Arunachal 0.86500 4.6.08 Yes 17.6.08 Yes
Pradesh
23 Lakshadweep 0.41000 4.6.08 Yes 17.6.08 Yes
23A West Bengal 0.37,046 25.6.08 Yes Yes
(second time)
23B Rajasthan 0.57840 22.8.08 23.9.08 No
(second time)

List of states from which proposals for training have not been
received

Name of State Letter asking for furnishing


proposal for training sent on
1 Bihar 25.08.2008
2 Goa -do-
3 Himachal Pradesh -do-
4 Jammu & Kashmir -do-
5 Manipur -do-
6 Nagaland -do-
7 A & N Islands -do-
8 Chandigarh -do-
9 D & N Haveli -do-
10 Daman & Diu -do-
11 Delhi -do-
12 Pondicherry -do-
States/UTs who have constituted Monitoring
Committees in view of para 6.3 of guidelines
States/UTs who have formed Monitoring States/UTs who are yet to form Monitoring
Committees Committees
States UTs. States UTs.
Assam Lakshdweep Maharashtra Dadar & Nagar
Haveli
Arunachal Pr. Puducherry Mizoram Daman & Diu
Gujarat Delhi Jammu & Kashmir Chandigarh
Goa A & N Island
Haryana
Jharkhand
Karnataka
Kerala
Madhya Pradesh
Orissa
Nagaland
Punjab
Sikkim
Tamil Nadu
Tripura
Uttar Pradesh
Chhatisgarh
Himachal Pradesh
Meghalaya
Manipur
Rajasthan
Uttrakhand
Bihar
West Bengal
Andhra Pradesh
Information regarding compliance of the Guidelines regarding
Constitution of the Monitoring Committee
and review of the Scheme as per para 6.4(vi) of the Guidelines on
MPLADS
(As on 12-01-2009)
State/ Whethe No. and Minutes Whether No. of District Whether Action
UT r Dates received MP was District wise No. MP was taken
Monitor of the or not invited following of invited against
ing meetin or not para meeting or not defaultin
Commit g held and No. 6.4(vi) held at and No. g District
tee of MPs District of MPs Authoriti
constitu attended level attended es not
ted or meeting meeting followin
not g para
6.4(vi)
(Pont (Pont (Pont 3) (Pont 4) (Pont 5A) (Pont (Pont (Pont 6)
1) 2) 5B) 5C)
Andhra Yes -- -- - - - - -
Prades
h
Arunac Yes No No - - - - -
hal
Prades
h
Assam Yes 21.03.2007 -- - - - - -
(I) Yes Yes
13.02.2008
(II)
Bihar Yes 21-02- Yes Yes - - - -
2008
Chattis Yes - - - - - - -
garh
Goa Yes 04-09- Yes Yes/2 2 (North (Yes/2) No
2006 Yes Yes/2 2 Goa-12 adverse
14.11.20 South report
07 Goa-15) recd.
Against
Distt.
Authoritie
s
Gujara Yes - - - - - - -
t
Haryan Yes - - - - - - -
a
Himac Yes - No - - - - -
hal
Prades
h
J&K No - - - - - - -
Jharkh Yes - No - - - - -
and
Karnat Yes - - - - - - -
aka
Kerala Yes 23.07.20 Yes No All District Thiruvana Yes/Distt. -
07 Yes - nthapura MPs are
04-07- m-3, attending
2008 Kollam-3, the
Pathanam meetings
thitta-5,
State/U Whether No. and Minutes Whether No. of District Whether MP Action
T Monitoring Dates of the received MP was District wise No. was invited or taken
Committee meeting or not invited or following of not and No. of against
constituted held not and No. para meeting MPs attended defaulting
or not of MPs 6.4(vi) held at meeting District
attended District Authorities
meeting level not
following
para 6.4(vi)
(Pont 1) (Pont 2) (Pont 3) (Pont 4) (Pont 5A) (Pont 5B) (Pont 5C) (Pont 6)
Nagala Yes 26.09.2007 Yes - - - - -
nd
Orissa Yes 17.12.2007 -- - - - - -
17.01.2008 Yes - - - - -
Punjab Yes 28-12-2007 Yes Yes/3 - - - -
Rajath Yes 17.09.2007 -- - - - - -
an 09.10.2007 Yes
Sikkim Yes 16-07-2007 -- Yes/Nil - - - -
30.11.2007 Yes
Tamil Yes - - - - - - -
Nadu
Tripur Yes - - - - - - -
a
Uttar Yes - - - 10* Meerut- Yes/Distt. MPs -
Prades 12, (except
h Bagpat-3, Ambedkar
Ghaziabad Nagar Distt. )
-3, are attending
Bulandshe the meetings
r-12, regularly
Gautambu
dh Nagar,
Farukhaba
d-12,
Chandauli
&
Aligarh-
once in
every
month,
Raibereill
y-6,
Ambedkar
Nagar-6,
Mainpuri-
10
Uttara Yes - - - - - - -
nchal
West Yes 07.03.2008 Yes No - No - -
Bengal
A&N Yes 22.02.2007 Yes
Island 17.08.2007 Yes
s 26.02.2008 Yes No - No - -
Chandi No - - - - - - -
garh
D&N No - - - - - - -
Haveli
Daman No - - - - - - -
& Diu
Delhi Yes, but - No - - N/A N/A N/A
under the
chairmanshi
p of
Fin.&Planni
ng Minister
of Govt. of
Delhi being
single
District
State
Laksh Yes 24.05.2005 Yes - - - - -
adwee 09.02.2007 Yes
p 08.05.2007 Yes
Puduc Yes 06-02-2007 No No - No - -
herry 26.02.2008 Yes
* Partial information received.

* Partial information received.


MPLADS-Lok Sabha Constituencies of Andhra Pradesh-
Status of Pending Instalments

Sl. Name of Constituency/ Due Documents required for


No. Member of Parliament installment the release of next instalment.

1)
Amalapuram
II/2008-09 ♣ MPR
Shri G.V. Harsha Kumar

2) Ankapalli
II/2008-09
Shri Pappala Chalapathi Rao ♣ Being released

3) Bhadrachalam ♣ MPR
II/2007-08
Shri Midiyam Babu Rao ♣ UC 2006-07
♣ AC 2005-06
4) Chittoor
II/2008-09 ♣ MPR
Shri D.K. Adikesavulu
♣ AC 2006-07
5) Cuddapah ♣ .MPR
II/2008-09
Shri Y.S. Vivekananda ♣ UC 2007-08
Reddy ♣ AC 2006-07

6) Hanamkonda
♣ Being released
Shri B. Vinod Kumar II/2008-09

7) Hyderabad
Shri Asaduddin Owaisi I/2008-09 ♣ Bieng released

8) Kakinada
Shri Mallipudi Pallam Raju II/2008-09 ♣ MPR
♣ AC 2006-07

9) Karim nagar
Shri K. Chandra Shekhar
II/2008-09 ♣ Being released
Rao

10) Khammam
Smt. Renuka Chowdhury I/2008-09 ♣ Being released

11) Kurnool ♣ MPR


Shri Jayasurva Prakasha II/2008-09 ♣ UC 2007-08
Reddy ♣ AC 2006-07

12) ♣ MPR
Machilipatnam
II/2008-09 ♣ UC 2007-08
Shri Badiga Ramakrishna
♣ AC 2006-07

13) Miryalguda II/2008-09 ♣ MPR


Shri Jaipal Reddy ♣ UC 2007-08
14) Nalgonda II/2008-09 ♣ MPR
Shri Suravaram Sudhakar ♣ UC 2007-08
Reddy
15) ♣ MPR
Nandyal II/2008-09
♣ UC 2007-08
Shri S.P.Y. Reddy
♣ AC 2006-07

16) Narasapuram
Shri Venkata II/2008-09 ♣ MPR
Hariramajogaiah

17) Nellore II/2008-09


♣ MPR
Ms. Panabaka Lakshmi

18) Nizamabad
Shri Goud Yaskhi I/2007-08 ♣ AC 2004-05

19) Rajahmundry II/2008-09 ♣ MPR


Shri Vundavalli Arun Kumar ♣ AC 2006-07

20) Secunderabad
II/2008-09 ♣ MPR
Shri M. Anjan Kumar Yadav

21) Siddipet
II/2008-09 ♣ MPR
Shri Sarvey Satyanarayana

22) Tirupathi ♣ Being released


I/2008-09
Shri Chinta Mohan
23) Vijayawada ♣ MPR
II/2008-09
Shri Rajagopal Lagadapati ♣ UC 2007-08
♣ AC 2006-07
24) II/2008-09
Vishakhapatnam
♣ Being released
Shri Janardhana Reddy
25) Warangal
♣ MPR
Shri Dharavath Ravinder II/2008-09
♣ UC 2007-08
Naik
MPLADS –Rajya Sabha MPs of Andhra Pradesh-
Status of Pending Instalments

Sl. Member of Parliament/ Due Documents required for


No. Nodal District installment the release of next instalment.

1. Dr. Dasari Narayana Rao ♣ MPR


Nodal District: West II/2008-09
Godavari,
2. Shri PenumalliMadhu II/2008-09 ♣ MPR
Nodal District: Hyderabad

3. Shri V. Hanumantha Rao ♣ MPR


Nodal District: Hyderabad II/2008-09

4. Shri Jairam Ramesh II/2007-08 ♣ MPR


Nodal District: Adilabad

5. Shri Jesuudasu Seelam, II/2008-09 ♣ MPR


Nodal District: Guntur ♣ AC 2006-07

6. Shri Gireesh Kumar Sanghi I/2007-08 ♣ Being released


Nodal District: Ranga Reddy

8. Dr. T.Subbarami Reddi II/2008-09 ♣ Being released


Nodal District:
Visakhapatnam

9. Shri C. Rama Chandraiah II/2008-09 ♣ MPR


Nodal District:Cuddapah

10. Shri Raashid Alvi II/2008-09 ♣ MPR


Nodal District: Hyderabad

11. Shri Syed Azeez Pasha II/2008-09 ♣ MPR


Nodal District: Hyderabad

12. Shri K Keshava Rao II/2007-08 ♣ MPR


Nodal District: Hyderabad

13. Shri Mule Venkata Mysura ♣ MPR


II/2008-09
Reddy ♣ AC 2006-07
Nodal District: Kadapa
14. Shri G. Sanjeeva Reddy II/2007-08 ♣ Being released
Nodal District: Ranga Reddy

15. Shri. Mohd. Ali Khan II/2008-09 ♣ MPR


Nodal District: Greater
Hyderabad

16. Shrimati Ratna Bai II/2008-09 ♣ MPR


Tadapatla
Nodal District: East Godavari

17. Shri K.V.P.Ramachandra Rao II/2008-09 ♣ MPR

18. Shri. Nandamuri Harikrishna II/2008-09 ♣ MPR

Note:-

MPR fulfilling conditions : Monthly Progress Report reflecting unsanctioned


balance less than Rs.50 lakh & unspent balance less
than Rs.1 crore.
UC : Utilisation Certificate
AC : Audit Certificate
ATN : Action Taken Note on the audit observations and
objections in the respective audit certificate which are
against the MPLADS guidelines.
Arunachal Pradesh

Statement showing the documents required for the release of next instalment
under MPLADS as on 31.12.2008

Lok Sabha

Sl. Name of the Instalment to Documents required to be furnished by


No. Constituency be released the DM for the release of next instalment
1 Arunachal East I/2008-09 ATR on AC 2005-06
II/2008-09

2 Arunachal West -- AC 2006-07

Rajya Sabha

Sl. Name of the Rajya Sabha MP Instalment Documents required to be


No. to be furnished by the DM for the
released release of next instalment
1 Shri Mukut Mithi -- --

MPR - Monthly Progress Report showing unsanctioned balance less than Rs.50 lakh and
unspent balance less than Rs.100 lakh.
UC - Utilisation Certificate (as at Annex – VIII of the Guidelines)
AC - Audit Certificate (as at Annex – IX of the Guidelines)
ATR- Action Taken Report
Assam

Statement showing the documents required for the release of next instalment
under MPLADS as on 31.12.2008

Lok Sabha

Sl. Name of the Instalment to Documents required to be furnished by


No. Constituency be released the DM for the release of next instalment
1 AUTONOMOUS II/2008-09 MPR
UC 2007-08
AC 2006-07
2 BARPETA II/2008-09 MPR
UC 2007-08
AC 2006-07

3 DHUBRI -- --

4 DIBRUGARH II/2008-09 MPR


UC 2007-08
5 GUWAHATI -- --

6 JORHAT -- --

7 KALIABOR II/2008-09 MPR


UC 2007-08
AC 2006-07

8 KARIMGANHJ -- UC 2007-08

9 KOKRAJHAR II/2008-09 MPR


UC 2007-08

10 LAKHIMPUR -- UC 2007-08

11 MANGALDOI II/2008-09 MPR


UC 2007-08
AC 2006-07

12 NOWGONG II/2008-09 MPR


UC 2007-08
AC 2006-07

13 SILCHAR -- --

14 TEJPUR II/2008-09 MPR


UC 2007-08
AC 2006-07
Rajya Sabha

Sl. Name of the Rajya Sabha MP Instalment Documents required to be


No. to be furnished by the DM for the
released release of next instalment
1 Sh Silvius Condpan -- --

2 Sh Syeda Anwara Taimur II/2008-09 MPR


UC 2007-08
3 Dr. Manmohan Singh --- --

4 SH Kumar Deepak Das II/2008-09 MPR


UC 2007-08
5 Bhubaneswar Kalita II/2008-09 MPR

6 Birendra Prasad Baishya II/2008-09 MPR

7 Biswajit Daimary II/2008-09 MPR

MPR - Monthly Progress Report showing unsanctioned balance less than Rs.50 lakh and
unspent balance less than Rs.100 lakh.
UC - Utilisation Certificate (as at Annex – VIII of the Guidelines)
AC - Audit Certificate (as at Annex – IX of the Guidelines)
ATR- Action Taken Report
BIHAR

Statement showing the documents required for the release of next instalment
under MPLADS

Lok Sabha

Sl. Name of the Instalment/ Documents required to be furnished by


No. Constituency instalments to be the DM for the release of next
released instalment
1 Araria II/2008-09 MPR
UC 2007-08
2 Arrah -- ATR on clauses D, H, J and sl.No.2 of the
Auditor’s Report on AC 2006-07
3 Aurangabad II/2008-09 MPR
4 Bagaha -- --
5 Balia -- --
6 Banka -- --
7 Barh II/2008-09 MPR
UC 2007-08
8 Begusarai -- --
9 Bettiah II/2008-09 MPR
10 Bhagalpur -- --
11 Bikramganj II/2003-04 MPR upto 13th LS
II/2007-08 MPR for 14th LS
I/2008-09 Combined MPR
II/2008-09 AC 2001-02
AC 2005-06
12 Buxar II/2007-08 MPR
I/2008-09
II/2008-09
13 Chapra II/2007-08 MPR
I/2008-09
II/2008-09
14 Darbhanga II/2008-09 MPR
UC 2007-08
AC 2006-07
15 Gaya II/2007-08 MPR
I/2008-09 UC 2006-07
II/2008-09 AC 2005-06
16 Gopalganj II/2008-09 MPR
UC 2007-08
17 Hajipur II/2008-09 MPR
18 Jehanabad II/2008-09 MPR
UC 2007-08
19 Jhanjharpur II/2008-09 MPR
AC 2006-07
ATR on clauses (g) and (i) of the prescribed
format is required.
20 Katihar II/2008-09 MPR
21 Khagaria II/2008-09 MPR
AC 06-07
UC 07-08
22 Kishanganj II/2008-09 MPR
UC 2007-08
AC 2006-07
23 Madhepura II/2007-08 MPR
I/2008-09 UC 2006-07
II/2008-09 AC 2005-06
24 Madhubani -- ATR on missing clause (H) & (I) of the
prescribed format AC 2006-07, deficiency on
maintaining Bank Reconciliation statement
and on audit observation.
25 Maharajganj II/2008-09 MPR
26 Monghyr II/2007-08 MPR
I/2008-09 UC 2006-07
II/2008-09 AC 2005-06
27 Motihari II/2008-09 MPR
28 Muzaffarpur I/2008-09 ATR on AC 2005-06 & 06-07 is required.
II/2008-09
29 Nalanda II/2005-06 MPR upto tenure of Shri Nitish Kumar, ex-
I/2006-07 MP(LS)
II/2008-09 MPR of Sh Swaroop Singh, ex-MP(LS)
Combined MPR
UC 2004-05
AC 2003-04
30 Nawada -- --
31 Patna II/2008-09 MPR
UC 2007-08
32 Rosera I/2007-08 ATR on AC 04-05, 05-06, 06-07 is required.
II/2007-08
I/2008-09
II/2008-09
33 Saharsa II/2008-09 MPR
UC 2007-08
AC 2006-07
34 Samastipur I/2008-09 ATR on clauses (d), (g), (h) and (l) of AC 2005-
II/2008-09 06 is required.
35 Sasaram II/2008-09 MPR
ATR on AC 2006-07
36 Sheohar -- --
37 Sitamarhi -- --
38 Siwan II/2007-08 MPR
I/2008-09 UC 06-07
II/2008-09 AC 05-06
39 Vaishali I/2007-08 ATR on ACs 04-05, 05-06 & 06-07 are required.
II/2007-08
I/2008-09
II/2008-09
40 Purnia II/2007-08 MPR
I/2008-09 UC 2007-08
II/2008-09
MPR - Monthly Progress Report showing unsanctioned balance less than Rs.50 lakh and
unspent balance less than Rs.100 lakh.
UC - Utilisation Certificate (as at Annex – VIII of the Guidelines)
AC - Audit Certificate (as at Annex – IX of the Guidelines)
ATR- Action Taken Report
Rajya Sabha

Sl. Name of the Rajya Sabha Instalment to Documents required to be


No. MP be released furnished by the DM for the
release of next instalment
1 Shri Mahendra Prasad II/2002-03 MPR
I&II/2003-04 UC 2001-02
I&II/2004-05 AC 2000-01
I&II/2005-06
I&II/2006-07
I&II/2007-08
I&II/2008-09
2 Shri Subhash Prasad Yadav -- UC 2007-08
3 Shri Sharad Yadav II/2006-07 MPR
I&II/2007-08 UC 2005-06
I&II/2008-09 AC 2004-05

4 Shri Prem Chand Gupta II/2006-07 MPR


I&II/2007-08
I&II/2008-09

5 R.K. Dhawan II/2005-06 MPR


I&II/2006-07
I&II/2007-08
I&II/2008-09
6 Shri Ravi Shankar Prasad II/2008-09 MPR
UC 2007-08
7 Shri Rajniti Prasad II/2008-09 MPR
UC 2007-08
8 Shri Ali Anwar -- UC 2007-08

9 Shri Mahendra Sahani II/2008-09 MPR


UC 2007-08
AC 2006-07
10 Shri Jabir Hussain II/2008-09 MPR
UC 2007-08
11 Dr. Ejaz Ali II/2008-09 MPR
12 Dr. C.P. Thakur II/2008-09 MPR
13 Shri Shivanand Tiwari II/2008-09 MPR
14 Shri Nand Kishore Singh I/2008-09 Choice of Nodal District is awaited
II/2008-09 from the Hon’ble MP(RS)
15 Shri Sabir Ali II/2008-09 MPR
16 Shri Rajiv Pratap Rudy II/2008-09 MPR

MPR - Monthly Progress Report showing unsanctioned balance less than Rs.50 lakh and
unspent balance less than Rs.100 lakh.
UC - Utilisation Certificate (as at Annex – VIII of the Guidelines)
AC - Audit Certificate (as at Annex – IX of the Guidelines)
ATR- Action Taken Report
OTHER PENDING ISSUES

™ Action may be taken to distribute Unspent Balance available in the


account of former Rajya Sabha MPs amongst the sitting Rajya Sabha MPs
at that time.
™ MPR, UC and AC of the amount released are required to be furnished in
respect of ex-MP(RS) whose unreleased fund are to be distributed
amongst the sitting Rajya Sabha MPs.
™ Distribution of unspent amount of Rs.5.62 crore amongst 16 sitting Rajya
Sabha (MPs) in the state of Bihar, which amount to Rs.35,12,500/- per
MP. However, the amount could not be transferred to Hon’ble MPs Shri
(Capt.) Jai Narain Prasad Nishad, Shri Mangni Lal Mandal and Shri
Subhash Prasad Yadav due to incorrect report from the District Authority
of Gopalganj and Madhubani. Necessary action may be taken.
™ MPR, UC and AC are not being forwarded in prescribed format by the
District Magistrate in many cases. Some districts are being forwarded
MPR only for 14th Lok Sabha period. DM may be requested to forward
combine MPR (10th to 14th Lok Sabha period) for the constituency for
updating the data.
Release Status
MEMBERS OF PARLIAMENT (LOK SABHA)
CHHATTISGARH

S. No CONSTITUENCY NAME OF MP MPLADS Document Remarks


Fund required for
instalment release of next
not instalment
released
1. BASTAR (ST) SH. BALIRAM II/08-09 Eligible MPR I/08-09
L/33/01/04 KASHYAP AC-06-07 released on
UC-07-08 9.5.07

2. BILASPUR SH. PUNNU LAL II/08-09 Eligible MPR 1/08-09


MOHLE AC-06-07 released on
L/33/2/04 UC-07-08 16.7.2009

3. DURG SH. TARACHAND II/08-09 Eligible MPR I/08-09


L/33/03/04 SAHU AC-06-07 released on
UC-07-08 22.04.2008

4. JANJGIR SMT. KARUNA I/2008-09 I/2008-09 will be II/07-08


SHUKLA II/2008- released released on
L/33/04/04 09 subsequent to 13.1.2009.
release of
II/2007-08.
However, for
release of
II/2008-09 the
following
documents are
required:-

Eligible MPR
AC-06-07
UC-07-08

5. KANER (ST) SH. SOHAN II/08-09 Eligible MPR I/08-09


L/33/05/04 POTAI AC-06-07 released on
UC-07-08 12.06.2008.

6. MAHASAMUND SH AJIT JOGI II/07-08 Eligible MPR I/07-08


AC-05-06 released on
L/33/06/04 UC-06-07 1.4.2008.

7. RAIGARH (ST) SH VISHNUDEO II/08-09 Eligible MPR I/08-09


L/33/07/04 SAI AC-06-07 released on
UC-07-08 24.07.2008.
8. RAIPUR SH RAMESH BAIS II/08-09 Eligible MPR 1/08-09
L/33/08/04 AC-06-07 released on
UC-07-08 28.07.2008.

9. RAJNANDGAON SH. DEVWRAT II/08-09 Eligible MPR 1/08-09


L/33/09/04 SINGH AC-06-07 released on
UC-07-08 11.9.2008.
10 SARANGARH SH GUHRAM II/08-09 Eligible MPR I/08-09
(SC) AJGALLE AC-06-07 released on
L/33/10/04 UC-07-08 16.06.2008.
11 SARGUJA (ST) SH. NAND KUMAR Eligible AC-06-07 I/08-09
SAI MPR released on
L/33/11/04- 22.04.2008.
MPLADS
12 CENTRAL-2 SMT. INGRID - - II/08-09
(NOMINATED) MCLEOD released on
L/00/01/04 26.08.2008
MEMBERS OF PARLIAMENT (Rajya SABHA)
CHHATTISGARH
S. MP Name NODAL DISTRICT MPLADS Document required Remarks
No Instalment for release of next
not instalment
released
1. SH. DALIP SINGH JASHPUR 1/2008-09 Eligible MPR II/2007-08
JUDEV II/2008-09 AC-06-07 released on 7-01-
R/33/01/04 UC-07-08 2009.

2 SMT. MOHSINA RAIPUR II/2007-08 Eligible MPR-not I/2007-08


KIDWAI recd released on
R/33/04/04 UC-06-07- received 5.10.2007
AC-05-06 –
received

3 SH RAMADHAR BILASPUR Tenure II/07-08 released


KASHYAP completed on on 29.02.2008
R/33/06/04 09.04.2008.

4 SH. MOTI LAL DURG II/08-09 Eligible MPR I/08-09 released


VORA AC-06-07 on 25.04.2008.
R/33/04/04 UC-07-08

5 SH. SHARIGOPAL MAHASAMUND II/08-09 Eligible MPR 1/08-09 released


VYAS AC-06-07 on 05.06.2008.
UC-07-08
R/33/01/06

6 SHRI SHIVPRTAP SURGUJA II/08-09 Eligible MPR I/08-09 released


. SINGH AC-06-07 on 01.05.2008.
UC-07-08
Fund release status (DELHI)
Delhi (Lok Sabha)

Sl. Name of the MP Fund to Documents required to be furnished by the


No. Nodal District be MCD for the release of next instalment
released
1 Delhi Sadar II/2006-07 ƒ Eligible MPR required
Shri Jaddsh Tytler I&II/2007- ƒ UC 2005-06 & 07-08 received
Nodal District: MCD 08 ƒ AC 2002-03, 03-04, 04-05, 05-06 & 06-07
I&II/2008- received but clarifications required
09
2 East Delhi I&II/2003- ƒ Eligible MPR upto 13th Lok Sabha required for
Shri Sandeep Dikshit 04 the release of I/2003-04.
Nodal District: MCD II/2006-07 ƒ Eligible MPR required
I&II/2007- ƒ UC 2005-06, 2006-07 & 2007-08 received
08 ƒ AC 2004-05 required
I&II/2008-
09
3 Karol Bagh (SC) I&II/2006- ƒ Eligible MPR required
Shri Krishna Tirath 07 ƒ UC 2004-05, 2005-06 & 2006-07, 2007-08
Nodal District: MCD I&II/2007- received
08
I&II/2008-
09
4 New Delhi II/2006- ƒ Eligible MPR received
Shri Ajay Maken 07 ƒ U C 2004-05, 2005-06 & 2006-07, 2007-08
Nodal District: MCD I&II/200 received
7-08
I&II/200
8-09
5 Outer Delhi II/2003-04 ƒ Eligible MPR required **
Shri Sajjan Kumar ƒ UC 2002-03 received
Nodal District: MCD ƒ AC 2001-02 required **
II/2005-06 ƒ Eligible MPR required **
I&II/2006- ƒ UC 2003-04, 2004-05, 2005-06 & 2006-07, 2007-
07 08 received
I&II/2007- ƒ
F.No.L/30/05/2004- 08
MPLADS I&II/2008-
09
6 South Delhi I&II/199 ƒ Eligible MPR required
Shri Vijay Kumar 5-06 ƒ UC 2005-06 received (UC of Ra.100 lakh
Malhotra released towards I&II 1994-95)
Nodal District: MCD
II/2004- ƒ Eligible MPR recvd
05 ƒ UC 2005-06, 2006-07 & 2007-08 received
I&II/200
5-06
I&II/200
6-07
I&II/200
7-08
I&II/200
8-09
7 Chandini Chowk I&II/1995- ƒ Eligible MPR required
Shri Kapil Sibal 06 ƒ UC of Rs.105 lakh released on 6.1.2006 towards
Nodal District: MCD I/1993-94 and I&II 1994-95.
II/2003-04 ƒ Eligible MPR
ƒ UC 2002-03
ƒ AC 2001-02
ƒ UC 2007-08 received
II/2006-07 ƒ Eligible MPR required
I&II/2007- ƒ UC 2005-06 & 2006-07 received
08 ƒ AC 2004-05 required
I&II/2008-
09

** letter issued for calling this information/document


Delhi (Rajya Sabha)

Sl. Name of the MP Fund to Documents required to be furnished by the


No Nodal District be District Collector for the release of next
. released instalment.
1 Shri Jai Prakash Aggarwal II/2007-08 ƒ Eligible MPR
Nodal District: MCD I&II/2008- ƒ UC 2006-07 & 07-08 received
09

2 Shri Janardhan Dwivedi II/2006-07 ƒ Eligible MPR


Nodal District: MCD I&II/2007- ƒ UC 2005-06, 2006-07 & 2007-08 received
08 ƒ AC 2004-05
I&II/2008-
09
3 Shri Karan Singh II/2005-06 ƒ AC 2002-03 received with discrepancies &
Nodal District: MCD I&II/2006- ATR also recd. thereafter.
07 ƒ UC 2002-03 to 2006-07 & 07-08 received.
I&II/2007- ƒ AC received for 2003-04, 2004-05, 2005-06 &
08 2006-07 with discrepancies, DFA put up.
I&II/2008-
09
Nominated (Rajya Sabha)

Sl. Name of the MP Fund to Documents required to Release status after 01-
No Nodal District be be furnished by the 04-2008
. released District Collector for the
release of next
instalment.
1 Shri Chandan Mitra II/2005-06 ƒ Eligible MPR received ƒ II/2004-05 released
Nodal District: MCD I&II/2006- ƒ UC 2003-04, 2004-05, on 09-09-2008.
07 2005-06 & 2006-07, 07-08 ƒ I/2005-06 released on
I&II/2007- received 30-09-2008.
08
I&II/2008-
09
2 Shobhana Bharatia II/2006-07 ƒ Eligible MPR ƒ
Nodal District: MCD I&II/2007- ƒ UC 2006-07 & 2007-08
08 received
I&II/2008-
09
3. Kapila Vatsyayan II/07-08 ƒ Eligible MPR ƒ
Nodal District : MCD I&II/2008-
09
4. A. R. Kidwai, Ex- ƒ UC 2006-07 & 2007-08 ƒ
MP(RS) received
3 Shri Fali S. Nariman, II/2002-03 ƒ Eligible MPR ƒ II/2001-02 released on
Ex. MP (RS) I&II/2003- ƒ UC 2001-02 & 2002-03, 02-07-2008
Nodal District: MCD 04 2003-04, 2004-05, 2005- ƒ I/2002-03 released on 18-
I&II/2004- 06, 2006-07 & 2007-08 07-2008
05 received.
I/2005-06
Release Status
GOA

LOK SABHA

S. No CONSTITUENCY NAME OF MP Instalment Document required


(Nodal dist.) to be for release of next
released instalment
4. MORMUGAO Shri Alenmao Churchil All released -
(South Goa) Braz, EX MP
Shri Francisco
Sardinha
5. PANAJI Shri Shripad Yesso Naik II/2007-08 Eligible MPR
( North Goa) I/08-09
II/08-09 UC 2006-07 recd.

AC 2005-06 recd.
More than one bank
a/c. ATR to be
obtained from the
district authority

RAJYA SABHA

S. No. Name of the MP Nodal District Instalments to Documents required


be released for release of next
instalment
1 Shri Shanta Ram Naik South Goa II/07-08 Eligible MPR
I/08-09 UC 2006-07
II/08-09 AC2005-06
Gujarat

Statement showing the documents required for the release of next instalment
under MPLADS as on 31.12.2008

Lok Sabha

Sl. Name of the Instalment to Documents required to be furnished by


No. Constituency be released the DM for the release of next instalment
1 Ahmedabad -- UC 2007-08

2 Amreli II/2007-08 MPR


I/2008-09 ATR on AC 2004-05, 2005-06 & 2006-07
II/2008-09
3 Anand II/2008-09 MPR
AC 2006-07.
4 Banaskantha I/2008-09 AC 05-06
II/2008-09
5 Vadodara II/2008-09 MPR
ATR on AC 2006-07
6 Bhavnagar II/2007-08 MPR
I/2008-09
II/2008-09

7 Bharuch II/2008-09 MPR

8 Bulsar II/2008-09 MPR

9 Chhotaudepur II/2008-09 MPR


ATR on AC 2006-07
10 Dhandhuka II/2008-09 MPR
UC 2007-08
11 Dahod I/2008-09 MPR
II/2008-09 ATR on AC 2005-06 & 2006-07

12 Gandhinagar II/2007-08 MPR


I/2008-09 UC 2006-07
II/2008-09

13 Godhra II/2008-09 MPR

14 Jamnagar II/2008-09 MPR


UC 2007-08
AC 2006-07
15 Junagadh II/2008-09 MPR
16 Kheda II/2008-09 MPR
UC 2007-08
AC 06-07

17 Kapadvanj II/2008-09 MPR


UC 2007-08
AC 2006-07
18 Kachchh II/2008-09 MPR
AC 2006-07
19 Mandvi II/2008-09 MPR
UC 2007-08
AC 2006-07
20 Mehsana I/2008-09 UC 2006-07
II/2008-09 AC 2005-06

21 Patan II/2008-09 UC 2007-08

22 Porbandar II/2007-08 MPR


I/2008-09 UC 2006-07
II/2008-09

23 Rajkot -- --
24 Sabarkantha II/2008-09 MPR
UC 2007-08
AC 2006-07
25 Surat I/2008-09 UC 2006-07
II/2008-09
26 Surendranagar -- --
Rajya Sabha

Sl. Name of the Rajya Sabha MP Instalment Documents required to be


No. to be furnished by the DM for the
released release of next instalment
1 Sh. Ahmed Patel II/2007-08 MPR
I&II/2008-09

2 Prof. Alkaben Balarambhai II/2005-06 MPR


Kshatriya I&II/2006-07 UC 2004-05
I&II/2007-08 AC 2003-04
I&II/2008-09

3 Sh. Arun Maharajkishan Jaitley II/2007-08 MPR


I&II/2008-09 AC 2005-06
4 Sh. Suryakant Krupashankar II/2007-08 MPR
Acharya I&II/2008-09

5 Sh. Surendra M. Patel II/2008-09 MPR

6 Sh. Kanjibhai Maganbhai Patel II/2008-09 MPR


UC 2007-08

7 Sh. Pravinchandra Somabhai II/2008-09 MPR


Rashtrapal UC 2007-08
8 Sh. Vijaykumar Ramniklal Rupani II/2007-08 MPR
I&II/2008-09 UC 2006-07

9 Sh. Natuji Halaji Thakor II/2008-09 MPR

10 Sh. Parshottam Khodabhai II/2008-09 MPR


Rupala

11 Sh. Bharatsinh Prabhatsinh II/2008-09 MPR


Parmar

MPR - Monthly Progress Report showing unsanctioned balance less than Rs.50 lakh and
unspent balance less than Rs.100 lakh.
UC - Utilisation Certificate (as at Annex – VIII of the Guidelines)
AC - Audit Certificate (as at Annex – IX of the Guidelines)
ATR- Action Taken Report
Release Status
HARYANA
LOK SABHA
S. No CONSTITUENCY NAME OF MP Instalment Document
to be required for
released release of next
instalment
1. BHIWANI Sh. Kuldeep Bishnoi (N) II/08-09 Eligible MPR
and UC-07-08
2. FARIDABAD Sh. Avtar Singh Bhadana (N) All released -

3. HISAR Sh. Jai Prakash (N) All released -


4. KARNAL Sh. Arvind Kumar Sharma(N) All released -
5. KURUKSHETRA Sh. Naveen Jindal (N) All released -
6. MAHENDRAGARH Sh. Inderjeet Singh Rao (N) All released -
7. ROHTAK Sh. Deepender Singh Hooda (N) All released -
8. SIRSA Sh. Atma Singh Gill (N) II/08-09 Eligible MPR, AC-
06-07
UC-07-08
9. SONIPAT Sh. Kishan Singh Sangwan (R) All released -
10. AMBALA) Smt. Kumari Selja (N) II/07-08 Audit objection in
I/08-09 AC- 05-06.
II/08-09 Release of II/07-
08 being
processed.

RAJYA SABHA
S. No MP Name NODAL Instalment Document required for
DISTRICT to be release of next instalment
released
1. SH. AJAY SINGH CHAUTALA Sirsa II/07-08 Eligible MPR
I/08-09 and AC-05-06
II/08-09
2. DR. RAM PRAKASH Kurukshetra II/08-09 Eligible MPR and AC-06-07
3. SH. TRALOCHAN SINGH Kaithal II/08-09 Eligible MPR
AC-06-07
UC-07-08
4. SH. HANS RAJ BHARDWAJ Rohtak II/07-08 Eligible MPR
I/08-09 UC-06-07
II/08-09 AC-Not required
5. Sh. ISHWAR SINGH Kurukshetra II/08-09 Eligible MPR
Release Status
HIMACHAL PRADESH
LOK SABHA

S. No CONSTITUENCY NAME OF MP Instalment to Document required for


be released release of next
instalment
6. HAMIRPUR ANURAG THAKUR All released -
L-08/01/04-MPLADS
7. KANGRA PROF. CHANDER II/08-09 Eligible MPR
L-08/01/04-MPLADS KUMAR AC-06-07
UC-07-08
8. MANDI SMT. PRATIBHA SINGH II/08-09 Eligible MPR
L-08/01/04-MPLADS AC-06-07
UC-07-08
4. SHIMLA SHRI (COL.) DHANI II/08-09 Eligible MPR
L-08/01/04-MPLADS RAM SHANDIL AC-05-06
UC-07-08 recd.

RAJYA SABHA

S. No MP Name NODAL DISTRICT Instalment to Documents required for


be released release of next instalment
1 SH. ANAND SHARMA Shimla II/07-08 Eligible MPR
I/08-09 UC-06-07 recd.
II/08-09 AC-05-06 recd.
2 SMT. VIPLOVE THAKUR Kangra II/08-09 Eligible MPR
AC-06-07
UC-07-08
3 SHRI SHANTA KUMAR Kangra II/08-09 Eligible MPR
Release Status
J&K
LOK SABHA
S. No CONSTITUENCY NAME OF MP Instalment Document
to be required for
released release of next
instalment
11. BARAMULLAH Shri Abdul Rashid I&II/95-96 Eligible MPR
Shaheen II/08-09 AC-06-07 recd.
UC-07-08
12. SRINAGAR Shri Omar Abdullah I/08-09 Release of I/08-
II/08-09 09 is under
process.
13. ANANTNAG Ms. Mehbooba Mufti II/07-08 Eligible MPR
I/08-09 AC-05-06 recd.
II/08-09 UC-06-07
14. LADAKH Shri Thupstan I/07-08 II/06-07 released
Chhewang II/07-08 on the condition
I/08-09 of submission of
II/08-09 AC/2004-05
15. JAMMU Shri Madan Lal Sharma II/08-09 (a) Eligible MPR
(b) UC-07-08
(c) AC- 06-07
16. UDHAMPUR Shri Lal Singh II/06-07 Eligible MPR
I/07-08 AC-06-07 recd.
II/07-08 UC-07-08 recd.
I/08-09
II/08-09

RAJYA SABHA
S. No MP Name NODAL Instalment Document required for
DISTRICT to be release of next
released instalment
6. SHRI CHOWDHARY Poonch I/08-09 Release of I/08-09 is
MOHAMMED ASLAM under process.
7. SHRI FAROOQ ABDULLAH Srinagar I/07-08 UC-05-06 (revised).
II/07-08 II/06-07 was released on
I/08-09 relaxation of revised
UC 2005-06
8. SHRI SAIF-UD-DIN SOZ Baramullah I/08-09 UC/2006-07
AC/2005-06
II/07-08 released on
2.1.09 (on condition of
UC & AC)
9. SHRI TARLOK SINGH BAJWA Jammu Total enlt. -
released
Ex. MP(RS)
S. No MP Name NODAL Tenure Instalment Document required for
DISTRICT to be release of next
released instalment
1. SHRI GULAM Doda 30.11.2002- II/2003-04 Eligible MPR
NABI AZAD 29.04.2006 released on UC 2002-03
relaxation AC 2001-02
I&II/2004-05
I&II/2005-06
JHARKHAND

Statement showing the documents required for the release of next instalment
under MPLADS as on 31.12.2008

Lok Sabha

Sl. Name of the Instalment to Documents required to be furnished by


No. Constituency be released the DM for the release of next instalment
1 Chatra II/2008-09 Eligible MPR
UC 2007-08
2 Dhanbad II/2008-09 MPR

3 Dumka II/2007-08 MPR


I/2008-09
II/2008-09

4 Giridih II/2007-08 MPR


I/2008-09
II/2008-09
5 Godda -- UC 2007-08

6 Hazaribagh II/2008-09 MPR


AC 2006-07
7 Jamshedpur -- UC 2007-08

8 Khunti -- UC 2007-08

9 Kodarma II/2007-08 MPR


I/2008-09
II/2008-09

10 Lohardaga --

11 Palamu II/2008-09 MPR


AC 2006-07
UC 2007-08
12 Rajmahal II/2008-09 MPR

13 Ranchi -- UC 2007-08

14 Singhbhum -- UC 2007-08
Rajya Sabha

Sl. Name of the Rajya Instalment to Documents required to be


No. Sabha MP be released furnished by the DM for the release
of next instalment
1 Digvijay Singh II/2007-08 MPR
I&I/2008-09 UC 2006-07
AC 2005-06
2 Ms. Mabel Rebello II/2007-08 Eligible MPR
I&II/2008-09 UC 2006-07

3 S.S. Ahluwalia II/2003-04 MPR


I&II/2004-05
I&II/2005-06
I&II/2006-07
I&II/2007-08
I&II/2008-09
4 Yashwant Sinha II/2007-08 MPR
I/2008-09
II/2008-09
5 Jai Prakash Narayan II/2008-09 MPR
Singh
6 Parimal Nathwani II/2008-09 MPR

MPR - Monthly Progress Report showing unsanctioned balance less than Rs.50 lakh and
unspent balance less than Rs.100 lakh.
UC - Utilisation Certificate (as at Annex – VIII of the Guidelines)
AC - Audit Certificate (as at Annex – IX of the Guidelines)
ATN- Action Taken Notes
MPLADS-Lok Sabha Constituencies of Karnataka-
Status of Pending Instalments
Sl. Member of Parliament/ Due Documents required for
No. Nodal District installment the release of next instalment.

1. Bagalkot II/2008-09 ♣ MPR


Shri Gaddigoudar Parvata
Gouda

2. Bangalore North II/2008-09 ♣ Being released


Dr. H.T. Sangliana

3. Bangalore South II/2006-07 ♣ MPR


Shri Ananth Kumar

4. Belgaum I/2008-09 ♣ Being relesed


Shri Suresh Angadi
Chanabasappa

5. Bellary I/2007-08 ♣ ATN on AC 2004-05


Shri G. Karunakara Reddy

6. Bidar II/2006-07 ♣ MPR


Shri H. Narsingrao ♣ UC 2005-06
Suryawanshi ♣ AC 2004-05
7. Bijapur II/2008-09 ♣ MPR
Shri Basangouda R. Patil ♣ UC 2007-08

8. Chamarajanagar II/2008-09 ♣ MPR


Shri M. Shivanna

9. Chikkodi II/2008-09 ♣ MPR


Shri Ramesh Chandrappa ♣ UC 2007-08

10. Chikmagalur ♣ MPR


Shri D.C. Srikantapa II/2008-09 ♣ UC 2007-08
♣ AC 2006-07
11. Dharwad North II/2007-08 ♣ MPR
Shri Prahlad Joshi ♣ UC 2006-07

12. Dharwad South II/2007-08 ♣ MPR


Shri Manjunath Channappa

13. Gulbarga II/2007-08 ♣ MPR


Shri Iqbal Ahmed Saradgi ♣ UC 2006-07

14. Hassan II/2007-08 ♣ MPR


Shri H.D. Deve Gowda

15. Kanakapura I/2008-09 ♣ UC 2006-07


Shri Tejashwini See ♣ AC 2005-06
Ramesh

16. Kanara II/2008-09 ♣ MPR


Shri Ananthkumar Hegde ♣ UC 2007-08
♣ AC 2006-07

17. Kolar II/2008-09 ♣ MPR


Shri K.H. Muniyappa ♣ AC 2006-07

18. Mandya II/2005-06 ♣ UC 2004-05


Note:-

MPR fulfilling conditions : Monthly Progress Report reflecting unsanctioned


balance less than Rs.50 lakh & unspent balance less
than Rs.1 crore.
UC : Utilisation Certificate
AC : Audit Certificate
ATN : Action Taken Note on the audit observations and
objections in the respective audit certificate which are
against the MPLADS guidelines.

MPLADS –Rajya Sabha MPs of Karnataka-


Status of Pending Instalments

Sl. Member of Parliament/ Due installment Documents required for


No. Nodal District the release of next
instalment.

1. Shri K. Rahman Khan II/2008-09 ♣ MPR


Nodal District: Bangalore Urban ♣ AC 2006-07

2. Dr. Vijay Mallya I/2007-08 ♣ Being released


Nodal District: Bangalore Urban

3. Shri M. Venkaiah Naidu ♣ MPR


Nodal District: Bangalore Urban II/2007-08 ♣ AC 2005-06

4. Dr. M.A.M. Ramaswamy I/2008-09 ♣ AC 2005-06


Nodal District: Bangalore Urban

5. Shri B.K. Hariprasad II/2008-09 ♣ MPR


Nodal District: Bangalore Urban

6. Shri Oscar Fernandes II/2006-07 ♣ MPR


Nodal District: Udupi

7. Shri K.B. Shanappa II/2008-09 ♣ MPR


Nodal District: Gulbarga ♣ UC 2007-08
♣ AC 2005-06

8. Shri Rajeev Chandrasekhar II/2008-09 ♣ MPR


Nodal District: Bangalore Urban ♣ AC 2006-07

9. Shri S.M.Krishna I/2008-09 ♣ District not opted


Nodal District:

10. Shri Kore Prabhakara I/2008-09 ♣ District not opted


Nodal District:

11. Shri M.Rama Jois II/2008-09 ♣ Being released


Nodal District:Bangalore Urban

12. Dr. K. Kasturirangan II/2007-08 ♣ MPR


Bangalore Urban

MPLADS-Lok Sabha Constituencies of Kerala-


Status of Pending Instalments
Sl. Member of Parliament/ Due Documents required for
No Name of Constituency/ installment the release of next instalment.
. Nodal District

1 Shri Chengara Surendran


II/2008-09 Š MPR fulfilling conditions
Adoor Constituency Š UC 2007-08
Š AC 2006-07
Nodal District: Kollam

2 Dr. K.S. Manoj


I/2007-08 Š Released on Relaxation
Alappuzha Constituency Š AC 2004-05

Nodal District: Alappuzha

3 Adv. P. Satheedevi
II/2007-08 Š MPR fulfilling conditions
Vatakara Constituency

Nodal District: Kozhikode

4 Shri M.P. Veerendra Kumar


II/2006-07 Š MPR fulfilling conditions
Kozhikode Constituency Š UC 2005-06
Š AC 2004-05
Nodal District: Kozhikode

5 Shri A.P. Abdullakutty


II/2007-08 Š MPR fulfilling conditions
Kannur Constituency Š UC 2006-07
Š AC 2005-06
Nodal District: Kannur

6 Shri Varkala Radhakrishnan


I/2006-07 Š Released on Relaxation
Chirayinkil Constituency Š ATN on AC 2003-04

Nodal District: Trivandrum

7 Dr. Sebastian Paul


II/2006-07 Š MPR fulfilling conditions
Ernakulam Constituency

Nodal District: Ernakulam

8 Shri K. Francis George


II/2006-07 Š MPR fulfilling conditions
Idukki Constituency Š ATN on AC 2004-05

Nodal District: Idukki

9 Shri P. Karunakaran
I/2007-08 Š .ATN on AC 2004-05
Kasaragod Constituency

Nodal District: Kasargod


Note:-

MPR fulfilling conditions : Monthly Progress Report reflecting unsanctioned


balance less than Rs.50 lakh & unspent balance less
than Rs.1 crore.
UC : Utilisation Certificate
AC : Audit Certificate
ATN : Action Taken Note on the audit observations and
objections in the respective audit certificate which are
against the MPLADS guidelines.

MPLADS –Rajya Sabha MPs of Kerala-


Status of Pending Instalments
Sl. Member of Parliament/ Due Documents required for
No Nodal District installment & the release of next instalment.
.
1. Shri P.V.V Abdul Wahab Š MPR fulfilling conditions
II/2007-08 Š UC 2006-07
Nodal District: Malappuram

2. Shri A. Vijaya Raghavan II/2006-07 Š MPR fulfilling conditions


Š AC 2004-05
Nodal District: Malappuram

3. Shri. T. Balakrishna Pillai II/2005-06 Š MPR fulfilling conditions


Š ATN on AC 2003-04
Nodal District: Trivandrum

4. Shri K. Chandran Pillai I/2006-07 Š UC 2004-05


Š AC 2003-04
Nodal District: Ernakulam

5. Shri P.J. Kurian II/2008-09 Š MPR fulfilling conditions


Š UC 2007-08
Nodal District: Pathanamthita

6. Shri Vayalar Ravi I/2006-07 Š MPR fulfilling conditions


Š AC 2003-04
Nodal District: Alappuzha

7. Shri A.K. Antony II/2007-08 Š MPR fulfilling conditions


Š AC 2005-06
Nodal District: Alappuzha

8. Shri P.R. Rajan II/2007-08 Š MPR fulfilling conditions


Š UC 2006-07
Nodal District: Thrissur

9. Shri K.E. Ismail II/2007-08 Š MPR fulfilling conditions


Š UC 2006-07
Nodal District: Palakkad

Former MPs (RS)

1. Late Shri K.Ahmmed Haji Š UC 2002-03


I/2003-04 Š AC 2001-02
Nodal District: Malappuram (Rs 1 crore)

2. Shri N.K. Premachandran Š UC 2004-05


II/2005-06 Š AC 2003-04
Nodal District: Kollam (Rs 1 crore)

Note:-

MPR fulfilling conditions : Monthly Progress Report reflecting unsanctioned


balance less than Rs.50 lakh & unspent balance less
than Rs.1 crore.
UC : Utilisation Certificate
AC : Audit Certificate
ATN : Action Taken Note on the audit observations and
objections in the respective audit certificate which are
against the MPLADS guidelines.
Release status
MEMBERS OF PARLIAMENT (LOK SABHA)
MADHYA PRADESH

S. CONSTITUEN NAME OF MP Installm Documents required for Remarks


No CY ent release of next
yet to installment
be
released
1 Balaghat Sh. GAURI II/2008- Eligible MPR I/08-09 released on
L/12/01/04 SHANKAR 09 UC-2007-08 22.07.2008.
CHATURBHUJ AC-2006-07
BISEN
2 BATUL SH HEMANT II/2008- Eligible MPR I/08-09 released on
L/12/03/04 KUMAR 09 UC-2007-08 5.6.07
AC-2006-07

3 BHIND DR. RAMLAKHAN II/07-08 Eligible MPR I/07-08 released on


L/12/04/04 SINGH I/2008- AC-04-05 recd. 16.07.2008.
09 UC-05-06 received.
II/2008- Letter dated 28.5.2008.
09
4 BHOPAL Sh. KAILASH II/2008- Eligible MPR I/08-09 released on
L/12/05/04 JOSHI 09 UC-2007-08 24.04.2008.
AC-2006-07

5 CHINDWARA Sh KAMALNATH II/2008- Eligible MPR I/08-09 released on


L/12/07/04 09 UC-2007-08 16.09.2008.
AC-2006-07
6 DAMOHA Sh II/08-09 released on
(L/12/08/04) CHANDRABHAN 14.10.2008.
BHAIYA
7 DHAR Sh CHHATAR - - II/08-09 released on
SINGH DARBAR 07.01.2009.
L/12/09/04

8 GUNA Sh II/08-09 Eligible MPR. UC 2006- I/08-09 released on


JYOTIRADITYA 07 15.12.2008.
L/12/11/04 MADHAVRAO AC-2006-07
SCINDIA UC-2007-08

9 GWALIOR SMT. II/07-08 Eligible MPR 1/2007-08 processed on


L/12/12/04 YOSHODHARA 1/2008- AC-05-06 recd. 27.6.2008.
RAJE SCHINDIA 09 AC/UC 06-07 recd.
II/2008-
09

1 HOSHANGAB Sh SARTAJ II/2008- Eligible MPR 1/08-09 released on


AD SINGH 09 UC-2007-08 11.12.2008.
L/12/13/04 AC-2006-07

1 INDORE Smt. SUMITRA - - I1/08-09 released on


MAHAJAN 22.09.2008.
(L/12/14/04)
1 JABALPUR Sh RAKESH II/2008- Eligible MPR 1/2008-09 released on
SINGH 09 UC-2007-08 11.9.2008
L/12/15/04 AC-2006-07

1 JHABUA (ST) Sh KANTILAL II/07-08 UC-06-07 1/07-08 released on


BHURIA 1/2008- AC-05-06 20.12.2007
L/12/17/04 09 Eligible MPR – letter
II/2008- dated 4.6.2008.
09
1 KHAJURAHO DR. RAMKRISHNA II/2008- Eligible MPR 1/08-09 released on
KUSHMARIYA " 09 UC-2007-08 24.4.2008.
L/12/19/04 BABA JEE " AC-2006-07

1 KHANDWA Sh NAND KUMAR II/08-09 released on


SINGH 11.12.2008.
L/12/20/04 CHAUHAN (
NANDU BHAIYA)
1 KHARGONE Sh ARUN YADAV II/2008- Letter dated 3.11.2008 1/2008-09 released on
09 on audit observation i.e 19.06.08.
L/12/21/04 more than one account
are being operated.
1 MANDLA (ST) Sh FAGGAN II/08-09 released on
SINGH KULASTE 11.12.2008.
L/12/23/04
1 MANDSAUR DR II/2008- Eligible MPR I/08-09 released on
LAXMINARAYAN 09 UC-2007-08 24.04.2008.
(L/12/24/04) PANDEYA AC-2006-07

1 MORENA Sh ASHOK II/2008- Eligible MPR I/08-09 released on


(SC) CHHAVIRAM 09 UC-2007-08 5.06.08.
ARGAL AC-2006-07
L/12/25/04s
2 RAJGARH Sh LAKSHMAN II/2008- Eligible MPR I/08-09 released on 16-
L/12/28/04 SINGH 09 UC-2007-08 06-08.
AC-2006-07

2 REWA Sh - - I/08-09 released on


CHANDRAMANI 24.04.2008.
L/12/30/04 TRIPATHI
2 SAGAR (SC) Sh VIRENDRA II/08-09 released on
L/12/31/04 KUMAR 20.11.2008.
2 SATNA Sh GANESH II/08-09 released on
L/12/33/04 SINGH 03.12.2008.
2 SEONI Smt. NEETA II/08-09 released on
L/12/34/04 PATERIYA 18.09.2008.

2 SHAHDOL Sh DALPAT II/08-09 released on


(ST) SINGH PARASTE 19.11.2008.

L/12/35/04
2 SHAJAPUR Sh II/08-09 released on
(SC) THAWARCHAND 11.12.2008.
GEHLOT
L/12/36/04
2 SIDHI (ST) SH. MANIK II/07-08 Eligible MPR I/07-08 released on
SINGH 1/2008- UC 2006-07. 28.5.2008.
L/12/37/04 09 AC-2005-06 recd.
II/2008-
09
2 UJJAIN (SC) DR. II/08-09 released on
SATYANARAYAN 13.01.2009.
L/12/39/04 JATIYA
2 VIDISHA SH RAMPAL II/2008- Eligible MPR I/08-09 released on
L/12/40/04 SINGH 09 UC-2007-08 02.05.08.
AC-2006-07

MEMBERS OF PARLIAMENT (Rajya SABHA)


MADHYA PRADESH
NEXT INSTALMENT OF MPLADS KLFUNDS NOT RELEASED
DUE TO NON RECEIPT OF ELIGIBLE MPR, US AND AC

S. MP Name NODAL Installment Document Remarks


No DISTRICT not required for
released release of
next
installment
1. SH ARJUN SINGH BHOPAL II/2008-09 Eligible MPR I/08-09 released
R/12/01/04 UC-2007-08 on 24.04.2008.
AC-2006-07
2. SMT. MAYA SINGH GWALIOR II/2008-09 Eligible MPR I/08-09 released
(R/12/06/04) UC-2007-08 on
AC-2006-07 07.08.2008.Re-
elected for the
next term.
3. SH.VIKRAM VERMA DHAR II/08-09 released
R/12/10/04 on 11.12.2008.
4. SH PYARE LAL CHINDWARA II/08-09 released
KHANDELWAL on 18.12.2008.
R/12/11/04
5. SH NARAYAN INDORE - - II/08-09 released
SINGH KESHRI on 25.09.2008.
R/12/12/04
6. SH LAXMI BHOPAL - - II/08-09 released
NARAYAN SHARMA on 12.06.2008.
R/12/13/04 Died on 18 Oct
2008.
7. SU THIRU GWALIOR II/2008-09 Eligible MPR 1/2008-09
NAVUKKARSAR UC-2007-08 released on
R/12/14/04 AC-2006-07 19.06.2008
8. SMT SHUSHMA BHOPAL II/2008-09 Eligible MPR I/08-09 released
SWARAJ UC-2007-08 on 19.11.2008.
R/12/02/06 AC-2006-07
9. SUSRI ANUSUYA CHHINDWARA - . II/08-09 released
ULIKE on 25.04.2008.
R/12/01/06
10. SHRI PRABHAT JHA GWALIOR II/2008-09 Eligible MPR 1/2008-09
UC-2007-08 released on
AC-2006-07 29.07.2008.
11. SHRI BHOPAL I1/08-09 released
RAGHUNANDAN on 11.12.2008.
SHARMA
Details of required documents for release of next due installments or
MPLAD funds in respect of Lok Sabha Constituencies and Rajya Sabha MPs
of Maharashtra.

Maharashtra-Lok Sabha

S. No. Name of Instalment Documents Remarks


constituency due for for release of
release next due
instalment
1 Ahmednagar II/2008-09 MPR,UC 2007-
08,AC 2006-07
2 Akola II/2008-09 MPR, UC 2007-
08, AC 2006-07
3 Amravati II/2008-09 MPR, UC 2007-
08,AC 2006-07
4 Aurangabad II/2008-09 MPR, UC 2007-
08, AC 2006-07
5 Baramati II/2008-09 MPR, UC 2007-
08,AC 2006-07
6 Bhandara I/2008-09 ATR
7 Beed II/2006-07 MPR only
8 Mumbai North II/2007-08 MPR, UC 2006-
07, AC 2005-06
9 Mumbai North I/2008-09 ATR
Central
10 Mumbai North II/2007-08 MPR, UC 2006-
East 07, AC 2005-06
11 Mumbai North II/2008-09 Instalment
West released
12 Mumbai South I/2008-09 ATR
13 Mumbai South II/2008-09 Instalment
Central released
14 Buldhana II/2007-08 MPR, UC 2006-
07,AC 2005-06
15 Chandrapur II/2008-09 MPR, UC 2007-
08, AC 2006-07
16 Chimur II/2008-09 Instalment
released
17 Dahanu II/2008-09 MPR, UC 2007-
08,AC 2006-07
18 Dhule II/2008-09 MPR,UC 2007-
08, AC 2006-07
19 Erandol II/2007-08 MPR, UC 2006-
07
20 Hingoli II/2008-09 MPR, UC 2007-
08, AC 2006-07
21 Ichalkaranji I/2008-09 AC for 2005-06
22 Jalgaon I/2008-09 ATR
23 Jalna II/2007-08 MPR, UC 2006-
07, AC 2005-06
24 Karad II/2008-09 MPR, UC 2007-
08, AC 2006-07
25 Khed II/2007-08 MPR,UC 2006-
07
26 Kulaba I/2007-08 ATR
27 Kolhapur II/2008-09 AC for 2005-06
28 Kopargaon II/2008-09 MPR,UC 2007-
08,AC 2006-07
29 Latur II/2008-09 MPR, UC 2007-
08, AC 2006-07
30 Malegaon II/2007-08 MPR, UC 2006-
07,AC 2005-06
31 Nagpur I/2004-05 ATR
32 Nanded II/2008-09 Instalment
released
33 Nandurbar II/2008-09 MPR, UC 2007-
08,AC 2006-07
34 Nashik II/2007-08 MPR, UC 2006-
07, AC 2005-06
35 Osmanabad II/2008-09 MPR,AC 2006-
07
36 Pandharpur II/2007-08 MPR,UC 2006-
07, AC 2005-06
37 Parbhani II/2008-09 Instalment
released
38 Pune II/2006-07 MPR only
39 Rajapur II/2006-07 MPR,UC 2005-
06,AC 2004-05
40 Ramtek II/2005-06 & MPR, UC 2006-
II/2007-08 07, AC 2005-06
41 Ratnagiri II/2008-09 Instalment
released
42 Sangli II/2008-09 MPR, UC 2007- II/2007-08 and
08,AC 2006-07 I/2008-09 being
relased
43 Satara II/2007-08 MPR, UC 2006-
07, AC 2005-06
44 Solapur II/2006-07 MPR,UC 2005-
06.AC 2004-05
45 Thane II/2008-09 MPR, UC 2007-
08, AC 2006-07
46 Wardha II/2008-09 MPR, UC 2007-
08, AC 2006-07
47 Washim II/2008-09 MPR, UC 2007-
08,AC 2006-07
48 Yavatmal II/2008-09 MPR, UC 2007-
08,AC 2006-07
Rajya Sabha

S. No. Name of Rajya Instalment Documents for Remarks


Sabha due for release of next
MP(S/Shri/Smt) release due
instalment
1 Balwant Apte II/2007-08 MPR, UC 2006-
07
2 Manohar Joshi II/2008-09 Instalment
released
3 Murli Deora I/2008-09 UC for 2006-07
and ATR
4 Praful Patel II/2006-07 MPR, UC 2005-
06
5 Rahul Bajaj II/2007-08 MPR,UC 2006-07
6 Rajeev Shukla II/2007-08 MPR,UC 2006-07
7 Rajkumar Dhoot II/2008-09 MPR, UC 2007-
08,AC 2006-07
8 Sanjay Raut II/2008-09 MPR, UC 2007-
08, AC 2006-07
9 Sharad Joshi II/2008-09 MPR,UC 2007-
08,AC 2006-07
10 Shivraj Patil II/2007-08 MPR only
11 Supriya Sule II/2007-08 MPR, UC 2006-
07
12 Sushilkumar Shinde II/2007-08 MPR, UC 2006-07
13 Tariq Anwar I/2008-09 ATR
14 Prithviraj Chavan II/2007-08 MPR, UC 2006-
07
15 Vijay Darda II/2006-07 MPR only
16 Bharatkumar Raut II/2008-09 Instalment
released
17 Janardhan II/2008-09 MPR only MP elected from
Waghmare 3/4/2008.
18 Prakash Javadekar II/2008-09 MPR only MP elected from
3/4/2008
19 Yogendra Trivedi II/2008-09 Instalment
released
Manipur

Statement showing the documents required for the release of next instalment
under MPLADS as on 31.12.2008

Lok Sabha

Sl. Name of the Instalment to Documents required to be furnished by


No. Constituency be released the DM for the release of next instalment
1 Inner Manipur -- --

2 Outer Manipur -- --

Rajya Sabha

Sl. Name of the Rajya Sabha MP Instalment Documents required to be


No. to be furnished by the DM for the
released release of next instalment
1 Rishang Keishing -- --

MPR - Monthly Progress Report showing unsanctioned balance less than Rs.50 lakh and
unspent balance less than Rs.100 lakh.
UC - Utilisation Certificate (as at Annex – VIII of the Guidelines)
AC - Audit Certificate (as at Annex – IX of the Guidelines)
ATR- Action Taken Report
Meghalaya

Statement showing the documents required for the release of next instalment
under MPLADS as on 31.12.2008

Lok Sabha

Sl. Name of the Instalment to Documents required to be furnished by


No. Constituency be released the DM for the release of next instalment
1 Shillong -- --

2 Tura II/2008-09 MPR


UC 2007-08
AC 2006-07

Rajya Sabha

Sl. Name of the Rajya Sabha MP Instalment Documents required to be


No. to be furnished by the DM for the
released release of next instalment
1 Shri Thomas A. Sangma II/2008-09 MPR

MPR - Monthly Progress Report showing unsanctioned balance less than Rs.50 lakh and
unspent balance less than Rs.100 lakh.
UC - Utilisation Certificate (as at Annex – VIII of the Guidelines)
AC - Audit Certificate (as at Annex – IX of the Guidelines)
ATR- Action Taken Report
Mizoram

Statement showing the documents required for the release of next instalment
under MPLADS as on 31.12.2008

Lok Sabha

Sl. Name of the Instalment to Documents required to be furnished by


No. Constituency be released the DM for the release of next instalment
1 Mizoram -- --

Rajya Sabha

Sl. Name of the Rajya Sabha MP Instalment Documents required to be


No. to be furnished by the DM for the
released release of next instalment
1 Shri Lalhming Liana II/2008-09 MPR

MPR - Monthly Progress Report showing unsanctioned balance less than Rs.50 lakh and
unspent balance less than Rs.100 lakh.
UC - Utilisation Certificate (as at Annex – VIII of the Guidelines)
AC - Audit Certificate (as at Annex – IX of the Guidelines)
ATR- Action Taken Report
Nagaland

Statement showing the documents required for the release of next instalment
under MPLADS as on 31.12.2008

Lok Sabha

Sl. Name of the Instalment to Documents required to be furnished by


No. Constituency be released the DM for the release of next instalment
1 Nagaland 2008-09 AC 2006-07

Rajya Sabha

Sl. Name of the Rajya Sabha MP Instalment Documents required to be


No. to be furnished by the DM for the
released release of next instalment
1 Shri Khekiho Zhimomi II/2008-09 MPR

MPR - Monthly Progress Report showing unsanctioned balance less than Rs.50 lakh and
unspent balance less than Rs.100 lakh.
UC - Utilisation Certificate (as at Annex – VIII of the Guidelines)
AC - Audit Certificate (as at Annex – IX of the Guidelines)
ATR- Action Taken Report
ORISSA Lok Sabha
S.No. Name of Installment Documents Remarks
constituency to be released for release of
next due
installment
1 Aska II/2007-08 MPR only
2 Balasore II/2008-09 MPR, UC 2007-
08,AC 2006-07
3 Berhampur II/2008-09 MPR, UC 2007-
08,AC 2006-07
4 Bhadrak II/2008-09 Instalment
released
5 Bhubaneshwar II/2008-09 Instalment
released
6 Bolangir II/2008-09 MPR, UC 2007-
08, AC 2006-07
7 Cuttack II/2008-09 Instalment
released
8 Deogarh II/2008-09 MPR, UC 2007-
08, AC 2006-07
9 Dhenkanal II/2008-09 Instalment
released
10 Jagatsinghpur II/2008-09 Instalment
released
11 Jajpur I/2008-09 ATR
12 Kalahandi II/2008-09 Instalment
released
13 Kendrapara II/2008-09 Instalment
released
14 Keonjhar II/2008-09 Instalment
released
15 Koraput II/2008-09 Instalment
released
16 Mayurbhanj II/2008-09 MPR, UC 2007-
08,AC 2006-07
17 Nowrangpur II/2008-09 Instalment
released
18 Phulbani II/2008-09 Instalment
released
19 Puri II/2008-09 Instalment
released
20 Sambalpur II/2008-09 Instalment
released
21 Sundargarh II/2008-09 MPR, UC 2007-
08, AC 2006-07

Rajya Sabha
S.No. Name of Rajya Instalment Documents Remarks
Sabha to be for release of
MP(S/Shri/Smt) released next due
instalment
1 Baijyant Panda II/2008-09 Instalment
released
2 Bhagirathi Majhi II/2008-09 Instalment
released
3 Balbir Punj II/2008-09 MPR only Newly elected
MP from 3-4-
2008.
4 Mangala Kisan II/2008-09 MPR only Newly elected
MP from 3-4-
2008
5 Pyarimohan II/2008-09 MPR, UC 2007-
Mohapatra 08, AC 2006-
07
6 Radhakant Nayak II/2007-08 MPR, UC 2006-
07, AC 2005-
06
7 Ramachandra II/2008-09 MPR only Newly elected
Khuntia MP from 3-4-
2008.
8 Renubala Pradhan II/2008-09 MPR only Newly elected
MP from 3-4-
2008
9 Rudra Narayan Pany II/2008-09 Instalment
released
10 Sushila Tiriya II/2008-09 MPR, UC 2007-
08, AC 2006-
07
Release Status
PUNJAB
LOK SABHA

S. CONSTITUENCY NAME OF MP instalment Document required


No not for release of next
released instalment
1. AMRITSAR Sh. Navjot Singh Sidhu (N) II/08-09 Eligible MPR
UC-07-08
AC-06-07
2. BATHINDA Smt. Parmjit Kaur Gulshan (N) All released -
3. FARIDKOT Sh. Sukhbhir Singh Badal (N) II/08-09 - AC 06-07
- UC 07-08
- Eligible MPR
4. FEROZEPUR Sh. Zora Singh Mann (R) All released -
5. GURDASPUR Sh. Vinod Khanna (R) II/08-09 - AC 06-07
- UC 07-08
- Eligible MPR
6. HOSHIARPUR Sh Avinash Rai Khanna (N) II/08-09 Release of II/08-09
under process
7. JALANDHAR Sh. Rana Gurjeet Singh (N) II/07-08 Eligible MPR
I/08-09 AC 05-06 recd. (more
II/08-09 than one a/c + Cash
Book + Eligible MPR
letter issued)
8. LUDHIANA Sh. Sharanjit Singh Dhillon (N) II/08-09 - AC 06-07
- UC 07-08
- Eligible MPR
9. PATIALA Smt. Preneet Kaur (R) II/08-09 Eligible MPR
AC-06-07
UC-07-08
10. PHILLAUR Sh. Charanjit Singh Atwal (N) II/07-08 (a) Eligible MPR
I/08-09 (b) AC-05-06 recd.
II/08-09 Letter issued for
more than one
account + Cash
Book + eligible MPR
11. ROPAR Sh. Sukhdev Singh Libra (N) II/08-09 Eligible MPR
UC-07-08
12. SANGRUR Sh. Sukhdev Singh Dhindsa (N) All released -

13. TARAN TARAN Dr. Rattan Singh Ajnala (N) II/08-09 - AC 06-07
- UC 07-08
- Eligible MPR
RAJYA SABHA

S. No MP Name NODAL MPLADS Document required for


DISTRICT Instalment release of next
not instalment
released
1. Smt. Ambika Soni Hoshiarpur II/08-09 - Eligible MPR

R/19/1/2004-MPLADS
2. Sh. Ashwani Kumar Gurdaspur II/2006-07 Eligible MPR
I/2007-08
II/2007-08
I/2008-09
II/2008-09
3. Sh. Dharam Pal Sabharwal Hoshiarpur II/2006-07 Eligible MPR.
I/2007-08 AC-2004-05
II/2007-08
I/08-09
II/08-09
4. Sh. M.S. Gill Tarn Taran II/08-09 - AC 06-07
- UC 07-08
- Eligible MPR
5. Sh. Raj Mohinder Singh Amritsar II/08-09 - AC 06-07
Majitha - UC 07-08
- Eligible MPR

6. Shri Naresh Gujral Gurdaspur II/08-09 Eligible MPR


(Smt. Sukhbans Kaur AC-06-07
Bhinder, Ex.MP)
RELEASE STATUS
MEMBERS OF PARLIAMENT (LOK SABHA)
RAJASTHAN

S. CONSTITU NAME OF MP Installment Documents Remarks


N ENCY yet to be required for
o released Release of next
installment
1. AJMER Prof. Rasa II/2008-09 Eligible MPR, I/2008-09 released
L/20/01/200 Singh Rawat AC-2006-07 on 26.05.2008
4 UC-2007-08
2. ALWAR Dr. Karan II/2008-09 released
L/20/02/200 Singh Yadav on 21.11.2008
4
3. BANSWARA Shri Dharm II/2008-09 Eligible MPR, I/2008-09 released
L/20/03/200 Singh Rawat AC-2006-07 on 29.05.2008
4 UC-2007-08
4. BARMER Shri II/08-09 released on
L/20/04/200 Manvendra 20.11.2008
4 Singh

5. BAYANA Shri Ram II/2008-09 released


L/20/05/200 Swroop Koli on 01.01.2009
4
6. BHARATPUR Shri II/2008-09 Eligible MPR, I/08-09 released on
L/20/06/200 Vishvendra AC-2006-07 26.05.2008
4 Singh UC-2007-08
7. BHILWARA Shri Vijendra II/08-09 released on
L/20/07/200 Pal Singh 07.01.2009
4
8. BIKANER Shri II/2008-09 released
L/20/08/200 Dhermendra on 18.11.2008
4
9. CHITTORGA Shri Shrichand II/2008-09 released
RH Kriplani on 30.10.2008
L/20/09/200
4
10 CHURU Shri Ram II/2008-09 released
L/20/10/200 Singh Kaswan on 21.11.2008 (Rx)
4
11 DAUSA Shri Sachin - II/2008-09 released
L/20/11/200 Pilot on 10.12.2008
4
12 GANGANAGA Shri Nihal II/2008-09 released
R Chand on 07.11.2008
L/20/12/200 Meghwal
4
13 JAIPUR Shri Girdhari II/2008-09 Eligible MPR, I/2008-09 released
L/20/13/200 Lal Bhargav AC-2006-07 on 04.08.2008
4 UC-2007-08
14 JALORE Smt. Susheela II/2008-09 Processed
L/20/14/200 Bangaru on 15.09.2008
4 Laxman
15. JHALAWAR Shri Dushyant I/2008-09 UC/AC are still II/2007-08 released
L/20/15/200 Singh II/2008-09 awaited on 26.02.2008
4
16. JHUNJHUNU Shri Sis Ram II/2008-09 released
L/20/16/200 Ola on 19.11.2008
4
17. JODHPUR Shri Jaswant II/2008-09 Eligible MPR, I/2008-09 released
L/20/17/200 Singh Bishnoi AC-2006-07 on 01.08.2008
4 UC-2007-08
18. KOTA Shri II/2008-09 released
L/20/18/200 Raghuveer on 09.01.2009
4 Singh Kaushal
19. NAGAUR Shri Bhanwar II/2007-08 UC/AC are still I/2007-08 released
L/20/19/200 Singh I/2008-09 awaited on 13.03.2008
4 Dangawas II/2008-09
20. PALI Shri Pushp Jain II/2008-09 I/2008-09 released
L/20/20/200 on 12.01.2009
4
21. SALUMBER Shri Mahavir II/2008-09 Eligible MPR, I/08-09 released on
L/20/21/200 Bhagora AC-2006-07 29.05.2008
4 UC-2007-08
22. SWAIMADH Shri Namo II/2008-09 Eligible MPR, I/08-09 released on
OPUR Narain Meena AC-2006-07 09.06.2008
L/20/22/200 UC-2007-08
4
23. SIKAR Shri Subhash - II/08-09 released on
L/20/23/200 Maharia 18.11.2008
4
24. TONK Shri Kailash II/2008-09 released
L/20/24/200 Megwal on 06.01.2009
4
25. UDAIPUR Smt. Kiran II/2008-09 Eligible MPR, I/2008-09 released
L/20/25/200 Maheshwari AC-2006-07 on 08.12.2008
4 UC-2007-08
MEMBERS OF PARLIAMENT (RAJYA SABHA)
RAJASTHAN
NEXT INSTALMENT OF MPLADS KLFUNDS NOT RELEASED
DUE TO NON RECEIPT OF ELIGIBLE MPR, UC AND AC
S. No MP Name NODAL Instalment Document required for Remarks
DISTRICT not release of next
released instalment
1. Smt. Najma Heptulla Jaipur II/2008-09 Eligible MPR, I/08-09 released on
R/20/01/2007 AC-2006-07 03.06.2008
UC-2007-08
2. Abhishekh Manu Jodhpur II/2007-08 UC(2006-07) &MPR are still I/2007-08 released on
Singh I/2008-09 awaited 26.12.2007
R/20/02/2004 II/2008-09
3. Dr.Gayan Prakesh Jaipur II/2007-08 Eligible MPR I/2007-08 released on
Pilania I/2008-09 AC-2005-06 23.09.2008
R/20/03/2004 II/2008-09 UC-2006-07
4. Jaswant Singh Barmer II/2008-09 Eligible MPR, I/2008-09 released on
R/20/04/2004 AC-2006-07 07.10.2008
UC-2007-08
5. Om Prakash Mathur Pali II/2008-09 Eligible MPR, I/2008-09 released on
R/20/01/2008 AC-2006-07 16.10.2008
UC-2007-08
6. Krishna Lal Balmiki Jaipur II/2008-09 released
R/20/02/2006 on 19.11.2008
7. Lalit Kishore Jaipur II/2008-09 Eligible MPR, I/2008-09 released on
Chaturvedi AC-2006-07 16.12.2008
R/20/06/2004 UC-2007-08
8. Prabha Thakur Ajmer II/08-09 released on
R/20/08/2004 29.09.2008
9. Ramdas Agarwal Jaipur II/07-08 1. Eligible MPR I/07-08 released on
R/20/03/2003 I/2008-09 2. UC(2006-07) 04.10.2008
II/2008-09
10. Santosh Bagrodia Bhilwara II/2008-09 Eligible MPR, I/2007-08 released on
R/20/10/2004 AC-2006-07 20.10.2008
UC-2007-08
11. K. Natwar Singh Bharatpur II/2007-08 Eligible MPR I/2007-08 released on
R/20/05/2004(forme I/2008-09 AC-2005-06 01.04.2008
r MP) II/2008-09 UC-2006-07
12. Narayan Singh II/2007-08 Eligible MPR I/2007-08 released
R/00/10/2004 I/2008-09 AC-2005-06 04.08.208
(Nominated) II/2008-09 UC-2006-
07
Sikkim

Statement showing the documents required for the release of next instalment
under MPLADS as on 31.12.2008

Lok Sabha

Sl. Name of the Instalment to Documents required to be furnished by


No. Constituency be released the DM for the release of next instalment
1 Sikkim -- --

Rajya Sabha

Sl. Name of the Rajya Sabha MP Instalment Documents required to be


No. to be furnished by the DM for the
released release of next instalment
1 Shri O.T. Lepcha -- --

MPR - Monthly Progress Report showing unsanctioned balance less than Rs.50 lakh and
unspent balance less than Rs.100 lakh.
UC - Utilisation Certificate (as at Annex – VIII of the Guidelines)
AC - Audit Certificate (as at Annex – IX of the Guidelines)
ATR- Action Taken Report
MPLADS-Lok Sabha Constituencies of Tamil Nadu-
Status of Pending Instalments

Sl. Name of Constituency Due Documents required for


No. installment the release of next instalment.

1 Madras Central I/2006-07 ♣ Being released


♣ For II/2006-07 MPR
fulfilling conditions
(unsanctioned balance
less than Rs 50 lakh &
unspent balance less
than Rs.1 crore) is
required.

2 Madras North II/2008-09 ♣ MPR


♣ UC – 2007-08
♣ AC – 2006-07

3 Madras South II/2007-08 ♣ MPR


♣ UC 2006-07
♣ AC 2005-06
4 Madurai II/2008-09 ♣ MPR
♣ AC – 2006-07

Note:-

MPR fulfilling conditions : Monthly Progress Report reflecting unsanctioned


balance less than Rs.50 lakh & unspent balance less
than Rs.1 crore.
UC : Utilisation Certificate
AC : Audit Certificate
ATN : Action Taken Note on the audit observations and
objections in the respective audit certificate which are
against the MPLADS guidelines.
MPLADS –Rajya Sabha MPs of Tamil Nadu-
Status of Pending Instalments

Sl. Member of Parliament/ Due Documents required for


No. Nodal District installment the release of next instalment.

1. Shri N. Jothi ♣ ATN on AC 2004-05


Nodal District: Vellore II/2006-07 required

2. Dr. K. Malaisamy, II/2008-09 ♣ MPR


Nodal District: Chennai ♣ AC 2006-07
♣ UC 007-08

3. Shri Anbumani Ramdoss II/2008-09 ♣ MPR


Nodal District: Villupuram

4. Smt. Kanimozhi II/2008-09 ♣ MPR


Nodal District-Chennai ♣ AC 2006-07
♣ UC 2007-08
5. Prof. M.S Swaminathan- II/2008-09 ♣ MPR
Nodal District: Chennai ♣ UC 2007-08 required

6. Shri N.S.Amir Ali Jinnah II/2008-09 ♣ MPR


Nodal District: Chennai

7. Shri T.K.Rangarajan II/2008-09 ♣ MPR


Nodal District: Chennai

8. Smt.Vasanthi Stanley II/2008-09 ♣ MPR


Nodal District: Chennai

9. Dr. C.Rangarajan (Nom) II/2008-09 ♣ MPR


Nodal Distirct-
Kancheepuram

Note:-
MPR fulfilling conditions : Monthly Progress Report reflecting unsanctioned
balance less than Rs.50 lakh & unspent balance less
than Rs.1 crore.
UC : Utilisation Certificate
AC : Audit Certificate
ATN : Action Taken Note on the audit observations and
objections in the respective audit certificate which are
against the MPLADS guidelines.
Tripura

Statement showing the documents required for the release of next instalment
under MPLADS as on 31.12.2008

Lok Sabha

Sl. Name of the Instalment to Documents required to be furnished by


No. Constituency be released the DM for the release of next instalment
1 Tripura East II/2008-09 MPR
UC 2007-08
AC 2006-07
2 Tripura west II/2008-09 MPR
AC 2006-07

Rajya Sabha

Sl. Name of the Rajya Sabha MP Instalment Documents required to be


No. to be furnished by the DM for the
released release of next instalment
1 Sh Matilal Sarkar II/2008-09 MPR
AC 2006-07

MPR - Monthly Progress Report showing unsanctioned balance less than Rs.50 lakh and
unspent balance less than Rs.100 lakh.
UC - Utilisation Certificate (as at Annex – VIII of the Guidelines)
AC - Audit Certificate (as at Annex – IX of the Guidelines)
ATR- Action Taken Report
STATUS OF RELEASE OF MPLADS FUNDS AS ON 16 September 2008
UTTAR PRADESH
LOK SABHA

S.No CONSTITUE NAME OF MP Installment Document Remarks


NCY (14TH Lok Sabha) to be required for
released release of next
installment of
MPLADS funds
1. AGRA SH RAJ BABAR I1/08-09 released
on 11.9.2008.
2. AKBARPUR SHRI SHANKH LAL II/2008-09 Eligible MPR I/08-09 released
(SC) MANJHI UC-2007-08 on 23.09.2008.
AC-2006-07

3. ALIGARH SH BIJENDRA II/2008-09 Eligible MPR I/08-09 released


SINGH UC-2007-08 on 25.04.2008
AC-2006-07

4. ALLAHABAD KUNWAR REWATI II/2008-09 Eligible MPR 1/2008-09


RAMAN UC-2007-08 released on
SINGH URF MANI AC-2006-07 7.8.2008.
JI
5. AMETHI SH RAHUL GANDH II/2008-09 Eligible MPR 1/08-09 released
I UC-2007-08 on 25.4.2008.
AC-2006-07
6. AMROHA SH. HARISH II/2008-09 Eligible MPR 1/08-09 released
NAGPAL UC-2007-08 on 25.4.2008
AC-2006-07
7. AUNOLA KUNWAR SARVRAJ II/08-09 released
SINGH on 09.01.2009

8. AZAMGARH SH. RAMAKANT II/2008-09


YADAV released on
19.12.2008.

9. BAGPAT SH. AJIT SINGH II/2008-09 Eligible MPR I/08-09 released


UC-2007-08 on 27.08.2008
AC-2006-07
10. BAHRAICH SH RUBAB SAYEDA II/08-09 released
on 7.1.2009.

11. BALLIA SH NEERAJ II/2008-09 Eligible MPR I/08-09 released


SEKHAR UC-2007-08 on 26.5.2008.
AC-2006-07
12. BALRAMPU SH BRIJ BHUSHAN II/2008-09 Eligible MPR 1/2008-09
R SHARAN SINGH UC-2007-08 released on
AC-2006-07 21.7.2008

13. BANASGAO SH MAHAVEER II/2008-09 Eligible MPR I/08-09 released


N (SC) PRASAD UC-2007-08 on 17.11.2008.
AC-2006-07
14. BANDA SH II/07-08 Eligible MPR 1/2007-08
SHYAMACHARAN I/2008-09 Letter issued on released on
GUPTA II/2008-09 01 May 2008 24.3.2008.

15. BARABANKI SH. KAMALA I1/.08-09


(SC) PRASAD released on
11.11.2008.

16. BAREILLY SH SANTOSH I1/.08-09


GANGWAR released on
18.11.2008

17. BASTI (SC) SH. LAL MANI I1/08-09 released


PRASAD on 17.12.2008.
18. BIJNOR SH. MUNSHIRAM I1/08-09 released
(SC) on 28.11.2008.

19. BILHAUR SH. ANIL SHUKLA II/2008-09 Eligible MPR I/-08-09 released
WARSI UC-2007-08 on 7.10.2008.
AC-2006-07
20. BADAUN SH. SALEEM IQBAL II/2008-09 Eligible MPR 1/08-09 released
SHERVANI UC-2007-08 on 29.4.2008.
AC-2006-07
21. BULANDSH SH. KALYAN II/07-08 Eligible MPR 1/07-08 released
ER SINGH 1/2008-09 UC-2006-07 on 23.09.2008.
II/2008-09 AC-2005-06

22. CHAIL (SC) SH. SHAILENDRA II/2008-09 Eligible MPR I/08-09 released
KUMAR UC-2007-08 on 19.12.2008.
AC-2006-07
23. CHANDOLI SH KAILASH NATH I1/08-09 released
SINGH YADAV on 14.11.2008.

24. DEORIA SH.MOHAN SINGH I1/08-09 released


on 18.11.2008.

25. DOMERIAG SH. MOHD. I1/08-09 released


ANJ MUQUEEM on 11.11..2008.

26. ETAH KU. DEVENDRA II/2008-09 Eligible MPR I/08-09 released


SINGH YADAV UC-2007-08 on 25.7.2008
AC-2006-07
27. ETAWAH SH. RAGHURAJ II/08-09 released
SINGH SHAKYA on 4.11.2008.
28. FAIZABAD SH MITRASEN II/2008-09 Eligible MPR 1/08-09 released
YADAV UC-2007-08 on 05.-5.2008.
AC-2006-07
29. FARUKKABA SH. CHANDRA II/2008-09 Eligible MPR I/08-09 released
D BHUSHAN SINGH UC-2007-08 on 26.5.2008.
MUNNOO BABU AC-2006-07

30. FATEHPUR SH. MAHENDRA I1/08-09 released


PRASAD NISHAD on 28.11.2008.

31. FIROZABAD SH. RAM JI LAL II/2008-09 Eligible MPR 1/08-09 released
(SC) SUMAN UC-2007-08 on 29.4.2008.
AC-2006-07

32. GHATAMPU SH. RADHEY II/07-08 Letter dated I/07-08 released


R (SC) SHYAM KORI I/2008-09 5.11.2008 for on 4.8.2008.
II/2008-09 UC -06-07 and
MPR

33. GHAZIPUR SH. AFAJAL II/08-09 released


ANSARI on 26.12.2008.

34. GHOSI SH. CHANDRADEO II/08-09 released


PRASAD on 26.11.2008.
RAJBHAR

35. GONDA SH. KIRTI II/2008-09 Eligible MPR I/2008-09


VARDHAN SINGH UC-2007-08 released on
ALIAS RAJA AC-2006-07 29.7.2008
BHAIYA
36. GORAKHPU SH. ADITYA II/2008-09 Eligible MPR I/08-09 released
R NATH UC-2007-08 on 11-12-2008.
AC-2006-07

37. HAMIRPUR SH. RAJNARAYAN II/2008-09 Eligible MPR I/08-09 released


BUDHOLIA ALIAS UC-2007-08 on 20.10.2008.
RAJJU MAHRAJ AC-2006-07
38. HAPUR SH. SURENDRA I1/08-09 released
PRAKASH GOYAL on 12.11.2008..

39. HARDOI SH. USHA VERMA I/08-09 released


(SC) on 9.07.2008.

40. HATHRAS SH. KISHAN LAL II/08-09 released


(SC) DILER on 7.1.2009.

41. JALAUN SH. BHANU II/2008-09 Eligible MPR I/2008-09


(SC) PRATAP SINGH UC-2007-08 relseaed on
VERMA AC-2006-07 7.10.2008.

42. JALESAR PRO. S.P SINGH II/2008-09 Eligible MPR I/2008-09


BAGHEL UC-2007-08 released on
AC-2006-07 25.07.2008.
Membership
ceased on
12.9.2008.
43. JAUNPUR SH. PARASNATH II/08-09 released
YADAVA on 18.11.2008.

44. JHANSI SH. CHANDRAPAL II/08-09 released


SINGH YADAV on 09.01.2009.
45. KHAIRANA SH. ANURADHA - - II/08-09 released
CHOUDHARY on 22.10.2008.

46. KAISERGAN SH. BENI PRASAD II/2008-09 Eligible MPR I/08-09 released
J VERMA UC-2007-08 on 5.05.2008.
AC-2006-07

47. KANNAUJ SH. AKHILESH II/07-08 Eligible MPR 1/07-08 released


YADAV 1/2008-09 UC-2006-07 on 1.4.2008.
II/2008-09 AC-2005-06 Letter dated
5.11.2008 for
AC,UC and
eligible MPR.
48. KANPUR SHRI PRAKASH - - II/08-09 released
JAISWAL on 30.09.2008.

49. KHALILAAB SH BHISM I1/08-09 released


AD SHANKAR on
28.11.2008

50. KHERI SH. RAVI II/08-09 released


PRAKASH VERMA on 14.11.2008.

51. KHURJA SH. ASHOK II/2008-09 Eligible MPR I/08-09 released


(SC) KUMAR PRADHAN UC-2007-08 on 23.09.2008
AC-2006-07

52. LUCKNOW SH. ATAL BIHARI II/2008-09 Eligible MPR I/08-09 released
VAJPAYEE UC-2007-08 on 23.09.2008
AC-2006-07

53. MACHLISHA SH. UMAKANT II/07-08 Eligible MPR 1/2007-08


HAR YADAV 1/2008-09 UC-2006-07 processed on
II/2008-09 AC-2005-06 12.9.2008.

54. MAHARAJG SH. PANKAJ II/08-09 released


ANJ CHAUDHARY on 07.01.2009.

55. MAINPURI SH. 1/2008-09 Eligible MPR II/07-08 released


DHARMENDARA II/2008-09 UC-2007-08 on 6.6.2008.
YADAV AC-2006-07
56. MATHURA SH. MANVENDRA - - II/2008-09
SINGH released on
30.09.2008.
57. MEERUT SH. MOHD. II/07-08 Eligible MPR I/07-08 released
SHAHID UC-06-07 on 9.10.07.
AC-05-06, Membership
ceased. Hence
no installment is
to be released.
58. MIRJAPUR SH. RAMESH DUBE Eligible MPR I/08-09 released
II/2008-09 UC-2007-08 on 10.10.2008.
AC-2006-07
59. MISRIKH SH. ASHOK II/2008-09 Eligible MPR 1/2008-09
(SC) KUMAR RAWAT UC-2007-08 released on
AC-2006-07 14.10.2008.
60. MOHANLAL SH. JAI PRAKASH II/08-09 released
GANJ (SC) on 11.09.2008.

61. MUZAFFAR CH. MUNAWWAR - - II/08-09 released


NAGAR HASAN on 22.10.2008.

62. PADRAUNA SH. BALESHWAR II/08-09 released


YADAV on 23.09.2008.

63. PHULPUR SH. SH ATIQUE II/07-08 Eligible MPR- 1/2007-08


AHMAD 1/2008-09 Not recd. released on
II/2008-09 UC 2004-05- 23.1.2008
recd.
AC 2003-04-
recd
64. PILIBHIT SMT. MANEKA II/08-09 released
GANDHI on 05.12.2008.
65. PRATAPGAR SH. Eligible MPR I/2008-09
H AKSHAYPRATAP II/2008-09 UC-2007-08 released on
SINGH"GOPAL JI" AC-2006-07 25.7.2008

66. RAI SMT. SONIA Eligible MPR I/08-09 released


BAREILLY GANDHI II/2008-09 UC-2007-08 on 25..07.2008
AC-2006-07
67. RAMPUR SMT P. JAYA Eligible MPR I/08-09 released
PRADA NAHATA II/2008-09 UC-2007-08 on 29.07.2008
AC-2006-07
68. ROBERTSG SH BHAI LAL II/08-09 released
ANJ on 19.12.2008.

69. SAHARANP SH RASHEED - -. II/08-09 released


UR MASOOD on 22.10.2008.

70. SAIDPUR SH. TUFANI SAROJ II/08-09 released


(SC) on 06.10.2008.

71. SALEMPUR SH. HARIKEVAL II/08-09 released


PRASAD on 9.01.2009.
72. SAMBHAL PROf. RAM GOPAL Eligible MPR I/08-09 released
YADAV II/2008-09 UC-2007-08 on 11.12.2008
AC-2006-07
73. SHAHABAD SHRI ILIYAS II/2008-09 Letter dated I/08-09 released
AZMI 21.10.2008 for on 12.5.2008.
UC and eligible
MPR
74. SHAHJAHA KUNWAR JITIN Eligible MPR I/08-09 released
NPUR PRASAD II/2008-09 UC-2007-08 on 7.5.2008.
AC-2006-07
75. SITAPUR SH. RAJESH II/08-09 released
VERMA on 31.10.2008.

76. SULTANPUR SH. MOHD TAHIR Eligible MPR I/08-09 released


II/2008-09 UC-2007-08 on 13.07.07
AC-2006-07
77. UNNAO SH. BRAJESH Eligible MPR I/08-09 released
PATHAK II/2008-09 UC-2007-08 on 29.07.2008.
AC-2006-07
78. VARANASI DR. RAJESH II/08-09 released
KUMAR MISHRA on 23.09.2008.
79. MORADABA DR. Eligible MPR I/08-09 released
D SHAFIQURRAHMA II/2008-09 UC-2007-08 on 16.07.2008.
N BARQ AC-2006-07

80. LALGANJ Sh. DAROGA II/08-09 released


PRASAD SAROJ on 7.01.2009.
STATUS OF RELEASE OF MPLADS FUNDS AS ON -16 September 2008

RAJYA SABHA

S.No MP Name NODAL Installement Document Remarks


. DISTRICT of MPLADS required for
fund due release of next
instalement of
MPLADS funds
1 SH. LUCKNOW II/07-08 Eligible MPR 1/07-08
AKHILESH UC-06-07 released on 6-
DAS AC-05-06 09-2007.

2 SH. AMAR AZAMGARH Eligible MPR I/08-09


SINGH II/2008-09 UC-2007-08 released on
26.11.2002 AC-2006-07 21.7.2008
to
25.11.2008

3 SH. ARUN KANPUR NAGAR II/08-09


SHOURIE released on
30.09.2008.

4 SH. KALRAJ VARANASI II/2007-08 Eligible MPR I/07-08


MISHRA 1/2008-09 reqd. released on
II/2008-09 UC-06-07-Not 5.10.2007.
received
AC-05-06-Not
received.

5 SH VEER MORADABAD Eligible MPR I/08-09


SINGH II/2008-09 UC-2007-08 released
26.11.2002 AC-2006-07 on
to 02.07.2008
25.11.2008

6 SH RAM LUCKNOW Eligible MPR I/08-09


NARAIN II/2008-09 UC-2007-08 released
SHAHU AC-2006-07 on
21.08.2008

7 SH NAND AZAMGARH I/2008-09 Eligible MPR II/07-08


KISHORE II/2008-09 UC-2007-08 released on
AC-2006-07 27.03.2008
subject to
condition
8 SH KAMAL MORADABAD Eligible MPR 1/2008-09
AKHTAR II/2008-09 UC-2007-08 released
AC-2006-07 on
16.09.2008.
9 SH LUCKNOW Eligible MPR I/08-09
BHGWATI II/2008-09 UC-2007-08 released on
SINGH AC-2006-07 12.5.2008.

10 SH. SATISH LUCKNOW II/05-06 Eligible MPR- Required


CHANDER I/06-07 Not received documents be
MISRA II/06-07 UC 2004-05-Not forwarded
I/2007-08 received
II/2007-08 AC 2003-04-Not
I/2008-09 received
II/2008-09
Letter dated
30.09.2008
11 SH MURLI ALLAHABAD II/07-08 1/2007-08
MANOHAR 1/2008-09 released on
JOSHI II/2008-09 5.8.2008.

12 SH JYOTIBA Eligible MPR I/08-09


MAHMOOD PHULENAGAR II/2008-09 UC-2007-08 released on
MADANI AC-2006-07 6.7.2008

13 SH Kanpur Nagar II/2007-08 Eligible MPR 1/07-08


MAHENDRA I/2008-09 UC-2006-07 relesed on
MOHAN II/2008-09 AC-2005-06 10.10.2008..

14 SH MEERUT II/2008-09 Eligible MPR I/08-09


MUNQUAD UC-06-07 released on
ALI AC-05-06 02.07.2008

15 SH VINAY Faizabad Eligible MPR I/08-09


KATIYAR II/2008-09 UC-2007-08 released on
AC-2006-07 12.5.2008.

16 SH LUCKNOW Eligible MPR II/08-09


VIRENDRA II/2008-09 UC-2007-08 released on
BHATIA AC-2006-07 15.9.2008.

17 Shri Amir Muzaffar nagar II/08-09


Alam khan released on
22.10.2008.
18 Sh. Lucknow II/07-08 Eligible MPR 1/2007-08
Janeshwar I/2008-09 UC-06-07 released on
Mishra II/2008-09 AC-05-06 11.08.2008

19 Smt. Jaya Azamgarh II/06-07 Eligible MPR Latest eligible


Bachchan I/07-08 MPR -03/07 MPR as per
II/07-08 received. para 4.3 of
I/2008-09 Letter dated the guidelines
II/2008-09 23.09.2008. be forwarded.
20 Sh. Balihari Azamgarh Eligible MPR I/08-09
II/2008-09 UC-2007-08 released on
AC-2006-07 12.5.2008.
21 Sh Lucknow Eligible MPR I/08-09
Banwarilal II/2008-09 UC-2007-08 released on
Kanchchal AC-2006-07 16.5.2008.

22 Sh. Veerpal Bareilly II/08-09


Singh released on
9.01.2009

23 Sh Siddharth Nagar II/07-08 Eligible MPR I/07-08


Brijbhusan I/2008-09 UC 2006-07 released on
Tiwari II/2008-09 recd. 22.5.07.
AC 2005-06 Besides the
unreleased
fund of Shri
Suri i.e
II/2005-06
and 1/2006-
07 released
on
18.09.2008.
24 Shri Ambeth Gautambudh II/2008-09 Eligible MPR I/08-09
Rajan Nagar UC-2007-08 released on
AC-2006-07 12.5.2008.
25 Shri Avtar Ghaziabad Newly elected II/2008-09
Singh MP released on
Karimpuri 26.12.2008
26 Smt Kusum Newly elected
Rai MP. Nodal
District awaited
27 Shri Brij Lal Jaulan II/2008-09
Khabri released on
26.12.2008
28 Shri Brijesh Newly elected
Pathak MP. Nodal
District awaited
29 Shri Raja Azamgarh Newly elected II/2008-09
Ram MP released on
13.01.2009
30 Prof Ram Newly elected
Gopal Yadav MP. Nodal
District awaited
31 Shri Newly elected
Mohmmad MP. Nodal
Adeeb District awaited

List of Sitting Member of Parliament (Rajya Sabha) with Nodal District.

S.No. MP NAME NODAL DISTRICT


1 SH. AKHILESH DAS LUCKNOW
2 SH. AMAR SINGH AZAMGARH
3 SH. ARUN SHOURI KANPUR NAGAR
4 SH. GANDHI AZAD AZAMGARH
5 SH. KALRAJ MISHRA VARANASI
6 SH. SHAHID SIDDIQUI SAHARANPUR
7 SH. UDAY PRATAP SINGH FIROZABAD
8 SH VEER SINGH MORADABAD
9 SH RAM NARAIN SHAHU LUCKNOW
10 SH NAND KISHORE AZAMGARH
11 SH KAMAL AKHTAR MORADABAD
12 SH BHGWATI SINGH LUCKNOW
13 SH ABU ASIM HASAN AZMI AZAMGARH
14 SH. SATISH CHANDER LUCKNOW
MISRA
15 SH MURLI MANOHAR JOSHI ALLAHABAD
16 SH MAHMOOD MADANI JYOTIBA PHULENAGAR
17 SH MAHENDRA MOHAN KANPUR NAGAR
18 SH MUNQUAD ALI MEERUT
19 SH VINAY KATIYAR FAIZABAD
20 SH VIRENDRA BHATIA LUCKNOW
21 SHRI AMIR ALAM KHAN MUZAFFAR NAGAR
22 SH. JANESHWAR MISHRA LUCKNOW
23 SMT. JAYA BACHCHAN AZAMGARH
24 SH. MUKHTAR ABBAS NAQVI RAMPUR
25 SH. BALIHARI AZAMGARH
26 SH BANWARILAL LUCKNOW
KANCHCHAL
27 SH ISAM SINGH SAHARANPUR
28 SH. VEERPAL SINGH BAREILLY
29 SH RAJNATH SINGH LUCKNOW
30 SH BRIJBHUSAN TIWARI SIDDHARTH NAGAR
31 SHRI AMBETH RAJAN GAUTAMBUDH NAGAR
MEMBERS OF PARLIAMENT (Lok Sabha)
UTTARANCHAL

S. CONSTITUENCY NAME OF MP MPLADS Document Remarks


Fund required for
No instalment release of next
not released instalment
9. ALMORA SH BACHI SINGH II/08-09 Eligible MPR 1/08-09 released
L/34/01/04 RAWAT Audit Certificate on 22.04.2008
2006-07
UC-2007-08
10. GARHWAL GEN BHUWAN II/2008-09 Eligible MPR 1/2008-09
L/34/02/04 CHANDRA Audit Certificate released on
KHANDURI (AVSM) 2006-07 22.4.2008.
(RETD. UC-2007-08
11. HARDWAR (SC) SH. RAJENDRA II/08-09 released
L/34/03/04 KUMAR on 26.12.2008

12. NAINITAL SH. K.C. SINGH II/08-09 Eligible MPR I/08-09 released
L/34/04/04 “BABA” Audit Certificate on 14.5.2008
2006-07
UC-2007-08
Letter dated
8.12.2008.
13. TEHRI GARWHAL SH. VIJAY II/08-09 being I1/08-09
L/34/05/04 BAHUGUNA released. processed for
release on
07.01.2008

14. Nominated SH. FRANCIS II/08-09 Eligible MPR I/08-09 released


L/00/2/04 FANTHOME Audit Certificate on 21.07.2008.
2006-07
UC-2007-08
MEMBERS OF PARLIAMENT (Rajya Sabha)
UTTARANCHAL
S. No MP Name NODAL MPLADS Document required Remarks
DISTRICT Instalment for release of next
not instalment
released
2. SH. SATISH DEHRADUN II/07-08 Eligible MPR I/07-08 released
KUMAR SHARMA AC-2005-06 on 16.05.2008.
UC-2006-07
R/34/04-MPLADS
2. SH. SATYA VRAT DEHRADUN II/08-09 Eligible MPR I/08-09 released
CHATURVEDI Audit Certificate 2006- on 02.05.2008.
R/34/01/06 07
UC-2007-08
3. SHRI BHAGAT BAGESHWAR II/2008-09
SINGH released on
KOSHYARI 26.12.2008
West Bengal

LOK SABHA
S.No. Nameof the Instalment to Documents Remarks
constituency be released required for
release of
next due
instalment
1 Alipurduar II/2004-05 MPR,UC 2003-
04
2 Arambagh II/2008-09 MPR, UC 2007-
08, AC 2006-07
3 Asansol II/2008-09 MPR, UC 2007-
08, AC 2006-07
4 Balurghat II/2007-08 MPR, UC 2006-
07, AC 2005-06
5 Bankura II/2008-09 Instalment
released
6 Barasat II/2006-07 MPR, UC 2005-
06, AC 2004-05
7 Barrackpore II/2004-05 MPR, UC 2003-
04, AC 2002-03
8 Basirhat II/2004-05 MPR, UC 2003-
04, AC 2002-03
9 Behrampore II/2008-09 MPR, UC 2007-
08, AC 2006-07
10 Birbhum I/2008-09 ATR
11 Bolpur II/2007-08 MPR, UC 2006-
07, AC 2005-06
12 Burdwan II/2008-09 MPR only
13 Kolkata N.East II/2007-08 MPR only
14 Kolkata N.West II/2003-04 MPR only
15 Kolkata N.West II/2008-09 MPR only
16 Kolkata South II/2008-09 MPR only II/2007-08 &
I/2008-09
being released
17 Contai I/2007-08 ATR
18 Cooch Behar II/2008-09 Instalment
released
19 Darjeeling II/2008-09 MPR only
20 Diamond Harbour I/2005-06 ATR
21 Dum Dum II/2003-04 MPR, UC 2002-
03, AC 2001-02
22 Dum Dum II/2006-07 MPR, UC 2005-
06
23 Durgapur II/2007-08 MPR only
24 Hooghly II/2007-08 MPR, UC 2006-
07, AC 2005-06
25 Howrah II/2008-09 MPR, UC 2007-
08, AC 2006-07
26 Jadavpur I/2008-09 AC 2005-06
27 Jalpaiguri II/2005-06 MPR, UC 2004-
05
28 Jangipur II/2008-09 MPR, UC 2007-
08, AC 2006-07
29 Jhargram II/2008-09 Instalment
released
30 Joynagar II/2005-06 MPR only
31 Katwa II/2008-09 MPR, UC 2007-
08, AC 2006-07
32 Krishnagar II/2007-08 MPR, UC 2006-
07, AC 2005-06
33 Malda II/2005-06 Instalment
released
34 Malda II/2007-08 MPR, UC 2006-
07, AC 2005-06
35 Mathurapur II/2002-03 MPR, UC 2001-
02, AC 2000-01
36 Mathurapur II/2006-07 MPR, UC 2005-
06, AC 2004-05
37 Midnapore II/2008-09 MPR, UC 2007-
08, AC 2006-07
38 Murshidabad II/2008-09 Instalment
released
39 Nabadwip II/2008-09 MPR, UC 2007-
08, AC 2006-07
40 Panskura II/2008-09 Instalment
released
41 Purulia II/2007-08 MPR,AC 2005-
06
42 Raiganj II/2008-09 Instalment
released
43 Serampore II/2008-09 MPR, UC 2007-
08, AC 2006-07
44 Tamluk II/2007-08 MPR, UC 2006-
07
45 Uluberia II/2007-08 MPR, UC 2006-
07, AC 2005-06
46 Vishnupur II/2007-08 MPR, UC 2006-
07,AC 2005-06

RAJYA SABHA

S.No. Name of Instalment to Documents Remarks


Rajya Sabha be released required for
MP release of
next due
instalment
1 Abani Roy II/2008-09 Instalment
released
2 Arjun Sengupta II/2008-09 MPR only
3 Barun II/2007- MPR, UC 2006- MP has
Mukherjee 08(effectively 07 resigned from
last instalment) RS on 6-5-2008
and elected on
18-11-2008.
succeeding Shri
Debabrata
Biswas
II/2008-09
being
processed for
release on
opting nodal
district.
4 Brinda Karat II/2008-09 Instalment
released
5 Debabrata I/2005-06 Previous
Biswas instalment
released under
exemption for
UC and AC. MP
has resigned on
23-9-2008

7 Mohammed II/2007-08 MPR only


Amin
8 Moinul Hassan II/2007-08 MPR, UC 2006-
Ahamed 07, AC 2005-06
9 Mukul Roy II/2008-09 Instalment
under process
for release
10 Prasantha II/2007-08 MPR only
Chatterjee

12 Saman Pathak II/2008-09 MPR only


13 Sitaram II/2008-09 Instalment
Yechury released
14 Swapan Sadan II/2008-09 Instalment
Bose released
15 Tapan Kumar II/2008-09 MPR only
Sen
16 Tarini Kanta II/2008-09 Instalment
Roy released
17 Ahmed Saeed II/2008-09 MPR only Newly elected
Malihabadi MP from 3-4-
2008
18 Shyamal II/2008-09 Instalment
Chakraborty released
19 R.C. Singh II/2008-09 MPR only Newly elected
MP from 25-6-
2008
succeeding Dr.
Barun
Mukherjee.
UTS:-

Andaman & Nicobar Islands(Union Territory)

Name of MP(LS) Instalment to be released Documents required


Remarks

Shri Manoranjan Bhakta II/2007-08 MPR, UC 2006-07


AC 2005-06

Chandigarh(Union Terrritory)

Name of MP(LS) Instalment to be released Documents required


Remarks

Shri P.K. Bansal I/2008-09 ATR on audit discrepancy

Dadra & Nagar Haveli(Union Terrritory)

Name of MP(LS) Instalment to be released Documents required


Remarks

Shri Mohan Dhelkar II/2008-09 MPR, UC 2007-08,


AC 2006-07

Daman & Diu(Union Terrritory)

Name of MP(LS) Instalment to be released Documents required


Remarks

Shri Dahyabhai Patel II/2008-09 Instalment


released
Lakshadweep(Union Terrritory)

Name of MP(LS) Instalment to be released Documents required


Remarks

Shri P.P. Koya II/2003-04 MPR, UC 2002-03


AC 2001-02
II/2006-07 MPR, UC 2005-06,
AC 2004-05

Pondicherry(Union Terrritory)

Name of MP(LS) Instalment to be released Documents required


Remarks

Shri M. Ramdass I/2007-08 ATR on audit discrepancy

Name of MP(RS) Instalment to be released Documents required


Remarks

Shri V. Narayansamy II/2005-06 MPR, UC 2004-05,


AC 2003-04

Das könnte Ihnen auch gefallen