Beruflich Dokumente
Kultur Dokumente
Pier top
MWL
FRL
Kink
Crest Level
density
A
B
L1
1)
2)
3)
4)
5)
6)
a)
b)
7)
8) 1
A)
B)
8) 2
Zone-I
(a
(b
(c
Zone-II
(a
(b
(c
d1/d
M1/bd2
P/bd
Asc=Ast
Asc=Ast
Multiplication factors
F1/b
P1/b
6M/b2
7m Pier
7m
Hoist Placement
Pier top
MWL
FRL
Kink
1650.50
1646.00
1645.84
1643.50
1639.00
1636.10
1633.50
2.4
Crest Level
density
A
B
L1
7.89 m
5m
15.625 m
W1
577.27 t
W2
2793 t
13.3 m
W3
1570.8 t
5.5 m
W 4-1
422.142 t
4.37 m
W 4-2
403.788 t
4.37 m
W5
120.12 t
2.75 m
W6
120.07 t
3.5 m
Total weight
W per m of run
Weight of spillway bridge on the pier:
6007.19 t
194.313095 t/m
Lenghts
3.5 m
This load is transferred to the pier through the bearings of the bridge and this is assumed to be 20 T/m run
Assume
15 t/m
S.W per m run
209.31 t/m
10 % increment
230.24 t/m
Total Uplift-I
Total Uplift-II
Total uplift
Uplift-I per m run
Uplift-II per m run
PH
552.3 t
546.875 t
1099.175 t
70 t/m
35 t/m
500 t
MH
1666.67 t-m
PT
50.66 t
Earthquake forces
Description
W1
W2
W3
W4-1
W4-2
W5
W6
w
577.27
2793.00
1570.80
422.14
403.79
120.12
120.07
Seismic coffe.
0.12
0.12
0.12
0.12
0.12
0.12
0.12
Total
Inertia
69.27
335.16
188.496
50.66
48.45
14.41
14.41
720.86
23.32 t/m
159.93 t-m/m
w
Vertical coffe.
577.27
0.09
2793.00
0.09
1570.80
0.09
422.14
0.09
403.79
0.09
120.12
0.09
120.07
0.09
Total
17.49
10
47.5
Inertia
51.95
251.37
141.37
37.99
36.34
10.81
10.81
540.65
L.A
6.25
6.25
8.5
9.33
5.50
2.60
2.60
Cm
Cs
p
0.735
0.364
2.075
VH - I
MH - I
VH - II
MH - II
Without Earthquake
15.06
62.04
5.27
62.04
Bending Moment
20 % increment, M1
Vertical weight, P1
Horizontal weight, H1
129.299 t-m
284.458 t-m
160.24
38.790
M2
Mt
Vertical weight, P2
Horizontal weight, H2
With Earthquake
Zone-I
Moment without earthquake
Moment due to horizontal inertia
Moment due to hydrodynamic forces
Moment due to vertical inertia
Total
136.681
37.120
195.24
18.34
284.458
159.93
62.04
0
506.425
Vertical forces
vertical inertia forces
Total,
160.24
17.49
142.76
Horizontal forces
Horizontal inertia forces
Horizontal hydrodynamic forces
Total,
Zone-II
Moment without earthquake
Moment due to horizontal inertia
Moment due to hydrodynamic forces
Moment due to vertical inertia
Total
38.790
23.32
15.06
77.171
136.681
159.93
62.04
0
358.647
F1/b
P1/b
Vertical forces
vertical inertia forces
Total,
Horizontal forces
195.24
17.49
177.76
18.34
6M/b2
23.32
5.27
46.93
Zone-III
50 % of the reinforcement provided in the zone-I or 25 dia @ 300 mm,
whichever is more. It should not be less than 25 dia @ 300 mm in any
case
Area
equivalent width
Effective cover
113.567
3.674
0.15
3.674
3.524
d
d1
d1/d
m2
m
m
m
m
0.959
2
M1/bd
4962.94231
0.0536
0.0555
0.002702 chart 5.2
2
49.629 cm
P/bd
Asc=Ast
6.170912507
IN ZONE-I
0.002415
44.35790406
0.0380
0.0691
0.0007
2
12.8573635 cm
P/bd
Asc=Ast
Multiplication factors
F1/b
IN ZONE-II
-11.0244257
P1/b
20.3937465
6M/b
-62.0111797
Table
HORIZONTAL ANCHORAGE
X/b
0.25
Y/b
Contribution
of x due to
Coeff
0.5
x
Coeff
Shear force
Direct Load
Moment
Total
Shear force
Direct Load
Moment
Total
Shear force
Direct Load
Moment
Total
Shear force
Direct Load
Moment
Total
Shear force
Direct Load
Moment
Total
Shear force
Direct Load
Moment
Total
Shear force
Direct Load
Moment
Total
0.25
0.5
0.75
1.25
1.5
16.6265
576.3965
0.03605699
364.043297
1.84
197.849618
32
804.248
24.6005818
in two tiers
Table
X/b
Y/b
0
0.6994
1
0.5
0.385
0.3929
0.004
0.1474
0.1862
-0.0544
0.0598
0.0978
-0.0408
0.0269
0.0551
-0.0262
0.0134
0.0332
-0.0168
0.0072
0.212
-0.0111
-7.710483
20.393747
-31.00559
-18.32233
-4.244404
8.012703
-0.248045
3.5202544
-1.625
3.7973156
3.3734082
5.545723
-0.659261
1.9945084
2.5300561
3.8653039
-0.296557
1.1236954
1.6246929
2.451831
-0.147727
0.6770724
1.0417878
1.5711329
-0.079376
4.3234743
0.6883241
4.9324225
2.925
1
1
0.602
0.347
0.046
0.2577
0.2251
-0.0326
0.1215
0.1424
-0.0398
0.0615
0.0908
-0.0321
0.0332
0.0595
-0.0236
0.0191
0.0403
-0.0171
Extended upto
t/m
t/cm2
cm2
mm
mm2
VERTICAL ANCHORAGE
Vertical anchorage
0.25
0.50
Contribution
of y due to
Coeff
y
Coeff
Shear force
0.00
0.25
0.5
0.75
1.25
1.5
1.75
Direct Load
Moment
Total
Shear force
Direct Load
Moment
Total
Shear force
Direct Load
Moment
Total
Shear force
Direct Load
Moment
Total
Shear force
Direct Load
Moment
Total
Shear force
Direct Load
Moment
Total
Shear force
Direct Load
Moment
Total
Shear force
Direct Load
Moment
Total
Shear force
Direct Load
Moment
Total
t/m
2
t/cm
1.84
cm2
490.873852
1.00
1.00
0.30
0.50
0.35
0.25
0.48
0.23
0.20
0.45
0.14
0.16
0.41
0.09
0.12
0.37
0.06
0.10
0.33
0.04
0.08
0.30
0.03
0.06
0.27
0.02
Zone-I
39.69855 t/m
2
21.575299 cm
5 2454.3693 25 @ 200C/C
Angle
11.4543
Zone-I
Zone-II
Alpha-H
Alpha-V
should check
20.29
10.625
0.12
0.09
M
432.95
2094.75
1602.22
472.80
266.50
37.48
37.46
4944.16
-6.70483
2.925
-19.61
1.0246
-6.87
M1/bd2
0.037967
25.3937
25.39
0.00
P/bd
0.069126
-51.2353
-51.24
-45.45
-4.04
8.81
-2.36
0.00
-6.87
0.602
0.347
0.046
0.0007
Asc=Ast 12.85736
50% of zone-I should be provided
2.42
horizontal anchorage 25@300 in zone-II
25% of zone I
50% of Zone-II
25@300
160mm
(chart 5.3)
in 2 rows
490.87
10
490.87
5
490.87
4
4908.74
2454.37
1963.50
2
49.09 cm
2
24.54 cm
2
19.63 cm
17.58741
-71.4513
1.319245
0.5
0.75
x
Coeff
Zone-I
Zone-II
Zone-III
-0.43075
-32.2464 1.0246
20.3937
0
-62.0112
0
-73.8639
-6.6367 0.6695
7.07663 0.2851
-2.85251 0.0929
-2.41259
-2.84099 0.3488
4.59063 0.2489
2.02156 0.0245
3.7712
-1.33947 0.1873
2.90407 0.1806
2.46804
-0.01
4.03265
-0.678
0.1019
1.85175 0.1269
1.99056 -0.0194
3.16431
-0.36601 0.0612
1.21343 0.0892
1.46346 -0.0193
2.31088
-0.21057 0.0373
0.82187 0.0636
1.06039 -0.0164
1.67169
-11.2956
0
0
-11.2956
-7.38085
5.814257
-5.76084
-7.32743
-3.84532
5.076004
-1.51927
-0.28859
-2.06487
3.683111
0.620112
2.238347
-1.12339
2.587966
1.203017
2.667594
-0.67469
1.819122
1.196816
2.341243
-0.41121
1.297042
1.016983
1.902815
1.1076
84.16431
126.376
0.142432
-73.8639
1.75
-20
2
-2.41259 cm
3.771202
3006 mm
61.9007 t/m
1.84
2
2
33.6417 cm
3364.167 mm
Noof bars 4.182998
490.87
7 3436.117
0.50
2
34.36 cm
spacing
142.86 mm
0.75
y
0.00
Coeff
0
y
0.00
0.00
20.39
-62.01
-41.62
-3.30
10.13
-21.52
-14.69
-2.81
9.78
-13.96
-6.98
-2.25
9.14
-8.83
-1.94
-1.76
8.35
-5.63
0.96
-1.37
7.55
-3.69
2.49
-1.08
6.81
-2.50
3.24
-0.86
6.17
-1.74
3.56
-0.70
5.60
-1.26
3.64
0
0
0.147
0.089
0.06
0.21
0.214
0.109
0.202
0.271
0.102
0.176
0.288
0.081
0.147
0.285
0.06
0.122
0.273
0.045
0.01
0.258
0.033
0.084
0.242
0.025
Zone-II
10.94 t/m
2
5.94565 cm
0.00
0.00
0.00
-1.62
1.82
-3.72
-3.53
-2.32
4.36
-6.76
-4.71
-2.23
5.53
-6.33
-3.03
-1.94
5.87
-5.02
-1.09
-1.62
5.81
-3.72
0.47
-1.34
5.57
-2.79
1.43
-0.11
5.26
-2.05
3.10
-0.93
4.94
-1.55
2.46
1.00
1.00
0.30
0.50
0.35
25.39375
-51.2353
-25.8416
-2.00877
12.61815
-17.7838
-7.17439
-41.62
1.75
20t/m2
-14.69
cm2
2
ne-I should be provided 24.81471 cm
2
12.40736 mm
2
12.40736 mm
490.8739
2
4 1963.495 19.63495 mm
20t/m2
1.319245
-0.43075
1.75
e should be provided.
X/b
Y/b
0
0.25
0.5
0.75
1.25
1.5
1.75
Contribution of
x due to
Shear force
Direct Load
Moment
Total
Shear force
Direct Load
Moment
Total
Shear force
Direct Load
Moment
Total
Shear force
Direct Load
Moment
Total
Shear force
Direct Load
Moment
Total
Shear force
Direct Load
Moment
Total
Shear force
Direct Load
Moment
Total
Shear force
Direct Load
Moment
Total
Shear force
Direct Load
Moment
Total
Coeff
0.25
Txy
Coeff
-0.73
-0.94
-0.72
-0.5
-0.35
-0.27
-0.16
-0.12
Unit Moment
0.25
0.5
Txy
Coeff
0.75
Txy
Coeff
1
Txy
Coeff
1.25
Txy
Coeff
Txy
-0.91
-0.43
0.5
0.28
-0.97
-0.42
0.37
0.6
-0.9
-0.45
0.03
0.48
-0.7
-0.53
-0.13
0.22
-0.55
-0.34
-0.12
0.03
-0.38
-0.33
-0.19
-0.1
-0.26
-0.27
-0.21
-0.14
-0.2
-0.22
-0.19
-0.17
1.5
Coeff
1.75
Txy
Coeff
2
Txy
Coeff
Txy
0.27
0.22
0.13
0.38
0.26
0.21
0.34
0.27
0.22
0.24
0.2
0.19
0.09
0.13
0.11
0.03
0.09
-0.09
0.04
-0.09
-0.04