#REF!

1 All items shall be referred as per specification/appendix attached.


2 All quantities are PROVISIONAL. The actual quantites installed shall be measured on site after completion and prices
will be adjusted accordingly.
3 The Installation must be complete with Configuration, Testing and Commissioning for full functionality of the Equipment.
4 All Items must be provided with two (2) years maintenance and guarantee after commissioning of the equipment installed.
Description
Brief Specifications
F INTEGRATED SECURITY MANAGEMENT SYSTEM
Supply, deliver, install and configure of the following items:
F.1 CONTROLLER & PERIPHERALS
F1.1 Access Control System inclusive of Wiring Installation Work (concealed & hacking)
a) Door Controller Unit - Single Door Nos 7
b) Door Controller Unit - Double Door Nos 16
Door Control Unit TCP/IP Included:
i) Smart Card/Mifare Proximity Reader Nos 23
ii) EM Lock Nos 39
iii) Exit Push Button Nos 23
iv) On-Off Keyswitch (3"x3") Nos 23
v) Break Glass - Emergency Exit Nos 23
vi) Magnetic Contact Nos 23
vii) Backup Battery Nos 23
viii) Memory Module - 20K User, 40K Events Nos 23
F.2 MANAGEMENT SOFTWARE
F2.1 Web Management Software inclusive of all necessary licences Nos 1
F2.2
Desktop PC with latest version of hardware and software inclusive of
antivirus.
Nos 1
Total Price
(RM)
SUB- TOTAL (SCHEDULE F)
PEMASANGAN SISTEM TEKNOLOGI MAKLUMAT & KOMUNIKASI (ICT) UNTUK
PEMBANGUNAN PUSAT PENDIDIKAN ASASI, UNIVERSITI ISLAM ANTARABANGSA GAMBANG,
PAHANG DARUL MAKMUR
-FASA 2: BANGUNAN PENTADBIRAN DAN KOLEJ KEDIAMAN
ICT SERVICES
Items Unit Qty
Unit Price
(RM)
1 All items shall be referred as per specification/appendix attached.
2 All quantities are PROVISIONAL. The actual quantites installed shall be measured on site after completion and prices
will be adjusted accordingly.
3 The Installation must be complete with Configuration, Testing and Commissioning for full functionality of the Equipment.
4 All Items must be provided with two (2) years maintenance and guarantee after commissioning of the equipment installed.
Description
Brief Specifications
A
A1
A2 Lump Sum
A3 Lump Sum
A4 Lump Sum
A5 Lump Sum
A6 Lump Sum
A7 Lump Sum
To provide for all costs incurred by complying with all Safety, Health and Welfare
Regulations, pertaining to all workpeople employed on the Site by the ICT
Contractor.
Insurance premiums for Public Liability/Contractor All Risks (CAR), SOCSO etc.
Fee/Premium for Performance Bond (Insurance Guarantee or Bank Guarantee),
Stamp Duty, etc.
Documentation of contract documents (10 sets hard cover).
Provide ICT shop drawing for every building and interbuilding cabling. All drawings
in AutoCAD or Visio format.
The Contractor shall prepare and submit to the S.O. a complete set of Coordinated
Drawings which comprise Architectural, Structural, Mechanical, Electrical and ICT
works pertaining to all the services incorporated into the Works by his sub-
contractors, nominated sub-contractors or otherwise. The Coordinated drawings
submitted by the Contractor must integrate with all the drawing for the whole Works
and must ensure efficient and orderly installation of all the parts of the Works to
ensure of non-interference with structural framing, ceilings, partitions, equipments,
lights, mechanical and electrical and other services, with emphasis to safety,
maintainability and serviceability for the lifetime of the Works. The Contractor shall
guarantee that the said Coordinated Drawings shall be free and independent of
any fault and they are fit for the purpose.
The description of materials and workmanship in these Bills of Quantities and/or
Drawings are to be read in conjunction with the relevant Specifications contained
in the Sub-Contract. Materials and equipment supplied and installed shall comply
with the conditions set down in General Practice for ICT System Installation.
Items Qty
Unit Price
(RM)
Lump Sum
Allow for submission of samples of materials and workmanship as the S.O.'s
Representative may require for this approval before the materials are supplied and
installed or workmanship are embodied in the finished works. All samples which are
approved shall be retained On-Site and shall represent or indicate the standard to
samples shall be cleared away when no longer so required for that purpose.
The preliminary items set out hereunder are deemed to apply to the whole of the
Sub-Contract Works all as shown on the Drawings and/or described in this Bills of
Quantities, and the ICT Contractor shall allow for complying with the same and for
any clause or item listed in this section which has not been included elsewhere in
this section or in Bills of Quantities section and no claims will be entertained for those
unpriced clauses.
PRELIMINARIES
ICT SERVICES
1 All items shall be referred as per specification/appendix attached.
2 All quantities are PROVISIONAL. The actual quantites installed shall be measured on site after completion and prices
will be adjusted accordingly.
3 The Installation must be complete with Configuration, Testing and Commissioning for full functionality of the Equipment.
4 All Items must be provided with two (2) years maintenance and guarantee after commissioning of the equipment installed.
Description
Brief Specifications
A
Items Qty
Unit Price
(RM)
PRELIMINARIES
ICT SERVICES
A8
a) As built drawings (trunking/conduiting routes, location of network port,
equipment racks (TC), schematic diagram, IP Address Schema, arrangement
b) Manuals for operation of installed equipment/system;
c) Setting parameters and configurations of each related equipment;
d) Test results on cabling systems, switches, and PABX;
e) Equipment Catalogues;
f) Complete inventory list of systems installed;
g) Manuals for reporting flow during warranty, defects and liability period;
h) Warranties, certificates and licenses in an exclusive folder;
A9 Lump Sum
A10
a) Planning, preparing, maintaining and updating the CPM programme
preferaby using latest version of Microsoft Project.
b) Monthly submission of the reports to the S.O.'s Representative inclusive of all
updated data on computer medium and printed copies. The S.O.'s
Representative may instruct reports to be produced and submitted at more
frequent intervals.
A11
A12
a) Safety helmets (white colour c/w JKR logo)
b) Safety boots (similar to Red Wing)
A13 Lump Sum
A14 Lump Sum
A15 Lump Sum
The ICT Contractor will, on completion of the work, removes as quickly as possible
and convey away from site at is sole cost, all plants and surplus materials except
those ordered to be left on the site, together with all rubbish and debris. The site is
to be restored in a neat and workmanlike manner to the satisfaction of the S.O.
The ICT Contractor shall make good of any defects, shrinkage any other faults
which may appear within the Defects Liability Period comprehensive service and
maintenance during the Defect Liability Period as provided in the Sub-Contract,
commencing from Practical Completion of the Contract Works as certified by the
S.O's.
To allow here for any other items in compliance to the Specifications for the
completion of the Sub-Contract Works, which are not allowed for elsewhere in this
section and/or in the Bills of Quantities.
Lump Sum
To provide progress report in a proper and professional written manner complete
with photographs, video CD/DVD to be published in JKR Elektrik website
progressively (at least once a month).
During excavations, when the ICT Contractor comes across any underground
cables, pipes, etc. he shall stop work immediately and report to the S.O.'s Rep. who
shall give the necessary instructions to the ICT Contractor who shall then carry work
as instructed. The ICT contractor shall be responsible for making good all damages
to the cables, pipes, etc. and shall indemnify the Government against any claims as
a results of such damage.
To allow and provide on the Site during the duration of the Sub-Contract equipment
of a standard to be approved by the S.O.'s . Representative for the sole of the S.O's
Representative and his supervisory staff and any officials authorised by the S.O.'s
Representative as follows:- Lump Sum
To protect, uphold and maintain all existing and in use pipes, ducts, sewers, services
mains, underground cables, etc., during the execution of the Sub-Contract Works,
unless otherwise directed.
Lump Sum
Provide for implementing the Critical Path Method programme in conjunction with
Main Contract Works for planning, monitoring, control of resources and progress of
work shall include:-
Lump Sum
To Provide a set of as-built document (hardcopy with hardcover and softcopy:
Structured Web Format) in 3 copies. The as-built document consists of:
1 All items shall be referred as per specification/appendix attached.
2 All quantities are PROVISIONAL. The actual quantites installed shall be measured on site after completion and prices
will be adjusted accordingly.
3 The Installation must be complete with Configuration, Testing and Commissioning for full functionality of the Equipment.
4 All Items must be provided with two (2) years maintenance and guarantee after commissioning of the equipment installed.
Description
Brief Specifications
A
Items Qty
Unit Price
(RM)
PRELIMINARIES
ICT SERVICES
A16 Lump Sum
A17 Lump Sum
SUB- TOTAL (SCHEDULE A)
To provide test results for all system installed in hardcopy & softcopy format.
To provide Project Management for the duration of project implementation period.
#REF!
1 All items shall be referred as per specification/appendix attached.
2 All quantities are PROVISIONAL. The actual quantites installed shall be measured on site after completion and prices
will be adjusted accordingly.
3 The Installation must be complete with Configuration, Testing and Commissioning for full functionality of the Equipment.
4 All Items must be provided with two (2) years maintenance and guarantee after commissioning of the equipment installed.
Description
Brief Specifications
B
B.1
B1.1
Supply, install and terminate data points using Category 6 (EIA/TIA), 23
AWG UTP copper cable from the associated Telecommunication Closet
Room (TCR) to the designated work area - office spaces and/or
Workstations in hot dip galvanised metal trunking, UPVC concealed
conduit, underfloor trunking for underfloor outlet box (underfloor cable
containment to be provided by M&E where applicable) including all
necessary materials/accessories to reflect complete system installation.
Nos 371
B.1.2
Supply 3.0 meter length UTP Cat 6 (EIA/TIA) factory terminated patch cords
c/w RJ45 connectors and boots from faceplate to workstation.
Nos 252
B.1.3
Supply 1.5 meter length UTP Cat 6 (EIA/TIA) factory terminated patch cords
c/w RJ45 connectors and boots from faceplate to Wireless Access Point
(AP), CCTV Cameras and Card Access Controllers
Nos 119
B.1.4
Supply 3.0 meter length UTP Cat 6 (EIA/TIA) factory terminated patch cords
c/w RJ45 connectors and boots for 42U rack.
Nos 371
B.1.5
Supply 8.0 meter length UTP Cat 6 (EIA/TIA) factory terminated patch cords
c/w RJ45 connectors and boots for 42U rack.
Nos 25
B.1.6
To supply and install Category 6 UTP Patch Panel 24-port complete with
rear cable support bar and designated labels for ease of identification at
designated Telecommunication Closet Room (TCR).
Nos 19
B.1.7 Single shuttered angled face plate & Category 6 UTP modular jack. Nos 371
B.2 BACKBONE CABLING SYSTEM (Intrabuilding)
B.2.1
To supply and install 12 core indoor SMF 9/125 m fiber optic cable from
Data Center (Level 1, Bangunan Pentadbiran) to Level
Ground,Telecommunication Closet Room (TCR - 1A.G.01) in hot dip
galvanised metal trunking including all necessary materials/accessories to
reflect complete system installation.
Meter 60
B.2.2
To supply and install 12 core indoor SMF 9/125 m fiber optic cable from
Data Center (Level 1, Bangunan Pentadbiran) to Level 1,
Telecommunication Closet Room (TCR - 1A.1.01) in hot dip galvanised
metal trunking including all necessary materials/accessories to reflect
complete system installation.
Meter 50
B.2.3
To supply and install 12 core indoor SMF 9/125 m fiber optic cable from
Data Center (Level 1, Bangunan Pentadbiran) to Level 2 ,
Telecommunication Closet Room (TCR - 1A.2.01) in hot dip galvanised
metal trunking including all necessary materials/accessories to reflect
complete system installation.
Meter 60
B.2.4
To supply and install 12 core indoor SMF 9/125 m fiber optic cable from
Data Center (Level 1, Bangunan Pentadbiran) to the MDF Room (Level
Ground, Bangunan Pentadbiran) in hot dip galvanised metal trunking
including all necessary materials/accessories to reflect complete system
installation.
Meter 110
B.2.5
To supply and install 12 core indoor SMF 9/125 m fiber optic cable from
Main Telecommunication Closet Room, Residential College (TCR,
5A1.G.01) to the designated TCR in Level Ground (5A1.G.02) in hot dip
galvanised metal trunking including all necessary materials/accessories to
reflect complete system installation.
Meter 100
PEMASANGAN SISTEM TEKNOLOGI MAKLUMAT & KOMUNIKASI (ICT) UNTUK
PEMBANGUNAN PUSAT PENDIDIKAN ASASI, UNIVERSITI ISLAM ANTARABANGSA GAMBANG,
PAHANG DARUL MAKMUR
-FASA 2: BANGUNAN PENTADBIRAN DAN KOLEJ KEDIAMAN
ICT SERVICES
Total Price
(RM)
STRUCTURED CABLING SYSTEM
HORIZONTAL CABLING
Items Unit Qty
Unit Price
(RM)
#REF!
1 All items shall be referred as per specification/appendix attached.
2 All quantities are PROVISIONAL. The actual quantites installed shall be measured on site after completion and prices
will be adjusted accordingly.
3 The Installation must be complete with Configuration, Testing and Commissioning for full functionality of the Equipment.
4 All Items must be provided with two (2) years maintenance and guarantee after commissioning of the equipment installed.
Description
Brief Specifications
B
PEMASANGAN SISTEM TEKNOLOGI MAKLUMAT & KOMUNIKASI (ICT) UNTUK
PEMBANGUNAN PUSAT PENDIDIKAN ASASI, UNIVERSITI ISLAM ANTARABANGSA GAMBANG,
PAHANG DARUL MAKMUR
-FASA 2: BANGUNAN PENTADBIRAN DAN KOLEJ KEDIAMAN
ICT SERVICES
Total Price
(RM)
STRUCTURED CABLING SYSTEM
Items Unit Qty
Unit Price
(RM)
B.2.6
To supply and install 12 core indoor SMF 9/125 m fiber optic cable from
Main Telecommunication Closet Room, Residential College (TCR,
5A1.G.01) to the designated TCR in Level 3 (5A1.3.01) in hot dip galvanised
metal trunking including all necessary materials/accessories to reflect
complete system installation.
Meter 30
B.2.7
To supply and install 12 core indoor SMF 9/125 m fiber optic cable from
Main Telecommunication Closet Room, Residential College (TCR,
5A1.G.01) to the designated TCR in Level 3 (5A1.3.02) in hot dip galvanised
metal trunking including all necessary materials/accessories to reflect
complete system installation.
Meter 130
B.2.8
Fiber termination of fiber optic cable using Single Mode Fiber Pigtail, SC-
Style
Nos 216
B.2.9
To supply and install 12-port SC Rack Mount Fiber Patch Enclosure c/w
splice tray and accessories for TCR equipment Rack.
Nos 18
B.2.10 To supply Single Mode Fiber Optic Cable Patch Cord, 3.0 meter Nos 36
B.2.11
To supply and install 8 core 3c2v coaxial cable from Data Center (Level 1,
Bangunan Pentadbiran) to MDF Room (Level Ground, Bangunan
Pentadbiran) in galvanised hot deep metal trunking including all
necessary materials/accessories to reflect complete system installation.
Meter 110
B.3 BACKBONE CABLING SYSTEM (Interbuilding)
B.3.1
To supply and install 12-Fiber outdoor amoured Single Mode 9/125um fiber
optic cable from Data Center (Level 1, Bangunan Pentadbiran) to the
Residential College - Hostel, 5A.1 (Level Ground, 5A1.G.01)
Meter 1400
B.3.2
To supply and install 12-Fiber outdoor amoured Single Mode 9/125um fiber
optic cable from Residential College - Hostel, 5A.1 (Level Ground,
5A1.G.01) to Dining Hall (Level Ground)
Meter 300
B.4 TELECOMMUNICATION CLOSET
Supply, deliver, install and test of the following items:
B.4.1
42U 19" Equipment Rack (800mm x 1000mm) c/w power supply (1 x 12 nos.
13A S/S/O), vertical (four side) cable management, 4 nos. ventilation fans,
quick release lockable perforated side panels, lockable metal perforated
front door, cable entry points provided for top/bottom access, adjustable
feet/100mm plinth/heavy duty castors
Nos 9
B.4.2
24U 19" Equipment Rack (800mm x 1000mm) c/w power supply (1 x 7 nos.
13A S/S/O), vertical (four side) cable management, 2 nos. ventilation fans,
quick release lockable perforated side panels, lockable metal perforated
front door, cable entry points provided for top/bottom access, adjustable
feet/100mm plinth/heavy duty castors
Nos 3
B.4.3
15U 19" Wall Mount Equipment Rack (600mm x 600mm) c/w power supply
(1 x 4 nos. 13A S/S/O), top cover with 2 nos. ventilation fans, quick release
reversible safety glass door, front and side access.
Nos 1
#REF!
1 All items shall be referred as per specification/appendix attached.
2 All quantities are PROVISIONAL. The actual quantites installed shall be measured on site after completion and prices
will be adjusted accordingly.
3 The Installation must be complete with Configuration, Testing and Commissioning for full functionality of the Equipment.
4 All Items must be provided with two (2) years maintenance and guarantee after commissioning of the equipment installed.
Description
Brief Specifications
B
PEMASANGAN SISTEM TEKNOLOGI MAKLUMAT & KOMUNIKASI (ICT) UNTUK
PEMBANGUNAN PUSAT PENDIDIKAN ASASI, UNIVERSITI ISLAM ANTARABANGSA GAMBANG,
PAHANG DARUL MAKMUR
-FASA 2: BANGUNAN PENTADBIRAN DAN KOLEJ KEDIAMAN
ICT SERVICES
Total Price
(RM)
STRUCTURED CABLING SYSTEM
Items Unit Qty
Unit Price
(RM)
B.4.4 1U Rackmount 17 LCD Monitor with integrated keyboard and touchpad Nos 1
B.4.5 1U Rackmount 8 port PS/2 - USB KVM Switch & Cable Nos 1
B.5 UPS
Supply, deliver and install of the following items:
B.5.1 To provide and install 5kVA rack mount UPS for TCR equipment rack . Nos 1
B.5.2 To provide and install 3kVA rack mount UPS for TCR equipment rack . Nos 3
B.5.3 To provide and install 1kVA rack mount UPS for TCR equipment rack . Nos 3
B.5.4
To provide and install 750VA rack mount UPS for wall mount equipment
rack .
Nos 1
SUB- TOTAL (SCHEDULE B)
1 All items shall be referred as per specification/appendix attached.
2 All quantities are PROVISIONAL. The actual quantites installed shall be measured on site after completion and prices
will be adjusted accordingly.
Description
Brief Specifications
C
To supply, install, test, commission and handover of both of the fully
functional Local Area Networks (LAN) for the Project
C.1
C.1.1
Provide 2 x 40 Gigabit (80 GB bonded) connectivity between core
switches.
Includes switch fabric capable of supporting up to 720 Gbps bandwidth
including all required Operating System
C.1.1.1 And Provide appropriate 1 GB line cards in core switches to support all
uplinks to connect to access layer switches.
C.1.1.2 #no of Supervisor Engine with two ports 40GbE
C.1.1.3 2 no of Power Supply Module
C.1.1.4 Support for future capacity 100Gbit ports
C.1.1.5 # port Gigabit Ethernet Module
C.1.1.6 Layer 3 Forwarding Performance of up to 400 Mpps.
C.1.1.7
Backplane Bandwidth >= 700 Gbps.
C.1.1.8 # lot of GE SFP, Base-T
C.3
C.3.1.1 Enterprise Class switches
C.3..1.2
have 48 10 / 100 / 1000 ports and a minimum of 4 SFP based Gigabit
Ethernet ports
C.3.1.3 Minimum 64Gbps stacking forwarding rat
C.3..1.4 Minimum of 160-Gbps switching fabric
C.3.1.5 Provide support for 2 port 10 gigabit SFP+ module
C.3..1.6 (DHCP) auto configuration
C.8
C.8.1 Layer 3 and Layer 4 protection
IDS-Intrusion Detection System
C.8.2 IPS - Intrusion Prevention System
C.8
C.8.1 server hardware Nos 1
C.8.2 Licance software Nos 1
Unit Qty
NETWORK ACTIVE EQUIPMENT
Unit Price
(RM)
Total Price
(RM)
10
ICT SERVICES
SERVER ACCESS SWITCH
FIREWALL
NETWORK MANAGEMENT SYSTEM
Items
CORE SWITCH
Nos 1
Nos 1
Nos
1 All items shall be referred as per specification/appendix attached.
2 All quantities are PROVISIONAL. The actual quantites installed shall be measured on site after completion and prices
will be adjusted accordingly.
Description
Brief Specifications
C
Unit Qty
NETWORK ACTIVE EQUIPMENT
Unit Price
(RM)
Total Price
(RM)
ICT SERVICES
Items
C.8
C.8.1
Call Processing Servers
Minimum support of 100 IP phones per server
Nos 1
C.8.2 Media Gateways Nos 1
C.8.3 Call recording appliances Nos 1
C.8.4 Call logging servers Nos 1
C.8.5
Operator Console (TYPE F)
Nos 5
C.8.6
Entry Level Sets (TYPE C)
Nos 40
C.8.7 Voicemail servers Nos 133
C.9 OTHERS
To supply, install and configure DNS/DHCP Server, NMS, IPS, Bandwidth
Management System c/w the latest software image and redundant power
supply as per drawing and Schedule of Compliancy.
C.9.4 Bandwidth Management System
C9.4.1 Appliance that Accelerates, Monitors and Optimizes. Lot 1
NOTES:
SUB- TOTAL (SCHEDULE C)
IP TELEPHONY COMMUNICATION
#REF!
1 All items shall be referred as per specification/appendix attached.
2 All quantities are PROVISIONAL. The actual quantites installed shall be measured on site after completion and prices
will be adjusted accordingly.
3 The Installation must be complete with Configuration, Testing and Commissioning for full functionality of the Equipment.
4 All Items must be provided with two (2) years maintenance and guarantee after commissioning of the equipment installed.
Description
Brief Specifications
D MANHOLE & ACCESSORIES (EXTERNAL TELECOMMUNICATION WORK)
Supply, deliver, install and test of the following items:
D.1
Supply and Installation of Cable Chamber with cover and frame, with all
necessary iron wares and fittings, including excavation, backfilling,
resurfacing, and disposal spoilt off site.
D.1.1 Manhole type - JC9C Nos 16
D.1.3 Pit - 600 x 600mm (c/w metal chequers plate with lifting handle) Nos 3
D.2
Supply and Installation of UPVC ducts approved by SIRIM & TMB having
100mm ID, 3.0mm thick and frame, with warning tapes, including
excavation, backfilling, resurfacing, disposal spoilt off site, rodding test,
duct plugs, guide rope, and other necessary works as per specification
and drawings:
Earth covering onto pipes, without concrete encasement, without
pavement;
D.2.1 2 ways 1530mm depth Meter 56
D.2.2 4 ways 1530mm depth Meter 140
D.2.3 6 ways 1680mm depth Meter 76
D.2.4 8 ways1830mm depth Meter 1168
D.3
Supply and Installation of GI ducts Class A approved by SIRIM & TMB
having 100mm ID, 3.0mm thick and frame, with warning tapes, including
excavation, backfilling, resurfacing, disposal spoilt off site, rodding test,
duct plugs, guide rope, and other necessary works as per specification
and drawings:
Earth covering onto pipes, without concrete encasement, without
pavement
D.3.1 6 ways 1680mm depth Meter 315
D.3.2 8 ways 1830mm depth Meter 192
D.4 Interbuilding Copper Backbone Cabling System
D.4.1
To supply and install Copper Backbone/Tie Cable, 0.63mm outdoor (100 -
Pair): From MDF room (Bangunan Pentadbiran) to TCR (5A1.G.01,
Residential College - Hostel 5A.1)
Meter 1300
D.4.2
To supply and install Copper Backbone/Tie Cable, 0.63mm outdoor (10 -
Pair): From TCR (5A1.G.01, Residential College - Hostel 5A.1) to Dining Hall
Meter 300
D.5 Intrabuilding Copper Backbone Cabling System
D.5.1
To supply and install Copper Backbone/Tie Cable, 0.63mm indoor
(10-Pair) in hot dip galvanised metal trunking, UPVC concealed conduit
including all necessary materials/accessories to reflect complete system
installation:
D.5.1.1
From MDF room (Bangunan Pentadbiran) to TCR Ground (1A1.G.01,
Bangunan Pentadbiran)
Meter 60
D.5.1.2
From MDF room (Bangunan Pentadbiran) to TCR First Floor (1A1.1.01,
Bangunan Pentadbiran)
Meter 70
PEMASANGAN SISTEM TEKNOLOGI MAKLUMAT & KOMUNIKASI (ICT) UNTUK
PEMBANGUNAN PUSAT PENDIDIKAN ASASI, UNIVERSITI ISLAM ANTARABANGSA GAMBANG,
PAHANG DARUL MAKMUR
-FASA 2: BANGUNAN PENTADBIRAN DAN KOLEJ KEDIAMAN
ICT SERVICES
Total Price
(RM)
Unit Price
(RM)
Items Unit Qty
Description
Brief Specifications
Total Price
(RM)
Unit Price
(RM)
Items Unit Qty
D.5.1.3
From MDF room (Bangunan Pentadbiran) to TCR Second Floor (1A1.2.01,
Bangunan Pentadbiran)
Meter 80
D.6 MDF Room/Equipment Room
D.6.1
Supply and install 2-vertical 200 pairs stainless steel Wall Mounting Frame
c/w necessary disconnection modules lightning arrestors and labelling at
TCR Ground Floor (1A.G.01) Bangunan Pentadbiran
Nos 1
D.6.2
Supply and install 2-vertical 200 pairs stainless steel Wall Mounting Frame
c/w necessary disconnection modules lightning arrestors and labelling at
TCR Ground Floor (5A1.G.01) Residential College
Nos 1
D.6.3
Supply and install metalclad telephone DP, 10-pairs c/w necessary
disconnection modules, lightning arrestors and labelling
Nos 4
SUB- TOTAL (SCHEDULE D)
#REF!
1 All items shall be referred as per specification/appendix attached.
2 All quantities are PROVISIONAL. The actual quantites installed shall be measured on site after completion and prices
will be adjusted accordingly.
3 The Installation must be complete with Configuration, Testing and Commissioning for full functionality of the Equipment.
4 All Items must be provided with two (2) years maintenance and guarantee after commissioning of the equipment installed.
Description
Brief Specifications
E
Supply, deliver, install and configure of the following items:
E.1 IP CAMERA
E.1.1
Fixed dome , vandal-resistant, H.264, 1MP, Varifocal 2.8-10 mm
lens with fixed iris.
Nos 42
E.1.2
Outdoor PTZ Camera, 35X Zoom, H.264, Outdoor-ready, IP66-rated,
PTZ Dome camera with 35x Zoom
Nos 10
E.1.3 Wall Bracket for Outdoor PTZ Camera Nos 10
E.2 SOFTWARE
E.2.1 Management Software inclusive of all necessary licenses Lot 1
E.3 MANAGEMENT SERVER WITH OS
E.3.1
Video Management (NVR) Server with minimum specification as follows:
- Xeon Processor, 4GB RAM, Windows Server 2008 Std Edition or latest
version,
industrial grade chassis with heavy duty PSU, and storage capacity up
to 10TB.
Nos 1
E.4 SERVER RACK
E.5.1 42U 19-inch Server Rack 800mm x 1000mm c/w accessories Nos 1
E.5.2 1U Rackmount 17 LCD Monitor with integrated keyboard and touchpad Set 1
E.5.3 1U Rackmount 8 port PS/2 - USB KVM Switch & Cable Nos 1
E.5 MAIN CONTROL ROOM
E.5.1 32" Professional LCD Full HD Display Nos 2
E.5.2
NVR Viewing Workstation or with minimum specification or latest version as
follows:
- Xeon Processor, 4GB RAM, 500GB Hard Disk, 2GB HD GPU Graphics
Output (support) up to 2 x Large Format Display), Windows 7 Professional
Edition or latest version/Embedded, Industrial Grade Chassis with Heavy-
duty PSU
Nos 1
E.5.3 Joystick Camera Controller Nos 1
Unit Qty
ICT SERVICES
PEMASANGAN SISTEM TEKNOLOGI MAKLUMAT & KOMUNIKASI (ICT) UNTUK
PEMBANGUNAN PUSAT PENDIDIKAN ASASI, UNIVERSITI ISLAM ANTARABANGSA GAMBANG,
PAHANG DARUL MAKMUR
-FASA 2: BANGUNAN PENTADBIRAN DAN KOLEJ KEDIAMAN
SUB- TOTAL (SCHEDULE E)
Total Price
(RM)
IP CCTV SYSTEM
Unit Price
(RM)
Items
1 All items shall be referred as per specification/appendix attached.
2 All quantities are PROVISIONAL. The actual quantites installed shall be measured on sheet
Description
Brief Specifications
F INTEGRATED SECURITY MANAGEMENT SYSTEM
Supply, deliver, install and configure of the following items:
F.0 CONTROLLER & PERIPHERALS
F Access Control System
F.1.2 must fully integrate with the building fire alarm system Nos 1.00 4.00 4.00
UPS or Back-Up Battery (on-line type) shall be provided in the system
with at least 1 hour operation time
Nos 5.00 4.00 20.00
electronic locks Nos 2 6.00 12.00
card readers Nos 4.00 5.00 20.00
magnetic locks Nos 5.00 3.00 15.00
push to exit buttons Nos 4.00 3.00 12.00
card encoding system which includes 2 x badging stations Nos 6.00 44.00 264.00
software with licenses Nos 5.00 4.00 20.00
cables as required to make a fully operable Nos 5.00 4.00 20.00
1800 access cards. Nos 4.00 4.00 16.00
prepare all workshop drawings detailing the containment routes,
arrangements, floor plans, security office lay out and schematic
diagrams required. "schematic diagrams"
Nos 4.00 4.00 16.00
supply and install operator consoles in the Security Control Room
suitable to accommodate three operators and all supporting
equipment.
Nos 3.00 2.00 6.00
Employer / Operator training. Nos 3.00 4.00 12.00
Access Control Barriers Nos 4.00 3.00 12.00
-
F.2 MANAGEMENT SOFTWARE -
F2.1 Web Management Software inclusive of all necessary licences Nos 1.00 3.00 3.00
F2.2
Desktop PC with latest version of hardware and software inclusive of
antivirus.
Nos 1.00 4.00 4.00
456.00 SUB- TOTAL (SCHEDULE F)
Qty
ICT SERVICES
Total Price
(RM)
Unit Price
(RM)
Items Unit
#REF!
1 All items shall be referred as per specification/appendix attached.
2 All quantities are PROVISIONAL. The actual quantites installed shall be measured on site after completion and prices
will be adjusted accordingly.
3 The Installation must be complete with Configuration, Testing and Commissioning for full functionality of the Equipment.
4 All Items must be provided with two (2) years maintenance and guarantee after commissioning of the equipment installed.
Description
Brief Specifications
G OTHERS
G1 LABELLING
G1.1
To provide and install labeling for all network cable, patch panel, rack, faceplate,
switches, phone, LDC and associated peripherals complying to JKR specification.
Lump Sum
G2 TESTING AND COMMISSIONING
Testing and commissioning of the ICT system and guarantee full functionality of the
entire Network and Communication System complete with integration to the
Campus Core System (UIA Gombak). (Contractor needs to carry out pre-
commissioning and UAT for all the system and submit test results to JKR before
carrying out commissioning work with JKR)
G2.1 Structured Cabling System Lump Sum
G2.2 Active Equipment System Lump Sum
G2.3 CCTV System Lump Sum
G2.4 Card Access System Lump Sum
G2.5 Data Center Equipment as Item H Lump Sum
G3 TRAINING
On-site Training of the ICT system to the client representatives for the operational
and functionality of the systems for 5 pax.
G3.1 Structured Cabling System (2 days) Lump Sum
G3.2 Active Equipment System (5 days) Lump Sum
G3.3 CCTV System (2 days) Lump Sum
G3.4 Card Access System (2 days) Lump Sum
G3.5 Data Center ( 2 days) Lump Sum
PEMASANGAN SISTEM TEKNOLOGI MAKLUMAT & KOMUNIKASI (ICT) UNTUK
PEMBANGUNAN PUSAT PENDIDIKAN ASASI, UNIVERSITI ISLAM ANTARABANGSA GAMBANG,
PAHANG DARUL MAKMUR
-FASA 2: BANGUNAN PENTADBIRAN DAN KOLEJ KEDIAMAN
ICT SERVICES
SUB- TOTAL (SCHEDULE G)
Items Unit
Total Price
(RM)
#REF!
1 All items shall be referred as per specification/appendix attached.
2 All quantities are PROVISIONAL. The actual quantites installed shall be measured on site after completion and prices
will be adjusted accordingly.
3 The Installation must be complete with Configuration, Testing and Commissioning for full functionality of the Equipment.
4 All Items must be provided with two (2) years maintenance and guarantee after commissioning of the equipment installed.
Description
Brief Specifications
H
Supply, deliver and install of the following items:
H.1 UPS
H.1.1
40KVA UPS c/w with standard 415V/3ph/50Hz double conversion
on-line uninterruptible power supply system c/w the following features:
- 10 minutes autonomy back-up maintenance free sealed lead acid
batteries in cabinet using 10 years design life spend battery
H.2 WATER DETECTION SYSTEM
H.2.1
To supply and install Water Leak Detection System inclusive of the
following:
H.2.1.1
Water Detection Control panel capable of sensitivity adjustment, cable
break alarm and loop back system complete with
- Water Detected & open circuit relay outputs
- Leak Detection Cable at perimeter of the data center
H.3 SMOKE DETECTION SYSTEM
H.3.1
1 set of system c/w fitting and accessories to protect the data center
room c/w the following:
- Piping, installation and fitting
- Engineering programming, testing and commissioning
H.4 FACILITIES MONITORING SYSTEM
H.4.1
To supply and install Monitoring System c/w Monitoring Controller,
Workstation with 17" LCD Monitor, Digital/Analog Input and Output
interface, and Configuration for Displaying/Controlling Equipment Status
and Alert Messages.
Lot 1
H.4.2
To supply and install Single-Pair cable in PVC conduit from controller to the
following equipments/sensor:-
- Water Leak Panel
- Temperature/Humidity Transmitter sensor
- UPS system
- PDU/DB/MSB/EMSB Digital Meter
- Precision Air Conditioning
- Fire Alarm Panel
H.5 OTHERS
H.5.1
To supply and install overhead hop dip galvanised cable ladder and
trunking including all necessary materials/accessories to reflect complete
system installation and cable access to the data center.
Lot 1
Lot 1
SUB- TOTAL (SCHEDULE H)
Lot 1
Nos
Lot 1
DATA CENTER EQUIPMENT AND PERIPHERALS
Unit Price
(RM)
Items Unit Qty
1
ICT SERVICES
PEMASANGAN SISTEM TEKNOLOGI MAKLUMAT & KOMUNIKASI (ICT) UNTUK
PEMBANGUNAN PUSAT PENDIDIKAN ASASI, UNIVERSITI ISLAM ANTARABANGSA GAMBANG,
PAHANG DARUL MAKMUR
-FASA 2: BANGUNAN PENTADBIRAN DAN KOLEJ KEDIAMAN
Total Price
(RM)
#REF!
1
2
3
4
A
B
C
D
E
F
G
H
Signature of Tenderer :
Name :
Designation :
Tenderer's Seal :
Address :
Date :
Witness
Signature of Witness : :
Name :
Address :
Date :
All quantities are PROVISIONAL. The actual quantites installed shall be measured on site after completion and prices
will be adjusted accordingly.
All items shall be referred as per specification/appendix attached.
The Installation must be complete with Configuration, Testing and Commissioning for full functionality of the
Equipment.
All Items must be provided with two (2) years maintenance and guarantee after commissioning of the equipment
installed.
DATA CENTER
PRELIMINARIES
STRUCTURED CABLING SYSTEM
NETWORK ACTIVE EQUIPMENT
MANHOLE & ACCESSORIES (EXTERNAL TELECOMMUNICATION WORK)
IP CCTV SYSTEM
INTEGRATED SECURITY MANAGEMENT SYSTEM
OTHERS
PEMASANGAN SISTEM TEKNOLOGI MAKLUMAT & KOMUNIKASI (ICT) UNTUK
PEMBANGUNAN PUSAT PENDIDIKAN ASASI, UNIVERSITI ISLAM ANTARABANGSA GAMBANG,
PAHANG DARUL MAKMUR
-FASA 2: BANGUNAN PENTADBIRAN DAN KOLEJ KEDIAMAN
GRAND TOTAL
ICT SERVICES
Items
Total Price
(RM)
Summary Of Tender