1.6.2 AED DESIGN REQUIREMENTS DOCUMENTS


Unless specifically stated herein, the AED-N Standard Design Requirements (latest version) shall be
adhered to in this Contract. These documents are available from the AED-N website located at:
http://www.aed.usace.army.mil/engineeringtop2010.asp
These documents shall be used as the basis for design and construction, and for selecting options within
the United Facilities Guide Specifications (UFGS). When provided, its the Contractors option to use
either the specifications contained in the AED-N Standard Design Requirements, or to adapt the UFGS
specifications to match the requirements provided in the AED-N Standard Design Requirements. Site or
project specific data and requirements in the AED-N Standard Design Requirements shall supersede
UFGS language where there are differing criteria which must be evaluated and selected.
2.0 CIVIL REQUIREMENTS
The project includes furnishing all materials, equipment and labor for constructing electrical, water,
communication, wastewater treatment and storm sewer service lines, as applicable, and connecting to
the existing utility networks.
2.1 ENVIRONMENTAL PROTECTION
The Contractor shall comply with all requirements of Section 01355 ENVIRONMENTAL PROTECTION.
2.2 GEOTECHNICAL
2.2.1 GEOTECHNICAL REPORT
Geotechnical report(s) have already been provided for the site and can be found in Appendix B-3 for
reference.
2.3 SITE DEVELOPMENT
2.3.1 SITE PLAN
The Contractor shall provide the following plans, and submit as part of the required design review process
as defined in Section 01335 SUBMITTAL PROCEDURES.
2.3.2 SITE SURVEY PLAN
a. As located and defined by the items listed in Section 1.6.1 provided in Section 01010 SCOPE OF
WORK, the Site Survey Plan shall be performed by a licensed professional (surveyor, civil engineer
or architect), and shall show the areas in the NLC to be modified in this Contract. The areas to be
surveyed shall include items 4, 5, 6, 7, and 10 as described in Section 01010 1.6.1b. The site survey
shall meet the requirements of World Geodetic System 1984 in decimal degrees.
b. The plan shall be based on a professional survey of the project site, and shall include and locate the
following existing information: topographic contours, corners of existing buildings and significant
structures, trees, wadis, adjacent and/or on-site roads with names and widths, utility easements,
right-of-ways, setbacks, parking and paved areas, storage containers, stoops, sidewalks, barriers,
ECPs, perimeter walls and towers, above ground utilities, and bunkers.
2.3.3 MASTER SITE PLAN
a. The Master Site Plan shall identify and show all proposed work including the following: site limits,
perimeter walls and all its related components, entry control point components, buildings, roads,
parking areas, fenced-in areas, sidewalks, utility structures, landscape features, and drainage
structures. The Master Site Plan shall refer to the provided Conceptual Site Plan, other provided
drawings and all requirements stated in Section 01010 SCOPE OF WORK to assist in developing the
W912DQ-13-R-4034