BLACK START

RESTORATION PROCEDURES
OF
SOUTHERN REGION 2014







SOUTHERN REGIONAL LOAD DESPATCH CENTRE
POWER SYSTEM OPERATION CORPORATION LTD

NOVEMBER 2013
BANGALORE


INDEX
CHAPTER DESCRIPTION PAGE NO.
1 Introduction 1-2
2 Black start Facilities 3-4
3 System Restoration Approach 5-7
4 Southern region Over view & Grid maps 8-16
5 Detailed Operational Procedure for AndhraPradesh 17-70
6 Detailed Operational Procedure for Karnataka 71-96
7 Detailed Operational Procedure for Tamil nadu 97-151
8 Detailed Operational Procedure for Kerala 152-175
9 Electric Traction 176-191


List of Annexures
ANNEXUR
E
DESCRIPTION PAGE NO.
I List of Power Stations With Black Start Facility in S.R 192-193
II List of Major Sub-Stations With Synchronising Facility
in S.R
194-197
III List of Railway Traction Stations 198-201
IV Mock Exercise Procedure For Inter Regional HVDC
Links
202-206


List of Exhibits
EXHIBIT DESCRIPTION PAGE NO.
ANDHRA PRADESH
1
Startup Power for A.P Subsystem 1: RYTPP, VTPS,
Srisailam & NSagar Complex (During Total / Partial
Blackout)
27


EXHIBIT DESCRIPTION PAGE NO.
2
Startup Power for A.P Subsystem 2: Ramagundam
NTPC (During Total Blackout)
39
3
Schematic Diagram of Badravathi HVDC Back to Back
Station
40
4
Startup Power for A.P Subsystem 2: Ramagundam
NTPC (During Partial Blackout)
46
5
Startup Power for A.P Subsystem 3: KTPS, NTPC
Simhadri (During Partial Blackout)
50
6
Schematic Diagram of Gajuwakha HVDC Back to Back
Station
55
7 Supply Details for Railway Traction System in A.P 60-62
KARNATAKA
8
Startup Power for Karnataka Subsystem 1:
Sharavathi, Sharavathi Tail Race (STRP), Jog, Varahi
and Yelehanka (Diesel). (During Total / Partial
Blackout)
77
9
Startup Power for Karnataka Subsystem 2:
RTPS,BTPS, Nagjheri, Kadra, Kodasalli ,Kaiga, Tata &
Jindal (During Total /Partial Blackout)
84
10
Supply Details for Railway Traction System in
Karnataka
95
TAMIL NADU
11
Startup Power for TN Subsystem 1: TTPS (During
Total Blackout)
110
12
Startup Power for TN Subsystem 2: MTPS & NLC
(During Total / Partial Blackout)
121
13
Startup Power for TN Subsystem 3: Chennai Area
(During Total / Partial Blackout)
140
14
Supply Details for Railway Traction System in Tamil
Nadu.
146-147
KERALA
15
Startup Power for Kerala Subsystem 1: North Kerala
(During Total / Partial Blackout)
158


16
Startup Power for Kerala Subsystem 2: South Kerala
(During Total / Partial Blackout)
163
17
Supply Details for Railway Traction System in Kerala. 169
Grid Maps
EXHIBIT DESCRIPTION PAGE NO.
1 Andhra Pradesh System 12
2 Karnataka System 13
3 Kerala System 14
4 Tamil Nadu System 15
5 Southern Region 16

Mock Drill
EXHIBIT DESCRIPTION PAGE NO.
1 Andhra Pradesh System 63-70
2 Karnataka System 96
3 Kerala System 170-175
4 Tamil Nadu System 150-151

SRLDC Black Start Restoration Procedure 2014


1.0 INTRODUCTION

1.1 In an integrated power system, disturbances of major / minor nature can occur under
various contingencies. Such disturbances can result in collapse of a part of the
system or sometimes entire system, requiring restoration of the affected system in
the minimum possible time. In order to achieve the same, it is therefore necessary to
have a well laid down restoration procedure under various conditions of partial black
out and /or total black out of the system.

1.2 In the event of a black out, the initial moments are extremely precious and it requires
the right decision to be taken at first instance for speedy restoration of the system.
Any lapse or delay in taking the right initial decision may prove to be very costly.
Hence, it is of paramount importance that all the operating personnel of Load
Despatch Centres and the officials involved in grid operation should be thoroughly
conversant with the restoration procedure so as to minimise the time taken in
restoration of the system after partial /total black out. Further during the Restoration
process the system operators, Power station and Substation personnel must act in
consonance to normalize the grid.

1.3 SRLDC has been publishing the document on Black Start Restoration Procedure in
SR from time to time viz. December 1999, January 2002, July 2004, July 2006,
February 2009, February 2010 , February 2011, January 2012, December 2012. As
the network is expanding, in line with clause 5.8 (a & b) of IEGC, this Procedure
requires review and/or revision every year, based on which the Mock drill of the
procedure for different sub-systems shall be carried out by the constituents at least
once every six months under intimation to SRLDC.

1.4 SRLDC has requested the feedback & changes w.r.t last year in 88
th
OCCM & 89
th

OCCM & letter dt 29.10.13.


1.5 Based on the details of new elements added during this year and the feedback
received during Black start Workshop held at constituents premises & letter
1 of 206.
SRLDC Black Start Restoration Procedure 2014


communication, the updated version of the Black Start Restoration Procedure in SR
2014 (BSRP 2014) is being released.


1.6 The procedures given in this document are general in nature and provide a guideline
for the restoration team at the time of disturbance. Depending on the availability of
transmission elements, generators and the category and extent of blackout,
restoration on real time basis should adopt the best procedure suited for the
situation.

1.7 Based on this document, SR constituents are advised to prepare station wise
detailed mock drill procedure/plan including switching instructions in their control
centres, so that the operators will have further clarity to ensure faster restoration in
case of contingencies.

--------

2 of 206.
SRLDC Black Start Restoration Procedure 2014


2.0 BLACK START FACILITIES

2.1 Existing Black Start facilities :
A list of generating stations with self-start facilities is enclosed as Annexure-I.

2.2 Survival/Auxiliary power requirement :
Survival power can be defined as the minimum power required for avoiding the
damage to the equipment in case of supply failure and keep the equipment fit for
reuse immediately. Under black start failure the survival / auxiliary power would
consist of the following:
Turbine emergency oil pump
Jacking oil pumps
Barring gear of the turbine
Lubricating oil pumps
Compressors for breaker operation
Emergency lighting
Battery chargers communication & telemetry system.

2.3 As a general rule, the survival power requirement would be around 0.25-0.30%
of the unit capacity.
Sl.No. Unit Capacity Survival power required
1 120 MW Unit 250-350 KW
2
210 MW unit 350-500 KW
3
500 MW Unit 1250-1500 KW

2.4 Start up power requirement:
The start up power is the power required for the auxiliaries while the generating unit
is restored. The requirement of start up power by various units is as follows:
Nuclear & Thermal : 7 to 8% of the unit capacity
Hydro : 0.5 to 1% of the unit capacity
Gas : 1.5 to 2%of the unit capacity
The startup power requirement for starting the thermal units is considerably high as
the major auxiliaries like BFP, ID Fan, FD fan, CW pumps etc. are of bigger size and
3 of 206.
SRLDC Black Start Restoration Procedure 2014


the starting torque is large. However, in case of hydro units, the requirement of start-
up power is comparatively much lower because of relatively very few auxiliaries. The
details of the DG Set installed in the generating stations for providing start up power
is enclosed as Annexure-I.

2.5 Synchronising facilities at power stations / Major sub-stations:
In order to build up the system, the synchronizing facilities play a very important role.
The different generating stations having synchronising facilities are indicated in
Annexure-1. Similarly, major 220/230KV sub-stations where synchronising facilities
are available are detailed at Annexure-II. All 400kV Stations in the Region have
Synchronising facility

2.6 Railway Traction Supply
During the time of System Restoration (Black Start) due importance is required to be
given to the traction load and the supply to the grid points feeding the Railway
Traction Station is to be extended on priority. A List of Railway Traction Stations is
given in Annexure III

2.7 Mock Exercise Procedure
Mock Exercise Procedure for availing start-up power through AC by-pass of Inter
Regional HVDC Links is detailed in Annexure IV.

4 of 206.
SRLDC Black Start Restoration Procedure 2014


3.0 SYSTEM RESTORATION APPROACH

While Restoring the System the following specific points must be given due
importance:

3.1 Systems with a fair dispersal of generating stations with Black Start facilities
Those generating stations where black start facility are available should be started
up and stable islands should be formed around these generating stations by
connecting essential loads. These islands should be gradually interconnected at the
earliest opportunity keeping into consideration the total load-generation balance.
Care should be taken to add loads in steps keeping in view the load characteristics
i.e. variation of load with respect to voltage & frequency.

3.2 Systems with limited and /or distant Black Start facility
Providing start up power for systems which have few generating stations with black
start facilities or the start up power to be imported from neighboring regions at one or
two points is a challenging job. This is mainly due to the distance between the source
of startup power and the generators and while extending the startup power care
should be taken to control the voltages at various intermediate points. This can be
achieved by providing loads and adjusting the taps of the transformers at the
intermediate stations. Sufficient attention has to be given for MVAR management
and line loadings to prevent secondary collapse during restoration which will extend
the restoration time.

3.3 Reactive Power Control:
During initial stages of restoration process, it is of utmost importance to keep the
system voltages within the allowable limit. This can be accomplished by

Charging the shorter line first
Switching off capacitor bank
Taking bus reactors into service
Charging transformers and taking Bus reactors into service wherever
available.
Converting line reactors into Bus reactors wherever feasible.
Operating generators at minimum voltage levels
Changing transformer taps
Energisation of fewer high voltage lines.

3.4 Load & Generation Balance:

Achieving load generation balance by restoring commensurate and essential
loads only.
Restoring load in small steps keeping in view the load characteristics.
Paying special attention while restoring traction and other fluctuating loads.
If considered essential, then by by-passing the U/F relays initially, until
sufficient loads are connected & frequency stabilizes.
Maintaining frequency close to 50 Hz.
5 of 206.
SRLDC Black Start Restoration Procedure 2014


Keeping Generating units on FGMO

3.5 Priorities:
Provide backup survival/start up power to nuclear units.
Restore start up power supply to generating stations, critical sub-stations and
load dispatch centres
Formation of self-sustaining Islands around the generating stations for which
procedures should be laid down in advance.
Avoid paralleling islands through weak ties.

3.6 Communication & Co-ordination:
Ensuring reliable communication between LDCs, generating stations and
major sub-stations.
Agreed back up procedures & delegation of control in the event of failure of
communication facilities.

Actions to be taken at Generating Stations and Substations:

Each Substation/Generating Station should draw its own detailed procedure for
the action to be taken in their stations during restoration

To avoid delay in restoration ensure the proper functioning of bus couplers,
synchronising facility etc at regular intervals
Ensure proper gas/air pressure in breakers and attend to minor leaks in time.
Do not attempt charging the suspected element.
Controlling high voltage during restoration to avoid damage to equipments
In case of low battery condition during restoration (due to weak battery/long
duration outage of power supply), to avoid excessive power drain, only the
essential load/communication channels to be kept in service Detail procedure
for such actions has to be prepared and kept handy by the concerned
substation/generating station

3.7 Survival Power:

Ensuring availability of backup power supplies such as batteries, battery chargers,
diesel sets to ensure supply to essential loads like air compressor for operation of
circuit breakers, DC system for communication systems etc.


6 of 206.
SRLDC Black Start Restoration Procedure 2014


3.8 General Guidelines:
While each disturbance would be different and may require a different plan,
nevertheless it would be useful to formulate general guidelines for the benefit of the
load despatchers. These may be described as below:

a) The operator at generating stations and sub-stations should have the
knowledge of pre-identified synchronising locations and pre laid down
synchronising procedures.

b) Switching procedure should be clearly laid down and periodically reviewed.

c) The transformer taps should be checked for desired setting to minimise
voltage difference.

d) The sub-stations operators and load despatchers should make a check of the
capacitor banks and reactors in service & accordingly should carry out the
switching operations for voltage control.

e) Energising of high voltage lines and cables should be avoided until enough
generating capacity is available.

f) Provision of islanding schemes area-wise, power station wise, and Unit wise
would enhance the ability to restore faster. These should be fully exploited.

g) Startup power to nuclear plants should be extended fast as poisoning of the
reactors would delay restoration of nuclear units.

h) Guidelines for decision making should be clear and should be delegated to all
the major sub-stations and generating stations under varied conditions.

i) Imparting training & providing necessary documentation to the load
despatchers

Note: The Restoration Procedure and sequence as given in document gives the
general guidelines for restoring the system. However, as the exact conditions
in case of each disturbance may be different and vary, the officer building up
the system may take the action best suited for speedy Restoration of the
system in real time.

7 of 206.
SRLDC Black Start Restoration Procedure 2014



4.0 SOUTHERN REGION OVERVIEW

This chapter explains the broad guidelines for restoring the system during Blackouts.
Procedure is split up in to four sections covering each Geographical area as detailed
below

Geographical
Area
Systems Covered Section Covering
the Procedure
Andhra
Pradesh
Andhra Pradesh and NTPC,
Ramagundam
5
Karnataka Karnataka and Kaiga APP 6
Tamilnadu Tamil Nadu, Pondy, NLC and MAPS 7
Kerala Kerala and Rajeev Gandhi CCPP 8

Each state has been divided in to Subsystems on the basis of the natural separation
taking place during disturbances.
Source for providing start up powers has been identified for each Subsystem both
from within the Subsystem and also from outside the Subsystem for early
Restoration of the power system.
The details of subsystems are:

4.1 ANDHRAPRADESH
Andhrapradesh has been divided into three subsystems as mentioned below:

SUB SYSTEM 1: The sub-system 1 comprises of major thermal stations viz.
VTPS, Lanco , RYTPS, SEPL , MEPL & Krishnapattinam AP and the important load
centers like Hyderabad, Vijayawada, Kurnool, Machilipatnam & Nellore along with
Black Start facilities at Srisailem & NSagar, Jurala ( if Water Available) Hydro
stations
8 of 206.
SRLDC Black Start Restoration Procedure 2014



SUB SYSTEM 2: The sub-system 2 comprises of Ramagundam Thermal power
station, Kakatiya and the important load centers like Ramagundam loads & Western
Region with No Black Start facilities in the Sub system.

SUB SYSTEM 3: The sub-system 3 comprises of major thermal stations viz.
KTPS, Simhadri, & Gas Stations viz Jegrupadu, VGTS, Spectrum, Gowthami,
Konaseema, GMR Vemagiri,Jegrupadu Extn and BSES and the important load
centers like Vizag, Kakinada along with Black Start facilities at USileru, LSileru
Hydro stations

Synchronisation of Sub Systems: Once the individual subsystems are built to a
stable level, the systems are synchronized with each other. The synchronization of
subsystems will be done at the generating stations, preferably

4.2 KARNATAKA
Karnataka has been divided into two subsystems as mentioned below:

SUB SYSTEM 1: The sub-system 1 comprises of Major Hydro Stations Viz.
Sharavathi, Sharavathi Tail Race (STRP), Jog, Varahi and Yelehanka (Diesel),
UPCL. It includes major and important load centre like Bangalore, Mysore, Hoody,
Peenya & Mangalore etc.

SUB SYSTEM 2: The sub-system 2 comprises of Major Thermal Stations Viz.
Raichur & Bellary and Major Hydro Stations Viz. Nagjheri, Kadra, Kodasalli & Almatti
and Kaiga (Nuclear), Tata (Diesel) & Jindal (Corex). It includes major and important
load centre like Hubli, Belgaum & Gulbarga etc.

4.3 TAMIL NADU
Tamilnadu has been divided into three subsystems as mentioned below:

SUB SYSTEM 1: The sub-system 1 comprises of major thermal station viz. TTPS,
Kudankulam Atomic Power Station, Hydro stations like Periyar, Suruliyar,
Papanasam, Servalar etc., Madurai Power Corporation Pvt. Ltd., (Diesel Power
9 of 206.
SRLDC Black Start Restoration Procedure 2014


Generating station), PENNA Power (Gas Power Generating Station) Valuthur GTPP
and wind generation spread over southern part of Tamilnadu. The important load
centers in this sub system include Tuticorin, Nagercoil, Tirunelveli & Madurai. This
sub system has process industries like Sterlite and Space research centre at
Mahendragiri etc., INS Kattabomman Naval Centre,

SUB SYSTEM 2: The sub-system 2 comprises of ISGS station NLC (TS-I Expn,
TS-II, TS-I(Expn)) and major thermal station viz. NLC TS-I, MTPS, Hydro stations
like Kundah, Pykara, Moyar etc., Gas Power Generating Stations like PP Nallur,
ABAN, Kuttalam, Kovilkalappal, Diesel generating station at Samalpatti etc., in the
coastal area of Tamil Nadu and wind generation at Udumalpet area. The important
load centers in this sub system include Coimbatore, Tiruppur, Salem, Tanjore, Trichy
& Hosur. Important Loads such as Traction at Trichy Murugupatty -Ambigapuram
and Ariyalur-Koothur in Trichy area.

SUB SYSTEM 3: The sub-system 3 comprises of ISGS Nuclear station MAPS,
major thermal stations viz. North Chennai, Vallur, Ennore, GMR Vasavi, Basin Bridge
Gas Power Generating Stations, HITECH and TCPL etc., The important load centers
in this sub system include Chennai and Arni.

4.4 KERALA
Kerala has been divided into two subsystems as detailed below:

SUB SYSTEM 1: The sub-system 1 comprises of Kozhikode Diesel Generating
Power Station (KDPP) and Kuttiadi Hydro Power Station in the northern part of
Kerala. It includes the load centre like Nallalam, Areakode (Kozhikode), Kasarkode,
Taliparamba, Kannur, etc.,

SUB SYSTEM 2: The sub-system 2 comprises of Major Hydro Stations Viz. Idukki,
Lower Periyar, Sabirigiri and RGCCPP Kayankulam (Naptha / Gas). It includes major
and important load centres like Trivandrum, Kalamassery, Pallam etc.,
4.5 PROCEDURE DETAILS
Source of startup power in case of Total Blackout of the Region, Blackout of the
entire state system and Blackout of the Subsystem alone.
10 of 206.
SRLDC Black Start Restoration Procedure 2014


Identifying the loads for each Subsystem.
Points of synchronisation with other Subsystems.
Actions to be taken by various Generating Stations and Substations.

The procedures given in this document are general in nature and provide a guideline
for the Restoration team depending on the availability of Transmission Elements,
Generators and the Type and the extend of Blackout Restoration Team, on Real
Time basis, should adopt the best procedure suited for the situation

Based on this document Constituents have to prepare Station wise detailed switching
instructions so that the Operators will have clarity and Restoration will be faster.

4.6 GENRAL PRE RESTORATION REQUIREMENTS
Whenever there is a total Blackout in a state / region, to facilitate early building up of
the stable subsystems, the constituents should keep the UFRs & FGMO in by-
passed condition during the restoration process. Also all the filter banks / capacitor
banks should be in switched off condition during the restoration process.

11 of 206.
SRLDC Black Start Restoration Procedure 2014



SUB SYSTEM 2
SUB SYSTEM 1
SUB SYSTEM 3
12 of 206.
SRLDC Black Start Restoration Procedure 2014



SUB SYSTEM 2
SUB SYSTEM 1
13 of 206.
SRLDC Black Start Restoration Procedure 2014




SUB SYSTEM 1
SUB SYSTEM 2
14 of 206.
SRLDC Black Start Restoration Procedure 2014



SUB-SYSTEM-3
SUB-SYSTEM-2
SUB-SYSTEM-1
15 of 206.
SRLDC Black Start Restoration Procedure 2014



16 of 206.
SRLDC Black Start Restoration Procedure 2014



5.0 RESTORATION OF AP SYSTEM

5.1 SYSTEM OVERVIEW
AP system can be divided in to three sub systems, which can be brought up
independently and synchronized subsequently once the system develops in to larger
sustainable islands.

5.2 MAJOR GENERATING STATIONS
Following are the Major Generating Stations in the AP System
Sl
No
STATION TYPE SECTO
R
SUB
SYSTE
M
CAPACIT
Y
IN MW
BLACK
START
FACILITY
1 R S T P S Thermal ISGS 2 2600 Not
Available
2 V T P S Thermal State 1 1760 Not
Available
3 LANCO Gas State 1 352 Not
Available
4 BSES Gas State 3 220 Not
Available
5 JEGURUPADU Gas State 3 216 Not
Available
6 SPECTRUM Gas State 3 208 Not
Available
7 V G T P I Gas State 3 100 Not
Available
8 V G T P II Gas State 3 172 Available
9 K T P S Thermal State 3 1720 Not
Available
10 LOWER
SILERU
Hydro State 3 460 Available
17 of 206.
SRLDC Black Start Restoration Procedure 2014


11 UPPER SILERU Hydro State 3 240 Available
12 JURALA Hydro State 1 234 Available
13 SIMHADRI Thermal State 3 1500 Not
Available
14 SRISAILAM LB Hydro State 1 900 Available
15 N SAGAR Hydro State 1 816 Available
16 SRISAILAM RB Hydro State 1 770 Available
17 R Y T P S Thermal State 1 1050 Not
Available
18 KAKATIYA Thermal State 3 500 Not
Available
19 VEMAGIRI Gas State 3 370 Not
Available
20 LKPPL Gas IPP 3 366 Not
Available
21 JEGRUPADU GAS IPP 3 220 Not
Available
22 GAUTHAMI GAS IPP 3 464 Not
Available
23 KONASEEMA GAS IPP 3 444 Not
Available
24 GMR BARGE GAS IPP 3 237 Available
25 SEPL THERMA
L
IPP 1 300 Not
Available
25 MEPL THERMA
L
IPP 1 300 Not
Available




18 of 206.
SRLDC Black Start Restoration Procedure 2014


5.3 LIST OF SUB-STATIONS WITH SYNCHRONISING FACILITY
Sl. No. SUB STATION
SYNCHRONISING
FACILITY YES/NO
1 220 KV Mydukur YES
2 220 KV Kondapalli YES
3 220 KV Gooty YES
4 220 KV Nunna YES
5 220 KV Garividi YES
6 220 KV Markapur YES
7 220 KV Ongole YES
8 220 KV Somayajulapalli YES
9 220 KV Thallapalli YES
10 220 KV Malkaram YES
11 222 KV Shapurnagar YES
12 222 KV Dindi YES
13 220 KV Miryalaguda YES
Sl. No. SUB STATION
SYNCHRONISING
FACILITY YES/NO
14 220 KV Budidampadu YES
15 220 KV Dichpalli YES
16 220 KV Kalwakurthy YES
17 220 KV Tadikonda YES
18 220 KV Bommuru YES
19 220 KV Nidadavole YES
20 220 KV Podili YES
21 220 KV Chandrayangutta YES
22 220 KV Bhongiri YES
23 220 KV Narketpalli YES
24 220 KV Samarlakota(Peddpuram) YES
25 ALL 400 KV Stations in AP YES

5.4 IMPORTANT CONNECTIONS OF AP SYSTEM
5.4.1 WITH OTHER REGION
19 of 206.
SRLDC Black Start Restoration Procedure 2014


With Western Region: HVDC Back to Back Station at Chandrapur
(Bhadrawathi) with A/C by-pass arrangement and 400kV Chandrapur
Ramagundam D/C
With Eastern Region: HVDC Back to Back Station at Gajuwaka with A/C
by-pass arrangement and 400kV Jeypore Gajuwaka D/C

5.4.2 220kV Barasur Lower Sileru and 220kV Balimela Upper Sileru lines are
not in use.WITHIN THE REGION
A. With Karnataka:
a) 400kV S/C Gooty Somanahally
b) 400kV S/C Gooty Neelamangala
c) 400kV D/C Gooty Raichur
d) 400kV S/C Mehaboobnagar Raichur
e) 400kV S/C Kadapa Kolar
f) 220kV S/C Gooty Regulapadu -Alipur (Bellary)
g) 220kV S/C Tandur Sedam
B. With Tamil Nadu
a) 400kV S/C Chittoor Sriperumpudur
b) 400kV D/C Nellore Alamathy
c) 220kV S/C Sulurpet Gummidipoondi
d) 220kV S/C Chittoor - Thiruvalam

5.5 SUB SYSTEM DEMARCATION
SUB SYSTEM 1: The sub-system 1 comprises of major thermal stations viz.
VTPS, Lanco, RYTPS, SEPL , MEPL & Krishnapattinam AP (as and whenit gets
commissioned) and the important load centers like Hyderabad, Vijayawada, Kurnool,
Machilipatnam & Nellore along with Black Start facilities at Srisailm & NSagar, Jurala
( if Water Available) Hydro stations

SUB SYSTEM 2: The sub-system 2 comprises of Ramagundam Thermal power
station, Kakatiya and the important load centers like Ramagundam loads & Western
Region with No Black Start facilities in the Sub system.

20 of 206.
SRLDC Black Start Restoration Procedure 2014


SUB SYSTEM 3: The sub-system 3 comprises of major thermal stations viz.
KTPS, Simhadri, & Gas Stations viz Jegrupadu, VGTS, Spectrum, Gowthami,
Konaseema, GMR Vemagiri,Jegrupadu Extn and BSES and the important load
centers like Vizag, Kakinada along with Black Start facilities at USileru, LSileru
Hydro stations

Synchronisation of Sub Systems: Once the individual subsystems are built to a
stable level, the systems are synchronized with each other. The synchronization of
subsystems will be done at the generating stations, preferably.

IMPORTANT Criteria for deciding Restoration approach in AP System.

SURVIVAL of Ramagundam islanding scheme is the most important criteria in
deciding Restoration approach of AP system during total black out condition.

If the Ramagundam islanding scheme successfully survives, then it is
practically NOT possible to connect with WR through AC by-pass at HVDC
Badravathi.

If the Ramagundam-Hyderabad Island of approximately 1800 MW acts (47.8 Hz
with 200ms delay), the System Operator has to restore the Island as quickly as
possible as there are no hydro generators in this Island and Ramagundam
units have limited bandwidth to flex generation as required by the loads. The
System Operator at AP SLDC would endeavor to closely match loads to
Ramagundam Generation at all times. The Restoration procedure would now
focus on synchronising this Island with NSagar-Srisailam island that may
have to be built up from black start. In case rest of AP/SR survives the
Ramagundam-Hyderabad Island can be quickly synchronised with rest of
AP/SR system by flexing the generation at NSagara Srisailam complex. In case
rest of AP/SR does not survive, NSagar- units would be self-started with
minimum loads(KM Palli) and supply would be extended to Talapalli.
Simultaneously units at Srisailam (RB) would be started up and synchronised
with NSagar units. Loads would be extended by closing Srisailam-Mydukur
21 of 206.
SRLDC Black Start Restoration Procedure 2014


line and afterwards extending the same to Cuddapah-Chinakampalli-Muddanur
for starting up of units.
Srisailam (LB) would be started up and power extended to Kurnool. Meanwhile
the NSagar-Srisailam(RB) complex would extend supply to Kurnool and
synchronise with Srisailam(LB) at Kurnool. After the island has reached 700-
1000 MW, the 400 kV Talapalli-Hyderabad line would be usedto synchronise
Ramagundam-Hyderabad island with Srisailam-NSagar island. The Kurnool-
Hyderabad 400 kV would also be closed to strengthen the link.

Only incase Ramagundam island failed to survive, it can be connected to WR
through AC by-pass at Ramagundam for availing start-up power to NTPC
Ramagundam.





22 of 206.
SRLDC Black Start Restoration Procedure 2014


SUB SYSTEM 2
SUB SYSTEM 1
SUB SYSTEM 3
23 of 206.
SRLDC Black Start Restoration Procedure 2014



5.6 RESTORATION OF SUB SYSTEM 1
The sub-system 1 comprises of major thermal stations viz. VTPS, LANCO, RYTPS,
SEPL , MEPL & Krishnapattinam AP and the important load centers like Hyderabad,
Vijayawada, Kurnool, Machilipatnam & Nellore along with Black Start facilities at
Srisailm & NSagar Hydro stations

5.6.1 AVAILING START-UP POWER
This subsystem can avail start up power supply from the following sources
A. During Total Regional Blackout and / or Total Blackout of AP system
Self-start NSagar and avail startup power from NSagar through
220kV NSagar Tallapalli to VTPS, VTPS U#7 & to Lanco via VTPS-
Kondapalli-Lanco & to Lanco(ISGS) via VTPS-Nunna-Lanco4
Self-start Srisailam RB and avail startup power from Srisailam RB
through Mydukur Kadapa Chinkampally Muddanur to RYTPS
Extend startup power from Srisailam RB to SEPL/ MEPL Srisailam
RB Markapur-Podili/Ongole Nellore 220 Nellore 400
SEPL/MEPL
Synchronise 220kV Srisailam NSagar

B. During Blackout of Sub system 1 alone
From KTPS through 220kV KTPS Nunna VTPS, VTPS U#7 & & to
Lanco via VTPS-Kondapalli-Lanco & to Lanco(ISGS) via VTPS-
Nunna-Lanco4
From Vijjeswaram/Shimadri through Bommur - Vijjeswaram stage1
Bhimadole- Nunna VTPS & & to Lanco via VTPS-Kondapalli-Lanco
& to Lanco(ISGS) via VTPS-Nunna-Lanco4

Self-starting of Hydro systems of Srisailam NSagar and through
220kV NSagar Srisailam RB - Mydukur Kadapa Chinkampally
Muddanur to RYTPS
Extending startup power from Srisailam RB to SEPL/ MEPL Srisailam
RB Markapur-Podili/Ongole Nellore 220 Nellore 400 Nellore PS
SEPL/MEPL
24 of 206.
SRLDC Black Start Restoration Procedure 2014


Extending startup power from Srisailam RB to Krishanapattinam AP
Srisailam RB Markapur-Podili/Ongole Nellore 220 Nellore 400
Krishnapattinam APFrom TN System through 400kV Almatty Nellore
SEPL/MEPL
From TN System through 400kV Sriperumpudur Chittoor Kadapa &
220kV Kadapa RYTPS
From Karnataka System through 400kV Kolar Kadapa & 220kV
Kadapa RYTPS
From Karnataka System through 400kV RTPS Mahboobnagar
NSagar
Through 220kV Tandur Sedam line
Through 220kV Gooty Regulapadu- Bellary (Alipur) line

5.6.2 RESTORATION OF THE SUBSYSTEM 1 DURING TOTAL BLACKOUT OF
AP SYSTEM.
This subsystem will be developed after availing startup power supply as
mentioned in 5.6.1 (A). The restoration process is as follows:
(a) Self-start one unit at NSagar with 90 MW generation while supplying
loads at NSagar (60 MW) local loads and extend startup supply to VTS
via 220kV S/C Talapalli line.
(b) Self-start one unit at Srisailam RB with local loads of 20 MW &
Simultaneously, syncronise Srisailam-NSagar.
(c) Extend supply to RYTPP via 220kV Mydukur (20MW) Kadapa (30MW)
Chinkampally Muddanur (30MW). Simultaneously start two units at
Srisailam RB and increase the generation to meet the loads
(d) Extend start up supply to VTPS U#7 from VTS 220kV
(e) Extend supply to SEPL/MEPL via 220kV Markapur(10MW) -
Podili/Ongole (10MW) 220kv Nellore (10MW) 400kv Nellore. Extend
startup power to LANCO through 220kV VTS Kondapalli line.
(f) Extend supply to Chandrayengutta via Dindi and supply to important
loads at Hyderabad.
25 of 206.
SRLDC Black Start Restoration Procedure 2014


(g) If Self-start of Srisailam LB is not available then Extend supply from
Srisailam RB to 220kV ( AP Carbide) Kurnool (100MW). via
Somayajulapalli and Extend supply from Chandrayangutta to
Mamidapally.
(h) If self-start of Srisailam LB is available then Self-start Srisailam LB &
extend to Kurnool 400 kV and supply important loads. Simultaneously
charge 400 kV Srisailam-Mamidapally line and supply to important loads
at Hyderabad.
(i) Self-Start Jurala (if water available) and extend to dindi via
Mehboobnagar-Boothpur-Kalvakurthi for synchronization at dindi
(j) Extend startup power to LANCO (ISGS) through 220kV VTS 220KV
Nunna 400kv Nunna -line.
(k) Extend supply to Khamam from NSagar & Energise Khamam 400 kV.

The subsystem 1 is developed by gradually increasing the generation in
the subsystem and extending supply to loads of Podili, Tadikonda,
Gunadala, Nunna, Hyderabad.
This subsystem 1 can be synchronised with subsystem 3 at KTS
through 220kV D/C KTS-Khamam line.
Subsequently 400 kV Nunna - Khammam, Nunna -Srisailam,
Mamidapalli - Ghanapur, NSagar - Khammam would be taken up
whenever voltage permits. Warangal 400 kV would be energized.
Sub System 2 & rest of A.P would be synchronized at Ramagundam
through 400 kV Ramagundam Warangal / Khammam line after
matching the frequency of both subsystems.
AP Hydro would be flexed to minimize flow on Ramagundam -
Chandrapur line & subsequently this would be tripped.
26 of 206.
SRLDC Black Start Restoration Procedure 2014



27 of 206.
SRLDC Black Start Restoration Procedure 2014


5.6.3 ACTIONS TO BE TAKEN BY VARIOUS GENERATING STATIONS OF AP
IN RESTORING SUBSYSTEM 1 DURING TOTAL REGIONAL BLACKOUT
AND / OR BLACKOUT OF ENTIRE AP SYSTEM
(a) At NSAGAR:
Ascertain the Total Blackout in AP System or Southern Region.
Open all the lines connected to NSagar.
Self-start one unit at NSagar with 90 MW generation while supplying
loads at NSagar (60 MW) and extend startup supply to VTS via 220kV
S/C Talapalli line
Co-ordinate with Srisailam RBPH and synchronise NSagar Srisailam
RBPH lines with gradual increase of generation in line to connected
loads in the part system.
After stable operation of subsystem 1 with generation of NSagar,
Srisailam, VTS and RYTPS and connected load and synchronization of
Srisailam Kurnool 400kV line, Synchronise the NSagar Khammam
400kV line
(b) At TALLAPALLY:
Keep 220kV Tallapally VTS line in open condition.
After getting energized the 220kV bus through NSagar Tallapally
line, extend supply to VTS by synchronizing 220kV Tallapally VTS
line
Connect the Loads at Tallapally area
(c) At VTS:
Ascertain the Total Blackout in AP System or Southern Region.
Open all the lines connected to VTS.
After getting energized the 220kV bus at VTS through 220kV Tallapally
VTS line, extend the supply to unit auxiliary/station supply.
Extend startup power to VTS-VI via 220 kV
28 of 206.
SRLDC Black Start Restoration Procedure 2014


Charge 220kV VTS Kondapally line and extend startup power to
LANCO.
Charge 220kV VTS Nunna line and extend startup power to
LANCO(ISGS) via 400KV Nunna.
Charge 220kV VTS Nunna- Bhimadolu line and connect the loads as
per the level of generation.
(d) At SRISAILAM RBPH:
Ascertain the Total Blackout in AP System or Southern Region.
Open all the lines connected to Srisailam RBPH
Self-start one unit of Srisailam RBPH with local loads of 20 MW and
simultaneously Synchronise 220kV Srisailam RBPH NSagar
Extend supply to Mydukur through 220kV Srisailam RBPH -Mydukur
line
Extend Supply to Dindi through 220kV Srisailam RBPH Dindi line and
request for connecting loads at Dindi
Extend supply to YG Palem through 220kV Srisailam RBPH Dornala
and request Dornala to connect loads
Extend supply to Podli through 220kV Srisailam RBPH Podli line and
request Podli to connect loads with gradual increase in generation.
(e) At DINDI:
Ascertain the Total Blackout in AP System or Southern Region.
Open all the lines connected to Dindi
Avail supply from Srisailam RBPH and charge the 220kV bus.
Extend supply to CH gutta in consultation with SLDC regarding
Ramagundam island status
Avail supply from Kalwakurthy and synchronise
(f) At CHANDRAYANGUTTA:
Ascertain the Total Blackout in AP System or Southern Region.
29 of 206.
SRLDC Black Start Restoration Procedure 2014


Open all the lines connected to CH gutta in consultation with SLDC
regarding status of Ramagundam island.
Avail supply from Dindi and charge the 220kV bus.
Connect the local loads
Extend supply to Jubliee Hills through 132kV line
Charge / Synchronise the Mamidipally 220kV line as per direction of
SLDC
(g) At SRISAILAM LBPH:
Ascertain the Total Blackout in AP System or Southern Region.
Open all the lines connected to Srisailam LBPH
Self-start unit at Srisailam LBPH unit
Charge 400kV Srisailam LBPH Karnool line and request to connect
the local loads at Karnool
Start other units one by one with gradual increase in load at Kurnool
and Voltage profile around 400kV.
Controlling the voltage at Srisailam LBPH around 400kV, charge 400kV
Srisailam LBPH Mamidipally line and request to connect the loads at
Mamidipally in consultation with SLDC regarding Ramagundam island
status.
(h) At MAMIDIPALLY:
Ascertain the Total Blackout in AP System or Southern Region.
Open all the lines connected to Mamidipally
Avail supply through 400kV Srisailam LBPH Mamidipally line or
220kV CH gutta Mamidipally line in consultation with SLDC regarding
Ramagundam island status.
Connect the local loads at Mamidipally
Charge / Synchronise the other line as per direction of SLDC.

30 of 206.
SRLDC Black Start Restoration Procedure 2014


(i) At MYDUKUR:
Ascertain the Total Blackout in AP System or Southern Region.
Open all the lines connected to Mydukur.
Avail supply through Srisailam RBPH and energise the 220kV bus at
Mydukur.
Connect the local loads at Mydukur
Extend supply to Kadapa
(j) At KADAPA (220kV):
Ascertain the Total Blackout in AP System or Southern Region.
Open all the lines connected to Kadapa
Avail supply from Mydukur and energise the 220kV bus at Kadapa.
Connect the local loads at Kadapa
Extend supply to Chinakampalli
(k) At CHINAKAMPALLI:
Ascertain the Total Blackout in AP System or Southern Region.
Open all the lines connected to Chinakampalli
Avail supply from Kadapa and energise the 220kV bus at
Chinakampalli.
Connect the local loads at Chinakampalli
Extend supply to RYTPP
Charge / Synchronise Chinakampalli Renigunta 220kV line
(l) Action at RYTPP:
Open all the lines
Avail Start up supply from
- Chinkampally ( NSagar / SSailem/ Kolar - Kadapa / SP Budur-
Chittor- Kadapa) or
- Ananthpur ( Through Nelamangala / Hoody Gooty 400kV Line )
31 of 206.
SRLDC Black Start Restoration Procedure 2014


Start the generation at RYTPP and Synchronise.
Extend supply to Yeraguntala and request for connecting local loads at
Yeraguntala
(m) At PODLI:
Ascertain the Total Blackout in AP System or Southern Region.
Open all the lines connected to Podli
Avail supply through Srisailam RBPH and energise the 220kV bus at
Podli.
Connect the local loads at Podli
Extend supply to Ongole for Traction Supply
Extend Supply to Nellore for Traction Supply
(n) At ONGOLE:
Ascertain the Total Blackout in AP System or Southern Region.
Open all the lines connected to Ongole
Avail supply from Podli and energise the 220kV bus at Ongole.
Connect the Traction loads & local loads at Ongole
Charge / Synchronise 220kV Ongole Nellore line in consultation with
Nellore 220kV S/S
(o) At NELLORE:
Ascertain the Total Blackout in AP System or Southern Region.
Open all the lines connected to Nellore
Avail supply from Podli / Ongole and energise the 220kV bus at
Nellore.
Charge Nellore 400kV & Extend startup power to SEP/MEPL Connect
the Traction loads & local loads at Nellore
Extend supply to Manubolu and Sullurpet
Charge / Synchronise 220kV Nellore Manubolu line
32 of 206.
SRLDC Black Start Restoration Procedure 2014


(p) At RENIGUNTA:
Ascertain the Total Blackout in AP System or Southern Region.
Open all the lines connected to Renigunta
Avail supply from Manubolu / Chinakampalli and energise the 220kV
bus at Renigunta.
Connect the Traction loads & local loads at Renigunta
Extend supply to 220kV Chittor through 220kV Mahadeva Mangalam
and request to connect local loads
Charge / Synchronise 220kV Nellore / Chinakampalli feeders as the
case may be.
(q) At CHELLAKURTHY:
Ascertain the Total Blackout in AP System or Southern Region.
Open all the lines connected to Chalakurthy
Avail supply from NSagar and charge the 220kV bus.
Connect the local loads
Extend supply to Miryalguda & KM Palli
(r) At MIRYALGUDA:
Ascertain the Total Blackout in AP System or Southern Region.
Open all the lines connected to Miryalguda
Avail supply from Chellakurthy and charge the 220kV bus.
Connect the local loads
Extend supply to Khammam
33 of 206.
SRLDC Black Start Restoration Procedure 2014


(s) At KHAMMAM:
Ascertain the Total Blackout in AP System or Southern Region.
Open all the lines connected to Khammam
Avail supply from Miryalguda and charge the 220kV bus.
Connect the local loads
Charge the 400 / 220kV ICT and energise the 400kV bus
Wait for the instruction of SLDC / RLDC for synchronizing the 400kV
lines.

(t) At Lanco(ISGS) :
Ascertain the Total Blackout in AP System or Southern Region.
Open all the outgoing lines
Avail start up supply from Vijaywada 400kV after getting clearance from
RLDC

(u) At SEPL/MEPL:
Ascertain the Total Blackout in AP System or Southern Region.
Open all the outgoing lines
Avail start up supply from Nellore PS 400kV after getting clearance
from RLDC
(v) At Krishnapattinam AP:
Ascertain the Total Blackout in AP System or Southern Region.
Open all the outgoing lines
Avail start up supply from Nellore 400kV after getting clearance from
RLDC

34 of 206.
SRLDC Black Start Restoration Procedure 2014


5.6.4 PROCEDURE FOR AVAILING STARTUP POWER DURING PARTIAL
BLACKOUT OF SUB-SYSTEM 1 ALONE
As already explained earlier in clause 5.6.1 (B), during the restoration of
Subsystem 1 alone start up power can be availed from other subsystems
through
From KTPS through 220kV KTPS Nunna VTPS
From Vijjeswaram/Shimadri through Bommur - Vijjeswaram stage1
Bhimadole- VTPS.
Self-starting of Hydro systems of Srisailam NSagar and through
220kV NSagar Srisailam RB - Mydukur Kadapa Chinkampally
Muddanur to RYTPS
From TN System through 400kV Sriperumpudur Chittoor Kadapa &
220kV Kadapa RYTPS
From Karnataka System through 400kV Kolar Kadapa & 220kV
Kadapa RYTPS
From Karnataka System through 400kV Neelamangala Gooty /
Sommanahally Gooty & 220kV Gooty Ananthapur Muddanur -
RYTPS
Extending startup power from Srisailam RB to SEPL/ MEPL Srisailam
RB Markapur-Podili/Ongole Nellore 220 Nellore 400- Nellore PS
SEPL/MEPL
Extending startup power from Srisailam RB to SEPL/ MEPL Srisailam
RB Markapur-Podili/Ongole Nellore 220 Nellore 400-
Ksishnapattinam AP
From TN System through 400kV Almatty Nellore-Nellore PS
SEPL/MEPL
From Srisailam & NSagar complex as explained in clause 5.6.1 (A)
After startup power is available for VTPS & RYTPS, further extend for
restoration of this sub-system may be initiated as explained in 5.6.2 &
5.6.2.1 above




35 of 206.
SRLDC Black Start Restoration Procedure 2014


5.7 RESTORATION OF SUB SYSTEM 2
The sub-system 2 comprises of Ramagundam & Kakatiya Thermal power station and
the important load centers like Ramagundam loads & Western Region with No Black
Start facilities in the Sub system.

5.7.1 AVAILING START-UP POWER
Presently this subsystem has an islanding scheme for NTPC Ramagundam
along with Hyderabad loads. Incase of survival of this subsystem in islanding
mode, the island could not be connected to WR through AC by-pass at HVDC
Badravathi as the frequency of WR and surviving island would be different
and flexing generation / loads of the surviving island for matching to WR
frequency may be very difficult and may lead to collapse. Also, attempt to
avail support through Badrawathi HVDC Back-to-Back by synchronizing
Ramagundam Chandrapur lines, with out building the island to sufficiently
large size, is not preferable due to low short circuit level at HVDC Badrawathi.
Under such situation, the surviving island has to be synchronized with rest of
AP at the earliest possible with increase in hydro generation along with
matching loads in other subsystems of AP.

Incase, the islanding scheme could not survivie, then, this subsystem can
avail start up power supply from the following sources

36 of 206.
SRLDC Black Start Restoration Procedure 2014


A. During Total Regional Blackout and / or Total Blackout of AP system
From Western Region through HVDC Back to Back station at
Bhadrawati (Chandrapur) with A/C bypass arrangement and 400kV
Chandrapur- Ramagundam D/C. line
From Subsystem 1 by availing self-starting facility of hydro units at
Nsagar / Srisailam complex.

B. During Blackout of Sub system 2 alone
From KTPS through 220 kV KTPS Khammam Warangal-Nagaram-
Malayalapalli-Ramagundam
From 220Kv NSagar Chellakurthi Miryalguda Khammam
Warangal Ramagundam lines
From KTPS 5th Stage through
- 220 kV KTPS- Budidampadu (Khammam 400 kV)
- 400 kV Khammam Ramagundam line
From VTPS through
- 220 kV VTPS-Nunna &
- 400 kV Vijayawada-Khammam-Ramagundam
From Srisailam, Nsagar Hydro complex through
- 220 kV Nsagar Tallapalli
- 400 kV Nsagar Ramagunadam
5.7.2 RESTORATION OF THE SUBSYSTEM 2 DURING TOTAL BLACKOUT OF
AP SYSTEM.
This subsystem will be developed after availing startup power supply as
mentioned in 5.7.1 (A). The restoration process is as follows:
1. Extend startup supply to Ramagundam & Kakatiya from Western region
through Chandrapur A.C bypass link, following procedure as follows.
(a) Ensure that line breakers of 400 kV Ramagundam-Chandrapur lines I
and II are opened at Ramagundam & Chandrapur end
(b) Ensure that HVDC system is isolated from both West and South Bus.
37 of 206.
SRLDC Black Start Restoration Procedure 2014


(c) Ensure that all filter Isolators are opened.
(d) Ensure that West Bus 2 is in energized condition
(e) Close A/C bypass link isolators
(f) Close breaker of Ramagundam line I or II in consultation with
Ramagundam. This would extend start up power to Ramagundam.
(g) In case the bus voltage at Ramagundam is very high, request AP to
avail some loads radially to control the voltage.
(h) Extend startup supply to Kakatiya via 400kv Ramagundam
Warrangal-Bhoopalpally alternately via 220kv Malayalapalli-220 kv
Nagaram- 220 kv Warrangal -400kv Warrangal
(i) Ramagundam would build up the generation gradually with load
through ICTs at Ramagundam.

The subsystem 2 is developed by gradually increasing the generation in the
Ramagundam and extending supply to loads of Ramagundam.

Sub System 2 & rest of A.P would be synchronized at Ramagundam
through 400 kV Ramagundam Warangal / Khammam line after
matching the frequency of both subsystems.
AP Hydro would be flexed to minimize flow below 20MW on
Ramagundam - Chandrapur line & subsequently this would be tripped.

2. Incase of any difficulties in extending startup supply to Ramagundam from
Western region through Chandrapur A.C bypass link, avail startup power
from NSagar Complex through 400kV NSagar Hyderabad -
Ramagundam lines along with loads at Hyderabad for controlling the
voltage profile.
38 of 206.
SRLDC Black Start Restoration Procedure 2014



39 of 206.
SRLDC Black Start Restoration Procedure 2014



40 of 206.
SRLDC Black Start Restoration Procedure 2014


5.7.3 ACTIONS TO BE TAKEN BY VARIOUS GENERATING STATIONS AND
HVDC OF AP IN RESTORING SUBSYSTEM 2 DURING TOTAL REGIONAL
BLACKOUT AND / OR BLACKOUT OF ENTIRE AP SYSTEM & NON-
SURVIVAL OF RAMAGUNDAM ISLANDING SCHEME.
(a) Actions by HVDC Bhadrawati
Upon receipt of request from Ramagundam for providing start up power
Bhadrawati will make the following arrangements to extend the start up
power.
Ensure that line breakers of 400 kV Ramagundam-Chandrapur lines I
and II are opened at Ramagundam & Chandrapur ends
Ensure that HVDC system is isolated from both West and South Bus.
Ensure that all filter Isolators are opened.
Ensure that West Bus 2 is in energized condition
Close A/C bypass link isolators
Close breaker of Ramagundam line I or II in consultation with
Ramagundam
This would extend start up power to Ramagundam STPS & Kakatiya.
(b) Actions by RSTPS
Ensure all 400 kV line breakers open at Ramagundam end.
Avail start up supply from HVDC station at Bhadrawati through one of
the circuits of 400kV Ramagundam-Chandrapur line for starting the
unit.
In case the bus voltage at Ramagundam is very high, request AP to
avail some loads radially to control the voltage.
Extend start up supply to Kakatiya via Warrangal-Bhoopalpally
Ramagundam would build up the generation gradually with load
through ICTs at Ramagundam.
(c) Actions by KAKATIYA
Open all 400 kV line breakers.
41 of 206.
SRLDC Black Start Restoration Procedure 2014


Avail start up supply from Ramagundam via 400kv Warrangal in
consultation with SLDC.
Kakatiya would build up the generation.
(d) Actions By APLD
Provide the loads for Ramagundam generators through ICTs at
Ramagundam in coordination with RSTPS.
Loads to be regulated keeping in view the level of generation at
Ramagundam and import constraints as per the directions of SRLDC.
Note: SRLDC/WRLDC Control Room, Ramagundam and Bhadrawati HVDC
stations shall endeavor to confirm the actions to be taken in the event of Total
Black-out in the AP system. However, extension of WR power to
Ramagundam shall be carried out at the request of Ramagundam without
waiting for any code from SRLDC /WRLDC except that before extending the
supply, Bhadrawati shall interact with Ramagundam and obtain clearance
from Ramagundam for its readiness to avail the power supply.

5.7.4 PROCEDURE FOR AVAILING STARTUP POWER SUPPLY FROM WITH IN
AP SYSTEM
In the event of difficulty in availing WR supply for any reason, the alternate
source for availing start up power to Ramagundam & Kakatiya would be from
Nsagar or Srisailam Hydel power stations In this case the following steps
would be followed.
(a) Supply from Nsagar or Srisailam power house would be extended to
Tallapally.
(b) 220 kV supply from Tallapally would be extended and stepped up to 400
kV by charging one of 220/400 kV 315 MVA transformers at 400 kV
Nsagar sub station.
(c) Before extending 400 kV supply from Nsagar to Ramagundam, the
voltage at Nsagar would be controlled by utilising bus reactor, line
reactor provided at both ends of 400 kV Nsagar-Ramagundam line and
if required by varying ICT taps at Nsagar.
42 of 206.
SRLDC Black Start Restoration Procedure 2014


(d) In case 400 kV voltage at Nsagar is not brought under control by using
reactors and ICT taps at Nsagar, 400 kV supply from Nsagar should be
extended to Hyderabad and voltage at Hyderabad could be controlled by
connecting loads through ICT at Hyderabad. Supply to Ramagundam
can be extended by charging one of the 400 kV lines from Hyderabad to
Ramagundam and NTPC can avail start up power by charging
Ramagundam bus.
(e) Once Startup is given to Ramagundam, Then extend start up power from
to Kakatiya as explained above

5.7.5 SYNCHRONISING SUBSYSTEM 2 (RAMAGUNDAM & KAKATIYA) WITH
REST OF A.P AND OPENING OF AC BY-PASS LINK WITH WR
As the Subsystem 2 builds up it has to be synchronised with rest of AP at the
earliest opportunity to increase the stability of the\ grid. This Subsystem can
be synchronised with rest of A.P by closing 400 kV Warangal / Khammam -
Ramagundam line. Tying of subsystem to be done preferably at 400 KV level
only. Once the Northern part of AP grid is adequately strengthened and
stabilised, RLDC shall request WRLDC to withdraw the assistance from WR.
The following steps shall then be taken to open out the AC bypass link at
HVDC Bhadrawati.
After the AP system develops into a stable island of about 2500 to
3000MW, A/C inter connection with WR will be opened out only after
reducing the flow on the interconnection to a minimum value by adjusting
the load generation balance in AP Subsystem.
Load in AP system would be regulated to bring down the flow on 400 kV
Ramagundam-Chandrapur line as minimum as possible (10 to 20 MW) by
regulating generation at Nsagar, Srisailam and Chandrapur (WR).
NTPC would then manually open 400 kV Ramagundam-Chandrapur line
to separate part SR system from WR system in consultation with SRLDC /
Bhadrawati.
Opening of A/C Bypass Link At Bhadrawati:
43 of 206.
SRLDC Black Start Restoration Procedure 2014


Bhadrawati shall obtain permission from WRLDC and SRLDC to open out
the A/C bypass link.
Breaker controlling Ramagundam I and II lines shall be opened.
Open breaker of MSEB-2 controlling West Bus-2.
Check that West Bus and South Bus is dead.
Open A/C bypass link isolators
Prepare the HVDC station for operation in Back to Back Convertor mode
and then await instructions and code exchange between WRLDC and
SRLDC.

5.7.6 PROCEDURE FOR AVAILING STARTUP POWER DURING PARTIAL
BLACKOUT OF SUB-SYSTEM 2
In the event of Partial Black out in AP system and Subsystem 2 alone going
into black out startup power for Subsystem 2 will be made available from any
one of the neighboring Subsystem in AP and the procedure is detailed below
A. From KHAMMAM
Charge 400 kV Ramagundam Warangal / Khammam line at
Warangal / Khammam
Charge 400 kV Switchyard at Ramagundam and avail start up power

B. From WARANGAL
Charge 220 kV Warangal-Nagaram-Malayalpalli switching sub-station
Charge 220 kV Malayalpalli-Ramagundam line-1 or line-2 or line-3
Charge 220 kV/400 kV Auto Transformer-3, 4 or 5 and avail start up
power supply

C. From NSAGAR / SRISAILAM Hydro Complex
Procedure as detailed in section 5.7.4
44 of 206.
SRLDC Black Start Restoration Procedure 2014



In case of Sucessful Islanding of Ramagundam- Hyderabad Scheme Sub
System 2 & rest of A.P would be synchronized at 400kV Ghanapur NSagar at
NSagar End and 400kV Ramagundam Warrangal Khamam at Ramagundam
end.

45 of 206.
SRLDC Black Start Restoration Procedure 2014



46 of 206.
SRLDC Black Start Restoration Procedure 2014


5.8 RESTORATION OF SUB SYSTEM 3
The sub-system 3 comprises of major thermal stations viz. KTPS, Simhadri & Gas
Stations viz Jegrupadu, VGTS-2, Spectrum and BSES and the important load
centers like Vizag, Kakinada along with Black Start facilities at USileru, LSileru ,
Donkarai Hydro stations, Vijjeswaram stage1 gas Station.

5.8.1 AVAILING START-UP POWER
To restore this Subsystem Startup power can be availed from the following:
A. During Total Regional Blackout and / or Total Blackout of AP system
From Eastern Region through HVDC Back to Back station at
Gazuwaka with A/C bypass arrangement and 400kV Gazuwaka -
Jeypore D/C. line (First Option)
From Lower Sileru, Upper Sileru & Donkarai hydro units through
220kV L.Sileru Donkarai - U.Sileru Pendurthy Gazuwaka &
400kV Gazuwaka Simhadri (Gazuwaka Kalpakka - Simhadri
line will be used as alternate path instead of Gazuwaka Simhadri)
From Lower Sileru to KTPS
From Lower Sileru - 220KV KTPS 220 KV Khammam-400kV
Khamam KTPS VI
From GMR Barge units through
From GMR Barge to PD Puram - BSES
From GMR Barge to Bommur 220kV Vemagiri 400kV Vemagir
Vemagiri gas complex
B. During Blackout of Sub system 3 alone

From L.Sileru / U.Sileru / Donkarai as detailed in 5.8.1 (A)
From GMR Barge as detailed in 5.8.1 (A)
From Subsystem 1 through
220kV NSagar Chellakurthi Miryalguda Khammam lines
47 of 206.
SRLDC Black Start Restoration Procedure 2014


220kV VTS NUNNA- Bhimadole- Vijjeswaram stage1 Bommur
Peddapuram Parwada -Gazuwaka & 400kV Gazuwaka-
Kalpakka-Simhadri
220kV VTS KV Kota - Vijjeswaram stage2 Bommur
Peddapuram Parwada Gazuwaka & 400kV Gazuwaka
Kalpakka Simhadri
220kV Vijjeswaram stage1 Bommur - L.Sileru KTPS & KTPS VI
5.8.2 RESTORATION PROCESS FOR SUBSYSTEM 3 DURING TOTAL
BLACKOUT OF AP SYSTEM
5.8.2.1 In case of total blackout of AP System
a) The First option for Simhadri startup is through AC Bypass of Gazuwaka
HVDC & Extending ER Supply to Simhadri. On exercising this option,
Start-up supply to be extended to Vemagiri complex through Gajuwaka
Parwada Peddapuram Bommur 220kV lines or Gajuwaka
Pendurithi U.Sileru Donkarai L.Sileru Bommur 220kV lines.
Subsequently, builtup an island with Simhadri, Vemagiri Complex &
Sileru generation along with matching loads at Vizag, Pendurithi,
Bommur etc to an extend of 1000MW 1500MW. After building-up the
island, flexing the Sileru hydro generaion, delink the island from N-E-W
grid at HVDC Gajuwaka by tripping the 400kV AC inter connector feeder
to Gajuwaka ICT.
b) Alternately, Self-start Lower Sileru and extend startup supply (20MW) to
KTPS through 220kV L.Sileru KTPS line
c) Extend start up supply to KTPS VI from 220KV KTPS 220 KV
Khammam-400kV Khamam KTPS VI as the first option. 400kV
Ramagundam 400kV Warrangal 400kV Khammam 400kV KTS VI
will be second option if voltage permits
d) Simultaneously startup Upper Sileru and extend 220kv supply to
Gazuwaka via Donkarai Upper Sileru Pendurthi (50MW) Gazuwaka
(20 MW) and further extend startup supply to Simhadri via Gazuwaka
Simhadri 400kV line.
48 of 206.
SRLDC Black Start Restoration Procedure 2014


e) Simultaneously Donkarayi can be started
f) Simultaneoulsy start up GMR Barge and extend start up supply to
BSES(via PD Puram)..
g) Extend supply to Bommur from GMR Barge via PDPuram as the first
option and from Lower Sileru as the second option and both can be
synchronized at Bommur
h) Extend startup supply to Jegrupadu, VGTS-1 VGTS-2 & Spectrum (via
Kakinada)
i) From Bommur extend supply to Gazuwaka (PG) via Kakinada /
PDPuram and then to Simhadri (Option # 3 for Simhadri startup).
j) Extend Start Up supply to Vemagiri Gas Complex via Bommur
Vemagiri 220kv / 400 Kv.
49 of 206.
SRLDC Black Start Restoration Procedure 2014



50 of 206.
SRLDC Black Start Restoration Procedure 2014


5.8.3 ACTIONS TO BE TAKEN BY VARIOUS GENERATING STATIONS AND
SUB-STATIONS DURING TOTAL REGIONAL BLACKOUT AND / OR
TOTAL BLACKOUT IN AP SUBSYSTEM 3
(a) At LOWER SILERU
Ascertain the Total Blackout in AP System or Southern Region
Open out all outgoing lines
Self-start the machine
Extend supply to KTPS
Charge / Synchronise 220kV L.Sileru Donkarai line
Extend supply to Bommur through 220kV L.Sileru Bommur line for
connecting Traction loads at Bommur.
Incase any delay / difficulties in self-start L.Sileru Units, first avail supply
from Donkarai
(b) At KTPS
Ascertain the Total Blackout in AP System or Southern Region
Follow the instructions of SLDC for any operation
(c) At DONKARAI
Ascertain the Total Blackout in AP System or Southern Region
Open out all outgoing lines
Self-start the machine
Charge / synchronise 220kV Donkarai U.Sileru line
Charge / Synchronise 220kV Donkarai L.Sileru line
Incase any delay / difficulties in self-start Donkarai Units, first avail
supply from U.Sileru / L.Sileru as the case may be and then proceed
the steps above
51 of 206.
SRLDC Black Start Restoration Procedure 2014


(d) At BOMMUR
Bommur is a very important substation from the point of Black Start Procedure
since it connects to Subsystem 1 through Bommur Vijjeswaram stage2 - KV
Kota VTS. It also connects to all the gas stations of this Subsystem.
Following are the actions to be taken at Bommur.
Ascertain the Total Blackout in AP System or Southern Region
Open out all outgoing lines
Avail supply from GMR Barge via PDPuram in consultation with APLD.
Incase any delay / difficulties in self-starting GMR Barge Units, first
avail supply from U.Sileru / L.Sileru as the case may be and then
proceed the steps below
Connect limited local loads
Extend startup power to Jegrupadu
Extend startup power to Spectrum through 220kV Bommur Kakinada
line
Extend startup power to BSES through 220kV Bommur Peddapuram
line
Charge / Synchronise 220kV Bommur Vijeswaram stage 2 line &
Bommur Vijeswaram stage 1 line
(e) At VIJJESWARAM STAGE - 1
Ascertain the Total Blackout in AP System or Southern Region
Open out all outgoing lines
Avail Start Up supply from Bommur.
Extend power supply to Bhimadole
(f) At UPPER SILERU
Ascertain the Total Blackout in AP System or Southern Region
Open out all outgoing lines
Self-start the machine
52 of 206.
SRLDC Black Start Restoration Procedure 2014


Charge / synchronise 220kV Donkarai U.Sileru line
Extend supply to Pendurthy traction lopads through 220kV U.Sileru
Pendurthy line
(g) At PENDURTHY
Ascertain the Total Blackout in AP System or Southern Region
Open out all outgoing lines
Avail supply from Upper Sileru
Extend supply to Gazuwaka
Extend supply to traction loads in consultation with APLDC.
(h) At PEDDAPURAM
Ascertain the Total Blackout in AP System or Southern Region
Open out all outgoing lines
Avail supply from Bommur
Charge 220kV Peddapuram Parwada line.
Extend startup supply to BSES.
(i) At PARWADA
Ascertain the Total Blackout in AP System or Southern Region
Open out all outgoing lines
Avail supply from Peddapuram
Charge / Synchronise 220kV Parwada Gajuwaka line.
(j) At GAZUWAKA 220kV & 400 kV A.C
Ascertain the Total Blackout in AP System or Southern Region
Open out all outgoing lines
Avail 220kV supply from Pendurthy / Parwada.
Charge 400/220 kV Transformer
Extend 400kV supply to Kalpakka / Simhadri
53 of 206.
SRLDC Black Start Restoration Procedure 2014


(k) At KALPAKKA
Ascertain the Total Blackout in AP System or Southern Region
Open out all outgoing lines
Avail 400kV supply from Gazuwaka 400kV
Extend startup supply to Simhadri.
(l) At SIMHADRI
Ascertain the Total Blackout in AP System or Southern Region
Open out all outgoing lines
Avail startup supply for starting the unit from Kalpakka/Gazuwaka
Build up the generation
(m) At Warrangal 400
Ascertain the Total Blackout in AP System or Southern Region
Open out all outgoing lines
Avail supply from Warrangal 220kv via Nagram
(n) At GMR Barge
Ascertain the Total Blackout in AP System or Southern Region
Open out all outgoing lines
Self-start the machine
Charge 220kV GMR Barge PDPuram in consultation with SLDC
In the event of failure / delay in availing startup supply from ER System
for any reason the alternate source for availing start up power to
Simhadri would be from Upper Sileru / Lower Sileru.
The following steps would be followed to avail supply from ER System.

54 of 206.
SRLDC Black Start Restoration Procedure 2014



55 of 206.
SRLDC Black Start Restoration Procedure 2014


(o) Actions by HVDC Gajuwaka
Upon confirmation of Total AP system failure Simhadri will request
Gajuwaka for making necessary arrangements to operate A/C bypass
system at Gajuwaka HVDC under instructions from SRLDC.
Gajuwaka shall request Jeypore to extend start up power from Eastern
Region in case supply is not available on East Bus at Gajuwaka
Gajuwaka shall extend the power supply to South Bus on A/C bypass
mode by taking following actions
a. All filter on either side (East and South) are to be opened.
b. All connections to HVDC system from both East and South side are
opened
c. Ensure that East Bus is in energized condition from Jeypore end.
d. Close isolators to close A/C bypass link.
e. Close 400kV Gajuwaka Simhadri line in consultation with
Simhadri for extending start up power to Simhadri
NOTE: In the event of total black out in the AP system, start up power can be
obtained / availed from Eastren Region through Gajuwaka HVDC bypass link
as option - 3. Since this line connects two regions using Line Isolators only,
due caution has to be exercised while connecting/disconnecting the two
Regions. The schematic diagram depicting the setup of the HVDC station at
Gajuwaka A/C Bypass link is shown in Exhibit-F.

NOTE Even though, SRLDC,ERLDC AP LD, Control Room Shimadri and
Gajuwaka HVDC station shall endeavor to confirm the actions to be taken in
the event of total Black-out in the AP system extension of ER power to South
bus at Gajuwaka shall be carried out only after availing code by Simhadri or
Gajuwaka.
56 of 206.
SRLDC Black Start Restoration Procedure 2014


(p) Opening of A/C Bypass link
Once the AP grid is adequately strengthened, SRLDC shall request
ERLDC to withdraw the assistance from ER.
The following steps shall then be taken to open out the HVDC bypass
link at Gajuwaka
Action shall be taken by ERLDC and SRLDC to bring the flow on 400kV
Jeypure - Gajuwaka line to +/- 10MW, by regulating generation in AP
and ER system
Gajuwaka shall obtain permission from ERLDC and SRLDC to open out
the bypass link.
Open out Jeypore - Gajuwaka line.
Check that East bus and South bus at HVDC station is dead.
Open Isolator --- open A/C bypass link.
Prepare the HVDC station for operation in Back to Back Converter
mode and then await instructions and code exchange between ERLDC
and SRLDC.
(q) Synchonisation of this Subsystem with other Subsystems and
Opening of A/C Bypass Link:-
As Simhadri generation picks up the load on the ICTs at Kalpakka
would be provided by APLD in a regulated manner keeping in view the
level of generation and import/export constraints as per the directions of
SRLDC.
Simultaneously AP Subsystem 3 would be built up with fair degree of
load generation balance.
In consultation with APLD this Subsystem is synchronized with
Subsystems 1 / 3 at the following Locations
At KTPS through 220kV KTPS V - Khammam line.
At KTPS through 220kV KTPS Nunna line.
At VTPS through 220kV VTPS Bhimadole- Vijjeswaram stage1
57 of 206.
SRLDC Black Start Restoration Procedure 2014



5.8.4 PROCEDURE FOR AVAILING STARTUP POWER DURING PARTIAL
BALCKOUT OF SUB-SYSTEM3:
As already explained earlier, during the restoration of Subsystem 3 alone start
up power can be availed from other subsystems through

From Subsystem 1 through
220kV D/C KTPS V - Khammam line.
220kV S/C KTPS - Nunna line
220kV VTS NUNNA- Bhimadole- Vijjeswaram stage1 Bommur
Peddapuram Parwada -Gazuwaka & 400kV Gazuwaka- Simhadri
220kV VTS KV Kota - Vijjeswaram stage2 Bommur Peddapuram
Parwada -Gazuwaka & 400kV Gazuwaka- -Simhadri

5.9 CRITICAL LOADS IN A.P
a. Heavy Water Plant at Manuguru, KTS 220kV.
b. Vizag Naval Wharf, Ghazuwaka(AP) 220kV.
c. Vizag steel plant, Gazuwaka(PSG) 220kV.
d. DGNP, Vizag(Naval Wharf 132 Kv(220KV Gazuwaka))
e. Ports at Kakinada, Kakinada 220kV.
f. Nuclear Fuel Complex Maulali 220kV.
g. Sriharikota, Sulurpet 220Kv
h. Shamshabad Airport, Mamidapally 220kV
i. Gangavaram Port, Gazuwaka (AP) 220kV
j. Port at Machilipatnam, Gundala 220kV
k. APGENCO KTPP at 132 KV SS Chelpur (220 KV RSS)
l. SCCL Manuguru at 220 KV SS Manuguru
m. SCCL Kothagudem at 220 KV SS Seetharamapatnam
n. SCCL, OCM at 132 KV SS Manthani & Ramagundam (220 KV RSS)
o. Krishnapatnam Port, Nellore District, 132 KV Bramhadevam SS. (220 KV
Nellore)
p. Visakhapatnam Port, 132 KV Port SS, 220 KV Gazuwaka /Pendurthy
58 of 206.
SRLDC Black Start Restoration Procedure 2014


q. Hindustan Zince LTD 220 KV Gajuwaka SS
r. Andhra Sugar,132kv Seggonda (220 KV Nidadavolu)
s. Brandix, 132 KV Brandix SS (220 KV Gazuwaka)
t. GMR Vasavi industries at 220KV Tekkali SS

5.10 SUPPLY DETAILS FOR RAILWAY TRACTION SYSTEM IN A.P
The Traction details are as given below.



59 of 206.
1 2 3 4 5 6 7 8 11 12 13 14 15 16 17 18 19
Sl. No
Railway
section
Electric
Division
/Circle
Subsyste
m No.
220 KV feeding point
132 KV intervining
substation if /132
132 KV tap line
Grid substation
Railway Traction Sub
Station
Transfor
mation
capacity
(MVA)
Phase
details
Sanctio-
ned load
in MVA
Average
demand
in MVA
Priority
Emergenc
y
minimum
requireme
nt MVA if
all
substation
s are given
Emergenc
y
minimum
requireme
nt MVA if
alternatvie
substation
s are given
DISCOM
Traction
power
control
centre
1 Manubolu 220 KV -- 1 x 21.6
1 Sullurpet 220KV Naidupeta 1 x 12.5
2 Nellore 1 Nellore 220 KV -- Brhmadevam Niduguntapalem 1 x 21.6 Y - R 6.00 4.14 A2 3 -- APSPDCL
3 Nellore 1 Nelloe 220 KV -- NTS Padugupadu
1 x 21.6
1 x 12.5
B - Y 14.00 12.61 A2 7 11 APSPDCL
4 Nellore 1 Ongole 220 KV Kandukuru Kavali Kavali 2 x 21.6 R - Y 16.00 14.33 A2 8 -- APSPDCL
5 Ongole 1 Ongole 220 KV -- Ongole Ongole 2 x 21.6 R - B 17.00 16.13 A1 9 13 APSPDCL
1 Paruchuru 220 KV --
1 Tadikonda 220 KV Guntur
7 Guntur 1 Tadikonda 220 KV Guntur Tenali Tenali 2 x 21.6 R - B 15.00 11.55 A1 8 11 APSPDCL
1 Gunadala 220 KV Ganguru/Autonagar
1 Tadikonda 220 KV --
9 Eluru 3 Bhimadolu 220 KV Peddavegi Eluru Vatlur 2 x 21.6 R - Y 16.00 15.71 A2 8 -- APEPDCL
3 Bhimadolu 220 KV --
3 Nidadavolu 220 KV Nidadavolu
11 Rajahmundry 3 Bommuru 220 KV -- Bommuru Rajahmundry
1 x 21.6
1 x 12.5
R - B 12.00 11.67 A1+ 6 -- APEPDCL
Samalkot 220 KV --
Bommuru 220 KV
Parawada 220 KV Koruprolu Payakaro peta Tuni 2 x 21.6 B - Y 15.00 13.27 A2 8 -- APEPDCL
Pendurthi 220 KV -- Kasimkota Anakapalli 2 x 21.6 R - B 14.00 12.71 A1 7 11 APEPDCL
Renigunta 220 KV
Sullurpet 220KV
15 Tirupathi 1 Renigunta 220 KV -- Renigunta Renigunta 2 x 21.6 R - B 18.00 15.61 A1 9 14 APSPDCL
Chinakampalli 220 KV
Renigunta 220 KV
Kadpa 220 KV - Kadapa
Chinakampalli 220 KV Moolavanka RTSS
Kondapuram 220 KV
Gandikota LIS &
Muddanur RTSS
Muddanuru
Yerraguntla 220 KV - RTSS
Kalikiri 220 KV Rompicherla
Renigunta 220 KV Tirupathi & KP Mitta
South Central Railway
7.63 A1 5 8 APSPDCL
APSPDCL
19
Renigunta
- Katpadi
Tirupathi 1 Pakala Pakala 2 x 12.5 Y - B 10.00
R - B 12.00 9.68 A2 6 9
14.35 A1 6 -- APSPDCL
18 Kadapa 1 Muddanuru 2 x 21.6
6 9 APSPDCL
17 Kadapa 1 Kadapa 2 x 21.6 B - Y 12.00
Razampeta (220 KV) 2 x 21.6 R - Y 12.00 13.26 A1
7 -- APSPDCL
Traction
power
control /
Guntakal
Phone:
08552-
229679,
97013740
80
Sr.DEE/Tr
action/
Guntakal :
08552-
220037,
97013743
01
Renigunta
- Guntakal
16 Kadapa 1 -- Razampeta 220 KV
Venkatagiri 2 x 12.5 B - Y 14.00 13.08 A2 14
Gudur -
Renigunta
Nellore 1 Kalahasthi132KV Venkatagiri
A1 8 12 APEPDCL
13
Visakhapa-
tnam
3
APEPDCL
12 Rajahmundry 3 Peddapuram Samalkot 2 x 21.6 R - Y 16.00 14.33
Y - B 16.00 12.49 A2 8 12
Vijayawad
a-
Visakhapa
tnam
10 Eluru Pedatadepalli Tadepalligudem 2 x 21.6
18.00 15.36 A1+ 9 14 APSPDCL 8 Guntur Tadepalli Krishna canal Junction 2 x 21.6 Y - R
15.00 9.69 A2 8 -- APSPDCL
7 11 APSPDCL
Traction
power
control /
Vijayawad
a
Phone:
0866-
2571739,
97013739
41,
97013739
42
Sr.DEE/Tr
D/Vijayaw
ada :
08662573
117,
97013733
30
6 Guntur Bapatla Bapatla 2 x 12.5 Y - B
DETAILS OF TRACTION SUBSTATIONS IN ANDHRA PRADESH
1
Vijayawad
a -
Chennai
Nellore Gudur Gudur R - B 14.00 11.99 A1
60 of 206.
20
Vijayawad
a
1 Kondapalli 220 KV Kondapalli Kondapalli 2 x 13.5 B - R 15.00 13.02 A1 8 -- APSPDCL
21 Khammam 1 Chilakallu 220 KV -- Chilakallu Bonakal 2 x 21.6 B - Y 17.00 15.92 A2 9 13 APNPDCL
22 Khammam 3 Budidampadu 220 KV -- Budidampadu Dornakal 2 x 21.6 R - Y 19.00 16.83 A1 10 14 APNPDCL
Sitarampatnam 220
KV
--
Budidampadu 220 KV Khammam
Warangal 220 KV
KTPS 132 KV
25 Warangal 2 Warangal 220 KV - Madikonda Kazipet 2 x 21.6 R - Y 15.00 15.39 A1 8 11 APNPDCL
Warangal 220 KV
RTS - B
27 Karimnagar 2 Ramagundam220 KV -- Ramagundam 132 KV Ramagundam
1 x 21.6
1 x 13.5
Y - R 19.00 17.01 A1+ 10 14 APNPDCL
28 Adilabad 2 Ramagundam220 KV -- Bellampalli 132 KV Bellampalli 2 x 21.6 B - Y 15.00 14.98 A1 8 -- APNPDCL
29 Adilabad 2 Ramagundam220 KV Bellampalli 132 KV Sirpur Kagaznagar Sirpur Kagaznagar
1 x 21.6
1 x 13.5
B - R 16.00 15.34 A2 8 12 APNPDCL
Warangal 220 KV
Madikonda &
Dharmasagara '-
Waddekottapally -
Warangal 220 KV Jangaon
Bhongir 220 KV -
32
Ranga
Reddy
east
1
Ghanapur 220 KV
(Hyderabad)
-- Ghanapur Ghatkesar 2 x 21.6 R - Y 18.00 16.23 A1 9 14 APCPDCL
Shapur Nagar 220KV --
Gachibowli Erragadda
Tandur 220 KV Pargi
Yeddumailram 220 KV Dharmasagara
35
Ranga
Reddy
South
1 Tandur 220 KV -- Tandur Tandur 1 x 21.6 R - Y 10.00 9.70 A2 5 8 APCPDCL
-- 1 Gooty 220 KV SS -
1 Gooty 220 KV RS -
-- Tadipatri 220 KV -
Gooty 220Kv RS
Gudipadu &
Ankireddy palli
38
Gudur-
Chennai
Nellore 1 Sullurpet - Sullurpet Sullurpet 2X21.6 Y-B 13 11.91 A2 9.1 13 APSPDCL
39
Renigunt
a-
Arakkona
m
Tirupathy 1 Renigunta - Puttur Puttur 2X21.6 R-Y 14 12.24 A1 9.8 14 APSPDCL
Southern Railway
TPC/Che
nnai, 044-
2535354
0
10.00 -- A2 5 8 APCPDCL
5 -- APCPDCL
Traction
power
control /
Guntakal
Phone:
37 1 Komali Komali 2X21.6 R - B
APCPDCL
36
Renugunt
a -
Guntakal
Gooty RTSS Gooty 2X21.6 R - B 10.00 -- A2
B - R 10.00 10.28 A2 5 --
A1 8 11 APCPDCL
34
Ranga
Reddy
South
1
Vikarabad
RTSS
Vikarabad 2 x 21.6
APCPDCL
33
Hyderaba
d (HDN)
1 Sanath Nagar Sanath Nagar 2 x 21.6 B - Y 15.00 14.19
R - B 16.00 17.53 B 8 12 31 Nalgonda 2 Aler 132 KV Aler 2 x 21.6
12.50 11.87 A2 6 -- APNPDCL
9 APNPDCL
30
Kazipet-
Secunder
abad-
wadi
Warangal 2 Raghunathpalli132KV Ghanpur 2 x 21.6 Y - B
2 x 21.6 Y - B 14.00 12.49 A2 7
-- APNPDCL
Kazipet -
Ballarsha
TPC /
Secunder
abad 040-
27823137
,
97013713
47,
97013713
46,
97013713
48
Sr.DEE/T
RD/Secun
d-erabad :
040-
27833031
,
97013713
01
26 Karimnagar 2/3 - Jamikunta Jamikunta
2 x 13.5 R - B 14.00 12.73 A2 7 24 Warangal 2/3 - Nekkonda Nekkonda
TPC /
Secunder
abad 040-
27823137
,
97013713
47,
97013713
46,
97013713
48
Sr.DEE/Tr
d/Secund-
erabad :
23 Khammam 3 Kothagudam RTSS Badhrachalam Road 2 x 21.6 Y - B 12.00 9.68
Vijayawad
a -Kazipet
A1 6 6 APNPDCL
61 of 206.
40
Khurda-
Palasa
3
Srikakula
m
Tekkali - Palasa Baruva 1X21.6 R-B 14 14.2 A2 7 14 APEPDCL
Traction
power
control/
Kurdha-
Road,
0674-
2491538
41 3 Garividi Tekkali - Tekkali Naupada 2X21.6 Y-B 13 13.8 A1 7 13 APEPDCL
Tekkali - Tekkali 1X21.6
Garividi Pydi Bhimavaram C.K.Palem 1X12.5
Garividi -
Pendurthy
Goldstar & TB
Vara
Ontithadi
Pendurthy - 1X21.6
Gajuwaka 1X12.5
Gajuwaka -
Pendurthy
Simhachalam &
ACC
Pendurthy Goldstar 1X13.5
Garividi - 1x12.5
Garividi T.B.Vara
Pendurthy Goldstar & TB Vara
Garividi T.B.Vara
Pendurthy Goldstar & TB Vara
Garividi T.B.Vara
Pendurthy Goldstar & TB Vara
APEPDCL
East Coast Railway
R-Y 9 8.8 A1 5 9
A2 7 13 APEPDCL
49 3 Paaderu Araku Gorapur 1X12.5
APEPDCL
48 3 Paaderu Araku Similiguda 2X12.5 B-R 13 11.4
B-R 13.5 13.4 A1 7 13.5
A2 4 7.5 APEPDCL
47 3 Paaderu Araku Tyada 2X12.5
APEPDCL
46
Kottavalsa-
Koraput
3 Paaderu T.B.Vara
Srungavarapukota
(SKT)
Y-B 7.5 8.6
R-Y 9 9.5 A2 5 9 45 3
Visakha
patnam
VSEZ Duvvadda 2X21.6
15 14.7 A1 8 15 APEPDCL 44 3
Visahka
patnam
Simha chalam Simha- chalam R-Y
15 15.6 A1 8 15 APEPDCL
A2 6 11 APEPDCL
43 3
Vizia-
nagaram
Vizia-nagaram 2 x 21.6 R-Y Pasala-
Duvadda
Traction
power
control
/Visakha-
patnam,
0891-
2746245,
0891-
2705812
42 3 Garividi Ponduru Y-B 11 11.5
62 of 206.
SRLDC Black Start Restoration Procedure 2014


5.11 BLACK START MOCK DRILL PROCEDURE
The procedure for mock drill exercise is as given below.
Step by step procedure for extending of start up Power Supply from Nagarjunasagar
Hydel Power Station to Vijayawada Thermal Power Station

Step 1:

At 220KV Nagarjunasagar switchyard:
a. 220 Tallapally feeder-3, 100MVA-1 Transformer and identified generator which is to be
started with Diesel set shall be kept on Bus-I and all other feeders, Generators and
Transformer shall be kept on Bus-II.
b. 100MVA-1 Transformer and 132KV Halia feeder with radial load shall be kept on 132KV
Bus-I.
c. 132 KV Bus coupler and 220KV Bus coupler shall be opened duly ensuring safe loading
on 100MVA-2.
d. 220KV Tallapally feeder-3 shall be kept open.

At 132KV Halia Sub station:
a. Open 132KV ring between Halia and Nalgonda and ensure radial feeding of Halia load
from Nagrjunasagar.
b. Also ensure safe loading of 100MVA PTRs at 220KV Narketpally S.S.

Step 2:

At 220KV Tallapally Sub station:
a. 220KV Nagarjunasagar feeder -3 and VTPS-1 feeder shall be kept on Bus-I and all
other feeders and ICTs shall be kept on Bus-II
b. Bus coupler- I and II shall be opened.
c. Open the Nagarjunasagar -3 and VTPS -1 feeder.

OR

a. 220KV VTPS-4 and ICT-3 shall be shifted to Bus section-3 from section -4
b. Open the NSagar feeder-3 and VTPS feeder-1 which are on Bus section-3
c. Open Bus coupler between Bus section-3 and 4
d. Open Bus section between 2 and 4

Step 3:

At 220KV VTPS Swith yard:
a. Open the Tallapally feeder- I
b. Isolate By pass bus/Transfer Bus from the grid if in service and keep the Tallapally
feeder -1 on By pass bus.






63 of 206.
SRLDC Black Start Restoration Procedure 2014


Step 4:

At Nagarjunasagar Power House and Switchyard:
a. Start the identified generator using D.G set and connect to Bus-I
b. Charge 100MVA PTR and feed Halia loads radially.
c. Charge 220KV Tallapally feeder -3.


Step 5

At 220Tallapally S.S.
a. Charge Bus-I with Nagarjunasagar feeder -3 and extend supply to VTPS through
feeder -1

OR

a. Charge Bus section -4 through Nagarjunasagar feeder-3 and extend supply to VTPS
through feeder -1

Step 6

At 220KV VTPS Switchyard:
a. Charge By pass bus.

Step 7
a. Take out the generator at Nagarjunasagar gradually reducing the load.
b. Normalcy shall be restored at Nagarjunasagar switchyard, Tallapally S.S and VTPS
S.S.
c. Intimate the logging details at each station to SLDC.



NOTE:

Selection of Bus & Feeders will be finalized by the SLDC Operator in Coordination with
substation and Generating station officers while carrying out Mock exercise.












64 of 206.
SRLDC Black Start Restoration Procedure 2014


Step by step procedure for extending of start up Power Supply from Srisailam Right
Bank Hydel Power Station to Rayalaseema Thermal Power Station

Step 1:
At 220KV Srisailam Right Bank switchyard:
220 KV Mydukur feeder and identified generator which is to be started with Diesel set
shall be kept on Bus-I and all other feeders, Generators and 100MVA Transformer
shall be kept on Bus-II.
220KV Bus coupler shall be opened.
Open 220KV Mydukur feeder.

Step 2:
At 220KV Mydukur SS:
Open HV & LV Breakers of both transformers (50MVA and 31.5MVA) and Cuddapah
feeder breaker.
Keep Srisailam feeder in closed condition.
Open 220KV Cuddapah feeder.

Step 3:

At 220KV Cuddapah SS:
Open HV & LV Breakers of all three 100 MVA transformers.
Open Chinakampally feeder.
Arrange alternate supply to the loads of Kadapa SS as extent as possible.

Step 4:

At 220KV Chinakampally:
Keep RTPP-I and Cuddapah feeder on Bus I and all other feeders and 100 MVA PTR
on Bus -II.
Open the 220KV Bus Coupler after ensuring safe loading on Bus-II as both the buses
are old.
Open 220KV RTPP-1 feeder after ensuring safe loading on RTPP feeder-II.

Step 5:
At 200KV RTPP Switchyard:
Isolate By pass Bus/Transfer Bus from the Grid if in service and keep the
Chinakampally feeder -1 on by pass bus.
Open Chinkampally feeder -1.
65 of 206.
SRLDC Black Start Restoration Procedure 2014




Step 6:

At Srisailam Right bank Switchyard:
Start the identified Generator using D.G.Set and connect to Bus-1.
Charge 220KV Mydukur feeder.

Step 7:
At 220KV Mydukur SS:
Close HV Braker of 50MVA Transformer and avail 30MW load radial load.
Extend supply to Cuddapah.
Step 8:
At 220KV Cuddapah SS:
Extend supply to Chinakampally.

Step 9:
At 220KV Chinakampally:
Extend Supply to RTPP by charging RTPP feeder-1

Step 10:
At 220KV RTPP Swichyard
Avail supply from Chinakampally and Charge By pass Bus/Transfer Bus.

Step 11:
Take out the generator at Srisailam Right bank Power House by gradually reducing
the load.
Normalcy shall be restored at Srisailam Right Bank switchyard, Mydukur S.S,
Cuddapah SS, Chinkampally SS and RTPP S.S.
Intimate the logging details at each station to SLDC.


NOTE:

1. Selection of Bus & Feeders will be finalized by the SLDC Operator in Coordination with
substation and Generating station officers while carrying out Mock exercise.
2. As both the buses at Chinakampally are old, it is advisable to carry out Mock exercise after
strengthening of Buses.
3. Also it is advisable to carry out the Mock exercise when one of the RTPP units is under
shutdown as the safe loading on 220 KV Chinakampally RTPP feeder is to be ensured.


66 of 206.
SRLDC Black Start Restoration Procedure 2014


Step by step procedure for extending of start up Power Supply from Lower Sileru
Hydel Power Station to Kothagudam Thermal Power Station (Old Station)


Step 1:
At 220KV Lower Sileru switchyard:
220 KV KTS feeder-1 and identified generator which is to be started with Diesel set
shall be kept on Bus-II and all other feeders, Generators and Transformer shall be
kept on Bus-I.
Open KTPS-1 feeder breaker

Step 2:
At 220KV KTPS Switchyard (Old Station):
Keep Lower Sileru feeder-1 on Bus section 3 and all other feeders and Generators
which are on Bus section -3 shall be kept on Bus section-4.
Open 220KV Bus coupler between Bus Section-3 and 4 and Bus sectionaliser
between Bus section 1 and 3.
Open Lower Sileru feeder breaker.

Step 3:
At 220KV Lower Sileru Power House and Switchyard:
Start the identified generator using D.G set and connect to Bus-II
Charge 220KV KTS Feeder-1.

Step 4:
At 220KV KTPS(Old Station) Switchyard:
Charge Bus section -3 by closing 220KV Lower Sileru feeder-1


Step 5:
Take out the generator at Lower Sileru gradually reducing the load.
Normalcy shall be restored at Lower Sileru switchyard and KTPS S.S.
Intimate the logging details at each station to SLDC.

NOTE:

Selection of Bus & Feeders will be finalized by the SLDC Operator in Coordination with
substation and Generating station officers while carrying out Mock exercise.


67 of 206.
SRLDC Black Start Restoration Procedure 2014


Step by step procedure for extending of start up Power Supply to Thermal
Generating Station from Upper Sileru Hydro Power Station to 400KV Kalpaka
Substation

Step 1:

At 220KV Upper Sileru switchyard:
Ensure all the 4 Units of Upper Sileru under shutdown.
Open 220KV Donkarai and Anrock feeders in coordination with Donkarai and Anrock
Sub stations.


Step 2:
At 220KV Anrock SS.
Open 220KV Breaker of Anrock Industry.
Open 220KV Pendurthy feeder in coordination with Pendurthy SS.

Step 3:
At 220KV Pendurthy:
Keep 220KV Anrock and Dairy farm feeder on Bus-1.
All other feeders and 3Nos 100MVA Transformers on Bus-2
Open Bus coupler.
Open 220KV Dairy farm feeder in coordination with Dairy farm SS.

Step 4:
At 220KV Dairy Farm:
Open 220KV Pendurthy and Kalpaka feeders 1&2 feeders in coordination with
Kalpaka SS.
Open HV side of 100MVA Transformer.

Step 5:
At 220KV/400KV Kalpakka SS:
220KV Dairy Farm-I feeder and 315MVA ICT-I shall be kept on 220KV Bus-I.
All other feeders and 315MVA ICTs-2 shall be kept at Bus-2.
Open 220KV Bus Coupler between Bus-1 and Bus-2 ensuring safe loading on all
other feeders and ICT-2.
Keep 315MVA ICT-1 on 400KV Bus section -2.
Keep all other 400KV feeders and ICT-2 on Bus section-1
Open Bus coupler between Bus section-1 and Bus section -2.
Open Bus sectionaliser between Bus section -2 and Bus section -4.
Open LV and HV side breakers of ICT-1.


Step 6:
At Upper Sileru:
Start the identified Generator using D.G.set and connect to Main bus.
Charge 220KV Anrock feeder.


68 of 206.
SRLDC Black Start Restoration Procedure 2014


Step 7:
At 220KV Anrock SS:
Charge Bus and Extend supply to Pendurthy SS


Step 8:
At 220KV Pendurthy SS.
Charge Bus-I and extend supply to Dairy farm.


Step 9:
At 220KV Dairy Farm
Avail supply from Pendurthy
Charge 100MVA Transformer and gradually add radial loads up to 30MW.
Extend supply to 220KV Kalpaka by charging 220KV Kalpaka -1 feeder.


Step 10:
At 220KV/400KV Kalpakka SS:
Charge 220KV Bus-1 through Dairy form feeder-1.
Close the LV Breaker of ICT-1.
Charge 400KV Bus section-2 by closing HV breaker of ICT-1.


Step 11:

Stop the generator at Upper Sileru
Normalcy shall be restored at all SS.
Intimate the loggings to Load Dispatch


NOTE:

Selection of Bus & Feeders will be finalized by the SLDC Operator in Coordination with
substation and Generating station officers while carrying out Mock exercise.

5.12 BLACK START MOCK DRILL SCHEDULE FOR THE YEAR 2014
Sl
No
STATION TYPE CAPACITY
IN MW
SUB
SYSTEM
BLACK
START
FACILITY
Mock Drill
Schedule
1 LOWER
SILERU
Hydro 460 3 Available June 13/
Dec 13
2 UPPER
SILERU
Hydro 240 3 Available June 13/
Dec 13
69 of 206.
SRLDC Black Start Restoration Procedure 2014


3 SRISAILAM LB Hydro 900 1 Available June 13/
Dec 13
4 SRISAILAM
RB
Hydro 770 1 Available June 13/
Dec 13
5 N SAGAR Hydro 816 1 Available June 13/
Dec 13
*6 JURALA Hydro 195 1 Available June 13/
Dec 13
7 GMR Barge Hydro 237 3 Available June 13/
Dec 13
Mock drill at Jurala will be conducted when water is available since it is run off river
70 of 206.
SRLDC Black Start Restoration Procedure 2014


6.0 RESTORATION OF KARNATAKA SYSTEM


6.1 SYSTEM OVERVIEW
Karnataka system can be further divided in to two Subsystems which can be brought
up independently and synchronised subsequently once the Subsystems develops in
to larger sustainable islands

6.2 MAJOR GENERATING STATIONS
Following are the Major Generating Stations in Karnataka system
Sl
No
POWER
STATION
TYPE SECTOR
SUB
SYSTEM
CAPACITY
in MW
BLACK
START
FACILITY
1 Sharavathy Hydel State 1 1035 Available
2 STRP Hydel State 1 240 Available
3 Varahi Hydel State 1 460 Available
4 Yelahanka Diesel State 1 128 Not available
5 Nagjhari Hydel State 2 885 Available
6 Kaiga Nuclear Central 2 880 Not available
7 Kadra Hydel State 2 150 Available
8 Supa Hydel State 2 100 Available
10 Kodasalli Hydel State 2 120 Available
11 Tata Diesel State IPP 2 79.1 Available
12 Raichur Thermal State 2 1720 Not available
13 Jindal Thermal State IPP 2 1160 Not available
14 Almatti Hydel State 2 290 Available*
15 Bellary Thermal State 2 500 Not Available
16 UPCL Thermal State IPP 1 1200 Not Available
Cant take radial load due to hunting of Machines, Irrigation dependent.
71 of 206.
SRLDC Black Start Restoration Procedure 2014


6.3 LIST OF MAJOR SUB-STATIONS WITH SYNCHRONISING FACILITY:
SUB STATION
VOLTAGE
LEVEL (KV)
SYNCHRONISING
FACILITY YES/NO
HOODY 400/220 YES
HOODY 220 YES
NELAMANGALA 400/220 YES
RTPS 400/220 YES
TALAGUPPA 400/220 YES
KADAKOLA 220 YES
YERANDANAHALLY 220 YES
SHIMOGA 220 YES
BIDNAL 220/110 YES
KEMAR 220 YES
BELGAUM 220 YES
BAGALKOTE 220 YES
PEENYA 220 YES
LINGAPURA 220 YES
AMBEWADI 220 YES
BBAGEWADI 220 YES
LINGASUGUR 220 YES
GUTTUR 220 YES
MLPURA 220 YES

6.4 IMPORTANT INTER CONNECTIONS
6.4.1 WITH OTHER REGION
a) It is connected with Eastern Region through +/- 500 kV HVDC Talcher-
Kolar link
b) It is connected to Western Region through 220 kV Chikkodi-Kolhapur D/C
and 220 kV Ambewadi - Xeldom and Ambewadi - Ponda

72 of 206.
SRLDC Black Start Restoration Procedure 2014


6.4.2 WITHIN THE REGION
A. With Andhra Pradesh
a) 400 kV S/C Kadapa-Kolar
b) 400 kV S/C Gooty-Somanahally
c) 400 kV S/C Gooty-Nelamangala
d) 400 kV S/C Mehaboobnagar-Raichur
e) 400 kV D/C Gooty-Raichur
f) 220 kV S/C Gooty-Alipur
g) 220 kV S/C Tandur-Sedam
B. With Kerala
a) 220 kV S/C Kadakola-Kaniyampeta
b) 110 kV S/C Manjeswara-Kulashekara
C. With Tamil Nadu
a) 400 kV S/C Kolar- Kalavindapattu
b) 400 kV D/C Kolar-Hosur
c) 400 kV S/C Somanahalli-Salem
d) 220 kV S/C Yerandanahalli-Hosur

6.5 SUB SYSTEM DEMARCATION
SUB SYSTEM 1: The sub-system 1 comprises of Major Hydro Stations Viz.
Sharavathi, Sharavathi Tail Race (STRP), Jog, Varahi and Yelehanka (Diesel),
UPCL. It includes major and important load centre like Bangalore, Mysore, Hoody,
Peenya & Mangalore etc.

SUB SYSTEM 2: The sub-system 2 comprises of Major Thermal Stations Viz.
Raichur & Bellary and Major Hydro Stations Viz. Nagjheri, Kadra, Kodasalli & Almatti
and Kaiga (Nuclear), Tata (Diesel) & Jindal (Corex). It includes major and important
load centre like Hubli, Belgaum & Gulbarga etc.





73 of 206.
SRLDC Black Start Restoration Procedure 2014





SUB SYSTEM 2
SUB SYSTEM 1
74 of 206.
SRLDC Black Start Restoration Procedure 2014


6.6 RESTORATION OF SUBSYSTEM 1- (SHARAVATHY AREA)
6.6.1 AVAILING START UP POWER
To restore this Subsystem Startup power can be availed from the following:
A. During Total Regional Blackout and /or Total Blackout in Karnataka
Self-starting of Sharavathy hydro generation.
Self-starting of Varahi hydro generation.
Self-starting of STRP hydro generation.
From Andhra Pradesh system through 400 kV Kadapa & Gooty lines.
From Kerala system through 220kV S/C Kadakola - Kaniyampeta line.
From Tamil Nadu system through 400 kV Kalavindapattu, Hosur, Salem and
from 220 kV Hosur lines.

B. During Blackout of Subsystem 1 only
From Andhra Pradesh system through 400 kV Kadapa & Gooty lines.
From Kerala system through 220kV S/C Kadakola - Kaniyampeta line.
From Tamil Nadu system through 400 kV Kalavindapattu, Hosur, Salem and
from 220 kV Hosur lines.
From Subsystem 2 through 400 kV D/C Guttur-Hiriyur to Hiriyur and from
220kV D/C Hubli-Sharavathy & 200 kV S/C Ranibennur-Sharavathy lines to
Sharavathy Generating Station.

6.6.2 RESTORATION PROCESS FOR SUB-SYSTEM 1 (IN CASE OF TOTAL
BLACKOUT OF THE REGION)
6.6.2.1 Availing Start up Power
All Major generators (Sharavathy, STRP & Varahi) in this Subsystem are
having self-starting facilities and can come up on their own.

6.6.2.2 Restoration of the Subsystem
In case of Total Blackout of the System all hydro/naptha in this system can be
self-started and this island can be gradually developed by providing loads of
Shimoga, Mysore, Mangalore and Bangalore urban..

75 of 206.
SRLDC Black Start Restoration Procedure 2014


The actions at Sl No. (a) to (c) shall be done simultaneously
a) Start one unit at Sharavathi and extend supply to Skoppa & Extend
supply to Shimoga from Sharavathy with 40 MW load at Shimoga
b) Start Varahi generation and Extend supply to Kemar (20MW) & Start
Up Power to UPCL (25MW)
c) Start STRP generation and extend supply to Talguppa
d) Synchronise 220 kv Shimoga - Varahi line at Varahi.
e) Extend supply to Puttur & Kavoor. Connect loads at Puttur (20 MW) &
Kavoor (50MW) by extending power from Kemar.
f) Synchronise 220 kv Talguppa - Sharavathy line at Sharavathy.
g) Extend supply from Shimoga to Nelamangala 220kV via KB cross
(20MW) and connect about ( 40 MW) load at Nelamangala
h) Extend supply from Nelamangala to Peenya 220kV and connect some
loads (15MW) at Peenya at 66kv.
i) Extend supply to 400 kV at Nelamangala & extend to Somanahalli &
connect some loads at Sommanahalli (30 MW)
j) Extend supply to Yelehanka and synchronise Yelehanka units.
k) Extend Supply from Peenya to Sommanahalli via SPura (30MW) and
synchronise at Sommanahalli.
l) Charge Talguppa 400 kV station & close Talguppa-Hassan-
Nelamangala Line
76 of 206.
SRLDC Black Start Restoration Procedure 2014


77 of 206.
SRLDC Black Start Restoration Procedure 2014



6.6.3 ACTIONS TO BE TAKEN BY VARIOUS GENERATING STATIONS AND
SUB-STATIONS DURING TOTAL REGIONAL BLACKOUT AND / OR
TOTAL BLACKOUT IN KARNATAKA
(a) At Sharavathy
In case of Total failure of supply in Karnataka System start the
generators from station auxiliaries or from diesel set and await for
further instruction from SLDC
Bring at least four to five machines on bar
Charge Sharavathy-SKoppa line and avail loads in consultation with
SLDC and SKoppa
Charge one of Sharavathy-Shimoga line and avail loads in consultation
with SLDC and Shimoga.
Charge one of Sharavathy-Sirsi-Hubli line and avail loads in
consultation with SLDC, Sirsi and Hubli.
Charge Sharavathy-Talaguppa in consultation with Talaguppa and
SLDC
Gradually cut in other generators and lines as the load in the
Subsystem picks up in consultation with SLDC
(b) At Varahi
In case of Total failure of supply in Karnataka System start the
generators from station auxiliaries or from diesel set and await for
further instruction from SLDC.
Charge One of Varahi-Kemar 220kV line and avail loads in consultation
with Kemar and SLDC
Synchronise Varahi-Shimoga 220kV line at Varahi
78 of 206.
SRLDC Black Start Restoration Procedure 2014


(c) At STRP
In case of total failure of supply in Karnataka System start the
generators from station auxiliaries or from diesel set and await for
further instruction from SLDC.
Extend power supply to Talaguppa substation in consultation with
SLDC and Talaguppa
(d) At Kemar
Avail Supply from Varahi
Avail loads in consultation with SLDC
Extend Start up supply to UPCL.
Extend supply to Puttur & Kavoor
(e) At Shimoga
Avail Power supply from Sharavathy
Avail limited load in consultation with SLDC
Extend supply to Varahi and synchronise with Sharavathy system at
Varahi
Extend Power supply to Neelamangala either through Kibbanahalli
(Preferred) or Antharasanahally or Kadur or Hassan/Nittur.
Extend Power supply to other substations in consultation with SLDC
(f) At Nelamangala
Avail Power supply from Shimoga
Extend Power supply to Peenya which in turn extend it to Yelahanka
Generating Station for Start-up.
Extend Power supply to Somanahalli through 400 kV system by
charging 400 kV Nelamangala-Bidadi-Somanahalli line and take
minimum load.
Extend Power supply to Hoody through 400 kV system by charging 400
kV Nelamangala-Hoody line and take minimum load.
79 of 206.
SRLDC Black Start Restoration Procedure 2014


Extend Power supply to Kolar through 400 kV system by charging 400
kV Kolar-Somanahalli line and take minimum load.
Gradually extend power supply to Somanahalli area in consultation with
SLDC
Once the island is built up it can be synchonised with Subsystem 2 by
availing power supply from Guttur through Hiriyur
This island can also be synchronized with central grid by synchronizing
with 400 kV Gooty-Nelamangala/ 400 kV Gooty-Somanahally / 400 kV
Kadapa-Kolar / 400 kV Hosur-Kolar / 400 kV Kalavindapattu-Kolar lines
(g) At Peenya
Avail Power supply from Nelamangala
Avail limited load in consultation with SLDC
Extend power supply to Yelahanka Generating Station for Start up
Extend Power supply to Somanahally through SPura.
(h) At Talaguppa
Avail Power supply from STRP if unit has started at STRP
Extend supply from STRP system for synchronization with Sharavathy
at Sharavathy
Charge one of the 400 kV TalaguppaHassan-Nelamangala line.
Before charging this line ensures that the Line Reactors of the other
line are converted in to Bus reactors at both ends to prevent over
voltage during charging the line.
(i) At UPCL
Trip all out going lines
Avail startup power supply from Varahi through 220KV Varahi Kemar
UPCL in consultation with SLDC.

6.6.4 Restoration of Subsystem 1 during collapse of this Subsystem alone
or Karanataka system alone
80 of 206.
SRLDC Black Start Restoration Procedure 2014


All generating stations in this Subsystem are having self-starting facility.
Operating staff of these stations should start the generators from station
auxiliaries or from DG set and await for further instruction from SLDC

6.6.4.1 Extending Supply from 400 kV System
If the supply is available at 400 kV Kadapa / Gooty / Kalavindapattu / Salem /
Hosur, the same should be extended to this Subsystem in consultation with
SRLDC to meet partial and important loads around Somanahalli by extending
supply to Somanahally and Nelamangala from Gooty or to Somanahalli from
Salem and to Kolar either from Kadapa, Hosur or Kalavindapattu.

If the Power supply is available at Somanahalli / Hoody / Nelamangala, the
same can be extended to Shimoga by restoring restricted loads at intervening
substations. Sharavathy generating station can start their generators and
extend up to Shimoga for synchronizing Sharavathi with rest of the grid.

6.6.4.2 Extending supply from Subsystem 2
Supply to Sharavathy can be extended from Hubli or from Ranibennur and
Subsystem 2 can be synchronized with Subsystem1. Then supply to be
extended to Nelamangala via Shimoga.

81 of 206.
SRLDC Black Start Restoration Procedure 2014


6.6.5 RESTORATION OF SUBSYSTEM 2- (RAICHUR, BELLARY, NAGJHERI
COMPLEX & KAIGA AREA IN KARNATAKA SYSTEM)
A. Availing Start Up Power
To restore this Subsystem Startup power can be availed from the following:

A. During Total Regional Blackout and /or Total Blackout in Karnataka
Self-starting of Nagjheri hydro generation.
Self-starting of Kadra hydro generation.
Self-starting of Supa hydro generation.
Self-starting of Kodasalli generation.
From Andhra Pradesh system through 400 kV Gooty, Mehaboobnagar
and from 220 kV Gooty, Tandur lines.

B. During Blackout of Subsystem 2 only
From Andhra Pradesh system through 400 kV Gooty, Mehaboobnagar
and from 220 kV Gooty, Tandur lines.
From Subsystem 1 through 400 kV D/C Guttur-Hiriyur and from 220kV
D/C Hubli-Sharavathy lines.

6.6.6 RESTORATION PROCESS FOR SUB-SYSTEM 2 (IN CASE OF TOTAL
BLACKOUT OF THE REGION)

A. Availing Start up Power
All Major Hydro generators (Nagjheri, Kadra, Kodasalli & Supa) in this
Subsystem are having self-starting facilities and can come up on their own.

B. Restoration of the Subsystem
In case of Total Blackout of the System all hydro generators in this system can
be self-started and this island can be gradually developed by providing loads
of Hubli, Mahalingapur, B.B. Wadi, Gulbarga, Humnabad & Belgaum. The
actions at Sl No.1&2 shall be done simultaneously
82 of 206.
SRLDC Black Start Restoration Procedure 2014


a) Start Nagajhari generation and extend supply to Kaiga via Kodasahalli.
Kaiga to synchronise their units in case units are in House load or else
avail startup.
b) Startup Supa and Extend to Nagjheri via Ambewadi (110kV).
c) Extend supply from Nagajhari to BTPS via Bidnal (40MW), Enercon,
Lingapur BTPS.
d) Extend supply from Lingapur JSW.
e) Extend supply from Lingapur to RTPS via Sindanur, Lingasugur RTPS.
f) Start Kodasahalli and Kadra units and synchronise Kadra-Kodasahalli
and Kadra-Kaiga. Generation of kadra and kodasalli may be restricted to
avoid line loadings.
g) Extend supply to Belgaum via Narendra from Nagjheri and Synchronise
Tata Power. Tata Power has startup but cannot be utilized due to lack of
synchronizing capacity at Belgaum & Narendra.
h) Charge 400kV Narendra-Kaiga at Narendra End and Synchronise at
Kaiga end.
i) Extend supply to important loads such as Sea Bird (Karwar).
j) No Traction loads available in Subsystem2.
k) In case supply is available at Kolhapur the same can be availed radially
at Belgaum & Chikkodi. Subsequently, Subsytem 1 & 2 shall be
synchronized at Sharavathy through 220 kV Hubli-Sharavathi Lines.
l) 400kV Kaiga-Guttur,Guttur-Hiryur-Nelamangala & Raichur-Guttur
corridors would be normalized depending on system condition.
-





83 of 206.
SRLDC Black Start Restoration Procedure 2014



84 of 206.
SRLDC Black Start Restoration Procedure 2014


6.6.7 ACTIONS TO BE TAKEN BY VARIOUS GENERATING STATIONS AND
SUB-STATIONS DURING TOTAL REGIONAL BLACKOUT AND / OR
TOTAL BLACKOUT IN KARNATAKA
(a) At Nagjheri
Open all out going lines.
Self-start generators through station auxiliaries available or through DG
Set.
Charge one of the Nagjheri-Hubli lines and avail limited load.
Once one or two units of Nagjheri started supply should be extended to
Kodasahalli in consultation with Kodasalli and SLDC through 220 kV
Nagjheri-Kodasalli line which will be further extended to Kaiga for
starting up the generators
Charge one of the Nagjheri-Ambewadi lines and avail limited load.
Since the generators at Nagjheri cannot run at loads less than 100MW
per generator system loads should be gradually resumed. Following
procedure may be adopted to provide sufficient loads to meet the
requirement of minimum generator loading
1 One unit of Nagjheri
Synchronised
Resume 100MW of Hubli,
Ambewadi, Narendra Load
2 Second unit of Nagjheri
Synchronised
Resume 100MW of Belgaum Load
3 Third unit of Nagjheri
Synchronised
Resume 100MW Load of
Mahalingapur
(b) At Supa
Open all out going lines.
Self-start generators through Supa station auxiliaries available or
through DG Set and extend power supply to Ambewadi.
Once Nagjheri Generator comes up it can be synchronized at Nagjheri
through 220 kV Ambewadi-Nagjheri line.

85 of 206.
SRLDC Black Start Restoration Procedure 2014


(c) At Hubli
Open all out going lines.
Avail Power supply from Nagjheri
Restore loads at Hubli considering the generation limits at Nagjheri in
consultation with Nagjheri /SLDC
As the generation in the Subsystem picks up gradually restore the
nearby loads (Bidnal, Mahalingapur & Lingapur)
Synchronise it with Subsystem 1 in consultation with SLDC
(d) At Lingapur
Trip all out going lines
Avail power supply from Alipur if supply is available at Gooty via
Regalapadu
In case power supply is available at Hubli the same can be availed
Extend the startup power to BTPS
Extend the same to Jindal
Extend the same to RTPS through Lingasugur in consultation with
Lingasugur /SLDC.
(e) At Raichur
Trip all out going lines
If the station is on House load start other units and wait for instruction
from SLDC
In case AP system is intact and Nsagar machines are running. Start-up
power can be availed through 400 kV NSagar-Mehaboobnagar-
Raichur line. Start-up power can also be availed through 400 kV Gooty-
Raichur.
Startup power can also be availed through 220KV Tandur-Sedam-
Raichur line.
86 of 206.
SRLDC Black Start Restoration Procedure 2014


In case assistance is not available from AP system startup power
supply should be availed from Nagjheri through 220KV Nagjheri Hubli
Bidnal Enercon - Lingapur-Lingasugur - Raichur. Since this is a long
line to control the charging voltage suitable loads in the intermediate
stations should be availed.
As the generation picks up 220KV lines are charged and power supply
is extended to the surrounding substations.
As the island develops 400KV Guttur/Munirabad lines can be charged.
(f) At Alipur
Trip all out going lines
Avail supply from Regalapadu/ Gooty in consultation with SLDC and
Regalapadu / Gooty
Extend power to Kuditini for start up the unit at BTPS
Extend power supply to Lingapur for extending the same to Jindal
(g) At Sedam
Trip all out going lines
Avail supply from Tandur in consultation with SLDC and Tandur
Extend the same to Raichur if startup power is required for Raichur
Avail local loads in consultation with SLDC
Extend power supply to Humnabad in consultatiuon with SLDC and
Humnabad.
(h) At Bellary TPS
Trip all out going lines
If the station is on House load start other units and wait for instruction
from SLDC
In case AP system is intact avail startup from Gooty through 220 kV
Gooty-Alipur-Kuditini.
87 of 206.
SRLDC Black Start Restoration Procedure 2014


In case assistance is not available from AP system startup power
supply should be availed from Nagjheri through 220KV Nagjheri-Hubli-
Bidnal-Enercon-Lingapur-Kuditini. Since this is a long line to control the
charging voltage suitable loads in the intermediate stations should be
availed.
(i) At JSW
Trip all out going lines
In consultation with SLDC avail power supply from / extend power
supply to Lingapur As per the status of survival of islanding scheme at
JSW.
(j) At Kodasalli
Open all out going lines.
Self-start generators through through DG Set or Nagjheri station
auxiliaries available and synchronise it with Nagjheri through 220 kV
NagjheriKodasalli line.
Extend power supply to Kaiga incase Kaiga didnt get startup power
from Nagjheri through 220 kV Nagjheri-Kodasalli-Kaiga lines.
Extend power supply to Kadra
Generation may be restricted to avoid line loading.
(k) At Kadra
Open all out going lines.
Self-start generators through Nagjheri station auxiliaries available or
through DG Set and synchronise it with Nagjheri through 220 kV
NagjheriKodasalli-Kadra line.
Generation may be restricted to avoid line loading.
(l) At Kaiga
Open all out going lines.
88 of 206.
SRLDC Black Start Restoration Procedure 2014


Avail survival power, if required from Nagjheri through 220 kV Nagjheri-
Kodasalli-Kaiga line & synchronise it with Kaiga generator if they are on
house load otherwise use this power for starting up generators.
Extend power supply to Guttur or Narendra. and gradually increase the
generation as load picks up in consultation with SLDC/SRLDC
In case of delay in availing power supply from Nagjheri, it can be
availed from Narendra-Kaiga lines, otherwise from Subsystem 1
through Kaiga-Guttur-Ranibennur-Sharavathy lines.
(m) At Ambewadi
Open all out going lines.
Avail power supply Either from Supa or Nagjheri
Avail local loads
Extend the same to Narendra
Close interstate lines Ambewadi-Ponda and Ambewadi-Xeldem in
consultation with SLDC and GOA
(n) At Tata Generating Station
In case of total failure of supply in Karnataka System start the
generators from diesel set and await for further instruction from SLDC.
Extend power supply to Belgaum and avail limited load.
Power supply can also be extended to Narendra / Chikkodi from
Belgaum.

(o) At Narendra
Open all out going lines
Avail Power supply from Hubli and resume partial loads in consultation
with SLDC
If Kaiga units are on bar one of 400 kV Kaiga-Narendra line may be
charged and supply from Kaiga maybe availed.
89 of 206.
SRLDC Black Start Restoration Procedure 2014


Power supply can also be availed from Ambewadi & Belgaum
(p) At Belgaum
Open all out going lines.
Avail power supply from Tata Generating Station.
Extend Power supply from Narendra
Extend power supply to Chikkodi
(q) At Chikkodi
Open all out going lines.
Avail Power supply from Belgaum
In case of delay in obtaining power supply from Belgaum and supply
has to be availed from Western Region it can be availed from Kolhapur
in consultation with SLDC and Kolhapur.
Depending on the quantum of power to be imported from Western
Region supply can be extended to Belgaum

6.6.8 Restoration of Subsystem 2 during collapse of this Subsystem alone
All major hydro generating stations & Tata (Diesel) Generating Station in this
Subsystem are having self-starting facility. Operating staff of these stations
should start the generators from station auxiliaries or from diesel set and
await for further instruction from SLDC


6.6.9 Extending Supply from 400 kV System
If supply is available at 400 kV Regulapadu/Mahaboobnagar, it should be
extended to this Subsystem in consultation with SRLDC to startup the Raichur
units and it can be further extended to meet important loads of Gulbarga &
B.B. Wadi area.

6.6.10 Extending supply from Subsystem 1
90 of 206.
SRLDC Black Start Restoration Procedure 2014


Supply to this Subsystem can be availed from 220 kV Sharavathy-Hubli-
Nagjheri line and synchronized it at Nagjheri.

Supply to this Subsystem can also be availed from 400 kV Guttur-Hiriyur lines.

6.7 CRITICAL LOADS IN KARNATAKA
Sl.
No
Area Installatiom
Load
MW
Connected
220 KV
Station
Sub
Syste
m
1 Bangalore
DRDO, NAL, HAL, HAL Air
Port, Water Supply, ISRO
20 HAL 1
Vidhana Soudha,
Rajbhavan, High Court,
Central Railway Station,
Water supply, Bangalore
Bus Stand
25 NRS/ Hebbal 1
Agriculture University, Water
supply, Jekkur air port
20 Hebbal 1
Nimhans, Water Supply 8 HSR Lay out 1
ISRO, Water supply 15 Peenya 1
Jayadeva, Water Supply 4
Subramanyap
ura
1
BIAL Devanahally, 3 Begur 1
Bangalore
Milk chilling Venter, Infosys,
Electronic City, Water
Supply
10
Yerandanahal
ly
1
Rail Way Traction, Water
Supply, Bagmane Estate
15 Hoody 1
General Hospital, Water
Supply.
15 Somanahally 1
CPRI 8 CPRI 1
ITPL 8 ITPL 1
Tataguni Water supply 15
Tataguni
BWSSB
1
Harohally Water supply 15
Harohally
BWSSB
1
2 Tumkur
General Hospital, Water
Supply, HMT, Siddaganga
Mutt, Milk Diary.
8
Antharasanah
ally,

3 Davanagere
General Hospital, Water
Supply
3 Davanagere
4 Madhugiri
General Hospital, Water
Supplly,
5 Madhugiri
5 Kibbanahally
General Hospital, Water
Supplly,
5 Kibbanahally
91 of 206.
SRLDC Black Start Restoration Procedure 2014


6 Kolar
Rail Way Traction, Water
Supply, HVDV Station, Milk
Diary
10 Kolar 1
7 Gouribidanur BARC, Water supply 3 Gouribidanur 1
8 Shimoga
All India Rdio, General
Hospital, Water Suppl.
MPM, VISL, Shringeri,
Varanadu.
12 Shimoga 1
9 Mangalore
Air Port, General Hospital,
Water Supplt , Mangalore
Port, Udupi
12 Kavoor 1
10 Kemar
MAHE, Dharmasthala,
Kollur, Kateelu Water
supply, General Hospital.
12 Kemar 1
11 Mysore
DRDO, KRS, BARC, All
India Radio, Mysore Palace,
Chamundeshwari Hill, Air
force centre, Milk Diary,
Water Supply
15 Hootagally 1
12 T K Hally
Bangalor Water Supply,
General Hospital.
20 T K Hally 1
13
Madhuvana
hally
General Hospital, Water
Supplly. Mahadeshwara
Temple.
5
Madhuvanah
ally
1
14
Chamaraja
nagar
General Hospital, Water
Supplly.
3
Chamaraja
nagar
1
15 Nanajanagud
General Hospital, Water
Supplly, Nanajangud
Temple, Suttur Matt.
5 Kadakola 1
16 Tubinakere
General Hospital, Water
Supplly.
3 Tubinakere 1
17 Hassan
General Hospital, Water
Supplly, ISRO.
12 Hassan 1
18 Chinthamani
General Hospital, Water
Supplly.
3 Chinthamani 1
19 D B Pura
General Hospital, Water
Supplly.
3 D B Pura 1
20 Hubli
Air Port, General Hospital,
Water Supplt , Southeren
Railway
5 Hubli 2
21 Dharwad
All India Rdio, General
Hospital, Water Suppl.
VTU.
3 Narendra 2
22 Belgaum
Army base camp, General
Hoapital, Water Supply
3 Belgaum 2
23 Bidar
Air Force Centre, Water
Supply, General Hospital
5 Humnabad 2
92 of 206.
SRLDC Black Start Restoration Procedure 2014


24 Gulbarga
All India Rdio, General
Hospital, Water Suppl. T V
Station.
8 Gulbarga 2
25 Raichur
General Hospital, Water
Supply.
4 Raichur 2
26 Bellary
General Hospital, Water
Suppl. TB Dam
5 Alipur 2
27 Raichur
Start-up supply to RTPS,
Water Supply
20
220/ 400 KV
Supply
2
28 BTPS
Start up supply to RTPS,
Water Supply
10
220/ 400 KV
Supply
2
29 Koppal
General Hospital, Water
Supply.
3 Munirabad 2
30
Mahalinga
puara
General Hospital, Water
Supply.
5
Mahalinga
puara
2
31 BB Wadi
General Hospital, Water
Supplly.
5 BB Wadi 2
32 Lingasugur
General Hospital, Water
Supplly.
5 Lingasugur 2
33 Chikkodi
General Hospital, Water
Supplly.
5 Chikkodi 2
34 Karwar
Sea Bird, Water supply,
General Hospital.
5 Karwar 2
35 Shahapur
General Hospital, Water
Supplly.
4 Shahapur 2
36 Sedam
General Hospital, Water
Supplly.
5 Sedam 2
37 Gadag
General Hospital, Water
Supplly.
6 Gadag 2
38 Hubli
Air Port, General Hospital,
Water Supplt , Southeren
Railway
5 Hubli 2


93 of 206.
SRLDC Black Start Restoration Procedure 2014


6.8 SUPPLY DETAILS FOR RAILWAY TRACTION SYSTEM IN KARNATAKA
The details of traction system in Karnataka are given below
94 of 206.
S.No. Railway section
Electric
Division/
Circle
Sub
system
No.
220 KV
feeding
point
132 KV
intervining
substation
if 132 KV
tap line
Grid
substation
Railway
Traction
Sub
Station
Transfor
mation
capacity
(MVA)
Phase
details
Sanc-
tioned
load in
MVA
Average
demand
in MVA
Priority
Emergency
minimum
requirement
MVA if all
substations are
given
Emergency
minimum
requirement
MVA if
alternative
substations
are given
Source of
supply
Controled by
1 Jolarpet-Bangalore Hoody 1 Hoody 220 - Hoody 220 Whitefield 2 X 20 R-Y 8.5 8 A2 5 8.5 BESCOM
2 Jolarpet-Bangalore Kolar 1 Kolar 220 - Kolar 220 Bangarpet 2 X 20 R-Y 14 13 A1 10 14 BESCOM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Sl. No Railway section
Electric
Division
/Circle
Subsyst
em No.
220 KV
feeding
point
132 KV
intervining
substation if
/132 132 KV
tap line
Grid
substation
Railway
Traction
Sub Station
Transform
ation
capacity
(MVA)
Phase
details
Sanctio-
ned load
in MVA
Average
demand in
MVA
Priority
Emergency
minimum
requirement MVA if
all substations are
given
Emergency
minimum
requirement MVA
if alternatvie
substations are
given
DISCOM
Traction power
control centre
Hoody 220
kV
-- Hoody 66kV
HAL 220 kV HAL 66kV
-- SRS Peenya 66kV
Welcast 66kV
Subramanyap
ura 220 kV
-- Subramanyapura 66kV
Sommanahall
i 220 kV
Khoday RS 66kV
Vrushbavathi
220 kV
-- Vrushbavathi 66kV
NRS 220 kV NRS 66kV
Remarks Any single source is required. At present both substations are required
* Yet To be commissioned
SOUTH WESTERN RAILWAY
BMRCL
2.00 A 1 1 BESCOM
Traction power
control / Phone:
080-25191075,
DGM/Trd
BESCOM
Traction power
control / Phone:
080-25191075,
DGM/Trd
4 Byappanhalli - Mysore Road Peenya 1 *Mysore Road 2 x 25 3 phase 4.00
3 phase 4.00 2.00 A 1 1 3 Jalahalli - Puttenahalli Peenya 1 *Puttenahalli 2 x 25
2.00 A 1 1 BESCOM
Traction power
control / Phone:
080-25191075,
Traction power
control / Phone:
080-25191075,
DGM/Trd
2 Jalahalli - Puttenahalli Peenya 1
SRS Peenya
220 kV
Peenya 2 x 25 3 phase 4.00
4.00 2.00 A 1 1 BESCOM
DETAILS OF TRACTION SUBSTATIONS IN KARNATAKA
TPC/Bangalore,
080-22871334 ,
973166350
1 Byappanhalli - Mysore Road HOODY 1 Byappanahalli 2 x 25 3 phase
95 of 206.
SRLDC Black Start Restoration Procedure 2014



6.9 BLACK START MOCK DRILL PROCEDURE
A. Sharavathy
a. Start-up Sharavathy extend to shimoga.
B. Varahi
a. Start-up Varahi
b. Synchronise shimoga Varhi at Varahi
C. STRP
a. Start-up STRP & extend to Talguppa
b. Synchronise Talguppa Sharavathy at Sharavathy.
D. Kadra
a. Start-up Kadra & extend to Kaiga
b. synchronise at Kaiga (yet to be tested)
E. Kodasahalli
a. Start-up Kodasahalli & extend to Kaiga
b. synchronise at Kaiga (yet to be tested)

6.10 BLACK START MOCK DRILL SCHEDULE FOR THE YEAR 2014
SUB SYSTEM 1 JUNE 2014
SUB SYSTEM 2 JUNE 2014

96 of 206.
SRLDC Black Start Restoration Procedure 2014


7.0 RESTORATION OF TAMIL NADU SYSTEM

7.1 SYSTEM OVERVIEW
Tamil Nadu system comprises of ISGS, State owned major Thermal & Hydro
generating stations. The TN system can be divided in to three sub systems, which
can be brought up independently and synchronized subsequently once the system
develops in to larger sustainable islands.

7.2 MAJOR GENERATING STATIONS
Following are the Major Generating Stations in the TN System
Sl
No
STATION TYPE SECTOR CAPACITY
IN MW
BLACK
START
FACILITY
SUB
SYSTE
M
1 Tuticorin TPS Thermal State 1050 Not available 1
2 Periyar Hydro State 147 Available 1
3 Madurai Power CL Diesel State IPP 106 Available 1
4 Kodayar 1,2 Hydro State 100 Available 1
5 Vazhuthur Stage I Gas State 98 Not Available 1
6 Vazhuthur satge II Gas State 95 Not available 1
7 Papanasam Hydro State 32 Available 1
8 Servalar Hydro State 20 Available 1
9 Suruliyar Hydro State 35 Not available 1
10 Penna Gas State IPP 52.8 Not Available 1
11 Neyveli TPS II Thermal Central 1470 Not available 2
12 Mettur TPS Thermal State 840 Not available 2
13 Neyveli TPS I Thermal State 600 Not available 2
14 Neyveli TPS I
(Exp) Thermal Central 420 Not available 2
15 Kadamparai Hydro State 400 Not available 2
16 P.P.Nallur Naptha State IPP 330.5 Not available 2
97 of 206.
SRLDC Black Start Restoration Procedure 2014


17 ST CMS Thermal State IPP 250 Not available 2
18 Mettur Tunnel Hydro State 200 Not Available 2
19 Mettur Dam Hydro State 50 Available 2
20 Moyar Hydro State 36 Available 2
21 Kundah PH 1 Hydro State 60 Not available 2
22 Kundah II Hydro State 175 Not Available 2
23 Kundah III Hydro State 180 Not Available 2
24 Kundah IV Hydro State 100 Available 2
25 Kundah V Hydro State 40 Not Available 2
26 Kundha VI Hydro State 30 Not Available 2
27 PUSHEP Hydro State 150 Available 2
28 Lower Mettur Hydro State 120 Not Available 2
29 Aban Power Gas State IPP 120 Not Available 2
30 Kovil Kalapal Gas State 107 Not Available 2
31 Kuttalam Gas State 101 Not Available 2
32 Sholayar 1,2 Hydro State 95 Not Available 2
33 Aliyar Hydro State 60 Available 2
34 Pykara Hydro State 59 Not Available 2
35 Samalpatti Diesel State IPP 106 Available 2
36 Sarkarpathy Hydro State 30 Available 2
37 Bavani Kattalai
Barriage Hydro State 30 Not available 2
38 North Chennai
TPS Thermal State 630 Not available 3
39 Ennore TPS Thermal State 450 Not available 3
40 MAPS Nuclear Central 440 Not available 3
41 GMR Power Diesel State IPP 196 Available 3
98 of 206.
SRLDC Black Start Restoration Procedure 2014


42 Basin Bridge Naptha State 120 Available 3
43 TCPL Coal CPP 58 Not available 3
44 OPG Coal State IPP 80 Not available 3
45 Kamakshi Coal State IPP 70 Not available 3
46 NCTPS Stage 2 Coal State 600 Not Available 3
47 MTPS Stage 3 Coal State 600 Not Available 2
48 NTECL Vallur Coal CGS 1200 Not Available 3
49 Kudankulam Nuclear CGS 1000 Not Available 1

7.3 LIST OF SUB-STATIONS WITH SYNCRONISING FACILITY
Sl.No. SUB STATION
VOLTAGE
LEVEL (KV)
SYNCHRONISING
FACILITY
YES/NO
1 ACHARAPAKKAM 230 YES
2 ALAGARKOIL 230 YES
3 ALUNDUR 230 YES
4 AMUTHAPURAM 230 YES
5 ANUPPANKULAM 230 YES
6 ARANI 230 YES
7 ARASUR 230 YES
8 BASIN BRIDGE 230 YES
9 CHECKANOORANI 230 YES
10 CUDDALORE 230 YES
11 DEVIAKURICHY 230 YES
12 EACHANGADU 230 YES
13 GOBI 230 YES
14 GUMMIDIPOONDI 230 YES
15 HOSUR 230 YES
99 of 206.
SRLDC Black Start Restoration Procedure 2014


16 INGUR 230 YES
17 K.R. THOPPUR 230 YES
18 KADALANGUDI 230 YES
19 KADAPERI 230 YES
20 KARAIKUDI 230 YES
21 KARIAMANGALAM 230 YES
22 KAVANOOR 230/110 YES
23 KAYATHAR 230 YES
24 KILPAUK 230 YES
25 KITS PARK 230 YES
26 KODIKURUCHI 230 YES
27 KORATTUR 230 YES
28 KOYAMBEDU 230 YES
29 MAMBAKKAM (SIPCOT) 230 YES
30 MANALI 230 YES
31 METTUR 230 YES
32 MOSUR 230 YES
33 MYLAPORE 230 YES
34 NOKIA 230 YES
35 OK MANDAPAM 230 YES
36 ORAGADAM 230 YES
37 PALLADAM 230 YES
38 PASUMALAI 230 YES
39 PERAMBALUR 230 YES
40 PONNAPURAM 230 YES
41 PUDHANSANDHAI 230 YES
100 of 206.
SRLDC Black Start Restoration Procedure 2014


42 PUDUKOTTAI 230 YES
43 PUGALUR 230 YES
44 RENGANATHAPURAM 230 YES
45 S.P. KOIL 230 YES
46 S.R.PUDUR 230 YES
47 SALEM 230 YES
48 SAMAYAPURAM 230 YES
49 SANGANERI 230 YES
50 SEMBATTY 230 YES
51 SINGARAPET 230 YES
52 SIRUSERI 230 YES
53 SRIPERUMBUDUR 230 YES
54 TARAMANI 230 YES
55 THANJAVUR 230 YES
56 THENI 230 YES
57 THIRUVANNAMALAI 230 YES
58 THIRUVARUR 230 YES
59 TONDIARPET 230 YES
60 TRICHY 230 YES
61 TUTICORIN AUTO 230 YES
62 TUTICORIN SIPCOT 230 YES
63 UDAYATHUR 230 YES
64 UDUMALPET 230 YES
65 UNJANAI 230 YES
66 VALUTHUR 230/110 YES
67 VEERANAM 230 YES
101 of 206.
SRLDC Black Start Restoration Procedure 2014


68 VILLUPURAM 230 YES
69 VINNAMANGALAM 230 YES
70 THIRUVALAM 230 YES
71 MYVADI SWITCHING
STATION
230 YES
72 ANIKADAVU 230/33 YES
73 SADAYARPALAYAM 230/33 YES

7.4 IMPORTANT INTER CONNECTIONS
7.4.1 WITH OTHER REGION
Tamil Nadu does not have interconnections with other regions.
7.4.2 WITHIN THE REGION
A. With Andra Pradesh
a) 400 KV S/C Chittoor- Sriperumbudur
b) 400 KV D/C Nellore-Alamathy
c) 220 KV S/C Sulurpet- Gummidipoondi
d) 220 KV S/C Chittoor-Thiruvalam

B. With Kerala
a) 400 KV D/C Udumalpet-Pallakad
b) 400 KV D/C Tirunelveli Trivandrum
c) 220 KV S/C Udumalpet-Idukki
d) 220 KV S/C Sabarigiri-Theni
e) 400 KV D/C Tirunelveli Edamon (Charged on 220KV )
f) 110 KV S/C Kuzhithurai-Parasala

C. With Karnataka
a) 400 KV S/C Kolar- Kalivendapattu
b) 400 KV D/C Kolar-Hosur
c) 400 KV S/C Bangalore-Salem
d) 220 KV S/C Yerandanahalli-Hosur
102 of 206.
SRLDC Black Start Restoration Procedure 2014


7.5 SUB SYSTEM DEMARCATION
SUB SYSTEM 1: The sub-system 1 comprises of major thermal station viz. TTPS,
Kudankulam Atomic Power Station, Hydro stations like Periyar, Suruliyar, Papanasam,
Servalar etc., Madurai Power Corporation Pvt. Ltd., (Diesel Power Generating station),
PENNA Power (Gas Power Generating Station) Valuthur GTPP and wind generation
spread over southern part of Tamilnadu. The important load centers in this sub system
include Tuticorin, Nagercoil, Tirunelveli & Madurai. This sub system has process
industries like Sterlite and Space research centre at Mahendragiri etc., INS
Kattabomman Naval Centre, The supply points for the gas stations (ONGC/GAIL) in
the Valuthur area (R.S.Madai 110 KV SS), Existing traction centres in Subsystem I are
at Vaiyampatti, R.Vellodu & Eraniel and Upcoming traction centres are at Samaynallur,
Virudhunagar, Kovilpatti, Maniyachi, Nangueri, Valliyur (Thovalai)

SUB SYSTEM 2: The sub-system 2 comprises of ISGS station NLC (TS-I Expn, TS-
II, TS-I(Expn)) and major thermal station viz. NLC TS-I, MTPS, Hydro stations like
Kundah, Pykara, Moyar, Kadamparai, Aliyar, Sarkarpathy, Sholayar PH1&2 etc., Gas
Power Generating Stations like PP Nallur, ABAN, Kuttalam, Kovilkalappal, Diesel
generating station at Samalpatti etc., in the coastal area of Tamil Nadu and wind
generation at Udumalpet area. The important load centres in this sub system include
Coimbatore, Tiruppur, Salem, Tanjore, Trichy & Hosur. Important Loads such as
Traction at Sulur, Ingur, Sankagiri,Mettur, Salem, Bommidi, Thirupathur, Valathur,
Trichy Murugupatty -Ambigapuram and Ariyalur-Koothur in Trichy area.

SUB SYSTEM 3: The sub-system 3 comprises of ISGS Nuclear station MAPS,
major thermal stations viz. North Chennai, Vallur, Ennore, GMR Vasavi, Basin Bridge
Gas Power Generating Stations, HITECH and TCPL etc., The Major City in this area is
Chennai Metropolitan City. The important traction points are in this sub system are
Chindadripet MRTS, Ennore Traction, Kadaperi Traction, Avadi Traction,
Acharapakkam, VIllupuram Traction, Mosur Traction, Thiruvalam Traction. The Critical
loads are RajBhavan, Secretariat complex, High Court Complex, Foreign Embassies,
International / Domestic Air Port, Water Works, Minjur Water De-salination plant.


103 of 206.
SRLDC Black Start Restoration Procedure 2014



SUB-SYSTEM-3
SUB-SYSTEM-2
SUB-SYSTEM-1
104 of 206.
SRLDC Black Start Restoration Procedure 2014


7.6 RESTORATION OF SUB SYSTEM 1 ( TTPS Area)
7.6.1 AVAILING START-UP POWER
This subsystem can avail start up power supply from the following sources
A. During Total Regional Blackout and / (or) Total Blackout of TN
system
By availing self start facility available at Kodayar (since it is a non-
irrigation based power plant)
By availing self start facility available at Periyar hydro generating
station
By availing self start facility available at Papanasam and Servalar
Self start MPCPL (106 MW) and wait for synchronizing
In case of Total blackout of TN alone then from Kerala through
230 KV Theni-Sabarigiri line
230 KV D/C Tirunelveli Edamon
400KV Trivandrum Tirunelveli D.C. line
B. During Blackout of Sub system 1 for availing start up supply to
TTPS/MPCPL/ Valathur I &II

From subsystem 2 through.
400 KV S.C Udumalpet (Myvadi) Madurai (Chekkanoorani) and 230
KV Madurai (Checkanoorani)- TTPS D/C
400 KV Trichy (Alundur) - Madurai (Chekkanoorani) and 230 KV
Madurai (Chekkanoorani) TTPS D/C
400 KV Karur (Pugalur)-Madurai (Chekkanoorani) D/C and 230 KV
Madurai (Checkanoorani) - TTPS D/C
400 KV Trichy- Karaikudi- Madurai (Chekkanoorani) S/C and 230 KV
Madurai (Checkanoorani) - TTPS D/C
400 KV KARUR (PUGALUR) Pugalur 230 KV SS -230 KV R N
Puram Madurai (Chekkanoorani) - TTPS
105 of 206.
SRLDC Black Start Restoration Procedure 2014


230 KV Udumulpet (Myvadi) Sembatty and 110 KV Sembatty
MPCPL.
230 KV Alundur (Trichy) Alagarkovil 230/110 KV Auto
Transformer - 110 KV MPCPL # 1,2
230 KV Alandur (Trichy) Alagarkovil Pasumalai 230/110 KV Auto
Transformer 110 KV Pasumalai - MPCPL
230 KV Alandur (Trichy) Alagarkoil - Valuthur 230/110 KV Auto
Transformer and 110 KV Valthur Phase I and II
230 KV Thiruvarur N.T.Kudi- Karaikudi- Valuthur Valuthur 230/110
KV Valuthur Phase I & II
230 KV Pudukottai Karaikudi 400KV- Karaikudi 230 KV Karaikudi
230 KV Valuthur and Valuthur Phase I and II
From Kerala through
230 KV Moozhiyar - 230KV Theni -Checknaoorani - TTPS DC line
400 KV D.C. Trivandrum-Tirunelveli (Abhishekapatti) -230KV
Abhishekapatti Kayathar and 230 KV Kayathar TTPS D/C
220 KV DC Edamon - Tirunelveli (Abhishekapatti) - 230 KV Kayathar -
TTPS DC line
The other 230 KV lines linking Subsystem-1 and 2 are
Sembatti-Myvadi
Alagarkoil-Alandur
Karaikudi-Karaikudi 400 KV Pudukottai 230 KV
Karaikudi-Tiruvarur
Chekkanoorani-RNPuram-Pugalur

7.6.2 RESTORATION OF THE SUBSYSTEM 1 DURING TOTAL BLACKOUT OF
TN SYSTEM.
7.6.2.1 In case of total blackout of the region,
A) Self Start Facility of Generators
106 of 206.
SRLDC Black Start Restoration Procedure 2014


(i) Kodayar I & II
(ii) Periyar
(iii) Papanasanam, Servallar
(iv) MPCPL
B) Major Generators Start up Supply required
(i) Valathur I & II (Gas)
(ii) Suruliyar (Hydro)
(iii) TTPS (Thermal)
(iv) Ind Bharat (Coal)
(v) Koodankulam (Nuclear)
(vi) ARKAY Rameswaram CPP (Gas)
(a) Self-start hydel machines at Kodayar 2 and extend supply to 110 KV
Kayathar line with a load of about 10 MW load in the intermediate
substations.
(b) Self start hydel machines of Periyar and Extend power supply to
Kayathar / synchronise 110KV Periyar Kayathar line (Because
Kayathar has no synchronization facility) as per the status of Kayathar
110kV sub-station. Then, extend supply to MPCL through theni -
Sembatty 110kV lines.
(c) Kayathar 110 KV would extend supply to Kodayar/Periyar for
synchronization at the power plant end since there is no
synchronization facility at Kayathar 110 KV SS.
(d) Self-start Hydel machines at Papanasam and Servalar and
synchronise them at Papanasam with Kodayar/Periyar through
Kayathar.
(e) Start Unit at Kodayar PH 1 and increase generation to 70 MW level
(f) Charge & synchronise Suruliar through 110KV S/C lines emanating to
these hydro stations from Kayathar
107 of 206.
SRLDC Black Start Restoration Procedure 2014


To extend Supply to TTPS
Option 1: From 110 KV Kayathar 230/110 KV AUTO TRANSFOMER -
Extend to TTPS via 230 KV Kayathar TTPS D/C
Option 2: From Kodayar PH, through 110 KV S.R.Pudur-Kodayar # , Auto
transformer at S.R.Pudur, 230 KV S.R.Pudur-Koodangulam-TTPS
Option 3:
a) From Periyar through 110 KV Periyar Theni #3 Theni
230/110KV Auto Tr 230 KV Theni Checkanoorani 230 KV
Checkanoorani TTPS DC
b) From Periyar through 110 KV Periyar Theni #3 110 KV Theni-
Pasumalai #1/2-Auto transformer at Pasumalai- 230 KV Pasumalai
TTPS S.C.
Option 4: From 110 KV Kayathar Extend to TTPS via 230 KV Kayathar TTN
Auto TTPS S/C
To extend Supply MPCPL
Self start MPCL and wait for supply to be extended to MPCPL
Option 1: From 110 KV Periyar-Theni 3, 110 KV Theni-Sembatty-MPCPL
Line
Option 2: From 110 KV Periyar Theni #3 110 KV Theni Pasumalai #2 -
MPCPL
Option 3: Extend Supply to MPCPL from TTPS via TTPS-Pasumalai 230 KV
line through Pasumalai Auto tr. and 110 KV Pasumalai-MPCPL
Option 4: Availing supply from 230 KV Kayathar Pasumalai line charging
and extending through 110 KV Pasumalai MPCPL
Option 5: Extend supply to MPCPL via Pasumalai TTPS 230 KV
Pasumalai Auto transformer 110 KV MPCPL #
To extend supply to Vazhathur Gas Units (IPP/CPP)
Option1: From 110 KV MPCPL Alagarkoil 1 or 2 Extend supply to
Vazhathur 230 KV via 230 KV Alagarkoil Vazhathur by charging
108 of 206.
SRLDC Black Start Restoration Procedure 2014


the Auto Tr.at Alagarkoil. Extend to all IPPs & CPPs from Valuthur
110 KV lines (Penna, Arkey VGTPP, CECL, Sai Regency, etc )
Option2: 110 KV MPCPL # 1,2 Extend supply to Karaikudi through 110 KV
Alagarkovil Karaikudi extend to Valuthur and Penna, Arkey
VGTPP, CECL, Sai Regency, etc
(a) Extend Supply from TTPS to SIPCOT, then to Kavanoor
(Paramakudi), Extend Supply from Valuthur to Karaikudi and
synchronise at Kavanoor (Paramakudi).
(b) To Synchronize complete sub system-1
(c) Extend Supply to Koodankulam from 230 KV TTPS OR S.R.Pudur
(d) As the generation picks up, this island is built by step by step
synchronizing 230KV lines emanating from TTPS & Madurai and
gradually providing the loads of Southern Tamilnadu.
This subsystem can be synchronized with Subsystem 2 at
Chekkanoorani / Trichy(Alundur) along 400KV Udumalpet -
Madurai, 400 KV Madurai-Karur D.C. line,400KV Trichy Madurai,
400 KV Trichy-Karaikudi-Madurai lines, via 230 KV Alagarkovil-
Alandur, 230 KV Karaikudi-Thiruvarur, 230 KV Karaikudi-Karaikudi
400 KV SS -Pudukottai-Alandur, 230 KV Sembatty-Myvadi, 230 KV
Checkanoorani -Renganathapuram-Pugalur.
This Subsystem can be synchronized with Kerala System at
Theni through 230 KV Theni-Moozhiyar or at Tirunelveli through 400
KV Tirunelveli - Trivandrum and along 220 KV Tirunelveli - Edamon
lines.
Note: Start up supply to Kudamkulam TPS can be extended from Idukki
via 220kv Idukki-Newpollam-Pollam-Sabargiri-Edaman-Tirunelvelli-400kV
Tirunelvelli.
Startup supply have to be given only after Kerala subsystem-2 build
upto around 500 MW
2 Nos bus reactors to be taken in to service at 400kV Tirunelvelli
before extending supply to Kudamkulam.

109 of 206.
SRLDC Black Start Restoration Procedure 2014




110 of 206.
SRLDC Black Start Restoration Procedure 2014


7.6.2.2 ACTIONS TO BE TAKEN BY VARIOUS GENERATING STATIONS
OF TN IN RESTORING SUBSYSTEM 1 DURING TOTAL
REGIONAL BLACKOUT AND / OR BLACKOUT OF ENTIRE TN
SYSTEM

While extending Start up supply from Black Start generators viz. Periyar,
Kodayar, Papanasam, Servalar all the wind connected feeders in the
intermediate 110,33/11 KV Sub stations will be kept opened to avoid
mismatch in load and generation.
(a) Action at Periyar:
Open out all outgoing lines
Self start machines at Periyar
Extend power supply to Theni through 110 KV Periyar -Theni feeder
and then to Chekkanoorani and TTPS (Option 2 for TTPS)
Extend power supply to Kayathar through 110 KV Kayathar-Periyar
feeder.
(b) Action at Kodayar:
Open out all outgoing lines
Self Start machines at Kodayar PH1 and 2
Extend power supply to Kayathar through 110 KV Kayathar-Kodayar
# 1,2
Synchronize Periyar Kayathar 110 KV and Synchronize with
Kodayar
Extend power supply to S.R.Pudur through 110 KV Kodayar-
S.R.Pudur # and extend supply to Koodankulam and TTPS by
charging the Auto tr. at S.R.Pudur and 230 KV S.R.Pudur-
Koodankulam-TTPS
(c) Action at Papanasam:
Open out all outgoing lines
Self start machines at Papanasam
Receive supply from Servalar
Receive power supply from Kayathar through 110 KV Kayathar-
Papanasam 2/1 feeder and synchronise.
111 of 206.
SRLDC Black Start Restoration Procedure 2014


(d) Action at Servalar:
Open out all outgoing lines
Self start machines at Servalar
Extend power supply to Papanasam through 110 KV
Servalar-Papanasam 1/2 feeder
(e) Action at Kayathar
Open out all outgoing lines
Avail power supply from Kodayar/Periyar/Papanasam (Servalar)
Since there is no synchronizing facility available at 110 KV Kayathar
Substation, the above power has to be extended to Periyar / Kodayar
/ Papanasam for synchronization.
Extend power supply to TTPS for starting the units through Auto
transformer and 230 KV Kayathar - TTPS # 2&1
(f) Action to be taken at TTPS
Open out all outgoing lines
Avail power supply either from Kayathar, Madurai, Chekkanoorani
or Koodankulam (thro kodayar - S R Pudur
Start the units and extend power supply to surrounding loads around
TTPS.
(g) Action to be taken at Chekkanoorani 230 KV, Pasumalai SS.
Open out all outgoing lines
Avail supply from Periyar via Theni 230 KV through 230 KV Theni
Checkanoorani.
Extend supply to TTPS if not already done (Option 2 for TTPS)
Extend supply to Pasumalai through 230 KV Checkanoorani
Pasumalai # 1 & 2 Through 230/110 KV Auto Tr extend supply to
MPCPL through 110 KV PSQ-MPCPL #
Extend supply to Alagarkoil through 230 KV CKNI-PSQ #1/2, 230 KV
PSQ-ALKL and then through 230 KV ALKL-VLDR # to Valuthur
Wait for TTPS Island to build up and synchronise with TTPS on
instructions from LD
(h) Action to be taken at Alagarkoil
112 of 206.
SRLDC Black Start Restoration Procedure 2014


Open out all outgoing lines
Avail power supply from MPCPL/Pasumalai or Alandur and extend
to Valuthur on 230 KV
(i) Action to be taken at Vazhathur 230 KVSS
Open out all outgoing lines
Avail power supply from Alagarkoil
Extend supply to VGTPP through 110 KV Link Line Start up
the units.
Extend power to Pioneer Power Limited and ARKEYEnergy on 110
KV Valthur Paramakudi lines
(j) Action to be taken at S.R. PUDUR 230 KV SS
Open out all outgoing lines
Avail power supply from Kodayar 110 KV and extend supply to TTPS
via 230 KV S.R.Pudur Koodankulam TTPS line (with LD
permission)
Avail supply from Koodankulam
(k) Action to be taken at Koodankulam 230 KVSS
Open all outgoing lines
If Koodankulam is survived on House load the same can be
synchronized with availing supply from S.R.Pudur or TTPS
Otherwise wait for startup power from either from TTPS(one unit put
on the bar) or from S.R.Pudur( with LD permission).
Startup supply to Kudamkulam TPS can be extended from Idukki via
220kv Idukki-Newpollam-Pollam-Sabargiri-Edaman-Tirunelvelli-
400kV Tirunelvelli.
Startup supply have to be given only after Kerala subsystem-2 build
upto around 500 MW
2 Nos bus reactors to be taken in to service at 400kV Tirunelvelli
before extending supply to Koodankulam.

7.6.2.3 Restoration of Subsystem 1 during collapse of this Subsystem
alone
113 of 206.
SRLDC Black Start Restoration Procedure 2014


(a) Extend power supply to Chekkanoorani from Theni after availing Self
start from Periyar PH through 110 KV Theni Periyar #3 - Auto
transformer at Theni - and 230 KV Theni-Chekkanoorani.
(b) Extend power supply to TTPS through 230 KV Chekkanoorani-TTPS #
1,2
(c) Extend power supply to MPCPL from Theni through 110 KV Theni-
Sembatty # 1,2 and 110 KV Sembatty-MPCPL
(d) This subsystem can be synchronized with Subsystem 2 at 400 KV
Trichy Madurai, 400KV Udumalpet - Madurai, 400KV Karaikudi
Madurai, 400 KV Karur Madurai, 230 KV Alagarkovil - Alandur , 230
KV Pudukottai - Karaikudi PGCIL - Karaikudi , 230 KV Karaikudi -
Thiruvarur, 230 KV Pugalur- Renganathapuran Checkanoorani, 230
KV Sembatty Myvadi,
(e) This Subsystem can be synchronized with Kerala System through 400
KV Tirunelveli Trivandrum or through 220 KV Sabarigiri - Theni line
or 230 KV Edamon Abshekapatti Kayathar.

7.6.2.4 Important loads in sub system 1
The following are traction loads in this sub system 1:
SL
NO
NAME OF
TRACTION
NAME OF
SUBSTATION
FEEDING
NAME OF FEEDER
1 Vaiyampatty SEMBATTY 110 110KV Sembatty Allandur #
2 Rvellodu SEMBATTY 110 110KV Sembatty Natham #
3 Vridhunagar PASUMALAI 230
110KV Pasumalai
Anapankulam
4 Eraniel S.R.PUDUR 230
Eraniel S.R.Pudur 230 KV SS
110 KV S.R.Pudur-Kodayar # 1
Other Important loads and restoration paths
1. INS Kattabomman Naval communication facility : 110 KV Supply from
S.R.Pudur SS
114 of 206.
SRLDC Black Start Restoration Procedure 2014


2. ISRO Mahendragiri : 110 KV Supply from S.R.Pudur SS
3. 110 KV Water pumping station of TTPS at Manjaneerkayal: Supply
from Tuticorin Auto SS.
4. NPCIL, Koodankulam through 230 KV S.R.Pudur-Koodangulam or
110 KV Tuticorin Auto SS Arumuganeri-S.R.Pudur feeder.
5. The supply points for the gas stations (ONGC/GAIL) in the Valuthur
area (R.S.Madai 110 KV SS from 110 KV Kavanoor-Vazhuthur #.
115 of 206.
SRLDC Black Start Restoration Procedure 2014


7.6.2.5 Length of 230 KV and 110 KV lines involved in Black start
operation:
Sl.
NO.
IF , THE CRITICAL FEEDER
THROUGH WHICH SUPPLY COULD
BE EXTENDED
TYPE OF
CONDUCTOR
DISTANCE OF
THE FEEDER
IN KM
1 230 KV KAYATHAR-TTPS # 1 KUNDAH 52.570
2 230 KV KAYATHAR-TTPS # 2 KUNDAH 51.230
3 230 KV PASUMALAI-TTPS # KUNDAH 137.620
4 230 KV CHECKANOORANI-TTPS #
1,2
KUNDAH 148.28 EACH
5 230 KV ALAGARKOVIL-VALUTHUR
#
ZEBRA 160.346
6 230 KV KARAIKUDI-VALUTHUR # ZEBRA 108.200
7 230 KV CHECKANOORANI-THENI KUNDAH 61.700
8 230 KV CHECKANOORANI-
KAYATHAR # 1,2
ZEBRA 122.000
9 230 KV CHECKANOORANI-
RENGANATHAPUAM
KUNDAH 103.213
10 230 KV CHECKANOORANI-
PASUMALAI # 1
KUNDAH 13.660
11 230 KV CHECKANOORANI-
PASUMALAI # 2
KUNDAH 16.000
12

230 KV CHECKANOORANI-
AMUTHAPURAM # 1,2
ZEBRA 112.000
13 230 KV PUGALUR-
RENGANATHAPURAM
KUNDAH &
ZEBRA
62.520
14 230 KV ALAKARKOVIL-ALUNDUR # KUNDAH 110.300
15 230 KV KAYATHAR-
ABHISHEKAPATTI #
ZEBRA 23.259
16 230 KV ABHISHEKAPATTI-
VEERANAM
ZEBRA 31.000
17 230 KV ABHISHEKAPATTI-
SANGANERI
ZEBRA 105.030
18 230 KV KARAIKUDI-KARAIKUDI 400 ZEBRA 5.944
116 of 206.
SRLDC Black Start Restoration Procedure 2014


KV SS
19 230 KV PUDUKOTTAI-KARAIKUDI
400 KV SS
ZEBRA 49.206
20 230 KV SANKANERI-S.R.PUDUR ZEBRA 28.584
21 230 KV SANKANERI-KAYATHAR ZEBRA 87.430
22 230 KV KAYATHAR-UDAYATHUR ZEBRA 82.420
23 230 KV KAYATHAR-TUTICORIN
AUTO SS
KUNDAH 45.970
24 230 KV KAVANOOR-SIPCOT KUNDAH 82.380
25 230 KV SIPCOT-TTPS KUNDAH 12.200
26 230 KV KAYATHAR-
ANUPPANKULAM
KUNDAH 69.225
27 230 KV PASUMALAI-
ANUPPANKULAM
KUNDAH 69.555
28 230 KV ANUPPANKULAM-
STERLITE
KUNDAH 95.376
29 230 KV STERLITE-TTPS # KUNDAH 15.765
30 230 KV KAYATHAR-VEERANAM KUNDAH 89.200
31 230 KV VEERANAM-KODIKURICHI KUNDAH 24.498
32 230 KV KODIKURICHI-
AMUTHAPURAM #
ZEBRA 30.000
33 230 KV PASUMALAI-ALAGARKOVIL
#
KUNDAH 41.372
34 230 KV THENI-SEMBATTY # ZEBRA 62.600
35 230 KV THENI-MOOZHIYAR # KUNDAH 106.580
36 230 KV KARAIKUDI- N.T.KUDI KUNDAH &
ZEBRA
94.97
230 N.T.KUDI-THIRUVARUR 3 KUNDAH &
ZEBRA
68.09
37 230 KV KARAIKUDI-KAVANOOR # KUNDAH 75.488
230 KV KAVANOOR-VALUTHUR ZEBRA 51.79
38 110 KV PERIYAR-KAYATHAR WOLF 120.650
39 110 KV PERIYAR-THENI #3 PANTHER 55.000
117 of 206.
SRLDC Black Start Restoration Procedure 2014


40 110 KV KODAYAR I- II LINK # WOLF 3.200
41 110 KV KAYATHAR-KODAYAR # 1 WOLF 88.300
42
110 KV KAYATHAR- MELAKALLUR
KODAYAR
WOLF AND
PANTHER
114.500
43 110 KV PERIYAR-SURILIYAR WOLF 12.540
44 110 KV SURILIYAR-KAYATHAR WOLF 115.565
45 110 KV KAYATHAR-
O.THULUKAPATTI-PAPANASAM
PANTHER 57.000
46 110 KV KAYATHAR-PAPANASAM PANTHER 57.000
47 110 KV PAPANASAM-SERVALAR #
1,2
RACOON 7.00 EACH
48 110 KV THENI-SEMBATTI # 1:
22 KV VAIGAI DAM-VAIGAI PH 1,2
WOLF 28.970
49 110 KV VALUTHUR - VALUTHUR
PH 1
PANTHER 0.750
50 110 KV VALUTHUR - VALUTHUR
PH 2
PANTHER 0.750
51 110 KV KAVANOOR-RSMADAI-
VALUTHUR #
PANTHER 51.200
52 110 KV KAVANOOR-PENNA PANTHER 51.385
53 110 KV PASUMALAI-MPCPL DOUBLE
MINK
11.400
54 110 KV SEMBATTI-MPCPL DOUBLE
MINK AND
PANTHER
45.370
55 110 KV KODAYAR-S.R.PUDUR #1 PANTHER 101.559
56 110 KV THENI-PASUMALAI # 1 LYNX 40.230
57 110 KV THENI-PASUMALAI # 2 LYNX 40.230
58 110 KV MPCPL-ALAKARKOVIL # 1 PANTHER 22.040
59 110 KV MPCPL-ALAKARKOVIL # 2 PANTHER 26.780
60 110 KV THENI-SEMBATTY # 2 WOLF 28.970
61 110 KV KARAIKUDI-KAVANOOR LEOPARD 95.856

7.7 RESTORATION OF SUB SYSTEM 2 ( MTPS & NLC Area)
118 of 206.
SRLDC Black Start Restoration Procedure 2014


7.7.1 AVAILING START-UP POWER
This subsystem can avail start up power supply from the following sources
A. During Total Regional Blackout and / or Total Blackout of TN system
i) Generators with Black start facility
1. Mettur Dam
2. Kundah PH-IV
3. Aliyar
4. Kundah VI (reference voltage required)
5. Sarkarpathy
6. PUSHEP
7. Moyar
8. Samalpatty(SPCL) (reference voltage required)
ii) Generators Start up supply required
(i) Mettur Tunnel
(ii) Kundah PH 1,2,3,5
(iii) Kadampari
(iv) Pykara
(v) MTPS
(vi) NLC complex(NLC TS-I,TS-II,TS-I EXP,TSII EXP)
(vii) Kuttalam and Koilkalappal
(viii) IPPs like PPN, Aban
RLDC in coordination with CPCC will extend 400 KV supply to 400 KV
Neyveli complex (NLC TS II, NLC TS I Expn, NLC TS II Expn)
Mettur Dam to self start extend to Mettur Tunnel and exclusively
startup MTPS and Neyveli TS-II and extend to SPCL (105MW)
Kundah complex machines to self start and to startup MTPS as option
2
Aliyar and Sarkarpathy to self start and extend to Kadamparai &
eventually synchronise with Kundah complex.
From Karnataka through 400 KV Bangalore-Salem & 400 KV Kolar-
Hosur and 230 KV Yerandanahalli-Hosur
119 of 206.
SRLDC Black Start Restoration Procedure 2014


From Andhra Pradesh through 400 KV Chittoor-Sriperumbudur-
Neyveli TPS 2
From Kerala through 400 KV Pallakad Myvadi and 230 KV Idukki-
Udumalpet line
B. During Blackout of Sub system 2 alone From Sub system-1
400 KV Madurai-Trichy-Neyveli TPS 2
400 KV Trcihy-Karaikudi S/C
400 KV Trichy-Madurai S/C
400 KV Udumalpet Madurai S/C
400 KV Madurai Karur DC
230 KV Alandur Alagarkoil
230 KV Tiruvarur N.T.Kudi-Karaikudi
230 KV Myvadi Sembatti
230 KV Pugalur Renganathapuram - Checkanoorani
From Sub system-3
400 KV Sriperumbudur-SVChatram-Pondy-Neyveli TPS 2
230 KV Arni-Singarpet-MTPS
230 KV Thiruvallam-Singarpet
230 KV Acharapakam- Villupuram
From With Karnataka
400 KV Somanhalli (Bangalore) Salem S/C
400 KV Kolar Hosur D/C
230 KV Yerandanahalli Hosur S/C
From Kerala
400 KV Udumalpet 400 Pallakad D/C
230 KV Udumalpet 230 Idukki S/C

120 of 206.
SRLDC Black Start Restoration Procedure 2014



121 of 206.
SRLDC Black Start Restoration Procedure 2014


7.7.2 RESTORATION OF THE SUBSYSTEM 2 DURING TOTAL BLACKOUT OF
TN SYSTEM
7.7.2.1 In case of total blackout of the region,
(* Mettur Dam Power House will be available for Self Start during
irrigation demand period if permitted also for black start operation ) .
1. Startup supply for MTPS from PUSHEP
Self start PUSHEP and extend startup power to MTPS through
Option: 1. 230KV PUSHEP Arasur Ingur - MTPS
Option: 2. 230KV PUSHEP Arasur Gobi MTPS

2. Startup supply for MTPS from Kundah PH
Self start Kundah-4 and extend startup power to MTPS through
Option 1: 230KV Kundah4 - Kundah3 - Kundah2 Arasur Ingur -
MTPS
Option 2: 230KV Kundah4 - Kundah3 PUSHEP Arasur Ingur
MTPS.
Note : Arasur & Ingur loads shall be restricted to 30MW loads each.
3. Startup supply for MTPS from Mettur Dam
Self start Mettur Dam (50 MW) and Extend supply to Mettur Auto
through 110 KV.
Extend Supply from Mettur Auto to Mettur Tunnel Power House.
Mettur Tunnel units to avail supply and start.
Mettur Tunnel extends supply to MTPS
MTPS avails startup supply and then ensure that some load (10 MW)
is taken up at Mettur Auto before extend supply to Singarapettai
through 230 KV line.
4. Startup supply for NLC ST II
122 of 206.
SRLDC Black Start Restoration Procedure 2014


Extend supply to Samalpatti through 110 KV from 230 KV MTPS
Singarpet and 110 KV Singarpet Samalpatti. Self start Samalpatty
(106 MW) and synchronize
Extend startup power to Neyveli TS2 & Neyveli TS2 Exp through
110 KV Samalpatty Singarapet and 230 KV Singarapet
Tiruvannamalai - Neyveli TSI - TSII . Neyveli-TS2 & Neyveli -TS2
Exp machines to avail start up supply. At this stage both NLC TS-I
and TS-I Expansion shall not avail the startup supply
Neyveli TS2 & Neyveli -TS2 Exp startup requirement would be
restricted to 105 MW in the first stage and additional 30 MW
subsequent to increase in generation from samalpatty.
Extend supply to pondy (30MW) via Neyvelli-Villinur/ Bahoor
subsequent to increase in generation from samalpatty.
Self-start Moyar and extend supply to Pykara and synchronize at
Pykara, extend to Kundah PH-VI to startup via Sandynalla with 10
MW load.
Extend supply to Kundah-V, KundahI from Kundah PH-VI and
synchronize complete Kundah system at Kundah-II and extend
supply to Thudiyalur.
Self start Sakarapathy and Aliyar and synchronise with Kundah
system at Udumalpet 230KV via Udumalpet400 - O.K.Mandapam-
Thudiayalur.
Extend supply to Kadamparai Machines via 230 KV Udumalpet-
Kadamparai.
After Kundah system is stabilized, charge & synchronise 230KV
Ingur Salem400 Deviakurichi STCMS Neyveli TSII TSI
lines. Now TS-1 and STCMS would avail startup power. This will also
be an alternate path for startup power to NLY-TS2 in case of any
difficulties in starting up of Samalpatty and extend startup supply to
NLC TS-I Expansion from TS-II
123 of 206.
SRLDC Black Start Restoration Procedure 2014


Extend startup to units in Kadalangudi, Thanjavur basin (ABAN, PP
Nallur, Kuttalam, Kovilkallapal) through 230KV lines viz.
Udumalpet400 Pugulur400-Alandur Thanjavur Tiruvarur PP
nallur Kadalangudi- Neyveli.
Startup PP Nallur, ABAN, Kuttalam & Kovilkallapal
As the generation picks up, this island is built up step by step
synchronizing 230KV lines emanating from MTPS & NLC and
gradually connecting the loads at Salem, Gobi, Arasur, Hosur,
Cuddalore, Villupuram etc.
This subsystem can be synchronized with Subsystem 1
400 KV Pugalur- Maduarai D/C
400KV Trichy Karaikudi S/C
400 KV Trichy- Madurai S/C
400 KV Udumalpet- Madurai S/C
230 KV Pugalur Renganathapuram Checkanoorani
230 KV Alandur Alagarkoil S/C
230 KV Tiruvarur N.T.Kudi - Karaikudi S/C
230 KV Myvadi Sembatti S/C
230 KV Pudukottai 230 KV Karaikudi PGCIL 230 KV Karaikudi
This subsystem can be synchronized with Subsystem 3
400 KV Sriperumbudur-SVChatram-Pondy-Neyveli TPS 2
230 KV Arni-Singarpet-MTPS
230 KV Thiruvallam-Singarpet
230 KV Acharapakam- Villupuram- Tiruvannamalai
124 of 206.
SRLDC Black Start Restoration Procedure 2014


This subsystem can be synchronized with Karnataka
400 KV Somanhalli (Bangalore) Salem S/C
400 KV Kolar Hosur D/C
230 KV Yerandanahalli Hosur S/C
This subsystem can be synchronized with Kerala
400 KV Udumalpet 400 Pallakad D/C
230 KV Udumalpet 230 Idukki S/C
7.7.2.2 ACTIONS TO BE TAKEN BY VARIOUS GENERATING STATIONS
OF TN IN RESTORING SUBSYSTEM 2 DURING TOTAL
REGIONAL BLACKOUT AND / OR BLACKOUT OF ENTIRE TN
SYSTEM
a) At Samalpatti
Open out all out going lines
Self start the generators
Wait for power to be extended from Singarapet as the Samalpatti
generators cannot charge a dead bus.
b) At Mettur Dam
Open out all out going lines
Self start the generators
Extend power to Mettur Auto via 110 KV
c) At Mettur Auto
Open out all out going lines
Receive power from Mettur Dam via 110 KV
Extend power to MTPS via 230 KV
Extend power to Mettur Tunnel via 230 KV
Extend to local loads for voltage control
125 of 206.
SRLDC Black Start Restoration Procedure 2014


d) At Mettur Tunnel
Open out all out going lines
Receive power from Mettur Auto via 230 KV
Start up the machines
Extend power to MTPS
e) At MTPS
Open out all out going lines
Receive power from Mettur Tunnel/Mettur Auto
Extend power for start up of MTPS units
Ensure that Mettur Tunnel machines are on bar
Ensure that load(10 MW) is taken up at Mettur Auto
Extend power to Singarapettai via 230 KV line.
f) At Singarapet
Open out all out going lines
Receive power supply from MTPS and extend to Samalpatti
After Samalpatti units are synchronized, extend power supply to
Neyveli-TS1 via TV Malai -
In case SLDC requests extend supply to Arani on 230 KV for startup
of MAPS.
In case SLDC requests extend supply to TVMalai-Villupuram-
Acharpakkam on 230 KV for startup of MAPS
g) At T.V. Malai
Open out all out going lines
Receive power supply from Singarapet
Extend to Neyveli TS1.
Extend to MAPS via Villupuram-Acharpakkam.
h) At Neyveli-TS1
126 of 206.
SRLDC Black Start Restoration Procedure 2014


Open out all out going lines
Receive power supply from TV Malai
Extend to TS2 for start up of units
Avail start up supply after confirming that TS2 units put on bars.
i) At Kundah PH 4
Open out all out going lines
Self start the generators
Extend power supply to Thudiyalur
Extend power supply to Kundah PH 3
PH3 to startup and synchronise with PUSHEP
j) At PUSHEP
Open out all out going lines
Self start the generators
Extend/Avail power supply to/from Kundah PH 3 and synchronise.
Extend power supply to Arasur
k) At Moyar
Open out all out going lines
Self start generators
Extend power supply to Pykara and synchronise the generators with
this subsystem
l) At Thudiyalur
Open out all out going lines
Avail power supply from Kundah PH 4
Extend power supply to PH2 and further to Sandynallah and Pykara
to enable starting Pykara Hydro Station and synchronise the
generators.
127 of 206.
SRLDC Black Start Restoration Procedure 2014


Extend power supply to Udumalpet400(Myvadi) via oK Mandapam
(Malumichampatti) after ensuring that Pykara generators are
synchronized
Extend power supply to Arasur via 110 KV
m) At Sandinallah
Open out all out going lines
Avail power supply either from Pykara or Thudiyalur
Extend power supply to Kundah PH6 and Pykara enable starting
Kundah PH6 & Pykara Hydro Station and to further synchronise the
generators
n) At Kundah PH6
Open out all out going lines
Self start the generators
Wait for power to be extended from Sandynallah as the generators
cannot charge a dead bus
Extend power supply to Kundah complex to provide startup power to
Kundah 5, 1, 2 & 3. These generators will start their units and
synchronise the same with the Subsystem.
o) At Pykara
Open out all out going lines
Avail power supply from Sandynallah / Moyar / Thudiyalur
Start the generators
Extend power supply to Moyar / Thudiyalur / Sandynallah
128 of 206.
SRLDC Black Start Restoration Procedure 2014


p) At Kundah PH 3
Open out all out going lines
Avail power supply from KundahPH4 / PUSHEP
Start the generators
Extend power supply to Kundah PH 2
q) At Kundah PH 2
Open out all out going lines
Avail power supply from Kundah PH 1 or PH3 or
Thudiyalur
Start the generators
Extend power supply to Arasur after synchronizing the Generators
r) At Kundah PH 1
Open out all out going lines
Avail power supply from Kundah PH 5 or PH2
Start the generators
Extend power supply to Kundah PH 5 or PH2 after synchronizing
the generators
s) At Udumalpet 400
Open out all out going lines
Avail power supply from Thudiyalur via OK Mandapam
(Malumichampatti)
Extend power supply to Kadamparai to enable starting Kadamparai
to synchronise the generator Extend power supply to Udumalpet
230.
t) At Udumalpet 230
Open out all out going lines
Avail power supply from Udumalpet400 or
129 of 206.
SRLDC Black Start Restoration Procedure 2014


Avail power supply from Thudiyalur via OK
Mandapam (Malumichampatti)
Extend power supply to Kadamparai via Aliyar to enable starting
Kadamparai to synchronise the generator
Extend power supply to Aliyar via 110 KV line and Synchronise
u) At Aliyar
Open out all out going lines
Self start the generators
Extend power supply to Sarkarapathy and synchronise
Extend power supply to Kadamparai via Udumalpet110
udumalpet230 - Kadamparai
Extend power supply to SholayarPH1 & 2.
v) At Sarkarpathy PH
Open out all out going lines
Self start the generators
Extend power supply to Aliyar and synchronise
w) At Sholayar PH1
Open out all out going lines
Avail power supply from Aliyar
Start the generators Extend power supply to Sholayar PH2 after
synchronizing the generators
x) At Sholayar PH 2
Open out all out going lines
Avail power supply from Sholayar PH1
Start the generators and synchonise the generator.

130 of 206.
SRLDC Black Start Restoration Procedure 2014


With the above actions all hydel generating stations of this Subsystem will be
on bars and now start up power from this hydro complex can be extended to
thermal stations.
y) At Arasur
Avail power supply from Kundah PH 2/PUSHEP
Extend limited loads(30MW) in consultation with SLDC
Extend power supply to Ingur/Gobi
z) At Ingur/Gobi
Avail power supply from Arasur
Extend power supply to MTPS/Salem400
Extend limited loads(30MW) in consultation with SLDC
aa) At Salem (PGCIL)
Avail power supply from Ingur/Gobi
Extend limited loads in consultation with SLDC
Extend power supply to ST-CMS through Deviakurichi
bb) At ST-CMS
Avail power supply from Salem400 through Deviakurichi
Extend power supply to Neyveli TPS 2
Avail start supply after confirming that Neyveli TPS 2 units put on
bars
cc) At Neyveli TPS 2
Avail power supply from NLY TS1/ST-CMS
Start the generators.
Extend power supply to Neyveli TPS 1 if not already energized
Charge 230/400 KV ICT and energise 400 KV BUS
Extend power supply to Neyveli TPS 1 (Exp)
Extend power supply to Pondy through Vilianur/Bahoor.
131 of 206.
SRLDC Black Start Restoration Procedure 2014


Extend power supply to Maps via Villupuram-Acharapakam - MAPS
dd) At Neyveli TPS 2 Exp
Avail power supply from NLY TS1/ST-CMS
Start the generators.
Energise 400 KV BUS

7.7.2.3 Important loads in sub system 2
The following are traction loads in this sub system 2:
SL
NO
NAME OF
TRACTION
NAME OF
SUBSTATION
FEEDING
NAME OF FEEDER
1 Valathoor VINNAMANGALAM 230
110KV Vinnamangalam -
Vadakathipatti #
2 Thirupathur SINGARAPETTAI 230
110KV Singarapet
Thirupathur #
3 Samalpatti SINGARAPETTAI 110
110KV Singarapet110
Samalpatti Traction # 1 & 2
4 Bommidi
SINGARAPETTAI 230
SINGARAPETTAI 110
KARIMANGALAM 230
110KV Mettur Auto
Singarapet110 # 1 & 2
5 Mettur Dam METTUR AUTO 230
110KV Mettur Auto
Mettur Dam PH # 1
6 Salem
SALEM 230
SALEM 400
110KV Salem230 - Salem 400 #
1 & 2
7 Sankagiri SANKAGIRI 110
110KV Sankagiri110 - Traction
# 1 & 2
8 Ingur INGUR 230 110KV Ingur 230 - Traction #
9 Sulur Road ARASUR 230
110KV Arasur230 - Singanallur
#
The supply points for the gas stations (ONGC/GAIL) in the Kuttalam GTPP,
ABAN area (Kuttalam 110 KV SS), Kovilkalappal GTPP area
(Thiruthuraipoondi area), Other important loads can be taken up in
consultation with LD. Other loads can be released only after some units are
132 of 206.
SRLDC Black Start Restoration Procedure 2014


started at MTPS and Kadamparai or in case of a robust interconnection with
other Subsystems or States.

7.7.2.4 CHANGE / MODIFICATION IN BLACK START AVAILABLE
GENERATING STATIONS

SL
NO
POWE
R
STATI
ON
INSTALL
ED
CAPACIT
Y
UNIT
TYPE
STARTUP
FACILITY SYN.
FACILIT
Y REMARKS
SOURC
E
CAPACIT
Y
1
KUNDA
H PH 6
1 x 30
HYDR
O
Diesel 100KVA YES
Reference Load in
the Bus required for
Syn. During
blackstart
Sandynallah load
also to be included
2
SAMAL
PATTY
IPP
7 x 15 Diesel Diesel 500 KVA YES
Reference Voltage in
the Bus required for
Syn. Hence initial
Black Start is not
feasible
7.7.2.5 LENGTH OF 230KV / 110KV LINES INVOLVED IN BLACK START
OPERATION
SL
NO
NAME OF THE FEEDERS
TYPE OF
CONDUCT
OR
DISTAN
CE IN
Kms
CURRENT
CARRYING
CAPACITY
AT 30
230KV LINES
1 KUNDAH PH4 - THUDIYALUR # KUNDHA 27 696
2 KUNDAH PH4 - KUNDAH PH3 # KUNDAH 5.6 696
3 KUNDAH PH3 - KUNDAH PH2 # KUNDAH 11.3 696
SL
NO
NAME OF THE FEEDERS
TYPE OF
CONDUCT
OR
DISTAN
CE IN
Kms
CURRENT
CARRYING
CAPACITY
AT 30
4 KUNDAH PH3 - PUSHEP # KUNDHA 85 696
133 of 206.
SRLDC Black Start Restoration Procedure 2014


5 KUNDAH PH2 - ARASUR # KUNDAH 61.35 696
6 ARASUR - PUSHEP # KUNDHA 84 696
7 ARASUR - INGUR # KUNDHA 33.182 696
8 INGUR MTPS # KUNDHA 67.32 696
9 INGUR - SALEM 400KVSS # ZEBRA 79.715 810
10 MTPS - SINGARAPET # KUNDHA 102 696
11 SINGARAPET - TIRUVANNAMALAI # KUNDHA 120 696
12
TIRUVANNAMALAI - NEYVELI TS1 #
ZEBRA +
KUNDHA 94.45 745
13 SALEM 400KVSS - D'KURICHI # KUNDHA 103 696
14 D'KURICHI - STCMS # KUNDHA 94.626 696
15 ARASUR -GOBI # KUNDHA 80.02 696
16 GOBI MTPS # KUNDHA 72.232 696
17 GOBI - SALEM 400KV SS # KUNDHA 96.11 696
18 THUDIYALUR - O K MANDAPAM # KUNDHA 28.3 696
19
O K MANDAPAM UDUMALPET400
# 1, 2 KUNDHA 55.6 696
20
UDUMALPET230 - UDUMALPET400
# 1,2 KUNDHA 8.1 696
21
UDUMALPET230 - KADAMPARAI PH
# KUNDHA 47.06 696
22
UDUMALPET400 - PUGALURPGCIL
# KUNDHA 104.425 696
UPT400 - PUGALUR LINE IS CONVERTED AS UPT400 - PUGALUR
PGCIL - PUGALUR230 ON COMMISIONING OF NEW PUGALUR
400KV SS 110KV LINES
1 KPH 6 - KPH 5 # PANTHER 11.24 427
2 KPH 6 - S'NALLAH # PANTHER 16 427
3 KPH 5 - KPH 1 # LEOPARD 8.05 286
4 KPH 1 - KPH 2 # 1, 2 OWL 5.7 400
SL
NO
NAME OF THE FEEDERS
TYPE OF
CONDUCT
OR
DISTAN
CE IN
Kms
CURRENT
CARRYING
CAPACITY
AT 30
134 of 206.
SRLDC Black Start Restoration Procedure 2014


5 TDLR - KPH2 # 1, 2 OWL 40.2 400
6 TDLR - S'NALLAH # LEOPARD 62 286
7 TDLR - METTUPALAYAM # LEOPARD 22 286
8 KPH 5 - S'NALLAH # PANTHER 31.064 427
9 S'NALLAH - PYKARA PH # LEOPARD 16.96 286
10 PYKARA PH - MOYAR PH # LEOPARD 13.85 286
11 PYKARA PH - METTUPALAYAM # LEOPARD 71 286
12 SINGARAPET230 - SPCL # PANTHER 23.3 427
13 SARKARPATHY - ALIYAR PH # LEOPARD 17.84 286
14 ALIYAR PH - SHOLAYAR PH1 # 1,2 WOLF 25.8 343
15 ALIYAR PH - NEGAMAM # PANTHER 38.2 427
16 ALIYAR PH - UDUMALPET110 # 1, 2 WOLF 36.1 343
17 NEGAMAM - O K MANDAPAM # PANTHER 12.194 427
18
UDUMALPET110 - UDUMALPET230
# 1,2, 3 PANTHER 4.15 427
19 110 KV THIRUVARUR-
KOVILKALAPPAL EXPRESS #
PANTHER 35.0
427
20 110 KV THIRUVARUR-KUTTALAM
GTPP
PANTHER 53.820
427
21 110 KV KADALANGUDI-KUTTALAM
EXPRESS #
PANTHER 8.4
427
22 230 KV KADALANGUDI-PPNLR # 1,2 ZEBRA 33
EACH 810
23 230 KV THIRUVARUR-PPNLR # ZEBRA 44.6 810
24 230 KV THIRUVARUR-
KADALANGUDI
KUNDAH 49.5
696
25 230 KV THANJAVUR-PPNALR# ZEBRA 105.3 810
26 110 KV ABAN-KADALANGUDI
EXPRESS #
PANTHER 10.630
427
27 230 KV THIRUVARUR-KARAIKUDI KUNDAH 146.0 696
SL
NO
NAME OF THE FEEDERS
TYPE OF
CONDUCT
OR
DISTAN
CE IN
Kms
CURRENT
CARRYING
CAPACITY
AT 30
135 of 206.
SRLDC Black Start Restoration Procedure 2014


28 230 KV THIRUVARUR-THANJAVUR ZEBRA 71.2 810
29 230 KV ALUNDUR-THANJAVUR #
1,2
ZEBRA 54.5
810
30 230 KV THIRUVARUR-
KADALANGUDI
KUNDAH 49.5
696
31 230 KV KADALANGUDI-NEYVELI KUNDAH 90.0 696
32 230 KV PUGALUR-
KARUR(PARAMATHI) 400 KV # 1
KUNDAH &
ZEBRA
19.130
745
33 230 KV PUGALUR-
KARUR(PARAMATHI) 400 KV # 2
KUNDAH &
ZEBRA
28.3
745
34 230 KV PUGALUR-PUDANCHANDAI KUNDAH 56.817 696

7.8 MOCK DRILL PROCEDURE
Sub-system 2
a) Kundha PH4
Hand trip 230KV feeders at KPH4 and remote ends
Self Start KPH4
Extend supply to Thudiyalur and synhronise at Thudiyalur
Extend supply to KPH3 and synhronise at KPH3
b) PUSHEP
Hand trip 230KV feeders at PUSHEP and remote ends
Self Start PUSHEP
Extend supply to Arasur and synchronise at Arasur
Extend supply to KPH3 and synhronise at KPH3
c) Moyar
Hand trip all 110KV feeders at Moyar
Self Start at Moyar
Extend supply to Pykara and Synchronise at Pykara
d) Sarkarpathy
Hand trip Sarkarpathy Aliyar Feeder
Self Start Sarkarpathy
Synchronise Sarkarpaty Aliyar feeder at Sarkarpathy
e) Aliyar
136 of 206.
SRLDC Black Start Restoration Procedure 2014


Hand trip Aliyar unit
Self Start at Aliyar
Synchronise Aliyar unit at 110KV Aliyar Bus
f) Mettur Dam
Hand trip all the 110KV feeders at Mettur DAM
Self Start MDPH
Extend supply to Mettur Town and synhronise at Mettur Auto.

7.9 RESTORATION OF SUB SYSTEM 3 ( Chennai Area)
7.9.1 AVAILING START-UP POWER
This subsystem can avail start up power supply from the following sources
A. During Total Regional Blackout and / or Total Blackout of TN system
Generators having Self Start Facility
GMR Power (Diesel)
Basin Bridge (Naptha)
Generators Start up Supply required
North Chennai
Ennore TPS
MAPS
TCPL
OPG
Hi-Tech
Kamatchi Sponge
From Andhra Pradesh
400 KV Chittor- Sriperumbudur S/C
400 KV Nellore Alamathi S/C
230 KV Sullurpet Gummidipundi S/C
230 KV Chittor Thiruvallam S/C
From Karnataka
400 KV Kolar- Kalvindapttu S/C
From Subsytem II
400 KV Sriperambudur- SVChatram -Pondy-Nevyli TS-II S/C
230 KV Arni Singarpet S/C
230 KV Tiruvannamalai - Villupuram Acharapakam
137 of 206.
SRLDC Black Start Restoration Procedure 2014


230 KV Thiruvallam -Singarpet
By availing self start facility available at GMR Power house.
By availing self start facility available at Basin bridge Power house.
From Subsystem 2 through self start of Samalpatti/Kundah
complex/Mettur Dam
B. During Blackout of Sub system 3 alone
400 KV Neyveli TS-II Pondy - SVChatram Sriperambudur S/C
400 KV Kolar - Kalivanthapattu S/C
400 KV Nellore Alamathi D/C
230 KV Chittor Thiruvalam S/C
230 KV Sulurpet Gumidipoondi S/C
230 KV Singarpet - Arni S/C
230 KV Tiruvannamalai - Villupuram Acharapakam S/C
230 KV Singarpet - Thiruvallam S/C
7.9.2 RESTORATION OF THE SUBSYSTEM 3 DURING TOTAL BLACKOUT OF
TN SYSTEM
7.9.2.1 In case of total blackout of the region,
a) Self start GMR Power (196 MW) and extend supply to Basin Bridge
230/110 KV SS
b) Self start BasinBridge(120 MW) and extend supply to Basin Bridge 230
KV SS and Vysarpadi 110 KV SS
c) Avail supply from Basin Bridge 230 KV SS / Vysarpadi 110KV SS and
synchronise machines.
d) Both the lines i.e to 230 KV SS to Tondiarpet and Vysarpadi 110KV SS
to Tondiarpet should be closed for avert Overloading.
e) Supply from 230 KV Basin Bridge SS (or) Vysarpadi 110 KV SS would
be extended to Tondiarpet 230 KV /110KV Sub Station and from thereon
to NCTPS and ETPS via 230kV lines
f) NCTPS would avail supply from Tondiarpet 230 KV Sub Station (or)
Avail supply from Alamatty 400 KV SS and start up the units.
138 of 206.
SRLDC Black Start Restoration Procedure 2014


g) ETPS would avail supply from Tondiarpet 230 KV Sub Station (or) Avail
supply from Alamatty 400 KV SS via Manali 230 KV SS and start up
the units.
h) Startup power would also be extended to MAPS via Sriperumbudur
Oragadam SP Koil or Via 230 KV SGPT Arni feeder or Neyveli TS2
Villupuram-Acharpakkam feeder.
i) Startup power for IPPs like TCPL,HITECH, OPG, Kamakshi,etc would
also to be extended via 230 kV NCTPS Goomidipoondi line
Startup Supply to MAPS
a) Option 1: 230KV NCTPS 230KV Sriperumbudur-230KV Arani -
Kalpakkam
b) Option 2: 230KV NCTPS 230KV Sriperumbudur -230KV Oragadam
230KV Spkoil - Kalpakam
c) Option 3: 230KV Neyveli TS2 230KV Vilupuram 230KV
Acharapakkam Kalapakam
d) Option 4: 230 KV Singarpet 230KV Arni 230KV Spkoil - Kalpakam
e) Option 5: 230 KV Chittor 230KV Tiruvallam 230KV SPkoil
Kalapakam
f) Option 6: 400KV Kolar 400KV Kalivanthapattu -230KV SP.Koil -
Kalpakkam


139 of 206.
SRLDC Black Start Restoration Procedure 2014



140 of 206.
SRLDC Black Start Restoration Procedure 2014


7.9.2.2 ACTIONS TO BE TAKEN BY VARIOUS GENERATING STATIONS
OF TN IN RESTORING SUBSYSTEM 3 DURING TOTAL
REGIONAL BLACKOUT AND / OR BLACKOUT OF ENTIRE TN
SYSTEM
a. At GMR Vasavi
Open out all out going lines
Self start the generators
Extend power supply to Basin Bridge 230kV/110 KV SS
b. At Basin Bridge Gas Station
Open out all out going lines
Self start the generators
a)Extend power supply to Vyasarpadi
b)Extend power supply to Basin Bridge 230/110 KV SS
c. At 110 KV Vyasarpadi
Open out all out going lines
Avail supply from Basin Bridge Power Station
Extend supply to Tondiarpet 230 KV SS through 110KV line
d. At 230 KV Basin Bridge SS
Open out all out going lines
GMR Power Station via 110kv line
(or) Avail supply from Basin Bridge Power Station
Extend supply to Tondiarpet 230 KV SS
e. At 230 KV Tondiarpet SS
Open out all out going lines
Avail supply from 230 KV Basin Bridge SS
(or) Avail supply from 110KV Vyasarpadi SS
Extend supply to NCTPS
Extend supply to ETPS
f. At 400/230 KV Alamathy SS
Open out all out going lines
Avail supply from APTRANSCO through 400 KV D/C Nellore -
Alamathy line.
Extend power supply to NCTPS.
Extend power supply to ETPS via. Manali 230 KV SS.
141 of 206.
SRLDC Black Start Restoration Procedure 2014


Extend power supply to Vallur -Sriperumbudur 400 KV SS.
g. At 400/230 KV Kalivanthapattu SS
Open out all out going lines
Avail supply from KPTCL through 400 KV D/C Kolar line.
Extend supply to MAPS via SPKOIL 230 KV SS.
Extend supply to NCTPS via Spkoil Oragadam
Sriperumbudur 230 KV feeder.
h. At 230 KV NCTPS
Open out all out going lines
Avail supply from Tondiarpet 230KV SS(or)
Avail supply from Alamathy 400 KV SS )
Startup units
Extend supply to Sriperumbudur 400 KV SS
Extend supply to Gummidipoondi 230 KV SS
Extend supply to Kilpauk 230 KV SS
Extend supply to Mosur 230 KV SS
Extend supply to Korattur 230 KV SS.
i. At 230 KV ETPS
Open out all out going lines
Avail supply from Tondiarpet 230 KV SS
Avail supply from Alamatty 400 KV SS via Manali 230KV SS
Avail supply from NCTPS
Startup units
j. At 230 KV Gummidi Poondi SS
Open out all out going lines
Avail supply from NCTPS
Avail supply from Sulurpet.
Extend supply to TCPL and startup unit
Extend supply to HITEC via Sipcot 110KV SS and startup unit
Extend startup supply to Kamakshi & OPG IPPs (after
commissioning)
k. All machines at Gumidipoondi:
Avail supply from Gumidipoondi
142 of 206.
SRLDC Black Start Restoration Procedure 2014


Startup OPG, TCPL, HITECH & Kamatchi Sponge units and
synchronise
l. At 230 TCPL
Open out all out going lines
Avail supply from Gumidipoondi
Startup unit and synchronise
m. At 400/230 KV Sriperumbudur
Open out all out going lines
a) Avail Supply from 400 KV Alamatty - Vallur SS (or)
b) Avail Supply from from NCTPS
c) Extend Supply to SP.koil 230KV SS
n. M. At 230 KV Oragadam
Open out all out going lines
Avail Supply from Sriperumbudur
Extend Supply to SP.koil 230KV SS
o. N. At 230 KV S.P.Koil
Open out all out going lines
Avail supply from Oragadam 230KV SS
Avail supply from Kalvindapattu 230KV SS
Extend Supply to MAPS
p. O. At 230 KV MAPS
Open out all out going lines
Avail supply from S.P.Koil 230 KV SS/Arani 230 KV SS/ Acharapakam
230 KV SS
Startup the Units
q. P. At 230 KV Thiruvalam SS
Open out all out going lines
Avail supply from Chitoor.
a) Extend supply to NCTPS via Mosur 230KV SS
b) Extend supply to MAPS via SPKOIL 230 KV SS
The important loads can be taken up in consultation with LD. Other loads can
be released only after some units are started at GMR, Basin Bridge , NCTPS
and ETPS or in case of a robust interconnection with other Subsystems or
States.
143 of 206.
SRLDC Black Start Restoration Procedure 2014



In case Subsystem 2 is energized the supply for startup can be obtained from
Neyveli TS2-Villupuram-Acharapakam-MAPS, Singarapet-Arani- MAPS and
Singarapet - Arani-Sriperumbudur.

7.9.3 Important loads in sub system 3
7.9.3.1 The following are traction loads in this sub system 3:
Sl.No Name of the
Traction
Fed by
01 Chennai MRTS 110 KV Chindhadaripet MRTS #1 & 2
02 Ennore 110 KV Ennore SS Traction #
03 Kadapperi 110 KV Kadapperi - SPKoil # 1- Traction #
04 Avadi
110 KV Korattur Sriperumbudur #1 Traction #
1 & 2
05 Acharapakkam 110 KV Acharapakkam SS Traction #
06 Villupuram 110 KV Villupuram SS Traction #
07 Mosur 110 KV Mosur SS Arakkonam traction # 1 & 2
08 Thiruvalam 110 KV Thiruvalam SS Traction #
09 Eraniel Eraniel 110 KV S.R.Pudur-Kodayar # 1

7.9.3.2 The following are the critical loads in this sub system 3:
Sl.
No
Locations Fed by
01 Airport 110 KV Pallavaram / 230 KV Kadaperi SS
02 Secretariat
Complex SS
110KV High court 230KV Basin Bridge SS
03 Raj Bhavan 110 KV Velachery SS/230 KV Tharamani SS

04 Highcourt
Complex
110 KV Highcourt SS / 230 KV BasinBridge SS
05 Water Works 110 KV Kipauk Water Washed Works / 230 KV
Kilpauk SS
144 of 206.
SRLDC Black Start Restoration Procedure 2014


110 KV Semparambakkam SS / 230 KV Kadaperi
SS
06 Minjur De-
Salination Plant
110KV Manali Metro water feeder
07 Factories
08 Heavy Vehicle
Factory
110 KV HVF SS / 400 KV Alamatty SS
09 Aavin Diary 110 KV SIDCO SS / 230 KV Manali SS
10 Puzhal Jail 110 KV Avadi SS / 230 KV Manali SS
11 MFL 110 KV MFL 1 / 230 KV Manali SS
110 KV MFL 2 / 230 KV Manali SS
110 KV CTCL SS
110 KV CMWSS SS
110 KV Melur SS
12 Port Trust 33 KV OHP SS / 230 KV Tondiarpet SS
Hospital
13 General
Hospital
110 KV High Court SS/230 KV Basin Bridge SS
14 Kilpauk Medical
College
110 KV Kilpauk SS/230 KV Kilpauk SS
15 Stanley 110 KV Seven Wells SS
16 Royapettah 110 KV Adyar ss / 230 KV Tharamani SS
17 TB Hospital 110 KV Chrompet SS / 230 KV Kadaperi SS
18 VIP Residents
19 Honble
ChiefMinister of
Tamil Nadu
230 KV Mylapore SS
110 KV Adyar
21 Honble minister
of Electricity
230KV Tharamani SS 110KV Adayar


7.10 Details of Traction Substations of TN System
The traction substations in Tamil Nadu are as given below
145 of 206.
SN
R
a
i
l
w
a
y

S
e
c
t
i
o
n
Electric Division
Sub
syst
em
230 kV / 220kV
Feeding Point
110/132 KV
intervening
substation/Tappin
g if any
Grid Substation RLY. TSS
T
r
a
n
s
f
o
r
m
e
r

c
a
p
a
c
i
t
y

i
n

M
V
A
P
h
a
s
e

d
e
t
a
i
l
s
S
a
n
c
t
i
o
n
e
d

l
o
a
d

i
n

M
V
A
A
v
g
.

D
e
m
a
n
d

i
n

M
V
A
P
r
i
o
r
i
t
y
E
m
e
r
g
e
n
c
y

m
i
n

r
e
q
u
i
e
m
e
n
t

i
f

a
l
l

T
S
S

f
e
d
E
m
e
r
g
e
n
c
y

m
i
n

r
e
q
u
i
e
m
e
n
t

i
f

a
d
j
a
c
e
n
t


T
S
S

f
e
d
DISCOM
C
o
n
t
a
c
t

N
o

o
f

T
P
C
-
C
U
G

M
O
B
Ennore T.P.S
Enore
T.P.S/Ennore
Manali Manali/ETPS
Alamathi --
Sriperumbudur --
Tapping from
Sriprumbudur-
Korattur FDR
--
Mosur --
Sriperumbudur --
4 Vellore 3 Thiruvalam -- Thiruvalam Tiruvalam 2x21.6 B-R 17.4 15.91 A1 11.9 17 TANGEDCO
Chinnavarikkam
Pernambut
Vaduganthangal
Gudiyattam
Periya Paravaikal
Singarpettai --
Vinnamangalam --
Mylapore --
GMR Vasavi --
8 South 3 SP Koil
Singaperumalkoil/
Kadaperi
Tapped Tambaram 2x21.6 R-Y 17.5 16.42 A1+ 12.6 18 TANGEDCO
Acharapakkam --
S.P.Koil --
Neyveli --
Acharappakkam --
Villupuram --
Thiruvannamalai --
DETAILS OF TRACTION SUBSTATIONS IN TAMIL NADU
Details of Traction Substations and Its feeding SEB susbtation over Southern Railway
4.2 6 TANGEDCO VIllupuram 2x12.5 B-R 6 5.85 A1
7.28 A2 5.18 7.4 TANGEDCO
10
Villupuram-
Trichy
Villupuram 3 Villupuram
TANGEDCO
Chennai-
Villupuram
9 Chengalpattu 3

Acharapakkam
Acharapakkam 2x12.5 Y-B 7.4
B-R 11 9.37 A1+ 7.7 11
12.6 18 TANGEDCO
7 MRTS Central 3 Chintadripet Chindatripet 2x21.6
Tirupattur 2x21.6 Y-B 18.4 16.46 A1
Tiruvalam
6
Jolarpettai-
Salem
Thirupattur 2 Tirupattur
18.6 16.03 A2 13.3 19 TANGEDCO
TANGEDCO
Arakkonam-
Jolarpettai
5 Thirupattur 2
Vinnamangalam
Vadakathipatti Valathur 2x21.6 R-Y
Arakkonam 2x21.6 R-Y 17.5 15.61 A2
2x21.6 B-R 22 19.29 A1+ 15.4 2
Chennai-
Arakkonam
West 3 Avadi Avadi
3 Vellore 3 Mosur
13.19 A1 9.8 14 TANGEDCO
Traction Power
Control/Chennai
Phone :044-
25353540,
09003161382
09003161394
09003161381
09003161389
Sr.DEE/TRD/Chen
nai :044-25355213,
9003161362
22 TANGEDCO
12.6 18
1 Chennai-Gudur North 3 Tapped Ennore 2x21.6 R-Y 14
146 of 206.
Singarpettai --
Mettur Auto --
Arni --
SPCL --
Singarpettai --
Metturdam
Metturdam/Singar
pettai
13 Salem 2 Nethimedu -- Nethimedu Salem 2x21.6 R-Y 8.8 7.71 A2 6.16 8.8 TANGEDCO
14
Salem-
Metturdam
Metturdam 2
Metturdam Hydro
P.H
Metturdam Hydro
P.H/Metturdam
Hydro
Tapped Metturdam 2x12.5 B-R 6.2 5.33 C 4.34 6.2 TANGEDCO
15 Salem-Erode Metturdam 2 Metturdam -- Sanniyasipatti Sankari Durg 2x21.6 B-R 13 12.03 A1 9.1 13 TANGEDCO
16 Erode 2 Ingur -- Ingur Ingur 2x21.6 R-Y 10.3 9.39 A2 7.21 10 TANGEDCO
17 Coimbatore 2 Arasur Arasur/ Sulur Tapped Sulur Road 2x21.6 Y-B 10.8 10.67 A1 7.56 11 TANGEDCO
Alandur --
Thuvakudi
Bhel EHT
K.Sathanur
19 Perambalur 2 Perambalur -- Koothur Ariyalur 2x21.6 Y-B 6 6.59 A1 4.2 6 TANGEDCO
20 Cudalore 2 Neyveli
Deviyakuruchi/Ney
veli
Tapped Vridhachalam 1x21.6 B-R 5.7 5.53 A2 3.99 5.7 TANGEDCO
Alandur --
Senkurichi
Thamaripadi
Ayyalur
22 Dindigul 1 Sempatti -- Dindigul Dindigul 2x21.6 Y-B 5 0.11 A2 3.5 5 TANGEDCO
23
Trivandrum-
Nagerkoil
Nagercoil 1 S.R.Pudur
SR
Pudur/Kodaiyar
Tapped Erniel 1x21.6 R-Y 5 3.11 A2 3.5 5 TANGEDCO
Traction Power
Control/Trivandrum
: 0471-2332482,
0471-2336429,
09567869922
09567869923
09567869946,
DEE/TRD/Trivandr
um:0471-2324446,
9746769351
5 TANGEDCO
Traction Power
Control/Madurai :
0452-2308033,
8754570625,
DEE/TRD/Madurai
: 0452-2308080,
8056162319
Sempatti
1x21.6 R-Y 5 3.54 A1 3.5
6 TANGEDCO
Traction Power
Control/Trichy :
0431-2412720,
8056064318,
Sr.DEE/TRD/Trichy
: 0431-2414233,
9003864312
Tanjavur
21
Trichy-Madurai
Trichy 1 Vaiyampatti Vaiyampatti
1x21.6 R-Y 6 4.63 A2 4.2 18
Villupuram-
Trichy
Trichy 2 Ambikapuram Trichy
11.94 A1 9.1 13 TANGEDCO
Erode-Podanur
TANGEDCO
Traction Power
Control/ Salem
:Phone : 0427-
2330149,
09003956328
07708017399,
Sr.DEE/TRD/Sale
m : 0427-2440084,
9003956325
12 Dharmapuri 2 Bommidi Bommidi 2x21.6 R-Y 13
B-R 9.3 9.36 A2 6.51 9.3 11
Jolarpettai-
Salem
Thirupattur 2 Singarpettai Samalpatty 2x21.6
147 of 206.
SRLDC Black Start Restoration Procedure 2014



LIST OF POWER STATIONS WITH BLACK START FACILITY AND BLACK START
MOCK DRILL OPERATION TENTATIVE PROGRAMME FOR 2014
SL
NO
POWER
STATION
INSTALLE
D
CAPACITY
UNIT
TYPE
STARTUP
FACILITY SYN.
FACILIT
Y
PROG.
DATE SOURCE
CAPACIT
Y
1
METTUR
DAM PH
4x12.5 (50) HYDRO HYDRO 375 KVA YES

2
SARKARPAT
HY PH
1 x 30 HYDRO Diesel 100 KVA YES

3 ALIYAR PH 1 x 60 HYDRO Diesel 100KVA YES

4
KUNDAH PH
4
2 x 50 HYDRO Diesel 100KVA YES

6 PUSHEP PH 3 x 50 HYDRO Diesel
2x500
KVA
YES

7 MOYAR PH 3 x 12 HYDRO
Pelten Wheel
Governor
NO


8

PERIYAR
2*42 +
1*42(UNDER
PROGRESS) +
1* 35
HYDRO
(MACHINE
1,2,3
SEPARATEL
Y
EXCITED)
MACHINE 4
(OLD)
SELF
EXCITED
:DC
Source
2*42 +
1*42(UNDER
PROGRESS)
+ 1* 35
220V
300AH
YES

9 KODAYAR I 1 x 60 HYDRO
DC
Source
110 V
400AH
YES

10 KODAYAR II 1 x 40 HYDRO
DC
Source
110 V
400AH
YES

11
PAPANASA
M
4 x 8(32) HYDRO Diesel 125 KVA YES

148 of 206.
SRLDC Black Start Restoration Procedure 2014


12 SERVALAR 1 x 20 HYDRO Diesel 260 KVA YES

13 BBGTPH 120(4*30) Naptha Diesel 500 KVA YES

14 GMR 196(4*49) LSHS Diesel 1800 KVA YES


149 of 206.
SRLDC Black Start Restoration Procedure 2014


7.11 MOCK DRILL PROCEDURE

Sub-System -1
a. Kodaiyar:
All 110KV lines connected to Kodaiyar 110KV bus shall be hand
tripped.
Self Start Kodaiyar
Charge Kayathar through Kodaiyar Kayathar 110KV feeder 1 via
veeravanallur (10MW)
b. Papanasam & Servalar
All 110KV feeders connected at Papanasam shall be hand tripped
Self Start at Papanasam
Self Start at Servalar
Extend supply from Papanasam to Servalar through 110KV
papanasam Servalar Feeder
Extend Supply to Kayathar through Papanasam - Kayathar Feeder 1
c. Periyar
All 110KV lines connected to Periyar shall be hand tripped
Extend supply to 110KV Theni through Periyar-Theni 110KV feeder
3
Sub-system 2
d. Kundha PH4
Hand tripp 230KV feeders at KPH4 and remote ends
Self Start KPH4
Extend supply to Thudiyalur and synhronise at thudiyalur
Extend supply to KPH3 and synhronise at KPH3
e. PUSHEP
Hand tripp 230KV feeders at PUSHEP and remote ends
Self Start PUSHEP
Extend supply to Arasur and synchronise at Arasure
Extend supply to KPH3 and synhronise at KPH3
150 of 206.
SRLDC Black Start Restoration Procedure 2014


f. Moyar
Hand tripp all 110KV feeders at Moyar
Self Start at Moyar
Extend supply to Pykara and Synchronise at Pykara
g. Sarkarpathy
Hand tripp Sarkarpathy Aliyar Feeder
Self Start Sarkarpathy
Synchronise Sarkarpaty Aliyar feeder at Sarkarpathy
h. Aliyar
Hand tripp all the 110KV lines connected to Aliyar
Self Start at Aliyar
Extend supply to UDPT 110KV through Aliyar UDPT 110KV feeder
2 and synhronise at UDPT 110KV
i. Mettur Dam
Hand tripp all the 110KV feeders at Mettur DAM
Self Start MDPH
Extend supply to Mettur Town and synhronise at Mettur Auto
Sub-system 3
j. Basin Bridge
Trip all the 110KV feeders at Basin Bridge
Self Start Basin Bridge
Charge Basin bridge - Vyasarpadi feeder and synchronise at
Vyasarpadi.
k. GMR Vasavi
Trip all the 110KV feeders at GMR Vasavi
Self-Start units
Charge 110KV GMR Vasavi - Basin Bridge feeder and synchronise at
Basin Bridge.

151 of 206.
SRLDC Black Start Restoration Procedure 2014


8.0 RESTORATION OF KERALA SYSTEM

8.1 SYSTEM OVERVIEW
Kerala is predominantly Hydro power based system with few Diesel / Naptha power
stations. The Kerala system is divided into two Subsystems for the purpose of Black
Start Restoration, (North Kerala & South Kerala) which can be brought up
independently and synchronised subsequently once the Subsystem develops into
larger sustainable islands

8.2 MAJOR GENERATING STATIONS
Following are the Major Generating Stations in Kerala system

Sl
No
POWER
STATION
TYPE
SECTOR /
Ownership
SUB
SYSTE
M
CAPACIT
Y in MW
BLACK
START
FACILITY
1 IDUKKI Hydro State 2 780 Available
2
RGCCPP,
Kayamkulam
Naptha
/Gas
NTPC 2 360 Available
3 SABRIGIRI Hydro State 2 310
Available but
Cannot be
used since
dead line
charging is
not posible
4
LOWER
PERIYAR
Hydro State 2 180 Available
5 BSES Naptha State IPP 2 157 Available
6 KDPP Diesel State 1 128 Available
7
KUTTIYADI +
KUTTIADI EXTN
Hydro State 1 225
Available in
Kuttiadi
152 of 206.
SRLDC Black Start Restoration Procedure 2014


8 SHOLAYAR Hydro State 2 54 Available
9
NERIMANGALA
M
Hydro State 2 48 Available
10 BDPP Diesel State 2 106 Not Available
8.3 LIST OF SUB-STATIONS WITH SYN FACILITY
SUB STATION
VOLTAGE LEVEL
(KV)
SYNCHRONISING
FACILITY YES/NO
AREACODE 220 YES
NALLALAM 220 YES
MADAKKATHARA 220 YES
CHALAKUDY 110 YES
PALLOM 220 YES
NEW PALLOM 220 YES
BRAHMAPURAM 220 YES
KAYAMKULAM 220 YES
KALAMASSERY 220 YES
MUVATTUPUZHA 110 YES
POTHENCODE 220 YES
THALIPPARAMBA 220 YES
KANHIRODE 220 YES
EDAPPON 220 YES
KANIYAMPET 220 YES

8.4 IMPORTANT INTER CONNECTIONS
8.4.1 WITH OTHER REGION
Kerala does not have interconnections with other regions

8.4.2 WITHIN THE REGION
A. With Karnataka
a) 220 kV S/C Kaniyampet Kadakola
b) 110 kV S/C Manjeswara Kulashekara
153 of 206.
SRLDC Black Start Restoration Procedure 2014



B. With Tamil Nadu
a) 400 kV D/C Pallakad - Udumalpet
b) 400 kV D/C Trivandrum - Tirunelveli
c) 400 kV D/C Edamon Tirunelveli ( Charged at 220kV)
d) 220 kV S/C Idukki - Udumalpet
e) 220 kV S/C Theni Mozhiyar
f) 110 kV S/C Parassala - Kuzhithurai

8.5 SUB SYSTEM DEMARCATION
SUB SYSTEM 1: The sub-system 1 comprises of Kozhikode Diesel Generating
Power Station (KDPP) and Kuttiadi Hydro Power Station in the northern part of
Kerala. It includes the load centre like Nallalam, Areakode (Kozhikode), Kasarkode,
Taliparamba, Kannur, etc.,

SUB SYSTEM 2: The sub-system 2 comprises of Major Hydro Stations Viz. Idukki,
Lower Periyar, Sabirigiri and RGCCPP Kayankulam (Naptha / Gas). It includes major
and important load centres like Trivandrum, Kalamassery, Pallam etc.,






154 of 206.
SRLDC Black Start Restoration Procedure 2014




SUB SYSTEM
1
SUB SYSTEM
2
155 of 206.
SRLDC Black Start Restoration Procedure 2014


8.6 RESTORATION OF SUBSYSTEM 1-(NORTH KERALA AREA)
8.6.1 AVAILING START UP POWER
To restore this Subsystem Startup power can be availed from the following:
A. During Total Regional Blackout and /or Total Blackout in Kerala
Self starting of KDPP & Kuttiadi units.
From Karnataka system through 220kV S/C Kadakola - Kaniyampet
line.
B. During Blackout of Subsystem 1 only
From Karnataka system, through 220kV S/C Kadakola-Kaniyampeta
line.
From Subsystem 2 through 220kV S/C Madakkathara Areacode
line.

8.6.2 RESTORATION PROCESS FOR SUB-SYSTEM 1
8.6.2.1 In case of total blackout of the region,
a) Self start two units at KDPP Diesel generating Station, energise 110 kV
and extend supply to Nallam and connect 20 MW loads at Kozhikode.
b) Simultaneously self start units at Kuttiadi and extend start up supply to
Kuttiadi Exten and Addl Extn and Extend supply to Kozhikode 110KV
via Kakayam (5MW load) and Chevayur (5MW load)
c) Synchronise Supply from KDPP & Kuttiadi at Nallam
d) Extend Supply from Kozhikode 110kV to Nallalam 220kV.
e) Extend supply to Areakode from Nallam and gradually increase
generation as well as connected loads.
f) Extend Supply to essential loads in this subsystem.
g) As the generation picks up, this Island gets build-up by gradually providing
the Loads of Areacode / Nallalam
h) This Subsystem can be synchronized with Subsystem 2 at Areacode r
along 220kV Areacode Madakathara .
156 of 206.
SRLDC Black Start Restoration Procedure 2014


i) Kerala and Karnataka system can be synchronized at Kadakola /
Kaniyapet. This may be done after synchronizing the subsystem 2 with
Tamil Nadu system.
j) After this subsystem getting stabilized or getting synchronized with
main system, 220kV stations at Kanhirode, Taliparambu, Mylatti etc.,
can be energized & extend supply.
157 of 206.
SRLDC Black Start Restoration Procedure 2014





158 of 206.
SRLDC Black Start Restoration Procedure 2014



8.6.2.2 ACTIONS TO BE TAKEN BY VARIOUS GENERATING STATIONS
AND SUB-STATIONS DURING TOTAL REGIONAL BLACKOUT
AND / OR TOTAL BLACKOUT IN KERALA

(a) At KDPP
Open out all outgoing lines
Self start the machines
Co-ordinate with SLDC and extend power supply to Kozhikode 110
kV.
(b) At KUTTIADI
Open out all outgoing lines
Self start the machines
Extend supply to Kozhikode 110 kV via Kakkayam and chevayoor
(c) At NALLALAM
Open out all outgoing lines
Avail 110kV power supply from KDPP and Kuttiadi and
synchroniseExtend power supply to essential / important loads at
Nallalam.
Extend power supply to 220kV from 110kV.
Co-ordinate with SLDC and extend 220kV power supply to
Areakode lines for restoring essential and important loads at
Areakode.
(d) At AREAKODE (KOZHIKODE)
Open out all outgoing lines
Avail power supply from Nallalam.
Restore essential and important Loads.
Co-ordinate with SLDC for synchronizing with subsystem 2 through
220kV Areakode Madakathara line

159 of 206.
SRLDC Black Start Restoration Procedure 2014


8.6.3 RESTORATION OF SUBSYSTEM 1 DURING COLLAPSE OF THIS
SUBSYSTEM ALONE.
Power supply to Areakode can be availed from Karnataka through 220 kV S/C
Kadakola - Kaniyampet line. Alternately, it can be availed from Subsystem 2
through 220 kV S/C Madakkathara - Areakode line. In addition, the
generating units at KDPP / Kuttiadi is to be self started and 110kV / 220kV
lines are to be synchronized as per 8.6.2 above to restore the loads in
Northern parts of Kerala.

8.7 RESTORATION OF SUBSYSTEM 2 (SOUTHERN KERALA AREA)
8.7.1 AVAILING START UP POWER
To restore this Subsystem Startup power can be availed from the following:
A. In case of Total Regional Blackout and /or Total Blackout in Kerala
Since most of the generators in Kerala are having self start facilities, in
case of total grid collapse all major generators in Kerala System can come
up on their own.
The Hydro generation at Idukki, Lower Periyar may be self started
first and extend startup power supply to Sabarigiri and loads at
Trivandrum, Kalamassery etc.,
In case of failure of Kerala System alone emergency loads can be
availed from the neighbouring states through the following lines

From Tamil Nadu through
400 kV D/C Pallakad Udumalpet to meet the loads of Thrissur,
Kalamassery & Palakkad
400 kV D/C Trivandrum Tirunelveli to meet the loads of Trivandrum
220 kV D/C Edamon Tirunelveli to meet the loads of Edamon
220 kV S/C Idukki Udamalpet for starting up Idukki, if required
220 kV S/C Sabarigiri - Theni for starting up Sabarigiri, if required

160 of 206.
SRLDC Black Start Restoration Procedure 2014


B. In case of Blackout of Subsystem 2 only
From Subsystem 1 through 220 kV S/C Madakkathara -Areakode
line.
Alternatively through the lines connected to Tamil Nadu as mentioned
above.

8.7.2 RESTORATION PROCESS FOR SUBSYSTEM 2
8.7.2.1 In case of total blackout of the region,
Start up power is obtained from self starting Hydro units of Idukki, Lower
Periyar, Sholayar, Neriamangalam, Poringal & Kayamkulam Generation. As
the generation picks up, this Island is built by gradually providing the Loads of
Kalamsserry, Pallom, Edamon, Pothencode, Madakathara etc. The details of
actions are as mentioned below:
a) Self start units of Idukki and extend supply to New Pallom &
Kalmaserry
b) Extend Supply to Muvatatupuzha, Mylattor & Idamalayar via
Kalmaserry 110 kV with total load of 75 MW & then to Pallom with
load of 25MW.
c) Self Start units at Lower Periyar and synchronise with Idukki and
increase loads at Kalamassery to 125MW.
d) Simultaneous to step c extend supply to Pothencode from Pallom via
Sabarigiri-Edamon to supply important loads at Pothencode. and start
units at Sabarigiri.
e) Extend startup supply to BDPP from Kalamassery or Lower Periyar
and extend supply to Brahamapuram essential loads (25MW).
f) Self Start units at Kayamkulam and synchronise Kayamkulam New
Pallom at New Pallom and tie Kayamkulam - Edamon line at
Kayamkulam via Edappon/Kundra.
g) Extend supply to Madakathara loads from Idukki / Lower Periyar.
h) Start generation at Idamalayar (110kV) Hydro station.
161 of 206.
SRLDC Black Start Restoration Procedure 2014


i) Self start units at Sholayar and extend start up supply to Poringal with
local loads (10MW) and extend supply to Chalakudyand then
synchronise Idamalayar-Chalakudy line at Chalakudy(110kV). Then
extend supply to Traction loads at Chalukudy via Aluva.
j) Self Start units at Neriamangalam. Synchronise Kalamassery-
Muvattupuzha and Neriamangalam- Muvattupuzha lines at
Muvattupuzha(110kV).
k) Extend startup supply to Sengulam(110kV) Hydro station.
l) Extend supply to Shornur (220kV) from Madakathara and further
synchronise with subsytem1 at Areakode
m) It can also be synchronized with 400 kV system at Pallakad or
Trivandrum and with Tamilnadu 220 kV System at Idukki 220kV
stations.
n) Extend supply to Traction loads and other essential loads
o) Self start units at BSES and synchronise with rest of the grid at
Kalamassery
162 of 206.
SRLDC Black Start Restoration Procedure 2014






163 of 206.
SRLDC Black Start Restoration Procedure 2014


8.7.2.2 ACTIONS TO BE TAKEN BY VARIOUS GENERATING STATIONS
AND SUBSTATIONS DURING TOTAL REGIONAL BLACKOUT
AND / OR TOTAL BLACKOUT IN KERALA
(a) At IDUKKI
Trip all out going lines
Selfstart one Unit at Idukki in the stage - II
First stage units are unstable for independent operation and to be
started only after Idukki is synchronised with other generators.
Charge the New Pallom line for providing essential loads at Pallom
area and extending the supply to Sabarigiri (start up power)
Co-ordinate with SLDC and charge one of the two 220 kV circuits of
Idukki - Kalamassery for meeting essential loads at Kalamassery
Charge 220kV Idukki - Lower Periyar line from Idukki. At Idukki
more units may be put into service as and when required, keeping
generation of 50 MW per unit.
Co-ordinate with SLDC and charge Idukki Madakathara line for
synchronizing with Subsystem1 at Madakathara
(b) At NEW PALLOM
Open out all outgoing lines
Avail power supply from Idukki and restore limited load
Extend power supply to Pallam in consultation with SLDC and
Pallam
Synchronise Kayankulam - New Pallom line at New Pallom in
consultation with SLDC and Kayankulam if Kayankulam generating
station has been self started and Kayankulam New Pallom is
charged from Kayankulam end.
164 of 206.
SRLDC Black Start Restoration Procedure 2014


(c) At PALLOM
Open out all outgoing lines
Avail power supply from New Pallom and restore limited load
Extend power supply to Sabarigiri in consultation with SLDC and
Sabarigiri hydro station
Extend power supply to BDPP in consultation with SLDC and BDPP
diesel generating station
(d) At SABARIGIRI
Open out all outgoing lines
Avail startup power supply either from Idukki through Pallom line or
from Pothencode (from 400 kV System) through Edamon line or
from Theni (Tamilnadu) 230kV line.
In case power is available from Pallom line, extend power to
Pothencode through Edamon line for meeting important loads of
Edamon and further at Trivandrum.
(e) At LOWER PERIYAR
Open out all outgoing lines
Self start the machines and await for further instruction from SLDC.
Extend power supply to Idukki if L.P generators are started first else
avail power supply from Idukki and synchronise generators with the
bus.
Extend power supply to BDPP in consultation with SLDC and BDPP
Charge & synchronise 220kV Lower Periyar Madakathara line in
consultation with SLDC
(f) At THRISSUR
Open out all outgoing lines
Avail supply from Idukki / L.Periyar Hydro station
Restore essential and important loads
Charge one of 400/220 kV ICTs
Avail 400 kV Supply from Udamalpet
Synchronise the two sub systems in consultation with SRLDC and
SLDC
Extend power supply to Areacode for synchronization with Sub
system1 at Areacode .
165 of 206.
SRLDC Black Start Restoration Procedure 2014



(g) At KALAMASSERY
Open out all outgoing lines
Avail power supply from Idukki.
Restore essential and important loads
Extend startup power supply to Idamalayar Hydro station through
Malayattoor line110kV line and supply loads at Mylatoor.
Extend power supply to Muvattupuzha for supplying loads and for
synchronization with Nerimangalam at Muvattupuzha and startup
supply to Sengulum Hydro station.
Extend power supply to Poringal & Sholayar Hydro stations through
Alva Chalakudy 110kV lines
(h) At POTHENKODE
Open out all outgoing lines
Avail power supply from 400 kV system, if available in consultation
with SLDC
Restore essential and important Loads
Avail Power supply from Edamon synchronise with 400 kV system
in consultation with SLDC
(i) At Brahmapuram
Open out all outgoing lines
Avail Startup supply from Kalmaserry in consultation with SLDC
Restore essential and important Loads
(j) At Kayankulam
Open out all outgoing lines
Self Start units at Kayamkulam and charge Kayamkulam New
Pallom.
Synchronise Kayamkulam - Edamon line at Kayamkulam via
Edappon/Kundra
(k) At Idamalayar
Open out all outgoing lines
Avail Start up supply from Mayalatoor and start the units
Charge Idamalayar Chalkudy in consultation with SLDC.
(l) At Sholayar
166 of 206.
SRLDC Black Start Restoration Procedure 2014


Open out all outgoing lines
Self Start units at Sholayar
Extend Start Up supply to Poringal
Charge Sholayar Chalkudy in consultation with SLDC.
Synchronise Idamalayar Sholayar in consultation with SLDC
(m) At Poringalkuthu
Open out all outgoing lines
Avail Start Up Supply from Sholyarl
Charge Poringal Chalkudy in consultation with SLDC.
Synchronise Idamalayar Poringal in consultation with SLDC
(n) At CHALAKUDY
Open out all outgoing lines
Avail power supply from Kalamaserry and Supply traction Loads.
Avail power supply from Idamalayar / Poringal / Sholyar and
synchronise.
Extend supply to traction and other essential loads.
(o) At Nerimangalam
Open out all outgoing lines
Self Start units at Nerimangalam
Charge Nerimangalam Muvattupuzha for synchronization at
Muvattupuzha in consultation with SLDC.
(p) At Sengulam
Open out all outgoing lines
Avail Start up supply from Muvattupuzha and start the units

8.7.2.3 Restoration of Subsystem 2 during collapse of this Subsystem
alone

As already explained earlier, during the restoration of Subsystem 2
alone start up power can be availed from Tamil Nadu through
a) 400 kV D/C Udumalpet - Pallakad - Thrissur to meet the loads of
Thrissur & Kalamassery
b) 400 kV D/C Tirunelveli - Trivandrum to meet the loads of Trivandrum
167 of 206.
SRLDC Black Start Restoration Procedure 2014


c) 220 kV S/C Udamalpet - Idukki for starting up Idukki, (Check the
voltage at Udmalpet end. If it is below 220kV, then only Udamalpet
Idukki can be charged)
d) 220 kV S/C Sabarigiri - Theni for starting up Sabarigiri, if required
e) 220 KV D/C Tirunelveli Edamon
f) Alternately, power can be availed from Subsystem 1 through 220 kV
S/C Madakkathara - Areakode line. (Check the voltage at
Madakathara end. If it is below 220kV, then only lines eminating from
Madakathara can be charged)

8.8 SUPPLY DETAILS FOR RAILWAY TRACTION SYSTEM IN KERALA
The traction substation in kerala are detailed below
168 of 206.
SN
R
a
i
l
w
a
y

S
e
c
t
i
o
n
Electric Division
Sub
syst
em
230 kV / 220kV
Feeding Point
110/132 KV
intervening
substation/Tappin
g if any
Grid Substation RLY. TSS
T
r
a
n
s
f
o
r
m
e
r

c
a
p
a
c
i
t
y

i
n

M
V
A
P
h
a
s
e

d
e
t
a
i
l
s
S
a
n
c
t
i
o
n
e
d

l
o
a
d

i
n

M
V
A
A
v
g
.

D
e
m
a
n
d

i
n

M
V
A
P
r
i
o
r
i
t
y
E
m
e
r
g
e
n
c
y

m
i
n

r
e
q
u
i
e
m
e
n
t

i
f

a
l
l

T
S
S

f
e
d
E
m
e
r
g
e
n
c
y

m
i
n

r
e
q
u
i
e
m
e
n
t

i
f

a
d
j
a
c
e
n
t


T
S
S

f
e
d
DISCOM
C
o
n
t
a
c
t

N
o

o
f

T
P
C
-
C
U
G

M
O
B
Kalamssery Kodakara
Aluva
Kurmassery
2 Kalamssery Vytilla
Bramhapuram --
3
Ernakulam-
Allepy-
Kayankulam
Alleppy 2 Pallom -- Chengulam Punappara 1x12.5 Y-B 5 4.14 A2 3.5 5 KSEB
4
Ernakulam-
Kottayam-
Kayankulam
Puvanturt 2 Pallom -- Pallom Chingavanam
1x21.6,
1x12.5
R-Y 6 5.87 A1 4.2 6 KSEB
5
Kayankulam-
Kollam
Kundara 2 Kundara -- Kundara Periyanad
1x21.6,
1x12.5
B-R 9 7.78 A2 6.3 9 KSEB
6
Kollam-
Trivandrum
Pothencode 2 Pothencode -- Technopark Kazhakkutam 2x21.6 R-Y 8.5 7 A1 5.95 8.5 KSEB
7 Palakkad 2 Palakkad -- Kanjikode Kanjikode 2x21.6 B-R 12.5 10.63 A2 8.75 13 KSEB
8 Palakkad 2 Shornur -- Shornur Shornur
1x21.6,
1x12.5
Y-B 9.1 8.51 A1 6.37 9.1 KSEB
Traction Power
Control/Trivandrum
: 0471-2332482,
0471-2336429,
09567869922
09567869923
09567869946,
DEE/TRD/Trivandr
um:0471-2324446,
9746769351
DETAILS OF TRACTION SUBSTATIONS IN KERALA
Podanur-
Soranur
Traction Power
Control/Palakkad :
Phone :0491-
2552686,
9746740013
Sr.DEE/TRD/Palak
kad: 0491-
2555513,
9746763301
8 7.58 A1 5.6 8 KSEB
5.95 8.5 KSEB
Madakkathara
2 Brahmapuram Kadavanthara Ernakulam 2x21.6 B-R
Chalakudi 2x21.6 R-Y 8.5 8.82 A2 1
Shoranur-
Ernakulam
Trichur 2 Chalakudi
Details of Traction Substations and Its feeding SEB susbtation over Southern Railway
169 of 206.
SRLDC Black Start Restoration Procedure 2014


8.9 CRITICAL LOADS IN KERALA
a) Cochin port (West Island) extend supply through 110kV Brhamapuram
Kadavanthara line
b) TERLS extend supply through 110kV Pothenkode TERLS line

8.10 BLACK START MOCK DRILL PROCEDURE
The procedure for mock drill exercise is as given below.
(a) KDPP:
Self-start two units at KDPP Diesel generating Station
Extend 110 kV supply and connect 20 MW loads at Kozhikode
(b) Kuttiadi Related Activities

Pre-requisites
1. Instructions may be given in advance to the concerned City
Control Room, Electrical section offices about the probable
interruptions if any may occur during the process of mock drill
scheduled at 10:00Hrs on a particular date.
2. A dedicated phone no. at the concerned stations may be
intimated to the Electrical section office for their exclusive
communication regarding operations at 11kVside and
authorize an operator for attending this at the station.
3. FCT/PLCC facility may be used at the concerned station for
the communication during the process of Mock drill.
4. SCADA/Communication data to be ensured.
5. At 09-00 Hrs, arrangement may be made for feeding 110kV
S/S Quilandy and 110kV Substation Westhill from 220 kV S/S
Vatakara and switch off 110kV Chevayoor-WestHill feeder at
Chevayoor end.
6. At 09-00 Hrs, arrangement may be made for feeding 110kV
S/S Kunnamangalam and Koduvally from 220kV S/S Nallalam
via 110kV Nallalam-Kunnamangalam feeder and switch off
110kV Kakkayam-Koduvally feeder at Kakkayam end.

09.00 Hrs at 220kV Substation, Nallalam.
1. 110kV NLCH-I feeder, and 110/11kV 12.5 MVA No.1
transformer to be shifted to 110kV Bus (B) and rest of the
110kV feeders are to be connected to 110kV Bus (A) with
110kV bus coupler in closed condition.

09.30 Hrs.at Kuttyadi Hydro Electric Project
170 of 206.
SRLDC Black Start Restoration Procedure 2014


1. Switch off 110kV KKCH at Kakkayam end.
2. Switch off 25MW generator unit 1,2 & 3
3. Confirm 110kV KDKK feeder and 10 MVA, 110/11 kV
transformer is in switched off condition.
4. Open 110kV Bus section isolator between Unit 4(50 MW)
generator and others.
5. Ensure Unit 4 (50 MW) generator with 110kV KKCK and
KKKH feeders are tied with grid through Kanhirode supply.

09.45 Hrs at 110kV S/S Chevayoor
1. Switch off 110kV NLCH 1 & 2 and 110kV KKCH feeder
2. Segregate the 110kV BUS with 110kV NLCH 2 feeder
,110/11kV 10MVA Transformer, 110/66kV 25 MVA
Transformer and 110kV KKCH feeder in one section.
3. Switch on 110kV NLCH 1 and Rest of the Load may be met
with this feeder from Nallalam
4. Switch off 110kV NLCH 2 feeder at 10:00 hrs at Chevayoor
end

10.00 Hrs at Kuttiyadi Hydro Electric Project , 110KV S/s
Chevayoor and 220kV S/s Nallalam (Sequence of
operations for Mock drill)
1. Start the 160kVA DG set and avail auxiliary supply to
Machine #1.
2. Start the black start machine #1 by taking the auxiliary supply
from 160kVA DG set and energise 110kV Bus and load the
system gradually up to 5 MW. (Ensure isolation of LT supply
with that of 50 MW Generator). Monitor subsystem
Parameters (freq. ,voltage and Load). Maintain sub system
frequency above 49.5 Hz.
3. Ensure that 110kV Chevayoor bus is dead and then charge
the 110kV feeder Kakkayam-Chevayoor.
4. Avail supply at Chevayur S/s by closing the CB of 110kV
Kakkayam-Chevayoor feeder and load the system gradually
in consultation with the LD and Kuttiady operators.
5. Start the machine #2 at Kuttiady using the auxiliary supply
from Unit #1.
6. Switch off and isolate 110kV Bus coupler at Nallalam.
7. Extend the Supply to Nallalam S/s from Chevayoor through
Nallalam-Chevayoor #1 feeder.
8. Energize the 110kV bus B at Nallalam substation and switch
on 12.5 MVA Transformer and load the system gradually.
171 of 206.
SRLDC Black Start Restoration Procedure 2014


9. Increase the 11kV load gradually at Nallalam end after
consultation with the LD and Kuttiady operators and monitor
subsystem Parameters (freq., voltage and Load).
10. Synchronise Unit #2 at Kuttiady with the subsystem (Unit #1).
11. Monitor the subsystem Parameters (freq., voltage and
Load) at all stations. Maintain sub system frequency
above 49.5 Hz . Care should be taken that there will be
two system (Sub system and main system) in all the
stages.
12. Increase the load gradually at Chevayoor and Nallalam in
consultation with the Kakkayam Operator and monitor
voltage, frequency, MW and MVAR.
13. Monitor System Parameters like Voltage and Frequency at
both 110kV buses at Nallalam
14. Synchronise the Subsystem of 110kV Bus B with the main
System of 110kV Bus A at Nallalam through 110kV Bus
coupler Breaker using Synchronizing Trolley. Coordinate with
Kakkayam for adjusting the Voltage and Frequency.

The following points are also to be noted.
1. The splitting of Buses are to be carried out sufficiently earlier
before the commencement of Mock drill (Mock Drill
scheduled to start at 10:00 hrs on Scheduled date).
2. The frequency of the subsystem should always be
maintained above 49.5Hz.
3. As there is possibility of over voltage due to lightly loaded
feeders, special attention has to be given to limit the
subsystem voltage.
4. All operations have to be done in consultation with LD
Station, Kalamassery.
5. Advance information to the public regarding supply
interruption through media has to be arranged from
concerned substations.
6. Advance information to the concerned distribution section
offices should be given from the substations to avoid permit
work or back feeding of the identified feeders.

(c) IDUKKI
Trip all out going lines
Selfstart one Unit at Idukki in the stage - II
First stage units are unstable for independent operation and to be
started only after Idukki is synchronised with other generators.
172 of 206.
SRLDC Black Start Restoration Procedure 2014


Charge the New Pallom line and extending the supply to Sabarigiri
(start up power)
Co-ordinate with SLDC and charge one of the two 220 kV circuits of
Idukki - Kalamassery
Charge 220kV Idukki - Lower Periyar line from Idukki. At Idukki more
units may be put into service as and when required, keeping
generation of 50 MW per unit.
Co-ordinate with SLDC and charge Idukki Madakathara line for
synchronizing with Subsystem1 at Madakathara
(d) SABARIGIRI
Open out all outgoing lines
Avail startup power supply either from Idukki through Pallom line or
from Pothencode (from 400 kV System) through Edamon line or from
Theni (Tamilnadu) 230kV line.
In case power is available from Pallom line, extend power to
Pothencode through Edamon line for meeting important loads of
Edamon
(e) LOWER PERIYAR
Open out all outgoing lines
Self-start the machines and await for further instruction from SLDC.
Extend power supply to Idukki if L.P generators are started first else
avail power supply from Idukki and synchronise generators with the
bus.
Extend power supply to BDPP in consultation with SLDC and BDPP
Charge & synchronise 220kV Lower Periyar Madakathara line in
consultation with SLDC
(f) Brahmapuram
Open out all outgoing lines
Avail Startup supply from Kalmaserry in consultation with SLDC
Restore essential and important Loads
(g) At Kayankulam
Open out all outgoing lines
Self Start units at Kayamkulam and charge Kayamkulam New
Pallom.
173 of 206.
SRLDC Black Start Restoration Procedure 2014


Synchronise Kayamkulam - Edamon line at Kayamkulam via
Edappon/Kundra
(h) At Idamalayar
Open out all outgoing lines
Avail Start up supply from Mayalatoor and start the units
Charge Idamalayar Chalkudy in consultation with SLDC.
(i) At Sholayar
Open out all outgoing lines
Self Start units at Sholayar
Charge Sholayar Chalkudy in consultation with SLDC.
Synchronise Idamalayar Sholayar in consultation with SLDC
(j) At Poringal
Open out all outgoing lines
Self Start units at Poringal
Charge Poringal Chalkudy in consultation with SLDC.
Synchronise Idamalayar Poringal in consultation with SLDC
(k) At Nerimangalam
Open out all outgoing lines
Self Start units at Nerimangalam
Charge Nerimangalam Muvattupuzha for synchronization at
Muvattupuzha in consultation with SLDC.
(l) At Sengulam
Open out all outgoing lines
Avail Start up supply from Muvattupuzha and start the units

174 of 206.
SRLDC Black Start Restoration Procedure 2014


8.11 BLACK START MOCK DRILL SCHEDULE FOR 2014
Sl No
POWER
STATION
TYPE
CAPACIT
Y in MW
SUB
SYSTE
M
BLACK
START
FACILITY
Mock Drill
Schedule
1 IDUKKI Hydro 780 2 Available
2
RGCCPP,
Kayamkulam
Naptha
/Gas
360 2 Available
3
LOWER
PERIYAR
Hydro 180 2 Available
4 BSES Naptha 157 2 Available
5 KDPP Diesel 128 1 Available
6 SHOLAYAR Hydro 54 2 Available
7
NERIMANGALA
M
Hydro 48 2 Available
8 PORINGAL Hydro 32 2 Available




















175 of 206.
SRLDC Black Start Restoration Procedure 2014


9.0 ELECTRIC TRACTION


9.1 SOTHERN REGION RAILWAY TRACTION

Based on the Enquirey report recommendations. The meeting were held with
railways on 24.07.13, 23.09.13 & 22.11.13, A chapter on Railways is being
introduced which covers in detail. In This regard SRLDC officials visited the
Bangarpet traction Substation and Traction control centre, Bangalore to understand
the specific requirements of railway traction. Nodal Officers were identified. Specific
recommendations were made with target dates.

Railways work under zonal model, wherein zones cut across states boundary.
It is required to understand the zones in Southern Region.

9.2 RAILWAY ZONES IN SOUTHERN REGION.

The following Railway zones are fed from the network of southern region.
a. Southern Railway covers Tamil Nadu, Part of Andhra Pradesh, Kerala with
head quarters at Chennai
b. South Western Railway covers Karnataka with head quarters at Bangalore
c. South Central Railway covers Majority of the Andhra Pradesh with head
quarters at Secunderabad
d. East Coast Railway Covers Part of Andhra Pradesh.

9.3 TYPICAL TRACTION SUBSTATION SINGLE LINE DIAGRAM.
The typical layout of traction substation is attached below






176 of 206.
SRLDC Black Start Restoration Procedure 2014


177 of 206.
SRLDC Black Start Restoration Procedure 2014



9.4 NODAL OFFICERS
The following officers are identified as Nodal officers for the purpose of single point
contact during crisis management.

Name of
Railways
Name of Nodal
Officer(S/Shri)
Designation Phone No. Mobile No. Address Email id
Southern
Rly
Shri K.Palani Dy. Chief Ele.
Engr.
044-
25355384
9003160309 Headquarters
Office
Electrict Deptt.
Chennai-
600 003
dyceetrd@sr.railnet.gov.in
palanisrchn@yahoo.com
South
Western
Railway
Shri
R.N.Meena

Senior Divisional
Electrical
Engineer
/Traction
Distribution
080
22871365

9731666305

Divisional
Railway Manager
(Traction
Distribution)
South Western
Railway
Divisional Office
Traction
Distribution
Bangalore -23
deetrdsbc@gmail.com

rnurmila@yahoo.com

South
Central
Rly
Shri
B.V.Ramana
Kumar
Dy. Chief
Ele. Engr.
040-
27820409
09701370310 Headquarters
Office,
Electrical Branch
Rail Nilayam
Secunderabad
PIN-500 071
trdscr@gmail.com
East
Coast Rly
Shri
M.C.Meena
Sr.Div. Ele.
Engr./TRD
0891-
2746240
08978080305 Office of the
Chief Electgrical
Engineer,
Rail Sadan
Chandrasekharp
ur
Bhubaneswar-
751017
srdeetrdwat@yahoo.in




Bangalor
e Metro
Rail
Corpn.
Ltd
Shri
A.Dattatreyulu
DGM (Traction) 080-
25191074
/75
9448287995 Bangalore Metro
Rail Corpn, Ltd
Bangalore -
560027
dattatreyulu@bmrc.co.in


9.5 RAILWAY TRACTION MAP & DATA
The railway traction data both in terms of data & SLD is detailed below. The priorities
has been identified and accordingly
178 of 206.
SN
R
a
i
l
w
a
y

S
e
c
t
i
o
n
Electric Division
Subs
yste
m
230 kV / 220kV
Feeding Point
110/132 KV
intervening
substation/Tapping
if any
Grid Substation RLY. TSS
T
r
a
n
s
f
o
r
m
e
r

c
a
p
a
c
i
t
y

i
n

M
V
A
P
h
a
s
e

d
e
t
a
i
l
s
S
a
n
c
t
i
o
n
e
d

l
o
a
d

i
n

M
V
A
A
v
g
.

D
e
m
a
n
d

i
n

M
V
A
P
r
i
o
r
i
t
y
E
m
e
r
g
e
n
c
y

m
i
n

r
e
q
u
i
e
m
e
n
t

i
f

a
l
l

T
S
S

f
e
d
E
m
e
r
g
e
n
c
y

m
i
n

r
e
q
u
i
e
m
e
n
t

i
f

a
d
j
a
c
e
n
t


T
S
S

f
e
d
DISCOM
C
o
n
t
a
c
t

N
o

o
f

T
P
C
-
C
U
G

M
O
B
Ennore T.P.S
Enore
T.P.S/Ennore
Manali Manali/ETPS
Alamathi --
Sriperumbudur --
Tapping from
Sriprumbudur-
Korattur FDR
--
Mosur --
Sriperumbudur --
4 Vellore 3 Thiruvalam -- Thiruvalam Tiruvalam 2x21.6 B-R 17.4 15.91 A1 11.9 17 TANGEDCO
Chinnavarikkam
Pernambut
Vaduganthangal
Gudiyattam
Periya Paravaikal
Singarpettai --
Vinnamangalam --
Mylapore --
GMR Vasavi --
8 South 3 SP Koil
Singaperumalkoil/
Kadaperi
Tapped Tambaram 2x21.6 R-Y 17.5 16.42 A1+ 12.6 18 TANGEDCO
Acharapakkam --
S.P.Koil --
Neyveli --
Acharappakkam --
Villupuram --
Thiruvannamalai --
3
3
Vellore 3
Thirupattur 2
Thirupattur
North
West
Central
Chengalpattu
Villupuram
Arakkonam-
Jolarpettai
Jolarpettai-
Salem
MRTS
Chennai-
Villupuram
Villupuram-
Trichy
2
3
5.18 7.4 TANGEDCO
2x12.5 B-R 6 5.85 A1 4.2 6 TANGEDCO
2x12.5 Y-B 7.4 7.28 A2
12.6 18 TANGEDCO
2x21.6 B-R 11 9.37 A1+ 7.7 11 TANGEDCO
2x21.6 Y-B 18.4 16.46 A1
13.19 A1
12.6 18 TANGEDCO
2x21.6 R-Y 18.6 16.03 A2 13.3 19 TANGEDCO
2x21.6 R-Y 17.5 15.61 A2
Vinnamangalam
Tiruvalam
9.8 14 TANGEDCO Chennai-Gudur
Avadi Avadi 2x21.6 B-R 22 19.29 A1+ 15.4 22 TANGEDCO
Chennai-
Arakkonam
3 2x21.6 R-Y 14
VIllupuram
Traction Power
Control/Chennai
Phone :044-
25353540,
09003161382
09003161394
09003161381
09003161389
Sr.DEE/TRD/Chenn
ai :044-25355213,
9003161362
3
Details of Traction Substations and Its feeding SEB susbtation over Southern Railway
Vadakathipatti Valathur
Mosur Arakkonam
Tirupattur Tirupattur
Chintadripet Chindatripet
Acharapakkam Acharapakkam
Villupuram
Tapped Ennore 1
2
3
5
6
7
9
10
179 of 206.
SN
R
a
i
l
w
a
y

S
e
c
t
i
o
n
Electric Division
Subs
yste
m
230 kV / 220kV
Feeding Point
110/132 KV
intervening
substation/Tapping
if any
Grid Substation RLY. TSS
T
r
a
n
s
f
o
r
m
e
r

c
a
p
a
c
i
t
y

i
n

M
V
A
P
h
a
s
e

d
e
t
a
i
l
s
S
a
n
c
t
i
o
n
e
d

l
o
a
d

i
n

M
V
A
A
v
g
.

D
e
m
a
n
d

i
n

M
V
A
P
r
i
o
r
i
t
y
E
m
e
r
g
e
n
c
y

m
i
n

r
e
q
u
i
e
m
e
n
t

i
f

a
l
l

T
S
S

f
e
d
E
m
e
r
g
e
n
c
y

m
i
n

r
e
q
u
i
e
m
e
n
t

i
f

a
d
j
a
c
e
n
t


T
S
S

f
e
d
DISCOM
C
o
n
t
a
c
t

N
o

o
f

T
P
C
-
C
U
G

M
O
B
Details of Traction Substations and Its feeding SEB susbtation over Southern Railway
Singarpettai --
Mettur Auto --
Arni --
SPCL --
Singarpettai --
Metturdam
Metturdam/Singar
pettai
13 Salem 2 Nethimedu -- Nethimedu Salem 2x21.6 R-Y 8.8 7.71 A2 6.16 8.8 TANGEDCO
14
Salem-
Metturdam
Metturdam 2
Metturdam Hydro
P.H
Metturdam Hydro
P.H/Metturdam
Hydro
Tapped Metturdam 2x12.5 B-R 6.2 5.33 C 4.34 6.2 TANGEDCO
15 Salem-Erode Metturdam 2 Metturdam -- Sanniyasipatti Sankari Durg 2x21.6 B-R 13 12.03 A1 9.1 13 TANGEDCO
16 Erode 2 Ingur -- Ingur Ingur 2x21.6 R-Y 10.3 9.39 A2 7.21 10 TANGEDCO
17 Coimbatore 2 Arasur Arasur/ Sulur Tapped Sulur Road 2x21.6 Y-B 10.8 10.67 A1 7.56 11 TANGEDCO
Alandur --
Thuvakudi
Bhel EHT
K.Sathanur
19 Perambalur 2 Perambalur -- Koothur Ariyalur 2x21.6 Y-B 6 6.59 A1 4.2 6 TANGEDCO
20 Cudalore 2 Neyveli
Deviyakuruchi/Ney
veli
Tapped Vridhachalam 1x21.6 B-R 5.7 5.53 A2 3.99 5.7 TANGEDCO
Alandur --
Senkurichi
Thamaripadi
Ayyalur
22 Dindigul 1 Sempatti -- Dindigul Dindigul 2x21.6 Y-B 5 0.11 A2 3.5 5 TANGEDCO
Thirupattur 2
Dharmapuri 2
Erode-Podanur
6.51 9.3 TANGEDCO
2x21.6 R-Y 13 11.94 A1 9.1 13 TANGEDCO
2x21.6 B-R 9.3 9.36 A2 Singarpettai Samalpatty
Bommidi Bommidi
Traction Power
Control/ Salem
:Phone : 0427-
2330149,
09003956328
07708017399,
Sr.DEE/TRD/Salem
: 0427-2440084,
9003956325
Jolarpettai-
Salem
11
12
18
Villupuram-
Trichy
Trichy 2 Ambikapuram Trichy 1x21.6 R-Y 6 4.63 A2 4.2 6 TANGEDCO
Traction Power
Control/Trichy :
0431-2412720,
8056064318,
Sr.DEE/TRD/Trichy
: 0431-2414233,
9003864312
Tanjavur
21 Trichy 1 Vaiyampatti Vaiyampatti 1x21.6 R-Y 5 3.54 A1 3.5 5 TANGEDCO
Traction Power
Control/Madurai :
0452-2308033,
8754570625,
DEE/TRD/Madurai :
0452-2308080,
8056162319
Sempatti Trichy-Madurai
180 of 206.
SN
R
a
i
l
w
a
y

S
e
c
t
i
o
n
Electric Division
Subs
yste
m
230 kV / 220kV
Feeding Point
110/132 KV
intervening
substation/Tapping
if any
Grid Substation RLY. TSS
T
r
a
n
s
f
o
r
m
e
r

c
a
p
a
c
i
t
y

i
n

M
V
A
P
h
a
s
e

d
e
t
a
i
l
s
S
a
n
c
t
i
o
n
e
d

l
o
a
d

i
n

M
V
A
A
v
g
.

D
e
m
a
n
d

i
n

M
V
A
P
r
i
o
r
i
t
y
E
m
e
r
g
e
n
c
y

m
i
n

r
e
q
u
i
e
m
e
n
t

i
f

a
l
l

T
S
S

f
e
d
E
m
e
r
g
e
n
c
y

m
i
n

r
e
q
u
i
e
m
e
n
t

i
f

a
d
j
a
c
e
n
t


T
S
S

f
e
d
DISCOM
C
o
n
t
a
c
t

N
o

o
f

T
P
C
-
C
U
G

M
O
B
Details of Traction Substations and Its feeding SEB susbtation over Southern Railway
23
Trivandrum-
Nagerkoil
Nagercoil 1 S.R.Pudur
SR
Pudur/Kodaiyar
Tapped Erniel 1x21.6 R-Y 5 3.11 A2 3.5 5 TANGEDCO
Kalamssery Kodakara
Aluva
Kurmassery
2 Kalamssery Vytilla
Bramhapuram --
26
Ernakulam-
Allepy-
Kayankulam
Alleppy 2 Pallom -- Chengulam Punappara 1x12.5 Y-B 5 4.14 A2 3.5 5 KSEB
27
Ernakulam-
Kottayam-
Kayankulam
Puvanturt 2 Pallom -- Pallom Chingavanam
1x21.6,
1x12.5
R-Y 6 5.87 A1 4.2 6 KSEB
28
Kayankulam-
Kollam
Kundara 2 Kundara -- Kundara Periyanad
1x21.6,
1x12.5
B-R 9 7.78 A2 6.3 9 KSEB
29
Kollam-
Trivandrum
Pothencode 2 Pothencode -- Technopark Kazhakkutam 2x21.6 R-Y 8.5 7 A1 5.95 8.5 KSEB
30 Palakkad 2 Palakkad -- Kanjikode Kanjikode 2x21.6 B-R 12.5 10.63 A2 8.75 13 KSEB
31 Palakkad 2 Shornur -- Shornur Shornur
1x21.6,
1x12.5
Y-B 9.1 8.51 A1 6.37 9.1 KSEB
32 Chennai-Gudur Nellore 1 Manarpoluru Mannarpoluru Mannarpoluru Sullurpeta 2x21.6 Y-B 13 11.91 A2 9.1 13 APTRANSCO
33
Arakkonam-
Renigunta
Tirupathi 1 Renigunta Puttur Puttur Puttur 2x21.6 R-Y 14 12.24 A1 9.8 14 APTRANSCO
Ernakulam Kadavanthara
Podanur-
Soranur
24
Shoranur-
Ernakulam
Trichur 2 Chalakudi Chalakudi 2x21.6 R-Y 8.5 8.82 A2 5.95 8.5 KSEB
Madakkathara
25 Brahmapuram
Traction Power
Control/Palakkad :
Phone :0491-
2552686,
9746740013
Sr.DEE/TRD/Palakk
ad: 0491-2555513,
9746763301
Traction Power
Control/Chennai
Phone :044-
25353540,
09003161382
09003161394
09003161381
09003161389
Sr.DEE/TRD/Chenn
ai :044-25355213,
9003161362
Traction Power
Control/Trivandrum
: 0471-2332482,
0471-2336429,
09567869922
09567869923
09567869946,
DEE/TRD/Trivandru
m:0471-2324446,
9746769351
2x21.6 B-R 8 7.58 A1 5.6 8 KSEB
181 of 206.
SRLDC Black Start Restoration Procedure 2014


S.P.KOIL
VINNAMANGALAM VADAKATHIPATTI VALATHUR
SINGARPETTAI TIRUPATTUR TIRUPATTUR
VINNAMANGALAM
SINGARPETTAI SINGARPETTAI SAMALPATTI
METTUR AUTO
ARNI
SINGARPETTAI BOMMIDI BOMMIDI
NETHIMEDU NETHIMEDU SALEM
METTUR DAM SANNIYASIPATTI SANKARI DRUG
INGUR INGUR
ARASUR SULUR SULUR ROAD
KANJIKODE PALAKKAD
SHORNUR SHORNUR
MADAKKATHARA
CHALAKUDI
KALAMSSERI
BRAMHAPURAM
KADAVANTARA ERNAKULAM KALAMSSERY
PALLOM CHENGULAM PUNAPPARA
PALLOM CHINGAVANAM
KUNDARA PERIYANAD
POTHENCODE TECHNOPARK KAZHZKKUTAM
ERNIEL S.R.PUDUR KODAYAR
ALAMATHI AVADI
SRIPERUMBUDUR
SRIPERUMBUDUR KORATTUR
SRIPERUMBUDUR MOSUR ARAKKONAM
MOSUR
AVADI
TIRUVALAM TIRUVALAM TIRUVALAM
E
N
N
O
R
E

T
.
P
.
S
.
E
N
N
O
R
E
M
A
N
A
P
O
L
U
R
U
ENNORE SULLURPETA
M
A
N
A
L
I

E
T
P
S
R
E
N
I
G
U
N
T
A
PUTTUR
ACHARAPAKKAM ACHARAPAKKAM ACHARAPAKKAM
S.P.KOIL KADAPERI TAMBARAM
ACHARAPAKKAM VILLUPURAM VILLUPURAM
VILLUPURAM
TIRUVANNAMALAI
NEYVELI
VRIDHACHALAM
PERAMBALUR KOOTHUR ARIYALUR
ALANDUR AMBIKAPURAM TRICHY
TANJAVUR K.SATHANUR
ALANDUR VAIYAMPATTI VAIYAMPATTI
SEMPATTI
SEMPATTI DINDIGUL DINDIGUL
NEYVELI
CHENNAI CENTRAL
CHENNAI BEACH
CHENNAI EGMORE
KANNIYAKUMARI
M
Y
L
A
P
O
R
E
C
H
IN
T
A
D
R
IP
E
T
CHINDATRIPET
G
M
R
V
A
S
A
V
I
GRID POWER SUPPLY ARRANGEMENTS FOR TRACTION SUB-STATIONS
OF SOUTHERN RAILWAY
MOSUR
TECHNOPARK
230/110kV SS
110kV SS
RLY. TSS
INDEX
METTUR DAM
M
E
T
T
U
R
D
A
M

H
Y
D
R
O

P
H
M
E
T
T
U
R
D
A
M

H
Y
D
R
O

P
H
Chinnavarikkam Pernambut
Periya Paravaikal Vaduganthangal Gudiyattam THIRUVALAM
SPCL
KODAKARA
ALUVA KURUMASSERY
VYTILLA
Thuvakudi BHEL EHT
Ayyalur Senkurichi Thamaripadi
M
A
N
A
P
O
L
U
R
U
P
U
T
T
U
R
KANJIKODE
SHORNUR
PALLOM
KUNDARA
DEVIAKURICHI
INGUR
METTURDAM SINGARPETTAI
CHALAKUDI
A2 A1
A+
A2
A1
A2
A1
A2
A1
A2
A1
A2
A1
A2
A1
A2
A1
A2
A1
A2
A3
A1
A1+
A1+
A2
A1
A2
A1
A2
A1
A2
A2
A1

182 of 206.
1 2 3 4 5 6 7 8 11 12 13 14 15 16 17 18 19
Sl.
No
Railway section
Electric
Division
/Circle
Subsys
tem No.
220 KV feeding point
132 KV intervining
substation if /132
132 KV tap line
Grid substation
Railway Traction Sub
Station
Transformat
ion capacity
(MVA)
Phase
details
Sanctio-
ned load
in MVA
Average
demand
in MVA
Priority
Emergency
minimum
requirement
MVA if all
substations
are given
Emergency
minimum
requirement
MVA if
alternatvie
substations
are given
DISCOM Traction power control centre
1 Manubolu 220 KV -- 1 x 21.6
1 Sullurpet 220KV Naidupeta 1 x 12.5
2 Nellore 1 Nellore 220 KV -- Brhmadevam Niduguntapalem 1 x 21.6 Y - R 6.00 4.14 A2 3 -- APSPDCL
3 Nellore 1 Nelloe 220 KV -- NTS Padugupadu
1 x 21.6
1 x 12.5
B - Y 14.00 12.61 A2 7 11 APSPDCL
4 Nellore 1 Ongole 220 KV Kandukuru Kavali Kavali 2 x 21.6 R - Y 16.00 14.33 A2 8 -- APSPDCL
5 Ongole 1 Ongole 220 KV -- Ongole Ongole 2 x 21.6 R - B 17.00 16.13 A1 9 13 APSPDCL
1 Paruchuru 220 KV --
1 Tadikonda 220 KV Guntur
7 Guntur 1 Tadikonda 220 KV Guntur Tenali Tenali 2 x 21.6 R - B 15.00 11.55 A1 8 11 APSPDCL
1 Gunadala 220 KV Ganguru/Autonagar
1 Tadikonda 220 KV --
9 Eluru 3 Bhimadolu 220 KV Peddavegi Eluru Vatlur 2 x 21.6 R - Y 16.00 15.71 A2 8 -- APEPDCL
3 Bhimadolu 220 KV --
3 Nidadavolu 220 KV Nidadavolu
11 Rajahmundry 3 Bommuru 220 KV -- Bommuru Rajahmundry
1 x 21.6
1 x 12.5
R - B 12.00 11.67 A1+ 6 -- APEPDCL
Samalkot 220 KV --
Bommuru 220 KV
Parawada 220 KV Koruprolu Payakaro peta Tuni 2 x 21.6 B - Y 15.00 13.27 A2 8 -- APEPDCL
Pendurthi 220 KV -- Kasimkota Anakapalli 2 x 21.6 R - B 14.00 12.71 A1 7 11 APEPDCL
Renigunta 220 KV
Sullurpet 220KV
15 Tirupathi 1 Renigunta 220 KV -- Renigunta Renigunta 2 x 21.6 R - B 18.00 15.61 A1 9 14 APSPDCL
Chinakampalli 220 KV
Renigunta 220 KV
Kadpa 220 KV - Kadapa
Chinakampalli 220 KV Moolavanka RTSS
Kondapuram 220 KV
Gandikota LIS &
Muddanur RTSS
Muddanuru
Yerraguntla 220 KV - RTSS
Kalikiri 220 KV Rompicherla
Renigunta 220 KV Tirupathi & KP Mitta
3
8 APSPDCL
Traction power control /
Guntakal Phone: 08552-
229679, 9701374080
Sr.DEE/Traction/ Guntakal :
08552-220037, 9701374301
2 x 12.5 Y - B 10.00 7.63 A1 5 Tirupathi 1
Renigunta -
Katpadi
19 Pakala Pakala
12.00 9.68 18
Renigunta -
Guntakal
Kadapa 17
A2 6 9 APSPDCL Kadapa 1 Muddanuru 2 x 21.6 R - B
Kadapa 12.00 14.35 A1 6 -- APSPDCL
-- APSPDCL
Kadapa 1
2 x 21.6 B - Y 1
12.00 13.26 A1 16 -- Razampeta 220 KV Razampeta (220 KV) 2 x 21.6 R - Y
Gudur -
Renigunta
14.00 13.08 A2 7 14 Kalahasthi132KV Venkatagiri Venkatagiri 2 x 12.5
8 12 APEPDCL
Nellore 1 B - Y
6 9 APSPDCL
13
Gudur Gudur
6
12 Rajahmundry 3 Peddapuram
Guntur
11.99 A1 7 11
DETAILS OF TRACTION SUBSTATIONS IN SOUTH CENTRAL RAILWAY
Vijayawada-
Visakhapatnam
Traction power control /
Vijayawada Phone: 0866-
2571739, 9701373941,
9701373942
Sr.DEE/TrD/Vijayawada :
08662573117, 9701373330
Samalkot 2 x 21.6 R - Y
APSPDCL
Guntur Bapatla Bapatla 2 x 12.5 Y - B 15.00 9.69 A2 8 -- APSPDCL
Vijayawada -
Chennai
Tadepalli Krishna canal Junction 2 x 21.6 Y - R 18.00 15.36 A1+ 9 14 APSPDCL
Eluru Pedatadepalli Tadepalligudem 2 x 21.6 Y - B 16.00 12.49 A2 8 12 APEPDCL
16.00 14.33 A1
Visakhapa-
tnam
1
8
10
R - B 14.00 Nellore
183 of 206.
Sl.
No
Railway section
Electric
Division
/Circle
Subsys
tem No.
220 KV feeding point
132 KV intervining
substation if /132
132 KV tap line
Grid substation
Railway Traction Sub
Station
Transformat
ion capacity
(MVA)
Phase
details
Sanctio-
ned load
in MVA
Average
demand
in MVA
Priority
Emergency
minimum
requirement
MVA if all
substations
are given
Emergency
minimum
requirement
MVA if
alternatvie
substations
are given
DISCOM Traction power control centre
20 Vijayawada 1 Kondapalli 220 KV Kondapalli Kondapalli 2 x 13.5 B - R 15.00 13.02 A1 8 -- APSPDCL
21 Khammam 1 Chilakallu 220 KV -- Chilakallu Bonakal 2 x 21.6 B - Y 17.00 15.92 A2 9 13 APNPDCL
22 Khammam 3 Budidampadu 220 KV -- Budidampadu Dornakal 2 x 21.6 R - Y 19.00 16.83 A1 10 14 APNPDCL
Sitarampatnam 220 KV --
Budidampadu 220 KV Khammam
Warangal 220 KV
KTPS 132 KV
25 Warangal 2 Warangal 220 KV - Madikonda Kazipet 2 x 21.6 R - Y 15.00 15.39 A1 8 11 APNPDCL
Warangal 220 KV
RTS - B
27 Karimnagar 2 Ramagundam220 KV -- Ramagundam 132 KV Ramagundam
1 x 21.6
1 x 13.5
Y - R 19.00 17.01 A1+ 10 14 APNPDCL
28 Adilabad 2 Ramagundam220 KV -- Bellampalli 132 KV Bellampalli 2 x 21.6 B - Y 15.00 14.98 A1 8 -- APNPDCL
29 Adilabad 2 Ramagundam220 KV Bellampalli 132 KV Sirpur Kagaznagar Sirpur Kagaznagar
1 x 21.6
1 x 13.5
B - R 16.00 15.34 A2 8 12 APNPDCL
Warangal 220 KV
Madikonda &
Dharmasagara '-
Waddekottapally -
Warangal 220 KV Jangaon
Bhongir 220 KV -
32
Ranga Reddy
east
1
Ghanapur 220 KV
(Hyderabad)
-- Ghanapur Ghatkesar 2 x 21.6 R - Y 18.00 16.23 A1 9 14 APCPDCL
Shapur Nagar 220KV --
Gachibowli Erragadda
Tandur 220 KV Pargi
Yeddumailram 220 KV Dharmasagara
35
Ranga Reddy
South
1 Tandur 220 KV -- Tandur Tandur 1 x 21.6 R - Y 10.00 9.70 A2 5 8 APCPDCL
-- 1 Gooty 220 KV SS -
1 Gooty 220 KV RS -
-- Tadipatri 220 KV -
Gooty 220Kv RS
Gudipadu &
Ankireddy palli
A2 5 -- APCPDCL
1
APCPDCL
B - R 10.00 10.28
Ranga Reddy
South
1 34
Vikarabad
RTSS
Vikarabad 2 x 21.6
B - Y 15.00 14.19 A1 8 11 33
Hyderabad
(HDN)
1 Sanath Nagar Sanath Nagar 2 x 21.6
16.00 17.53 B 8 12 APCPDCL
11.87 A2 6 -- APNPDCL
Nalgonda 2 Aler 132 KV Aler 2 x 21.6
9 APNPDCL
Warangal 2 30 Raghunathpalli132KV Ghanpur 2 x 21.6 Y - B 12.50
2 x 21.6 Y - B 14.00 12.49 A2 7 Karimnagar 2/3 26 - Jamikunta Jamikunta
TPC / Secunderabad 040-
27823137, 9701371347,
9701371346, 9701371348
Sr.DEE/Trd/Secund-erabad :
040-27833031, 9701371301
2/3
9.68 A1 6 6 APNPDCL
R - B 14.00 12.73 24
23
- Nekkonda Nekkonda 2 x 13.5
Vijayawada -
Kazipet
Warangal A2 7 -- APNPDCL
Khammam 3 Kothagudam RTSS Badhrachalam Road 2 x 21.6 Y - B 12.00
Gooty
37
TPC / Secunderabad 040-
27823137, 9701371347,
9701371346, 9701371348
Sr.DEE/TRD/Secund-erabad :
040-27833031, 9701371301
NOTE 1. Komali and Gooty TSS are upcoming TSSs in Andhra pradesh which are yet to be commissioned.
--
Renugunta -
Guntakal
Gooty RTSS
31 R - B
Kazipet -
Ballarsha
Kazipet-
Secunderabad-
wadi
2X21.6 R - B 10.00 36 A2 5 -- APCPDCL Traction power control /
Guntakal Phone: 08552-
229679, 9701374080
Sr.DEE/TR/Guntakal : 08552-
220037, 9701374301
APCPDCL 5 8 Komali Komali 2X21.6 R - B 10.00 A2 --
184 of 206.
SRLDC Black Start Restoration Procedure 2014


T
U
N
I

V
A
T
L
U
R
T
A
D
E
P
A
L
L
I
G
U
D
E
M
GUDUR
KATPADI
VENKATAGIRI
R
A
J
A
M
P
E
T
220/132 kV RENIGUNTA
PAKALA
VENKATAGIRI
KAVALI
NELLORE
CHENNAI
NIDIGUNTAPALEM
KAVALI
TADEPALLI
TENALI
BAPATLA BAPATLA
TRACTION SUB-STATION
132kV GRID SUB-STATIONS
220kV GRIDSUB-STATIONS
GRID POWER SUPPLY ARRANGEMENTS FOR TRACTION SUB-STATIONS
OF SOUTH CENTRAL RAILWAY IN ANDHRA PRADESH
G
H
A
N
P
U
R

A
L
E
R

WADI
2
2
0
/
1
3
2

k
V

G
H
A
N
A
P
U
R

(
H
Y
D
E
R
A
B
A
D
)


NEKKONDA
BONAKALU
NEKONDA
220/132 kV RAMAGUNDAM
MADIKONDA
JAMIKUNTA JAMIKUNTA
SIRPUR -
GADCHANDUR (MAHARASTRA)
SIRPUR KAGHAZNAGAR

BELLAMPALLI

WIRUR

BALHARSHAH
VISAKHAPATNAM
KOTHAGUDAM RTSS
T
A
N
D
U
R
2
2
0

k
V

/
1
3
2

k
V

T
A
N
D
U
R
V
I
K
A
R
A
B
A
D

T
A
N
D
U
R

TSS/GSS AS ON 08-10-2013(To SRPC)

S
A
N
A
T
H
N
A
G
A
R

A
L
E
R

R
A
G
H
U
N
A
T
H
-

-
P
A
L
L
I
KAGHAZNAGAR
BHADRACHALAM ROAD
220/132 kV BUDIDAMPADU
220/132 kV CHILLAKALLU

E
L
U
R
U
P
E
D
A
T
A
D
E
P
A
L
L
I
2
2
0
/
1
3
2

k
V

B
O
M
M
U
R
U

P
E
D
A
P
U
R
A
M
P
A
Y
A
K
A
R
A
O
P
E
T
A
K
A
S
I
M
K
O
T
A

K
A
D
A
P
A


R
T
S
S
KALAHASTHI
MANUBOLU
BRAHMADEVAM
ONGOLE
220/132 kV ONGOLE
PARUCHURU
GUNTUR TADIKONDA
GANGURU / AUTO NAGAR
220 kV / 132 kV KONDAPALLI
SITARAMPATNAM
WARANGAL
RTS-B
RAMAGUNDAM
BELLAMPALLI

RAMAGUNDAM

B
H
I
M
A
D
O
L
U
S
A
M
A
L
K
O
T
P
A
R
A
W
A
D
A
P
E
N
D
U
R
T
H
I
C
H
I
N
K
A
M
P
A
L
L
Y

W
A
R
A
N
G
A
L
S
H
A
P
U
R

N
A
G
A
R

M
U
D
D
A
N
U
R
U
K
O
M
A
L
I
G
O
O
T
Y


G
O
O
T
Y

R
T
S
S
T
A
D
I
P
A
T
R
I
2
2
0
/
1
1
0

k
V

S
E
D
A
M
(
K
A
R
N
A
T
A
K
A
)
M
A
L
K
H
A
I
D

R
O
A
D

WIRUR T SS LOCATED TO MAHARASHTRA
MALKHAIDROAD T S S (110 kV) LOCATED INKARNATAKA
KOMALI & GOOTY T SS s ARE YET TO BE COMMISSIONED
GUNTAKAL
INDEX:
NTS PADUGUPADU NELLORE
VIJAYAWADA
RENIGUNTA
ROMPICHERLA
MITTA
KALIKIRI
SULLURPET
RENIGUNTA
NAIDUPETA SULLURPET
KANDUKURU
GUNTUR TADIKONDA
GUNADALA
TADIKONDA
P
E
D
D
A
V
E
G
I
N
I
D
A
D
A
V
O
L
U

N
I
D
A
D
A
V
O
L
U
B
O
M
M
U
R
U
K
O
R
U
P
R
O
L
U
R
E
N
I
G
U
N
T
A
K
A
D
A
P
A
M
O
O
L
A
V
A
N
K
A
C
H
I
N
K
A
M
P
A
L
L
Y


M
U
D
D
A
N
U
R
U

R
T
S
S

G
A
N
D
I
K
O
T
A

L
I
S
Y
E
R
R
A
G
U
N
T
L
A
K
O
N
D
A
P
U
R
A
M

K
O
M
A
L
I
\
p
t
4
5
;
G
U
D
I
P
A
D
U

&

A
N
K
I
R
E
D
D
Y

P
A
L
L
I
G
O
O
T
Y

R
S

G
O
O
T
Y

S
S

G
O
O
T
Y

R
S
KTPS
KHAMMAM BUDIDAMPADU
M
A
D
I
K
O
N
D
A

&

D
H
A
R
M
A
S
A
G
A
R
A
W
A
D
D
E
K
O
T
A
P
A
L
L
Y

J
A
N
G
A
O
N
B
H
O
N
G
I
R
E
R
R
A
G
A
D
D
A
G
A
C
H
I
B
O
W
L
I
V
I
K
A
R
A
B
A
D

R
T
S
S
P
A
R
I
G
I
D
H
A
R
M
A
S
A
G
A
R
A
Y
E
D
D
U
M
A
I
L
A
R
A
M
WARANGAL
WARANGAL

B
H
I
M
A
D
O
L
U
W
A
R
A
N
G
A
L
A
2
A
2
A
1
A
1
A
2
A
2
A
2
A
1
A
1
A1
A2
A1
A1
A1
A1
A1
A1
A
A2
A
2
A
1
A
1
A1
A2
A2
A+
RAMAGUNDAM
A
2
A
2
A
2
A2
A2
A2
A2
A
2
A
2
A+
A
+
R
A
J
A
H
M
U
N
D
R
Y
KRISHNACANAL JN.
S
A
N
A
T
N
A
G
A
R

G
H
A
T
K
E
S
A
R

BELLAMPALLI

KAZIPET
DORNAKA
L
A2
KONDAPALLI
TENALI
ONGOLE
GUDUR
S
A
M
A
L
K
O
T
A
N
A
K
A
P
A
L
L
I
R
A
Z
A
M
P
E
T
A

K
A
D
A
P
A

PAKALA
A1
RENIGUNTA
185 of 206.
S.No.
Railway
section
Sub
system
No.
Electric
Division/
Circle
220 KV
feeding
point
132 KV
intervining
substation if
132 KV tap line
Grid
substation
RTSS
Transformati
on capacity
(MVA)
Phase
details
Sanc-
tioned
load in
MVA
Average
demand in
MVA
Priority
Emergency
minimum
requirement
MVA if all
substations
are given
Emergency
minimum
requirement
MVA if
alternative
substations
are given
Source of
supply
Controled by
1
Khurda-
Palasa
3 Srikakulam Tekkali - Palasa Baruva 1X21.6 R-B 14 14.2 A2 7 14 APEPDCL
Traction power
control/ Kurdha-
Road, 0674-2491538
2 3 Garividi Tekkali - Tekkali Naupada 2X21.6 Y-B 13 13.8 A1 7 13 APEPDCL
Tekkali - Tekkali 1X21.6
Garividi
Pydi
Bhimavaram
C.K.Palem 1X12.5
Garividi -
Pendurthy
Goldstar &
TB Vara
Ontithadi
Pendurthy - 1X21.6
Gajuwaka 1X12.5
Gajuwaka -
Pendurthy
Simhachalam &
ACC
Pendurthy Goldstar 1X13.5
Garividi - 1x12.5
Garividi T.B.Vara
Pendurthy
Goldstar & TB
Vara
Garividi T.B.Vara
Pendurthy
Goldstar & TB
Vara
Garividi T.B.Vara
Pendurthy
Goldstar & TB
Vara
A1 8 15 APEPDCL
5
Duvvadda
Simha-
chalam
APEPDCL R-Y 15
11 APEPDCL
4 3 Vizia-nagaram
Vizia-
nagaram
2 x 21.6 R-Y 15 15.6
DETAILS OF TRACTION SUBSTATIONS IN EAST COAST RAILWAY
Garividi 3 3 Ponduru Y-B 11 11.5 A2 6
14.7 A1 8 15
Visakha
patnam
3 5 9 6
Pasala-
Duvadda
VSEZ
3
Visahka
patnam
Simha
chalam
7.5 APEPDCL T.B.Vara
2X21.6 R-Y 9 9.5 A2 APEPDCL
8.6 7 3 Paaderu
Srungavarap
ukota (SKT)
Y-B 7.5 A2 4
9
3 Paaderu Araku
Kottavalsa-
Koraput
10 3 Paaderu Araku
Tyada 2X12.5 B-R 13.5 13.4 8
13 11.4 A2 7 13 B-R APEPDCL
A1 7 13.5 APEPDCL
3 Paaderu Araku Similiguda 2X12.5
A1 5 9 APEPDCL
Traction power
control /Visakha-
patnam, 0891-
2746245, 0891-
2705812
Gorapur 1X12.5 R-Y 9 8.8
186 of 206.
SRLDC Black Start Restoration Procedure 2014


ONTITHADI VIZIANAGARAM
PENDURTHY
SIMHACHALAM
SIMHACHALAM NORTH
GAJUWAKA
DUVVADDA
PALASA
TEKKALI TEKKALI NAUPADA
BARUVA
PONDURU
220 KV SS
132 KV SS
RAILWAY TSS
INDEX
PENDURTHY TB VARA
GARIVIDI
A2
A1
A2
A1
A1
A2
CHILAKALAPALEM GARIVIDI
TEKKALI
PYDI BHIMAVARAM
VSEZ PENDURTHY
GAJUWAKA
SIMHACHALAM&
ACC
HOWRAH
GORAPUR
SIMILIGUDA
TYADA
T.B. VARA S. KOTA
A1
A2
A1
A2
KIRANDUL
GOLDSTAR
ARAKU
ARAKU T.B.VARA
GOLDSTAR
& T.B.VARA
ARAKU GARIVIDI
PENDURTHY
T.B.VARA
GOLDSTAR
& T.B.VARA
KOTTAVALASA
GARIVIDI
PENDURTHY
T.B.VARA
GOLDSTAR
& T.B.VARA
GARIVIDI
PENDURTHY
PENDURTHY
GARIVIDI
CHENNAI
GRID POWER SUPPLY ARRANGEMENTS FOR TRACTION SUB-STATIONS
OF EAST COAST RAILWAY IN APEPDCL AREA
TEKKALI

187 of 206.
S.No. Railway section
Electric
Division/
Circle
Sub
system
No.
220 KV
feeding
point
132 KV
intervining
substation
if 132 KV
tap line
Grid
substation
Railway
Traction
Sub
Station
Transfor
mation
capacity
(MVA)
Phase
details
Sanc-
tioned
load in
MVA
Average
demand
in MVA
Priority
Emergency
minimum
requirement
MVA if all
substations are
given
Emergency
minimum
requirement
MVA if
alternative
substations are
given
Source of
supply
Controled by
1 Jolarpet-Bangalore Hoody 1 Hoody 220 - Hoody 220 Whitefield 2 X 20 R-Y 8.5 8 A2 5 8.5 BESCOM
2 Jolarpet-Bangalore Kolar 1 Kolar 220 - Kolar 220 Bangarpet 2 X 20 R-Y 14 13 A1 10 14 BESCOM
DETAILS OF TRACTION SUBSTATIONS IN SOUTH WESTEREN RAILWAY
TPC/Bangalore,
080-22871334 ,
973166350
188 of 206.
SRLDC Black Start Restoration Procedure 2014


KOLAR BANGARPET (A1)
Bangalore
GRID POWER SUPPLY ARRANGEMENTS FOR TRACTION SUB-STATIONS
OF SOUTH WESTERN RAILWAY
HOODY 230kV SS
RLY. TSS
INDEX
Jolarpet
WHITEFIELD (A2) HOODY
189 of 206.
1 2 3 4 5 6 7 8 11 12 13 14 15 16 17 18 19
Sl.
No
Railway
section
Electric
Division
/Circle
Subsys
tem No.
220 KV feeding point
132 KV intervining
substation if /132
132 KV tap line
Grid substation
Railway Traction Sub
Station
Transforma
tion
capacity
(MVA)
Phase
details
Sanctio-
ned load in
MVA
Average
demand
in MVA
Priority
Emergency
minimum
requirement
MVA if all
substations
are given
Emergency
minimum
requirement
MVA if
alternatvie
substations
are given
DISCOM Traction power control centre
Hoody 220 kV -- Hoody 66kV
HAL 220 kV HAL 66kV
-- SRS Peenya 66kV
Welcast 66kV
Subramanyapura 220 kV -- Subramanyapura 66kV
Sommanahalli 220 kV Khoday RS 66kV
Vrushbavathi 220 kV -- Vrushbavathi 66kV
NRS 220 kV NRS 66kV
Remarks Any single source is required. At present both substations are required
* Yet To be commissioned
DETAILS OF TRACTION SUBSTATIONS IN BMRCL
1
Byappanhalli -
Mysore Road
HOODY 1 Byappanahalli 2 x 25 3 phase 4.00 2.00 A 1 1 BESCOM
Traction power control /
Phone: 080-25191075,
DGM/Trd 9448287995
2
Jalahalli -
Puttenahalli
Peenya 1 SRS Peenya 220 kV Peenya 2 x 25 3 phase 4.00 2.00 A 1 1 BESCOM
Traction power control /
Phone: 080-25191075,
DGM/Trd 9448287995
3
Jalahalli -
Puttenahalli
Peenya 1 *Puttenahalli 2 x 25 3 phase 4.00 2.00 A 1 1 BESCOM
Traction power control /
Phone: 080-25191075,
DGM/Trd 9448287995
4
Byappanhalli -
Mysore Road
Peenya 1 *Mysore Road 2 x 25 3 phase
Traction power control /
Phone: 080-25191075,
DGM/Trd 9448287995
4.00 2.00 A 1 1 BESCOM
190 of 206.
SRLDC Black Start Restoration Procedure 2014


HOODY 220 / 66KV BYAPPANAHALLI(A1)
MYSORE ROAD
GRID POWER SUPPLY ARRANGEMENTS FOR TRACTION SUB-STATIONS
OF BMRCL
HOODY 220kV SS
RLY. TSS
INDEX
BYAPPANAHALLI
HAL 220 / 66KV
VRISHBAVATHI 220 / 66KV
JALAHALLI R V ROAD
WELCAST 66KV
SRS PEENYA 220 / 66KV
SOMMANAHHALY 220
S R PURA 220 / 66KV
KHODAY RS 220 / 66KV
PEENYA 220
NRS 220 / 66KV
*MYSORE ROAD(A1)
*PUTTENAHALLI(A1) PEENYA(A1)
* Yet To be commissioned


191 of 206.
SRLDC Black Start Restoration Procedure 2014



ANNEXURE-I

LIST OF POWER STATIONS WITH BLACK START FACILITY:

ANDHRA PRADESH

POWER
STATION
INSTALLED
CAPACITY
UNIT
TYPE
START UP FACILITY SYNCHRONISIN
G FACILITY
SOURCE
CAPACIT
Y (MW) (YES/NO)
N'SAGAR 1*110+7*100.8 HYDRO DG SET 250 KVA YES
SRISAILAM
RB 7*110 HYDRO DG SET 800 KVA YES
LOWER
SILERU 4*115 HYDRO DG SET 250 KVA YES
MACHKUND
70%(3*23+3*1
7) HYDRO DG SET 250 KVA YES
T.B.DAM 80%(4*9+ 4*9) HYDRO
HOUSE
SET 350 KVA YES
UPPER
SILERU 4*60 HYDRO DG SET 250 KVA YES
SRISAILAM
LB 6*150 HYDRO DG SET
2*1000
KVA YES
JURALA 39*6 HYDRO YES
GMR BARGE 237 NAPTHA YES


KARNATAKA
POWER
STATION
INSTALLED
CAPACITY
UNIT
TYPE
START UP FACILITY SYNCHRONISIN
G FACILITY
SOURCE
CAPACIT
Y (MW) (YES/NO)
SHARAVATHY 10*103.5 HYDRO DG SET 437.5 KVA YES
VARAHI 4*115 HYDRO DG SET 625 KVA YES
KADRA 3*50 HYDRO DG SET 625 KVA YES
KODASALLI 2*40 HYDRO DG SET 400 KVA YES
NAGJHARI
1 *135 +
5 *150 HYDRO DG SET 625 KVA YES
GHATAPRABH
A 2*16 HYDRO DG SET 310 KVA YES
SUPA 2*50 HYDRO DG SET 310 KVA YES
LINGANAMAK
KI 2*27.5 HYDRO DG SET 312 KVA YES
MALLAPUR 2*4.5 HYDRO DG SET 35 KVA YES
STRP 4*60 HYDRO DG SET 600 KVA YES
ALMATTI 1*15+5*55 HYDRO DG SET 600 KVA YES
YELEHANKA 6*21.32 DIESEL DG SET 750 KVA YES
TATA POWER 16.26 * 5
HFO,
DIESEL DG SET 250 KVA YES

192 of 206.
SRLDC Black Start Restoration Procedure 2014






KERALA

POWER
STATION
INSTALLE
D
CAPACIT
Y
UNIT
TYPE
START UP FACILITY
SYNCHRONISIN
G FACILITY
SOURCE
CAPACIT
Y
(MW) (YES/NO)
KUTTIADI
+KAES
3*25+1*50
+2*50 HYDRO DG SET 160 KVA YES
SHOLAYAR 3*18 HYDRO DG SET 25KVA YES
NERIMANGALA
M 3*15 HYDRO DC START YES
L.PERIYAR 3*60 HYDRO DG SET 250KVA YES
IDUKKI 6*130 HYDRO DG SET 310KVA YES
KDPP 8*16 LSHS DG SET 500KVA YES
RGCCPP
2*115+1*1
30 NAPHTHA DG SET 3MW YES
BSES
3*43.5+1*3
5.5 NAPHTHA DG SET
1325KVA*
2 YES

TAMIL NADU

POWER
STATION
INSTALLED
CAPACITY
UNIT
TYPE
START UP FACILITY SYNCHRONISIN
G FACILITY
SOURCE
CAPACIT
Y (MW) (YES/NO)
KUNDAH-4 2*50 HYDRO DIESEL 100 KVA YES
KUNDAH-6 1*30 HYDRO DIESEL 100 KVA YES
METTUR DPH 2*12.5+2*10 HYDRO DIESEL * 375 KVA YES
ALIYAR 1*60 HYDRO DIESEL 30 KVA YES
PERIYAR
2*42 +
1*42(UNDER
PROGRESS) +
1* 35 HYDRO
(MACHINE 1,2,3
SEPARATELY EXCITED)
MACHINE 4 (OLD) SELF
EXCITEDE YES
PAPANASAM 4*8 HYDRO DIESEL 125 KVA YES
SERVALAR 1*20 # HYDRO DIESEL 250 KVA YES
KODAYAR 1 1*60 HYDRO SELF EXCITED YES
KODAYAR 2 1*40 HYDRO SELF EXCITED YES
SARKARPATHY 1*30 HYDRO DIESEL 100 KVA YES
PUSHEP 3*50 HYDRO DIESEL 2*500 KVA YES
BASIN BRIDGE 4*30 GAS DIESEL 500 KVA YES
SAMALPATTY 7*15 DIESEL DIESEL 500 KVA YES
GMR VASAVI 4*50 DIESEL DIESEL 2250 KVA YES


193 of 206.
SRLDC Black Start Restoration Procedure 2014


ANNEXURE-II

LIST OF MAJOR SUB-STATIONS WITH SYNCHRONISING FACILITY:


ANDHRA PRADESH

SUB STATION
VOLTAGE LEVEL
(KV)
SYNCHRONISING
FACILITY YES/NO
Mydukur 220 YES
Kondapalli 220 YES
Gooty 220 YES
Nunna 220 YES
Garividi 220 YES
Markapur 220 YES
Ongole 220 YES
Somayajulapalli 220 YES
Thallapalli 220 YES
Malkaram 220 YES
222 KV Shapurnagar 220 YES
222 KV Dindi 220 YES
Miryalaguda 220 YES
Budidampadu 220 YES
Dichpalli 220 YES
Kalwakurthy 220 YES
Tadikonda 220 YES
Bommuru 220 YES
Nidadavole 220 YES
Podili 220 YES
Chandrayangutta 220 YES
Bhongiri 220 YES
Narketapalli 220 YES
Samarlakota 220 YES
All 400KV Station 400 YES




194 of 206.
SRLDC Black Start Restoration Procedure 2014



KARNATAKA
SUB STATION
VOLTAGE LEVEL
(KV)
SYNCHRONISING
FACILITY YES/NO
HOODY 400/220 YES
HOODY 220 YES
NELAMANGALA 400/220 YES
RTPS 400/220 YES
TALAGUPPA 400/220 YES
KADAKOLA 220 YES
YERANDANAHALLY 220 YES
SHIMOGA 220 YES
BIDNAL 220/110 YES
KEMAR 220 YES
BELGAUM 220 YES
BAGALKOTE 220 YES
PEENYA 220 YES
LINGAPURA 220 YES
AMBEWADI 220 YES
BBAGEWADI 220 YES
LINGASUGUR 220 YES
GUTTUR 220 YES
MAHALINGAPUR 220 YES

KERALA

SUB STATION
VOLTAGE LEVEL
(KV)
SYNCHRONISING
FACILITY YES/NO
AREACODE 220 YES
NALLALAM 220 YES
MADAKKATHARA 220 YES
CHALAKUDY 110 YES
PALLOM 220 YES
NEW PALLOM 220 YES
BRAHMAPURAM 220 YES
KAYAMKULAM 220 YES
KALAMASSERY 220 YES
MUVATTUPUZHA 110 YES
POTHENCODE 220 YES
THALIPPARAMBA 220 YES
KANHIRODE 220 YES
EDAPPON 220 YES
KANIYAMPET 220 YES





195 of 206.
SRLDC Black Start Restoration Procedure 2014


TAMIL NADU
SUB STATION
VOLTAGE LEVEL
(KV)
SYNCHRONISING
FACILITY YES/NO
ACHARAPAKKAM 230 YES
ALAGARKOIL 230 YES
ALUNDUR 230 YES
AMUTHAPURAM 230 YES
ANUPPANKULAM 230 YES
ARANI 230 YES
ARASUR 230 YES
BASIN BRIDGE 230 YES
CHECKANOORANI 230 YES
CUDDALORE 230 YES
DEVIAKURICHY 230 YES
EACHANGADU 230 YES
GOBI 230 YES
GUMMIDIPOONDI 230 YES
HOSUR 230 YES
INGUR 230 YES
K.R. THOPPUR 230 YES
KADALANGUDI 230 YES
KADAPERI 230 YES
KARAIKUDI 230 YES
KARIAMANGALAM 230 YES
KAVANOOR 230/110 YES
KAYATHAR 230 YES
KILPAUK 230 YES
KODIKURUCHI 230 YES
KORATTUR 230 YES
KOYAMBEDU 230 YES
MAMBAKKAM (SIPCOT) 230 YES
MANALI 230 YES
METTUR 230 YES
MOSUR 230 YES
MYLAPORE 230 YES
NOKIA 230 YES
NEMMELI THIPPAYAKUDI 230 YES
OK MANDAPAM 230 YES
ORAGADAM 230 YES
PALLADAM 230 YES
PASUMALAI 230 YES
PERAMBALUR 230 YES
PONNAPURAM 230 YES
PUDHANSANDHAI 230 YES
PUDUKOTTAI 230 YES
PUGALUR 230 YES
RENGANATHAPURAM 230 YES

196 of 206.
SRLDC Black Start Restoration Procedure 2014



SUB STATION
VOLTAGE LEVEL
(KV)
SYNCHRONISING
FACILITY YES/NO
S.P. KOIL 230 YES
S.R.PUDUR 230 YES
SALEM 230 YES
SAMAYAPURAM 230 YES
SANGANERI 230 YES
SEMBATTY 230 YES
SINGARAPET 230 YES
SIRUSERI 230 YES
SRIPERUMBUDUR 230 YES
TARAMANI 230 YES
THANJAVUR 230 YES
THENI 230 YES
THIRUVANNAMALAI 230 YES
THIRUVARUR 230 YES
TONDIARPET 230 YES
TRICHY 230 YES
TUTICORIN AUTO 230 YES
TUTICORIN SIPCOT 230 YES
UDAYATHUR 230 YES
UDUMALPET 230 YES
UNJANAI 230 YES
VALUTHUR 230/110 YES
VEERANAM 230 YES
VILLUPURAM 230 YES
VINNAMANGALAM 230 YES
THIRUVALAM 230 YES

197 of 206.
SRLDC Black Start Restoration Procedure 2014


ANNEXURE-III
LIST OF RAILWAY TRACTION STATIONS

Sl. No. NAME OF TSS AGENCY
1 Gudur APTRANSCO
2 Niduguntapalem APTRANSCO
3 Padugupadu APTRANSCO
4 Kavali APTRANSCO
5 Ongole APTRANSCO
6 Bapatla APTRANSCO
7 Tenali APTRANSCO
8 Krishna canal Junction APTRANSCO
9 Vatlur APTRANSCO
10 Tadepalligudem APTRANSCO
11 Rajahmundry APTRANSCO
12 Samalkot APTRANSCO
13 Tuni APTRANSCO
14 Anakapalli APTRANSCO
15 Venkatagiri APTRANSCO
16 Renigunta APTRANSCO
17 Razampeta (220 KV) APTRANSCO
18 Kadapa APTRANSCO
19 Muddanuru APTRANSCO
20 Pakala APTRANSCO
21 Kondapalli APTRANSCO
22 Bonakal APTRANSCO
23 Dornakal APTRANSCO
198 of 206.
SRLDC Black Start Restoration Procedure 2014


Sl. No. NAME OF TSS AGENCY
24 Gudur APTRANSCO
24 Badhrachalam Road APTRANSCO
25 Nekkonda APTRANSCO
26 Kazipet APTRANSCO
27 Jamikunta APTRANSCO
28 Ramagundam APTRANSCO
29 Bellampalli APTRANSCO
30 Sirpur Kagaznagar APTRANSCO
31 Ghanpur APTRANSCO
32 Aler APTRANSCO
33 Ghatkesar APTRANSCO
34 Sanath Nagar APTRANSCO
35 Vikarabad APTRANSCO
36 Tandur APTRANSCO
37 Gooty APTRANSCO
38 Komali APTRANSCO
39 Sullurpet APTRANSCO
40 Puttur APTRANSCO
41 Baruva APTRANSCO
42 Naupada APTRANSCO
43 Ponduru APTRANSCO
44 Vizia-nagaram APTRANSCO
45 Simha- chalam APTRANSCO
46 Duvvadda APTRANSCO
47 Srungavarapukota (SKT) APTRANSCO
199 of 206.
SRLDC Black Start Restoration Procedure 2014


Sl. No. NAME OF TSS AGENCY
48 Tyada APTRANSCO
49 Similiguda APTRANSCO
50 Gorapur APTRANSCO
51 Whitefield KPTCL
52 Bangarpet KPTCL
53 Byappanahalli KPTCL
54 Peenya KPTCL
55 Chalakudi KSEB
56 Ernakulam KSEB
57 Punappara KSEB
58 Chingavanam KSEB
59 Periyanad KSEB
60 Kazhakkutam KSEB
61 Kanjikode KSEB
62 Shornur KSEB
63 Ennore TANTRANSCO
64 Avadi TANTRANSCO
65 Arakkonam TANTRANSCO
66 Tiruvalam TANTRANSCO
67 Valathur TANTRANSCO
68 Tirupattur TANTRANSCO
69 Chindatripet TANTRANSCO
70 Tambaram TANTRANSCO
71 Acharapakkam TANTRANSCO
200 of 206.
SRLDC Black Start Restoration Procedure 2014



Sl. No. NAME OF TSS AGENCY
72 VIllupuram TANTRANSCO
73 Samalpatty TANTRANSCO
74 Bommidi TANTRANSCO
75 Salem TANTRANSCO
76 Metturdam TANTRANSCO
77 Sankari Durg TANTRANSCO
78 Ingur TANTRANSCO
79 Sulur Road TANTRANSCO
80 Trichy TANTRANSCO
81 Ariyalur TANTRANSCO
82 Vridhachalam TANTRANSCO
83 Vaiyampatti TANTRANSCO
84 Dindigul TANTRANSCO
85 Erniel TANTRANSCO

201 of 206.
SRLDC Black Start Restoration Procedure 2014


ANNEXURE -IV
Mock drill for startup power to Simhadri STPS


1. Name of Power Utility/Generating Station : Simhadri TPS

2. Date / Time of Mock-drill : 04.08.13 / 09:30 Hrs

3. Location site of Mock-drill : Simhadri TPS / Gazuwaka HVDC
4. Observers :
1. General Manager, NTPC
2. Shift-in-charge, Simhadri, NTPC
3. Shift-in-charge of SRLDC & ERLDC
4. DGM(OS) SRLDC,POSOCO
5. SE,APTRANSCO
5. Scenario of mock emergent situation :
Extending start up power to Simhadri TPS during Complete black out of AP / SR

6. Objective : Availing start-up power from Eastern region through AC By-Pass at HVDC
Gazuwaka

7. Chronological order of events logged :

09:41 Code received for Power flow reduction from 600MW to 400MW made
09:45 Power flow reduced from 600MW to 400MW &
East bus voltage increased from 388kV to 392kV
09:47 Code received for Power flow reduction from 400MW to 200MW made
09:51 Simhadri confirmed that all LT side isolation has been completed as well as
opening of 400kV bus sectionaliser for Bus # 4
09:52 Power flow reduced from 400MW to 200MW &
East bus voltage increased from 393kV to 404kV
10:07 Code for commencement of Black Start Mock exercise received.
SRLDC Code: 90, ERLDC Code: 108 & NLDC Code: 29
10:09 Instruction given for tripping of Jeypore Gajuwakha 400kV line # 2 and by-
pass FSC at Jeypore.
Convert L/R in to B/R at Gajuwakha
Voltage observed at south Bus is 416kV & at East bus is 404kV
10:21 Jeypore Gajuwakha 400kV line # 2 H/T from Gajuwakha end.

On receipt of instruction at 10:09hrs, Jeypore took action for by-passing FSC
and then trip from Jeypore end. However, as the time taken was more,
jeypore was advised to clear the working personal from switchyard and the
line was tripped from Gajuwakha end. Subsequently Jeypore was asked to by-
pass the FSC.
10:22 Instruction given for reducing HVDC power flow from 200MW 0MW
10:22 HVDC Pole 2 blocked and connected filters are removed
East Bus Voltage observed was 393kV
10:25 Power flow reduced from 200MW to 0MW &
East bus voltage increased from 393kV to 412kV
10:27 HVDC Pole 2 blocked and connected filters are removed
East Bus Voltage observed was 393kV
202 of 206.
SRLDC Black Start Restoration Procedure 2014


10:27 Gajuwakha Simhadri 400kV line H/T from Gajuwakha end &
Activities for isolation of South Bus I started.
10:27 NTPC Simhadri Bus Section # 4 got isolated from SR grid
10:28 Line Reactor of Jeypore Gajuwakha line # 2 at Gajuwakha has been
converted as Bus Reactor.
East bus Voltage at has got reduced from 412kV to 395kV
10:33 South Bus I isolation completed (Breaker operations) and voltage become
Zero
South Bus 2 voltage observed was 415kV
East Bus voltage remain around 395kV
10:53 AC by-pass isolator at HVDC Vizag closed after ensuring opening of all the
isolators of both the pole 1 & 2 of HVDC
10:54 South Bus I charged with ER supply from East bus
East bus / South Bus I voltage observed was 397kV
10:56 Gajuwakha Simhadri I charged from Gajuwakha end extending ER power
to NTPC Simhadri.
Open end voltage observed at Simhadri was 386kV
10:56 The L/R of Jeypore Gajuwakha line # 2 (converted as B/R) was taken out for
improving the voltage profile.
The voltage increased from 390kV to 402kV
10:59 After checking voltage & sequence, Simhadri Bus # 4 energised with ER
supply through synchronization of Gajuwakha Simhadri 400kV line # 1
11:05 As the voltage at Simhadri bus # 4 was varying around 400kV and putting of
high inductive pump load may decrease the voltage significantly, NTPC
simhadri requested for increasing the voltage around 410kV.
11:06 Filter bank of 110MVAR and Bus Reactor of 80MVAR taken in to service at
HVDC Vizag. This has given a net effect of about 30MVAR capacitance to the
South Bus I.
The voltage variation during this operation are 402kV 429kV 410kV.
Subsequently the voltage stabilized around 408kV
11:08 NTPC Simhadri has taken the station transformer # 1 in to service with Bus
Section # 4
11:11 NTPC Simhadri connected the Pump load and started to draw about 5MW
11:21 The drawal of NTPC Simhadri increased in steps to 9MW 10MW. During this
time momentarily the drawal has touched 12MW whle starting-up the pump.
11:30 Instruction given to NTPC Simhadri for withdrawing the loads in steps
11:30 SRLDC was requested code for normalizing the Black Start Mock Exercise.
11:33 Drawal of NTPC Simhadri reduced to 5MW level
11:36 Drawal of NTPC Simhadri became Zero
11:40 Code for Normalisation of Mock Exercise Received
SRLDC Code: 92, ERLDC Code: 112 & NLDC Code: 30
11:41 Gajuwakha Simhadri line # 1 was Hand tripped from Simhadri end
11:42 South Bus I Circuit Breaker Opened
11:45 AC By-pass isolator opened after opening the connecting breakers of Pole 1
& 2
12:06 All isolators closed at HVDC vizag. South Bus I was taken in to SR grid.
Voltage of South Bus I was observed as 415kV & East bus was 395kV
12:09 Pole 1 taken on Standby mode
12:12 Gajuwakha Simhadri 400kV line 1 charged from Gajuwakha end &
synchronized at NTPC Simhadri
12:14 HVDC Pole I de-blocked with a power flow of 200MW ER SR
12:15 HVDC Pole 2 de-blocked
12:17 Instruction Given to Jeypore for charging the Jeypore Gajuwaka line # 2
203 of 206.
SRLDC Black Start Restoration Procedure 2014


12:20 SRLDC code received for increasing power flow from 200MW 400MW
12:22 ER SR power flow made to 400MW
12:28 Jeypore Gajuwkha 400kV line # 2 charged from Jeypore end and
synchronized at Gajuwakha end
12:30 Declared completion of Black Start Mock Exercise successfully

8. Observations on effectiveness of Mock Drill :
a. As the Mock Exercise conducted using Gajuwakha Simhadri direct line, the
duration of Mock exercise has reduced from 3hours to 2hours 30 minutes.
b. Within 26minutes (10:27hrs to 10:53hrs), South Bus I got isolated and AC by-pass
at HVDC Vizag closed availing ER supply.
c. While Voltage profile of east bus remains around 400kV & below with HVDC flow of
about 400MW 600MW and about 1000MW hydro generation near Jeypore, there
were no high / low voltage issues during Black Start Mock exercise.
d. Availability of switchable reactors & filter banks at HVDC Vizag, gives a very good
flexibility in voltage management during Black Start Mock exercise
e. Preparation & co-ordination by the Black Start Mock Exercise team of NTPC
Simhadri and HVDC Vizag is appreciable.

9. Recommendations / Suggestions on the observations (Sl.No.8) :
Nil

Mock drill for Black start at RSTPS

The Mock drill will be done by issuing total of 4 No of codes Mock Exercise as
detailed below:
o Code No 1: Issued by SRLDC for commencement of Mock drill and
corresponding codes will be collected from WRLDC & NLDC. The
activities to be carried out for this code are
a. HVDC bhadravathi will reduce the power flow in steps of 100
MW. When the flow becomes around 300MW, one of the Bwati
Rgdm line will be hand tripped. When the flow become Zero,
other line will also be tripped. HVDC Bwati will do all the
operations as per the list for blocking of both the poles, tripping
of filters, closing of by-pass and energise one bus at Southern side
of HVDC.
b. NTPC, Ramagundam will trip both the Bwati Ramagundam
lines in co-ordination with HVDC Bwati. Isolate Bus section 1,
transferring the 33 kV loads & be ready and 400 kV Rgm Bus 1 will
be made clear
c. AP will be ready by transferring all the loads on one bus keeping
the other bus isolated and the bus coupler in open condition.

204 of 206.
SRLDC Black Start Restoration Procedure 2014


o Code No 2: Issued by SRLDC for extension of Start-up power from WR
to SR and corresponding codes will be collected from WRLDC. The
activities to be carried out for this code are
a. HVDC bhadrawathi will charge Ramagundam Chpr#1 and
convert the line reactor of ckt # 2 in to bus reactor at Bwati
south bus.
b. NTPC, Ramagundam will close the ckt #1 and charge bus #1 at
RGDM. Extend supply to AT#2 and extend supply to APTRANSCO
132kv Sub-station isolated bus.
c. APTRANSCO charge the isolated bus and transfer the identified
feeder of about 40MW load to the other bus which has been
charged from WR grid.
d. NTPC Ramagundam will extend the supply to raw water feed
pump through 33kv Transformer.
o Code No 3: Issued by SRLDC for termination of Start-up power from WR
to SR and corresponding codes will be collected from WRLDC. The
activities to be carried out for this code are
a. NTPC Ramagundam disconnect the raw Water pumps and
isolate the 33kV bus that was feeding from WR
b. NTPC Ramagundam trip the Rgdm Cpur line # 1and isolate
bus section 1 at NTPC
c. APTRANSCO disconnect the identified feeder and isolate the
132kv bus that was connected to WR
d. HVDC Bhadrawati open the Rgdm Cpur line # 1and AC by-
pass at Bwati
o Code No 4 Issued by SRLDC for closure of Mock exercise and restore
normal mode of operation and corresponding codes will be collected
from WRLDC & NLDC. The activities to be carried out for this code are
Closing of Mock exercises
a. HVDC Bhadrawati normalise Converter Transformer Breakers,
filters required for de-blocking one of the HVDC poles.
b. HVDC Bhadrawati charge the South bus through HVDC poles
c. NTPC Ramagundam normalise Bus Section 1 and Auto
Transformers.
d. APTRANSCO restore the 132kV sub-station with all feeders
connected to both the buses as per normal configuration.
205 of 206.
SRLDC Black Start Restoration Procedure 2014


e. HVDC Bhadrawati charge Bwati Rgdm Line #1
f. NTPC Ramagundam Synchronise the Bwati Rgdm Line #1
g. Power flow from WR to SR commenced by de-blocking the
HVDC and increase in steps of 100MW till 400MW level
h. HVDC Bhadrawati insert the line reactor for Bwati Rgdm Line
#2
i. HVDC Bhadrawati charge Bwati Rgdm Line #2
j. NTPC Ramagundam Synchronise the Bwati Rgdm Line #2
k. NTPC Ramagundam maximise MVAR obsorbtion for maintaining
the voltage at Ramagundam end.
l. Power flow from WR to SR through HVDC increased in steps of
100MW till the Scheduled value
o Mock Exercise is declared as completed.
o All the stations will record the details of code, time of code received,
sequence of each operation carried out by the respective station with
time, voltage, frequency and power flow (MW, MVAR) details of each
activity during the Mock Exercise. All these details along with the copies
of Event Logger and DR printout needs to be submitted to SRLDC
immediately after completion of Mock exercise for consolidation &
analysis for further improvement and sharing of experience to all.



206 of 206.









































( (( ( , ) )) )
POWER SYSTEM OPERATION CORPORATION LIMITED
(A wholly owned subsidiary of Power Grid Corporation of India Limited, A Govt. of India Enterprise)
/ SOUTHERN REGIONAL LOAD DESPATCH CENTRE