Holder Activity
PTW
Approv
er
PTW
Authori
ty
Work
Permits
Additional certificates
PTW
Review
er
C
o
l
d
W
o
r
k
H
o
t
W
o
r
k
I
s
o
l
a
t
i
o
n
/
L
O
T
O
C
o
n
f
i
n
e
d
S
p
a
c
e
E
x
c
a
v
a
t
i
o
n
L
i
f
t
i
n
g
P
l
a
n
DR Nipple up /down drip pan / bell nipple /flow line CR TP x
DR Replacing valves on BOPs and / or chicksan TP CR WSS x
DR / AD
Maintenance, repair or installation on high pressure lines,
stand pipe manifold, valves, pressure sensoTP, etc.
WSS CR TP x x
DR
Maintenance or repair on choke manifold (valves, pressure
sensoTP, chokesetc, when connected to the well)
TP CR WSS x x
DR Change pipe rams on BOP stack / repair BOP stack in place TP CR WSS x x
CM Major work on mud pump ( mechanical part ) CR TP x x
AD Any work in mud pump fluid end CR TP x x
CM / CE Maintenance or repair on drawworks CR TP x x
CM / CE Maintenance or repair on ELMAGCO brake CR TP x x
CM / CE Maintenance or repair on accumulator unit TP CR WSS x x
CM / CE Maintenance or repair on engines (rig and camp) CR TP x x
CM / CE
Maintenance or repair on any auto start or remote starting
equipment
CR TP x x
DR Slip and cut drilling line / Reeling and unreeling drilling line CR TP x
DR Using man rider winch TP CR WSS x x
AD Using crane or man riding basket CR TP x x
AD Tank and confined space entry / cleaning mud tanks CR TP x x
CM Maintenance / repair on HPU bottles CR TP x x
DR Installing sheaves in derrick CR TP x
AD / DR Use of web slings on location CR TP x
Scaffolding erection on rig (NOT ALLOWED) CR
CE
Rigging Down / Rigging up Power system (generator, PCR,
grasshopper, diesel tanks)
CR TP x x x
DR / ATP Dismantling / Assembling mast and sub-structure CR TP x x
DR / ATP
/ AD
Critical Loading / Offloading operations (mud system, power
pack and drilling package)
CR TP x
As
designate
by WSS /
TP
Any activity determined as non routine with potential risk
above acceptable levels as determined by PTW Authority
(WSS or TP)
TBD CR TBD TBD TBD TBD TBD TBD TBD