Sie sind auf Seite 1von 5

JINDAL POWER LIMITED

O.P. JINDAL THERMAL POWER


PLANT(4X600MW)
TAMNAR , RAIGARH (C.G.)
DOCNO
:Elec/co./cl/0!"
#$% #TATION :
%A& NO :
IDENTI'ICATION NO:
DATE O' TE#TING :
COMMI##IONING 'ORMAT 'OR %ATTER& CHARGER
!. LOCATION :
(. DATE O' ERECTION : ). DATE O'
ENERGI*ATION :
4. DETAIL# O' E+$IPMENT :
#L.NO :
MAIN AC INP$T :
MAN$'ACT$RE :
&EAR O' MAN$'ACT$RE
DETAIL# 'LOAT CHARGER %OO#T C$M 'LOAT
CHARGER
'LOAT
MODE
%OO#T MODE
,OLTAGE
C$RRENT
RIPPLE :
REG$LATION :
!. ,OLTAGE :
(. C$RRENT :
AM%IENT TEMP :
PROTECTION $#ED :
-. PRE.COMMI##IONING CHEC/#:

#L.
NO
DE#CRIPTION
#TAT$# REMAR/ RECORD
DE'ICIENCIE#, I'
AN& &E#
N
O
1
INSPECT ALL COMPONENTS FOR MECHANICAL
DAMAGES. CONFIRM THEIR RATINGS / RANGES
AGAINST DRAWING.
2
ENSURE THAT THE EQUIPMENT IS INSTALLED AT
INDOOR PLACE SUITABLY VENTILATED.
3
ENSURE THAT THE INSIDE OF THE CHARGER IS
PROPERLY CLEAN
4
CHECK & ENSURE THE SIE OF CABLES FOR
INPUT SUPPLY! BATTERY & LOAD AS PER DESIGN.
" CHECK FOR PROPER FARTHING OF PANELS
#
IN#$LATION RE#I#TANCE CHEC/ O'
CHARGER(WITH -00, MEGGAR):
TEST THE EQUIPMENT FOR INSULATION
RESISTANCE $WITH MEGGAR% BEFORE
CONNECTING THE AC & DC CABLE TO CHARGER
TERMINAL BOARD.
&
POWER #$PPL& 0 CONNECTION:ENSURE THAT
THE AC INPUT CABLES ARE CONNECTED TO THE
INPUT TERMINALS OF CHARGER WITH PROPER
PHASE SEQUENCE. BEFORE TESTING OF THE
CHARGER DO NOT CONNECT THE CHARGER TO
BATTERY & LOAD.
' CHECK FOR TIGHTNESS OF CONTROL / POWER


#$PPLIER
REPRE#ENTATI,E
JPL ERECTION JPL COMMI##IONING
N()*
D*+,-.(/,0.
S,-.(/12*/D(/
*
PREPARED BY3N(-*./4,2(. R CHECKED BY3S(/,+4 S4,.5*
APPROVED BY3N(2*+4 P1.6(7,
P(-* ! 08 -
JINDAL POWER LIMITED
O.P. JINDAL THERMAL POWER
PLANT(4X600MW)
TAMNAR , RAIGARH (C.G.)
DOCNO
:Elec/co./cl/0!"
#$% #TATION :
%A& NO :
IDENTI'ICATION NO:
DATE O' TE#TING :
COMMI##IONING 'ORMAT 'OR %ATTER& CHARGER
WIRING CONNECTIONS.
9
CHECK IR VALUES $WITH "::V MEGGAR% OF
CABLES & RECORD IN THE SPECIFIED TABLE
1:
ENSURE ALL FUSES OF CHARGER ARE INTACT &
OF CORRECT RATING AS PER DRAWING.
11 CHECK FUNCTIONING OF COOLING FANS
12 CHECK FUNCTIONING OF HEATER / LAMP.
13
CHECK CONTROLS / INDICATORS/ ALARMS AS
PER SCHEME AND RECORD.
14 COMMISSIONING CHECK LIST3
1" TEST CTS FOR RATIO / POLARITY.
1#
CHECK AND RECORD SETTING OF PROTECTIVE
DEVICES.
1&
SWITCH ON CHARGER INPUT SWITCH AND
CONFIRM VOLTAGE IN THE RANGE
OF 41" $;/<% 1:= ON AC VOLTMETER.
1'
PER'ORM NO LOAD TE#T O' CHARGER:
SWITCH ON CHARGER OUTPUT SWITCH. CHECK
THAT OUTPUT VOLTAGE GRADUALLY INCREASES
TO RATED VOLTAGE$DEPENDING ON THE
CHARGER% AND REMAINS STABLE.
19 PER'ORM LOAD TE#T O' CHARGER
IF THE CHARGER TEST RESULT IS OK THEN
CONNECT BATTERY CABLES WITH PROPER
POLARITY TO THE BATTERY TERMINALS OF
CHARGER. THAT IS CONNECT THE POSITIVE
TERMINAL OF THE BATTERY TO THE POSITIVE
TERMINAL OF THE CHARGER AND THE BATTERY
NEGATIVE TO THE CHARGER NEGATIVE. THEN
CONNECT LOAD CABLES TO CHARGER.


6. IN#$LATION RE#I#TANCE MEA#$REMENT AT -00,
#L.N
O
%ETWEEN IR ,AL$E
1 CHARGER INPUT TERMINALS TO EARTH
2 CHARGER OUTPUT TERMINALS TO EARTH

#$PPLIER
REPRE#ENTATI,E
JPL ERECTION JPL COMMI##IONING
N()*
D*+,-.(/,0.
S,-.(/12*/D(/
*
PREPARED BY3N(-*./4,2(. R CHECKED BY3S(/,+4 S4,.5*
APPROVED BY3N(2*+4 P1.6(7,
P(-* ( 08 -
JINDAL POWER LIMITED
O.P. JINDAL THERMAL POWER
PLANT(4X600MW)
TAMNAR , RAIGARH (C.G.)
DOCNO
:Elec/co./cl/0!"
#$% #TATION :
%A& NO :
IDENTI'ICATION NO:
DATE O' TE#TING :
COMMI##IONING 'ORMAT 'OR %ATTER& CHARGER
3
3 PHASE AC INPUT CABLE3<
$I%BETWEEN PHASES3
R<Y
Y<B
B<R
$II%BETWEEN PHASE TO EARTH3
R<E
Y<E
B<E
4
D.C. OUTPUT CABLE3
$I%BETWEEN TWO WIRES3
;VE TO <VE
$II%BETWEEN EACH WIRE TO EARTH3
;VE TO E
<VE TO E
1. NO LOAD TE#T O' CHARGER :
CHARGER RATED ,OLTAGE :
TIME O$TP$T ,OLTAGE O' CHARGER(,)
REMAR/#:
2. LOAD TE#T O' CHARGER:
CHARGER RATING :

#$PPLIER
REPRE#ENTATI,E
JPL ERECTION JPL COMMI##IONING
N()*
D*+,-.(/,0.
S,-.(/12*/D(/
*
PREPARED BY3N(-*./4,2(. R CHECKED BY3S(/,+4 S4,.5*
APPROVED BY3N(2*+4 P1.6(7,
P(-* ) 08 -
JINDAL POWER LIMITED
O.P. JINDAL THERMAL POWER
PLANT(4X600MW)
TAMNAR , RAIGARH (C.G.)
DOCNO
:Elec/co./cl/0!"
#$% #TATION :
%A& NO :
IDENTI'ICATION NO:
DATE O' TE#TING :
COMMI##IONING 'ORMAT 'OR %ATTER& CHARGER
#L
.N
O
CHAGER
MODE
O$TP$T DC
$RRENT(A)
CHARGER O$TP$T DC
,OLTAGE(,)
2. 'INAL DOC$MENTATION RE,IEW
,. FINAL DOCUMENTS OF PRE< COMMISSIONING CHECKS
REVIEWED AND APPROVED
,,. DOCUMENT REGARDING SPARES EQUIPMENT! O&M MANUALS
ETC AVAILABLE AT SIT FOR O&M PURPOSE
,,,. AFTER MODIFICATION! IF ANY! >AS BUILT DRAWINGS? ARE
AVAILABLE AT SITE
". DE''ECT/OMMI##ION LI#T:
#L.NO DE#CRIPTION REMAR/#

#$PPLIER
REPRE#ENTATI,E
JPL ERECTION JPL COMMI##IONING
N()*
D*+,-.(/,0.
S,-.(/12*/D(/
*
PREPARED BY3N(-*./4,2(. R CHECKED BY3S(/,+4 S4,.5*
APPROVED BY3N(2*+4 P1.6(7,
P(-* 4 08 -
YES NO
YES NO
YES NO
JINDAL POWER LIMITED
O.P. JINDAL THERMAL POWER
PLANT(4X600MW)
TAMNAR , RAIGARH (C.G.)
DOCNO
:Elec/co./cl/0!"
#$% #TATION :
%A& NO :
IDENTI'ICATION NO:
DATE O' TE#TING :
COMMI##IONING 'ORMAT 'OR %ATTER& CHARGER

#$PPLIER
REPRE#ENTATI,E
JPL ERECTION JPL COMMI##IONING
N()*
D*+,-.(/,0.
S,-.(/12*/D(/
*
PREPARED BY3N(-*./4,2(. R CHECKED BY3S(/,+4 S4,.5*
APPROVED BY3N(2*+4 P1.6(7,
P(-* - 08 -