Sie sind auf Seite 1von 13

SITE TEST REPORT FOR 6.6 /0.420kV 2.

5 MVA POWER TRANSFOMER, CCM


CLIENT:

CONSULTANT:

MAIN CONTRACTOR:

QATAR STEEL COMPANY

DASTUR ENGINEERING
INTERNATIONAL, GmbH
DUSSELDORF M.N DASTUR &
COMPANY (P) LTD. KOLKATA

SIEMENS W.L.L
Contract No
Date
Bay Number
Manufacturer

EF5 PROJECT

2.5MVA TRANSFORMER COMMISSIONING REPORT


Name of Substation
: CCM LCSS
Name of Equipment
: 2.5MVA Transformer

:
: 07-07-2013
: 1F12
:SIEMENS

Test Procedure, Forms with Applicable Standards.


This document details the visual checks, mechanical and electrical tests on
the Transformer. It is organized in several sheets in Method Statement which
briefly gives information related to
Test Set Up
Test Procedure
Test Results
Acceptance Norm
Test Instruments
The following equipment were used during test.
Testing
Equipment

Equipment-1

Equipment-2

Equipment-3

Equipment-4

Equipment Used:

IR Measurement

CPC100

Multi meter

Clamp meter

Sr. No

100710 / 2595

LJ552T / HK059

97100545

15730023

Make / Model

Megger-MIT510/2

Omicron

Fluke/179

Fluke/365

Calibration
Date:

13-07-2012

12-07-2012

06/07/2012

10/07/2012

Calibration Due:

12-08-2013

11-08-2013

06/08/2013

10/08/2013

W.L.L QATAR

DASTUR ENGINEERING
INTERNATIONAL, GmbH DUSSELDORF
M.N DASTUR & COMPANY (P) LTD.

QATAR STEEL
COMPANY

KOLKATA

Signature
Name

Muhammad Rafique

Date

Date: 16/06/2013

Signature

Signature

Name

Name

Date

Date

Page 1

SITE TEST REPORT FOR 6.6 /0.420kV 2.5 MVA POWER TRANSFOMER, CCM
CLIENT:

CONSULTANT:

MAIN CONTRACTOR:

QATAR STEEL COMPANY

DASTUR ENGINEERING
INTERNATIONAL, GmbH
DUSSELDORF M.N DASTUR &
COMPANY (P) LTD. KOLKATA

SIEMENS W.L.L

EF5 PROJECT

2.5MVA TRANSFORMER COMMISSIONING REPORT


Name of Substation
: CCM LCSS
Name of Equipment
: 2.5MVA Transformer

Contract No
Date
Bay Number
Manufacturer

:
: 07-07-2013
: 1F12
:SIEMENS

C. SAFETY PRECAUTIONS:

Safety Labels has been installed in Power Transformer Area (e.g. Power
Transformer testing under progress).

Barricades have been provided near Power Transformer during testing.

Testing area has been kept clean and have sufficient space during testing.

Power Transformer earthed properly before starting the testing.

Power Transformer identified before starting the commissioning.

2.5MVA POWER TRANSFORMER SITE TEST REPORT


1. TRANSFORMER NAME PLATE DETAILS:

Bay reference

: 1F12 CCM

Serial Number

: Nr LEL-111449

Year of Mfg

: 2012

Power Rating

: 2.5MVA

Vector Group

: DYn11

Type of Cooling

: ONAN

Rated Frequency

: 50Hz

Th. Short CIRCUIT


Current/2Sec

: 2.850KA

Rated HV Voltage

: 6600V

Rated LV Voltage

: 420V

HV Current

: 218.7A

LV Current

: 3437A

Tap Changer

: DETC

Range of Taps

: 5

Insulated Oil Type

: ERGON HYVOLTI

Ambient Temperature

: 55C

%Impedance at tap
No.3

: 7.7%

Temperature Rise
Winding/Oil

: 50/45K

Bushings

Date: 16/06/2013

Page 2

Breather

SITE TEST REPORT FOR 6.6 /0.420kV 2.5 MVA POWER TRANSFOMER, CCM
CLIENT:

CONSULTANT:

MAIN CONTRACTOR:

QATAR STEEL COMPANY

DASTUR ENGINEERING
INTERNATIONAL, GmbH
DUSSELDORF M.N DASTUR &
COMPANY (P) LTD. KOLKATA

SIEMENS W.L.L
Contract No
Date
Bay Number
Manufacturer

EF5 PROJECT

2.5MVA TRANSFORMER COMMISSIONING REPORT


Name of Substation
: CCM LCSS
Name of Equipment
: 2.5MVA Transformer

:
: 07-07-2013
: 1F12
:SIEMENS

Make

2. VISUAL INSPECTION AND GENERAL CHECKS:


S. No

Type of
Check

Description

Result

Checked as per Erection Control Form

Visual

O.K

Oil dielectric strength


Acceptance Standard :
BDV - 60kV> 1 min with gap Setting of 2.5 mm

75.7KV, Test
conducted
with BDV
KIT,

O.K

Valve Positions

Visual

O.K

Phase Sequence of Auxiliary Supply.

Electrical

O.K

LV Bushings

Visual

O.K

Transformer Main Earthing

Visual

O.K

Transformers Equipment Earthing

Visual

O.K

3. MEASUREMENT OF EXCITATION CURRENT:


Apply 3-phase (415 V) to the high voltage bushings. Measure voltage between phases
and current on each phase. This test is to be applied immediately after
installation, before applying any voltage to the transformer and when the
transformer is completely de-magnetized.
Applied Voltage (V)

Tap

Measured Current (mA)

R Y

Y - B

B R

414.7

415.03

414.85

25.86

20.21

26.41

Date: 16/06/2013

Page 3

SITE TEST REPORT FOR 6.6 /0.420kV 2.5 MVA POWER TRANSFOMER, CCM
CLIENT:

CONSULTANT:

MAIN CONTRACTOR:

QATAR STEEL COMPANY

DASTUR ENGINEERING
INTERNATIONAL, GmbH
DUSSELDORF M.N DASTUR &
COMPANY (P) LTD. KOLKATA

SIEMENS W.L.L
Contract No
Date
Bay Number
Manufacturer

EF5 PROJECT

2.5MVA TRANSFORMER COMMISSIONING REPORT


Name of Substation
: CCM LCSS
Name of Equipment
: 2.5MVA Transformer

:
: 07-07-2013
: 1F12
:SIEMENS

415.01

415.01

414.84

28.18

21.97

28.74

415.07

415.03

415.04

30.77

23.97

31.40

Apply 3-phase (415 V) to the low voltage bushings. Measure voltage between phases
and current on each phase.
Applied Voltage (V)

Tap

Measured Current (A)

R Y

Y - B

B R

415.02

414.97

414.98

3.7333

3.7718

4.7629

4. INSULATION RESISTANCE MEASUREMENT:

Connection

Applied
Voltage
(Volts)

Measured Values ( G )

Polarization Index

R60

R300

R600

R300/R60

R600/R60

HV - (LV + E)

2500

1.21

2.1

2.40

1.74

2.0

LV ( HV + E)

250

1.61

3.54

4.25

2.2

2.64

HV LV

250

2.01

3.79

4.51

1.89

2.24

(HV+LV) E

250

1.62

2.88

3.36

1.77

2.027

Acceptance Norm: 1 Mega Ohm / kV of the Insulation


Transformer Insulation is excellent, satisfying the IEC standards i.e. IEC 60076-2000
part 1, IEEE 62. For very good / excellent condition, polarization Index (P.I) must
be above 1.3

Date: 16/06/2013

Page 4

SITE TEST REPORT FOR 6.6 /0.420kV 2.5 MVA POWER TRANSFOMER, CCM
CLIENT:

CONSULTANT:

MAIN CONTRACTOR:

QATAR STEEL COMPANY

DASTUR ENGINEERING
INTERNATIONAL, GmbH
DUSSELDORF M.N DASTUR &
COMPANY (P) LTD. KOLKATA

SIEMENS W.L.L

EF5 PROJECT

2.5MVA TRANSFORMER COMMISSIONING REPORT


Name of Substation
: CCM LCSS
Name of Equipment
: 2.5MVA Transformer

Contract No
Date
Bay Number
Manufacturer

:
: 07-07-2013
: 1F12
:SIEMENS

5. MEASUREMENT OF WINDING RESISTANCE:


Test Procedure

Isolate primary/secondary/neutral earth.


Measure winding resistance between phase to neutral for all taps in case of
star connection and phase to phase in case of delta
First measure the winding resistance at nominal tap for base reference and
later carry out measurement in all taps from start to finish.
Compare the resistances between all three phases and observe changes in
each tap and the overall trend.
Measures the resistance with Omicron Kit.
Compare its value with the factory test reports.
The Omicron kit will automatically performs a discharging of the winding
after saving the measurement.

HV Winding Resistance:
Tap
Position
No.

Measured Resistance
Between Phase to Phase ()

Mean Value at

Reference Temp.75 C

Factory
Value at
26 C

Value at
Reference
Temp.

Factory
Value at
Reference
Temp.

%
Deviation

R Y

Y - B

B R

Measured
Value at
39.0 C

0.1308

0.1309

0.1314

0.1310

0.1487

0.1244

0.1238

0.1246

0.1242

0.121

0.1411

0.1437

1.80

0.1172

0.1165

0.1171

0.1169

0.1327

According to IEC standards 600076-2000, part 1, caluse-102; tolerance 3% is


generally acceptable for the measured values at site over the factory test report
value.
LV Winding:

Date: 16/06/2013

Page 5

SITE TEST REPORT FOR 6.6 /0.420kV 2.5 MVA POWER TRANSFOMER, CCM
CLIENT:

CONSULTANT:

MAIN CONTRACTOR:

QATAR STEEL COMPANY

DASTUR ENGINEERING
INTERNATIONAL, GmbH
DUSSELDORF M.N DASTUR &
COMPANY (P) LTD. KOLKATA

SIEMENS W.L.L

EF5 PROJECT

2.5MVA TRANSFORMER COMMISSIONING REPORT


Name of Substation
: CCM LCSS
Name of Equipment
: 2.5MVA Transformer
Measured Resistance
Between Phase to Neutral (m)
R - Y

Y B

B R

0.4633

0.4545

0.4638

Mean Value at
Meas. Value
at
39.0 C
0.4605

Factory
Value at
26 C
0.4290

Contract No
Date
Bay Number
Manufacturer

:
: 07-07-2013
: 1F12
:SIEMENS

Reference Temp.75 C
Value at
Reference
Temp.

Factory
Value at
Reference
Temp.

% Deviation

0.5210

0.5095

-2.25

6. CHECKING OF VECTOR GROUP:


Test Set Up

Test Procedure

Dyn11

Select the normal tap


Isolate primary/secondary/neutral earth.
Short R r, Apply 3 phase 415V to R Y B terminals.
Measure the voltages given below.
From the measured voltages check the following conditions for the vector
group.
R r = 0,

RY = R n + Y n,

Bb< By

Yb = Yy

Date: 16/06/2013

Page 6

SITE TEST REPORT FOR 6.6 /0.420kV 2.5 MVA POWER TRANSFOMER, CCM
CLIENT:

CONSULTANT:

MAIN CONTRACTOR:

QATAR STEEL COMPANY

DASTUR ENGINEERING
INTERNATIONAL, GmbH
DUSSELDORF M.N DASTUR &
COMPANY (P) LTD. KOLKATA

SIEMENS W.L.L

EF5 PROJECT

2.5MVA TRANSFORMER COMMISSIONING REPORT


Name of Substation
: CCM LCSS
Name of Equipment
: 2.5MVA Transformer

Contract No
Date
Bay Number
Manufacturer

:
: 07-07-2013
: 1F12
:SIEMENS

Test Results
Short R & r
Apply Voltage (Volts)
R Y

415.4

Y B

414.4

B R

414.3

Measure Voltage across (Volts)


R

391.4

414.4

415.2

16.07

391.3

390.7

399.20

Compare the values for the following combinations

Dyn11
R r = 0,
RY = R n + Y n,
Bb< By
Yb = Yy

Conclusion on the Test :


Remarks:

VECTOR GROUP Dyn11 - OK

Date: 16/06/2013

Page 7

SITE TEST REPORT FOR 6.6 /0.420kV 2.5 MVA POWER TRANSFOMER, CCM
CLIENT:

CONSULTANT:

MAIN CONTRACTOR:

QATAR STEEL COMPANY

DASTUR ENGINEERING
INTERNATIONAL, GmbH
DUSSELDORF M.N DASTUR &
COMPANY (P) LTD. KOLKATA

SIEMENS W.L.L

EF5 PROJECT

2.5MVA TRANSFORMER COMMISSIONING REPORT


Name of Substation
: CCM LCSS
Name of Equipment
: 2.5MVA Transformer

Contract No
Date
Bay Number
Manufacturer

:
: 07-07-2013
: 1F12
:SIEMENS

8. TURNS RATIO TEST:


Test Set Up

Test Procedure

Isolate primary/secondary/neutral earth.


Switch on the Omicron kit.
Select the transformer page.
As per the instructions given by manual enter the test current and pressing
the start button, the test card displays.
For this test, a test voltage of up to 415V is injected on HV side.
This voltage is measured internally with high precision.
The ratio is calculated automatically.
Repeat the same procedure for all other taps and other phases

Date: 16/06/2013

Page 8

SITE TEST REPORT FOR 6.6 /0.420kV 2.5 MVA POWER TRANSFOMER, CCM
CLIENT:

CONSULTANT:

MAIN CONTRACTOR:

QATAR STEEL COMPANY

DASTUR ENGINEERING
INTERNATIONAL, GmbH
DUSSELDORF M.N DASTUR &
COMPANY (P) LTD. KOLKATA

SIEMENS W.L.L

EF5 PROJECT

2.5MVA TRANSFORMER COMMISSIONING REPORT


Name of Substation
: CCM LCSS
Name of Equipment
: 2.5MVA Transformer

Contract No
Date
Bay Number
Manufacturer

:
: 07-07-2013
: 1F12
:SIEMENS

Test Results
Tap
Position
No.

Applied
Voltage
(V)

Rated
HV/LV
Ratio

415

Measured HV/LV Ratio

% Error

R-Y/r-n

Y-B/y-n

R-B/b-n

Average
Ratio

R-Y/r-n

Y-B/y-n

R-B/b-n

28.625

28.625

28.625

28.625

415

27.927

27.927

27.927

27.927

415

27.217

27.270

27.270

27.270

27.270

-0.19

-0.19

-0.19

415

26.545

26.545

26.545

26.545

415

25.855

25.855

25.855

25.855

IEC Standard 60076-2000, Part 1, states that maximum allowable ratio error for the
principle tap is 0.5 % i.e. got it within the limit.

Date: 16/06/2013

Page 9

SITE TEST REPORT FOR 6.6 /0.420kV 2.5 MVA POWER TRANSFOMER, CCM
CLIENT:

CONSULTANT:

MAIN CONTRACTOR:

QATAR STEEL COMPANY

DASTUR ENGINEERING
INTERNATIONAL, GmbH
DUSSELDORF M.N DASTUR &
COMPANY (P) LTD. KOLKATA

SIEMENS W.L.L

EF5 PROJECT

2.5MVA TRANSFORMER COMMISSIONING REPORT


Name of Substation
: CCM LCSS
Name of Equipment
: 2.5MVA Transformer

Contract No
Date
Bay Number
Manufacturer

:
: 07-07-2013
: 1F12
:SIEMENS

9. MAGNETIC BALANCE TEST:


Test Set Up

Test Procedure

Isolate primary/secondary/neutral earth.


Select the normal tap, Apply single phase voltage between R & B.
Measure the voltages in Y R & B Y, r & n , y & n, b & n.
Repeat the same procedures for the all other sequences in both primary and
secondary of the transformer.

Test Results:
APPLIED VOLTAGE 230V HV SIDE

APPLIED VOLTAGE 230V LV SIDE

R Y

Y B

B R

r n

y n

b n

230.4

177.3

53.35

229.5

142.1

87.5

116.4

230.5

114.2

114.6

227.5

113.2

56.84

173.3

230.3

111.4

117.3

228.7

The measured values must be in conformance to the values in the factory Acceptance
report of this transformer. Normally in a well balanced magnetic circuit, voltage
applied at one phase would be the summation of other two phases. The required result
is achieved.

Date: 16/06/2013

Page 10

SITE TEST REPORT FOR 6.6 /0.420kV 2.5 MVA POWER TRANSFOMER, CCM
CLIENT:

CONSULTANT:

MAIN CONTRACTOR:

QATAR STEEL COMPANY

DASTUR ENGINEERING
INTERNATIONAL, GmbH
DUSSELDORF M.N DASTUR &
COMPANY (P) LTD. KOLKATA

SIEMENS W.L.L
Contract No
Date
Bay Number
Manufacturer

EF5 PROJECT

2.5MVA TRANSFORMER COMMISSIONING REPORT


Name of Substation
: CCM LCSS
Name of Equipment
: 2.5MVA Transformer

:
: 07-07-2013
: 1F12
:SIEMENS

11. TRANSFORMER SHORT CIRCUIT IMPEDANCE MEASUREMENT:


Test Set up

Test Procedure

Isolate primary/secondary/neutral earth.


Short all the three phases on the LV side of the transformer.
Apply 3-Phase Voltage on HV Side,
Measure the Voltage and current in all the three phases in HV Side
Calculate the impedance by voltage/current (V/I).

Test Results
Temp 40C
Tap
position
Connection.
3

Voltage

applied (V)

Measured Current (A)

Name Plate Values

R-Y

Y-B

R-B

Average

Average

%Z

MVA

Current

% Z

134.80

133.0

130.9

132.9

35.2

35.8

34.6

35.30

12.19

2.5

218.7

7.7

Date: 16/06/2013

Page 11

SITE TEST REPORT FOR 6.6 /0.420kV 2.5 MVA POWER TRANSFOMER, CCM
CLIENT:

CONSULTANT:

MAIN CONTRACTOR:

QATAR STEEL COMPANY

DASTUR ENGINEERING
INTERNATIONAL, GmbH
DUSSELDORF M.N DASTUR &
COMPANY (P) LTD. KOLKATA

SIEMENS W.L.L

EF5 PROJECT

2.5MVA TRANSFORMER COMMISSIONING REPORT


Name of Substation
: CCM LCSS
Name of Equipment
: 2.5MVA Transformer

Contract No
Date
Bay Number
Manufacturer

:
: 07-07-2013
: 1F12
:SIEMENS

According to IEC Standard 60076-2000, Part 1, Clause 10.1, % impedance at principle


tap is within the measuring accuracy / tolerance limit i.e. below 1%.

16. Oil Break Down Test Report


S. No
Oil Break Down Value After Top Up

Oil Break Down Value before oil Top Up

80.2 KV

58.9KV

80.1 KV

68.4KV

71.8 KV

72.9KV

80.2 KV

75.9KV

80.0 KV

71.8KV

80.1 KV

72.6KV

Mean Value

78.8 KV

70.1KV

Oil quality is very good, satisfied the IEC Standards 60156-95, for new oil the BDV
must be above 60KV
17. Insulation resistance test:
DESCRIPTION

Measurement
value

Heaters, Lighting and Breather

> 2.2 Mega Ohm

WTI 1,WTI 2,OTI Alarm & Trip


Contacts

> 2.2 Mega Ohm

Buchholz relays, PRDS, Oil Level


indicators Alarm and Trip Circuit

> 2.2 Mega Ohm

Transformer Signaling Circuit

Test voltage

500VDC

Done it

18. Mechanical Protective device Testing Procedure:

18.1. Buchholz relay:


Simulation by Draining Oil Alarm and Trip Contact status checked.
18.2 Pressure relieve device:

Switch operated manually, checked Contacts status.


18.3 Oil Level Flow Gauge

Two Switches provided to operate and reset correspondingly. Switches operated


manually and checked Contact status. Max & Min oil Level alarm Signals Checked by
Moving of Indication Needle.
18.4 Oil temperature setting.

Setting for OTI: Alarm: 85C, Tripping: 90C.

Date: 16/06/2013

Page 12

SITE TEST REPORT FOR 6.6 /0.420kV 2.5 MVA POWER TRANSFOMER, CCM
CLIENT:

CONSULTANT:

MAIN CONTRACTOR:

QATAR STEEL COMPANY

DASTUR ENGINEERING
INTERNATIONAL, GmbH
DUSSELDORF M.N DASTUR &
COMPANY (P) LTD. KOLKATA

SIEMENS W.L.L

EF5 PROJECT

2.5MVA TRANSFORMER COMMISSIONING REPORT


Name of Substation
: CCM LCSS
Name of Equipment
: 2.5MVA Transformer

Date: 16/06/2013

Contract No
Date
Bay Number
Manufacturer

:
: 07-07-2013
: 1F12
:SIEMENS

Page 13