(PR) Vig & QC SUB-DIVISION, NALGONDA. Ci!"#$ N%. AEE&RCC C"#'()*&VQC N#g&+,-.. D$)(/0 --.-+.+,-.. Sub:- CD Works-Constructon of RCC Ppe Cuverts n Rura Roads Certan gudenes communcated for proper executon of ths Mnor CD Works on Rura Roads -- Reg. * * * It s observed durng the nspecton of the varous roads by the OC Wng n the dstrct that the many of the Fed Engneers are constructng the Ppe Cuverts at ther whms and fances not based on coda provsons and warrants of the ste requrement. The foowng common defects are observed n constructon of mnor CD Works n rura roads. 1) Improper seecton of type of CD Works between Pped Cuvert, RCC Sab Cuvert, Road Dam, Box cuvert. 2) Insumcent cushon over pped cuvert. 3) Length of Body was & Parapets. 4) Wrong agnment wth respect to ow channe n case skewed crossngs. And Lne of body was gushng nto embankment. 5) Inadequate U/S & D/S protecton measures n case of hgh veocty ows and CD s ocated n |unge areas. 6) Lne & Pumb for body was not foowed. 7) CC Bed under ppes, Bodywa depth under ppes etc., defectve. 8) Parapets not matchng n ength & eve. Outer dstance does not stck on to 7.5m standard road wdth. 9) Pantng, Numberng etc not foowed. In vew of the above, the gudenes for Constructon of RCC Ppe Cuverts n rura roads as stpuated n IRC codes & other materas are re terated for gudance of ed engneers for adopton and better constructon practces. The pped cuverts are taken up now as ths type of cuvert s most mportant and ma|or tem n a estmates than the other CD structures. The sef-drawn typca RCC Pped cuvert and IRC Codes coverng CD Works are here wth communcated to a ed engneers for gudance, adopton & further dscussons.
(-) R(1((2!( M$2"$#*00 () IRC-Sp-20-2004-Rura Roads Manua () IRC-Sp-13-2004-Desgn of Sma Brdges & Cuverts () IS-458-2003- Speccatons for Precast Concrete Ppes (v) IS-783-2005- Code of Practce for Layng of Concrete Ppes. (+) P($34#( 00 Renforcement Concrete Cement Ppes are popuary known as Hume Ppes or Spun Ppes. These are used for cuverts, sewer nes etc., (.) C"#'()* 00 A sma brdge structure of ess than 6 meter span between faces of abutment s caed a cuvert. A Cuvert s a cross dranage structure & the functon s to convey storm runoh and or other dscharges from one sde of the roadway to the other sde expedtousy and ehectvey. ..-. T56(* %1 C"#'() The foowng types of cuverts are generay provded across the country: (a) RCC Ppe Cuvert (b) RCC Sab Cuvert (c) RCC Box Types Cuvert (d) Arch Cuvert (e) Cut Stone Sab Cuvert The rst two types of cuverts are most popuar across ths state. RCC Sab cuverts sha be adopted where the foundng strata s rocky or of better bearng capacty. In case where adequate cushon s not avaabe for ocatng ppe cuvert RCC sab cuvert shoud be adopted. (IRC SP13-2004). Ppe cuvert may prove to be economca where foundaton of cuvert s key to be deeper or n predomnanty back cotton so area; and where foundatons are requred to be taken to more than 2.5 m beow the bed eve. For catchment areas upto 20 hectares ppe cuverts w be economca n comparson to sab cuverts on a types of roads. For catchment area more than 60 hectares, RCC sab cuvert ohers an economca and convenent proposa. Aternatvey box cuverts, snge or mutpe ce span be used. (7) C%2*)"!)i%2 %1 Pi6(/ C"#'() D(*ig2 $*6(!)*0 7.- G(2($#0 The requred formaton wdth for rura roads |Other Dstrct Road (ODR) and Vage Road (VR)| s 7.5m. The desgn fe for a cuvert types s 100 years. 7.+ C%/(* The ppes sha be conform to IS:458-1989 (Speccaton for concrete ppes) and sha be ad as per reevant IS:783-1985 (ayng of concrete ppes). 7.. H5/$"#i! & Fi(#/ D$)$ The foowng data needs to be coected for the desgn of a cuvert after detaed survey and from ed vst: () Catchment area of the stream n hectares. () Traverse the stream 100M ether sde of cuvert to ascertan the actua ow detas ke veocty, wdth & depth of ow n the cear bankng reaches. () Any meanderng of the stream or skew requrement sha be ascertaned. (v) Average Bed Leve (BL), Hgh ood eve (HFL) & Road top eve (RTL). (v) Other detas /c sos data, net and outet eroson ssues and possbe sedment / debrs ssues, any cuvert skew requrements The road top eve at cuvert shoud be xed n advance.
7.7 L%!$)i%2 %1 C"#'()* A cuvert shoud be ocated to t the natura channe i2 #i2( $2/ g$/( as far as s practca and agned to gve the stream a drect entrance and a drect ext. The cuverts shoud ne up the natura skew n a channe as far as possbe, as a cuvert on a dherent skew coud cause progressve bank eroson & protecton of banks become costy. If possbe, a cuvert shoud have the same agnment as ts channe. 7.8. S(#(!)i%2 %1 T56( %1 Pi6(, Di$ & N%.%1 %9* The number of ppes, ength and ppe da shoud be seected based on the study of catchment area, stream wdth & depth of water, stream agnment, net & outet condtons. Snce the catchment area vares wdey, t s suggested to estmate dscharge of a natura stream by drect measurement. If t s not possbe to measure, some of the emprca formuae (ke, Dcken's and Ings ) sted n IRC:SP:13 may be referred to x the dscharge. The sampe desgn on ow proe s as foows.. ) Approxmate catchment area of the stream-"M" Acres ) Usng Dckens formua, Max. Dscharge O = C(M) ( Where C=11- 14 , where annua ran fa s 60-120 Cms). ) Assume Veocty of Fow based on sope condtons= V m/sec v) Arrve Ventage area A=O/V sqm. v) Assume da. of ppes and No. of rows based on ste condton and check for ventage provded. 7.8.- Di$3()( %1 6i6( 0 The cost of sab cuvert s ess f the hard strata for foundaton s wthn 2m from the bed eve, otherwse, ppe cuvert s chosen. The man advantage n ppe cuverts s the speed of constructon and good quaty of factory produced ppes. Athough use of 450 mm, 600 mm dameter ppes n CD works was more popuar n ow to moderate ranfa regons, from nspecton and mantenance pont of vew, a mnmum of 900 mm (nterna) dameter s recommended. However, takng nto consderaton the ow embankment heghts, ppes of esser da, vz, 600 mm or 750 mm may aso be used substantatng wth reasons. RCC ppes of 300 and 450 mm da, used for rrgaton/ agrcuture are to be consdered as mere bured conduts and not as cuverts. 7.8.+ C#$** %1 Pi6(*00 RCC NP3 Cass non pressure ppes are generay used for cuvert constructons. Prevousy RCC NP2 ppes on rura roads are extensvey used but due ess she thckness there are damaged eary due to the Cass A oadng wth mpact generated by modern vehcuar movements. The ppes for cuverts sha to IS:458-1989 The she thckness s as foows. NP. Pi6(* Di$. S:(## ):i!;2(** 300MM 40mm 600MM 85mm 900MM 100mm 1000MM 115mm 1200MM 125mm 7.8.. S(#(!)i2g ):( Di$3()( %1 Pi6(* (As per IRC-SP 20-2002) Catchment Area (Hectares) Dameter of Ppe (mm) Up to 10 1000 snge row 10 to 20 1200 snge row 20 to 50 1000 or 1200 (2 to 3 rows) 7.< E$):9%; E=!$'$)i%20 The wdth of the ppe trench sha be sumcent to permt satsfactory |ontng of the ppe, but t sha not be ess than the externa dameter of the ppe pus 8 nches on each sde. The depth beow ppes sha be executed at east (0.2Da. + Thckness of concrete beddng), beow the bed eve of the watercourse. For headwas the depth of excavaton sha be taken upto hard sos. 7.> B(//i2g 4(#%9 Pi6(*00 The structura desgn of ppe cuvert requres cacuatons of probabe maxmum oad on the ppe, nherent strength of ppe and seecton of beddng for the ppe. It s desrabe to use Type A, .e., !%2!()( !$/#( 4(//i2g for ppes of 000 mm dameter and above and those wth s hgher than 4 m. The wdth of the crade s not ess than the externa dameter of the ppe pus 200 mm. The mnmum compressve strength of concrete shoud be 15MPa(M15). The Type B beddng s adopted for heght of between 0.60 m and 4.0 m. It conssts of a contnuous ayer of compacted sand or moorum, wth mnmum thckness of 75 mm beow the ppe. In case where foundaton condtons are unusua, ow avaabe cushon, the ppes sha be encased wth 150mm thck cement concrete 1:5:10 or compacted sand or grave a- around n. 7.? L%9(i2g $2/ L$5i2g %1 Pi6(*0 7.?.- G(2($# The ayng and assemby of ppes sha conform to IS: 783. The trench sha be checked for proper eve, grade and agnment before owerng the ppes. 7.?.+ L%9(i2g %1 Pi6(*0 The ppes sha be owered cautousy to prevent dsturbance of the bed and sdes of the trench & mpact on ppe & coar. The heavy ppes sha be owered by means of proper chan puey bocks. 7.?.. L$5i2g %1 Pi6(*0 Layng of ppes sha proceed n up-grade of sopes & to be conrmed for requred nvert eves at ether ends. Ppes sha be ad true to ne and grade as speced. A ppes & coars must be new and perfecty sound, free from cracks, cyndrcay straght and of standard nomna dameter and ength wth even texture. The body of the ppe for ts entre ength sha rest on an even bed n the trench and paces sha be excavated to receve the Coar for the purpose of assemby. 7.?.7 A**(34#5 %1 RCC Pi6(* The cuvert s to be agned wth the exstng watercourse channe. The bottom of the cuvert shoud be embedded at east 0.2D (Dened as 20% or 1/5 of the dameter of the cuvert) beow the bed of the watercourse at the upstream and downstream end of the structure. 7.?.8 @%i2)* 1% Pi6(* ( IS0>?.--A?8)00 The ends of concrete ppes used for road cuverts maybe sutabe for ush (NP3 and NP4) or coar |onts (NP2) . For ppes of dameter up to 700 mm, externa ush |ont and for dameters above 700 mm, nterna ush |ont s recommended. 7.?.8.- T56(* - The |onts may be many of two types, a) Rgd |onts, and b) Fexbe |onts. Rigi/ @%i2)* - In ths the water sea s ehected by cement mortar or smar matera whch w not aow any movement between the two ppes. $).S%!;() $2/ S6ig%) @%i2) - The annuar space between socket and spgot s ed wth cement mortar (1 : 2). 4).C%##$ @%i2) - Coars of 15 to 20 cm wde cover the |ont between two ppes. A sghty damp mxtures of cement and sand s rammed wth caukng too. !).F#"*: @%i2)- . Interna ush |ont - . Externa ush |ont.
F#(=i4#( @%i2)* - The water sea s ehected because of contact pressure between the seang rubber rngs and the ppe surface. Rubber Rng |onts provde concrete ppes wth a hgh degree of exbty to accommodate ground settement or agnment ad|ustments whe mantanng a watertght |ont capabe of wthstandng the common eves of hydrauc head occurrng n a storm water ppene. T:(*( $( 3$i2#5 )9% types. a). Ro on |ont, b). Conned Gasket |ont. 7.?.< @%i2)i2g %1 6i6(*0 The ppes sha be |oned ether by ush |ont or the coar |ont. In case of ush |ont the ends of ppes are specay shaped to form a sef- centerng |ont wth |ontng space 13 mm wde. The |ontng space sha be ed wth cement mortar (cement : sand I :2) mxed sumcenty dry to reman n poston when forced wth a trowe or rammer. Care sha be taken to a vods and excess mortar sha be removed & gunny bags sha be covered on each |ont after competon. The coar sha be of RCC 150 mm to 200 mm wde havng strength as that of ppes. Caukng space sha be between 13 to 20 mm accordng to the dameter of the ppe. A few skens of spun yarn soaked n neat cement wash sha be nserted n the groove at the end of the ppe and the two ad|onng ppes butted aganst each other. The coar sha than be sded over the |ont coverng equay both the ppes. Spun yarn soaked n neat cement wash sha be passed round the ppes and nserted n the |ont by means of caukng toos from both ends of the coar. Caukng matera sha be a wet mx of cement and sand n the rato of 1:2 rammed wth caukng rons. 7.?.> C"i2g %1 @%i2)* The cement mortar |onts sha be cured at east for seven days. 7 .A G(%3()i! S)$2/$/* 1% C"#'()* 7.A.- O'($## 9i/): %1 CD 9%;*0
The overa wdth of cuvert shoud be equa to the formaton wdth of the road. In rura roads, the road way wdth s 7.5m n pan and rong terran measured from outer to outer of parapet was. The carrage way wdth of a CD structure s generay the overa wdth mnus the parapets or kerbs wth or wthout rangs whch shoud normay aow passage of two trans of IRC Cass A Loadng. 7.A.+ D(*ig2 L%$/i2g Cuverts and brdges of 6m, 6.4m and 7.5m overa wdths on rura roads are normay desgned for two anes of IRC Cass A oadng wth mpact. 7.A.. Mi2i3"3 *6$2 0 From the consderaton of mantenance of cuverts, t s preferabe that the cear waterway of ppe cuvert s 1000 mm (900 mm nterna 4). Cuverts of sma span or dameter get choked due to st. It s not possbe to enter the ppe and carry out nspecton and repars. Irrgaton ppes do not come under the purvew of ppe cuverts. 7.A.7 H($/9$##0 The Headwas are rased up to top of the crust eve of the road. The ength of headwa s (B"$# )% 1%" )i3(* ):( /i$3()( %1 6i6( for retanng the sope of earthen bank wthn 1(Vertca) to 1.5(Horzonta). Longer head was are provded for wder streams as per ste requrements. Sutaby desgned RCC face wa (150mm thck ) can aso be used for snge row ppe cuverts. R%"g: !$#!"#$)i%2 %1 #(2g): %1 B%/5 9$##*. Length of the body wa L =2H+(nD+(n-1)D/2)+0.60 Where H=Ht. of the Body wa from the Bed Leve, N=No.of vents, D= Da. Of Ppes n Mtrs. It sha be ensured that the nvert of the ppe s paced 150mm beow the average bed eve. 7.A.8. P$$6() 9$## $2/ $i#i2g : For cuverts, where parapet was are provded they sha be of pan concrete M15 grade or store masonry wth sze 0.30x0.30M or 0.30x0.45M or 0.45x 0.45M over Head was. The standard road wdth of 7.50M sha be mantaned measured from outer to outer of parapet was at a ponts. In case of sma ppe cuverts wth ow bankng heght, no parapet was are needed and guard stones woud be adequate. Guard stones provded sha be of sze 200x200x600 mm. (IRC SP-13-2004). If consdered necessary ether ppe rang or guard stones of 200x200mm secton pro|ectng 300mm above kerb and spaced at 1200mm c/c may be xed. At the end of parapets and returns, 400x400x600mm RCC bocks are provded at four comers at the md of returns. Numberng of cuverts and drecton of ow can be marked on these pars. 7.A.< Li2(, G$/( & P#"340C Lne and grade shoud be checked as the ppe are nstaed on the beddng and further the head was sha be checked aganst Lne & Pumb, any uneven surface notced sha be mmedatey rected on the day of remova of shutterngs. 7.A.> G$/( %1 C%2!()(0 As per IRC: 21, the M15 s the mnmum grade for pan concrete and M20 for desgn mx. Where the quantum of concrete work s sma ke CD works of rura roads, t s suggested to use nomna mx based on voumetrc proporton of cements and aggregate wth a water cement rato upto 0.45. The mnmum quantty of cement sha be 310kg/m 3. The nomna mx adapted n sma works and ther correspondng strength for dherent works usng 43 grade cement s gven n Tabe for gudance (IRC-SP-20-2002). The Super pastczers coud be used to mprove workabty. It s advsabe to use pastcsers and reduce w/c rato to 0.4 to acheve hgher strength of concrete. TABLE 00 GRADES %1 CONCRETE G$/( N%3i2$# Mi= U*$g( M10 1:4:8 Lean concrete as eveng course M15 1:3:6 Bed Concrete, PCC Per/Abutments 1:2.5:5 Abutment, Wng/Return Was, Foundaton for RCC works M20 1:2:4 RCC Per, Abutment Caps, Raft foundatons, Drt was M25 1:1.5:3 RCC Superstructure Note: Mx proportons are by weght The Power drven mxers and vbrators must be used for concrete works of CD Works to acheve requred compacton & strength. 7.A.? N"34( %1 !"#'()* 6( ;i#%3()( (IRC-S6-+,-+,,+)00 It s recommended to provde about 2-3 cuverts per km ength of road dependng on the topography. Cuverts are provded at the rate of one per 500 m ength of road to avod water oggng. 7.A.A H(ig:) %1 C"#'()0 The mnmum heght of the formaton eve of the road from the bed eve requred n case of ppe cuvert s 1.75m ( for 900mm ppe) ( IRC Sp-20-2002) 7.A.-, C"*:i%2 %'( Pi6(* : The cushon between the top of the ppe and the road top eve sha not be ess than 600 mm. (IRC SP13-2004) and preferaby 1.0M (IRC_SP-20-2002). 7.A.-- C#($ Di*)$2!( 4()9((2 Pi6(* : The Cear Dstance between Ppes may be adopted as 500mm for ppes da. ess than 1000mm and 600mm for the ppes above 1200mm. (IRC_SP-20- 2002). 7.-,. N"34(i2g %1 C"#'()*0 7.-,.-. The number of cuvert s ndcated n each km. For nstance number 21/8 represent the 8th CD structure n kometre 21. The nformaton regardng (1) the number of spans (2) cear span ength n m, and (3) the type of deckng or cuverts, s ndcated beow: Number of spans, cear span n m, type of cuvert/sma brdges are gven, e.g. - = + = S , means 1 span of 2 m wth RCC sod sab. For varous types of cuverts and sma brdges use the symbo as RCC Sod sab S, Ppe cuvert P, Arch A, Box Type B, Stone Sab ST. The number of the structure sha be nscrbed near the top of the eft hand sde parapet wa as seen by tramc n the end eevaton when approachng the structure from each drecton. 7.-,.+. The methodoogy for nscrbng numbers on parapets, RCC posts has been gven, n IRC:7 'Recommended Practce for Numberng of Brdges and Cuverts. The sze of etter sha not be ess than 100mm hgh and sha conform to IRC:30' Standard Letters and Numeras of Dherent Heghts for Use on Hghway Sgns'. 8.,. P%)(!)i%2 9%;*0 When the mean veocty of ow s more than 2.6m/sec protecton of entry and ext end s desrabe. Otherwse, stone ptchng of bed woud be adequate (IRC_SP-20). Hgh outet veoctes can cause eroson for a sgncant dstance downstream of an outet & approprate dsspaton measures w be requred. 8.- A6%2* If hgh headwater depths are to be encountered, or f the approach veocty of the channe s hgh or speca so condtons, such as auva sos w cause scour, a short channe exbe bouder apron at U/S & D/S of cuvert s necessary. Ths apron shoud extend at east one ppe dameter upstream from the entrance and 1.5 tmes the dameter of ppe downstream wth the top of the apron shoud not protrude above the norma streambed eevaton. The sze of stone for exbe bouder apron sha be arge as possbe. In no case any fragment sha wegh ess than 40 kg and sze not ess than 300mm. A toe wa a aong the apron wth 600mm x 600mm sze ed wth the same stones s desrabe. The surface on whch the stone apron s to be ad sha be eveed, compacted and prepared for the ength and wdth. The cement concrete groutng sha be undertaken at the dscreton of the engneer n charge as per prevang ste condton. 8.+ R('()3(2) )% B$2;*00 Where the formaton heght of embankment s qute hgh, a quadratera revetment on four sdes wth RR Stones not ess than 225mm thck wth 150mm grave backng sha be provded to safe guard the embankment aganst scour.
8.. D(4i* C%2)%# Accumuaton of debrs / |unge trash at a cuvert net can resut n the cuvert not performng as desgned. The consequences may be damages from nundaton of the road and upstream property. The desgner has three optons for copng wth the debrs probem: () Debrs Racks are ron |oy structures paced across the stream channe to coect the debrs before t reaches the cuvert entrance. () |unge Trap : 200mm da. 1.0 to 1.50M hgh RCC Guard posts at 0.60m c/c n Zgzag manner nstaed on U/S to prevent Tree trunks/branches etc from enterng nto the cuvert vents. <.,. C"#'() 3$i2)(2$2!( Snce the waterway s usuay sma they tend to get cogged due to accumuaton of st and debrs. In addton, the growth of vegetaton shoud be checked est the fe of CD works woud be curtaed. Cuverts w not ast the expected fe uness nspected and repared twce n a year. The mantenance covers the foowng aspects: () Chokng of Vents () Wash out of Approaches () Dsodgement of Cushon v) Scour on D/S v) Stng/Debrs on U/S The bed of the stream shoud be sutaby protected to prevent eroson or scour. The snkng of approaches s qute common n rura areas. Ths s prmary due to mproper compacton of the earth . Occurrence of pothoes due to undermnng s aso common phenomenon. The OC Inspectons w be focused on ths aspect of proper constructons of pped cuverts and defectve constructon w be recommended for re|ecton and the amount can be recovered from the ed omcers n charge of the works hence forth.
Yours fathfuy, ( Neeakanteshwar Yeda) neeakantyeda@gma.com Dy. Executve Engneer, (PR) Vg & OC Sub-Dvson, Nagonda. Enc:- 1) Typca 1V & 2V Ppe cuvert drawng. 2) Reevant IRC Codes. To, The Executve Engneer (PR) PIU Dvn Nagonda, EE PRI Dvn Nagonda & EE PRI Mryaaguda wth a request to communcate the same a ed Engneers under ther contro. Copy to a DyEEs /AEEs through EEs concerned. C/S to the Executve Engneer (PR) Vg & OC Dvn.Hyderabad for favour of nformaton.