TOTAL TOTAL

DESCRIPCION CANTIDAD UNI MATERIAL M. O. OTROS COSTO COSTO I.V.A. COSTO COSTO
DAD DIRECTO INDIRECTO 13% UNITARIO PARCIAL
PISCINA 0 0
Trazo y Nivelacion 35 m2 11.36 11.74 0.35 23.45 0.00 0.00 0.67 23.45
Excavacion a Mano hasta 1.50 mts 70 m3 311.02 30.34 341.36 0.00 0.00 4.88 341.36
Relleno Compactado suelo cemento 20:1 10 m3 205.82 47.10 30.34 283.26 0.00 0.00 28.33 283.26
Solera de Fundacion 50x30 8-1/2"+est-3/8" @ 15cms 1:2:2 3.75 m3 898.40 249.38 8.81 1156.59 0.00 0.00 308.42 1156.59
Losa Concreto e=12.5 cms, 3/8" a.s @ 15 cms., 1:2:2 35 m2 947.33 838.60 27.65 1813.58 0.00 0.00 51.82 1813.58
Columna 30 x 30 cms, a 8 7/8",estr 3/8" @ 15 cms 1 m3 344.72 74.39 2.67 421.78 0.00 0.00 421.78 421.78
Nervio 40 x 25 cms, 6 5/8",estr 1/4" @ 8 cms 0 m3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Tensor 30x30 6-1/2",est 3/8" @ 12cms 1:2:2 0.5 m3 157.14 43.53 3.07 203.74 0.00 0.00 407.48 203.74
Pared de ladrillo de Barro puesto de trinchera, 1:4 30 m2 534.79 460.29 79.72 1074.80 0.00 0.00 35.83 1074.80
Repello de paredes 30 m2 56.27 59.13 1.97 117.37 0.00 0.00 3.91 117.37
Pulido de superficies 30 m2 24.33 38.73 0.04 63.10 0.00 0.00 2.10 63.10
Tuberia PVC 3" 250 psi 30 ml 89.10 20.31 0.61 110.02 0.00 0.00 3.67 110.02
Tuberia PVC 2" 160 psi 10 ml 45.50 6.07 0.18 51.75 0.00 0.00 5.18 51.75
Tuberia PVC 1" 160 psi 10 ml 3.50 3.57 0.11 7.18 0.00 0.00 0.72 7.18
Tee PVC de 3" 5 unidad 20.25 6.04 0.18 26.47 0.00 0.00 5.29 26.47
Codo PVC 3"x90 8 unidad 21.20 6.30 0.19 27.68 0.00 0.00 3.46 27.68
Valvula de paso de bronce 1" 2 unidad 43.30 8.03 0.24 51.57 0.00 0.00 25.79 51.57
Pintura en Interior de Piscina 35 m2 112.49 19.23 0.58 132.30 0.00 0.00 3.78 132.30
Enchapado de Ceramica 20x20 cms en pared 9.2 m2 217.35 24.44 0.73 242.53 0.00 0.00 26.36 242.53
Solera Intermedia 30 x 20 cms, 4 3/8",estr 1/4" @ 15 cms 1.38 m3 283.02 166.32 5.97 455.30 0.00 0.00 329.93 455.30
Solera Coronamiento 10 x 45 cms, 4 3/8",estr 1/4" @ 15 cms,1:2:2 1.03 m3 263.73 252.14 7.88 523.75 0.00 0.00 508.50 523.75
Recubrimiento con Granza de Marmol (Bordillo) 28.92 m2 806.29 43.38 1.30 850.97 0.00 0.00 29.43 850.97
Equipo de Bombeo y mantenimiento de Piscina 1.00 unidad 0.00 1.57 1000.05 1001.62 0.00 0.00 1001.62 1001.62
COSTO TOTAL
IVA
VALOR DE LA OFERTA
PLAN DE OFERTA
PROYECTO CONSTRUCCION DE PISCINA
COSTO DIRECTO
MUNICIPIO DE LA LIBERTAD, DEPARTAMENTO DE LA LIBERTAD
PRESENTA ARQ. ADRIANA DE SERRANO
21 DE OCTUBRE 2013
COSTO
DE
PARTIDA
8980.16
PLAN DE OFERTA
PROYECTO CONSTRUCCION DE PISCINA
MUNICIPIO DE LA LIBERTAD, DEPARTAMENTO DE LA LIBERTAD
PRESENTA ARQ. ADRIANA DE SERRANO
21 DE OCTUBRE 2013
Descripcion
partida No PISCINA
Unidad m3
ITEM No.: Solera Intermedia 30 x 20 cms, 4 3/8",estr 1/4" @ 15 cms
vol de obra 1.38
Descripcion unidad Cantidad Precio Total
Materiales
Cemento bolsa 15.18 $8.50 $129.03
Arena m3 0.79 $9.00 $7.08
Grava m3 0.79 $25.00 $19.67
Hierro 3/8" qq 1.24 $51.00 $63.36
Hierro 1/4" qq 0.80 $51.00 $40.88
alambre libras 6.21 $0.75 $4.66
Tabla de Pino varas 12.75 $0.99 $12.62
Costanera de pino varas 18.70 $0.29 $5.42
Clavo con cabeza 2-1/2" libras 0.28 $0.50 $0.14
Desencofrante-separol cimbrafest gln 0.02 $6.86 $0.17
Total Materiales $283.02
Mano de Obra
Concreteado Solera ml 23.00 $4.00 $92.00
armaduria 3/8 qq 1.24 $7.67 $9.53
armaduria 1/4 qq 0.80 $8.52 $6.83
Moldeado de SOLERA INERMEDIA ml 19.32 $3.00 $57.96
mayor 25 cms ancho
Total Mano de Obra $166.32
Herramientas y Equipo
Herramienta % 0.03 $166.32 $4.99
Vibrador Electrico para concreto hora 0.14 $0.57 $0.08
Concretera hora 0.14 $6.50 $0.90
$5.97
costo directo $455.30
0.00% Indirectos $0.00
I.V.A. 59.19
Precio Unitario $372.82
ANALISIS DE PRECIOS UNITARIOS
LICITACION
PROYECTO CONSTRUCCION DE PISCINA
MUNICIPIO DE LA LIBERTAD, DEPARTAMENTO DE LA LIBERTAD
21-Oct-13
PRESENTA ARQ. ADRIANA DE SERRANO
Descripcion
partida No PISCINA
Unidad m3
ITEM No.: Solera Coronamiento 10 x 45 cms, 4 3/8",estr 1/4" @ 15 cms,1:2:2
vol de obra 1.03
Descripcion unidad Cantidad Precio Total
Materiales
Cemento bolsa 11.33 $8.50 $96.31
Arena m3 0.59 $9.00 $5.28
Grava m3 0.59 $25.00 $14.68
Hierro 3/8" qq 1.52 $51.00 $77.38
Hierro 1/4" qq 0.99 $51.00 $50.34
alambre libras 7.73 $0.75 $5.79
Tabla de Pino varas 11.77 $0.99 $11.66
Costanera de pino varas 4.12 $0.50 $2.06
Clavo con cabeza 2-1/2" libras 0.21 $0.50 $0.10
Desencofrante-separol cimbrafest gln 0.02 $6.86 $0.13
Total Materiales $263.73
Mano de Obra
Concreteado Solera ml 22.89 $6.00 $137.33
armaduria 3/8 qq 1.52 $7.67 $11.64
armaduria 1/4 qq 0.99 $8.52 $8.41
Moldeado Especial curvo ml 23.69 $4.00 $94.76
mayor 25 cms ancho
Total Mano de Obra $252.14
Herramientas y Equipo
Herramienta % 0.03 $252.14 $7.56
Vibrador Electrico para concreto hora 0.04 $0.57 $0.03
Concretera hora 0.04 $6.50 $0.29
$7.88
costo directo $523.75
0.00% Indirectos $0.00
I.V.A. 68.09
Precio Unitario $574.60
ANALISIS DE PRECIOS UNITARIOS
LICITACION
PROYECTO CONSTRUCCION DE PISCINA
MUNICIPIO DE LA LIBERTAD, DEPARTAMENTO DE LA LIBERTAD
21-Oct-13
PRESENTA ARQ. ADRIANA DE SERRANO
Descripcion
partida No PISCINA
Unidad m2
ITEM No.: Recubrimiento con Granza de Marmol (Bordillo)
vol de obra 28.92
Descripcion unidad Cantidad Precio Total
Materiales
Cemento bolsa 28.92 $8.50 $245.82
Arena m3 16.48 $9.00 $148.36
Grava m3 16.48 $25.00 $412.11
Total Materiales $806.29
Mano de Obra
Hechura Bordillo hora 28.92 $1.50 $43.38
Total Mano de Obra $43.38
Herramientas y Equipo
Herramienta % 0.03 $43.38 $1.30
$1.30
costo directo $850.97
0.00% Indirectos $0.00
I.V.A. 110.63
Precio Unitario $33.25
ANALISIS DE PRECIOS UNITARIOS
LICITACION
PROYECTO CONSTRUCCION DE PISCINA
MUNICIPIO DE LA LIBERTAD, DEPARTAMENTO DE LA LIBERTAD
21-Oct-13
PRESENTA ARQ. ADRIANA DE SERRANO
Descripcion
partida No PISCINA
Unidad unidad
ITEM No.: Equipo de Bombeo y mantenimiento de Piscina
vol de obra 1
Descripcion unidad Cantidad Precio Total
Materiales
0 $0.00 $0.00
Total Materiales $0.00
Mano de Obra
Auxiliar por hora hora 1 $1.57 $1.57
Total Mano de Obra $1.57
Herramientas y Equipo
Herramienta en porcentaje a la % 0.03 $1.57 $0.05
Total Herramientas y Equipo $0.05
Subcontratos
Equipo de Bombeo y mantenimiento de Piscina sg 1 $1,000.00 $1,000.00
Total Herramientas y Equipo $1,000.00
costo directo $1,001.62
0.00% Indirectos $0.00
I.V.A. 130.21
ANALISIS DE PRECIOS UNITARIOS
PRESENTA ARQ. ADRIANA DE SERRANO
LICITACION
PROYECTO CONSTRUCCION DE PISCINA
MUNICIPIO DE LA LIBERTAD, DEPARTAMENTO DE LA LIBERTAD
21-Oct-13
Descripcion
partida No PISCINA
Unidad m2
ITEM No.: Trazo y Nivelacion
vol de obra 35
Descripcion unidad Cantidad Precio Total
Materiales
Cuarton de Pino varas 1.75 $0.90 $1.58
Costanera de Pino varas 10.5 $0.50 $5.25
Regla Pacha de Pino varas 9.45 $0.35 $3.31
Clavo con cabeza 2" libras 0.7 $0.50 $0.35
Crayones c/u 0.35 $0.50 $0.18
Pia Nylon # 3 cono 0.35 $2.00 $0.70
Total Materiales $11.36
Mano de Obra
Auxiliar por hora hora 5.25 $1.57 $8.24
Cuadrilla Topografia m2 17.5 $0.20 $3.50
Total Mano de Obra $11.74
Herramientas
Herramienta en porcentaje a la % 0.03 $11.74 $0.35
mano de obra
Mangura yarda 0.35 $0.69 $0.00
Total Herramientas y Equipo $0.35
Herramientas
Total Herramientas y Equipo
costo directo $23.45
0.00% Indirectos $0.00
I.V.A. 3.05
ANALISIS DE PRECIOS UNITARIOS
PRESENTA ARQ. ADRIANA DE SERRANO
LICITACION
PROYECTO CONSTRUCCION DE PISCINA
MUNICIPIO DE LA LIBERTAD, DEPARTAMENTO DE LA LIBERTAD
21-Oct-13
Descripcion
partida No PISCINA
Unidad m3
ITEM No.: Excavacion a Mano hasta 1.50 mts
vol de obra 70
Descripcion Cantidad unidad Precio Total
Mano de Obra
Auxiliar por hora 198.1 hora $1.57 $311.02
Total Mano de Obra $311.02
Herramientas y Equipo
Herramienta en porcentaje a la 0.03 % $311.02 $9.33
mano de obra
Total Herramientas y Equipo $9.33
costo directo $320.35
0.00% Indirectos $0.00
I.V.A. 41.65
Precio Unitario $5.17

PRESENTA ARQ. ADRIANA DE SERRANO
ANALISIS DE PRECIOS UNITARIOS
LICITACION
PROYECTO CONSTRUCCION DE PISCINA
MUNICIPIO DE LA LIBERTAD, DEPARTAMENTO DE LA LIBERTAD
21-Oct-13
Descripcion
partida No PISCINA
Unidad m3
ITEM No.: Relleno Compactado suelo cemento 20:1
vol de obra 10
Descripcion Cantidad unidad Precio Total
Materiales
Selecto 11.5 m3 $6.50 $74.75
Cemento 15 bolsas $8.50 $127.50
Agua llevada en pipa 0.85 m3 $4.20 $3.57
Total Materiales $205.82
Mano de Obra
Auxiliar por hora 15 hora $3.14 $47.10
Total Mano de Obra $47.10
Herramientas y Equipo
Herramienta en porcentaje a la 0.03 % $47.10 $1.41
mano de obra
Vibrocompactadora 0.0649 mes $445.71 $28.93
Total Herramientas y Equipo $30.34
costo directo $283.26
0.00% Indirectos $0.00
I.V.A. 0.00
Precio Unitario $28.33
ANALISIS DE PRECIOS UNITARIOS
PRESENTA ARQ. ADRIANA DE SERRANO
LICITACION
PROYECTO CONSTRUCCION DE PISCINA
MUNICIPIO DE LA LIBERTAD, DEPARTAMENTO DE LA LIBERTAD
21-Oct-13
10.5
Descripcion
partida No PISCINA
Unidad m3
ITEM No.: Solera de Fundacion 50x30 8-1/2"+est-3/8" @ 15cms 1:2:2
vol de obra 3.75 0.1875
Descripcion Cantidad unidad Precio Total
Materiales
Cemento 41.25 bolsa $8.50 $350.63
Arena 2.25 m3 $9.00 $20.25
Grava 2.25 m3 $25.00 $56.25
Hierro 3/8" 4.30 qq $51.00 $219.15
Hierro 1/2" 4.85 qq $51.00 $247.15
alambre 1.50 libras $0.75 $1.13
Tabla de Pino 3.19 varas $0.99 $3.16
Regla Pacha de pino 1.50 varas $0.29 $0.44
Clavo con cabeza 2-1/2" 0.38 libras $0.50 $0.19
Desencofrante-separol cimbrafest 0.01 gln $6.86 $0.06
Total Materiales $898.40
Mano de Obra
Concreteado Solera 25.00 ml $7.00 $175.00
armaduria 3/8 4.30 qq $7.67 $32.96
armaduria 1/2 4.85 qq $7.00 $33.92
Moldeado de Solera de 3.75 ml $2.00 $7.50
fundacion meyor 25 cms altura
Total Mano de Obra $249.38
Herramientas y Equipo
Herramienta 0.03 % $249.38 $7.48
Vibrador Electrico para concreto 0.19 ml $0.57 $0.11
Concretera 0.19 hora $6.50 $1.22
$8.81
costo directo $1,156.59
0.00% Indirectos $0.00
I.V.A. 150.36
Precio Unitario $348.52
ANALISIS DE PRECIOS UNITARIOS
LICITACION
PROYECTO CONSTRUCCION DE PISCINA
MUNICIPIO DE LA LIBERTAD, DEPARTAMENTO DE LA LIBERTAD
21-Oct-13
PRESENTA ARQ. ADRIANA DE SERRANO
3.75
Descripcion
partida No PISCINA
Unidad m3
ITEM No.: Columna 30 x 30 cms, a 8 7/8",estr 3/8" @ 15 cms
vol de obra 1
Descripcion unidad Cantidad Precio Total
Materiales
Cemento bolsa 11.00 $8.50 $93.50
Arena m3 0.57 $9.00 $5.13
Grava m3 0.57 $25.00 $14.25
Hierro 7/8" qq 2.54 $51.00 $129.54
Hierro 3/8" qq 1.47 $51.00 $74.97
alambre libras 21.00 $0.75 $15.75
Tabla de Pino varas 9.77 $0.99 $9.67
Costanera de pino varas 5.80 $0.29 $1.68
Clavo con cabeza 2-1/2" libras 0.20 $0.50 $0.10
Desencofrante-separol cimbrafest gln 0.02 $6.86 $0.12
Total Materiales $344.72
Mano de Obra
concreteado Columnas hora 0.50 $7.00 $3.50
armaduria 1/2 qq 2.54 $7.67 $19.48
armaduria 1/4 qq 1.47 $8.52 $12.52
Moldeado de columna ml 11.11 $3.50 $38.89
mayor 25 cms ancho
Total Mano de Obra $74.39
Herramientas y Equipo
Herramienta % 0.03 $74.39 $2.23
Vibrador Electrico para concreto ml 0.06 $0.57 $0.04
Concretera hora 0.06 $6.50 $0.41
$2.67
costo directo $421.78
0.00% Indirectos $0.00
I.V.A. 54.83
Precio Unitario $476.61
ANALISIS DE PRECIOS UNITARIOS
LICITACION
PROYECTO CONSTRUCCION DE PISCINA
MUNICIPIO DE LA LIBERTAD, DEPARTAMENTO DE LA LIBERTAD
21-Oct-13
PRESENTA ARQ. ADRIANA DE SERRANO
Descripcion
partida No PISCINA
Unidad m3
ITEM No.: Tensor 30x30 6-1/2",est 3/8" @ 12cms 1:2:2
vol de obra 0.5 0.025
Descripcion Cantidad unidad Precio Total
Materiales
Cemento 6.00 bolsa $8.50 $51.00
Arena 0.32 m3 $9.00 $2.86
Grava 0.32 m3 $25.00 $7.94
Hierro 3/8" 0.94 qq $51.00 $48.00
Hierro 1/2" 0.82 qq $51.00 $41.94
alambre 5.29 libras $0.75 $3.96
Tabla de Pino 1.13 varas $0.99 $1.11
Regla Pacha de pino 0.88 varas $0.29 $0.25
Clavo con cabeza 2-1/2" 0.13 libras $0.50 $0.06
Desencofrante-separol cimbrafest 0.00 gln $6.86 $0.01
Total Materiales $157.14
Mano de Obra
Concreteado tensor 5.56 ml $3.00 $16.67
armaduria 3/8 0.94 qq $7.67 $7.22
armaduria 1/2 0.82 qq $7.00 $5.76
Moldeado de Solera de 5.56 ml $2.50 $13.89
fundacion menor 25 cms altura
Total Mano de Obra $43.53
Herramientas y Equipo
Herramienta 0.03 % $43.53 $1.31
Vibrador Electrico para concreto 0.25 hora $0.57 $0.14
Concretera 0.25 hora $6.50 $1.63
$3.07
costo directo $203.74
0.00% Indirectos $0.00
I.V.A. 26.49
Precio Unitario $460.45
ANALISIS DE PRECIOS UNITARIOS
LICITACION
PROYECTO CONSTRUCCION DE PISCINA
MUNICIPIO DE LA LIBERTAD, DEPARTAMENTO DE LA LIBERTAD
21-Oct-13
PRESENTA ARQ. ADRIANA DE SERRANO
0.45
11.11111111
4.888888889
5.555 3.6663
10.5799373
Descripcion
partida No PISCINA
Unidad m3
ITEM No.: Nervio 40 x 25 cms, 6 5/8",estr 1/4" @ 8 cms
vol de obra 0
Descripcion unidad Cantidad Precio Total
Materiales
Cemento bolsa 0.00 $4.95 $0.00
Arena m3 0.00 $8.57 $0.00
Grava m3 0.00 $20.95 $0.00
Hierro 5/8" qq 0.00 $33.00 $0.00
Hierro 1/4" qq 0.00 $30.00 $0.00
alambre libras 0.00 $1.00 $0.00
Tabla de Pino varas 0.00 $0.99 $0.00
Costanera de pino varas 0.00 $0.29 $0.00
Clavo con cabeza 2-1/2" libras 0.00 $0.50 $0.00
Desencofrante-separol cimbrafest gln 0.00 $6.86 $0.00
Total Materiales $0.00
Mano de Obra
auxiliar hora 0.00 $1.57 $0.00
armaduria 1/2 qq 0.00 $7.67 $0.00
armaduria 1/4 qq 0.00 $8.52 $0.00
Moldeado de columna ml 0.00 $3.50 $0.00
mayor 25 cms ancho
Total Mano de Obra $0.00
Herramientas y Equipo
Herramienta % 0.03 $0.00 $0.00
Vibrador Electrico para concreto hora 0.00 $0.57 $0.00
Concretera hora 0.00 $6.50 $0.00
$0.00
costo directo $0.00
0.00% Indirectos $0.00
I.V.A. 0.00
Precio Unitario $0.00
ANALISIS DE PRECIOS UNITARIOS
LICITACION
PROYECTO CONSTRUCCION DE PISCINA
MUNICIPIO DE LA LIBERTAD, DEPARTAMENTO DE LA LIBERTAD
21-Oct-13
PRESENTA ARQ. ADRIANA DE SERRANO
Descripcion
partida No PISCINA
Unidad ml
ITEM No.: Tuberia PVC 3" 250 psi
vol de obra 30
Descripcion Cantidad unidad Precio Total
Materiales
Tuberia PVC 3" 250 psi 30 ml $2.90 $87.00
Pegamento 0.21 varas $10.00 $2.10
Total Materiales $89.10
Mano de Obra
Auxiliar por hora 3 hora $1.57 $4.71
fontanero 30 ml $0.52 $15.60
Total Mano de Obra $20.31
Herramientas y Equipo
Herramienta en porcentaje a la 0.03 % $20.31 $0.61
mano de obra
Total Herramientas y Equipo $0.61
costo directo $110.02
0.00% Indirectos $0.00
I.V.A. 0.00
Precio Unitario $3.67
ANALISIS DE PRECIOS UNITARIOS
PRESENTA ARQ. ADRIANA DE SERRANO
LICITACION
PROYECTO CONSTRUCCION DE PISCINA
MUNICIPIO DE LA LIBERTAD, DEPARTAMENTO DE LA LIBERTAD
21-Oct-13
Descripcion
partida No PISCINA
Unidad ml
ITEM No.: Tuberia PVC 2" 160 psi
vol de obra 10
Descripcion Cantidad unidad Precio Total
Materiales
Tuberia PVC 2" 160 psi 10 ml $4.50 $45.00
Pegamento 0.05 varas $10.00 $0.50
Total Materiales $45.50
Mano de Obra
Auxiliar por hora 1 hora $1.57 $1.57
fontanero 10 ml $0.45 $4.50
Total Mano de Obra $6.07
Herramientas y Equipo
Herramienta en porcentaje a la 0.03 % $6.07 $0.18
mano de obra
Total Herramientas y Equipo $0.18
costo directo $51.75
0.00% Indirectos $0.00
I.V.A. 0.00
Precio Unitario $5.18
ANALISIS DE PRECIOS UNITARIOS
PRESENTA ARQ. ADRIANA DE SERRANO
LICITACION
PROYECTO CONSTRUCCION DE PISCINA
MUNICIPIO DE LA LIBERTAD, DEPARTAMENTO DE LA LIBERTAD
21-Oct-13
Descripcion
partida No PISCINA
Unidad ml
ITEM No.: Tuberia PVC 1" 160 psi
vol de obra 10
Descripcion Cantidad unidad Precio Total
Materiales
Tuberia PVC 1" 160 psi 10 ml $0.30 $3.00
Pegamento 0.05 varas $10.00 $0.50
Total Materiales $3.50
Mano de Obra
Auxiliar por hora 1 hora $1.57 $1.57
fontanero 10 ml $0.20 $2.00
Total Mano de Obra $3.57
Herramientas y Equipo
Herramienta en porcentaje a la 0.03 % $3.57 $0.11
mano de obra
Total Herramientas y Equipo $0.11
costo directo $7.18
0.00% Indirectos $0.00
I.V.A. 0.00
Precio Unitario $0.72
ANALISIS DE PRECIOS UNITARIOS
PRESENTA ARQ. ADRIANA DE SERRANO
LICITACION
PROYECTO CONSTRUCCION DE PISCINA
MUNICIPIO DE LA LIBERTAD, DEPARTAMENTO DE LA LIBERTAD
21-Oct-13
Descripcion
partida No PISCINA
Unidad unidad
ITEM No.: Tee PVC de 3"
vol de obra 5
Descripcion Cantidad unidad Precio Total
Materiales
Tee PVC de 3" 5 unidad $4.00 $20.00
Pegamento 0.025 galon $10.00 $0.25
Total Materiales $20.25
Mano de Obra
Auxiliar por hora 0.5 hora $1.57 $0.79
fontanero 5 ml $1.05 $5.25
Total Mano de Obra $6.04
Herramientas y Equipo
Herramienta en porcentaje a la 0.03 % $6.04 $0.18
mano de obra
Total Herramientas y Equipo $0.18
costo directo $26.47
0.00% Indirectos $0.00
I.V.A. 0.00
Precio Unitario $5.29
ANALISIS DE PRECIOS UNITARIOS
PRESENTA ARQ. ADRIANA DE SERRANO
LICITACION
PROYECTO CONSTRUCCION DE PISCINA
MUNICIPIO DE LA LIBERTAD, DEPARTAMENTO DE LA LIBERTAD
21-Oct-13
Descripcion
partida No PISCINA
Unidad unidad
ITEM No.: Codo PVC 3"x90
vol de obra 8
Descripcion Cantidad unidad Precio Total
Materiales
Codo PVC 3"x90 8 unidad $2.60 $20.80
Pegamento 0.04 galon $10.00 $0.40
Total Materiales $21.20
Mano de Obra
Auxiliar por hora 0.8 hora $1.57 $1.26
fontanero 8 ml $0.63 $5.04
Total Mano de Obra $6.30
Herramientas y Equipo
Herramienta en porcentaje a la 0.03 % $6.30 $0.19
mano de obra
Total Herramientas y Equipo $0.19
costo directo $27.68
0.00% Indirectos $0.00
I.V.A. 0.00
Precio Unitario $3.46
ANALISIS DE PRECIOS UNITARIOS
PRESENTA ARQ. ADRIANA DE SERRANO
LICITACION
PROYECTO CONSTRUCCION DE PISCINA
MUNICIPIO DE LA LIBERTAD, DEPARTAMENTO DE LA LIBERTAD
21-Oct-13
Descripcion
partida No PISCINA
Unidad unidad
ITEM No.: Valvula de paso de bronce 1"
vol de obra 2
Descripcion Cantidad unidad Precio Total
Materiales
Valvula de paso de bronce 1" 2 unidad $21.60 $43.20
Pegamento 0.01 galon $10.00 $0.10
Total Materiales $43.30
Mano de Obra
Auxiliar por hora 0.02 hora $1.57 $0.03
fontanero 2 unidad $4.00 $8.00
Total Mano de Obra $8.03
Herramientas y Equipo
Herramienta en porcentaje a la 0.03 % $8.03 $0.24
mano de obra
Total Herramientas y Equipo $0.24
costo directo $51.57
0.00% Indirectos $0.00
I.V.A. 0.00
Precio Unitario $25.79
ANALISIS DE PRECIOS UNITARIOS
PRESENTA ARQ. ADRIANA DE SERRANO
LICITACION
PROYECTO CONSTRUCCION DE PISCINA
MUNICIPIO DE LA LIBERTAD, DEPARTAMENTO DE LA LIBERTAD
21-Oct-13
Descripcion
partida No PISCINA
Unidad m2
ITEM No.: Pared de ladrillo de Barro puesto de trinchera, 1:4
vol de obra 30
Descripcion unidad Cantidad Precio Total
Materiales
Cemento bolsa 23.40 $8.50 $198.90
Arena m3 2.43 $9.00 $21.87
Agua llevada en pipa m3 0.48 $4.20 $2.02
Ladrillo de obra 7 x 14 x 28 m3 2400.00 $0.13 $312.00
Total Materiales $534.79
Mano de Obra
auxiliar por hora hora 63.88 $1.57 $100.29
Pegamento de ladrillo de barro ml 2400.00 $0.15 $360.00
puesto trinchera 1 block
Total Mano de Obra $460.29
Herramientas
Herramienta % 0.03 $460.29 $13.81
Concretera hora 10.14 $6.50 $65.91
Total Herramientas $79.72
costo directo $1,074.80
0.00% Indirectos $0.00
I.V.A. 139.72
Precio Unitario $40.48
ANALISIS DE PRECIOS UNITARIOS
LICITACION
PROYECTO CONSTRUCCION DE PISCINA
MUNICIPIO DE LA LIBERTAD, DEPARTAMENTO DE LA LIBERTAD
21-Oct-13
PRESENTA ARQ. ADRIANA DE SERRANO
Descripcin
Partida No PISCINA
Unidad: m2
ITEM No Repello de paredes
vol. de obra 30
Descripcin Unidad Cantidad Precio U. Total
Materiales
Cuartondepino Varas 4.50 $0.80 $3.60
Arena de ro m3 0.47 $10.29 $4.86
Aqua potable llevada en pipa m3 0.15 $4.20 $0.63
Cemento gris portland tipo 1 Bolsa 5.55 $8.50 $47.18
Total de Materiales $56.27
Mano de Obra
Auxiliar por hora hora 9.00 $1.57 $14.13
LA:134 Repellar Superficie M2 30.00 $1.50 $45.00
Verticat.<3 ml
Total de Mano de Obra $59.13
Herramienta
Herramienta en porcentaje a la % 0.03 $1.29 $0.04
mano de obra
Concretera de 1 bolsa hora $0.56 $3.43 $1.93
Total de Herramienta $1.97
Costo Directo $ $117.37
0.00% Indirectos ( 20.0%) $23.47
IVA 13% $18.31
Unitario $5.30
21-Oct-13
Anlisis de Precio Unitario
LICITACION
PROYECTO CONSTRUCCION DE PISCINA
MUNICIPIO DE LA LIBERTAD, DEPARTAMENTO DE LA LIBERTAD
PRESENTA ARQ. ADRIANA DE SERRANO
Descripcin
Partida No PISCINA
Unidad: m2
ITEM No Pulido de superficies
vol. de obra 30
Descripcin Unidad Cantidad Precio U. Total
Materiales
Aqua potable llevada en pipa m3 0.15 $4.20 $0.63
Cemento gris portland tipo 1 Bolsa 6.00 $3.95 $23.70
Total de Materiales $24.33
Mano de Obra
Auxiliar por hora hora 9.00 $1.57 $14.13
LA:134 Pulir Superficie M2 30.00 $0.82 $24.60
Vertical.<3 ml
Total de Mano de Obra $38.73
Herramienta
Herramienta en porcentaje a la % 0.03 $1.29 $0.04
mano de obra
Total de Herramienta $0.04
Costo Directo $ $63.10
0.00% Indirectos ( 20.0%) $12.62
IVA 13% $9.84
Unitario $2.85
21-Oct-13
Anlisis de Precio Unitario
LICITACION
PROYECTO CONSTRUCCION DE PISCINA
MUNICIPIO DE LA LIBERTAD, DEPARTAMENTO DE LA LIBERTAD
PRESENTA ARQ. ADRIANA DE SERRANO
Descripcion
partida No PISCINA
Unidad m2
ITEM No.: Losa Concreto e=12.5 cms, 3/8" a.s @ 15 cms., 1:2:2
vol de obra 35 4.375
Descripcion unidad Cantidad Precio Total
Materiales
Cemento bolsa 42.88 $8.50 $364.44
Arena m3 2.41 $9.00 $21.66
Grava m3 2.41 $25.00 $60.16
Hierro 3/8" qq 7.57 $51.00 $386.31
alambre libras 35.00 $0.75 $26.25
Tabla de Pino varas 43.09 $0.99 $42.66
Regla Pacha de pino varas 20.90 $0.50 $10.45
Cuarton de Pino varas 23.16 $1.20 $27.79
Clavo con cabeza 4" libras 2.61 $0.50 $1.31
Clavo con cabeza 2-1/2" libras 2.61 $0.50 $1.31
Clavo acero 2-1/2" unidad 36.83 $0.12 $4.42
Desencofrante-separol cimbrafest gln 0.09 $6.86 $0.60
Total Materiales $947.33
Mano de Obra
Concreteado Losa m2 223.00 $3.50 $780.50
armaduria 3/8 qq 7.57 $7.67 $58.10
Moldeado de Losa m2 35.00 $0.00 $0.00
Total Mano de Obra $838.60
Herramientas y Equipo
Herramienta % 0.03 $838.60 $25.16
Vibrador Electrico para concreto hora 4.38 $0.57 $2.49
Concretera hora 4.38 $6.50 $28.44
$27.65
costo directo $1,813.58
0.00% Indirectos $0.00
I.V.A. 235.77
Precio Unitario $58.55
ANALISIS DE PRECIOS UNITARIOS
LICITACION
PROYECTO CONSTRUCCION DE PISCINA
MUNICIPIO DE LA LIBERTAD, DEPARTAMENTO DE LA LIBERTAD
21-Oct-13
PRESENTA ARQ. ADRIANA DE SERRANO
m2
cem 3.675 bol 1.22500
are 0.20625 m3 0.06875
gra 0.20625 m3 0.06875
losa densa h=10cms
cantidad \ cantidad unidad
Materiales
concreto 1.2.2 0.375 m3 0.12500 8.00000
armaduria de vigas 50 kg 16.66667 8.00000
encofrado 3 m2 1.00000 0.37500
encofrado losa densa h=10cms
cantidad cantidad unidad
Materiales
tabla 29.25 vrs 1.23106
cuarton 15.72 vrs 0.66162
costanera vrs
regla pacha vrs
clavos de acero 3" 25 unidad 1.05219
clavos 4" 5 vrs 0.21044
clavos 3" 3 lbs 0.12626
Mano de Obra
Encofrado 23.76 m2 1.00000
armaduria losa densa h=10cms
cantidad cantidad unidad
Materiales
Ho 3/8'' 0.648718 qq 0.21624 31 11
alambre 3 lbs 1.00000 31 33
Mano de Obra
Armaduria 3/8'' 1.1 qq 0.36667
64 12.26666667
0.943589744
0.648717949
Descripcion
partida No PISCINA
Unidad m2
ITEM No.: Enchapado de Ceramica 20x20 cms en pared
vol de obra 9.2 1.15
Descripcion unidad Cantidad Precio Total
Materiales
Cemento bolsa 2.30 $8.50 $19.55
porcelana bolsas 4.60 $3.00 $13.80
Ceramica 20 x 20 cms M2 9.20 $20.00 $184.00
Total Materiales $217.35
Mano de Obra
auxiliar ml 0.92 $1.57 $1.44
enchapado de pared m2 9.20 $2.50 $23.00
Total Mano de Obra $24.44
Herramientas y Equipo
Herramienta % 0.03 $24.44 $0.73
$0.73
costo directo $242.53
0.00% Indirectos $0.00
I.V.A. 31.53
Precio Unitario $29.79
ANALISIS DE PRECIOS UNITARIOS
LICITACION
PROYECTO CONSTRUCCION DE PISCINA
MUNICIPIO DE LA LIBERTAD, DEPARTAMENTO DE LA LIBERTAD
21-Oct-13
PRESENTA ARQ. ADRIANA DE SERRANO
25
11
0.648717949
Descripcion
partida No PISCINA
Unidad m2
ITEM No.: Pintura en Interior de Piscina
vol de obra 35
Descripcion unidad Cantidad Precio Total
Materiales
Pintura p/piscina Azul Caribe SW galon 2.625 $40.00 $105.00
Brocha 4" unidad 1.05 $3.00 $3.15
Lija 100 de agua pliego 0.945 $2.00 $1.89
Solvente Mineral galon 0.7 $3.50 $2.45
Total Materiales $112.49
Mano de Obra
Auxiliar por hora hora 12.25 $1.57 $19.23
Total Mano de Obra $19.23
Herramientas y Equipo
Herramienta en porcentaje a la % 0.03 $19.23 $0.58
mano de obra
Total Herramientas y Equipo $0.58
costo directo $132.30
0.00% Indirectos $0.00
I.V.A. 0.00
Precio Unitario $3.78
ANALISIS DE PRECIOS UNITARIOS
PRESENTA ARQ. ADRIANA DE SERRANO
LICITACION
PROYECTO CONSTRUCCION DE PISCINA
MUNICIPIO DE LA LIBERTAD, DEPARTAMENTO DE LA LIBERTAD
21-Oct-13

Das könnte Ihnen auch gefallen