3.1 Earlier Stage Audit There were no earlier audits for this project. 3.2 Design Criteria The design criteria for the junctions should adopt the JK!s " or e#ui$alent as it will for% a part of the Jalan &encongan Ti%ur. Done 3.3 Design Speed 1''(ph or lower. )oted 3.* +eneral Traffic ,anage%ent All t-pes of $ehicles allow entering the proposed de$elop%ent. )oted 3." Cli%atic and weather .%plications )ot applica/le. 4.0 Audit Geometric Design Elements *.1 0ori1ontal Align%ent There are no details on the road profile pro$ided /- the C2S Consultant. 0owe$er3 /ased on the site o/ser$ation3 &encongan Ti%ur is a straight road. 4hoto *.1 shows the condition of road. )oted *.2 5ertical Align%ent The $ertical align%ent of the Jalan &encongan Ti%ur in front of the Access 4oint is flat with good sight distance. See 4hoto *.2. )oted *.3 Co%/ination of 0ori1ontal and 5ertical Align%ent )o locations where the 0ori1ontal and 5ertical align%ent cause an- pro/le%s. )oted *.* +rades There are no critical grades since the road is flat. )oted *." Cross Section *.".1 &ane 6idth The width of deceleration lane is 3."%. This is accepta/le. The width of acceleration lane should also /e 3."%. 4lease pro$ide si1es of the e7isting carriagewa- lane in the cross section. See .te% A in 8igure *.1. )oted Done Done *.".2 ,arginal Strip The Design Consultant has pro$ided '."% %arginal strip on the left hand side of the road. This is accepta/le. See 8igure *.1. '."% %arginal strip on the left hand side of the road ha$e /een replaced with 2% pa$ed shoulder. *.".3 Shoulder 6idth )ot applica/le. JK has reco%%ended pro$iding 2% of pa$ed shoulder and 1% of unpa$ed shoulder. This has /een incorporated into design3 %a(ing up the total of 3% for road shoulder. . ,90A,ED S0A8.. ,:STA8A SE4TE,;E 2'13 ,.A+E C9)S:&TA)C< *.".* ,edian 6idth )ot applica/le. *."." 8ootpath )ot applica/le. *.".= Superele$ation )ot applica/le. 5.0 Auditing The Design of Interchanges and Intersection ".1 +eneral &a-out &ogic The consultant has pro$ided one >1? Access 4oint to the 4roposed De$elop%ent Site. The Access 4oint is connecting to the Jalan &encongan Ti%ur. Jalan &encongan Ti%ur is a *@lane dual carriagewa- road. This road is a %ajor highwa- in Sungai 4etani3 Kedah which acts as a /-pass on the Eastern Side of the town. The 4roposed Access 4oint is close to an E7isting Signali1ed Junction3 intersection of Jalan &encongan Ti%ur 2 Jalan Kuala Ketil. Distance of the Access 4oint and the Signali1ed Junction is a/out 3='%. The consultant proposed the Access 4oint as a &eft@.nA&eft@9ut junction. This is accepta/le. )oted ".2 5isi/ilit- and Sight Distance 5.2.1 Approach Sight Distance (ASD) Since the road section at the access point is a straight and flat road3 hence3 it will not affect the Sight Distance of the Access 4oint. )oted 5.2.2 Entering or Crossing Sight Distance (ESD) 8lat oad. )oted 5.2.3 Safe Intersection /Sight Distance (SISD) 8lat oad. )oted 5.2.4 Sight Distance to Queue !ehic"es )ot applica/le. 5.2.5 Sight #ines an !isi$i"it% to &raffic Signa"s/Signs )ot applica/le. 5.3 E'it/Entr% #a%out( Au'i"iar% #anes an #ane Continuit% The length of deceleration lane pro$ided /- the Design Consultant is a/out 1'*%. This is inade#uate. Te(ni( Jalan >ATJ? 11ABC 8igure 3@1" stated re#uired length for decelerating traffic fro% 1''(ph to 2'(ph is a/out 1='%. .te% ; in 8igure ".1. The lane length has /een a%ended to 1='% to suit auditor!s co%%ent . ,90A,ED S0A8.. ,:STA8A SE4TE,;E 2'13 ,.A+E C9)S:&TA)C< The 2''% length of acceleration lane is also inade#uate. The length for accelerating traffics fro% 2'(ph to 1''(ph should /e 31"%. .te% C in 8igure ".1. The junction turning radius %ust /e at least 13.C% for large $ehicles accessing and e7iting the Site. .te% D in 8igure ".2. The lane length has /een a%ended to 31"% to suit auditor!s co%%ent Turning radius pro$ided is 1*.1% 5.4 Is"an Si)e an Shape The Consultant proposed a ph-sical island for the Access 4oint. Si1e and shape of the .sland should follow to the JKDs Standard. That particular ph-sical island has /een changed to ghost island with fle7i/le posts to follow JK!s co%%ent. 5.5 *er$ &%pe The Consultant should pro$ide se%i@ %ounta/le (er/s for the proposed ph-sical island. Since the pre$ious proposed ph-sical island has /een changed to ghost island3 the use of (er/s is no longer applica/le. 5.+ ,ro-ision .or ,eestrian There are no pro$isions for pedestrian facilities at the Access 4oint. The Auditor is not a/le to co%%ent on this as there is no data a$aila/le. )oted 5./ #ocation 0f Signa"s( Sign( #ighting An 0ther 1oa .urniture The place%ent of road signs should not hinder sight distances. The locations of signs are accepta/le. )oted 5.2 !ehic"e ,ar3ing An 4us Stop There are no pro$isions for ;us Stops. The Consultants are ad$ised to connect the &ocal Authorities to ascertain the need of the ;us Stop. .t is ad$isa/le to locate the ;us Stop on the far end of the Access 4oint. )oted 5.5 ,ropert% Access ,oints There are %an- properties with indi$idual access points. These are not properl- designed access points. 0owe$er3 due to the tight 96 and other constraints3 the proposed access points are considered accepta/le. )oted 5.16 78&urn 0penings )ot applica/le. 5.11 &urning ,ath )ot applica/le. .0 Audit of Traffic !igning and "oad #ar$ing =.1 Traffic Signs +enerall-3 the pro$ision of traffic signs is ade#uate. )oted =.2 oad ,ar(ing and Delineation See .te% E in 8igure =.1. These lines should not /e EContinuit- &inesF3 should /e EEdges &inesF. Those lines ha$e /een changed fro% Gcontinuit- lines! to Gedges lines!. %.0 Audit of !treet &ighting Design . ,90A,ED S0A8.. ,:STA8A SE4TE,;E 2'13 ,.A+E C9)S:&TA)C< C.1 The E7tent of Street &ighting )o detail of street lighting design pro$ided /- the Consultant. Street lights should /e pro$ided at the access junction. )oted C.2 The Standard of &ighting )o details pro$ided. 4lease re$iew. C.3 &ighting Transition No details provided. Please review. C.* 0a1ards Caused /- &ighting 4oles No details provided. Please review. C." Sight &ine 9/struction No details provided. Please review. '.0 The Audit of "oadside !afet( Pro)isions B.1 The :se of 8rangi/le T-pes of oad 8urniture )ot applica/le. B.2 +uardrail 4ro$isions and Design Details The Consultant has proposed pro$iding guardrails along the road section of the 4roposed De$elop%ent Site. 0owe$er3 there are no details of the guardrail pro$ided /- the Consultant. The e7isting guardrail in front of the Access 4oint will /e repositioned as shown in 8igure B.1. The new position of the guardrail is accepta/le. The proposed guardrail should /e e7tended and lin(ed to the e7isting guardrail. .te% 8 in 8igure B.1. The guardrail should wrap around to the Access 4oint. See .te% + in 8igure B.2. )oted The guardrail is proposed to /e lin(ed to the e7isting guardrail. The guardrail is a%ended to /e e7tended along the access point as suggested /- the auditor. B.3 +uardrail 4ositioning elati$e to Ker/sA9/jects ;eing 4rotected The e7isting guardrail will /e repositioned as shown in 8igure B.1. )oted B.* ;ridge EndsA+uardrail to ;ridge ail Transitions )ot applica/le. B." ;arriersAailings on ;ridgesAEle$ated oadwa-s )ot applica/le. B.= &andscaping and ;eautification )ot applica/le. *.0 Audit of Pro)isions for !+ecial "oad ,sers H.1 4edestrian 8acilities There are no pro$isions for pedestrian facilities at the Access 4oint. The Auditor is not a/le to co%%ent on this as there is no data a$aila/le. )oted H.2;us Stops There are no pro$isions for ;us Stops. The Consultants are ad$ised to connect the &ocal Authorities to ascertain the need of the ;us Stop. .t is ad$isa/le to locate the ;us Stop on the far end of the Access 4oint. )oted -0.0 Auditing The Traffic #anagement Plan . ,90A,ED S0A8.. ,:STA8A SE4TE,;E 2'13 ,.A+E C9)S:&TA)C< 1'.1 +eneral &a-out )odetails pro$ided. 4lease re$iew. 1'.2 Traffic Control Ione 16.2.1 A-ance 9arning Area )o details pro$ided. 4lease re$iew. 16.2.2 &ransition Area )o details pro$ided. 4lease re$iew. 16.2.3 4uffer Space )o details pro$ided. 4lease re$iew. 16.2.4 9or3 Area )o details pro$ided. 4lease re$iew. 16.2.5 &er:ination Area )o details pro$ided. 4lease re$iew. 1'.3 4lanning for Traffic Control )o details pro$ided. 4lease re$iew. 1'.* 8unction of De$ices 16.4.1 Signs )o details pro$ided. 4lease re$iew. 16.4.2 Channe"ising De-ices )o details pro$ided. 4lease re$iew. 16.4.3 ;ar3ings )o details pro$ided. 4lease re$iew. 16.4.4 #ighting De-ices )o details pro$ided. 4lease re$iew. 16.4.5 ."agging )o details pro$ided. 4lease re$iew. . ,90A,ED S0A8.. ,:STA8A SE4TE,;E 2'13 ,.A+E C9)S:&TA)C<