Table : 1
Demand projection
(Figures in MVA)
3.2.2 The energy requirement for the distribution companies for FY 2001-02 and FY 2002-03 as
reported by GRIDCO for DF-2 of the BST and RR application is given in Table : 2.
Table : 2
Energy Projection
(Figures in MU)
3.2.3 GRIDCO in para 3.5 of their BST application for FY 2001-02 and that of FY 2002-03 has
stated that due to existing uncertainties in the sale of energy outside the state, the sale to other
states has not been considered in the BST application and RR application. Subsequently, in
the clarifications to queries of Director (Tariff), GRIDCO has stated that total estimated sale
to APTRANSCO during FY 2002 would be 716.41 MU and about 1400 MU to
APTRANSCO and Karnataka in FY 2003. On 30.3.2002, GRIDCO has stated that subject to
fresh agreement with APTRANSCO and Northern Region and resolution of wheeling
constraints there may be an estimated sale of 2376 MU in FY 2003.
http://www.orierc.org/Orders/2002/GRIDCO/bsttariff2.htm Page 1 of 7
GRIDCO 10/30/09 1:13 PM
Table : 3
Revenue Requirement For 2001-02
(Rs. in Crore)
3.3.3 For the FY 2001-02, GRIDCO submits that there has been an unusual upsurge in the cost of
power purchase from the Central Generating Station. The cost of power purchase of OHPC
has increased substantially in FY 2001-02 due to interest on convertible bonds and
conversion of bonds to equity which was envisaged in transfer scheme notification issued by
the Government of Orissa on 01.4.96 under the provision of OER Act, 1995 at the time of
restructuring of the power sector. Further, the purchase of low cost of power from the Captive
Power Plant of NALCO became lesser due to Ash Pond problem.
3.3.4 GRIDCO in its BST application for FY 2001-02 has requested for acceptance of Rs.108.25
Crore on account of arrear dues and Rs.60.13 Crore relating to power procurement for the
financial year 2000-01 due to variation in drawal from different sources and Rs.47.83 Crore
on account of increase in fixed cost of Central NTPC stations, TTPS and PGCIL and
electricity duty of Rs.29 lakh for OHPC which was not previously claimed.
http://www.orierc.org/Orders/2002/GRIDCO/bsttariff2.htm Page 2 of 7
GRIDCO 10/30/09 1:13 PM
3.3.5 A summary of the proposal of GRIDCO’s expected revenue for FY 2001-02 and FY 2002-03
is given in Table : 4 (TRT 24-2001-02, TRT 23-2002-03).
Table : 4
Expected Revenue charges 2001-02 & 2002-03
(Rs. in Crore)
Table : 5
Tariff Structure Options
3.4.3 In proposing the structure, GRIDCO has stated that realisation of fixed cost payable to the
generators should be ensured to meet its obligation to generators and maintain the system
stability. This could be possible only by designing the demand charges for recovery of the
entire fixed cost through it. However, as full cost recovery entails a steep rise for the purpose
of this application, GRIDCO proposes to fix it at the level of Rs.250/- per KVA.
http://www.orierc.org/Orders/2002/GRIDCO/bsttariff2.htm Page 3 of 7
GRIDCO 10/30/09 1:13 PM
3.4.4 GRIDCO has been billing to the distribution companies the demand charge on the basis of
simultaneous maximum demand for each month. GRIDCO has submitted that till the contract
demand is finalised with the distribution companies, the demand to be billed in a month will
be the higher of the SMD of the month or the difference between the SMD billed during the
months in the financial year upto the month of billing based on the SMD approved by
Commission in the tariff order.
3.4.5 GRIDCO has assessed the revenue receipt from demand charges based on a total
Simultaneous Maximum Demand (SMD) of 1746.098 MVA is given in Table : 6.
Table : 6
Computation of Demand Charges
Table : 7
Computation of Energy Charges (2001-02)
GRIDCO follows the principle of least cost procurement of power to minimize the total cost
of generation. Any excess drawal from the procurement plan provided by the DISTCOs will
force GRIDCO to procure power from the costlier sources not covered in the revenue
requirement finalised by the Commission. GRIDCO has drawn the attention of the
Commission to the BST approval order for the 2000-01 where the Commission had approved
that higher cost resulting from any drawal in excess of the projected requirement by
DISTCOs would be charged as a year end adjustment to cover the marginal cost of power
purchase plus transmission charges and transmission losses. GRIDCO has sought for approval
of the same provision in the order for this tariff application of 2001-02 with a stipulation that
GRIDCO may be allowed to raise the bill for overdrawal automatically.
3.7 Delayed payment surcharge
GRIDCO has proposed levy of delayed payment surcharge @ 2% per month for payments
received after the period of 30 days from the date of submission of the bills in line with the
existing provisions in the BST order of 2000-01.
http://www.orierc.org/Orders/2002/GRIDCO/bsttariff2.htm Page 4 of 7
GRIDCO 10/30/09 1:13 PM
3.8 Rebate
Corresponding to the delayed payment surcharge, GRIDCO has also proposed a rebate of 2%
of the amount of the monthly bill, if payment is made in full within 48 hours of the
presentation of the bill, 1.5% rebate, if a minimum of 85% out of billed amount is paid
within 48 hours and 1% rebate on the balance amount if paid in full within 15 days of the
presentation of the bill. For full payment made within 15 days from submission of in bill, a
rebate of 1% may be allowed.
3.9 Carry forward of revenue gap
GRIDCO has prayed that the proposed BST may be made applicable from Feb. 1, 2002 and
any gap between the approved revenue requirement for FY 2002 and the revenue realised
may be approved as a carry forward for adjustment during the future years.
3.10 Transmission tariff
3.10.1 GRIDCO has estimated that the full cost of transmission including reasonable return will
come to Rs.621.73 Crore. On the basis of its cost estimate, the calculation of transmission
tariff proposed by GRIDCO is given in Table : 8.
Table : 8
Transmission Tariff
3.10.2 GRIDCO has proposed that fixation of transmission tariff for the CPPs at 52.8 paise/unit will
defeat the very purpose of setting up of CPPs which are considered as second cheapest source
of power to GRIDCO at present. Hence, for encouraging installation of more number of CPPs
in the State, the wheeling charges to the CPPs for transportation of power to their sister units
may be fixed at 17.5 paise/unit in line with the wheeling charge being levied for MPSEB and
other states for wheeling of power through interstate transmission lines. However, in the
Annual Revenue Requirement application of FY 2002-03, GRIDCO has calculated
miscellaneous receipts on account of wheeling to CPP @ 31 paise/unit.
3.11 Transmission Loss
3.11.1 GRIDCO projects transmission loss of 4.6% for FY 2001-02 calculated in the net method on
the basis of actual energy exchange in the GRIDCO's transmission system for the FY 2000-
01. GRIDCO proposes to reduce transmission losses @ 0.2% per annum successively from
FY 02-03 as submitted in its business plan.
3.11.2 Accordingly, for the year 2002-03, GRIDCO projects transmission loss of 4.4% in their
Annual Revenue Requirement application.
3.12 Summary of Tariff filing of 2001-02
3.12.1 GRIDCO in DF-22 of their application has sought for approval of Bulk Supply Tariff
comprising :-
http://www.orierc.org/Orders/2002/GRIDCO/bsttariff2.htm Page 5 of 7
GRIDCO 10/30/09 1:13 PM
e. Rebate as proposed
f. Duty and Taxes - Electricity duty levied by Government of Orissa and any other
statutory levy/duty imposed under law shall be charged over and above tariff
Table : 9
Revenue Requirement for FY 2002-03
(Rs. in Crore)
http://www.orierc.org/Orders/2002/GRIDCO/bsttariff2.htm Page 6 of 7
GRIDCO 10/30/09 1:13 PM
http://www.orierc.org/Orders/2002/GRIDCO/bsttariff2.htm Page 7 of 7