Welbsun nuclear power limited

presentation on setup of 4000MW nuclear power plant.

project submitted to Govt. of INDIA.

this company is dedicated to all the masterminds who shared their enormous time in
developing
nuclear power for our better future..

( make ur company logo and display it)

FEATURE:-
1. Economical use of manpower to perform better in short duration.
2. electronically operated and hence low consumption of power in setup.
3. No fuel cost(fossil fuel)
4. Eco frindly.
5. better space utilisation(use of barren lands)
6. setup of railway tracks to transport nuclear fuel.
7. better disposal of nuclear wastes.
8. collaboration with DRDO to use nuclear waste for better security.
9. running cost of factory is low.

Plant Location:-
it should be situated in barren land which is useless for farming
it should be situated in a rural area which needs two way broad gauge railway
tracks and a station.
it should be a mildly populated area which will provide manpowr and employability.
it will hence provide employment to the unemployed.
it should be near a floeing water source..

strategy for plant setup;-


1. all raw materials to be brought by govt. agency due to less cost.
2. steel to be bought from SAIL for its high quality and delivery in time.
3. Red oxide cement to be used.
4. lead to be used of low level of toxicity.
5. graphite. boron and cadmium to be used must be from Govt agencies due to better
quality and low cost.

Areas of coverage;-
1.20% of the power is mainly focused on base i.e, villages.
2.60% of it will be sold to Power grid.
3.15% of it will be given to railways and all public sector companies.
4.5% of it will be given to defence org. and airports.

finance and policy;-


LOAN-----
first we have to select the right bank for providing us financinl support.
interest rates will be a major concern.

POLICY--------
decision panel & employee's facility.

Company working as that of SAIL:-


1.CEO--->MD-->ED--->gm--->dgm-->agm-->sr. mgr--> asst. mgr--->jr.mgr-->E0.
--->chargeman--->grade(1,2,3) workers--->technicians--->helpers.

The company is headed by a c.e.o. and the work load is further divided into 3
departments :
1. marketing department
2. Financing department.
3. Production department

Marketing outlets:-
power plant
head office
distribution outlets

Quality of outlet;-
1. non fluctuating constant current.
2. low cost per unit of power.
3. more greener energy.
4. maintaining balance in ecosystem by low dispose of wastes in water
and air.

conclusion;;-
the company's main motto is to create a greener and better future by reducing the
use of
fossil fuels and to protect the environment from global warming to make us and
future generation happy.

always be a part of making india to lead and success. superpower is here...