COST MODELS

HC BiMQS 2016 And Beyond


HC BiM QS is an unique Construction and Property Consultancy.
We offer a versatile and comprehensive portfolio of services to both Clients and
Contractors.
We seek to understand our Clients needs.
It is our aim to provide value for money and exceed our Clients expectations.
Our service is of the highest quality and our values determine the relationship with
our clients is always long term.
Introduction
HC BiMQS
2016 And Beyond
Quantity Surveying
HC BiM QS provides QS procurement and commercial support services for the construction
industry. Specialist capabilities include Building and Civil Engineering, Rail, M&E services
Cost Modelling
HC BiM QS provide an innovative process giving savings in time and cost
Accurate measurement of quantities from 5D models
Integrated bill of quantities' and estimates
Visual 3D outputs
Our Expertise
Introducing 5D A New Solution
Cost Modelling
Dynamic interactive BiM cost models from 2D drawings
BiM models produced for all sectors of construction and engineering
BiM process can be used at any stage of the project development
Cost Plans, Estimates and Bills of Quantities are automatically populated
Simple and quick change quantification
Process Explained
1. We construct a model from CAD
drawings, specifications and other
information available
2. We digitally measure geometric
information to produce accurate
quantities
3. We link the quantity information
with project specific Bills of
Quantities and Cost Plans
4. We create client specific reports.
Introducing Vico
Vico Cost Planner
Process Overview Map
Templates
SMM7
CESMM
Breakdown
Structures
Libraries
Historic Costs
BCIS
Hutchins,
SPONS, Etc.
Cost
Plan
2D CAD Drawings
Project Specifications Stage Reports
BiM Model
Bills of
Quants
Bills of
Quants
Bills of
Quants
Estimate
Cost Plans and Cost Estimates are dynamically linked to the 5D model to
calculate quantities.
NRM1
NRM2
CESMM
CASE STUDY Example:
Station Shafts and Tunnels
Estimate for Shafts and Tunnels
HC BiM QS were appointed to undertake the production of estimates for the
new Crossrail station at Whitechapel along with the associated shafts and
tunnels.
Subsequently we were requested to value various engineering options. As the
BiM model is dynamically linked to the requisite quantities we were able to
quantify each option quickly.
Case Study
Shaft
Shaft
Shaft Section
Station Tunnels Whitechapel Station
Station Tunnels Whitechapel Station
Rendered image of train station
CASE STUDY Example:
Building (School)
Case Study
Bill of Quantities for New Build School
HC BiM QS were appointed to produce the of bills of
quantities for all sections of the building works including the
external works for a client who was tendering for the works.
Using the BiM cost modelling process we produced the full
bill of quantities for the school within the 4 week timeframe
Case Study
Case Study
Case Study
Case Study
Case Study
CASE STUDY Example:
Superstore and Retail Units
Case Study
Bill of Quantities for New Superstore
Using the BiM cost modelling process HC BiM QS were
appointed to produce the of bills of quantities for a new
superstore and associated retail units for a client who was
tendering for the works.
Retail Block
Loading Bay
Superstore
CASE STUDY
C178
Westbourne Bus Park
Option 60 Capacity
Option 116 Capacity
Earthworks Cut & Fill calculation
Earthworks Cut & Fill calculation
Outputs 1 Traditional Bill
Outputs 2 Client Customised Bill
Outputs 3 - Estimate Customised
Outputs 4 Cost Plan
HC BiM QS Modelling provides:
1. Speed and Efficiency
The system is being used on live projects
providing time and cost savings
2. Flexibility
The system can incorporate changes in design
and specifications quickly
3. Clarity
The quantities and changes can be checked
live in BiM Model, providing traceability
4. Accuracy
Digital BiM models are created and linked to
design drawings
Benefit Overview
Cost Saving
Design Stages
Cost Saving
Through Efficiency and
Flexibility
HC BiM Cost Modelling provides:
1. Value Engineering
a. Optioneering,
b. Co-ordination and clash reports
2. Presentation / Visualisation
a. Clear / attractive tender presentations
b. Construction sequence images
c. Stakeholder communication
3. 3D + PLANNING + COST BiM
Secondary Benefits
5D: Model Schedule - Cost
5D: Model Schedule - Cost
BiM: Model Schedule - Cost
BiM: Model Schedule - Cost