Sie sind auf Seite 1von 2

OFFSHORE CRANE

WEEKLY CHECKLIST
MAKE / MODEL:

INSPECTED BY:

ASSET No.:

ENGINE HOURS:

RIG / LOCATION:

SHIFT:

DATE:
Day/Night
dd/mmm/yyyy
INSPECTION / WORK TO BE PERFORMED BEFORE
STARTING CRANE
COMMENTS / CORRECTIVE ACTIONS
Hydraulic oil reservoir level / Record level
Engine oil level / Record level
Radiator coolant level / Record level
Fan belt(s) condition / Record condition
Engine appearance / Oil leaks noticed / aint condition
!nspect main "inch mounts# bolts# reeving and cable
!nspect boom "inch mounts# bolts reeving and cable
!nspect $u%iliary "inch mounts# bolts# reeving and cable
!nspect all hydraulic hoses and connections &or leaks or bad
hoses and &ittings

!nspect and con&irm all dead ends are secure
!nspect and con&irm all pins are secure and lubricated
!nspect boom &or de&ormed# damaged or corroded lattice
'ove all control valve levers &ully in both directions to veri&y ease
o& operation and handles (Dead 'an) back to its* neutral position

!nspect crane hooks &or de&ormation or cracks+ Discard all hooks
"ith ,-. in e%cess o& original throat openings# or ,/ degree t"ist
&or original plane+

!nspect all electrical apparatus &or mal&unctioning signs o&
e%cessive "ear# dirt# moisture+

0est horn and 1aitronics+
2eri&y 3eight 4oad !ndicator is &ully &unctional
2eri&y load rating chart is in place and legible
START THE CRANE ENGINE AND RECORD OPERATING
HOURS ABOVE
COMMENTS / CORRECTIVE ACTIONS
Record oil pressure o& engine at idle
Record coolant temperature
2eri&y engine coolant &or 56/ Degrees F
Record staring pressure a&ter system recharge
Re5inspect all hoses and &ittings and hydraulic system &or leaks
F/--7 (/)
age , o& 6
OFFSHORE CRANE
WEEKLY CHECKLIST
Record hydraulic system &ilter pressure
SAFETY CHECKS COMMENTS / CORRECTIVE ACTIONS
4i&t boom until upper limit kick5out sa&ety valve stops the boom+
Record boom angle

4o"er boom to 8- degrees+ 4o"er and raise the load hoist and
au%iliary hoist+ 2eri&y anti5t"o blocking valves are &unctioning+
Record comments

PREVENTATIVE MAINTENANCE COMMENTS / CORRECTIVE ACTIONS
4ubricating o& s"ing bearing9 ump grease into each &itting "hile
crane is rotates (6) complete revolutions to ensure thorough
lubrication

1rease :oom hoist sheaves ( all sheaves)
1rease load hoist sheaves at boom tip
1rease au%iliary hoist sheaves at boom tip and o&&set
;heck oil in all "inches ( 'ain# :oom and $u% )
;heck s"ing gear reduction gear bo% oil level
;heck rigging &or damage and cert tags
;heck positive latch operation ( 'ain block and $u% )
1rease sheaves ( 'ain :lock )
;heck pedestal bolts# clamps < pins
1rease Heel pins
Record date o& last engine oil change and hours on oil
Record date o& last hydraulic oil change and &ilters
ADDITIONAL COMMENTS / CORRECTIVE ACTIONS

APPROVAL NAME SIGNATURE
OPERATOR:
NABORS RIG MANAGER:
;opy9 Rig Files ;opy9 $rea O&&ice
F/--7 (/)
age 6 o& 6

Das könnte Ihnen auch gefallen