Sie sind auf Seite 1von 1

J K

Adjust the verticals for plumb Align L-brackets with back of wall Align basket tracks over predrilled
holes. Fasten the track at predrilled
holes with Euro or barrel screws. Slide
the basket onto the track according to
manufacturer instructions.
by simply adjusting the hanging rail
according to manufacturer instructions.
Adjustments can slightly lift verticals
or push them away from the wall. With
this adjustability you can move along
the entire wall until your closet unit is
perfectly plumb, despite irregular walls.
and fixed shelves. Attach to the shelf
with %" pan head screws and attach to
the wall at stud locations with 2" stud
screws. Note: If your shelves have wood
cleats already attached to them, simply
fasten them to the wall with 3" screws.
K. SECURE UNIT IN PLACE
1. Once the entire unit is level and plumb, align
steel L-brackets flush with wall and underside of
fixed shelves (see plans on page 75 for suggested
fixed locations ).
2. Screw the L-bracket into the wall at stud
locations with 2" screws-or use screws driven
into hollow wall anchors where there are no
studs. Screw the L-bracket to the shelf with %"
panhead screws.
Alternative: If your fixed shelves have wood cleats
attached to them, simply screw them into the wall
with 3" drywall screws.
L. ADD FINISHING TOUCHES
For specifics on adding accessories, refer to the
Accessories section starting on page 103.
1. Insert shelf pins on verticals where desired.
Place adjustable shelves onto pins.
2. Mark the locations for closet rods on verticals
per plans. Attach end caps at marked locations.
Place the rods into cups. If necessary, use a
hacksaw or chop saw to cut metal rods to fit.
Place protective caps over the cut ends
before placing back into the rod cups on
the verticals.
3. Install pre-built drawers by screwing drawer tracks
onto the verticals using Euro or barrel screws
aligned with shelf pins. Slide drawers into place,
adjust as necessary for level and for uniform gaps in
between drawers.
4. Install pre-assembled baskets. Screw basket
tracks onto verticals according to manufacturer
instructions. Slide the basket onto the track and
level or adjust as necessary.
5. Slide your prebuilt shoe cubby onto the shelf
directly above drawers. Or fasten vertical partitions
in place according to design by countersinking
nails through the top shelf into the top of prepared
verticals. Insert shelf pins where desired and slide
adjustable shelves into place.
6. Add your tie and belt racks (refer to pages 108
and 109), by attaching them to the sides of
verticals with Euro or barrel screws aligned
with shelf-pin holes.
Tip
If KDs do not press easily into the predrilled holes, tap
them into place using a rubber mallet.
Custom Tnstallations 79

Das könnte Ihnen auch gefallen