SEATWORK No:
10
1. A project involving the installation of a computer system consists of eight activities. The
immediate predecessor and activity time in weeks are shown below:
Activity
Immediate
Predecessor
A
B,C
D
E
B,C
F,G
A
B
C
D
E
F
G
H
Time (weeks)
3
6
2
5
4
3
9
3
2
A
D
6
9
B
b.
Activity
A
B
C
D
E
F
G
H
Activit
y Time
3
6
2
5
4
3
9
3
ES
EF
LS
LF
Slack
0
0
3
6
11
15
6
18
3
6
5
11
15
18
15
21
1
0
4
6
11
15
9
18
4
6
6
11
15
18
18
21
1
0
1
0
0
0
3
0
Critical
Path
No
Yes
No
Yes
Yes
Yes
No
Yes
Critical path
B-D-E-F-H
c. Expected Project Completion = 21 weeks
AMBONG, JOSEFINA O.
SEATWORK No:
11
Activity
Description
Immediate
Predecess
or
Time (weeks)
A
B
C
D
E
F
G
H
A,B
C
C
D,E
E
F,G
6
8
12
4
6
15
12
8
15
122
12
Description
Survey building Site
Develop initial design
Obtain board
approval
Select architect
Establish budget
Finalize design
Obtain financing
Hire contractor
AMBONG, JOSEFINA O.
Activity Time
(weeks)
6
1
12
ES
EF
LS
LF
8
8
20
Slac
k
2
0
0
Critical
Path
No
Yes
Yes
0
0
8
6
8
20
2
0
8
4
6
15
12
8
20
20
26
26
41
24
26
41
38
49
22
20
26
29
41
26
26
41
41
49
2
0
0
3
0
No
Yes
Yes
No
Yes
SEATWORK No:
12
SALES
212,000
297,000
439,000
653,000
856,000
573,000
797,000
1,004,000
1,012,000
1,007,000
1,213,098
1,100,456
1,157,765
1,361,687.50
Solution:
y=ax+b
y
= (226,207.73*14) + 81,105.70
= 1,361,687.50
SUMMARY OUTPUT
Regression Statistics
0.9512020
Multiple R
51
0.9047853
R Square
42
Adjusted R
0.8961294
Square
64
107021.20
Standard Error
68
Observations
13
ANOVA
df
Regression
Residual
11
Total
12
SS
1.19722E+
12
1.25989E+
11
1.32321E+
12
MS
1.19722E+
12
114535387
07
F
104.528
43
Significance
F
5.92281E07
P-value
Lower 95%
Coefficient
s
Standard
Error
Intercept
226,207.73
62,965.76
3.59
0.00
X Variable 1
81,105.70
7,932.94
10.22
0.00
t Stat
Upper
95%
Lower
95.0%
Upper
95.0%
87,620.97
364,794.5
0
87,620.97
364,794.50
63,645.41
98,565.99
63,645.41
98,565.99