Detail of Measurements

Name of work:- Proposed House of


S.No. Description/Item of work
1

Nos.

H/D

Qty.

Excavation in foundation, trenches etc.

Col's foundation F1

15

1.50

1.50

1.50

50.63 Cum.

5
1

8.75
4.50

0.30
0.30

0.10
0.10

1.31 "
0.14 "

11.20

0.30

0.10

1.01 "

Plinth Beam:-

H-Beam
Verandah beam
V-Beam
Total
2

53.08 Cum

Sand filling under floor

Bed room
Toilet
Utility
Kitchen
Dining
Stair hall
D/Room
Verandah+Porch

1
1
1
1
1
1
1
1

4.50
2.40
3.60
3.60
3.60
3.60
4.50
4.50

3.60
1.80
1.80
2.80
6.45
1.00
3.90
2.65

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

Total
3
(i)

(ii)

15
15

2
2

0.30
0.15
0.50

(0.40+0.40)
(0.23+0.30)

10.55

13.80

Sqm
"
"
Sqm.

291.18 Sqm.

TOTAL

(iv)

57.15
3.60
7.95
68.70

Flat Surfaces such as soffits of suspended floors:-

Slab

(iii)

Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum

14.01 Cum

Providing formwork with steel plates 3.15 mm thick


Foundation, footing bases of columns etc:Footing
15
2 (1.40+1.40)
column neck to PL
Total

2.43
0.65
0.97
1.51
3.48
0.54
2.63
1.79

Columns, pillars, posts and struts


Square Cols.:Cols. Size(0.230x0.30)
30
Total

291.18 Sqm.

0.23+0.30

Beams, cantilevers, girders and lintels etc.:H-Beam


Side
8
2
Soffits
8
1
Side
8
2
Soffits
8
1

0.53

3.00

95.40 Sqm.
95.40 Sqm.

4.50
4.50
3.60
3.60

0.45
0.30
0.45
0.3

32.40
10.80
25.92
8.64

Sqm.
"
"
"

V-Bean:Side
Soffits
Lintels:Dw= 4Nos.(1.00x2.10)+0.46

60.48 Sqm.
20.16 "

6
6

2
1

11.20
11.20

0.45
0.30

Side
Soffits
D1 = 4Nos.(1.00x2.10)
Side
Soffits
D2 =1 Nos.(0.90x2.10)
Side
Soffits
D3 =3 Nos.(0.80x2.10)
Side
Soffits
D4=2Nos.(0.80x2.10)+0.45

4
4

2
1

1.76
1.46

0.15

2.11 "
1.34 "

4
4

2
1

1.30
1.00

0.15

1.56 "
0.92 "

1
1

2
1

1.2
0.9

0.15

0.36 "
0.21 "

3
3

2
1

1.1
0.8

0.15

0.99 "
0.55 "

Side
Soffits
W= 1Nos.(1.80x4.50)
Side
Soffits
W1= 5No.(1.80x1.35)+0.45

2
2

2
1

1.55
1.25

0.15

0.93
0.58

1
1

2
1

2.10
1.80

0.15

0.63 "
0.41 "

Side
Soffits
W2 = 1 No.(1.35x1.35)+0.45

5
5

2
1

2.55
2.25

0.15

3.83 "
2.59 "

Side
Soffits
W3 = 1 No.(1.35x1.05)+0.45

1
1

2
1

2.1
1.8

0.15

0.63 "
0.41 "

Side
Soffits
W4 = 1
No.(0.90x1.050)+0.45
Side
Soffits
W5 = 3 No.(0.90x1.35)+0.45

1
1

2
1

2.1
1.8

0.15

0.63 "
0.41 "

1
1

2
1

1.65
1.35

0.15

0.50 "
0.31 "

Side
Soffits
W6= 3 Nos.(0.75x1.05)+0.45

3
3

2
1

1.65
1.35

0.15

1.49 "
0.93 "

Side
Soffits
W7= 1 Nos.(1.50x1.45)

3
3

2
1

1.50
1.2

0.15

1.35 "
0.83 "

0.23

0.23

0.23

0.23

0.23

0.23

0.23

0.23

0.23

0.23

0.23

0.23

Side
Soffits

1
1

2
1

1.80
1.5

0.15
0.23

Total
(v)

Stair case (except spiral stair case) excluding landing :-

1
1
1

Steps
Sides
Total
(vi)

0.54 "
0.35 "
183.78 Sqm.

4
36
36 1/2

Edge of slab and breaks in floor and walls:F/S & B/S


4
1
L/S & R/S
2
1
Total

1.00
1.00
0.17

1.30
0.15
0.15

5.20
5.40
0.46
11.06

Sqm.
"
"
Sqm.

35.00 Rmt.
46.40 "
81.40 Rmt.

8.75
23.20

P/L Cement concrete 1:6:12 in Foundation and plinth :-

Under floors
Bed room
Toilet
Utility
Kitchen
Dining
Stair hall
D/Room
Verandah+Porch

1
1
1
1
1
1
1
1

4.50
2.40
3.60
3.60
3.60
3.60
4.50
4.50

3.60
1.80
1.80
2.80
6.45
1.00
3.90
2.65

0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

1.62
0.43
0.65
1.01
2.32
0.36
1.76
1.19

15

1.50

1.50

0.15

5.06 Cum.

5
1

8.75
4.50

0.30
0.30

0.45
0.45

5.91 "
0.61 "

11.20

0.30

0.45

4.54 "

Total
5

Cum.
"
"
"
"
"
"
"
9.34 Cum.

P/L CC 1:4:8 in Foundation and plinth :-

Col's foundation
Plinth Beam:-

H-Beam
Verandah beam
V-Beam
Total
6
(i)

16.11 Cum.

P/L in position C.C.1:2:4 cement concrete :Foundation, footing bases of columns and the like and mass
concrete:Footing
15
1.50
Trapazoidal
15 length of parallel
sides =1.20 and
Pedestal
15
1.20
Up to PL
15
0.23
Plinth Beam:-

H-Beam
Verandah beam
V-Beam

1.20
0.3

0.25
0.35
0.20
0.90

8.44
0.32
4.32
0.93

1.5
0.3

Cum.
"
"
"

5
1

8.75
4.50

0.30
0.30

0.45
0.45

5.91 "
0.61 "

11.20

0.30

0.45

4.54 "

Total
(ii)

25.06 Cum.

Suspended floors, roofs landings and


shelves
and
thire support, balconies,
GROUND
FLOOR

Bed room
Toilet
Utility
Kitchen
Dining
Stair Hall
D/Room
Verandah+ Porch

1
1
1
1
1
1
1
1
1

Mumty
FIRST FLOOR
Master Bed Room
Dressing Area
Pooja
Toilet-I
Toilet-II
Bed room
Bed/Living
Stair Hall
Terrace
Chhajja F/S & B/S
L/S & R/S

4.50
2.40
3.60
3.60
3.60
3.60
4.50
4.50
3.11

3.60
1.80
1.80
2.80
6.45
1.00
3.90
2.65
2.20

0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12

1.94
0.52
0.78
1.21
2.79
0.43
2.11
1.43
0.82

4.50
1.80
1.40
1.80
2.10
4.50
3.60
3.60
4.60
8.75
23.20

3.60
1.20
1.80
2.25
1.80
3.90
3.75
3.50
2.05
0.60
0.60

0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12

1.94
0.26
0.30
0.49
0.45
2.11
1.62
1.51
1.13
1.26
3.34

Cum.
"
"
"
"
"
"
"
"

2
2

1
1
1
1
1
1
1
1
1
1
1 (11.20+12.00)

2
2

5
1

8.75
4.50

0.23
0.23

0.30
0.30

11.20

0.23

0.30

"
"
"
"
"
"
"
"
"
"
"
"
6.04 "
0.62 "
"
4.64 "

Lintle:D = 4Nos.(1.00x2.10)+0.46

1.76

0.23

0.5

0.81 "

D1 = 4Nos.(1.00x2.10)
D2 =1 Nos.(0.90x2.10)
D3 =3 Nos.(0.80x2.10)
D4=2Nos.(0.80x2.10)+0.45

4
1
3
2

1.30
1.2
1.1
1.55

0.23
0.23
0.23
0.23

0.5
0.5
0.5
0.5

0.60
0.14
0.38
0.36

W= 1Nos.(1.80x4.50)
W1= 5No.(1.80x1.35)+0.45

1
5

2.10
2.55

0.23
0.23

0.5
0.5

0.24 "
1.47 "

W2 = 1 No.(1.35x1.35)+0.45

2.1

0.23

0.5

0.24 "

W3 = 1 No.(1.35x1.05)+0.45

2.1

0.23

0.5

0.24 "

W4 = 1
No.(0.90x1.050)+0.45
W5 = 3 No.(0.90x1.35)+0.45

1.65

0.23

0.5

0.19 "

1.65

0.23

0.5

0.57 "

H-Beam
Verandah beam
V-Beam

"
"
"
"

W6= 3 Nos.(0.75x1.05)+0.45

1.50

0.23

0.5

W7= 1 Nos.(1.50x1.45)

1.80

0.23

0.5

0.21 "
43.69 Cum.

0.23

0.30

3.00

6.21 Cum.
6.21 Cum.

0.15
0.17

1.30
0.15

0.78 Sqm.
0.46 "
1.24 Sqm.

Total
(iii)

(iv)

Columns, pillars, posts and struts


Square Cols.:Cols. Size(0.23x0.30)
30
Total

Stair case (except spiral stair case) excluding landing :Steps


Total

1
1

4
36 1/2

1.00
1.00

Providing tor steel reinforcement for reinforced cement concrete


work:As per Qty. of RCC work:-

i
ii
iii
iv

Foundation footing
Suspended floor
Columns pillar post
Stair case
Total

25.06
43.69
6.21
1.24
76.20
@73.5 Kg/Cum.

5601 Kgs.

Providing in RCC work smooth finishing of the exposed


surface
with
cement
1:3:Qty as per
form
work ofmortar
flat surface

291.18
95.40
183.78
11.06

As per Qty. of Form work of Column


Qty. of beams
Stair case
Total
9
i

0.52 "

Brick work in common burnt clay Building bricks in CM


1:6:In super structure:Ground Floor
Bed room
1
1 2(4.50+3.60)
D/Room
1
1 2(4.50+3.90)
Kitchen wall
1 (3.60+3.60+2.80)
Toilet
2 1.8
Dining
1 (3.6+6.45)
Stair Case
1
11
Verandha/porch
2 1.5
First Floor
Master Bed Room
1
1 2(4.50)
Dressing Area
1
1 1.80+1.20
1.8
Pooja
1
(1.80+2.25)
Toilet-I
1
1.8
Toilet-II
1

581.42 Sqm.

0.23
0.23
0.23
0.23
0.23
0.23
0.23

2.7
2.7
2.7
2.7
2.7
2.7
2.7

0.23
0.23
0.23
0.23
0.23

2.7
2.7
2.7
2.7
2.7

10.06 Cum.
5.22 "
6.21 "
2.24 "
6.24 "
0.62 "
1.86 "
"
5.59 "
1.86 "
1.12 "
2.52 "
1.12 "

Bed room
Bed/Living
Terrace
Stair Case

2(4.50+3.90)

1
1
1
1

3.60+3.60+3.75
2.05
1.98+3.50

0.23
0.23
0.23
0.23

2.7
2.7
2.7
2.7

Total
4

1.46

0.23

2.1

2.82 "

D1 = 4Nos.(1.00x2.10)
D2 =1 Nos.(0.90x2.10)
D3 =1 Nos.(0.80x2.10)
D4=1Nos.(0.80x2.10)+0.45

4
1
1
1

1.00
0.90
0.80
1.25

0.23
0.23
0.23
0.23

2.1
2.1
2.1
2.1

1.93
0.43
0.39
0.60

W= 1Nos.(1.80x4.50)
W1= 5No.(1.80x1.35)+0.45

1
5

1.80
1.35

0.23
0.23

4.5
1.35

1.86 "
2.10 "

W2 = 1 No.(1.35x1.35)+0.45

1.35

0.23

1.35

0.42 "

W3 = 1 No.(1.35x1.05)+0.45

1.35

0.23

1.05

0.33 "

W4 = 1
No.(0.90x1.050)+0.45
W5 = 3 No.(0.90x1.35)+0.45

0.90

0.23

1.05

0.22 "

0.90

0.23

1.35

0.84 "

W6= 3 Nos.(0.75x1.05)+0.45

1.20

0.23

1.05

0.87 "

W7= 1 Nos.(1.50x1.45)

1.50

0.23

1.45

0.50 "
13.31 "

32.45-13.31 =

Half Brick masonry using 2nd class common burnt


clay
Wall bricks:between toilet & pooja
1

"
"
"
"

19.14 Cum.

1.80

0.12

2.7

0.56 Cum.

S/wToilet and Master bed


room+Toilet and dressing
area
S/W of M.Bed Room and
balcony
Total
Deductions:D3 =2 Nos.(0.80x2.10)
D4=1Nos.(0.80x2.10)+0.45

4.05

0.12

2.7

1.26 "

3.80

0.12

2.7

1.18 "

2
1

0.80
1.25

0.12
0.12

2.1
2.1

3.00 "
"
0.39 "
0.30 "

W2 = 1 No.(1.35x1.35)+0.45

1.35

0.12

1.35

0.21 "

Total
Net Total Qty.

11

"
"
"
"
32.45 "

Deduction:D = 4Nos.(1.00x2.10)+0.46

Total
Net Total Qty.
10

10.43
6.80
1.27
3.40

P/F 40 mm thick 2nd class Deodar wood frame:D

3.00-2.10 =

0.90 "
2.10 Cum

H- Member
V- Member

4
4

1
2

1.46
2.1

0.08
0.08

0.125
0.125

0.058 Cum
0.168 "

H- Member
V- Member

4
4

1
2

1.00
2.1

0.08
0.08

0.100
0.100

0.032 "
0.134 "

H- Member
V- Member

1
1

1
2

0.90
2.1

0.08
0.08

0.125
0.125

0.009 "
0.042 "

H- Member
V- Member

3
3

1
2

0.8
2.1

0.08
0.08

0.125
0.125

0.024 "
0.126 "

H- Member
V- Member

2
2

1
2

1.25
2.1

0.08
0.08

0.125
0.125

0.025 "
0.084 "

H- Member
V- Member

1
1

3
4

2.25
1.35

0.08
0.08

0.125
0.125

0.068 "
0.054 "

H- Member
V- Member

5
5

3
4

1.35
1.35

0.08
0.08

0.125
0.125

0.203 "
0.270 "

H- Member
V- Member

1
1

3
4

1.75
1.35

0.08
0.08

0.125
0.125

0.053 "
0.054 "

H- Member
V- Member

1
1

3
4

1.75
1.05

0.08
0.08

0.125
0.125

0.053 "
0.042 "

H- Member
V- Member

1
1

3
2

1.35
1.05

0.08
0.08

0.125
0.125

0.041 "
0.021 "

H- Member
V- Member

3
3

2
2

1.35
1.35

0.08
0.08

0.125
0.125

0.081 "
0.081 "

H- Member
V- Member

3
3

2
2

1.20
1.05

0.08
0.08

0.125
0.125

0.072 "
0.063 "

H- Member
V- Member
Total

1
1

1
2

1.5
4.5

0.08
0.08

0.125
0.125

0.015 "
0.090 "
1.961 Cum.

1.46
1.00
0.90
0.80
0.80

2.10
2.10
2.10
2.10
2.10

D1

D2

D3

D4

W1

W2

W3

W4

W5

W6

W7 (main door)

12

P/F 40 mm thick 2nd class Deodar wood paneled, glazed or


panelled and glazed shutters:Door
D
D1
D2
D3
D4

4
4
1
3
2

1
1
1
1
1

12.264
8.400
1.890
5.040
3.360

Sqm.
"
"
"
"

13
(i)

14
(i)

(ii)

15
(i)

W
W1
W2
W3
W4
W5
W6
W7
Total

1
5
1
1
1
3
3
1

1
1
1
1
1
1
1
1

1.80
2.25
1.80
1.80
1.35
1.35
1.20
0.60

4.50
1.35
1.35
1.05
1.05
1.35
1.05
4.50

8.100
15.188
2.430
1.890
1.418
5.468
3.780
2.700

D
D1
D2
D3
D4
W7
Total

4
4
1
3
2
1

1
1
1
1
1
1

4
4
1
3
2
1
15

Nos.
"
"
"
"
"
Nos.

D
D1
D2
D3
D4
W7
Total

4
4
1
3
2
1

2
2
2
2
2
2

8
8
2
6
4
2
30

Nos.
"
"
"
"
"
Nos.

W
W1
W2
W3
W4
W5
W6
Total

1
5
1
1
1
3
3

8
8
8
8
4
2
2

8
40
8
8
4
6
6
80

Nos.
"
"
"
"
"
"
Nos.

"
"
"
"
"
"
"
"
60.000 Sqm.

P/F M.S sliding door


250x16 mm size
For main Door

P/F M.S tower bolts :200X10 mm


For Doors

150X10 mm
For Windows

Providing and fixing M.S. handles :100mm


For Doors
D
4
D1
4

2
2

8 Nos.
8"

(ii)

16

D2
D3
D4
W7
Total

1
3
2
1

2
2
2
2

2
6
4
2
18

"
"
"
"
Nos.

W
W1
W2
W3
W4
W5
W6
Total

1
5
1
1
1
3
3

4
4
4
4
2
1
1

4
20
4
4
2
3
3
40

Nos.
"
"
"
"
"
"
Nos.

Sqm.
"
"
"
"
"
"
"

75mm
For Windows

Providing and laying flooring in C.C. 1:2:4:GROUND FLOOR

Bed room
Utility
Kitchen
Dining
Stair Hall
D/Room
Verandah+ Porch

1
1
1
1
1
1
1
1

Mumty
FIRST FLOOR
Master Bed Room
Dressing Area
Pooja
Bed room
Bed/Living
Stair Hall
Terrace
Chhajja F/S & B/S
L/S & R/S
TOTAL
17

2
2

1
1
1
1
1
1
1
1
1 (11.20+12.00)

4.50
3.60
3.60
3.60
3.60
4.50
4.50
3.11

3.60
1.80
2.80
6.45
1.00
3.90
2.65
2.20

16.20
6.48
10.08
23.22
3.60
17.55
11.93
6.84

4.50
1.80
1.40
4.50
3.60
3.60
4.60
8.75
23.20

3.60
1.20
1.80
3.90
3.75
3.50
2.05
0.60
0.60

16.20
2.16
2.52
17.55
13.50
12.60
9.43
10.50
27.84

"
"
"
"
"
"
"
"
"
180.00 Sqm.

P/L 300x300 pattern finish ceramic (non slippary) tiles in


flooring, treads of steps
Ground Floor

Toilet

2.40

1.80

4.32 Sqm.

Toilet-I
Toilet-II
Total

1
1

1.80
2.10

2.25
1.80

4.05 "
3.78 "

First Floor

12.15 Sqm.

18

P/F glazed tiles pattern finish 200X300mm size:Toilet


1
2 (2.40+1.80)
Toilet-I
1
2 (1.80+2.25)
Toilet-II
1
2 (2.10+1.80)
Total

2.10
2.10
2.10

17.64
17.01
16.38
51.03

Sqm.
"
"
Sqm.

Deduction:-

D2

0.8

2.10

Net Qty.
19

45.99 Sqm.

15 mm cement Plastering in CM 1:6:Outer Side


(19.14/0.23)x2

Qty as per item of Brick


work

166.44 Sqm.

Total
20

21

5.04 Sqm.

166.44 Sqm.

Distempering (Two Coats) with oil bound distemper on


undecorated
wall,celing/slopy
roofs:Qty.
same as per
50% item of plastering

83.22 Sqm.

Distempering (Two Coats) with dry distemper on undecorated


wall,celing/slopy
GROUND FLOOR roofs:-

Bed room
Toilet
Utility
Kitchen
Dining
Stair Hall
D/Room
Verandah+ Porch
Mumty
FIRST FLOOR
Master Bed Room
Dressing Area
Pooja
Toilet-I
Toilet-II
Bed room
Bed/Living
Stair Hall
Terrace
Chhajja F/S & B/S
L/S & R/S
TOTAL

1
1
1
1
1
1
1
1
1

2
2

1
1
1
1
1
1
1
1
1
1
1 (11.20+12.00)

4.50
2.40
3.60
3.60
3.60
3.60
4.50
4.50
3.11

3.60
1.80
1.80
2.80
6.45
1.00
3.90
2.65
2.20

16.20
4.32
6.48
10.08
23.22
3.60
17.55
11.93
6.84

4.50
1.80
1.40
1.80
2.10
4.50
3.60
3.60
4.60
8.75
23.20

3.60
1.20
1.80
2.25
1.80
3.90
3.75
3.50
2.05
0.60
0.60

16.20
2.16
2.52
4.05
3.78
17.55
13.50
12.60
9.43
10.50
27.84

Sqm.
"
"
"
"
"
"
"
"

"
"
"
"
"
"
"
"
"
"
"
220.35 Sqm.

22

23

Finishing walls with water proofing


cement
paint:Qty. same
as per 50% item of plastering
Applying priming coat with ready mixed paint of approved quality
make brushing wood primer
and wood
D pink/ 4white over new wood
1.46
2.10
D1
D2
D3
D4
W
W1
W2
W3
W4
W5
W6
W7
Total

24

83.22 Sqm.

4
1
3
2
1
5
1
1
1
3
3
1

1.00
0.90
0.80
0.80
1.80
2.25
1.80
1.80
1.35
1.35
1.20
0.60

2.10
2.10
2.10
2.10
4.50
1.35
1.35
1.05
1.05
1.35
1.05
4.50

Painting two coats (excluding priming coat) with enamel paint of


required shade and approved
D brand
4 on new wood or wood
1.46 based
2.10
D1
D2
D3
D4
W
W1
W2
W3
W4
W5
W6
W7
Total

4
1
3
2
1
5
1
1
1
3
3
1

1.00
0.90
0.80
0.80
1.80
2.25
1.80
1.80
1.35
1.35
1.20
0.60

2.10
2.10
2.10
2.10
4.50
1.35
1.35
1.05
1.05
1.35
1.05
4.50

2.66
2.66
2.66
2.66
2.66
2.66
2.66
2.66
2.66
2.66
2.66
2.66
2.66

12.26
8.40
1.89
5.04
3.36
8.10
15.19
2.43
1.89
1.42
5.47
3.78
2.70
71.93

Sqm.
"
"
"
"
"
"
"
"
"
"
"
"
Sqm.

2.66
2.66
2.66
2.66
2.66
2.66
2.66
2.66
2.66
2.66
2.66
2.66
2.66

12.26
8.40
1.89
5.04
3.36
8.10
15.19
2.43
1.89
1.42
5.47
3.78
2.70
71.93

Sqm.
"
"
"
"
"
"
"
"
"
"
"
"
Sqm.

ABSTRACT OF COST
Name of work:- Proposed House of

Sr.
No.
1
2
a
b
c
d
e
e
3
4
i
ii
iii
iv
5
6
7
a
8
9
10
11
12
i
13
a
b
14
i
ii
15
16
17
18
19

Particulars

Quanti Unit
ty
53.08 Cum

Excavation in foundation, trenches etc. in earth work


in
all kinds
of soil including
blasting
work/chiseling
Providing
formwork
with steel
plates 3.15
mm thick
welded with angle
iron
in frame
30X30X5
Foundation,
footing
bases
of columns
etc. mm
and (thirty
mass
68.70
concrete
including
plinth
beams
and
columns
up
to
flat surfaces (all thicknesses) such as Soffits of
291.18
suspendedpillars,
floors, posts
roofs,and
landings,
the like
Columns,
struts,shelves
square,and
rectangular
95.40
or polygonal
in plan girders and lintels. Sides and
Beams,
cantilevers,
183.78
Soffits
of beams,
beam haunches,
girders,
Stair cases
with sloping
or steppedcantilievers
Soffits excluding
11.06
landings
Edge of slab and breaks in floors and walls.
81.40
Providing and laying cement concrete 1:6:12 (one
9.34
cement
:
six
sand
:twelve
graded
crushed
stone
Providing and laying Cement concrete 1:2:4 mixed and
vibrated mechanically
as required
andand
curing
Foundation,
footing bases
of columns
the complete
like and
25.06
mass
concrete
including
plinths
beams
and
columns
Suspended floors, roofs landings and shelves and thire 43.69
support, balconies,
Beams,
girders,
and
Columns
pillars, posts
and struts
upbressumers
to all heights.
6.21

Amount

180.55

9584.00

Sqm
Sqm
Sqm
Sqm
Sqm
Rmt
Cum

132.00
243.65
213.60
201.30
191.80
78.15
1942.50

9068.00
70946.00
20377.00
36995.00
2121.00
6361.00
18138.00

Cum
Cum
Cum
1.24
Cum
5601
Kg
581.42 Sqm

3658.15
3267.90
3540.75
3960.65
59.50
59.90

91666.00

Cum
Sqm
Cum
Sqm
Sqm

2895.20
443.75

55415.00
931.00

66432.50

130294.00

2747.70
1958.00

24671.00

Each

139.45

2092.00

30
80

each
each

62.45
45.20

1874.00
3616.00

18
40
180.00
12.15
45.99
166.4
220.3

each
each
Sqm
Sqm
Sqm
sqm
Sqm

31.50
25.70
3091.00
1094.60
701.10
78.90
42.80

567.00
1028.00
556380.0
13299.00
32244.00
13132.00
9431.00

Stair case (except spiral stair case) excluding landing


but
including
preparing
of the surface
and finishing
of
Providing
tor steel
reinforcement
for reinforced
cement
concrete work
including
straighening
bending,
binding
Providing
in RCC
work smooth
finishing
of the exposed
surface
withusing
cement
1:3 including
Brick
work
2ndmortar
class common
burntentire
clay
building
bricks
in
cement
mortar
1:6
(one
cement
: six
In superstructure including square and rectangualre
19.14
pillars
uptomasonry
all heights.
Half
Brick
using 2nd class common burnt clay 2.10
building
in super
structure
including
chamfering 1.961
Providingbricks
woodwork
in frames
of doors,
windows,
clerestory,
windows
other
frames
wrought,thick
framed
Providing and
fixing and
40 mm
(forty
millimeters)
60.00
2nd (second)
glazed
or
Providing
andclass
fixingDeodar
40 mmwood
(fortypaneled,
millimeters)
thick
12.60
2nd
(second)
class
Deodar
wood
wire
gauge
shutters
for
Providing and fixing anodized aluminium sliding door
bolt Anodized
transparent
dyedinto
to required
shade and size
250X16mm
(two
hundred fifty
sixteen millimeters)
15.00
Providing and fixing anodized aluminium tower bolts
(Barrel
Anodized
transparent
to required
200X10type)
mm (Two
hundred
into tendyed
millimeters)
150X10 mm (one hundred fifty into ten millimeters)
Providing and fixing aluminium handles anodized
transparent
dyed to millimeters)
required colour and shade with
100 mm (oneorhundred
75 mm (seventy five millimeters)
Providing and Laying marble work (Table rubbed and
polished ) and
in flooring
20mm thick base
of Cement
Providing
laying 300x300mm
pattern
finish
ceramic
(nontiles
slippary)
tiles
in flooring,
treadssize
of steps,
P/F
glazed
pattern
finish
200X300mm
n
skirting,
risers
of
steps
and
dado
on
12
mm
(twelve
15mm thick cement plaster in cement mortar 1:6 in
single coat on two
rough
sidewith
of brick/
stone/
concrete
Distempering
coats
oil bound
washable
distemper of required shade and approved brand and

Rate

142784.00

21988.00
4907.00
333260.00

34827.00

164862.00

20
21
22

Finishing walls with Premium Acrylic smooth exterior


83.22
paint
of Apex
brand
of with
Asianready
Paints,
Twopaint
or more
Applying
priming
coat
mixed
of coats
71.9
approved
quality
of
Asian,
Garware,
Johnson
and
Painting two coats (excluding priming coat) with enamel 71.9
paint of Asian, Garware, Johnson & Nickelson
Total make of

Say Rs.18.24 Lacs only

Sqm
Sqm
sqm

80.00
20.75
37.90

6657.00
1492.00
2726.00
1823733

0.4
0.4
0.23
F1

0.4
0.4
0.3
3.10

0.23

0.3

6.35
0.8
0.53
3.25

0.069

1.44
1.228414

5638.8

2
4.5

3.6

10
10.05
1

9
3
1.8
4.05

1.8

8.1

16.2

16.8
10.95
2.05
5.48

2.4
1.8
2.1

10.5

1.8
2.25
1.8

4.2
4.05
3.9

Das könnte Ihnen auch gefallen