Sie sind auf Seite 1von 2

Suppl y Chai n Ef f i ci ency Super i or Syst em Lower Cost

ROBUST DESIGN
+ Designed and tested to withstand 105mph winds as standard and up to 150mph for high
wind areas.
+ Sturdy structure to prevent panel fexing
+ Bearings and pivots resist wear with little to no maintenance
+ Rotationally Balanced structure
SOLAR FIELD FLEXIBILITY
+ Tracker design accommodates terrain undulations and grades of up to 5.
+ Facilitates non-rectilinear layouts for effective land use
+ Single tracker blocks up to 600kW
+ East to West auto tracking with 10/15 degree module tilt option
LOW POWER CONSUMPTION
+ Low power consumption maximizes system output
+ Tracker motor can be powered from the solar array, ac grid power, or battery (charged by
designated solar panel)
WIRELESS SYSTEM CONTROL
+ Zigbee protocol wireless communication reduces trenching and material costs
CONSTRUCTIBILITY
+ Low overall part count.
+ Factory pre-assembly of sub-components reduces feld labor and overall cost
+ No feld welding simplifes feld install
+ Field tolerances support rapid deployment
FULLY INTEGRATED BLOCKS
+ Available as tracker only or fully integrated blocks with piers, custom cable harnesses,
combiner boxes, and DC home run cable.
+ Integrated blocks facilitate supply chain effciency, transaction effciency, and logistics
benefts
TURNKEY OPTIONS
+ Tracker available as equipment only or fully installed with a guaranteed total installed
price.
+ System design and engineering services available
START-UP & CONTROL
+ Control electronics with integrated GPS self-calibrate upon startup
+ Remote monitoring options available, network connectivity
+ Full onsite support during construction, commissioning and startup
SI NGL E AXI S HORI Z ONTAL SOL AR T RACKER
MOST RECENT PROJECTS
Florida
0.5MW
Under Construction
India
3MW
Under Construction
India
1.5MW
Under Construction
Tanzania
50MW
In Engineering
India
70kw
Operating
Central America
50MW
In Engineering
Uganda
650KW
Operating
We have found the GSS tracker to be a
competitively priced, thoughtfully engineered,
durable product which has greatly improved the
fnancial performance of our projects.

Mark Antonucci

Mark Antonucci is the Chief Executive Offcer of a leading
renewable energy development company in Latin America. Mark
is currently developing the 100MW AC project in Nacaome,
Honduras which will be one of the largest solar plants in Central
America.
S C O R P I U S
S A T 1
www.gsolarsystems.com
Electronics & Software
Solar tracking method Ephemeris based algorithms, on board GPS
Power consumption per MW 300 kWh per MW per year / <0.02% (estimated)
Controller base ARM 32-bit Cortex M3 Microcontroller
Backtracking Yes Proprietary and handles feld slope in E-W direction
Azimuth Correction (for Backtracking) Yes
Auto stow at night Yes
Auto stow during high winds Yes, Anemometer and wind vane provided
Tracking Accuracy Limited to +/-1deg
Data exchange between sensors CAN bus
Logging Server Communication Ethernet, GPRS
Power backup for tracking Yes, 24V/12Ah battery bank with 2 days power backup
Single block power source (in terms of modules) 250w module for 250kW block
Pivoting technology and Structure design
Tracking Type Single Axis Automatic
Pivoting Technology Vader-xFP Frictionless Pivots and bearings (global patents fled)
Mechanical Pivot Maintenance No (Vader-xFP pivots do not require lubrication for 25+ years)
Tilt Angle +/- 45 degrees from Zenith
Block size in kW per motor/drive/controller set 200kW / 250kW / 350kW / 500kW or more
Motors per MW 2-5, depending on confguration, less motors per MW than competition
Single Block dimensions Site and module specifc
Tracker Height 1.2 mts above ground (can be changed per specifc requirements)
Max wind load 105 mph standard, up to 150
Modules compatible Most makes and technologies
Modules mounting Landscape and portrait options, as required
General specifcations, Installation, Maintenance and others
Welding during installation Not required (0%)
On site fabrication Not required
Installation supervision and Training Yes, included in scope
Linear Actuators and drives Lubrication once a year
Energy gain Upto 25% depending on site conditions
Land required per MW 5-7 acres / MW (design and location dependent)
Warranty 5 years
Specifcations of the Scorpius SAT1 Tracker controller and software
Kevin Bate
Global Solar Systems
213. 440. 4641
kpbate@gsolarsystems.com
www.gsolarsysystems.com

Das könnte Ihnen auch gefallen