Preliminary of 2.1m Mini-shelter
Mandatory tools Mandatory tools
Mini-shelter installation
1. Secure Mini-shelter
2. Install component inside Mini-shelter
3 Check and prepare to power on the Mini-shelter 3. Check and prepare to power on the Mini shelter
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 2
Basic Composition Basic Composition
2.1mminishelterprotfolio
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 3
Preliminary of 2.1m Mini shelter view Preliminary of 2.1m Mini shelter view
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 4
Remarks:
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 5
Power systemlayoutforMinishelteronnewsite
M
W
D
B
S
3
99
0
0
DCDU03B
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 6
Power systemequipmentlayoutforMinishelteronnewsite
AH1500(on the door)
PC500D(on the door)
Mains or Genset
RRU
MDB
MainsorGenset
AC Power
DC Power
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 7
Contents Contents
Preliminary of 2.1m Mini-shelter
Mandatory tools Mandatory tools
Mini-shelter installation
1. Secure Mini-shelter
2. Install component inside Mini-shelter
3 Check and prepare to power on the Mini-shelter 3. Check and prepare to power on the Mini shelter
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 8
Tools Tools
Mandatory Tools
Flatheadscrewdriver
(26mm
Phillipsscrewdriver
(M3M6)
Hammerdrill(4.2,8,
and16drillbit Clawhammer
Multimeter
Adjustablewrench Protectivegloves Wirestripper Measuringtape Marker
COAXcrimpingtool Level
Segmentedblade
utilityknife Hydraulicpliers
Diagonalpliers
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 9
Some picture of tools
Hydraulichammer
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 10
Some picture of tools
Flatheadscrewdriver Heatgun
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 11
Some picture of tools
Pliers Adjustablewrench
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 12
Remark: if we have to use a wrench tool as follows we must tap the handle with Remark:ifwehavetouseawrenchtoolasfollows,wemusttapthehandlewith
Insulationmaterials
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 13
Contents Contents
Preliminary of 2.1m Mini-shelter
Mandatory tools Mandatory tools
Mini-shelter installation
1. Secure Mini-shelter
2. Install component inside Mini-shelter
3. Check and prepare to power on the Mini-shelter p p p
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 14
Precautions
O l t i d d lifi d l ll dt i t ll t d i t i H i Only trained and qualified personnel are allowed to install, operate, and maintain Huawei
equipment, and they must understand basic safety precautions to avoid hazards.
If a Mini-shelter is assembled onsite, the site environment should be equal to or above 0C.
If the cabinet is scratched during transportation, paint or apply glue to the scratched areas.
Prepare a rainproof cloth to protect the Mini-shelter from rain.
Requirements for the Mini shelter location: Requirements for the Mini-shelter location:
A Mini-shelter should be installed in a high place where water can be easily drained.
Swales and the areas prone to pondings are unsuitable for site construction.
The cabinet must comply with installation space requirements for later cabinet
maintenance.
Requirements for the Mini-shelter installation direction:
Maintenance personnel must be safe when they maintain at the front door of the Mini-
shelter.
The Mini-shelter is not exposed to direct sunlight and stays away from the wind.
When installing a mini-shelter in a residential area, ensure the Mini-shelter doors do not
face the residential area.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 15
Installation Process
InstallingaSingle-CabinetMini-shelterAsaWhole
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 16
Move and secure Single-Cabinet 2 1m Mini-shelter
m
Move and secure Single-Cabinet 2.1m Mini-shelter
1 Requirements for Installation Space
The following figure shows the


2
0
0
0

m
m
The following figure shows the
required clearances around the Mini-
shelter.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 17
Move and secure Single-Cabinet 2.1m Mini-shelter
2 Requirements for door direction
The doors should not
face sunshine directly
in the afternoon in the afternoon
Door
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 18
Move and secure Single-Cabinet 2.1m Mini-shelter
3 Recommended method of moving Mini-shelter
Insertthepallettruckintotheholesatthebottomofthecabinetand
movethecabinettotheinstallationplaceusingapallettruck.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 19
Move and secure Single-Cabinet 2.1m Mini-shelter
Installexpansionboltsinthemountingholesatthefourcornersofthecabinet
4 SecuringaSingleCabinet
bottomtosecurethecabinet.
Draw
four
Movethe
bi t
Drillholes
Move
backthe
Securethe
expansion
Removethe
i b lt
four
holes
cabinet
base
expansion
tube
expansionbolts
Installand
secure
expansion
bolts
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 20
Move and secure Single-Cabinet 2.1m Mini-shelter
Details: How to SecuringaSingleCabinet
Markfirst
Drillaholevertically
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 21
Risk if not securing a Mini-shelter g
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 22
Contents Contents
Preliminary of 2.1m Mini-shelter
Mandatory tools Mandatory tools
Mini-shelter installation
1. Secure Mini-shelter
2. Install component inside Mini-shelter
3. Check and prepare to power on the Mini-shelter p p p
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 23
InstallingComponentsinsideaMinishelter
1 Installing a door sensor
1.Secure
the
1 Installing a door sensor
the
door
status
sensor.
2.Connectthe
ddoorstatus
sensor.
Doorstatus
sensor
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 24
sensor
Real Picture of Door sensor alarm cable connection
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 25
Door Sensor real picture view
Door sensor Doorsensor
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 26
InstallingComponentsinsideaMinishelter
2 Installing a Smoke Sensor
1.Securethesmokesensor.
Securethesmokesensorbasetothecabinettopusingtwoscrewsscrewsand
fastenthesmokesensortothebasebasedonthedirectionshowninthe
k smokesensor.
2.Connectthesmoke
sensor.
Smoke
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 27
Smoke
Sensor
Smoke Sensor real picture view
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 28
InstallingComponentsinsideaMinishelter
3 Installing a Temperature and Humidity Sensor 3 Installing a Temperature and Humidity Sensor
Remarks:ThissensorshouldbeinstalledinsideBTScabinet
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 29
Temperature and humidity sensor alarm cable connection
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 30
Temperature and humidity Sensor real picture view
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 31
InstallingComponentsinsideaMinishelter
1. Secure the battery temperature sensor.
4 Installing a Battery Temperature Sensor
Place the battery temperature sensor on the right rack in the middle of
the battery compartment and secure it by using a cable tie.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 32
Battery Temperature sensor alarm cable connection y p
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 33
InstallingComponentsinsideaMinishelter
5 I t lli W t S
1.Securethewatersensor.
Securethewatersensortothecabinetbottombyusingacabletie.
5 Installing a Water Sensor
2. Connect the water sensor 2.Connectthewatersensor
ThefollowingfigureshowstheportontheUIM02Ctoconnectto
signalcablesofthewatersensor.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 34
Water Sensor real picture view WaterSensorrealpictureview
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 35
Installing a DCDU
Slidethedirectcurrentdistributionunit(DCDU)intothe19inchrack
alongtheguiderailsandtightenitusingfourM6screws.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 36
Ali th t bl l ith th h l th b b d it (BBU) d
Installing a BBU
Alignthetwocableclawswiththeholesonthebasebandunit(BBU)and
securetheBBUusingfourM4screwsontheleftandrightsides.
SlidetheBBUintothe19inchrackalongtheguiderailsandtightenitusing
fourM6screws.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 37
Installing a Lamp
! Lamp is DC power !LampisDCpower
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 38
Installing the ETP48200
Slidetheembeddedtelecompower
(ETP48200)intothe19inchrackalongthe
guiderailsandtightenitusingeightM6
When installing the
ETP48200, take out
the PSUs, install
screws.
the power subrack,
and then reinstall
the PSUs.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 39
Connecting the Temperature Control Equipment
ConnectingtheIntelligent
HeatExchanger
ConnectingtheDCAir
Conditioner(PC500D)
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 40
Air-conditioner alarm cable connection
DIN6
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 41
Installing an Outdoor Ground Bar
Installthe
outdoorground
bar on the steel baronthesteel
baseoftheMini
shelter
(recommended). ( )
Groundbarsecuring
plate
M8x20(2PCS)antitheft
screw,tightenedusingan
antitheftwrench
Onthe
concrete
floor around flooraround
theMini
shelter.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 42
Real picture of Installing an Outdoor Ground Bar
Toinsidegroundingbar Tositemaingroundingbar
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 43
Grounding System Grounding System
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 44
Principles for connecting grounding cables Principles for connecting grounding cables
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 45
How to install battery How to install battery
Negative
RTN+Positive
Negative
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 46
How to install battery How to install battery
Connectioncopperbar
betweeneverybatterycell
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 47
Rectifierintroduction(ETP48200B6)
Wi i t i l N
Loadlowvoltage
disconnection(LLVD)circuit
breaker
Batterylowvoltage
ACinputcircuitbreaker
WiringterminalN
Batterycircuitbreaker
disconnection(BLVD)circuit
breaker
DCoutput (RTN+)
Groundbar
Monitoringunit
(SMU02B)
ACoutputcircuitbreaker
Userinterfacemodule
(UIM02C)
Rectifier
(PSU)
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 48
Connect the single-phase AC input Connect the single phase AC input
power cable.
IftheACinputcablehasaPE
(yellowandgreen)wire,
connectthePEwiretothe
Mustguaranteethevoltage
between the two phase is
indoorgroundbarintheMini
shelter.
betweenthetwophaseis
about220v(rangis200v
~240v)
Connect the double live wires AC input power cable.
h l Mustguaranteethevoltage
betweenthetwophaseisabout
220v(rangis200v~240v)
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 49
PowerdistributionforMinishelter
Receiving
Providing Power name Power cable connection port
Receiving
power name Cable size
BLVD
F78 16A MCB LAMP
F67 16A MCB PC500D
F6 16A MCB AH1500
F5 32A MCB RTN
Power system
ETP48200-B6
F5 32A MCB RTN
F4 63A MCB
LLVD
F3 20A MCB
F2 100A MCB
F1 100A MCB DCDU03B 16mm2
B tt i t
BAT2 125A MCB 150AH*1 225mm2
Battery input
BAT1 125A MCB 150AH*1 225mm2
AC power output AC output 1*16A MCB 2P AH1500
AC power input AC input 1*100A MCB 2P MDB 225mm2
LOAD8 12A MCB BBU
LOAD7 12A MCB
DCDU 03B
LOAD6 12A MCB
LOAD5 20A MCB
LOAD4 20A MCB
LOAD3 20A MCB
LOAD2 20A MCB RRU3
LOAD1 20A MCB RRU2
19
LOAD1 20A MCB RRU2
LOAD0 20A MCB RRU1
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 50
Power cable layout for Mini-shelter
MDB AH1500 AH1500
ETP48200B6
PC500D
DCDU03B
LAMP
R
T
N
1
BAT1 BAT2
BBU
R
R
U
1
R
R
U
2
R
R
U
3
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 51
1 2 3
Connecting the Communications Cable Between Monitoring
Equipment and Base Stations Equipment and Base Stations
RJ45
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 52
External alarm list election in Mini-shelter
Signal resource External Alarm Name
BBU
Board
BBU indicator Signal Cable color
PMU Alarm port
name
T l h l f il j hit / ALM1 Telecom shelter power fail major
EXT-ALM0
white+/orange- ALM1
Telecom shelter battery discharge
commercial power
white+/green- ALM2
Power UPEU
Rectifier fault alarm white+/blue- ALM3
Telecom shelter tower light alarm white+/brown- ALM4
Telecom/General shelter fire
alarm
EXT-ALM1
white+/orange- ALM5
Telecom shelter high temperature
alarm
white+/green- ALM6
Telecom/General shelter door
hit /bl A
Telecom/General shelter door
alarm
white+/blue- ALM7
Telecom shelter air condition
1and 2 fault
white+/brown- ALM8
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 53
Real connection view
EXTALM0 EXTALM1
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 54
PowermonitorbyM2000inMinishelter
DDF
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 55
Set parameter in PMU
Name:adminPassword:001or000001
SetpowerparameterinETP48200forMinishelter
p
Main Menu Second-level Menu Third-level Menu Fourth-level
Menu
Default Value
Settings System Para
LUI Language - Local language
Set Time Zone - GMT +3:00
Qty of Battery - - 1
Rated Capacity
- - 300Ah
Quick Settings
Rated Capacity
Set Date - - -
Set Time - - -
IP Address - - 192.168.0.10
Subnet Mask - - 255.255.255.0
Gateway - - 192.168.0.1
Contacttheelementmanagementsystem(EMS),andsubmitenvironmentmonitoring
f h ETP48200(UIM02C) h EMS (M2000) f fi i
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 56
parametersoftheETP48200(UIM02C)totheEMS(M2000)forcorrectconfiguration.
Contents Contents
Preliminary of 2.1m Mini-shelter
Mandatory tools Mandatory tools
Mini-shelter installation
1. Secure Mini-shelter
2. Install component inside Mini-shelter
3. Check and prepare to power on the Mini-shelter
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 57
CHECK! CHECK!
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 58
Checking the Installation
Checking the Cabinet Installation
g
No. Check That
1 The cabinet is placed in the planned position.
2
All bolts are tightened, especially the bolts used for electric connection. Flat
washers and spring washers are installed properly.
3 The cabinet is clean and free of dust and other materials.
4 The cabinet is clear and complies with dustproof requirements 4 The cabinet is clear and complies with dustproof requirements.
5 The paint on the cabinet exterior is intact.
6 The cabinet door and lock work properly. 6 The cabinet door and lock work properly.
7 Cable labels are correct, clear, and complete.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 59
Checking the Installation Environment Checking the Installation Environment
No. Check That
1 The cabinet surface is clean and free of dirt and fingerprints.
2 There is no unnecessary adhesive tape or cable tie on the cables.
3
The inside of the cabinet contains no waste tape, cable ties, paper, or
3
packing materials.
4 Objects around the cabinet are intact and clean.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 60
Checking Electrical Connections
No. Check That
1 All ground cables are copper cables. Cable diameters are correct. No switches
or fuses are installed on the cables and no short circuit occurs or fuses are installed on the cables and no short circuit occurs.
2 The ground cable, AC power cables, and internal cables are correctly connected
and screws are secured. No short circuit occurs during power input or output.
3 The length of ground cables and power cables is correct.
4 Lugs for power cables and PGND cables are soldered or crimped securely.
5 Power cables and PGND cables are routed and bundles separately from other
cables.
6 Storage batteries are free of damage cracks and bulge 6 Storage batteries are free of damage, cracks, and bulge.
7 Storage batteries are clear and experience no leakage.
8 Wiring terminal of storage batteries are free of damage break and acid leakage 8 Wiring terminal of storage batteries are free of damage, break, and acid leakage.
9 Battery safety valves remain intact and experience no acid leakage.
10 Storage batteries are connected correctly.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 61
g y
Checking Cable Installation
No. Check That
1 All cable joints are secured properly, especially the cable joints
between network cables and at the cabinet bottom.
2 Exposed parts near the wiring terminals and lugs are wrapped in
PVC insulation tape or heat shrinking tubing.
3 The flat washers and spring washers of all wiring terminals are
l i t ll d securely installed.
4 Cables are bound neatly and cable ties are secured evenly and
properly properly.
5 The routed cable should be convenient for future maintenance and
expansion. p
6 All labels at the cable ends are clear.
7 The excess section of a cable strip should be cut evenly.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 62
p y
KeyoperationforPoweronMinishelter
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential 63
63
Thank you
www.huawei.com
Copyright2011 Huawei Technologies Co., Ltd. All Rights Reserved.
The information in this document may contain predictive statements including, without limitation,
statements regarding the future financial and operating results, future product portfolio, new technology,
etc. There are a number of factors that could cause actual results and developments to differ materially
fromthose expressed or implied in the predictive statements. Therefore, such information is provided for
reference purpose only and constitutes neither an offer nor an acceptance. Huawei may change the
information at any time without notice.

Das könnte Ihnen auch gefallen