SCHEDULE OF GURANTEED TECHNICAL PARTICULARS OF TOWERS
(132KV ANGLE TOWER)
1. Whether the Material used conform to the relevant specifications Yes. 2. Type of Joints Bolted. 3. Details of design of the towers. Self-supporting lattice structures. Bracing will be designed for shear force and main legs bending moments. Due regards will be given to the relief provided to the bracing members by the horizontal Component of the inclined main leg forces. As a whole owers will be designed as vertical Cantilever trussed beam. 4. truct. !ormula for calculation of allowance stresses in tower mem"ers As per !S-"#$ %&art-'(Section ) $* -'++$ #. Details of hielding As per !S-$,#+ - !S-"#$ latest. $. %Do% Tower &'tensions %.*, / 0 %.*1 / (. Details of templates used emplate used for stub setting. ). Details of *nsulation attachment and earth conductor clamps. Suspension !nsulator '#nos '23 mm 4 $33 mm Dia +. Details of earthing of towers As per !S-,#2,(!S-$,#+(!55-"# 1,. Details of construction of towers 6alvanised structure bolted together and assembled at site. 11. Details of -olts. /uts and Washers Bolts - nuts for structural members conforming to !S-',270 !S-11,+ - !S-,#1, %/in. dia of bolt shall be '1mm - class 3.1* 12. Details of cuttings of mem"ers etc. &repared from detail fabrication drawings. 13. Details of tep -olts. '1 bolt placed at main leg of tower appro4 823# c(c starting $3##mm above 6.9. on alternate face. 14. Details of 0nticlim"ing device Barbed wire used. 1#. -Do- Bird guard Barbed wire used. 1$. -Do% danger. num"ers 1 phase plates. /.S. &late in each face. 1(. %Do% galvanising All structural Steel including Stub shall be hot dipped galvanised - zinc coating shall be as per !S-273+-'+"2 %/inimum 1'# gms(/ $ * 1). *ndividual loads inclusive of factor or safety and transverse. longitudinal vertical tens. &tc. under normal condition. 9oad !S-"#$ %&art-'* sec '('++3 1+. %Do% under "ro2en wire condition 9oad !S-"#$ %&art-'* sec '('++3 2, 0ggregate loads 3 compressive and tensile with factors of safety "ased on loads spci different conditions 9oad !S-"#$ %&art-'* sec '('++3 21Measured unsupported length of mem"ers. ,2"# mm 22. 4adius of gyration of mem"ers. $.+, cm $,. Slenderness ratio ''$ 24. i5e of mem"er proposed !SA '3# : '3# : '# bottom leg 2#. 6ermissi"le 7rippling stress and load $$, /pa.0 11#'# ;g. 2$. 8ross area of cross section of mem"ers $+.#, cm 2(. /o. and si5e of "olts provided '2<o. '1= bolt. 2). /et area of cross section $3.#, cm $ 2+. 6ermissi"le Tensile load 3"7#" >g. 3,. 0ggregate 7.. area of "olts. $" cm $ 31. hearing stress on "olts ? ,'# /&a. 34. 7alculated weight of each num"er 73 >g for bottom >g 3#. Details of foundation of each type of tower !solated foundation under each >g with inclined Chimney in which stub are embedded with @C5 spread footing at the bottom. 3$. -ro2en wire conditions assumed in tower design Ane conductor or 5arth wire Bro>en 3(. 7onductor sag. 1.1 meter 3). 8round wire sag. 1., meter 3+. !actor of afety for towers As per !S-"#$ %&art '* Sec '('++3 2#. %Do% &'tensions As per !S-"#$ %&art '* Sec '('++3 41. Designation of standard type towers. BAC-Suspension ower #-$ o Deviation BBC-angle tower ) #-,# o - Deviation BCC heavy angle tower-,# o -1# o
42. 6osition of insulator As per D5C-,13 &art-!0 !S-"#$ &art !0 Sec '0 !S-3#"$ 43. Type of insulator As per D5C-,13 &art-!0 !S-"#$ &art !0 Sec '0 !S-3#"$ 44. /ormal span length ,$# metre 4#. /o. of "ro2en conductors assumed. Any two phases bro>en on the same size and same span or any one phase and one ground wire bro>en on the same side and same span whichever combination is more stringent for a particular member. 21. Minimum /ormal ground clearance of conductor at ma'. pecified temperature 2.'30 metre 4( ag of line conductor in still air at ma'. pecified temperature for normal span ".#37 metre 4). 9eight a"ove ground level of lowest cross arm '$." metre 4+. :ertical distance "etween "ottom and middle cross arm 2.'3 metre #,. %Do% Middle and top%Do% 2.', /etre #1. 9eight of point of earth conductor a"ove top of highest line conductor cross arm 7.+$3 m #2. Total height of tower a"ove ground level $7.' m #3. ;verall dimensions of tower "ase at ground line%transverse ' longitudinal <M ' M= 1m 4 1m #4. 9ori5ontal distance from centre line of tower to attachment of a= Top *nsulator set "= Middle *nsulator set c= -ottom *nsulator set a* $.7,# m b* $.+#' m c* ,.'"+ m ##. Weight "elow ground level of tower '2.### ;g %appro4* #$. %Do%ie.. weight of stu" including cleat angles. 2eying rods etc. ,3# ;g #(. :olume of concrete foundation <7u"ic meter= a= !rustum "= 7himney a* 2.$" Cu.m EFithout e4tension in normal soilG b* '.', Cu..m E Fithout e4tension in normal soilG #). HWeight of "olts. nuts washers etc. for tower a"ove ground line <*ncluding #> e'tra= ,'3 ;g #+. %Do% for stu"s%Do% 2#$ ;g. $,. :olume of e'cavation given for each type of tower 3' Cu-m %Fithout e4tension normal soil* $1. 9ori5ontal spacing "etween top line conductors 3.21 m $2. %Do% Middle 3Do% 3."#$ m $3. %Do%-ottom%Do% 1.,7" m