Sie sind auf Seite 1von 2

JG SUMMIT

PETROCHEMICAL CORPORATION
JOB HAZARD ANALYSIS FORM
JHANO: DEPARTMENT: Maintenance
Others Specify
BASIC JOB STEPS POTENTIAL HAZARDS EFFECT PROPOSED ACTIONS OR PROCEDURES
1. Installation / Dismantling of scaffoldings Wrong Body Posture, Manual Handling Trip, Slip, Fall Proper coordination to area in charge/secure work permit.
of Materials;Mishandling of tools and Back injury;muscle pain, cuts Observe proper lifting procedure.
equipments, Hitting an object or person; Damage to property and/or equip.
Ensure that all tools and equipment are in good condition before use.
Rough surfaces, sharp edges Back Injury/Muscle Pain Ensure area is clear from any person.
Bump / Impact / Pinch points Cuts, hands & foot injury Wear proper PPE.
High Elevation Fall from Heights Barricading/Cordoning the area
Ensure work area free from obstruction before job commence.
Wear proper safety harness
Inspection of Scaffold prior use
2. Demolition of CHB wall, roof slab, Column, Beam& parapet wall Wrong body posture, Manual handling of materials, Trip, Slip, Fall Application of Work Permit
Mishandling of tools and equipment Back injury;muscle pain, cuts Observe proper lifting procedure.
Rough surface & sharp edges Damage to property and/or equip.
Ensure that all tools and equipment are in good condition before use.
High elevation Cuts, hands & foot injury Wear proper PPE.
Falling Debris Fall from hieghts Proper use of full body harness
High noise level Injury Installation of nylon net
Hearing impairment Wear earplug/muff
3. Civil Works Wrong body posture Body pain Proper coordination to area in charge/secure work permit.
a. Breaking of concrete flooring Mishandling of tools and equipment Twisted hand Observe proper lifting procedure.
b. Compaction of Soil ang gravel filling Hitting an object or person, Damage to property and/or equip.
Ensure that all tools and equipment are in good condition before use.
c. Concrete pouring Rough surfaces, sharp edges Back Injury/Muscle Pain Ensure area is clear from any person/proper coordination to other personnel
d. Masonry works Rotating/moving equipments Cut, Laceration Wear proper PPE.
e. Installation of dry wall partition Scattered tools and materials injury Barricading/Cordoning the area
Trip, Slip, Fall Ensure work area free from obstruction before job commence.
Be aware of pinch points
Observe good house keeping even while working
4. Architectural Works Wrong body posture Body pain Proper coordination to area in charge/secure work permit.
a. Ceiling finishes Mishandling of tools and equipment Twisted hand
Ensure that all tools and equipment are in good condition before use.
b. Wall finishes (installation of ficem board ceiling) Hitting an object or person, Damage to property and/or equip.
Ensure area is clear from any person/proper coordination to other personnel
c. Installation of stone cladding
Rough surfaces, sharp edges Back Injury/Muscle Pain
Wear proper PPE.
d. Floor finishes (installation of vinyl / ceramic tiles) Scattered tools and materials Cut, Laceration Barricading/Cordoning the area
e. Installation of toilet fixtures, cubicle & accessories injury Ensure work area free from obstruction before job commence.
Trip, Slip, Fall Be aware of pinch points
JOB DESCRIPTION: Renvation of old safety building
Job title of person who does the job: Mason, Helper, Erector, Tile Setter
PLANT/ LOCATION: Old Safety Building
REQUIRED PPE for:
Head Eye Hand Foot Harness
Observe good house keeping even while working
5. Sanitary Works
Scattered tools and materials Trip, Slip, Fall Proper coordination to area in charge/secure work permit.
a. Installation of storm drainage
Mishandling of tools and equipments injury Observe good house keeping even while working
b. Installation of water line
Hitting an object or person, Body pain
Ensure that all tools and equipment are in good condition before use.
c. Installation of sanitary line
Rough surfaces, sharp edges
Damage to property and/or equip.
Ensure area is clear from any person/proper coordination to other personnel
Slippery Surface Cut, Laceration Wear proper PPE.
Barricading/Cordoning the area
Ensure work area free from obstruction before job commence.
Clean / clear surface of slippery substance
Observe good house keeping
6. Housekeeping / Demobilization Wrong Body Posture, Manual Handling Trip, Slip, Fall Proper coordination to area in charge/secure work permit.
of Materials, Mishandling of tools and Back Injury/Muscle Pain Observe proper lifting procedure.
equipments,Hitting an object or person Damage to property and/or equip. Be aware of the weight to be carried
Rough surfaces, sharp edges Cut, Laceration
Ensure that all tools and equipment are in good condition before use.
Bump / Impact / Pinch points injury Ensure area is clear from any person.
Overexertion / Lifting heavy objects Back Injury/Muscle Pain Wear proper PPE.
Revision No: 0 ________________________ Effectivity: October 23,2013
Note:
1. Proper Coordination to Area In Charge
2. Always Secure Work Permit
3. Always wear proper PPE
Attendees: / Signature : 4. All tool and equipments must inspect by JGSPC personnels
5. All generated wastes must be disposed prolerly

Das könnte Ihnen auch gefallen