Sie sind auf Seite 1von 3

SHUCHITA ARORA

Electrical and Electronics Engineering


DATE OF BIRTH: 12
th
SEPTEMBER 1993
LANGUAGES KNOWN: HINDI, ENGISH, PUNJABI
PERMANENT ADDRESS: HARDWICK BUNGALOW,
R & T WING, C.R.I.
KASAULI, H.P.
Email Id : shuchita93@gmail.com
Contact number: 08904620057

CAREER OBJECTIVE


To evolve into a hardworking and sincere profession, contributing to the success of your
organization and at the same time enhance my knowledge and develop my communication,
managerial and interpersonal skills.

QUALIFICATION:

YEAR INSTITUTE DEGREE/CERTIFICATE MAJORS CGPI/
PERCENTAGE
NATIONAL B.TECH ELECTRICAL CGPI=8.44
2010- INSTITUTE OF AND RANK= 10th
2014 TECHNOLOGY ELECTRONICS
HAMIRPUR ENGINEERING
2009- ARMY PUBLIC CENTRAL BOARD MATHS,PHYSICS, 94%
2010 SCHOOL, OF SECONDARY CHEMISTRY,
DAGSHAI, EDUCATION(CBSE)- ENGLISH,
(H.P.) 12
TH
STANDARD INFORMATICS
PRACTICES
2007- St. MARYS CENTRAL BOARD OF MATHS, 92%
2008 CONVENT SECONDARY CHEMISTRY
SCHOOL EDUCATION(CBSE)- ,PHYSICS,BIOLOGY,
KASAULI 10
TH
STANDARD ENGLISH,HINDI,
(H.P.) SOCIAL SCIENCES





1
RELEVANT COURSES UNDERTAKEN:

Basic electrical , Basic electronics, Electrical machinery, Control Systems, Signals and Systems,
Design of Hydro Power Plant, Power system, Protection and Switch Gear, Network Analysis and
Synthesis, Power Electronics, Electrical Measurements and Instrumentation, Digital Electronics,
Transformer engineering, PSOC, HV Engineering, Microprocessors and Microcontrollers, Signals
and Systems, Neural Networks and Fuzzy Logic.

SUMMER TRAINING

1. SJVNL SHIMLA

PROJECT: Overview of the construction and electromechanical working of hydropower plant.

Duration: 6 weeks

Description: This training aimed to provide a sufficiently detailed version of the principle,
construction and generation of the 412 MW hydroelectric power in Rampur which is in tandem
operation with Nathpa Jhakri 1500 MW project of which the operation was analyzed.

2. BHEL, HARIDWAR

PROJECT: STATOR COILS MANUFACTIRING.

Duration: 30 Days

Description: Coil and insulation manufacturing block was allotted which intended to
demonstrate the class B Bituminous insulation of the stator coils which are manufactured in
two parts i.e. the upper and the lower bars.

3. DOORDARSHAN, KASAULI

PROJECT: THE CONCEPT OF COMMUNICATION OF CHANNELS TO VARIOUS USERS.

Duration: 15 Days

Description: A brief cognition about the satellite communication and the transmission of the
doordarshan channels to various users was imparted.



SCHOLASTIC ACHIEVEMENTS AND HONOURS:


2

Secured 95% marks in PHYSICS AND CHEMISTRY IN 2010 BOARDS.


Secured all india rank 12 in indian talent search examination (academics).


Secured 47
th
rank in bhabha science exam conducted at all india level.

Received many school level awards in writing articles


Won first prize in writing poem for a television program talent hunt show.


WORKSHOPS AND PROJECTS

Made a project in Matlab to calculate Voltage Stability Index.


Made a project on DEMULTIPLEXER in Digital Electronics under the guidance of Mrs. Gargi Khanna.

Attended Workshops ON C conducted by FORCE at NIT Hamirpur


Attended MS OFFICE-Workshop organized by ISTE.


Actively participated in various events of Annual Tech Fest like Electromora.




POSITIONS OF RESPONSIBILITY & EXTRA
CURRICULAR ACTIVITIES:

National Cadet Corps (NCC) C certificate holder in Navy Wing.


Volunteer of Literacy Mission. Educated students of backward class and provided them a
platform to enhance their standard of living and also provided financial and medical help
to these students.

Voluntarily participated in the organization of PRAYAS, Annual Cultural-cum-charity fest of Literacy


Mission.

Worked as Executive member in Dimensions team for 2 years.


Working as Coordinator in college Cultural-fest12 in technical club


Coordinator of Organization Club, Hill fair, Annual Cultural Fest, NIT Hamirpur in 2010.





HOBBIES:

Writing articles

Playing Carom, badminton.


Volunteering to teach children who dont have the necessary facilities




SOFTWARE AND HARDWARE PROFICIENCY:

LANGUAGES: C , SQL
SOFTWARE USED: MATLAB , SIMULINK, AUTOCAD,VISUAL BASIC, MS OFFICE, PHOTOSHOP



3

Das könnte Ihnen auch gefallen