Sie sind auf Seite 1von 12

ETA E1\1Glh!

EEQlMCi PRIVATE LIMITED


503-504, Prakash Deep Building, 7, Tolstoy Marg, New Delhi - 110001
Ph. : 01 1-26451115/6/7/8,43743800, 41520840143
Fax : 01 1-43743866,41520844
Email : etametro@vsnl.net
Ref: ETA/ICML/SMW/BC/SC/KK/O79
Date: August 11, 201 1
DGM-BUSINESS DEVELOPMENT (POWER)
MI S CESC LIMITED
CESC House
Chowringhee Square
Kolkata - 700001
West Bengal
KIND ATTN: MR ADRlT PALCHOUDHURY
SUB: ICML, 9MWp SOLAR POWER PROJECT AT PRATAPGARH, DIST.
KUTCH, GUJARAT - SUBMISSION OF BASIC DESIGN FOR SCADA
& HMI.
REF: 1) MOM DT. 05/08/2011
Dear Sir,
Further to the minutes of the meeting held in our office on 5th August, 2001 1
regarding Basic Design of SCADA & HMI, we are pleased to attach herewith
point-wise clarifications for your kind information.
We hope the above is in line with your requirements and would request you to
kindly let us have your kind approval for the same to enable us to proceed
further in the interest of the project.
Thanking you and assuring you of our best services at all times.
Yours faithfully,
for ETA ENGINEERING PVT LTD.
HAuRABH cHAuHAN
GENERAL MANAGER
Encl: as above
Regd. Office : 5, Moores Road, Chennai - 600 006 Tamil Nadu, India
Branches (Tel.) - Bangalore : 41802300, Chennai : 28297626, Hyderabad : 27763529130, Mumbai : 67742700, Pune : 26051310, Kolkata : 24864329
CUSTOMER
CONTRACTOR
Submission Phase:
DRAWINGS 1 DOCUMENT
VENDOR & TECHNICAL SUBMITTAL
CONSTRUCTION DOCUMENTS
REPORTS
RECORDS
Subrnission Number: R First Second Third Fourth
Submission Contents:
For Information I For Approval As Built
ETA:
--- - -
Sr.No.
1.
U
ICML:
Description of the Document
BASIC DESIGN- SYSTEM 5 SCADA & HMI
Approved By
Sauray Chauhari
Prepared By
Gaurav
WM
pp /
System Description
SCADA & HMI
Rev No
0 1
Checked By
Saurabh T r - t h i
Details
Approved By
DOCUMENT TRANSMITTAL. REF. DOC
ETA-SO LA R-TRANS-47
SUBMISSION
TR13NSMI'I"rAL FORM
Reviewed By
Kapil
Designation Name
Date
11-Aug-2011
C - -
1 1 . r r u v r t a a c - t t C _11(+n1 rrrlt map
I A....I~ rwt
Sign
PROJECT : 9MWp GRID INTERACTIVE SOLAR PV
POWER PROJECT
: INTEGRATED COAL MINING LIMITED -
GUJARAT
: ETA ENGINEERING PVT LTD
, .
L
SYSTEM-4 MONITORING SYSTEM
1. Monitoring system
The monitoring system of Schneider will be. used. It has the duty t o highlight the performance and
running of the plant. A good and robust working system is crucial for keeping high plant availability and
for matching with the yield forecast values.
In the following, the main requirements for the monitoring system will be mentioned and described:
Requirements for the manuf ac t u~:
production experience
region of manufacture
reliability
Requirements for the equipment:
Market criteria
initiation t o the market
availability
cost effectiveness
good ratio between costs and yield
Service
technical support
planning assistance
lifetime (the minimum lifetime shall be 25 years)
guarantee
terms of guarantee
Technolonv
Accuracy of equipment
Visualization of all necessary values
Centralization of the data
Outdoor installed equipment protection class IP 65
Shielded and twisted lines
Compatibility with inverter
User friendly software
Simple maintenance
Availability of accumulated or instantaneous values
Interface t o the weather station and counter
Data resolution down t o string level
Data export procedure
Small measuring interval
For easy availability of the monitored data a data transfer via internet is necessary.
All data will be recorded chronologically and will be MS Excel compatible
Fig1 : Monitoring Station
Material
The lifetime of the used materials will comprehend a minimum of 25 years. All materials must
be certified following international and Indian norms and guidelines.
All outdoor installed components have.to c o mw IP 65 or similar
Pyranometet', preciseness < 3%
Temperature sensor preciseness < 1%
Preciseness of current measurement < 1%
The data logger will have internal reliable battery backup t o record all kind of data
simultaneously
External AC or 24V DC auxiliary supply
Necessary parameter t o be taken and displayed:
SR.NO.
1
2
3
4
5
6
7
8
PARAMETER TO BE DISPLAYED
WEATHER STATION
lrradiation present values
lrradiation accumulated day
lrradiation accumulated month
lrradiation accumulated year
lrradiation accumulated Total
Ambient Temperature
W~nd Direction
Wlnd Speed
INVERTER
Through Softlink via Profibus
Through Softlink via RS 232
1
2
3
4
5
Total Energy
PV1 Total Energy
PV2 Total Energy
PV3 Total Energy
Inverter status
A l Dl A0
AC SIDE
D 0
6
7
8
9
10
11
12
ACPower
AC Reactive
AC Voltage
AC Frequency
AC Current
Power reduct~on
AC side breaker open & close status ( 2 DO )
PV SIDE
13
14
15
16
17
18
19
20
-
2 1
PV1 Power
PV2 Power
PV3 Power
PV1 Voltage
PV 2 Voltage
PV3 Voltage
SENSORS
Cooling liquid Temperature
Cabinet Temperature
- - --
Inverter alarmlerror codes 5 selected alarms out of
2000 wi l l be indicated i n
SCADA.
Al I A0 I Dl I DO
Through MODBUS RS485
available i n meter will be
installed f or monitoring
these parameters through
SCADA
1
1
2
3
4
5
6
7
8
9
11
12
13
14
15
TRANSFORMERS(12.5 MVA-1 Nos)
Operating Voltage L1
Operating Voltage L2
Operating Voltage L3
Operating Current L2
Operating Current L2
Operating Current L3
System Frequency
Active Power (Before Transformer)
Reactive Power (Before Transformer)
Active Power (Behind Transformer)
Apparent Power (Behind Transformer)
Reactive Power (Behind Transformer)
Transformer Temperature
WTI Alarm
16
17
18
19
20
2 1
22
23
24
25
26
WTI Trip
OTI Alarm
OTI Trip
MOG Alarm
Bucholz Alarm
pp
Bucholz Trip
PRVTrip
OLTC Oil level Low Alarm
OLTC Position status
OLTC Raise Command
OLTC Low Command
TRANSFORMERS (1.25 MVA-9 NOS)
Through MODBUS RS 485
available in meter will be
installed for monitoring
these parameters through
SCADA
Al
1
2
3
4
5
6
7
8
9
10
11
12
13
Operating Voltage L1
Operating Voltage L2
Operating Voltage L3
Operating Current L2
Operating Current L2
Operating Current L3
System Frequency
Active Power (Before Transformer)
Reactive Power (Before Transformer)
Active Power (Behind Transformer)
Apparent Power (Behind Transformer)
Reactive Power (Behind Transformer)
Transformer Temperature
A0
1
1
1
1
1
1
1
1
1
1
Dl
I
1
1
DO
14
15
16
1.
2.
3.
a)
b)
4.
a)
b)
c)
d)
e)
f )
5.
a)
6.
a)
7.
a)
MOG Alarm
OTI Alarm
Bucholz Alarm
11 KV PROTECTION DEVICES
IlkV Protection System (All IlkV panels)
Panel DC fail status (DC Supervision relay)
Panel AC fai l status
Over current & Earth faul t relay(l/C 9 nos)
-
Over current relay unhealthy status
Over current and Earth fault protection optd. status
I l k V Vaccum Circuit Breakers ( I/C 6 nos)
Vaccum Circuit Breaker open status
Vaccum Circuit Breaker close status
CB Trip coil healthy status
CB spring charge status
1l kV CB open command f r om SCADA
1l kV CB close command f rom SCADA
Flush mount ed high speed Tripping relay ( I/C 9 nos & O/G 2
nos.)
Flush mounted high speed Tripping relay normal status
Tripple Core CT (O/G 6 nos.)
Value of current in CT
Dual Core PT
Value of Voltage in PT
A l A0
1
1
1
Dl
1
1
1
1
1
1
1
1
1
1
1
1
1
DO
8.
a)
b)
c)
d)
9.
1
2
3
4
5
6
7
8
9
10
11
10.
1
2
3
4
5
6
11.
RMU
O/C & E/F Protection optd status
RMU all breaker's open status
RMU al l breaker's close status
Under voltage protection optd.
66kV Protection system
Panel DC fail status (DC Supervision relay)
Over current and earth fault relay optd.
Transformer Differential relay operated.
HV REF protection optd.
LV REF Protection optd.
Over fluxing protection alarm.
Over fluxing protection optd.
CB TC-1 Faulty
CB TC-2 Faulty
VT Fuse fail
High speed tripping relay(Master Trip) optd.
66kV SF6 CB
66kV CB open status
66kV CB close status
66kV CB open command from SCADA
66kV CB close command from SCADA
CB SF6 gas pressure low alarm
CB SF6 gas pressure lockout
Fire protection system:
Fire Alarm Indication
It can either be Hard wired
or Softlink.
Through Softlink
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
via .
1
1
Table- 1: Parameters to be monitored
12.
1.
2.
3.
4.
5.
1.
a)
b)
c)
2.
a)
b)
c)
3.
a)
b)
c)
Combiner Box (Both Levels, as applicable)
Module Temperature sensors
Monitoring of each string to be integrated with SCADA
All fuse status to be monitored via string box control unit.
Incoming current through each string to be monitored via
string box control unit.
Surge protection and total PV voltage to be monitored via
String Box control unit.
METERING
11 kV Side Metering
Active Power, present power and added
Apparent Power, present values and added
Reactive Power, present values and added
66 ItV Side Metering
Active Power, present power and added
Apparent Power, present values and added
Reactive Power, present values and added
11 kV Auxiliary Supply Panel
Active Power, present power and added
Apparent Power, present values and added
Reactive Power,,present values and added
MODBUS
Through MODBUS RS 485
available in meter will be
installed for monitoring
these parameters through
SCADA
String box supplier yet t o
confirm
Through RTD Sensors.
Through Softlink via
MODBUS
Through Softlink via
MODBUS
Through Softlink via Modbus
Main PLC
PCU room number 5 contains main PLC consisting of CPU, Communication and 110 Modules. It has Mod
bus serial ports which communicates with slave stations such has Weather Station, Energy meters, string
boxes etc. The hardwired signals form RMU, Transformers, Inverter, Fire Alarm and Protection for
monitoring are connected to I10 Modules which are mounted in Main PLC rack.
SCADA System
An Window based software is installed in work station, which will communicate with Main PLC and PLC
(RTU) using Fibre Optic Ethernet network.
PLC (RTU's)
Eight numbers of mini PLC's or RTU's will be installed in each PCU room except PCU room number 5
where Main PLC is installed. A Mini PLC consists of a base unit with 24 Digital inputs, 16 Digital output
and communication adapter. Each PLC is mounted in the Control Panel which consists of Ethernet Switch
and Patch Panel. All the hardwire connections from Inverter, RMU, String box & Transformer etc are
connected to the (RTU) controller.
Each (RTU) is having the Modbus (RS485) communication capabilities. String Box & other Modbus
devices are communicated to the (RTU) using RS485 port.
The monitoring data from (RTU) will be communicated to SCADA over fibre Optic Ethernet network.
System Architecture
The system consists of Ethernet network to communicate to the SCADA station; the data's from the main
PLC & (RTU) are communicated via Ethernet network.
The devices with Modbus communication capabilities under each PCU station are communicated to the
fRTU) which is placed in the each PCU area.
Refer to the System Architecture for more details.
Fig. 3: Complete monitoring system of the PV plant
el: >
I