Sie sind auf Seite 1von 32

3CM03094BAAARJZZA Edition 02 Released 1/32

COVER SHEET

PIS


Title 8650 SDM
SD01 Rack Layout
Product Installation on Site


Classification ATCA-V2
CBG/CTO/TC3
HW R&D

Edition 01 02
Date 2008-12-10 2009-03-05
Change Note
Appraisal
Authority(ies)
Company ALCATEL-LUCENT ALCATEL-LUCENT
Function
Name(s) Initial(s)
Originator
Company CITLN CITLN
Department CCHW CCHW
Name(s) Initial(s) PE PE


3CM03094BAAARJZZA Edition 02 Released 2/32


Originator(s) Pierre Esnault

Approval(s) Project TPM Installation Product Manager
B. PARIS P. LOLLIERIC JF. CIVEL
Product Integrity
Y. HENRY

ABSTRACT
This document defines the specific rules for installing, grounding,
powering and external wiring of the 8650 SDM product.
This document is for Alcatel-Lucent internal use only.

REVIEW
01 Creation
02
Add Chinese configuration (xSX extended and 1mF modular)
Rename IX board by RH board



3CM03094BAAARJZZA Edition 02 Released 3/32

INTERNAL HISTORY

Version Status Date
yy/mm/dd
Comments
Ed.01 Released 2008-12-10 Creation.
Ed.02 Proposal 01 2009-02-19
Add Chinese configuration (xSX extended and 1mF modular)
Rename IX board by RH board



3CM03094BAAARJZZA Edition 02 Released 4/32



ATCA-V2


8650 SDM

SD01 Rack Layout

Product Installation on Site



3CM03094BAAARJZZA Edition 02 Released 5/32

TABLE OF CONTENTS
REFERENCE LIST ..................................................................................................................................... 7
PREFACE.................................................................................................................................................. 8
1 GENERIC 9
2 RACK FIXING 9
2.1 Part List 9
2.2 Selection criteria 9
2.3 Survey and engineering questions 9
3 RACK GROUNDING 10
3.1 Part List 10
3.2 Selection criteria 10
3.3 Survey and engineering questions 10
4 RACK POWERING 11
4.1 Part List 12
4.2 Selection criteria 13
4.3 Survey and engineering questions 14
5 WIRING 15
5.1 Part List 15
5.2 Selection criteria 16
5.2.1 Serial Links......................................................................................................... 16
5.2.2 Ethernet Links.................................................................................................... 16
5.2.3 E1 Links .............................................................................................................. 18
5.2.4 Alarm Links ........................................................................................................ 24
5.3 How rout the External Cords 26
5.3.1 E1 Cords ............................................................................................................. 26
5.3.2 Other Cords........................................................................................................ 26
5.4 Survey and engineering questions 27
6 CABLING PARTS 28
6.1 Part List 28
6.2 Selection criteria 28
6.3 Survey and engineering questions 28
A. CONSUMPTION: .............................................................................................................................. 29
B. WIRING: .......................................................................................................................................... 31
GLOSSARY.............................................................................................................................................. 32


3CM03094BAAARJZZA Edition 02 Released 6/32

List of figures
Figure 1: wiring schematic of the JSXPDUE1 connection to the customer power plant.........................................11
Figure 2: All cases to connect the rack to the customer power plant ......................................................................12
Figure 3 : Example of copper GE links from S/R.....................................................................................................17
Figure 4 : 120 ohms case.........................................................................................................................................19
Figure 5 : 75 ohms case...........................................................................................................................................20
Figure 6 : 100 ohms case.........................................................................................................................................21
Figure 7 : Example of E1 links to customer DDF on one couple of RT board........................................................22
Figure 8 : Example of E1 links to customer DDF on one couple of RT board........................................................23
Figure 9 JBALARM (side view)...............................................................................................................................24
Figure 10 SCSI26 alarms connector pin-out ...........................................................................................................25
Figure 11 cabling way front view, example..............................................................................................................26
Figure 12. -48V Distribution in the rack ...................................................................................................................30

List of Tables
Table 1 Part list of fixing kits....................................................................................................................................9
Table 2 seismic and non seismic rack fixing .............................................................................................................9
Table 3 Part list of grounding elements..................................................................................................................10
Table 4 drums ..........................................................................................................................................................10
Table 5 Part list of powering elements...................................................................................................................12
Table 6 cables..........................................................................................................................................................12
Table 7 Part list of wiring elements........................................................................................................................15
Table 8. GE link between OS6850 and External networks, in all config.............................................................16
Table 9. Number of E1/T1 links vs. configuration. ...............................................................................................18
Table 10 E1/T1 link from AB/M03 RT stations to External DDF...........................................................................19
Table 11 E1/T1 link from AB/M03 RT stations to External DDF...........................................................................19
Table 12 Alarm link between Alarm board and external signal lamp panel........................................................24
Table 13 Part list of cabling parts...........................................................................................................................28
Table 14 Length of 16 and 35 mm external cords ...............................................................................................29
Table 15 Length of all external cords .....................................................................................................................29
Table 16 JLCAT6 length table ................................................................................................................................31
Table 17 ALETHC length table................................................................................................................................31
Table 18 JLDAW length table .................................................................................................................................31
Table 19 DLANM120 length table...........................................................................................................................31


3CM03094BAAARJZZA Edition 02 Released 7/32

REFERENCE LIST

[1] 8650 SDM ELS (SD01) 3CM03094AAAARJZZA
[2] Fixing GIS 3BW208340001RJZZA
[3] Grounding GIS 3BW208340003RJZZA
[4] Powering GIS (standard solution) 3BW208340007RJZZA
[5] Wiring GIS Add a JLDAW on a JSXPDUEx 3BW208340005RJZZA
[6] General Wiring GIS 3BW208340006RJZZA
[7] Files : KIACC1 3CM03177AA
[8] Files : KIBRAID 3BW13762AA
[9] Files : ZKFIXA 3BW11993AA
[10] Files : ZKFIX19P 3BW11883AA
[11] Files : MASISM1 3CM02941AA
[12] Files : KMISO 3CM02942AA
[13] Files : KI2HL2P2 3BW13774AA
[14] Files : KI2HL6P2 3BW13773AA
[15] Files : KI2HLGD1 3BW13768AA
[16] Standard for cable matrix 3CL000510001ASZZA
[17] Installation Decision Tool (IDT) for 8650 SDM (SD01) 3CM03094CAAAVTZZA

3CM03094BAAARJZZA Edition 02 Released 8/32

PREFACE
The purpose of this document is to provide useful information for assembling and connecting the SD01 rack
layout, for the 8650 SDM product, on customer field.
For each step of the installation (fixing, grounding, powering, wiring processes) one or more Generic
installation Sheet will be used.
A specific IDT (Installation Decision Tool) for the 8650 SDM product (SD01) ref. [17]), is available to
calculate the kits to be order for an installation.
The description of the SD01 rack layout is made on the ELS document [1].
Symbols in text
This symbol may be found in the text of this document. It has the following meanings.

!
CAUTION

CAUTION: Test set off in this manner indicates that failure to follow directions could result in
damage to equipment or loss of information

!
REMARK

Remark
Conventions
The naming of the devices and the ports is compliant with ELS naming.
The Right of the rack is the Right from the front view. So the right rear Vertical Rail is behind the right front
Vertical Rail.
External cord or access: external for the SD01 rack layout.
Internal cord or access: internal for the SD01 rack layout.
All the non validated options are in orange in this document.*
In red: modifications from the previous iteration

3CM03094BAAARJZZA Edition 02 Released 9/32

1 GENERIC
An accessories kit KIACC1 (3BW13769AA) should be order. It included consumables to install the rack in the
customer field.
2 RACK FIXING
The SD01 rack layout could be installed on solid or raised floor, on seismic or non seismic mode.
It is recommended to fix the rack on the floor (mandatory if seismic configuration).
2.1 Part List
The usable kits for this function are:
Kits Codes to be order function
ZKFIX19P 3BW11883AA FIXING KIT FOR RACK ON SOLID FLOOR
ZKFIXA 3BW11993AA fixation kit
MASISM1 3CM02941AA SEISMIC BASE FOR NRA2XX RACK
KMISO 3CM02942AA INSULATING PLATE KIT FOR NRA2XX RACKS
Table 1 Part list of fixing kits
2.2 Selection criteria
For solid floor installation, one ZKFIX19P is always ordered, and for raised floor one ZKFIXA is always ordered.
In this last case, on the seismic field, one MASISM1 is ordered. The following table summarizes these different
cases:
Seismic Non Seismic
Solid floor ZKFIX19P (ZKFIX19P)
1

Raised floor MASISM1 + ZKFIXA ZKFIXA
Table 2 seismic and non seismic rack fixing
For IBN customer fields, an insulation kit is foreseen: KMISO.
All these solutions are described in the Fixing GIS document [2].
2.3 Survey and engineering questions
The questions for the site survey and/or engineering are:
1/ seismic installation?
2/ on solid or raised Floor?
3/ IBN or CBN installation?
According to the answers, the different kits will be ordered.

1
It is recommended to fix the rack on the floor , but in this case, it is not mandatory

3CM03094BAAARJZZA Edition 02 Released 10/32

3 RACK GROUNDING
The 8650 SDM rack, in SD01 rack layout, has been developed for CBN installation mode, but it could be also
installed in IBN mode.
3.1 Part List
The usable elements for this function are:
Object Ref. ALU Codes function
G/Y Wire 3BK08957BA 100m of 16mm G/Y wire
G/Y Wire 3BK08960BA 100m of 35mm G/Y wire
KIBRAID 3BW13762AA CBN kit
KI2HLGD1 3BW13768AA Two Holes lugs kit
Table 3 Part list of grounding elements
3.2 Selection criteria
For CBN customer fields only, one KIBRAID must be ordered by rack. For IBN customer fields one KMISO will be
ordered and mounted under the rack, during rack fixing step (see chapter 2).
One or two KI2HLGD1 kits are to order, as much as the JSXPDUE1 number. This kit contains the two holes lugs
to connect the 16 or 35mm wires to the rack. The main features of these two holes lugs are: standard barrel
90, =19mm (3/4) =M6 (1/4)
In most countries, the 16mm 1AC017610012 wire is compliant and should be ordered.

!
CAUTION

CAUTION: The choice of the safety ground section wire is compliant with IEC60364-5-54. On some
customer fields the installation rules are more restricted and in this case, the solution is to order
the 35mm 1AC017610003 wire.
These wires could be ordered per drum. The only drums codified today are:
Section (mm) length ALU code Drum ref.
16 100m 1AC017610012 3BK08957BA
35 100m 1AC017610003 3BK08960BA
Table 4 drums
All these solutions are described in the Grounding GIS document [3].
3.3 Survey and engineering questions
The questions for the site survey and/or engineering are:
1/ IBN or CBN installation?
2/ Distance between this rack and the Ground Window Site?

!
CAUTION

CAUTION: In this document, the solutions with a distance more than 50m are not taking into
account.
3/ Are the local Grounding rules more restricting that IEC 60364-5-54?
According to the answers, the different kits and cable will be ordered.

3CM03094BAAARJZZA Edition 02 Released 11/32

4 RACK POWERING
The 8650 SDM rack, in SD01 rack layout, has been developed with one or two JSXPDUE1 Power Distribution
Units (PDU).
The JSXPDUE1 has been developed to feed one ATCA-V2 chassis, and up to four other small devices as
Switch/Routers (S/R) and an alarm board in redundant mode.
In these configurations, two power feeds (0V and -48V), one for A branch and one for B branch, could be
requested to the customer for each JSXPDUE1 implemented in the rack. Each power feed should be protected
by a dedicated CB on the Customer power plant.


Figure 1: wiring schematic of the JSXPDUE1 connection to the customer power plant

!
REMARK

Only black wires references are provided with colored rings.

!
CAUTION

CAUTION: The ground of the rack must be connected before to connect the rack
to the power plant. See chapter 3.
The nominal voltages are -48 or -60V. (From -40.5V to -72V).
The wires to use are double sheathing 10mm or 35mm wires.
B branch
A branch
X1
-48V
0V

3CM03094BAAARJZZA Edition 02 Released 12/32

4.1 Part List
The following table summarizes the usable elements for this function:
Objects Ref. ALU Codes function
KI2HL6P2 kit 3BW13773AA Four 16mm two holes lugs and colored heat shrinkable tubing
KI2HL2P2 kit 3BW13774AA Four 35mm two holes lugs and colored heat shrinkable tubing
Black wire 3BK0895BA 100m of 16mm (AWG6) double-sheathing wire for building
Black wire 3BK08959BA 100m of 35mm (AWG2) double-sheathing wire for building
Table 5 Part list of powering elements
The Two Holes lugs main features included in the KI2HLxP2 kits are: standard barrel, flat, =16mm (3/4)
=M6 (1/4)
These wires could be ordered per drum. The only drums codified today are:
Section (mm) length ALU code Drum ref.
16 (AWG6) 100m 1AC017610010 3BK08956BA
35 (AWG2) 100m 1AC017610001 3BK08959BA
Table 6 cables


Figure 2: All cases to connect the rack to the customer power plant

A
B
PDU1
SD01 Customer
Power
plant
CB
Customer
Dependent
A
B
KI2HL2P2 if
35mm wire,
and KI2HL2P6
if 16mm wire.
PDU2
(optional)
16mm wire
if D 20m, and
35mm wire
if 20 < D 45m.
Dr
CB max: 125A if 35mm, 80A if 16mm
Available CB: from (Max consumption x 1.25) to CB max:
from 60A to 80A if 16mm wire, or
from 60A to 125A if 35mm wire
To preserve the selectivity: from 90 to 125A
Strongly recommended: 80A if 16mm wire, and 90 or 100A if 35mm wire.
Consumption :
Nominal / Max
(worst Cases)
19.5 / 46.1A
19.5 / 46.1A
18.2 / 43.1A
18.2 / 43.1A

3CM03094BAAARJZZA Edition 02 Released 13/32

4.2 Selection criteria
To define the material to be ordered, three data must be defined:
Na The number of ATCAV2 chassis included in the rack.

!
REMARK

In the configurations with two ATCAV2 chassis (2D, 2F, 2DF and 2FD distributed
configurations and DC Compact configuration) the second JSXPDUE1 (X2) will be
connected on the customer power plan only when the second ATCAV2 chassis will
be implemented on the rack.

!
CAUTION

CAUTION: It is strongly advisable to connect the second JSXPDUE1 to customer
power plant when the second ATCAV2 chassis (CD) is not implemented in the rack.
Dr: distance from rack to customer power plant (meters): from 5 to 45m.
Ff: Foreseen for the future. If the distance between rack and customer power plant is less than 20m,
16mm cables are sufficient to feed the JSXPDUE1, but in this case, if the product used new more
consuming boards in the future, the power cables will be to replace by 35mm cables. The choice to
install directly 35mm cables is proposed.
From these two criteria, the number of cable drums and two holes kits could be defined with the following
table:
Dr Na = 1 x ATCAV2 chassis 2 x ATCAV2 chassis
Ff= 16 mm 35mm 16 or 35mm 35mm only
[5-12.5m] 1 x drum 16mm 1 x drum 35mm 1 x drum 16mm 1 x drum 35mm
]12.5-25m] 1 x drum 16mm 1 x drum 35mm 2 x drum 16mm 2 x drum 35mm
]25-33m] Not available 2 x drum 35mm Not available 3 x drum 35mm
]33-45m] Not available 2 x drum 35mm Not available 4 x drum 35mm
Two Holes lugs kits 1 x KI2HL6P2 1 x KI2HL2P2 2 x KI2HL6P2 2 x KI2HL2P2
Table 7 Drums and kits vs. criteria
On the site, each connected access (A and B) must be connected by two cables (-48V and 0V cables, see the
Figure 2)
The consumption of each these accesses, in the nominal / worst cases is given by the ELS document [1] and
recalled in the Figure 2.
The strongly recommended values to protect these accesses on the customer power plant are:
80A if 16mm wire (in this case the selectivity is not preserved),
90 or 100A if 35mm wire.


!
CAUTION

CAUTION: In no case should the circuit breaker protection exceed
125A for a 35mm cable, and 80A for a 16mm cable (IEC60364-5-
52 installation method E, F).
The Figure 2 summarize all the cases.

3CM03094BAAARJZZA Edition 02 Released 14/32



!
REMARK

How defined if your conf is a Compact or Distributed configuration?
one PDU + 2 CT + 2 RT + 2 DB boards (4xNBRZAN + 2xNBRZAF) : SC
compact cfg
one PDU + 2 CT + 4 RT + 2 DB boards (4xNBRZAN + 4xNBRZAG) : xSC
compact cfg
one PDU + 2 CT + 6 RT + 4 DB boards (6xNBRZAN + 6xNBRZAF): MC
2

compact cfg
two PDU + 4 CT + 8 DB + 12 RT boards (12xNBRZAN + 12xNBRZAF) :
DC
2
compact cfg
two PDU + 2 CT + 2 RH + 8 RT boards (4xNBRZAN + 8xNBRZAF): 1F
3

distributed cfg
two PDU + 4 CT + 2 RH + 8 RT boards + 10 DB boards (16xNBRZAN +
8xNBRZAF): 2DF
3
or 2FD
3
distributed cfg
two PDU + 4 CT + 4 RH + 4 to 20 RT boards (8xNBRZAN + 16xNBRZAF):
2F
3
distributed cfg
two PDU + 2 CT + 10 DB boards (12xNBRZAN): 1D distributed cfg
two PDU + 4 CT + 20 DB boards (24xNBRZAN): 2D distributed cfgFrom
these

All these solutions are described in the Grounding GIS document [4].
4.3 Survey and engineering questions
The questions for the site survey and/or engineering are:
1/ how many ATCAV2 chassis are implemented in the rack?
According to the answer, determine the number of links and kits to order.
2/ distance between the rack and the customer power plant to deduct the Dr length of the cable to fed
the rack?
According to the answer, calculate the number of 100m drum to order.
3/ 16 or 35mm cables between rack and customer power plant?
According to the answers:
35 : 35mm cables will be ordered
16 : 16 mm cable are ordered (if Dr 20m)
.


2
For Chinese market the NBRZAF are replaced by NBRZAG
3
For Chinese market the number of NBRZAF is at least 2 up to 8 by step of 2 per FE node

3CM03094BAAARJZZA Edition 02 Released 15/32

5 WIRING
There are four types of external cords:
Serial cords for debug and/or installation only,
Ethernet cords, on copper cable or optical fiber medium
E1 cords
Alarm links
5.1 Part List
The following cables could be ordered:
Objects Ref. ALU Codes function
JLCAT6 1AB2298300xx CAT6 S-FTP straight cord
LSMUD9 1AB360300001 DB9 mini USB Serial link
JLDAW 3BW13065AA Link to external Signal lamp panel
DLANM120 3BL02197AA 120 ohms E1 link to DDF
KRACG120 3BW12321AA 4 x 8 pairs terminal blocks kit
JSIO 1AB066340011 10 pairs Terminal Block
LDPETIQ 1AD021320001 Label holders
PVTBSYM 1AB227470001 External 120/75 ohms terminal
FICHE 1AB025460001 1.6/5.6 male plug
COAX1X 3BW12260AA 100m drum coaxial cable
Table 7 Part list of wiring elements
For the lengths vs. codes, see annex B

3CM03094BAAARJZZA Edition 02 Released 16/32

5.2 Selection criteria
5.2.1 Serial Links
Two LSMUD9 are always ordered with one rack.
These cords are used on debug and/or installation mode only. These cords could be connected on the serial
ports of the ROUZIC or MALBAN boards (ports X09 and X10 from M01 to M14) on the ATCA-V2 side and on DB9
Serial port on an external PC. This link is a 3m link only.
5.2.2 Ethernet Links
For Ethernet, Fast Ethernet (FE) and Giga Ethernet (GE) links, the only cords used are GE compliant cords
(100m). In standard solution, the provided Ethernet cords are white JLCAT6 (90m).
When the JLCAT6 length is customer dependent, to limit the number of codes, only 10, 15, 20, 30 and 40m
lengths will be suggested.
All these links are from the S/R accesses or Malban Switches (on ATCAV2 chassis).
The crossover cords are rarely used because many Ethernet accesses are Auto MDI-X., and by default, the
straight cords will be preferred. In other case, this data will be provided. When these cords are mandatory,
the ALETHC could be used, but this cable is not foreseen in the standard installation solution. The codes vs.
lengths for this cord see Annex B.
Two JLCAT6 (10m) are always provided to connect eventually two Malban switches (X01 port) to the
External management, in the debug or installation mode. This port is usable after disconnection of the
functional link. This functional link must be re-connected in operational mode.
All the other Ethernet links are configuration dependent.
5.2.2.1 External Ethernet Link from the Switch/routers
The OS6850 S/R are mandatory in this rack, then 2x24 ports are available to connect the customer networks.
All these port are Auto MDI-X, and then the Straight cords are always available. The wiring is defined for each
site but by default four accesses and four links are foreseen.
In the standard installation, four links are provided to fulfill this function. Their length is given by the IDTool.
In the standard installation, these links are copper links only.

FROM TO
Rack Device Port Side Rack Device Port Side
Cord
H1 GE C21 1 GE port 2 JLCAT6 (<90m)
H2 GE C21 1
customer network #1
GE port 2 JLCAT6 (<90m)
H1 GE C22 1 GE port 2 JLCAT6 (<90m)
SD01
H2 GE C22 1
External
customer network #2
GE port 2 JLCAT6 (<90m)
Table 8. GE link between OS6850 and External networks, in all config.

3CM03094BAAARJZZA Edition 02 Released 17/32


NRA244AA
43
AB
04
01
JSXPDUE1
X1
JBALARM AL1
03
Deflector
(NDDEF1U)
D1
5
40
44
1
ATCA-V2 chassis
Mandatory
S/R (OS6850-24D) H2
S/R (OS6850-24D) H1
C01 C03 C05 C09 C11
C02 C04 C06 C10 C12
C13 C15 C17 C19 C21 C23
C14 C16 C18 C20 C22 C24
C07
C08
M01 M03
M02 M04
C50
Console Port
C49
USB Port
C01 C03 C05 C09 C11
C02 C04 C06 C10 C12
C13 C15 C17 C19 C21 C23
C14 C16 C18 C20 C22 C24
C07
C08
M01 M03
M02 M04
C50
Console Port
C49
USB Port
H2
H1
Customer Networks
Switch#2
Switch#1

Figure 3 : Example of copper GE links from S/R (front view)

3CM03094BAAARJZZA Edition 02 Released 18/32

5.2.3 E1 Links
5.2.3.1 Number of links vs. Configurations
The number of E1/T1 links is dependent of:
- the number of RT boards
- the type of RT board (NBRZAF or NBRZAG),
The following table gives the number of these links vs. configurations:
Configuration
Number of
RT
RT
Board
Number of E1/T1 links Location
1D, 2D 0 NBRZAF 0 -
SC 2 NBRZAF 2x4 = 8 AB(M06+M14)
xSC 4 NBRZAG 4x8 = 32 AB(M06-M05 + M14-M13)
MC 6 NBRZAF 6x4 = 24 AB(M06 to M04 + M14 to M12)
MC for China market 6 NBRZAG 6x8 = 48 AB(M06 to M04 + M14 to M12)
1F, 2DF, 2FD 8 NBRZAF 8x4 = 32
AB(M06 to M03 + M14 to M11) or
CD(M06 to M03 + M14 to M11)
1F, 2DF, 2FD for
China market
2 to 10
[2]
NBRZAF
From 2x4=8 to 10x4=40
by step of 8
AB(M06 to M02 + M14 to M10) or
CD(M06 to M02 + M14 to M10)
DC 12 NBRZAF 12x4 = 48
AB(M06 to M04 + M14 to M12) and
CD(M06 to M04 + M14 to M12)
DC for China market 12 NBRZAG 12x8 = 96
AB(M06 to M04 + M14 to M12) and
CD(M06 to M04 + M14 to M12)
2F 16 NBRZAF 16x4 = 64
AB(M06 to M03 + M14 to M11) and
CD(M06 to M03 + M14 to M11)
2F for China Market
4 to 20
[2]
NBRZAF
From 4x4=16 to 20x4 =
80 by step of 16
AB(M06 to M02 + M14 to M10) and
CD(M06 to M02 + M14 to M10)
Table 9. Number of E1/T1 links vs. configuration.
Then, the number of E1/T1 links is given by the number of RT stations x 4 (NBRZAF), except in the
Chinese Compact configurations x8 (NBRZAG).

3CM03094BAAARJZZA Edition 02 Released 19/32

Three connection modes are available:
5.2.3.2 120 ohms E1 links
To connect these links to an external wiring system on a DDF, one DLANM120 cord will be ordered per PCM link
(200m). Their number is configuration dependent (see Table 9). Their length is customer dependent.


DLANM120 Wiring system for DDF
(JSIO kit or of KRACG120)
On customer DDF
Connect to
ATCA-V2
chassis

Figure 4 : 120 ohms case
The JSIO is a 10 pair terminal block. One LDPETIQ kit will be ordered by JSIO kit.
The KRACG120 is a kit of 4 x 8 pair terminal blocks and labels.
The Base8 kit is strongly recommended.
The following table gives the location of these links in the AB ATCA-V2 chassis, for the RT station in M03 slot,
in all configuration, except Chinese compact configurations.
FROM TO
Rack Device Port Side Rack Device Port Side
Cord
E1 M03/D02/X01 1 E1 port 2 in & out DLANM120 (200m)
E1 M03/D02/X02 1 E1 port 2 in & out DLANM120 (200m)
E1 M03/D02/X03 1 E1 port 2 in & out DLANM120 (200m)
SD01 AB
E1 M03/D02/X04 1
External
Customer
DDF
E1 port 2 in & out DLANM120 (200m)
Table 10 E1/T1 link from AB/M03 RT stations to External DDF
The following table gives the location of these links in the AB ATCA-V2 chassis, for the RT station in M03 slot,
in the Chinese Compact configurations (xSC, MC and DC for Chinese market).
FROM TO
Rack Device Port Side Rack Device Port Side
Cord
E1 M03/D02/X01 1 E1 port 2 in & out DLANM120 (200m)
E1 M03/D02/X02 1 E1 port 2 in & out DLANM120 (200m)
E1 M03/D02/X03 1 E1 port 2 in & out DLANM120 (200m)
E1 M03/D02/X04 1 E1 port 2 in & out DLANM120 (200m)
E1 M03/D01/X01 1 E1 port 2 in & out DLANM120 (200m)
E1 M03/D01/X02 1 E1 port 2 in & out DLANM120 (200m)
E1 M03/D01/X03 1 E1 port 2 in & out DLANM120 (200m)
SD01 AB
E1 M03/D01/X04 1
External
Customer
DDF
E1 port 2 in & out DLANM120 (200m)
Table 11 E1/T1 link from AB/M03 RT stations to External DDF
From these tables, the connection from each RT station could be extrapolate
In this case, will be always ordered:
As much as DLANM120 as PCM links
One KRACG120 kit for 16 PCM links, or one JSIO for 4 PCM links. In this last case, labels are added.

3CM03094BAAARJZZA Edition 02 Released 20/32

5.2.3.3 75 ohms E1 links
To connect these links to an external on the DDF, via two, three or four 120/75 ohms terminal blocks
(1AB227470001), a DLANM120 cord will be ordered per PCM link (200m). This terminal block provides the
coaxial plugs for 12 PCM links. It will be installing as near possible as the rack.
From the Terminal block, up to 96 x 1.6/5.6 plugs (1AB025460001) could be ordered (2 per PCM link).
Zero, one or two 100m drums of coaxial cable (3BW12260AA) could be also ordered. Their number is
configuration and customer dependent (see Table 9). Their length is customer dependent.


1.6/5.6 plugs (1AB025460001)
+ coaxial cable (100m drum = 3BW12260AA)
DLANM120
120/75ohms terminals installed on
the customer DDF (1AB227470001)
Connect to
external device
Connect to
ATCAV2
chassis

Figure 5 : 75 ohms case
As the DLANM120 length is customer dependent, to limit the number of codes, only 30, 50 and 80m lengths will
be suggested.
The wiring of the DLANM120 to the DDF is the same of the 120 ohms case. A preferentially repartition on the
75/120 ohms terminal is given by the GIS [6].
In this case, will be always ordered:
As much as DLANM120 as PCM links
One 120/75 ohms adaptor for 12 PCM links
Could be ordered:
One or two 100m drum coaxial cable
Up to 96 x 1.6/5.6 plugs.

3CM03094BAAARJZZA Edition 02 Released 21/32

5.2.3.4 100 ohms T1 links
To connect these links to an external wiring system on a DDF, one JLCAT6 cord will be ordered per PCM link
(90m). Their number is configuration dependent (see Table 9). Their length is customer dependent.


JLCAT6 or
specific T1 cord
Wiring system for DDF
(TBD)
On customer DDF
Connect to
ATCAV2
chassis

Figure 6 : 100 ohms case

!
REMARK

The IDTool can define all the kits to order in the two first cases, but it is not foreseen to define
the elements to order in the last case (T1 links).

!
REMARK

The E1/T1 accesses are on the front of the SS7 AMC card.

3CM03094BAAARJZZA Edition 02 Released 22/32


NRA244AA
43
AB
04
01
JSXPDUE1
X1
JBALARM AL1
03
Deflector
(NDDEF1U)
D1
5
40
44
1
ATCA-V2 chassis
Mandatory
S/R (OS6850-24D) H2
S/R (OS6850-24D) H1
C
u
s
t
o
m
e
r

D
D
F

M15
M16
M20
NBRZAN NBMASW
1
D01
D02
X01 X02
X03 X04
X07
X08
X09
X10
X05 X06 X05 X06
D01
D02
X01 X02
X03 X04
X07
X09
X10
X01
X02
X01
X02
M0
D01
D02
X01 X02
X03 X04
X07
X08
X09
X10
X05 X06 X05 X06
D01
D02
X01 X02
X03 X04
X07
X09
X10
X05 X06
D01
D02
X01 X02
X03 X04
X07
X09
X10
X05 X06
D01
D02
X01 X02
X03 X04
X07
X09
X10
X05 X06
D01
D02
X01 X02
X03 X04
X07
X09
X10
X05 X06
D01
D02
X01 X02
X03 X04
X07
X09
X10
X05 X06
D01
D02
X01 X02
X03 X04
X07
X09
X10
X05 X06
D01
D02
X01 X02
X03 X04
X07
X09
X10
X05 X06
D01
D02
X01 X02
X03 X04
X07
X09
X10
X05 X06
D01
D02
X01 X02
X03 X04
X07
X09
X10
X05 X06
D01
D02
X01 X02
X03 X04
X07
X09
X10
X05 X06
D01
D02
X01 X02
X03 X04
X07
X09
X10
M02 M01 M03 M04 M05 M06 M07 M10 M09 M11 M12 M13 M14 M08
M18
M17
NBRZAF NBRZAF NBRZAN
D02
X04
X03
X02
X01
D02
X04
X03
X02
X01
D02
X04
X03
X02
X01
D02
X04
X03
X02
X01
D02
X04
X03
X02
X01
D02
X04
X03
X02
X01
D02
X04
X03
X02
X01
D02
X04
X03
X02
X01

Figure 7 : Example of E1 links to customer DDF on one couple of RT board (rear view) with one AMC
The previous figure gives an example of E1 links from AB chassis to customer DDF for one couple of RT
boards. It could be extrapolated for the other boards & in the CD chassis. See GIS [6] for the wiring on the DDF.

3CM03094BAAARJZZA Edition 02 Released 23/32


NRA244AA
43
AB
04
01
JSXPDUE1
X1
JBALARM AL1
03
Deflector
(NDDEF1U)
D1
5
40
44
1
ATCA-V2 chassis
Mandatory
S/R (OS6850-24D) H2
S/R (OS6850-24D) H1
C
u
s
t
o
m
e
r

D
D
F

M15
M16
M20
NBRZAN NBMASW
1
D01
D02
X01 X02
X03 X04
X07
X08
X09
X10
X05 X06 X05 X06
D01
D02
X01 X02
X03 X04
X07
X09
X10
X01
X02
X01
X02
M0
D01
D02
X01 X02
X03 X04
X07
X08
X09
X10
X05 X06 X05 X06
D01
D02
X01 X02
X03 X04
X07
X09
X10
X05 X06
D02
X01 X02
X03 X04
X07
X09
X10
X05 X06
D02
X01 X02
X03 X04
X07
X09
X10
X05 X06
D01
D02
X01 X02
X03 X04
X07
X09
X10
X05 X06
D01
D02
X01 X02
X03 X04
X07
X09
X10
X05 X06
D02
X01 X02
X03 X04
X07
X09
X10
X05 X06
D02
X01 X02
X03 X04
X07
X09
X10
M02 M01 M03 M04 M05 M06 M07 M10 M09 M11 M12 M13 M14 M08
M18
M17
NBRZAG NBRZAG NBRZAN
D02
X04
X03
X02
X01
D02
X04
X03
X02
X01
D02
X04
X03
X02
X01
D02
X04
X03
X02
X01
D02 D02
X04
X03
X02
X01
D02 D02
X04
X03
X02
X01
D02 D02
X04
X03
X02
X01
D02 D02
X04
X03
X02
X01

Figure 8 : Example of E1 links to customer DDF on one couple of RT board (rear view) in xSC conf

3CM03094BAAARJZZA Edition 02 Released 24/32

5.2.4 Alarm Links
When the customer requests this function, a JLDAW cord should be used. One by JSXPDUE1 is required. In this
case, the following link is:
FROM TO
Rack Device Port Side Rack Device Port Side
Cord
AL1 Alarm X01 1 External Signal lamp panel TBD on the site 2 JLDAW (60m)
SD01
AL2 Alarm X021 1 External Signal lamp panel TBD on the site 2 JLDAW (60m)
Table 12 Alarm link between Alarm board and external signal lamp panel
As the JLDAW length is customer dependent, to limit the number of codes, only 20 and 40m lengths will be
suggested.
The Alarm board (JBALARM AL1) is plugged on the side of the JSXPDUE1 (X1 and/or X2) PDUs on the top
of the rack. A specific GIS [5] how to install this cord on the customer field. For memory this external cord will be
routed mainly on the Rear Area - Left RAL- and Rear Area Right RAR- (see [6]).

Figure 9 JBALARM (side view)
This board provides 4 accesses: P01 for the power, X01 for the alarm loops, X02 and X03 for the ATCA-V2
interface.
In this case: as much as JLDAW as PDU in the rack are proposed.


3CM03094BAAARJZZA Edition 02 Released 25/32


Figure 10 SCSI26 alarms connector pin-out

3CM03094BAAARJZZA Edition 02 Released 26/32

5.3 How rout the External Cords
5.3.1 E1 Cords
These cords are routed from the front of the ATCA-V2 chassis. They could be routed to the top or to the
bottom of the rack, following the generic methods given in the Wiring GIS [6]. For memory these external
cords will be routed mainly on the Rear Area - Left RAL- and Rear Area Right RAR- (see [6]).
With the AMC boards, the wiring is more complex. The suggested solution to wire all these cables is use two
accessories:
A KMFT1 horizontal side-to-side cable tray on the top of the rack (provided with the rack. See ELS [1])
and MPGC1 & MPGC2 horizontal front to rear cable trays (provided with the rack. See ELS [1]).


Figure 11 cabling way front view, example
5.3.2 Other Cords
The generic methods to rout these cords on the rack are given in the Wiring GIS [6], but in this product,
1. Because the number of these links from the ATCA-V2 chassis is small, no specific rules are given.
2. From the S/R, the external Ethernet links will be routed to the bottom of the rack:
- If the output is in the bottom, these links could be output directly,
- If the output is in the top, these links will creep along the Rear Right Vertical Rail (RRVR) to the
top of the rack (see the Wiring GIS [6]).
KMFT1
Rear of the
rack1
Front of the
rack1
MPGC1 & MPGC2
Cables from
boards
Cables from
AMC
Front uprights
used as vertical
cable trays

3CM03094BAAARJZZA Edition 02 Released 27/32

5.4 Survey and engineering questions
The questions for the site survey and/or engineering are:
1/ Distance between the rack and the Ethernet customer network?
According to the answers, will be defined the length of the different Ethernet cords.
2/ How many RT boards are provided?
3/ Is What is the RT type? NBRZAF or NBRZAG?
4/ Distance between the rack and the customer DDF?
5/ 75 or 120 ohms site?
According to the answer, will be defined if E1/T1 links will be delivery and the length of the different E1/T1
cords.
6/ Is Terminal blocks provided? base8 or base10?
According to the answer, will be defined if 120 ohms terminal blocks will be delivery.
7/ Is 120/75 ohms adaptor provided?
8/ Is 100m drum of coaxial cable provided? How?
9/ Is 1.6/5.6 coaxial plug provided?
According to the answer, will be defined if 75 ohms adaptor and accessories will or could be delivery.
10/ how many PDU will be connected to an external signal lamp panel?
11/ Have you need a link to a signal lamp panel?
12/ if yes, what is the distance?
According to the answers, will be defined the number and the length of a JLDAW cord to order.

3CM03094BAAARJZZA Edition 02 Released 28/32

6 CABLING PARTS
On the SD01 rack layout installation sites, some other elements could be useful. Two of they could be defined
from this chapter:
The wiring systems for DDF
The cable trays
6.1 Part List
The usable kits for this function are:
Kits Codes to be order function
CABLO CAF54/200/8000 1AD147470001 Cable tray LxWxD=8000x200x54
CABLO BOULON 1AD147490001 Screw and nuts for 24m of CABLO CAF54 kits
Table 13 Part list of cabling parts
6.2 Selection criteria
For a customer site, cable trays could be ordered. Up to three CABLO CAF54 kits for one CABLO BOULON kit
will be ordered.
6.3 Survey and engineering questions
The questions for the site survey and/or engineering are:
1/ How many cable tray are you need in the customer field?
According to the answers, the different kits will be ordered.

3CM03094BAAARJZZA Edition 02 Released 29/32

A. CONSUMPTION:
The section of the cable and the lugs to use, depend on the voltage drop and length of the cable.
Recall for memory: Consumption in the worst case, for small configuration 30.9A and for medium
configurations 46.1A (the reference values are given in the ELS document [1]).
The following table gives the maximum distance between the rack and the customer power plan (for a 1.7V
loss max) for 16 and 35mm wires:
Consumption

Upstream
protection
<16A 30.9A 46.1A mm AWG
10-80A 59,3 m 30,7 m 20,6 m 16 4
10-125A 129,6 m 67,1 m 45,0 m 35 2
Table 14 Length of 16 and 35 mm external cords
Other wire diameters are usable if the correspondent lugs are finding and checked in the JSXPDUE1. In this
case, the limitations are given by the following table:
Consumption

Upstream
protection
<16A 30.9A 46.1A mm AWG
10-63A 37,0 m 19,1 m 12,9 m 10 8
10-80A 59,3 m 30,7 m 20,6 m 16 4
10-100A 92,6 m 47,9 m 32,1 m 25 3
10-125A 129,6 m 67,1 m 45,0 m 35 2
Table 15 Length of all external cords

!
CAUTION

CAUTION: In this case, the maximum protections values could must be compliant with EN60950-1
and EN60364-5-54 or other safety local rules, for a loss of 1.7V max in the wires on one access (0V
and -48V)..

!
CAUTION

CAUTION: If 35mm Section is not installed on a power access, all evolution on the rack should be
completed by a check of the suitability of the wire Section and upstream customer protection.

!
CAUTION

CAUTION: The choice of a wire section is also dependent on the loss in the wire. For a Cross
Section, the maximum distance between source and JSXPDUEx is given by the following function:
Lmax (m) = 2400 * s (area wire in mm) / P (power in W) for 1.7V loss between A interface (PDU)
and Source.


3CM03094BAAARJZZA Edition 02 Released 30/32


P01
M48V-A1 M48V-A2
VRTN-A2
M48V-B1
VRTN-B1
M48V-B2
VRTN-B2
P02 P03 P04 P01 P02 P03 P04
VRTN-A1
M05
-48V
0V
GND
P01
JSXPDUE1
B3 B2 B1
P
9
3

P
9
0

P
9
5

P
8
7

P
8
9

P
8
4

P
8
5

P
8
1

P51-P52
AB
CD
H2
H1
AL1
X1
B5 B4
P
8
3

A3 A2 A1
P
4
3

P
4
0

P
4
5

P
3
7

P
3
9

P
3
4

P
3
5

P
3
1

P01-P02
A5 A4
P
3
3

1
0
A

1
0
A

1
0
A

1
0
A

7
5
A

1
0
A

1
0
A

1
0
A

1
0
A

7
5
A

B
A
JSXPDUE1
B3 B2 B1
P
9
3

P
9
0

P
9
5

P
8
7

P
8
9

P
8
4

P
8
5

P
8
1

P51-P52
AL2
X2
B5 B4
P
8
3

A3 A2 A1
P
4
3

P
4
0

P
4
5

P
3
7

P
3
9

P
3
4

P
3
5

P
3
1

P01-P02
A5 A4
P
3
3

1
0
A

1
0
A

1
0
A

1
0
A

7
5
A

1
0
A

1
0
A

1
0
A

1
0
A

7
5
A

B
A
A
c
c
e
s
s
e
s

t
o

c
u
s
t
o
m
e
r

p
l
a
n
t


Figure 12. -48V Distribution in the rack
For further details on the power wiring, see ELS [1] and MWR (link in the ELS).


3CM03094BAAARJZZA Edition 02 Released 31/32

B. WIRING:
Copper:

JLCAT6 code Length JLCAT6 code Length JLCAT6 code Length
1AB229830011 0m50 1AB229830006 5m 1AB229830016 40m
1AB229830001 1m 1AB229830007 10m 1AB229830010 45m
1AB229830002 1m50 1AB229830008 15m 1AB229830017 50m
1AB229830003 2m 1AB229830009 20m 1AB229830018 60m
1AB229830004 2m50 1AB229830012 25m 1AB229830019 70m
1AB229830005 3m 1AB229830014 30m 1AB229830020 80m
1AB229830022 3m50 1AB229830015 36m 1AB229830021 90m
Table 16 JLCAT6 length table

ALETHC ALETHC
code Length code Length
3BW01805AD 0m15 3BW01805HA 20m
3BW01805AL 0m50 3BW01805JA 30m
3BW01805BA 1m 3BW01805JL 40m
3BW01805CA 2m 3BW01805KA 50m
3BW01805CL 2m50 3BW01805KH 60m
3BW01805DA 3m 3BW01805KR 70m
3BW01805EL 5m 3BW01805LA 80m
3BW01805GA 10m 3BW01805LF 90m
3BW01805GL 15m 3BW01805LL 100m
Table 17 ALETHC length table
JLDAW JLDAW
code Length code Length
3BW13065FA 6m 3BW13065JL 40m
3BW13065GE 12m 3BW13065KA 50m
3BW13065HA 20m 3BW13065KH 60m
3BW13065JA 30m 3BW13065LA 80m
Table 18 JLDAW length table
DLANM120 DLANM120 DLANM120 DLANM120
code Length code Length code Length code Length
3BL02197FA 6m 3BL02197JA 30m 3BL02197KA 50m 3BL02197LS 110m
3BL02197GA 10m 3BL02197JC 32m 3BL02197KE 56m 3BL02197MA 120m
3BL02197GE 12m 3BL02197JE 34m 3BL02197KJ 62m 3BL02197MC 130m
3BL02197GJ 14m 3BL02197JG 36m 3BL02197KN 68m 3BL02197ME 140m
3BL02197GN 16m 3BL02197JJ 38m 3BL02197KT 74m 3BL02197MG 150m
3BL02197GT 18m 3BL02197JL 40m 3BL02197LA 80m 3BL02197MJ 160m
3BL02197HJ 24m 3BL02197JN 42m 3BL02197LD 86m 3BL02197ML 170m
3BL02197HN 26m 3BL02197JR 44m 3BL02197LG 92m 3BL02197MN 180m
3BL02197HT 28m 3BL02197JT 46m 3BL02197LK 98m 3BL02197MR 190m
3BL02197JW 48 3BL02197LN 104m 3BL02197MT 200m
Table 19 DLANM120 length table

3CM03094BAAARJZZA Edition 02 Released 32/32

GLOSSARY

1D Stand Alone DataBase distributed Configuration
1F Stand Alone Front End distributed Configuration
2D Dual DataBase distributed Configuration
2F Dual Front End distributed Configuration
2DF Dual distributed Configuration (1 DataBase then 1 Front End)
2FD Dual distributed Configuration (1 Front End then 1 DataBase)
AC Alternating Current
AMC Advanced Mezzanine Card
Auto-MDIX Crossed or Straight cord could be used equally on this port
Auto-sensing The Ethernet port recognizes speed of the links: 10/100 or 1000
CB Circuit Breaker
CBN Common Bounding Network
DB Database
DC Double Compact Configuration
DC Direct Current
DDF Digital Distribution Frame
ELS Equipment Layout Specification
EMC Electro Magnetic Compatibility
ETSI European Telecommunications Standards Institute
FE Front End
FE Fast Ethernet
GE Gigabit Ethernet
IBN Isolated Bounding Network
IP Internet Protocol
LAN Local Area Network
MC Medium Compact configuration
MOE Matriel d'Origine Exterieure (installation kit)
NMC Network Management Center
MWR Mounting and Wiring Rules
OAM Operation and Maintenance
OMC-CN Operation and Maintenance Center-Core Network
PCM Pulse Code Modulation
RRVR Rear Right Vertical Rail
SC Small Compact configuration
SS7 Signaling System N7
STM Synchronous Transfer Mode
TDM Time Division Multiplex

END OF DOCUMENT

Das könnte Ihnen auch gefallen