Sie sind auf Seite 1von 7

STEEL BUILDING SOLUTIONS

Registered Office:
Everest Industries Limited
Genesis, A-32, Mohan Co-operative,
Industrial Estate, Mathura Road,
New Delhi-1100
Tel +91 -11-41731951-53
F!+91-11-4"5""37#
$ www.everestind.com
%re Office : &e$ 'el(i
Everest Industries Limited
Genesis, A-32, Mohan Co-operative,
Industrial Estate, Mathura Road, New Delhi-
1100
!el "#1 -11-1$31#%1-%3, &a'"#1-11-(%((3$0
)*ntct +ers*n :
&me: +n,- %ggr$l
+(*ne &*. : #9"5#/94"00
E 1il: paggarwal@everestind.com
Ref :ESBS-ENQ 4264 /2011 28.04.2011
M/s Modern Industries
Kind ttention: Mr. S.K. Sri!st!
"ffer #esi$n% En$ineerin$ nd Su&&'( of )EB t *dr&ur% Rurdur&ur
-------------------------------------
The Offer l herein sets out the terms of Everest Industries Limited +EI,-, for design, engineering
and supply of Pre-Engineered steel uilding!s +.)EB/- to uyer. This Offer pertains only to the
pre-engineered metal "uilding materials specified herein #herein referred to as $)rodu0ts$%.
The terms of &esign, Engineering and 'upply are set out "elow(
1. #ESI*N 2RI3ERI1

1.1 Min #esi$n Bui'din$ 2odes:
Everest Pre-Engineered steel uildings are designed according to following codes
). *rame mem"ers are designed in accordance with )++, edition of the 14eri0n Institute of
Stee' 2onstru0tion +1IS2-(- .anual of 'teel /onstruction, 0llowa"le 'tress &esign-.
1. /old formed mem"ers are designed in accordance with the )++, edition of the 14eri0n Iron
nd Stee' Institute +1ISI-(-/old *ormed 'teel &esign .anual-
2. 0ll welding is done in accordance with the 1333 Edition of the 14eri0n 5e'din$ So0iet(+15S-4
'tructural 5elding /ode-'teel. 0ll 5elders are 6ualified for the type of welds performed.
7. 0ll the loads have "een applied in accordance with the re6uirements of the )++,
Edition of the Met' Bui'din$ Mnuf0turer 1sso0ition+MBM1-of the 8'0. Low rise "uilding
systems .anual.
Enq. Ref. No: ESBS-ENQ N-4264/ 2011
Revision Level: 00
Page 1 of 7


STEEL BUILDING SOLUTIONS
9. .anufacturing dimensional tolerances are in accordance with the re6uirements of the )++,
Edition of the MBM1.

1.2 #esi$n ,ods:
:oof Live Load 3.9; <=!m1
&ead Load 3.)9 <=!m1
5ind 'peed 7; m!s #2 sec gust wind speed%
'eismic Load >one I? #0s Per I' )@+2-1331%
&eflections L!)@3
A!)33
B. EN*INEERIN* 2RI3ERI1
B.1 Bui'din$ #es0ri&tion:
=o. of uildings "ne
0rea in '6. .ts. # 0pproBimate% 6470 S84
B.1.1 Bui'din$s #i4ensions -
Primary .em"ers
) *rame Type E!erest 2'er S&n +E2S-
1 5idth #m% #/!/ 'teel Line% 26 4
2 Length #m% #/!/ 'teel Line% 170 4
7 /lear Aeight #m% *rom **L 8.7 4
9 5idth .odule 1926 4
, 'lope 1:10
; ay 'pacing in m 209:.7 4
@ Type of End *rames Ri$id ;r4e on <ot= End >''s
+ End 5all /olumn 'pacing 497.:7 4
)3 racings Type Rod Br0in$
)) Primary!'econdary .em"er C
'urface preparation
Red "?ide )ri4er fo''o> >it= site &&'ied 2
0ots of Stndrd .S4o@e *re(/ S(nt=eti0
En4e' of Nero'0/Ber$er/1sin
Roof S(ste4
) 'heeting Profile ER 62-271
1 ThicDness Of 'heet #T/T% 0.4: 44 323
2 .aterial of /onstruction Bre *'!'u4e
7 Eave Eutter ! Eave trim ! ?alley Eutter Stndrd "ff 5=ite
9 =o. of *ramed Openings, 'iFe, Location. N1
5'' S(ste4
) 5all /ladding Profile E5 27-270
Enq. Ref. No: ESBS-ENQ N-4264/ 2011
Revision Level: 00
Page 2 of 7


STEEL BUILDING SOLUTIONS
1 ThicDness Of 'heet #T/T% 0.70 44 323
2 .aterial Of /onstruction 2o'or 2oted *'!'u4e
7 &ownspouts Stndrd "ff 5=ite
9 =o. *ramed Openings, 'iFe , Location N1
, ricD wall Aeight 64 fro4 ;;,
B.1.2 Bui'din$ 1dditions
2no&( / ;s0i / )rtitions:
Location &escription
) /anopy ,S5 2 nos 0o'u4n to 0o'u4n +64 +5- A 6.7 4 +B--
2rnes
) =o. of /ranes 1 no
1 /rane &escription# .aDe ! Type ! /apacity% 17 M3
2 Top of /rane eam 6.7 4
7 Trolley 5eight 6.: M3
9 /rane racDets B( E!erest
, /rane eam "&tion'
; 5heel Loads 12.6 M3
@ 5heel ase 4000 44
+ ridge 5eight of /rane 1: M3
B.1.2.1 100essories:
Stndrd Bui'din$ 100essories
#es0ri&tion SiCe Quntit( ,o0tion
) :oof *:P #1mm
thicD%
14?64 6D Nos Roof
Bui'din$ 1dditions:
A.Future Expansion is considered on RSW for same width module with same
capacity of crane.
B.One expansion joint is considered only on purlins & girts.
2. SE)),F 3ERMS
2.1
Su&&'( )ri0e : Rs 1%16%8:%D70 "n'(.
+In >ords :- Rs. "ne 2rore Si?teen '0s ei$=t( se!en t=ousnd nine =undred nd fift(
on'(.-
2rne Be4 o&tion'
Enq. Ref. No: ESBS-ENQ N-4264/ 2011
Revision Level: 00
Page 3 of 7


STEEL BUILDING SOLUTIONS
Su&&'( )ri0e : Rs 22%27%02: "n'(.
+In 5ords :- Rs. 3>ent( 3>o ,0 t>ent( fi!e t=ousnd nd t>ent( se!en on'(.-
2.1.1 The 'upply Price 6uoted a"ove relates to price of Products eBcluding transport costs
"ut does not include any sales taB which will "e charged eBtra @ 7.9G /'T or as applica"le in
the 'tate.
2.2 3?es nd #uties:
Octroi and entry taB, if any, will have to "e "orne "y the uyer as per actuals. Aowever, if there
is any change in sales taB, eBcise duty or any new statutory levies are introduced "y the
appropriate Eovernment #'tate and /entral% at the time of shipment, such additional charges
will have to "e "orne "y the uyer as per actuals.
2.6 E?0'usions:

The 'upply Price does not include the following and if any of the following are to "e supplied,
EIL will 6uote separate prices on order from uyer(
).0ny Dind of roof 0ccessories eBcept mentioned herein.
1./a"le Tray , ?entilation duct , Pipe 'upport 'tructure
2.0ny support structure for 0dditional Load considered
7.:oof EBtractors, :oof fans, vents, pipe flashing
9.Ladders for :oof 0ccess
,.5all vents, fans, Overhead doors
;./ivil, mechanical and electrical design and materials
@..iscellaneous steel eBcept as specified herein
9./oncrete em"edded plates, eBpansion "olts or weld plate of any Dind
)3./onstruction temporary "racing
)).'teel supports!"racing to accept collateral roof loads, eBcept as referenced herein
)1.0rchitectural services of any Dind
)2.0ll Dinds of civil worDs
)7.&oors, 5indows H any Dind of window framing.
)9.0ny other items not included in the "uilding specifications included earlier
),.0ny Dind of internal partitions eBcept those mentioned herein.
2.4 )(4ent S0=edu'e:
The terms of payment shall "e mutually agreed to in writing "y the parties in advance of EILIs
acceptance of uyerIs 'upply Order. uyerIs payment to EIL shall "e made as follows(
1. 23G #thirty percent% advance inclusive of all applica"le taBes at the time of issuing 'upply
Order.
2. ;3G #seventy percent% through an inland irrevoca"le sight confirmed letter of credit JL!/K.
The L!/ shall "e esta"lished within two weeDs of approval of drawings.
2.7 #e'i!er( S0=edu'e:
Enq. Ref. No: ESBS-ENQ N-4264/ 2011
Revision Level: 00
Page 4 of 7


STEEL BUILDING SOLUTIONS
On receipt of uyerIs 'upply Order, supply will "e effected as per the following schedule(-
*1 #r>in$s Su<4ission: In a"out 1 #two% weeDs from the date of receipt of
technically H commercially clear 'upply Order, advance H re6uired drawings if any, whichever
is later.
*1 #r>in$s 1&&ro!' : ) #one% weeD from su"mission4
)rodu0ts Su&&'( : ; #siB% weeDs thereafter.
3=e <o!e #e'i!er( S0=edu'e is indi0ti!e nd 0n <e dis0ussed furt=er nd 4( <e
re!ised s 4utu''( $reed u&on.
#. *ENER1,
.aterials other than the Products and services are not included unless specifically indicated
otherwise. EIL approval drawings shall consist of anchor "olt layouts and reactions, floor plan
layout, typical frame cross sections, elevations, mem"er siFes, and related design calculations.
If EIL is re6uired to change the design "ased on other partiesI details, design practice, special
re6uirements, change in scope H specifications, EIL may revise the prices and &elivery
'chedule accordingly.
E. G1,I#I3F
This Offer is valid for 23 #thirty% days only from the date hereof. The uyer must place the
'upply Order with EIL during the validity of this Offer.
;. ),12EMEN3 "; SE)),F "R#ER
If the Offer is accepta"le, you may place a 'upply Order for supply of PE at the following
address(
E!erest industries ,td
<hasra =o )9@-)9+
LeDesari,Pargana-hagwanpur
Teh--:oorDee,
&ist-Aaridwar 17;,,)
8ttaraDhand
5e are also enclosing with this Offer our standard product specifications.
5e also enclose with this Offer L0nneBure- 0- "eing a list of our valued clients with location of
proMect and area involved.
The 'tandard Terms and /onditions of EIL are an attachment to this Offer and this Offer shall
"e read in conMunction therewith.
Enq. Ref. No: ESBS-ENQ N-4264/ 2011
Revision Level: 00
Page 5 of 7


STEEL BUILDING SOLUTIONS
If the Offer herein is accepta"le, you may endorse your agreement "elow on the form of 'upply
Order. Once so endorsed, all the terms of the Offer herein shall "e deemed to "e
unconditionally accepted "y the uyer and the 'upply Order will constitute a "inding contract
"etween EIL and the uyer.
*or Everest Industries Limited
Place (
&ate (
0uthoriFed 'ignatory
SE)),F "R#ER
5e here"y place our 'upply Order on Everest Industries Limited #LEIL-% for design, engineering
and supply of Pre-Engineered steel uilding!s #LPE-% at our site at
NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN. 0ll the terms of offer of EIL
set out a"ove including the 'tandard Terms and /onditions are accepta"le to us. 5e
acDnowledge that placement "y us of this 'upply Order constitutes a "inding contract "etween
us and EIL enforcea"le in accordance with the aforesaid terms.
*or NNNNNNNNNNNNNNNNNNNNNNNNNNLtd.
Place (
&ate (
0uthoriFed 'ignatory
OOOOOOOOOOOOOOOOOOOO
Enq. Ref. No: ESBS-ENQ N-4264/ 2011
Revision Level: 00
Page 6 of 7


STEEL BUILDING SOLUTIONS
Enq. Ref. No: ESBS-ENQ N-4264/ 2011
Revision Level: 00
Page 7 of 7

Das könnte Ihnen auch gefallen