Sie sind auf Seite 1von 7

Rosa Thermal Power Project

4 x 300 MW
Rosa, Shahjahanpur( U.P.)

DESIGN BASIS REPORT


FOR
FLOW ELEMENT

DOCUMENT NO. RIEPL-RTPP-CEN-402-R-6503

ROSA POWER SUPPLY COMPANY LIMITED


4th Floor, Trade Tower,
DOCUMENT NO. RIEPL-RTPP-CEM-123-R-5014

94 Mahatma Gandhi Marg,


Lucknow 226 001

RELIANCE INFRASTRUCTURE ENGINEERS


PRIVATE LIMITED
3rd Floor, Reliance Energy Centre
Santa Cruz (East), Mumbai 400055
DOCUMENT NO. RIEPL-RTPP-CEM-123-R-5014

DEVELOPMENT CONSULTANTS PRIVATE LIMITED


Consulting Engineers
24B, Park Street, Kolkata - 700 016

DOCUMENT NO. RIEPL-RTPP-CEM-123-R-5014

RIEPL

DOCUMENT CONTROL SHEET

PROJECT

ROSA THERMAL POWER PROJECT


4 X 300 MW

CLIENT

ROSA POWER SUPPLY COMPANY LIMITED

DOCUMENT TITLE

DESIGN BASIS REPORT FOR FLOW ELEMENT

DOCUMENT NO.

RIEPL-RTPP-CEN-402-R-6503

REV. NO.

1 1

DCPL JOB NO.

DCPL-K6A20

ENDORSEMENTS

P. Bhowmick
1
0

Re
v.N
o.

10-0407
23-0307
Date

Final
For
Review
Descriptio
n

P. Bhowmick

Prepared by

SC
Sahac
howd
hury
SC
Sahac
howd
hury
Mech.

Civil

A . Chanda

S. Bhattacharyya

A . Chanda

S. Bhattacharyya

C&I

Approved by

Elec
.

Reviewed by

DESIGN BASIS REPORT


FOR
FLOW ELEMENT
1.00.00

GENERAL

1.01.00

ORIFICE PLATE

1.1.1

The orifice plate shall be either concentric square edge type or


segmental bored type as per type of process .

1.01.02

Manufacturing, installation and


standard BS1042 / ISO 5167.

1.1.2

Orifice plates will be made of type 316 stainless steel.

1.01.04

The plate thickness of the orifice shall be 3 mm minimum. However the


orifice thickness shall be determined by the actual process parameter .

1.02.01

ORIFICE FLANGE

1.02.02

Orifice flange rating will be the same as the piping class.

1.2.3

Flange shall be Standard / Slip on / socket weld raised face as per ANSI
B 16.5

1.02.04

Gasket shall be CAF type.

1.03.00

CARRIER RING

1.3.1

Male female carrier ring of SS316 material shall be provided .

1.04.00

PRESSURE TAP

1.4.1

Corner taps with Annular Groves on Carrier Rings as per BS 1042

1.4.2

Two sets of tappings of size inch (F) at 180 degree apart shall be
provided .

1.05.00

VENT HOLE / DRAIN HOLE

1.05.01

Suitable Vent hole for water service shall be provided.

2.00.00

BETA RATIO

DOCUMENT NO.:

RIEPLRTPP-CEN-402-R-6503

use will be in accordance to the

REV-1

Page

1of 2

2.01.00

The ratio of throat diameter to inlet diameter (beta ratio) of the Orifice
will be limited between 0.30 and 0.70.

3.00.00

ACCURACY

3.01.00

Accuracy ( uncertainties on discharge coefficient c ) of flow


measurement shall be 1% for orifice plates according to BS 1042.

4.00.00

ACCESSORIES

4.01.00

ISOLATION VALVES

4.01.01

Each tapping point shall be equipped with one primary isolating valve
for low pressure and two primary isolating valves for high pressure
installations (greater than 40 bar and/or 450 deg c).

4.01.02

Material of isolating valve shall be SS316

4.01.03

inch NPT (M) SS316 Nipples shall be used to interface valve with
orifice.

5.00.00

NUTS & BOLTS AND GASKETS

5.01.00

Jack bolt shall be provided for easier removal.

5.02.00

Studs and nuts material shall be ASTM A193 Gr. B7 / A194 Gr. 2H

6.00.00

TAGGING

6.01.00

Orifice plate will be provided with a Handle. Tag number, orifice plate
material, measured bore and id of the pipe will be stamped or deep
engraved on the upstream face of the Handle.

DOCUMENT NO.:

RIEPLRTPP-CEN-402-R-6503

REV-1

Page

2of 2