Sie sind auf Seite 1von 19

INSPECTION

REPORT

[Inspection Name, such as No. 8 DOUBLE
CROSSOVER IN-PLANT INSPECTION ]
[Project Name]
[CONTRACT NUMBER]
By
[Lead Inspectors Name]

Inspection Date: [Inspection Date]
Report Date: [Date the report is submitted]
INSPECTION REPORT
[Inspection Name]
[Project Name]
[Contract Name]
1. Introduction
This report presents the results of an [Inspection Date] inspection of [Inspection Name] for
[Project Name].
The report is in the following order:
Basis of inspection (references, tolerances, etc.).
Inspection conditions.
Inspection procedures.
Inspection results.
Contractor Follow-up actions from the inspection.
Recommendations for field installation preparations.
Appendices.
2. Basis of Inspection
The inspection was commissioned by [Project Manager Name and Affiliation] for [Client Name].
[One sentence description of nature of the inspection and where conducted]. See Appendix A,
Contacts, for the list of participants.
The inspection was conducted by [Name and affiliation of the inspector(s)].
The inspection was conducted in accordance with the Project specification and accepted industry
practice. See Appendix B, Technical References, for the list of technical documents applicable to
this inspection, Appendix C, Drawing List, and Appendix I, Drawings.
The tolerances applied in this inspection are either directly from or derived from the cited
Technical References. See Appendix D, Track Tolerances and Compliance Requirements, for
the list of tolerances.
3. Inspection Conditions
The [name the components inspected] was presented for inspection at [location name and
address of the inspection].
2
[Briefly describe the inspection conditions. As example for an in-plant double crossover
inspection, the following was described.
The crossover was fully assembled except for the following items:
Most joints were loosely assembled (not all bolts were installed, installed bolts were not
torqued)
Glued and Hucked joints intended for field installation were joined with standard bars and
bolts.
Rail ends intended for field welding were loose (not joined)
Switch machines, throw rods and throw rod adaptor were not available for the inspection.
Prior to inspection, the Contractor provided material certifications from third party vendors whose
products are included in the crossover assembly. The Contractor also provided updated shop
drawings (included in Appendix I).]
4. Inspection Procedures
[Briefly describe the inspection procedures. Include the inspection tasks in order, tasks that could
not be performed and reason, and any qualifying information on the nature of the inspection.]
5. Inspection Results Summary
[Generally characterize the inspection results, particularly whether the components and
assemblies will meet specification upon shipment. Refer to the detailed inspection data that
should be in the Appendix. Example for a No. 8 Double Crossover:
Based on the inspection measurements and observations, the No. 8 Double Crossover complies
with the Specification, except for those elements of the crossover that could not be inspected.
(please refer to Section 3, above, for incomplete assembly elements).
Inspection results are in Appendix E, Turnout Inspection Reports, Appendix F, Crossing Diamond
Inspection Report, Appendix G, Rail J oint Inspection, and Appendix H, Turnout A Tie Inspection.
The inspection results did not comply with all tolerances that are shown as assumed in the list of
tolerances (Appendix D). The assumed tolerances are more restrictive than the specification for
critical portions of the assembly. However, the assembly did largely meet these tighter
tolerances. The basis of acceptance must, contractually, be the specification tolerances, not the
tighter assumed tolerances.
All components inspected were located properly, and were free from flaws after identified repairs
or corrections were made. ]
6. Follow-up Actions
[Identify any contractual or construction actions that should be done prior to installation or final
acceptance, as applicable.]
3
7. Recommendations for Field Installation Preparation
[If applicable, identify any requirements or precautions that field personnel should be aware of in
their planning the installation.]
4
Appendix A
Contacts
5
CONTACTS
Sheet 1 of 2
[Inspection Name]
[Project Name]
[Contract Number]

FIRST
NAME
LAST
NAME TITLE AFFILIATION STREET CITY
STATE/
PROV ZIP WORKPHONE
Project Management

Design

Construction Contractor

Vendor

Fabricator



6
CONTACTS
Sheet 2 of 2
[Inspection Name]
[Project Name]
[Contract Number]

FIRST
NAME
LAST
NAME TITLE FAX Other Phone E-mail Note UPDATED
Project Management

Design

Construction Contractor

Vendor

Fabricator



7
Appendix B
Technical References
8

TECHNICAL REFERENCES
[Inspection Name]
[Project Name]
[Contract No.]
Inspection Date: [Date]

Inspection Location:
[Facility Name, address and phones]

Contract Specifications
1 Quality Control Plan (Section XXXXX)
2 Track (Section XXX-XX)

Contract Plans
3 Track Plans, Sheet Nos. XX through XX.

Contractor Submittals
4 Quality Control Plan
5 Working Drawings for XXXXX (see Drawing List)

Other Reference Drawings (Hanning & Kahl)
6
7

Industry References
8 American Railway Engineering and Maintenance Association
Portfolio of Trackwork Plans, with specific attention to
Plan XXXX-XX
Plan XXXX-XX
Plan XXXX-XX
Plan XXXX-XX
9 American Railway Engineering and Maintenance Association
Manual for Railway Engineering
9
Appendix C
Shop Drawing List
10
DRAWING LIST
No. 8 DOUBLE CROSSOVER PLANT INSPECTION
SAN YSIDRO INTERMODAL TRANSPORTATION CENTER PROJECT, PHASE 2
CONTRACT LRT-453
Inspection Date: 4/24/03

SHOP DRAWINGS
RAIL PRODUCTS AND FABRICATIONS Drawing No. MTD87601
Sheet Revision
Revision
Date Drawing Title


























Listed drawings are included in this report as Appendix I

11
Appendix D
Track Tolerances and
Compliance
Requirements
12
TRACK TOLERANCES AND COMPLIANCE REQUIREMENTS
[Project Name]
[Contract Number]
Inspection Date: [date]
[The following are examples. Enter the proper items, the correct tolerances, and the specification reference for the tolerance.]
Parameter Tolerance Spec Reference
Metric English
Tie Length 152.40 mm 0 6'' Assumed
Tie Spacing (Tie to Tie Spacing and Cumulative Distance)
Concrete Ties 25.40 mm 0 1'' 10-12-2.07.G
Switch Ties (Tie Nos. -1 to 16) 6.35 mm 0 1/4'' Assumed
Turnout Ties (Tie Nos. 17 to 29) 25.40 mm 0 1'' 10-12-2.07.G
Frog & Crossing (Tie Nos. 30 to 46) 6.35 mm 0 1/4'' Assumed
Tie Condition
Tie length and width 25.40 mm 0 1'' AREMA Ch 3, 2.1.3.1
Wane within rail bearing area ## 25.40 mm Max 1'' Max AREMA Ch 3, 2.1.3.1
Conditions: Splits, holes, knots, shake, checks ## 0 AREMA Ch 3, 2.1.4
Straightness, deviation from chord bet. Ends ## 50.80 mm Max 2'' Max AREMA Ch 3, 2.1.4
Track Gauge
Within Switch and Frog (incl. Crossing diamonds) Limits 1.59 mm 0 1/16'' Assumed
All other track 3.18 mm 0 1/8'' 10-12-2.07.A
Stock rail gauge 1.59 mm 0 1/16'' Assumed
Curve closure rail offsets 1.59 mm 0 1/16'' Assumed
Guard rail location 25.40 mm 0 1'' Assumed
Turnout lead 25.40 mm 0 1'' Assumed
Switch Throw, 4 3/4" (121 mm) 1.59 mm 0 1/16''
Assumed (refer to 10-12-
4.02.B)
Switch Point Stagger 6.35 mm 0 1/4'' Assumed

13
Parameter Tolerance Spec Reference
Metric English
Alignment
Horizontal misalignment from design, all track 12.70 mm 0 1/2'' 10-12-2.07.C.3
Horizontal misalignment from design, within stations 6.35 mm 1/4'' 10-12-2.07.C.2
Horizontal rate of change in 31' (9450 mm) 3.18 mm 0 1/8'' 10-12-2.07.C.1
Horizontal misalignment in curves 6.35 mm 0 1/4'' 10-12-2.07.D.2
Horizontal curve & spiral rate of change in 62' (18.90 m) chord 3.18 mm 0 1/8''
10-12-2.07.D.1 & 10-12-
2.07.E
Profile deviation from design 12.70 mm 0 1/2'' 10-12-2.07.F.2
Profile rate of change in 31' (9450 mm) 3.18 mm 0 1/8'' 10-12-2.07.F.1
Crosslevel 3.18 mm 0 1/8'' 10-12-2.07.B
Rail Welds ##
Vertical Crown in 18" (457 mm) with 36" straight edge ## 1.59 mm Max 1/16'' Max
AREMA Ch 4, Part
2.2.2.c.1,10-12-3.04.4
Vertical Dip in 18" (457 mm) with 36" straight edge ## 0.00 mm Max 0'' Max
AREMA Ch 4, Part
2.2.2.c.1,10-12-3.04.4

Horizontal misalignment +rail end offset in 18" (457 mm) with 36"
straight edge
1.59 mm 1/16''
AREMA Ch 4, Part
2.2.2.d,10-12-3.04.4
Top of rail finish to parent rail section 0.25 mm 0.010'' Max 10-12-3.04.4
Rail side head finish to parent rail section 0.25 mm 0.010'' Max
AREMA Ch 4, Part
2.2.2.f,10-12-3.04.4
Rail end cut squareness 0.79 mm 1/32'' 10-12-3.04.4
Rail End Hardening
Hardness 341 BHN Min 10-12-3.04.B
401 BHN Max 10-12-3.04.B
Flangeway Width ## 47.63 mm Min 1 7/8'' Min 10-12-4.02.F
Flangeway Depth ## 47.63 mm Min 1 7/8'' Min 10-12-4.02.F
Guard rail guages (guard face guage, guard check gage 1.59 mm 1/16'' Assumed
14
Appendix E
Turnout Inspection
Reports

Appendix F
Crossing Diamond
Inspection Report

Appendix G
Rail Joint Inspection

Appendix H
Tie Inspection

Appendix I
Drawings

Das könnte Ihnen auch gefallen