The Governance Cluster Plan contains 30 key initiatives that aim to curb corruption, improve the delivery of public services especially to the poor, and enhance the business and economic environment. Out of 30 initiatives:
15 initiatives 12 initiatives 3
Initiative Outcome 1. Improved Transparency and Citizens Empowerment Sub-outcome 1.1. Improved access to information 1. Transparency Seal - DBM 2. Philippine Government Electronic Procurement System (PhilGEPS) Software Modernization - DBM 3. National Government Portal - PCDSPO 4. Open Data-Philippines - PCDSPO, DBM, OPS ives Status Report (Q2 2014)
REPUBLIC OF THE PHILIPPINES CABINET CLUSTER ON GOOD GOVERNANCE AND ANTI MALACAANG, MANILA
Governance Cluster Initiatives Status Report (Q2 2014) The Governance Cluster Plan contains 30 key initiatives that aim to curb corruption, improve the delivery of public services especially to the poor, and enhance the business and economic 3 initiatives Initiatives committed in th Open Government Partner Key Accomplishments Outcome 1. Improved Transparency and Citizens Empowerment outcome 1.1. Improved access to information Compliance rate: 2013: NGAs 100% , GOCCs 77%, SUCs 2014 (partial): NGAs 97%, GOCCs 93%, SUCs
Philippine Government Electronic 100% of NGAs, SUCs, and GOCC procuring registered User Assessment of existing system completed On-going conduct of system requirement study
Foreign Aid Transparency Hub (FAiTH) Crisis Management Page developed 561 feedbacks processed 2.1 million page views of the Official Gazette
Open Data portal launched in January 750 datasets published; 11 dashboards and visualizations created Launched Open Reconstruction portal
Status Legend
On-time implementation and with Good Performance (75 100% of Milestones/KPIs are achieved) Delayed implementation (for 3 months or less) and with Average Performance (50-75% of Milestones/KPIs are achieved) Very delayed implementation (for more than 3 months) and with Poor Performance (Less than 50% of Milestones/KPIs are achieved) 1 CABINET CLUSTER ON GOOD GOVERNANCE AND ANTI-CORRUPTION 2014)
he Action Plan for the rship (OGP)
Q2 Status 77%, SUCs 87% 93%, SUCs 86%
100% of NGAs, SUCs, and GOCC procuring entities User Assessment of existing system completed going conduct of system requirement study
Foreign Aid Transparency Hub (FAiTH) and Yolanda 2.1 million page views of the Official Gazette
Open Data portal launched in January 750 datasets published; 11 dashboards and Launched Open Reconstruction portal in June
Legend time implementation and with Good Performance (75- Milestones/KPIs are achieved) Delayed implementation (for 3 months or less) and with 75% of Milestones/KPIs are Very delayed implementation (for more than 3 months) and with Poor Performance (Less than 50% of Milestones/KPIs are achieved) Governance Cluster Initiatives Status Report (Q
Sub-outcome 1.2. More meaningful citizens participation in governance 7. Citizens Participatory Audit - COA 8. Grassroots Participatory Budgeting Program - DILG, DBM, NAPC, DSWD 9. Civil Society Engagement in the National Budget Process - DBM Outcome 2. Improved public sector performance Sub-outcome 2.1. Strengthened public financial management and accountability 10. Government Integrated Financial Management Information System (GIFMIS) - DBM, DOF, BTr, COA 11. Comprehensive Human Resource Information System (CHRIS)-National Payroll System (NPS) - DBM, DOF, BTr, COA
12. Local Government Units Public Financial Management (LGU PFM) - DBM, DILG, DOF, NEDA, COA Sub-outcome 2.2. Improved performance management and Monitoring Initiatives: 13. Seal of Good Local Governance ives Status Report (Q2 2014) Key Accomplishments Restructured templates for disclosure (DILG MC No. 2013-140) 87% of LGUs fully or partially complying Status of full compliance: All LGUs 54%, Provinces 61%, Cities Municipalities 53%
Extractive Industries Transparency Trainings for NGAs and LGUs conducted 2 scoping studies completed, 2 are on work for the 1 st EITI report) outcome 1.2. More meaningful citizens participation in governance processes 3 audits completed, pre-work for 4 th audit on PMO created through COA Resolution
Participatory Budgeting 99% of LGUs with LPRAPs for 2015 budget preparation For 2013 projects: 1,760 projects completed 2,072 projects on-going (26%)
CSO Directory and Capacity Development Plan for selected NGAs developed 128 Budget Partnership Agreements established for 2014 budget preparation
Outcome 2. Improved public sector performance outcome 2.1. Strengthened public financial management and accountability Government Integrated Financial Management Information System Unified Account Code Structure (UACS) and design of the Treasury Single Account (TSA) developed Online submission of budget proposal implemented for 2015 budget preparation Developed current budget execution systems in the oversight agencies supporting UACS
Comprehensive Human Resource National Contract for software developer awarded in On-going implementation of CHRIS software in DBM Financial Management (LGU PFM) Public Financial Management Assessment Tool (PFMAT) implemented in 95% of LGUs LGU PFM Reform Roadmap and Implementation Strategy developed
outcome 2.2. Improved performance management and monitoring systems
Developed SGLG indicators 2
Q2 Status Restructured templates for disclosure (DILG MC No. % of LGUs fully or partially complying 61%, Cities 62%,
Trainings for NGAs and LGUs conducted , 2 are on-going (prep
audit on-going PMO created through COA Resolution
budget preparation completed (22%),
and Capacity Development Plan for established for
Unified Account Code Structure (UACS) and design of the Treasury Single Account (TSA) developed of budget proposal implemented Developed current budget execution systems in the
Contract for software developer awarded in June going implementation of CHRIS software in DBM
Public Financial Management Assessment Tool LGUs LGU PFM Reform Roadmap and Implementation
Governance Cluster Initiatives Status Report (Q
Initiative (SGLG) - DILG 14. Anti-Red Tape Program - CSC 15. Citizen Satisfaction Index System (CSIS) - DILG 16. Medium-Term Information and Communication Technology Harmonization Initiative (MITHI) - DBM, DOST, NEDA 17. Monitoring and Evaluation of Government Services - NCC 18. Cabinet Performance Contracts - OCS Incentive Systems: 19. Performance Challenge Fund (PCF) - DILG 20. Results-Based Performance Management System (RBPMS) - AO25 Task Force (DBM, OES, NEDA, DOF, PMS) 21. Philippine Quality Award (PQA) for the Public Sector - DTI, DAP Sub-outcome 2.3. Enhanced delivery of frontline services 22. Business Permit and Licensing System (BPLS) - DILG, DTI ives Status Report (Q2 2014) Key Accomplishments Implementing guidelines issued (JMC No. 2014 1,646 LGUs assessed for SGLG
Report Card Survey Q2 2014 results: (461 service offices surveyed) Excellent 83 (18%), Outstanding 7 (2%), Good (64%), Acceptable 54 (12%), Failed 241 service offices visited under ARTA Watch
Citizen Satisfaction Index System Implemented 2013 CSIS survey in 34 cities Developed and conducted trainings on the unified procedures for CSIS Utilization Conferences
Evaluated ICT plan and budget requests of agencies for 2015 budget preparation On-going development of a Government Management System
2013 Annual Enterprise Survey on Corruption results disseminated; On-going development of 2014 survey 2013 and 2014 Customer Satisfaction Feedback Survey completed 185 LGUs with BPLS validated
24 NGAs with furnished planning tools Developed M&E tool; monitored Q1 budget utilization performance
Performance Challenge Fund (PCF) On-going documentation of PCF good practices 719 LGUs recipient of PCF in 2013 On-going development of 2014 PCF guidelines
AO25 Task Force (DBM, OES, NEDA, Eligibility assessment for 2013 PBB completed Developed guidelines and conducted orientations for 2014 PBB
Philippine Quality Award (PQA) for Developed PQA Criteria for the Public Sector PQA Recognition Level awarded to 5 organizations, including 2 government agencies
outcome 2.3. Enhanced delivery of frontline services 56% of targeted LGUs complying with the standards 14 LGUs with on-going BPLS reform process
3
Q2 Status (JMC No. 2014-39) results: (461 service 7 (2%), Good 295 22 (5%) 241 service offices visited under ARTA Watch
2013 CSIS survey in 34 cities Developed and conducted trainings on the unified procedures for CSIS Utilization Conferences
budget requests of agencies for going development of a Government-wide Asset
2013 Annual Enterprise Survey on Corruption results development of 2014 survey 2013 and 2014 Customer Satisfaction Feedback Survey
NGAs with furnished planning tools Developed M&E tool; monitored Q1 budget utilization
going documentation of PCF good practices going development of 2014 PCF guidelines
completed guidelines and conducted orientations for
Public Sector PQA Recognition Level awarded to 5 organizations,
6% of targeted LGUs complying with the prescribed going BPLS reform process
Governance Cluster Initiatives Status Report (Q
Initiative 23. Gameplan for Competitiveness - NCC Sub-outcome 2.4. Enhanced delivery of justice 24. National Justice Information System (NJIS) - DOJ 25. Justice Sector Initiative - SC, DOJ, DILG Outcome 3. Improved anti-corruption measures Sub-outcome 3.1. Exact greater accountability of public servants 26. Revenue Integrity Protection Services (RIPS) Program - DOF 27. Income and Asset Declaration System Project - OMB Sub-outcome 3. 2. Exact greater accountability of public servants 28. Run After the Smugglers (RATS) Program - DOF-BOC 29. Run After Tax Evaders (RATE) Program - DOF-BIR, DOJ 30. Bureau of Customs Reform Project - DOF-BOC
ives Status Report (Q2 2014) Key Accomplishments Conducted Ease of Doing Business Summit Submitted 2015 Reform Inventory to IFC
outcome 2.4. Enhanced delivery of justice Information System On-going development of the Inmate Management Information System On-going development of foreign nationals registration system, for piloting in NAIA2 Implemented improved NBI Clearance System
Mapped inter-agency business/service processes for harmonization Issued Inter-Agency Anti-Graft Coordinating Council (IAAGCC) Guidelines for Cooperation
corruption measures accountability of public servants No. of personnel investigated: 53 No. of personnel charged: 27 No. of personnel suspended, dismissed imprisoned, or fined (successful resolutions): 12
On-going procurement for the conduct of assessment of the income and asset declaration system
outcome 3. 2. Exact greater accountability of public servants 43 smuggling cases filed in 2013; 11 cases in P1.5 billion worth of recovered smuggled goods in 2013; P240 million in Q2 2014
No. of cases filed: 52 No. of cases investigated: 26 No. of cases prosecuted: 26
Bureau of Customs Reform Project Year-on-year revenue collection growth of 17.5%; P27.33 billion revenue collection in June 2014 Launch of Customs ng Bayan Dashboard and Customs Watch ad campaign Seizure of thousands of containers of rice and other items without import permits
4
Q2 Status Conducted Ease of Doing Business Summit Submitted 2015 Reform Inventory to IFC
going development of the Inmate Management going development of foreign nationals registration system, for piloting in NAIA2 Implemented improved NBI Clearance System
agency business/service processes for Graft Coordinating Council
No. of personnel suspended, dismissed imprisoned, or
going procurement for the conduct of an assessment of the income and asset declaration
cases in Q2 2014 P1.5 billion worth of recovered smuggled goods in
year revenue collection growth of 17.5%; illion revenue collection in June 2014 Launch of Customs ng Bayan Dashboard and Customs of containers of rice and other
Governance Cluster Initiatives Status Report (Q
Priority Legislation
Outcome 4. Improved policy environment for good governance Sub-outcome 4.1. Greater support for the passage of priority legislations
House of Representatives 1. Amendments to the Ombudsman Act - OMB Pending with the Committee on Justice (Chair: Rep. N. Tupas) 2. Freedom of Information Bill - PCDSPO Pending with the Committee on Public Information (Chair: Rep. J. Almonte) - TWG deliberations of the proposed consolidated version on
3. Civil Service Code - CSC Pending with the Committee on Civil service and Professional Regulation (Chair: Rep. A. Salvacion, Jr.) - CSC draft for submission to Rep. Salvacion, Jr.
4. Uniformed Personnel Pension Reform Bill - DBM, DND
5. Whistleblowers Protection Act - DOJ Pending with the Committee on Justice (Chair: Rep. N. Tupas) 6. Amendments to the Witness Protection, Security, and Benefit Act - DOJ
Pending with the Committee on Justice(Chair: Rep. N. Tupas) 7. Fiscal Responsibility Bill - DBM Pending with the Committee on Appropriations (Chair: Rep. I. Ungab) ives Status Report (Q2 2014) Outcome 4. Improved policy environment for good governance outcome 4.1. Greater support for the passage of priority legislations Status (as of June 5) House of Representatives Pending with the Committee on Justice (Chair: Rep. N. Tupas)
Pending with the Committee on Justice & Human Rights - TWG Held on Feb. 13, 2014 - OMB version Guingona for authorship
Pending with the Committee on Public Information (Chair: Rep. J. Almonte) TWG deliberations of the proposed consolidated version on-going Approved on Third Reading 2014
Pending with the Committee on Civil service and Professional Regulation (Chair: Rep. A. Salvacion, Jr.) CSC draft for submission to Rep. Salvacion, Jr. Pending with the Committee on Civil Service and Government Reorganization (Chair: Sen. Trillanes IV) - Public hearing held on Feb. 11, 2014
No Bill filed yet Draft admin version DBM with the Committee on Justice (Chair: Rep. N. Tupas)
These bills are pending with the Committee on Justice & Human Rights (Chair: Sen. Pimentel III) - DOJ version submitted to Sen. Pimentel on Feb. 19, 2014 - 1 st Public Hearing conducted on May 14, 2014
Pending with the Committee on Justice(Chair: Rep. N. Tupas)
Pending with the Comm Human Rights - DOJ version submitted to Sen. Pimentel on Feb. 13, 2014 Pending with the Committee on Appropriations (Chair: Rep. I. Ungab)
Pending with the Committee on Finance (Chair: Sen. Escudero) - 1 st Public Hearing held on Feb. 26, 2014
5 Senate Pending with the Committee on Justice & Human Rights (Chair: Sen. Pimentel III) TWG Held on Feb. 13, 2014 OMB version will be forwarded to Sen. Guingona for authorship proved on Third Reading on March 10, Pending with the Committee on Civil Government Reorganization (Chair: Sen. Trillanes IV) Public hearing held on Feb. 11, 2014 No Bill filed yet dmin version already prepared by These bills are pending with the Committee on Justice & Human Rights (Chair: Sen. Pimentel III) DOJ version submitted to Sen. Pimentel on Feb. 19, 2014 Public Hearing conducted on May 14, Pending with the Committee on Justice & Human Rights (Chair: Sen. Pimentel III) DOJ version submitted to Sen. Pimentel Feb. 13, 2014 Pending with the Committee on Finance (Chair: Sen. Escudero) Public Hearing held on Feb. 26, 2014 Governance Cluster Initiatives Status Report (Q2 2014) 6
Status (as of June 5) House of Representatives Senate 8. Criminal Investigation Bill - DOJ Pending with the Committee on Justice (Chair: Rep. N. Tupas) - The Criminal Code Commission conducted a public hearing/consultation on March 6, 2014
No Bill filed yet - Administration version endorsed to Sen. Drilon, Sen. Pimentel and Sen. Guingona - Public Hearing last March 6, 2014 9. Criminal Code - DOJ Pending with the Committee on Justice (Chair: Rep. N. Tupas) - The Criminal Code Commission conducted a public hearing/consultation on March 6, 2014 No Bill filed yet - A modified draft on Book I (modification of HB 2300, Rep. Tupas) was created and presented to the SC Justices - Criminal Code Committee (CCC) will prepare the draft HoR Committee Report
Institutionalizing People Power by Sec. Florencio Abad. Presented During The Good Governance Dialogues - Baguio City at The City Light Hotel, Last November 13, 2014.