Sie sind auf Seite 1von 39

Engr. Jan Doris C.

Latada
Holy Cross of Davao College
1. Engineering Consultation
2. Design
3. Construction and Installation
4. Inspection, Appraisal, and
Acceptance
5. Operations
6. Maintenance
7. Research and Development
8. Education
9. Manufacturing


Percentage of Construction Cost
Unit Cost Basis
Cost Plus Reasonable Profit
Fixed Salary Basis
Professional Fee Plus Expenses
Cost Per Hour Basis
Task Rate Basis

the act of giving advice and information to a
client in the area of electronics engineering
and its related fields in line with current
internationally accepted standards and
practices.
As per R.A. 9292:
only registered Professional Electronics
Engineers (PECE) are authorized to render
engineering consultation services.


Scope of Work.
Provide specific advice to clients
Represent the client in obtaining from the
government/other agencies on the approval of
electronics permits, plans, specifications, etc.
Serve as technical witness/expert in litigations,
technical presentation and negotiations.
Provide technical specifications for electronics
equipment and systems.
Compensation
will be commensurate with his experience
and expertise and with the importance and
value of the activity covered.
For place more than 50 kilometers away
from the established office of the
Consultant:
business class transportation and
accommodation if the meetings/hearings
are conducted in a
Conference and Court Appearance.
rendering opinion or give advice;
clarification or explanation on technical
matters pertaining to electronics
engineering and associated matters; or to
appear as an expert witness in Court
arbitration hearings

Conference and Court Appearance.
recommended minimum fee will not be
less than P500.00 per hour but not less
than P1,000.00 per attendance or
appearance irrespective of whether the
schedules meeting or hearing is postponed
or not.

Project Consultation.
for a project which has a definite
duration:
hourly rate will not be less than one
hundredth (0.01) of the basic monthly
salary scale for salaried ECE
practitioners.


Routine Consultation (Retainer).
not be less than P1,500.00 a month
If consultants presence is required in
another place away from his established
office:
rate of P100.00 for every hour that he is
away from his office
at least business class traveling and
living expenses.

act of conceptualizing, planning and
projecting a scheme, system and
facility using the arts and science of
electronics along with social,
economic, financial and technical
considerations.
As per R.A. No. 9292, registered
Electronics Engineers are authorized to
render design services

Wired or wireless telecommunications systems
Broadcasting system
Cable or wireless television systems
Information Technology (IT) systems
Security and alarm systems
Electronic fire alarm systems
Sound-reinforcement systems
Navigational aids and controls
Indoor and outdoor signages
Electronically-controlled conveyance systems
Electronic/computerized process controls and automation systems
Building automation, management and control systems
Building wirings utilizing copper cables, fiber-optic cables or other
media
Any other electronic and IT systems, equipment, apparatus, device
and/or component that may be developed in the future
Compensation:
Percent of Total Project Cost Method
Percent of Cost Method
Unit Cost Method
Cost Plus Reasonable Profit



Percent of Total Project Cost
Method.
The rate of compensation is a
percentage of the total project cost,
but is dependent on the number of
electronics systems/equipment
required for the subject.
Groupings for Complexity:
Group I
The project with more than five (5) of the
listed systems, combined in one whole
project
the minimum basic design fee is one
percent (1%) of the total project cost.
Design fee shall be no less than
P10,000.00.

Group II
For project with three to five (3 to 5) of the
listed systems included in one whole
project
the minimum basic design fee is 1.5% of
the total project cost.
design fee shall be no less than P6,000.00.
Group III
For projects with one or two (1 or 2) of the
listed systems in one whole project
the minimum basic design fee is 2% of the
total project cost.
Basic design fee shall be no less than
P3,000.00.

Percent of Cost Method
except that the percentage is not
based on total project cost but
rather on the cost of the complete
electronics installation.

Grouping Based on Complexity
Group I
Minimum basic design fee is 10% of cost
of complete electronics installation.
design fee shall be no less than
P10,000.00

Group II
Minimum design fee is 8% of cost of
complete electronics installation.
Basic design fee shall be no less than
P6,000.00


Group III
Minimum design fee is 6% of cost
complete electronics installation.
basic design fee shall be no less than
P3,000.00.


Unit Cost Method
when a project involves alterations, repairs,
additions, modifications, etc., which do not
involve a whole project.
The design fee is based on the unit number
of electronics facilities that are included in
the design
In this method, the electronics facilities are
divided into classifications which have
corresponding unit design rates.

Unit Cost Method
For unit facilities/loads/equipment: a fee
of P100.00 per outlet for each
For partial facilities of a whole system, a
minimum fee of P1,000.00 for each but
not limited to the following:
1. Detached or Separate power supplies
of systems
2. Controls or auxiliary devices or facilities
of the systems

Cost Plus Reasonable Profit
For electronics design jobs which are
relatively complicated and require a lot of
time and effort
percentage of profit is to be agreed upon
between the designer and client prior to
the signing of the contract.
percentage will not be less than 25% of
the profit cost.

Per Diem of Traveling Expenses
For services of beyond a radius of fifty
(50) kilometers from his established
office:
per diem of not less than P1,000.00 plus
traveling and living expenses will be
chargeable to the owner/client

Extra Sets of Contract Documents
The electronics designer will furnish five
(5) sets of drawing specifications and
other contract documents.
The cost of reproduction of extra sets of
contract documents, when required by
the owner of his representative is to be
charged to and paid for by the owner.

Government Taxes on Services
Any tax that the government may impose
to the engineer or as a consequence of
the services performed for the project
(exclusive of income tax) will be paid by
the owner.
Basic Monthly Salary Scale for
Salaried ECE Practitioners
Up to 5 Years
P2,000 - P5,000

5 10 Years
P5,000 P8,000

10 Years up
P 8,000 Up


Escalation Formula
Where:
Ru = The upgraded minimum service rate or monthly salary at the time
of offer.
Rm = The minimum service rate or monthly salary as established in
this edition of the Manual of Practice.
Wc = Current minimum basic daily rate at the time of the computation.
Wm = Minimum basic rate at the time this Manual of Practice was
published which was P______
Pc = Current Consumer Price Index at the time the offer is made.
Pm = Consumer price index at the time this Manual of Practice was
published which was _______.

50%
Payable upon signing of the contract
45%
Payable upon submission of five (5) sets of
the final drawings and upon submission of
five (5) copies of the written specifications
5%
Payable upon submission of written
estimate

3. CONSTRUCTION AND INSTALLATION
act of putting together parts of a whole
in order to build-up; to erect or to form
and/or to set or establish electronics
equipment, systems or facilities.
Contractor
An electronics contractor can determine his
own compensation through reasonable
mark up on net costs of the project or
activity.
Salaried Employees
Based on the Basic Monthly Salary Scale
4. INSPECTION, APPRAISAL, ACCEPTANCE
Inspection
critical viewing or investigation or a careful,
complete and systematic examination
Appraisal
estimating the amounts, quality, conformity to
plans or objectives, and worth of an electronics
work item.
Acceptance
act of certifying that a certain equipment, system
or network has been properly engineered.
4. INSPECTION, APPRAISAL, ACCEPTANCE
Compensation
Salaried Professional
Compensation for a professional as an
employee of these agencies will be in
accordance with the Basic Monthly
Salary Scale for Salaried ECE
Practitioners


4. INSPECTION, APPRAISAL, ACCEPTANCE
Compensation
Task Rate Work.
not less than a minimum of one thousand
(P1,000.00) per day or fractions thereof
plus
if the site of the project is more than fifty
(50) kilometers away from the engineers
established office.
at least business class traveling and living
expenses


the process of running or managing an
electronics system, network, services and
peripheral facilities
Compensation
Based on Basic Monthly Salary Scale
for ECE Practitioners.

the proper upkeep of electronics systems and
equipment so as to attain maximum safety
and meet the desired grade of service.
Contract basis
will be based upon the degree of experience
of work as defined in the contract.
Salaried Employee
Based on Basic Monthly Salary Scale for
ECE Practitioners.
7. RESEARCH AND DEVELOPMENT
specialized investigation and evaluation of
operational and/or laboratory data resulting in the
design/manufacture/production of new or
improved electronics systems
Compensation:
Salaried Employee.
Based on Basic Monthly Salary for ECE
Practitioners.
Task Rate Work.
Based on engineers expertise, experience,
and projects monetary value

Full Time Basis.
Based on Basic Monthly Salary Scale
Part Time Basis.
the minimum basic rate per hour will be basic monthly
salary scale divided by fifty (50).
Lecturers.
the minimum basic rate per hour will be basic monthly
salary scale divided by twenty five (25).
Tutorial.
compensation will be determined on a case-to-case
basis depending upon the time of preparation needed.

the process of producing, forming or
fabricating electronic equipment and/or
related components, parts, devices and
accessories
Compensation
Salaried Employee.
Based on Basic Monthly Salary Scale for
ECE Practitioners.
Consultancy.
Same with Engineering Consultation.