No. Course & Module Title
Fees
for CIDB
Green Card
Holders
Fees for Non-CIDB
Green Card Holders
CCD
Point
Duration
(Day)
Date & Time Mar Apr May Jun
CIOB
Members
Non-CIOB
Members
CPD0217BQM BUILDERS QUANTITIES & MEASUREMENT RM200.00 RM320.00 RM400.00 16 2 13 & 14 Mar
1001 Fundamentals of Quantities & Measurement RM60.00 RM90.00 RM120.00 4 1/2 9am - 1pm 13
1002 Specifications & Standard Method of Measurement (SMM) RM60.00 RM90.00 RM120.00 4 1/2 2pm - 6pm 13
1003 Drawings & Plans for Quantities & Measurement RM60.00 RM90.00 RM120.00 4 1/2 9am - 1pm 14
1004 Builders Quantities & Measurement Techniques & Practices RM60.00 RM90.00 RM120.00 4 1/2 2pm - 6pm 14
CPD1616PPS PROJECT PLANNING & SCHEDULING USING CRITICAL PATH ANALYSIS RM150.00 RM240.00 RM300.00 12 1 1/2 27 & 28 Mar
1005 Effective Project Planning & Scheduling RM60.00 RM90.00 RM120.00 4 1/2 2pm - 6pm 27
1006 Project Planning & Scheduling for Tendering & Estimating RM60.00 RM90.00 RM120.00 4 1/2 9am - 1pm 28
1007 Project Planning & Scheduling Using Critical Path Analysis (CPA) Methods RM60.00 RM90.00 RM120.00 4 1/2 2pm - 6pm 28
CPD1613PMC PROJECT PLANNING, MONITORING & CONTROL RM200.00 RM320.00 RM400.00 16 2 3 & 4 Apr
1008 Project Planning & Scheduling Using Work Breakdown Structure (WBS) for Resource
Management
RM60.00 RM90.00 RM120.00 4 1/2 9am - 1pm 3
1009 Project S Curve & Earned Value Management for Project Budgeting, Time
Monitoring & Control
RM60.00 RM90.00 RM120.00 4 1/2 2pm - 6pm 3
1010 Project Planning & Scheduling Using Baseline Management for Time Monitoring &
Control
RM60.00 RM90.00 RM120.00 4 1/2 9am - 1pm 4
1011 Case Study & Presentation on Project Planning, Monitoring & Control RM60.00 RM90.00 RM120.00 4 1/2 2pm - 6pm 4
PARTICIPANTS FOR THIS MODULE ARE EXPECTED TO HAVE THE KNOWLEDGE ON
AND/OR HAVE ATTENDED MODULES 04PS101,201,301,302 & 304 ABOVE
CPD1915SOC CONSTRUCTION SITE ORGANISATION & CONTROL I RM200.00 RM320.00 RM400.00 16 2 10 & 11 Apr
1012 Effective Control of Construction Projects Through Process Management RM60.00 RM90.00 RM120.00 4 1/2 9am - 1pm 10
1013 Time, Cost, Quality & Occupational Safety, Health & Environmental Management RM60.00 RM90.00 RM120.00 4 1/2 2pm - 6pm 10
1014 Fundamentals of Engineering Surveying & Setting Out RM60.00 RM90.00 RM120.00 4 1/2 9am - 1pm 11
1015 Fundamentals of Engineering Surveying & Levelling RM60.00 RM90.00 RM120.00 4 1/2 2pm - 6pm 11
CPD1915SOC CONSTRUCTION SITE ORGANISATION & CONTROL II(A) RM100.00 RM160.00 RM200.00 8 1 17 Apr
1016 Construction Site Preparation & Organisation RM60.00 RM90.00 RM120.00 4 1/2 9am - 1pm 17
1017 Construction Site Security Management & Control RM60.00 RM90.00 RM120.00 4 1/2 2pm - 6pm 17
CPD1915SOC CONSTRUCTION SITE ORGANISATION & CONTROL II(B) RM150.00 RM240.00 RM300.00 12 1 1/2 18 & 24 Apr
1018 Construction Site Office Administration RM60.00 RM90.00 RM120.00 4 1/2 9am - 1pm 18
1019 Nominated & Domestic Sub-contract Work Coordination RM60.00 RM90.00 RM120.00 4 1/2 2pm - 6pm 18
1020 Practical Completion & Project Close-out RM60.00 RM90.00 RM120.00 4 1/2 9am - 1pm 24
CPD1701QAS QUALITY ASSESSMENT SYSTEMS IN CONSTRUCTION RM150.00 RM240.00 RM300.00 12 1 1/2 24 & 25 Apr
1021 Quality Management & Assurance for Construction & Project Development RM60.00 RM90.00 RM120.00 4 1/2 2pm - 6pm 24
1022 Quality Management & Assessment Principles & Practices RM60.00 RM90.00 RM120.00 4 1/2 9am - 1pm 25
1023 Quality Management & Assessment for Construction Projects RM60.00 RM90.00 RM120.00 4 1/2 2pm - 6pm 25
CPD0316CPA CONSTRUCTION CONTRACT & PROJECT ADMINISTRATION I RM200.00 RM320.00 RM400.00 16 2 8 & 9 May
1024 Construction Procurement Systems & Contractual Arrangement RM60.00 RM90.00 RM120.00 4 1/2 9am - 1pm 8
1025 Construction Contracts, Contractual Rights & Obligations RM60.00 RM90.00 RM120.00 4 1/2 2pm - 6pm 8
1026 Construction Contracts & Contract Documentation RM60.00 RM90.00 RM120.00 4 1/2 9am - 1pm 9
1027 Construction Drawing & Information Management RM60.00 RM90.00 RM120.00 4 1/2 2pm - 6pm 9
CPD1620PTE PROJECT TENDERING & ESTIMATING I RM150.00 RM240.00 RM300.00 12 1 1/2 15 & 16 May
1028 Effective Tendering & Estimating RM60.00 RM90.00 RM120.00 4 1/2 2pm - 6pm 15
1029 Cost Planning & Analysis For Project Estimates RM60.00 RM90.00 RM120.00 4 1/2 9am - 1pm 16
1030 Tendering & Estimating Preliminaries RM60.00 RM90.00 RM120.00 4 1/2 2pm - 6pm 16
CPD1620PTE PROJECT TENDERING & ESTIMATING II RM200.00 RM320.00 RM400.00 16 2 22 & 23 May
1031 Tender Documentation & Procedures RM60.00 RM90.00 RM120.00 4 1/2 9am - 1pm 22
1032 Tendering & Estimating Structural Works RM60.00 RM90.00 RM120.00 4 1/2 2pm - 6pm 22
1033 Tendering & Estimating Architectural Works RM60.00 RM90.00 RM120.00 4 1/2 9am - 1pm 23
1034 Tendering & Estimating Building Services RM60.00 RM90.00 RM120.00 4 1/2 2pm - 6pm 23
CPD0316CPA CONSTRUCTION CONTRACT & PROJECT ADMINISTRATION II (A) RM100.00 RM160.00 RM200.00 8 1 13 Jun
1035 Construction Budgeting, Sub-contracting & Control RM60.00 RM90.00 RM120.00 4 1/2 9am - 1pm 13
1036 Construction Insurance Management RM60.00 RM90.00 RM120.00 4 1/2 2pm - 6pm 13
No. Course & Module Title
Fees for
CIDB Green
Card
Holders
Fees for Non-CIDB
Green Card Holders
CCD
Point
Duration
(Day)
Date & Time Jun Ju; Aug Sep Oct Nov Dec
CIOB
Members
Non-CIOB
Members
CPD0316CPA CONSTRUCTION CONTRACT & PROJECT ADMINISTRATION II (B) RM200.00 RM320.00 RM400.00 16 2 25 & 26 Sep
1037 Nominated & Domestic Sub-contract Administration RM60.00 RM90.00 RM120.00 4 1/2 9am - 1pm 25
1038 Contract Payment Application & Certification RM60.00 RM90.00 RM120.00 4 1/2 2pm - 6pm 25
1039 Instructions, Variations & Claims RM60.00 RM90.00 RM120.00 4 1/2 9am - 1pm 26
1040 Defects Liability & Final Account RM60.00 RM90.00 RM120.00 4 1/2 2pm - 6pm 26
CPD0319CSS CIVIL & STRUCTURAL SUPERVISION & CONTROL (A) RM150.00 RM240.00 RM300.00 12 1 1/2 18 & 19 Jun
1041 Construction Materials For C&S Works RM60.00 RM90.00 RM120.00 4 1/2 2pm - 6pm 18
1042 Coordination & Supervision of Civil Engineering Works RM60.00 RM90.00 RM120.00 4 1/2 9am - 1pm 19
1043 Coordination & Supervision of Structural Engineering Works I RM60.00 RM90.00 RM120.00 4 1/2 2pm - 6pm 19
CPD0319CSS CIVIL & STRUCTURAL SUPERVISION & CONTROL (B) RM100.00 RM160.00 RM200.00 8 1 20 Jun
1044 Coordination & Supervision of Structural Engineering Works II RM60.00 RM90.00 RM120.00 4 1/2 9am - 1pm 20
1045 Common Defects & Rectification of C&S Works RM60.00 RM90.00 RM120.00 4 1/2 2pm - 6pm 20
CPD0201BAS BUILDING & ARCHITECTURAL SUPERVISION & CONTROL RM200.00 RM320.00 RM400.00 16 2 26 & 27 Jun
1046 Construction Materials For B&A Works RM60.00 RM90.00 RM120.00 4 1/2 9am - 1pm 26
1047 Coordination & Supervision of Building & Architectural Works I RM60.00 RM90.00 RM120.00 4 1/2 2pm - 6pm 26
1048 Coordination & Supervision of Building & Architectural Works II RM60.00 RM90.00 RM120.00 4 1/2 9am - 1pm 27
1049 Common Defects & Rectification of B&A Works RM60.00 RM90.00 RM120.00 4 1/2 2pm - 6pm 27
CPD1305MES MECHANICAL & ELECTRICAL SUPERVISION & CONTROL RM150.00 RM240.00 RM300.00 12 1 1/2 17 & 18 Jul
1050 Building Components For M&E Services RM60.00 RM90.00 RM120.00 4 1/2 2pm - 6pm 17
1051 Coordination & Supervision of Mechanical & Electrical Engineering Works I RM60.00 RM90.00 RM120.00 4 1/2 9am - 1pm 18
1052 Coordination & Supervision of Mechanical & Electrical Engineering Works II RM60.00 RM90.00 RM120.00 4 1/2 2pm - 6pm 18
CPD1616PPM PEOPLE & PERFORMANCE MANAGEMENT RM200.00 RM320.00 RM400.00 16 2 24 & 25 Jul
1053 Working With People & Contractors RM60.00 RM90.00 RM120.00 4 1/2 9am - 1pm 24
1054 Managing People & Contractors RM60.00 RM90.00 RM120.00 4 1/2 2pm - 6pm 24
1055 Developing People & Contractors RM60.00 RM90.00 RM120.00 4 1/2 9am - 1pm 25
1056 Project Team Performance & Management RM60.00 RM90.00 RM120.00 4 1/2 2pm - 6pm 25
CPD0304CDM CONSTRUCTUAL CLAIMS & DISPUTE MANAGEMENT RM200.00 RM320.00 RM400.00 16 2 9 & 10 Oct
1057 Delays & Extension of Time RM60.00 RM90.00 RM120.00 4 1/2 9am - 1pm 9
1058 Work Disruptions & Claims for Direct Loss & Expense RM60.00 RM90.00 RM120.00 4 1/2 2pm - 6pm 9
1059 Contractual Claims & Dispute Avoidance RM60.00 RM90.00 RM120.00 4 1/2 9am - 1pm 10
1060 Contractual Claims & Dispute Management RM60.00 RM90.00 RM120.00 4 1/2 2pm - 6pm 10
CPD0305CED CONSTRUCTION ENTREPRENEURSHIP DEVELOPMENT I RM200.00 RM320.00 RM400.00 16 2 13 & 14 Nov
1061 Business Strategy & Strategic Management I RM60.00 RM90.00 RM120.00 4 1/2 9am - 1pm 13
1062 Business Strategy & Strategic Management II RM60.00 RM90.00 RM120.00 4 1/2 2pm - 6pm 13
1063 Information Systems Strategy I RM60.00 RM90.00 RM120.00 4 1/2 9am - 1pm 14
1064 Information Systems Strategy II RM60.00 RM90.00 RM120.00 4 1/2 2pm - 6pm 14
CPD0305CED CONSTRUCTION ENTREPRENEURSHIP DEVELOPMENT II RM200.00 RM320.00 RM400.00 16 2 27 & 28 Nov
1065 Creativity & Innovation Strategy I RM60.00 RM90.00 RM120.00 4 1/2 9am - 1pm 27
1066 Creativity & Innovation Strategy II RM60.00 RM90.00 RM120.00 4 1/2 2pm - 6pm 27
1067 Quality Management & Assurance I RM60.00 RM90.00 RM120.00 4 1/2 9am - 1pm 28
1068 Quality Management & Assurance II RM60.00 RM90.00 RM120.00 4 1/2 2pm - 6pm 28
CPD1905SEM CONSTRUCTION SAFETY & ENVIRONMENTAL MANAGEMENT RM150.00 RM240.00 RM300.00 12 1 1/2 11 & 12 Dec
1069 Understanding Occupational Safety & Health Act & Environmental Impact
Assessment
RM60.00 RM90.00 RM120.00 4 1/2 2pm - 6pm 11
1070 Monitoring & Supervising Construction Safety RM60.00 RM90.00 RM120.00 4 1/2 9am - 1pm 12
1071 Construction Safety, Health & Environmental Policies & Management RM60.00 RM90.00 RM120.00 4 1/2 2pm - 6pm 12
CPD1313MMM CONSTRUCTION MATERIAL & MACHINERY MANAGEMENT RM200.00 RM320.00 RM400.00 16 2 18 & 19 Dec
1072 Construction Material Management & Inventory Control RM60.00 RM90.00 RM120.00 4 1/2 9am - 1pm 18
1073 Construction Material Management & Wastage Control RM60.00 RM90.00 RM120.00 4 1/2 2pm - 6pm 18
1074 Construction Plant & Procurement Management RM60.00 RM90.00 RM120.00 4 1/2 9am - 1pm 19
1075 Construction Plant & Maintenance Management RM60.00 RM90.00 RM120.00 4 1/2 2pm - 6pm 19
CONSTRUCTION CONTINUING PROFESSIONAL DEVELOPMENT (CCPD) PROGRAMME 2010
In Collaboration With The Chartered Institute Of Building (CIOB) Malaysia
Programme Venue
Akademi CPD
17 & 19, Jalan 10/23A, Medan Makmur off Jalan Usahawan
Setapak, 53200 Kuala Lumpur
Tel.: 603 4142 2232 E-mail: cpd@cpd-management.com
For enquiry, please contact:
The Chartered Institute Of Building (CIOB) Malaysia
5th Floor, 8 Jalan Bangsar Utama 9, Bangsar Utama, 59000 Kuala Lumpur
Miss Audrey Chen
Tel.: 603 2284 5754 Fax.: 603 2284 9754 E-mail: achen@ciob.org.my
No Name Profession / Designation
Valid CIOB
Membership No.
(If Any)
* Valid CIDB Green
Card No. (if any)
Exp. Date
Course / Module Participation
Amount
( ) Course No. ( ) Module No.
CONSTRUCTION CONTINUING PROFESSIONAL DEVELOPMENT (CCPD) PROGRAMME 2010
Registration Form
Approved / Submitted By:
Designation:
Name Of Organisation:
Correspondence Address:
Tel: Fax:
Mobile: E-mail:
Please note that registration will only be considered when FULL PAYMENT with all necessary documents
are received by CIOB Malaysia period on a "first come first serve" basis. Cancellation of registration is
not permitted. However, written request for substitution of participation will be considered favourably. If
warranted by circumstances beyond its control, the organiser reserves the right to the necessary changes
or adjustments of the programme accordingly. In the event of any cancellation of the programme, the
organiser's liability is limited to a full refund of the fees received only.
* To enjoy the special discounted fees, participants are requested to submit a
photocopy of a valid CIDB Green Card together with the Registration Form
Signature
Date:
By Cash, or
By Cheque or Bankers Order No.:
In favour of The Chartered Institute Of Building Malaysia
To
The Chartered Institute Of Building Malaysia
5th Floor, 8 Jalan Bangsar Utama 9, Bangsar Utama
59000 Kuala Lumpur
Attn: Miss Audrey Chen
Tel : 603 2284 5754 Fax : 603 2284 9754
Email : achen@ciob.org.my
Or
Current Account No. 381-3-000498-2
at The United Overseas Bank (Malaysia) Bhd
(Please fax copy of bank-in slip to CIOB Malaysia
Fax No.: 603 2284 9754)
Tick only when a "Course"
programme is selected. Fill in the full
range of module titles in each of the
boxes provided in the "Module No."
Column
Tick only when a specific CCPD module
is selected. Fill in only 1 module title
in each of the boxes provided.
Payment
Amounting RM

Das könnte Ihnen auch gefallen