GRINDING
Bilge, Ballast System
Continue Grinding For 100A & 125A Sch 80 For Overboard Discharge Pipe For Bilge System. (H102)

Lubricating & Hydraulic System
Continue Grinding For 100A & 125A Sch 80 Overboard Discharge Pipe For Lubricating & Hydraulic System. (H102)

Cargo Potable Water System
Grinding For 25A & 40A Sch 80 Cargo Potable Water System Penetration. (H102)

Air Vent System
Continue Grinding For 25A & 40A Sch 80 Sounding System Penetration. (H102)

Sanitary Discharge System
Grinding For 150A Sch 40 Main Line Sanitary Discharge System (FWD Flume TK).(H102)

FABRICATION
Sanitary Discharge System
Coontinue Welding Fit Up Flange & Elbow For 65A & 100A Sch 40 Sanitary Discharge System Spools From Toilet
Module
Penetration to Main Line Spool. (SB & SG). (H102)
Continue Welding Fit Up Sleeve & Flange For 100A Sch 80 Scupper For Toilet Module Penetration. (H102)

Bilge & Ballast System
Continue Welding Fit Up Flange & Elbow For 125A Sch 80 Water Ballast System For No.6 WB TK (STBD). (H102)

Cargo Potable Water System
Continue Welding Fit Up Flange & Doubler For 32A & 40A Sch 80 Potable Water System Penetration. (H102)

Fuel Oil Service System
Welding Fit Up Socket For 200A Sch 80 Fuel Oil Service System. (H102 & H103)

INSPECTION
Internal Visual Inspection For No.1 Cargo Potable TK & No.2 DB/WB TK Air Vent System. (PORT & STBD). (H102)


ON BOARD ACTIVITIES

Sanitary Discharge System
Continue Grinding Penetration & Scupper For Toilet Module At C Deck. (H102)
Continue Marking, Cutting & Fit Up Scupper & Penetration Toilet Module For Public Toilet At Main Deck. (H102)
Continue Assembly 80A & 150A SCH 40 For Main Line Sanitary Discharge System At A Deck.(H103)
Fit Up & Assembly 65A & 100A Sch 40 Spools From Toilet Module Penetration To Main Line Sanitary Discharge
System
At C Deck. (H102)

Bilge, Ballast System
Continue Fit Up & Assembly 125A Sch 80 Bilge, Ballast System Spools From Bilge Pump To AFT & FWD Fluming
Tank Ballast
Manifold At Engine Room. (H102)
Continue Fit Up & Assembly 125A Sch 80 Bilge, Ballast System Spools From Bilge Pump To Fire Main System At
Engine
Room. (H102)
Continue Assembly 125A Sch 80 For Bilge, Ballast System From Bilge, Ballast Pump To Overboard Discharge At
Engine
Room. (H103)

Fuel Oil System
Continue Fit Up & Assembly 125A Sch 40 From Fuel Oil Transfer Manifold To Fuel Oil Cargo Pump At Engine
Room. (H103)

Fire Fighting & Deck Wash System
Continue Assembly 100A Sch 40 Spool At Main Deck For Fire Fighting & Deck Wash System. (H102)
Assembly 100A Sch 40 Fire Fighting & Deck Wash System Spools At Bow thruster Comp From Penetration At BHD
97.(H102)

Cargo Potable Water System
Continue Assembly 125A Sch 40 For Suction Line Cargo Potable Water System For No.1, No.2 & No.3 Potable
Water TK At Bow Thruster Room. (PORT&STBD).(H102 & H103)
Continue Fit Up & Assembly 125A Sch 40 Potable Water Filling Line At Tween Deck. (H102)

Air Vent System
Continue Welding All Fit Up Penetration For Air Vent System At Main Deck (BHD 62). (H103)
Fit Up 150A Sch 80 Air Vent System Pipe At No.5 WB TK. (PORT & STBD) (H103)

Overboard
Marking, Cutting & Fit Up 100A Sch 80 Overboard Discharge Pipe From Galley & Sewage Treatment Plant At FWD
Machinery Tween Deck (PORT). (H102)
Fit Up & Welding 200A Sch 80 Overboard Discharge Pipe From Refrigeration Condenser At Engine Room Tween
Deck (SB).
(H102)

External FI-FI Pump Sea Chest System
Welding Fit Up 450A Sch 80 External Fi-FI Pump Sea Chest System Penetration At Engine Room. (H102)




















Reported by: Mohd Qisti Hakim Bin Shaharuddin
Date: Tuesday

BAY ACTIVITIES

Grinding For 125A Sch 80 Ballast Flume Tank Penetration. (H102 & H103)
Continue Grinding For 150A Sch 40 Main Line Sanitary Discharge System (SB). (H102)
Continue Welding Fit Up Flange & Elbow For 65A & 100A Sch 40 Spool Connected To Main Line Sanitary
Discharge System (SB & SG) (A & B Deck) (H102)
Welding Fit Up Flange For 150A Sch For Main Line Sanitary Discharge System. (SB) (H102)
Fit Up Flange For 50A Sch 80 Air Vent System. (H102)
Welding Fit Up Flange & Elbow For 65A Sch 40 Fuel oil Transfer System. (H102 & H103)
Fit Up Elbow To 125A Sch 80 Pipe For Water Ballast System. (H102 & H103)
Fit Up Flange To 100A Sch 40 Fire Main & Deck Wash System. (H102 & H103)




ONBOARD ACTIVITIES

Done Visual Inspection With Client For 450A Sch 80 External FiFi Fire Pump System Penetration. (H103) (2NOS)
Continue Fit Up & Assembly 80A Sch 40 Main Line Sanitary Discharge System (SG) At B & C Deck (H102) (PORT
& STBD)
Welding Fit Up 100A & 65A Sch 80 Scupper & Penetration For Toilet Module At D Deck. (H102)
Marking & Cutting To Fit Up Penetration For Accommodation Sanitary Discharge System At A Deck. (H103)
Assembly Butterfly Valve ForAft Ballast Manifold At Engine Room. (H102)
Fit Up Flange & Elbow For 125A Sch 80 for Water Ballast System From Manifold To No.6 DB/WB & No.8 DB.WB
TK (H102)
Continue Fit Up & Assembly 125A Sch 80 Bilge, Ballast System Spools From Bilge Pump To Overboard
Discharge At Engine Room (H102)
Fit Up & Assembly 125A Sch 80 Bilge, Ballast System From Bilge Ballast Pump At Engine Room. (H103)
Continue Fit Up And Welding Air Vent Pipes And Sounding Pipes For Potable Water Tank No.2 &No.3 At Main
Deck.(H103)
Welding Fit Up 40A Sch 80 Sounding System Penetration For No.6 WB TK At Main Deck (PORT & STBD). (H102)
Marking & Cutting To Fit Up 40A Sch 80 Sounding System Penetration For No.7 WB TK (PORT & STBD). (H102)
Continue Fit Up & Assembly 65A Sch 40 For FW Supply System At A Deck. (H102)


















Reported by: Mohd Qisti Hakim Bin Shaharuddin
Date: Wednesday

BAY ACTIVITIES

Continue Grinding For 125A Sch 80 Ballast Flume Tank Penetration. (H102 & H103)
Continue Grinding For 150A Sch 40 Main Line Sanitary Discharge System (SB). (H102)
Continue Welding Fit Up Flange & Elbow For 65A & 100A Sch 40 Spool Connected To Main Line Sanitary
Discharge System (SB & SG) (A & B Deck) (H102)
Continue Welding Fit Up Flange For 150A Sch For Main Line Sanitary Discharge System. (SB) (H102)
Fit Up Flange For 50A Sch 80 Air Vent System. (H102)
Welding Fit Up Flange & Elbow For 65A Sch 40 Fuel oil Transfer System. (H102 & H103)
Fit Up Elbow To 125A Sch 80 Pipe For Water Ballast System. (H102 & H103)
Continue Welding Fit Up Flange & Elbow For 125A Sch 80 Water Ballast System Suction Line From Manifold To
Penetration For No.7 WB TK (PORT & STBD) (H102)
Fit Up Flange To 100A Sch 40 Fire Main & Deck Wash System. (H102 & H103)


ONBOARD ACTIVITIES

Continue Fit Up & Assembly 80A Sch 40 Main Line Sanitary Discharge System At B & C Deck (H102) (PORT &
STBD)
Fit Up & Welding 150A Sch 80 Penetration For Main Line Sanitary Discharge System (SB) at B Deck. (H102)
Fit Up & Assembly 150A Sch 80 Main Line Sanitary Discharge System At A Deck.(H103)(STBD)
Assembly Butterfly Valve ForAft Ballast Manifold At Engine Room. (H103)
Fit Up Flange & Elbow For 125A Sch 80 for Water Ballast System From Manifold To No.6 DB/WB & No.8 DB.WB
TK (H102)
Fit Up & Assembly 125A Sch 80 Bilge, Ballast System Spools From Bilge Pump To Overboard Discharge At
Engine Room(H102)
Continue Fit Up And Welding Air Vent Pipes And Sounding Pipes For Potable Water Tank No.2 &No.3 At Main
Deck.(H103)
Continue Fit Up 40A Sch 80 Penetration For No.6 WB TK At Main Deck (PORT & STBD). (H102)






















Reported by: Mohd Qisti Hakim Bin Shaharuddin
Date: Thursday


BAY ACTIVITIES

Continue Grinding Fit Up Flange & Elbow For 125A Sch 80 Water Ballast System Spool For No.6 & No.7 DB/WB
TK (PORT & STBD) (H102)
Continue Grinding For 150A Sch 40 Main Line Sanitary Discharge System (SB). (H102)
Continue Welding Fit Up Flange & Elbow For 65A & 100A Sch 40 Spool Connected To Main Line Sanitary
Discharge System (SB & SG) (A & B Deck) (H102)
Continue Welding Fit Up Flange & Elbow For 65A Sch 40 Fuel oil Transfer System. (H102 & H103)
Continue Fit Up Elbow To 125A Sch 80 Pipe For Water Ballast System Suction GS Pump. (H102 & H103)


ONBOARD ACTIVITIES

Continue Fit Up & Assembly 80A Sch 40 Sanitary Discharge Line System At B Deck (H102)
Fit Up 150A & 100A Sch 80 Penetration For Main Line Sanitary Discharge System (SB & SG) at D Deck. (H102)
Fit Up * Assembly 150 Sch 40 Main Line Sanitary Discharge System At A Deck. (H103)
Continue Fit Up & Assembly 125A Sch 80 Bilge, Ballast System Spools From Bilge Pump For S.W Emergency
Cooling & Deck Machinery Cooling At Engine Room.(H102)
Welding Fit Up 125A Sch 80 Penetration For Overboard Discharge For Bilge, Ballast System At Engine Room.
(H102)
Continue Fit Up & Assembly 125A Sch 80 Ballast System Spools From FWD Ballast Manifold To FWD Flume TK
At Tween Deck FWD Machinery Comp. (H102)
Assembly For 125A Sch 80 Spools From Bilge, Ballast Pump To Overboard Discharge For Ballast System. (H103)
Continue Fit Up 65A Sch 40 For Fire Fighting & Deck Wash System At A Deck (H102)
Assembly Gate Valve For No.5 Potable Water TK. (PORT & STBD) (H102)



























Reported by: Mohd Qisti Hakim Bin Shaharuddin
Date: Friday

BAY ACTIVITIES

Continue Grinding Fit Up Flange & Elbow For 125A Sch 80 Water Ballast System Spool For No.6 & 7 DB/WB TK
(PORT & STBD) (H102)
Continue Grinding For 150A Sch 40 Sanitary Discharge Line System (SB). (H102)
Continue Welding Fit Up Flange & Elbow For 65A & 100A Sch 40 Spool Connected To Main Line Sanitary
Discharge System (SB & SG) (A & B Deck) (H102)
Continue Welding Fit Up Flange & Elbow For 65A Sch 40 Fuel oil Transfer System. (H102 & H103)
Continue Fit Up Elbow To 125A Sch 80 Pipe For Water Ballast System Suction GS Pump. (H102 & H103)
Closed Comment By Client For Visual Inspection At No.2 & 3 Potable Water TK (STBD) & No.5 WB TK (PORT &
STBD) (H102)


ONBOARD ACTIVITIES

Continue Fit Up & Assembly 80A Sch 40 Sanitary Discharge Line System At B Deck (H102)
Fit Up 65A & 100A Sch 40 Spool From Toilet Module Penetration To 150A & 80A Sch 40 For Main Line Sanitary
Discharge System (SB & SG) at C Deck. (H102)
Continue Assembly 150A SCH 40 For Main Line Sanitary Discharge System At A Deck.(H103)
Continue Fit Up & Assembly 125A Sch 80 Bilge, Ballast System Spools From Bilge Pump To S.W Emergency
Cooling & Deck Cooling System At Engine Room.(H102)
Assembly For 125a Sch 80 Suction Line Ballast System From FWD Ballast Manifold To No.3 DB/WB TK & No.5
WB TK (STBD) (H102)
Continue Assembly 125A Sch 80 For Bilge, Ballast System From Bilge, Ballast Pump To Overboard Discharge At
Engine Room. (H103)
Continue Fit Up 65A Sch 40 For Fire Main & Deck Wash System At A Deck (H102)
Welding Fit Up For 40A Sch 40 Sounding System For No.7 Water Ballast System TK. (PORT) (H102)
Assembly For 150A Sch 40 Air Vent System For No.1 Fuel Oil TK At Tween Deck. (PORT) (H102)
Assembly Valve & 125A Sch 40 For Suction Line Cargo Potable Water System For No.1, No.2 & No.3 Potable
Water TK (PORT&STBD).(H102)
Assembly Butterfly Valve For Potable Water Manifold.(H103)






















Reported by: Mohd Qisti Hakim Bin Shaharuddin
Date: Saturday

BAY ACTIVITIES

Continue Grinding Fit Up Flange & Elbow For 125A Sch 80 Water Ballast System Spool For No.6 & 7 DB/WB TK
(PORT & STBD) (H102)
Grinding For 100A Sch 40 Fire Fighting & Deck Wash System. (H102 & H103)
Continue Grinding For 150A Sch 40 Sanitary Discharge Line System (SB). (H102)
Grinding For 125A & 150A Sch 80 Sanitary Discharge System Penetration. (H102 & H103)
Continue Welding Fit Up Flange & Elbow For 65A & 100A Sch 40 Spool Connected To Main Line Sanitary
Discharge System (SB & SG) (A & B Deck) (H102)
Welding Fit Up Flange For 150A Sch 40 Main Line Sanitary Discharge System (SB) (Flume TK). (H102)
Welding Fit Up Flange & Doubler For 125A & 150a Sch 80 Sanitary Discharge System Penetration. (H102 &
H103)
Continue Welding Fit Up Flange & Elbow For 65A Sch 40 Fuel oil Transfer System. (H102 & H103)
Continue Fit Up Elbow, Flange & Tee Joint To 125A Sch 80 Pipe For Water Ballast System Suction GS Pump.
(H102)
Done Visual Inspection With Client For All Penetration In Bilge Holding TK At Engine Room. (H102)




ONBOARD ACTIVITIES

Continue Fit Up & Assembly 80A Sch 40 Sanitary Discharge Line System At B Deck (H102)
Continue Fit Up 65A & 100A Sch 40 Spool From Toilet Module Penetration To 150A & 80A Sch 40 For Main Line
Sanitary
Discharge System (SB & SG) at C Deck. (H102)
Continue Assembly 150A SCH 40 For Main Line Sanitary Discharge System At A Deck.(H103)
Continue Fit Up & Assembly 125A Sch 80 Bilge, Ballast System Spools From Bilge Pump To S.W Emergency
Cooling & Deck Cooling System At Engine Room.(H102)
Continue Assembly For 125a Sch 80 Suction Line Ballast System From FWD Ballast Manifold To No.3 DB/WB TK
& No.5 WB TK (STBD) (H102)
Continue Assembly 125A Sch 80 For Bilge, Ballast System From Bilge, Ballast Pump To Overboard Discharge At
Engine Room. (H103)
Assembly Valve & 125A Sch 40 For Suction Line Cargo Potable Water System For No.1, No.2 & No.3 Potable
Water TK(PORT&STBD).(H102)

Das könnte Ihnen auch gefallen