Project: Projek Jalan Bungalio - Longkou Lama - Timbok Taker off: Abdul Khaaliq Kamunri Squared by; Abdul Khaaliq Page: 1
Tuaran Sabah Checked by: Abdul Khaaliq Kamunri Revised by; Abdul Khaaliq Ref No: JUB4314
Code Descriptions Unit L W H Rates RM
Taking off List
A111 Performance bond Sum
A112 Design guarantee bond Sum
A12* Facilities for Engineer Sum
A231 Provision of transport vehicle Sum
A232 Maintenace of vehicle Mth
A254 Work programme Sum
A261 Progress report Mth
A262 Project signboard sum
A265 Temporary fencing and hoarding Sum
A341 Routing maintenance - existing road Sum
A350 Cleaning site upon completion Sum
C134 Traffic controller Sum
C111 Non-illuminated retro-reflective Sum
C121 Heavy-duty water/sand-filled PVC barrier Nr
C231 Cones Nr
C235 Blinker Nr
E110 Above ground Ha
F111 Topsoil M2
F121 Cut to fill; Earth M3
F135 Cut and dispose; unsuitable material M3
B/F
ITEMS DIMENSIONS COST QUANTITIES
No. Total
JABATAN UKUR BAHAN, FAKULTI ALAM BINA
Date:
UNIVERSITI TEKNOLOGI MALAYSIA, SKUDAI, JOHOR 17.04.2014
Project: Projek Jalan Bungalio - Longkou Lama - Timbok Taker off: Abdul Khaaliq Kamunri Squared by; Abdul Khaaliq Page: 1
Tuaran Sabah Checked by: Abdul Khaaliq Kamunri Revised by; Abdul Khaaliq Ref No: JUB4314
Code Descriptions Unit L W H Rates RM
Taking off List (Cont'd)
F312 Imported material M3
F322 Imported material M3
F340 Filling to structure M3
F510 Turfing M2
F520 Hydroseeding M2
G110 Provision Sum
G120 Moving and handling Sum
G211 Rock-filled gabion M3
G231 Geotextile M2
G232 Geogrid M2
G351 Horizontal drain in earth M
H110 Provision Sum
H120 Moving and handling Sum
H281 Supply Nr
H282 Depth driven M
H283 Jointing Nr
B/F
ITEMS DIMENSIONS QUANTITIES COST
No. Total
JABATAN UKUR BAHAN, FAKULTI ALAM BINA
Date:
UNIVERSITI TEKNOLOGI MALAYSIA, SKUDAI, JOHOR 17.04.2014
Project: Projek Jalan Bungalio - Longkou Lama - Timbok Taker off: Abdul Khaaliq Kamunri Squared by; Abdul Khaaliq Page: 1
Tuaran Sabah Checked by: Abdul Khaaliq Kamunri Revised by; Abdul Khaaliq Ref No: JUB4314
Code Descriptions Unit L W H Rates RM
Taking off List (Cont'd)
H510 Pile dynamic analyser (PDA) Nr
I110 Blinding M2 Querry grade
I142 Ground slab M3 Querry grade
I411 Sides of ground slab M2
I560 Fabric A6 & A10 M2
J160 Vertical facing to concrete M2
J421 Damp proof course M
L240 Handrails M
L311 Angle section M
P111 Not exceeding 1.5m M
P220 Bench drain M
P230 Roadside drain M
P270 Monsoon drain M
P320 Outlet drain M
Q330 Crushed aggregates M2 under 125mm slab
Q510 Remofal of flexible surface M2
Q520 Surface dressing M2
Q822 Continuos line M
Q823 Intermittent line M
B/F
No. Total
ITEMS DIMENSIONS QUANTITIES COST
67800 69800 68600 70350
66950 68700 67150 69575
850 1100 1450 775 4175
Left right
JABATAN UKUR BAHAN, FAKULTI ALAM BINA
UNIVERSITI TEKNOLOGI MALAYSIA, SKUDAI, JOHOR 16 April 2014
Project: Menaiktaraf Laluan Persekutuan 5 Dari Ipoh ke Lumut Taker off: Abdul Khaaliq Kamunri Squared by; Abdul Khaaliq Page: 1
Checked by: Abdul Khaaliq Revised by; Abdul Khaaliq Ref No: RTWALL-01
Code Descriptions Unit L W H Rates RM
A111 Contractual requirement; bond; performance Sum 30,000.00 30,000.00
bond
A112 Contractual requirement; bond; design Sum 10,000.00 10,000.00
guarantee bond for retaining wall
A121 Contractual requirement; insurance; Sum 25,000.00 25,000.00
insurance of the work
A122 Contractual requirement; insurance; Sum 30,000.00 30,000.00
public liability insurance
A123 Contractual requirement; insurance; Sum 35,000.00 35,000.00
Socso/Workmen compensation insurance
A231 Engineer's requirements; services for the Sum 1 1 70,000.00 70,000.00
Engineer representative; provision of
transport vehicle
A232 Engineer's requirements; services for the Mth 12 12 500.00 6,000.00
Engineer representative; maintenance of
vehicle
A254 Engineer's requirements; submission of Sum 600.00 600.00
documents; work programme
A261 Engineer's requirements; miscellaneous; Mth 12 12 120.00 1,440.00
progress report five sets monthly
CLASS A : 1/2 B/F
208,040.00
Date:
ITEMS DIMENSIONS QUANTITIES COST
No. Total
JABATAN UKUR BAHAN, FAKULTI ALAM BINA
UNIVERSITI TEKNOLOGI MALAYSIA, SKUDAI, JOHOR 16 April 2014
Project: Menaiktaraf Laluan Persekutuan 5 Dari Ipoh ke Lumut Taker off: Abdul Khaaliq Kamunri Squared by; Abdul Khaaliq Page: 2
Checked by: Abdul Khaaliq Revised by; Abdul Khaaliq Ref No: RTWALL-01
L W H Rates RM
C/F 208,040.00
A262 Engineer's requirement; miscellaneous; Nr 1 1 700.00 700.00
project signboard
A265 Engineer's requirement; miscellaneous; Sum 5,000.00 5,000.00
temporary fencing and hoarding
A341 Project requirement; maintenance of road; Sum 5,000.00 5,000.00
routine maintenance-existing road
A350 Project requirements; cleaning of site upon Sum 10,000.00 10,000.00
completion
Class A : 2/2 B/F 228,740.00
Date:
DIMENSIONS QUANTITIES COST
No. Total
JABATAN UKUR BAHAN, FAKULTI ALAM BINA
UNIVERSITI TEKNOLOGI MALAYSIA, SKUDAI, JOHOR 16 April 14
Project: Menaiktaraf Laluan Persekutuan 5 Dari Ipoh ke Lumut Taker off: Abdul Khaaliq Kamunri Squared by; Abdul Khaaliq Page: 3
Checked by: Abdul Khaaliq Revised by; Abdul Khaaliq Ref No: RTWALL-01
L W H Rates RM
C211 Temporary road furniture; temporary traffic Nr 4 4 500.00 2,000.00
sign; circular corner-cube prismatic lens
75mm diameter non-illuminated retro-
reflective sheeting
C221 Temporary road furniture; barrier and Nr 10 10 300.00 3,000.00
barricade; heavy duti water/sand-filled pvc
barrier
C231 Temporary road furniture; delineators; Nr 6 6 150.00 900.00
cone
C235 Temporary road furniture; delineators; Nr 6 6 500.00 3,000.00
blinkers
Class C: 1/1 8,900.00
No. Total
Date:
DIMENSIONS QUANTITIES COST
JABATAN UKUR BAHAN, FAKULTI ALAM BINA
UNIVERSITI TEKNOLOGI MALAYSIA, SKUDAI, JOHOR 16 April 14
Project: Menaiktaraf Laluan Persekutuan 5 Dari Ipoh ke Lumut Taker off: Abdul Khaaliq Kamunri Squared by; Abdul Khaaliq Page: 4
Checked by: Abdul Khaaliq Revised by; Abdul Khaaliq Ref No: RTWALL-01
L W H Rates RM
E110 General clearance; above ground; bushes Ha 0.1 10,000.00 1,000.00
Class E: 1/1 1,000.00
Date:
DIMENSIONS QUANTITIES COST
No. Total
JABATAN UKUR BAHAN, FAKULTI ALAM BINA
UNIVERSITI TEKNOLOGI MALAYSIA, SKUDAI, JOHOR 16/04/2014
Project: Menaiktaraf Laluan Persekutuan 5 Dari Ipoh ke Lumut Taker off: Abdul Khaaliq Kamunri Squared by; Abdul Khaaliq Page: 5
Checked by: Abdul Khaaliq Revised by; Abdul Khaaliq Ref No: RTWALL-01
L W H Rates RM
F110 Excavation; stripping; topsoil 200mm thick M2 4.18 14.50 60.61 2.00 121.22
for disposal
F121 Excavation; cut to fill ; earth M3 2 4.18 0.30 0.30 0.75 6.50 4.89
F135 Excavation; cut and dispose; earth M3 4.18 6.25 2.00 52.25 7.00 365.75
F312 Filling; general;imported material sand and M3 4.18 1.67 4.00 27.87 11.00 306.53
stone
F322 Filling; replacement; imported material M3 4.18 6.25 2.00 52.25 9.00 470.25
F340 Filling; to structure M3 4.18 2.60 0.26 2.83 7.00 19.78
F510 Landscaping; spot turfing M2 4.18 1.60 6.69 6.00 40.13
F520 Landscaping; hydroseeding with fibromat M2 4.18 8.50 35.53 12.00 426.36
Class F : 1/1 1,754.91
Date:
DIMENSIONS QUANTITIES COST
No. Total
JABATAN UKUR BAHAN, FAKULTI ALAM BINA
UNIVERSITI TEKNOLOGI MALAYSIA, SKUDAI, JOHOR 16/04/2014
Project: Menaiktaraf Laluan Persekutuan 5 Dari Ipoh ke Lumut Taker off: Abdul Khaaliq Kamunri Squared by; Abdul Khaaliq Page: 6
Checked by: Abdul Khaaliq Revised by; Abdul Khaaliq Ref No: RTWALL-01
L W H Rates RM
G110 Plant and equipment; provision Sum
G120 Plant and equipment ; moving and handling Sum
G211 Retaining structure; gabion; rock-filled M3 4 4.18 1.20 1.00 20.06 250.00 5,016.00
gabion
G231 Retaining structure ; reinforced soil slope; M2 4.18 3.50 14.63 185.00 2,706.55
geotextile non-woven polyster KET9
G232 Retaining structure ; reinforced soil slope; M2 4.18 26.00 108.68 1,060.00 115,200.80
geogrid KG120/25 at 0.5 vertical spacing
G351 Slope stabilisation; horizontal drain; in earth M 8 3 24.00 28.00 672.00
with G.I Pipe 50mm diameter
Class G: 1/1 123,595.35
Date:
DIMENSIONS QUANTITIES COST
No. Total
JABATAN UKUR BAHAN, FAKULTI ALAM BINA
UNIVERSITI TEKNOLOGI MALAYSIA, SKUDAI, JOHOR 16/04/2014
Project: Menaiktaraf Laluan Persekutuan 5 Dari Ipoh ke Lumut Taker off: Abdul Khaaliq Kamunri Squared by; Abdul Khaaliq Page: 7
Checked by: Abdul Khaaliq Revised by; Abdul Khaaliq Ref No: RTWALL-01
L W H Rates RM
H110 Plant and equipment; provision Sum 3,000.00 3,000.00
H120 Plant and equipment; moving and handling Sum 3,000.00 3,000.00
H281 Piles; steel pipe piles; supply 3.0m length Nr 24 24.00 230.00 5,520.00
75mm diameter G.I pipe at 2.0m spacing
H282 Piles; steel pipe piles; depth driven 3.0m M 24 3.00 72.00 10.00 720.00
H283 Piles; steel pipe piles; jointing with slab Nr 24 24.00 23.00 552.00
H510.1 Pile test; static load test; 80tons Nr 2 2.00 1,000.00 2,000.00
H510.2 Pile test; static load test; 160tons Nr 2 2.00 1,000.00 2,000.00
Class H: 1/1 16,792.00
Date:
DIMENSIONS QUANTITIES COST
No. Total
JABATAN UKUR BAHAN, FAKULTI ALAM BINA
UNIVERSITI TEKNOLOGI MALAYSIA, SKUDAI, JOHOR 16/04/14
Project: Menaiktaraf Laluan Persekutuan 5 Dari Ipoh ke Lumut Taker off: Abdul Khaaliq Kamunri Squared by; Abdul Khaaliq Page: 8
Checked by: Abdul Khaaliq Revised by; Abdul Khaaliq Ref No: RTWALL-01
L W H Rates RM
I110 In-situ concrete design mix; Grade C15 M2 4.18 7.80 32.60 8.00 260.83
blinding 50mm thick under ground slab
I142.1 In-situ concrete design mix; Grade C30 M3 4.18 1.20 0.08 0.40 400.00 160.51
ground slab 75mm thick
I142.2 In-situ concrete design mix; Grade C30 M3 4.18 2.30 0.13 1.25 450.00 562.42
ground slab 125mm thick
I142.3 In-situ concrete design mix; Grade C30 M3 4.18 2.80 0.25 2.93 550.00 1,609.30
ground slab 250mm thick
I411 Formwork; sides; ground slab M2 2 6.78 0.25 3.39 40.00 135.60
I560.1 Reinforcement; fabric or other stated material M2 4.18 2.60 10.87 16.00 173.89
BRC A6 to BS 4483
I560.2 Reinforcement; fabric or other stated material M2 2 4.18 7.9 66.04 24.00 1,585.06
BRC A10 to BS 4483
Class I : 1/1 B/F 4,487.61
Date:
DIMENSIONS QUANTITIES COST
No. Total
JABATAN UKUR BAHAN, FAKULTI ALAM BINA
UNIVERSITI TEKNOLOGI MALAYSIA, SKUDAI, JOHOR 16/04/14
Project: Menaiktaraf Laluan Persekutuan 5 Dari Ipoh ke Lumut Taker off: Abdul Khaaliq Kamunri Squared by; Abdul Khaaliq Page: 9
Checked by: Abdul Khaaliq Revised by; Abdul Khaaliq Ref No: RTWALL-01
L W H Rates RM
J160 Brickwork; vertical facing to concrete; M2 4.18 0.23 0.9614 55.00 52.88
225mm thick common brick cement and sand
1:3 mortar
J421 Miscellaneous work; ancillaries; damp proof M 4.18 4.18 20.00 83.60
course under 225mm thick brick with black
polythene laminated sheet, laid on mortar bed
Class J: 1/1 B/F 136.48
Date:
DIMENSIONS QUANTITIES COST
No. Total
JABATAN UKUR BAHAN, FAKULTI ALAM BINA
UNIVERSITI TEKNOLOGI MALAYSIA, SKUDAI, JOHOR 16/04/14
Project: Menaiktaraf Laluan Persekutuan 5 Dari Ipoh ke Lumut Taker off: Abdul Khaaliq Kamunri Squared by; Abdul Khaaliq Page: 10
Checked by: Abdul Khaaliq Revised by; Abdul Khaaliq Ref No: RTWALL-01
L W H Rates RM
L240 Miscellaneous metalwork; handrails M 4.18 4.18 280.00 1,170.40
rectangular hollow section 75mm x 38mm x
9mm thick
L311 Miscellaneous metalwork; miscellaneous M 4 0.90 3.60 230.00 828.00
framing; angle section circular hollow section
38mm diameter, 900mm high with top end
welded to underside of handrail
Class L: 1/1 1,998.40
Date:
DIMENSIONS QUANTITIES COST
No. Total
JABATAN UKUR BAHAN, FAKULTI ALAM BINA
UNIVERSITI TEKNOLOGI MALAYSIA, SKUDAI, JOHOR 16/04/2014
Project: Menaiktaraf Laluan Persekutuan 5 Dari Ipoh ke Lumut Taker off: Abdul Khaaliq Kamunri Squared by; Abdul Khaaliq Page: 11
Checked by: Abdul Khaaliq Revised by; Abdul Khaaliq Ref No: RTWALL-01
L W H Rates RM
P111.1 Drain excavation; in earth; depth not M 4.18 4.18 7.00 29.26
exceeding 1.5m for 300mm block drain
P111.2 Drain excavation; in earth; depth not M 4.18 4.18 7.00 29.26
exceeding 1.5m for 300mm half round drain
P111.3 Drain excavation; in earth; depth not M 4.18 4.18 7.00 29.26
exceeding 1.5m for monsoon drain
P220 Surface drain; bench drain; concrete Grade20 M 4.18 4.18 95.00 397.10
300mm half round drain 100mm thick
P230 Surface drain; roadside drain; concrete M 4.18 4.18 300.00 1,254.00
Grade 20 300mm block drain 200mm thick
P270 Surface drain; monsoon drain; concrete M 4.18 4.18 550.00 2,299.00
Grade 20 250mm lining thick
P320 Subsurface drains; outlet drain; 150mm M 6 3.00 18.00 127.00 2,286.00
diameter horizontal G.I pipe drain
Class P: 1/1 6,323.88
Date:
DIMENSIONS QUANTITIES COST
No. Total
JABATAN UKUR BAHAN, FAKULTI ALAM BINA
UNIVERSITI TEKNOLOGI MALAYSIA, SKUDAI, JOHOR 16/04/2014
Project: Menaiktaraf Laluan Persekutuan 5 Dari Ipoh ke Lumut Taker off: Abdul Khaaliq Kamunri Squared by; Abdul Khaaliq Page: 12
Checked by: Abdul Khaaliq Revised by; Abdul Khaaliq Ref No: RTWALL-01
L W H Rates RM
Q330 Roadbase; crushed aggregates M2 4.18 1.60 6.69 33.00 220.70
200mm thick crusher run
Q510 Surfacing; removal of flexible surface M2 4.18 5.20 21.74 20.00 434.72
existing cracked asphaltic concrete wearing
course (ACW20)
Q520 Surfacing; surface dressing compact asphaltic M2 4.18 5.20 21.74 45.00 978.12
concrete wearing course (ACW20) to the
compacted thickness of 50mm
Q822 Road furniture; pavement markings; M 1.50 1.50 5.60 8.40
continuos line 150mm wide hot-applied
superimposed reflectorised thermoplastic
all in accordance to Arahan Teknik Jalan
2D/85
Q823 Road furniture; pavement markings; M 2.00 2.00 3.70 4.00
intermittent line 100mm wide hot-applied
superimposed reflectorised thermoplastic
all in accordance to Arahan Teknik Jalan
2D/85
Class Q: 1/1 1,645.94
Date:
DIMENSIONS QUANTITIES COST
No. Total
JABATAN UKUR BAHAN, FAKULTI ALAM BINA
UNIVERSITI TEKNOLOGI MALAYSIA, SKUDAI, JOHOR 16/04/14
Project: Menaiktaraf Laluan Persekutuan 5 Dari Ipoh ke Lumut Taker off: Abdul Khaaliq Kamunri Squared by; Abdul Khaaliq Page: 13
Checked by: Abdul Khaaliq Revised by; Abdul Khaaliq Ref No: RTWALL-01
L W H Rates RM
Summary of Bills of Quantities
Class A 228,740.00
Class C 8,900.00
Class E 1,000.00
Class F 1,754.91
Class G 15,447.00
Class H 16,792.00
Class I 4,487.61
Class J 1,998.40
Class L 6,323.88
Class P 1,645.94
Class Q
B/F 287,089.74
Date:
DIMENSIONS QUANTITIES COST
No. Total
67800 69800 68600 70350
66950 68700 67150 69575
850 1100 1450 775 4175 MM
4.175
Left right
Projek Jalan Bungalio - Longkou Lama - Timbok, Tuaran, Sabah.
AMOUNT
RM
A100 CONTRACTUAL REQUIREMENTS
Bond
A111 Performance bond Sum 30,000.00 30,000.00
A112 Design guarantee bond for retaining wall to be designed Sum 10,000.00 10,000.00
by the Contractor.
Insurances
A121 Insurance of the works Sum 25,000.00 25,000.00
A122 Public liability insurance Sum 30,000.00 30,000.00
A123 Socso/Workmen compensation insurance Sum 35,000.00 35,000.00
ENGINEER'S REQUIREMENT
Services for the Engineer's/SO/PD's Representative
A231 Provision of transport vehicle [Type A as per 2500cc Sum 70,000.00 70,000.00
Vehicle to be reverted to the Contractor after
completion]
A232 Maintenace of the transport vehicle [Type A] Mth 12 500.00 6,000.00
Submission of Documents
A254 Work programme in Microsof Project on a Gantt Sum 600.00
Chart format]
Miscellaneous
A261 Progress report in five sets. Rate to include progress Mth 12 120.00 1,440.00
photos
A262 Project signboard Nr 1 700.00 700.00
A265 Temporary fencing and hoarding Sum 5,000.00 5,000.00
A300 PROJECT REQUIREMENTS
Maintenace of Road
A341 Routine maintenances for existing road as per Sum 5,000.00 5,000.00
spesification
A350 Clearing of site upon completion Sum 10,000.00 10,000.00
TO COLLECTION (CLASS A) 228,740.00
C200 TEMPORARY ROAD FURNITURE
ITEM NO
Bill of Quantities No 1 -Retaining Wall JUB4314/MSM/2013/RTWALL-01
CODE ITEM DESCRIPTION UNIT QUANTITY RATE
BQ-RTWALL-01/32/46
Projek Jalan Bungalio - Longkou Lama - Timbok, Tuaran, Sabah.
AMOUNT
RM
ITEM NO
Bill of Quantities No 1 -Retaining Wall JUB4314/MSM/2013/RTWALL-01
CODE ITEM DESCRIPTION UNIT QUANTITY RATE
Temporary traffic signs shall be in accordance with
JKR Arahan Teknik (Jalan) 2C/85
Temporary Road Traffic Sign
C211 Protable non-illuminated retro-reflective in PVC Nr 4 500.00 2,000.00
sheeting for advance warning sign.
Barrier and Barricades
C221 Heavy duty water or sand filled PVC barrier of the Nr 10 300.00 3,000.00
New Jersey type
Deliniators
C231 750mm PVC traffic cones with reflective bands Nr 6 150.00 900.00
C235 150mm diameter polycarbonate lens battery operated Nr 6 500.00 3,000.00
blinkers
TOTAL TO COLLECTION (CLASS C) 8,900.00
E100 GENERAL CLEARANCE
Above Ground
BQ-RTWALL-01/33/46
Projek Jalan Bungalio - Longkou Lama - Timbok, Tuaran, Sabah.
AMOUNT
RM
ITEM NO
Bill of Quantities No 1 -Retaining Wall JUB4314/MSM/2013/RTWALL-01
CODE ITEM DESCRIPTION UNIT QUANTITY RATE
E110 General clearance to primary forest. Rate to include the Ha 0.1 10,000.00 1,000.00
removal of trees and stumps, undergrowth, shrubs
roots and the likes (All trees of 0.5m girth and above
shall became the property of the Employer)
TOTAL TO COLLECTION (CLASS E) 1,000.00
F100 EXCAVATION
Stripping
F110 Topsoil to average depth of 200mm disposed to the M2 61 2.00 122.00
Contractor's dump site as approved by the Engineer/
BQ-RTWALL-01/34/46
Projek Jalan Bungalio - Longkou Lama - Timbok, Tuaran, Sabah.
AMOUNT
RM
ITEM NO
Bill of Quantities No 1 -Retaining Wall JUB4314/MSM/2013/RTWALL-01
CODE ITEM DESCRIPTION UNIT QUANTITY RATE
S.O/P.D
Cut to Fill
F121 Excavate in earth material from original ground level to M3 1 6.50 6.50
form a reduced level
Cut and Dispose
F135 Excavate in unsuitable material commencing from M3 53 7.00 371.00
original ground level to disposal site apprived by the
Engineer/S.O/P.D
F300 FILLING
General
F312 Imported material from Contractor's own source of M3 28 11.00 308.00
sand and stone as per spesification
Embankment
F322 Imported material from Contractor's own source with M3 53 9.00 477.00
grading limit as per Spesification to form embankment
Replacement
F340 To structures - filling around RC slab M3 3 7.00 21.00
F500 LANDSCAPING
Item for landscaping shall be deemed to include digging,
planting media, bedding, stalking, protection,
watering, weeding, required fertilising, and
replacement of dead item until vegetation is
established
F510 Spot turfing to slope area M2 7 6.00 42.00
F520 Hydoseeding with fibremat or equivalent M2 36 12.00 432.00
TOTAL TO COLLECTION (CLASS F) 1,779.50
G100 PLANT AND EQUIPMENT
G110 Provision of all necessary plant and equipment, Sum 5,000.00 5,000.00
transportation to the Site, handling, assembling and
removal off the Site after completion of operation.
G120 Moving and handling all necessary plant and equipment Sum 2,000.00 2,000.00
BQ-RTWALL-01/35/46
Projek Jalan Bungalio - Longkou Lama - Timbok, Tuaran, Sabah.
AMOUNT
RM
ITEM NO
Bill of Quantities No 1 -Retaining Wall JUB4314/MSM/2013/RTWALL-01
CODE ITEM DESCRIPTION UNIT QUANTITY RATE
within theSite and from location to location as often
as is and whenever necessary for the execution of
whole operation
G200 RETAINING STRUCUTURE
Gabion
G211 1.3m x 1.3m rock-filled gabion with PVC-Coated M3 20 250.00 5,000.00
wire gauge size of 2.7mm as shown on the drawing
Reinforce Soil Slope
G231 Woven geotextile with minimum long term design M2 15 185.00 2,775.00
strength of 100kN/m as soil reinforcement
G232 Geogrid with minimum long term design strength of
75kN/m KG120/25 as soil reinforcement
G300 SLOPE STABILISATION
Horizontal Drain
Rate for horizontal drain shall be deemed to include
drilling and perforated pipe
50mm diameter uPVC horizontal drain as shown in
Drawing
G351 In earth M 24 28.00 672.00
TOTAL TO COLLECTION (CLASS G) 15,447.00
H100 PLANT AND EQUIPMENT
H110 Provision of all necessary piling plant and equipment Sum 3,000.00 3,000.00
transportation to Site, handling, assembling, and
removal off Site after completion of operation
BQ-RTWALL-01/36/46
Projek Jalan Bungalio - Longkou Lama - Timbok, Tuaran, Sabah.
AMOUNT
RM
ITEM NO
Bill of Quantities No 1 -Retaining Wall JUB4314/MSM/2013/RTWALL-01
CODE ITEM DESCRIPTION UNIT QUANTITY RATE
H120 Moving and handling of all piling plant and equipment Sum 3,000.00 3,000.00
within the Site from location to location as often as
is, and whenever necessary for the execution of the
whole piling operations
H200 PILES
Steel Pipe Piles
H281 Supply of steel pipe piles with metal-filled primers of Nr 24 230.00 5,520.00
3m length. Rate to include cathodic protectiong using
the sacrificial anode system
H283 Jointing with butt weld all around as shown in Drawing Nr 72 10.00 720.00
to slab
H500 PILE TESTS
H510.0 Initial static load test on 75mm diameter steel pipe Nr 2 1,000.00 2,000.00
piles up to two times working load of 8,000kN
H510.2 Initial static load test on 75mm diameter steel pipe NR 2 1,000.00 2,000.00
piles up to two times working load of 16,000kN
TOTAL TO COLLECTION (CLASS H) 16,240.00
I100 IN SITU CONCRETE DESIGN MIX
Rate for in situ concrete designed mix shall be deemed
BQ-RTWALL-01/37/46
Projek Jalan Bungalio - Longkou Lama - Timbok, Tuaran, Sabah.
AMOUNT
RM
ITEM NO
Bill of Quantities No 1 -Retaining Wall JUB4314/MSM/2013/RTWALL-01
CODE ITEM DESCRIPTION UNIT QUANTITY RATE
to include placing and compaction of concrete
Grade C15 Concrete
I110 Mass concrete blinding 50mm thick to base slab M2 20 8.00 160.00
Grade: C30
I142.1 Reinforced concrete 75mm thick to concrete slab M3 1 400.00 400.00
I142.2 Reinforced concrete 125mm thick to ground slab M3 2 450.00 900.00
I142.3 Reinforced concrete 250mm thick to slab M3 3 550.00 1,650.00
I400 FORMWORK
Sides
I411 F1: rough finish to ground slabs M2 4 40.00 160.00
I500 REINFORCEMENT
Reinforcing Bars of Other Stated Material
I560.1 Fabric of other stated material BRC A6 to BS 4483 M2 11 16.00 176.00
I560.2 Fabric of other stated material BRC A10 to BS 4483 M2 66 24.00 1,584.00
TOTAL TO COLLECTION (CLASS I) 5,030.00
J100 BRICKWORK
BQ-RTWALL-01/38/46
Projek Jalan Bungalio - Longkou Lama - Timbok, Tuaran, Sabah.
AMOUNT
RM
ITEM NO
Bill of Quantities No 1 -Retaining Wall JUB4314/MSM/2013/RTWALL-01
CODE ITEM DESCRIPTION UNIT QUANTITY RATE
Item for brickwork shall be deemed to include joint
reinforcement, movement joints, fixing ties, bonds to
existing work and fixing clamps
J160 Common brick laid in stretcher bond, jointed in M2 1 55.00 55.00
(1:3) cement mortar as vertical facing to conrete
J400 MISCELLANEOUS WORK
Ancillaries
J421 Damp proof course, width 115mm to BS 743 Type D M 4 20.00 80.00
TOTAL TO COLLECTION (CLASS J) 135.00
BQ-RTWALL-01/39/46
Projek Jalan Bungalio - Longkou Lama - Timbok, Tuaran, Sabah.
AMOUNT
RM
ITEM NO
Bill of Quantities No 1 -Retaining Wall JUB4314/MSM/2013/RTWALL-01
CODE ITEM DESCRIPTION UNIT QUANTITY RATE
L200 MISCELLANEOUS METALWORKS
Item for miscellaneous metalwork shall be deemed to
include fixing to other work, supply of fixing component
and drilling or cutting of other works
L240 Galvanised mild steel handrail of 38mm diameter M 4 280.00 1,120.00
tubular section of 3.2mm thickness of 900mm high
as shown on the drawing
Miscellaneous Framing
L311 75mm x 38mm x 9mm thick angle section M 3.6 230.00 828.00
BQ-RTWALL-01/40/46
Projek Jalan Bungalio - Longkou Lama - Timbok, Tuaran, Sabah.
AMOUNT
RM
ITEM NO
Bill of Quantities No 1 -Retaining Wall JUB4314/MSM/2013/RTWALL-01
CODE ITEM DESCRIPTION UNIT QUANTITY RATE
TOTAL TO COLLECTION (CLASS L) 1,948.00
P100 DRAIN EXCAVATION
Drain excavation shall be deemed to include
preparation of surfacs, double handling, disposal of
surplus excavated material, upholding sides of
excavation, allowance for joints, backfilling and
removal of dead services and reinstated of Original
Surgface unless coverer by separate items.
300mm precast concrete drain for Road as shown
in th Drawing.
P111.1 In earth for 300mm precast concrete block drain not M 4.18 7.00 29.26
exceeding 1.5m
P111.2 In earth for 300mm precast concrete half round drain M 4.18 7.00 29.26
not exceeding 1.5m
P111.3 In earth for precast concrete monsoon drain not M 4.18 7.00 29.26
exceeding 1.5m
P200 SURFACE DRAINS
P220 Bench and berm drains, reinforced concrete Grade 20 M 4.18 95.00 397.10
300mm wide x 300mm deep and 75mm thick U shape
P230 Roadside drain, 300mm wide block drain with average M 4.18 300.00 1,254.00
300mm high brickwall and plastering
P270 Monsoon drain, precast concrete U-shaped drain with M 4.18 550.00 2,299.00
dry weather flow, to repair
P300 SURFACE DRAINS
Item for subsurface drains shall be deemed to include
getectiles fabric, lining and filter material
P320 Outlet drains, 150mm diameter UPVC pipe including M 18 127.00 2,286.00
fittings,. Rate to include bends, filter fabric and
concrete surround
Crushed
BQ-RTWALL-01/41/46
Projek Jalan Bungalio - Longkou Lama - Timbok, Tuaran, Sabah.
AMOUNT
RM
ITEM NO
Bill of Quantities No 1 -Retaining Wall JUB4314/MSM/2013/RTWALL-01
CODE ITEM DESCRIPTION UNIT QUANTITY RATE
TOTAL TO COLLECTION (CLASS P) 6,323.88
Q300 ROAD BASE
Roadbase shall be deemed to include chamfer
Q330 Crushed aggregates with a CBR value of more 80, M2 7 33.00 231.00
complying with Type II of spesification in 200mm thick
Q500 SURFACING
Q510.1 Removal of flexible surface. Rate to include scariying M2 22 20.00 440.00
the existing exposed surface
Q510.2 Removal of flexible surface. Rate to include milling M2 22 45.00 990.00
of exisiting roadbase before receiving the new
roadbase material
Q800 ROAD FURNITURE
Pavement Markings
Q822 Pavement markings shall generally be hot-applied M 1.5 5.60 8.40
superimposed reflectorised thermoplastic and in
accordance witrh JKR Arahan Teknkik (Jalan) 20/85
Q823 100mm wide intermittent (Centre) line with 4180mm M 2 3.70 7.40
line
BQ-RTWALL-01/42/46
Projek Jalan Bungalio - Longkou Lama - Timbok, Tuaran, Sabah.
AMOUNT
RM
ITEM NO
Bill of Quantities No 1 -Retaining Wall JUB4314/MSM/2013/RTWALL-01
CODE ITEM DESCRIPTION UNIT QUANTITY RATE
TOTAL TO COLLECTION (CLASS Q) 1,676.80
BQ-RTWALL-01/43/46
Projek Jalan Bungalio - Longkou Lama - Timbok, Tuaran, Sabah.

BQ-RTWALL-01/44/46
Projek Jalan Bungalio - Longkou Lama - Timbok, Tuaran, Sabah.
BQ-RTWALL-01/45/46
Projek Jalan Bungalio - Longkou Lama - Timbok, Tuaran, Sabah.
BQ-RTWALL-01/46/46